CN103903094B - System and method for bearing capacity evaluation of power grid enterprise - Google Patents

System and method for bearing capacity evaluation of power grid enterprise Download PDF

Info

Publication number
CN103903094B
CN103903094B CN201410121542.4A CN201410121542A CN103903094B CN 103903094 B CN103903094 B CN 103903094B CN 201410121542 A CN201410121542 A CN 201410121542A CN 103903094 B CN103903094 B CN 103903094B
Authority
CN
China
Prior art keywords
index
bearing capacity
enterprise
project
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410121542.4A
Other languages
Chinese (zh)
Other versions
CN103903094A (en
Inventor
李锡成
刘志清
王训杰
石岩
李颖
齐志强
李向奎
谷鸣
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410121542.4A priority Critical patent/CN103903094B/en
Publication of CN103903094A publication Critical patent/CN103903094A/en
Application granted granted Critical
Publication of CN103903094B publication Critical patent/CN103903094B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a system for bearing capacity evaluation of a power grid enterprise and relates to the field of enterprise sustainable development management technical research. The system comprises an enterprise operation and management module used for setting enterprise operation and management indexes and conducting weighting and assignment operation on enterprise level basic data, a standard engineering converting module used for setting standard engineering converting indexes and converting engineering project essential data, a project team management module used for setting project team management indexes and conducting weighting and assignment operation on professional basic data, a bearing capacity evaluation module used for establishing a bearing capacity evaluation model and obtaining a preliminary bearing capacity evaluation result and a bearing capacity evaluation and analysis module used for outputting a final bearing capacity evaluation result. The invention further provides a method for bearing capacity evaluation of the power grid enterprise. The professional ability of an engineering project in bearing area power grid construction of the enterprise is quantitatively analyzed and dynamically evaluated, so that the power grid construction capacity and the professional management level of the enterprise are improved.

Description

A kind of power grid enterprises bearing capacity evaluation system and method
Technical field
The present invention relates to Sustainable Development of Enterprises administrative skill research field, a kind of more particularly, to power grid enterprises bearing capacity is commented Estimate system and method.
Background technology
For meeting socio-economic development demand, accelerate transformation of the mode of economic development, the necessary initiative development of power industry, this is right Power network development level and power grid construction ability propose requirements at the higher level.Build that rack is strong, safe and efficient, green low-carbon, close friend Interactive modernization bulk power grid, is the brand-new problem that power industry development faces.Under these circumstances, power grid construction enterprise is necessary Innovative idea in management, using new theory, new method, lifts power grid construction ability and level.
With to build the transformation of the power network development mode as target for the strong intelligent grid, the personnel of enterprise that electrical network is taken part in building The aspects such as quality, technical merit, professional ability propose strict requirements further.Intelligent grid construction differs from traditional power grid construction, There is the features such as cost of investment is high, technical requirements are tight, difficulty of construction is big, debugging cycle is long, traditional power grid construction business administration More extensive it is difficult to meet the requirement of intelligent grid construction, this is accomplished by power grid construction enterprise and lifts management, to lean management Enterprise changes.
At present, power grid construction number of the enterprise is numerous, distributional region is wider, and power grid construction professional skill differs greatly, enterprise Management level mixed.For ease of the civil coordination in possession, owner's unit is generally followed principle on the spot and is selected to undertake electricity power engineering Undertaking of construction, cause Some Enterprises overload operation because engineering duty quantity is many, in engineering construction safety, quality, progress Etc. aspect bring risk hidden danger.How objectively, dynamically assessment power grid construction enterprise undertakes the ability of engineering project, breaks ground Domain border, reasonable selection high-quality Resources for construction, become important subject.
Domestic existing power grid enterprises appraisement system, the such as index system such as fellow peers' evaluation, credit rating, mostly from enterprise's warp Battalion's management, self-building aspect are evaluated;Existing information system, such as construction team's specialized management, capital construction management control letter Arrying main body (power grid construction enterprise) is not set up necessary association with carrying object (electricity power engineering project) by breath system.Thus, lack Few a set of real bearing capacity evaluation system meeting power grid construction enterprise practical and information system.At present, judge that power grid construction is looked forward to Industry undertakes the ability of engineering project, is to rely on gerentocratic experience mostly, does not have the assessment models of science, lack effective Information Number According to support, it will impact administrative decision.
Content of the invention
In order to overcome the deficiencies in the prior art, the present invention provides a kind of power grid enterprises bearing capacity evaluation system and side Method, takes into full account the feelings such as management mode, scopes of services, indicator-specific statistics cycle and the Standardization Construction of power grid construction enterprise Condition, carries out quantitative analysis and dynamic evaluation by the professional ability that enterprise is undertaken with regional power grid construction project, thus carrying Rise utility power grid constructive ability and specialized management level.
The method being combined using Mathematical Statistics Analysis and expertise, agriculture products implication, weight and assignment, to part Data is standardized conversion and processes, and builds Analysis of Bearing Capacity model, represents power grid construction enterprise in certain time and space model The ability of Grid Construction Project project can independently be undertaken in enclosing simultaneously.
For achieving the above object, the present invention adopts the following technical scheme that:
A kind of power grid enterprises bearing capacity evaluation system, comprising:
Enterprise operation and management module, for setting enterprise operation and management index, and the enterprise level master data to input It is weighted and assignment operation, then export operation result to bearing capacity evaluation module;
Standard engineering converts module, converts index, and the engineering project basic data to input for established standardses engineering Converted, then exported operation result to bearing capacity evaluation module;
Project team management module, for setting item Team Management index, and the professional's master data to input It is weighted and assignment operation, then export operation result to bearing capacity evaluation module;
Bearing capacity evaluation module, for according to enterprise operation and management module, standard engineering conversion module and project team pipe The operation result of reason module input builds bearing capacity evaluation model, and obtains bearing capacity entry evaluation result, then by bearing capacity Entry evaluation result sends to bearing capacity evaluation analysis module;
Bearing capacity evaluation analysis module, for undertaking engineering project history number from history data store module calls enterprise According to, and enterprise is undertaken with engineering project historical data and bearing capacity entry evaluation result is compared, when all participation bearing capacities When the historical data of assessment enterprise is optimum with the difference of entry evaluation result, when that is, the accumulated value of difference is minimum, output is held Load power final assessment result, otherwise readjust enterprise operation and management module and project team management module index weights and its Assignment.
History data store module, undertakes engineering project historical data for storing enterprise.
Further, enterprise operation and management module includes qualification and scope of business unit, human resource management unit, wealth Business asset management unit and plant asset management unit;Described qualification sets all kinds of qualification of enterprise with scope of business unit and its waits Level index, practical business range specifications and the prize-winning situation index of enterprise level;Described human resource management unit sets professional year Age structure index, all kinds of Specialized profession standard of qualification and talent's equal yield density index;Described financial management unit sets flat All total assets index, employment chance rate index and contract amount indexs per capita;Described plant asset management unit sets enterprise and leads to With assets index and professional equipment instrument index.
Further, project team management module includes project leader person's unit and project team personnel's unit;Institute State project leader person's unit and set personnel's Age Indices, professional posts entire period of actual operation index, professional practicing requirements index, equivalent Standard of qualification, professional work engagement index, professional work achievement and prize-winning situation index;Described project team personnel's unit sets Fix the number of workers's Age Indices, professional posts entire period of actual operation index, occupational qualification and professional work engagement index.
Further, standard engineering conversion module includes power transformation engineering project unit and line project project unit;Institute State power transformation engineering project unit and set power transformation essential information index and power transformation multidate information index, described power transformation essential information index Refer to including electric pressure index, construction scale index, wiring patterns index, general arrangement and power distribution equipment index, intelligent Plan Mark and transformer station's area index;Described power transformation multidate information index includes design phase chaining key index, the purchase of goods and materials stage closes Key chain index, construction and acceptance phase chaining key index;Described line project project unit set circuit essential information index and Circuit multidate information index, described circuit essential information index includes electric pressure index, overhead transmission line index, cable run refer to Mark and line corridor environmental index, described circuit multidate information index includes design phase chaining key index, purchase of goods and materials stage Chaining key index, construction and acceptance phase chaining key index.
Present invention also offers a kind of power grid enterprises bearing capacity evaluation method, comprise the steps:
(1) determine bearing capacity evaluation scope, confirm arrying main body and carry object;According to arrying main body, (utility power grid is built If troop) and carry dividing of object (Construction Project), index system is divided into carrying class index and Engineering to refer to by the present invention Mark two parts.Carry the important evidence that class index is that assessment enterprise undertakes standard engineering theoretical duty and actual ability, including enterprise Industry manages level of control and project team level of control;Engineering index is used for distinguishing difference and the structure between concrete engineering project Build bearing capacity model for dynamic analysis, convert index including standard engineering.
(2) enterprise operation and management index and project team level of control are determined, and to enterprise operation and management index and project Team Management's index is respectively provided with weight and assignment;
(3) determine standard engineering conversion index, and setup measures conversion factor is converted to standard engineering;
(4) the index collection master data being determined according to step (2) and (3);Described master data includes enterprise level base Notebook data, professional's master data and engineering project basic data, correspond to the enterprise's warp determining in step (2) and (3) respectively Battalion's level of control, project team level of control and standard engineering conversion index;
(5) the enterprise level base that enterprise operation and management desired value and weighted value gather to step (4) is arranged according to step (2) Notebook data is weighted and assignment operation;Project Team Management desired value is arranged according to step (2) and weighted value is adopted to step (4) Professional's master data of collection is weighted and assignment operation;The conversion factor being arranged according to step (3) is to engineering project base Plinth data carries out converting computing;
(6) operation result according to step (5) builds bearing capacity evaluation model, carries out bearing capacity evaluation measuring and calculating, is held Load power entry evaluation result;
(7) step (6) bearing capacity entry evaluation result is analyzed, exports bearing capacity final assessment result.
Further, step (2) enterprise operation and management index includes qualification and scope of business unit, human resource management Unit, financial management unit and plant asset management unit;Described qualification and scope of business unit include all kinds of money of enterprise Matter and its prize-winning situation index of grading index, practical business range specifications and enterprise level;Described human resource management unit bag Include professional age composition index, all kinds of Specialized profession standard of qualification and talent's equal yield density index;Described financial management list Unit includes average total assets index, employment chance rate index and contract amount index per capita;Described plant asset management unit bag Include enterprise's purpose balance index and professional equipment instrument index
Further, step (2) project team level of control includes project leader person's unit and project team personnel Unit;Described project leader person's unit includes personnel's Age Indices, professional posts entire period of actual operation index, professional practicing requirements refer to Mark, equivalent standard of qualification, professional work engagement index, professional work achievement and prize-winning situation index;Described project team people Member's unit includes personnel's Age Indices, professional posts entire period of actual operation index, occupational qualification and professional work engagement index.
Further, step (3) standard engineering conversion index includes power transformation engineering project unit and line project project Unit;Described power transformation engineering project unit includes power transformation essential information index and power transformation multidate information index, and described power transformation is basic Information index includes electric pressure index, construction scale index, wiring patterns index, general arrangement and power distribution equipment index, intelligence Change scheme index and transformer station's area index;Described power transformation multidate information index includes design phase chaining key index, goods and materials are adopted Purchase stage chaining key index, construction and acceptance phase chaining key index;Described line project project unit includes circuit to be believed substantially Breath index and circuit multidate information index, described circuit essential information index includes electric pressure index, overhead transmission line index, electricity Cable routing indicator and line corridor environmental index, described circuit multidate information index includes design phase chaining key index, goods and materials Acquisition phase chaining key index, construction and acceptance phase chaining key index.
Further, bearing capacity evaluation model is the operation result analysis company standard engineering quantity according to step (5) With company standard team quantity, obtain theory of the firm bearing capacity, enterprise reality bearing capacity and actual undertake in standard engineering number Amount, thus setting up one to represent the coordinate schematic diagram that Enterprise Construction troop undertakes standard engineering ability, as shown in figure 4, and then To bearing capacity entry evaluation result.With the time as transverse axis, with standard engineering quantity as the longitudinal axis, in figure covers three songs to this coordinate diagram Line, three regions.Wherein, dotted line represents construction team's theoretical maximum bearing capacity, and it is point professional posts statistician's quantity, root Draw theoretical standard team quantity according to " wooden pail effect ";Solid line represents construction team's reality bearing capacity, and it is a point professional posts meter Calculate profile, after additional enterprise management Index Influence, real standard team quantity is drawn according to " wooden pail effect ";Broken line Represent construction team is actual undertake in standard engineering quantity, it be practical engineering project is converted as standard engineering project after, By monthly or season statistics standard engineering quantity.Dotted region represents place of safety, the standard engineering number that is, construction team undertakes Amount is within the scope of its bearing capacity;Hatched example areas represent alert zone, and the standard engineering quantity that is, construction team undertakes has exceeded it The limit of power of assigned personnel, but have enough personnel can undertake, engineering safety, quality and Schedule schema should be watched out at any time;Net Shape region representation hazardous area, i.e. construction team's overload operation, do not have enough personnel to set up standard team and exceed to undertake Standard engineering is it is proposed that implement engineering duty shunting.
Further, when step (7) is analyzed to bearing capacity entry evaluation result, transfers enterprise and undertake engineering project Historical data, and enterprise is undertaken with engineering project historical data and bearing capacity entry evaluation result is compared, when all participations When the difference of the historical data of bearing capacity evaluation enterprise and entry evaluation result is optimum, when that is, the accumulated value of difference is minimum, Output bearing capacity final assessment result, otherwise readjusts the index power of enterprise operation and management module and project team management module Weight and its assignment.
Beneficial effect: (1) present invention application bearing capacity control theory, it is different from the synthesis traditional, subjective factor is dominated Arrying main body is necessarily associated with carrying object foundation by objective information data, presents by assessment indicator system and method Bearing capacity evaluation system that is a set of effective and meeting power grid construction enterprise practical.(2) Bearing Capacity Theory is used for ecosystem System, actually rare in enterprise level research bearing capacity.Bearing Capacity Theory is applied to power grid construction business administration by the present invention, wound New structure bearing capacity evaluation system, guiding power grid construction enterprise is objective, accurate, rational assessment enterprise itself undertakes power grid construction The risk of project and ability, to promotion Sustainable Development of Enterprises, strengthen core competitiveness and play positive impetus.
Brief description
A kind of power grid enterprises bearing capacity evaluation system structure diagram that Fig. 1 provides for the present invention.
Fig. 2 is to carry class evaluation index dendrogram.
Fig. 3 is Engineering evaluation index dendrogram.
Fig. 4 is bearing capacity evaluation model schematic.
Fig. 5 is the performance graph value schematic diagram of design companies.
Fig. 6 is certain design companies circuit design bearing capacity schematic diagram in 2013.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention is further described.
As shown in figure 1, a kind of power grid enterprises bearing capacity evaluation system that the present invention provides, comprising:
Enterprise operation and management module, for setting enterprise operation and management index, and the enterprise level master data to input It is weighted and assignment operation, then export operation result to bearing capacity evaluation module;
Standard engineering converts module, converts index, and the engineering project basic data to input for established standardses engineering Converted, then exported operation result to bearing capacity evaluation module;
Project team management module, for setting item Team Management index, and the professional's master data to input It is weighted and assignment operation, then export operation result to bearing capacity evaluation module;
Bearing capacity evaluation module, for according to enterprise operation and management module, standard engineering conversion module and project team pipe The operation result of reason module input builds bearing capacity evaluation model, and obtains bearing capacity entry evaluation result, then by bearing capacity Entry evaluation result sends to bearing capacity evaluation analysis module;
Bearing capacity evaluation analysis module, for undertaking engineering project history number from history data store module calls enterprise According to, and enterprise is undertaken with engineering project historical data and bearing capacity entry evaluation result is compared, when enterprise undertakes engineering item When the difference of mesh historical data and bearing capacity entry evaluation result is optimum, when that is, the accumulated value of difference is minimum, exports and carry Power final assessment result, otherwise readjusts index weights and its tax of enterprise operation and management module and project team management module Value.
The present invention according to arrying main body (utility power grid construction team) and carries dividing of object (Construction Project), will refer to Mark system is divided into carrying class index and Engineering index two parts.Carrying class index is that assessment enterprise undertakes standard engineering theory energy Power and the important evidence of actual ability, are set by enterprise operation and management module and project team management module, as shown in Fig. 2 holding Carry class index to divide according to " two-layer, three-level ", totally 27, wherein, enterprise operation and management module arranges 15, and project team manages Module arranges 12;The difference that Engineering index is used for distinguishing between concrete engineering project dynamically analyzes mould with building bearing capacity Type, by standard engineering conversion module set, as shown in figure 3, Engineering index is according to professional classification, be divided into power transformation engineering project and Line project project;According to purpose classification, it is divided into essential information and multidate information, essential information is used for Engineering Standardization and converts, Multidate information is used for building bearing capacity model for dynamic analysis.
The present invention also provides a kind of power grid enterprises bearing capacity evaluation method, comprises the steps:
(1) determine bearing capacity evaluation scope, confirm arrying main body and carry object;This preferred embodiment arrying main body is tool There are the design companies of national registration qualification, carrying object is 35~220 kv grid construction projects.
(2) enterprise operation and management index and project team level of control are determined, and to enterprise operation and management index and project Team Management's index is respectively provided with weight and assignment.Specifically, it is the index selecting in index directory tree shown in Fig. 2, according to Index definition sets index set, weight sets value preset collection, calculates management desired value (eiv) and the project team of this design companies Level of control collection (tig).
The present invention is respectively adopted different index assignment when entering row index assignment it is contemplated that different index actual conditions Method, as follows:
(1) Statistics Method
1. use mathematic expectaion agriculture products assignment
Set expectation proportion as, actual proportion is, then
This formula represents the layout closer to expectation proportion for the actual specific gravity, and index assignment is bigger, more levels off to 1.
There are personnel's age composition, professional equipment instrument etc. with the index of the method assignment.
2. use normal distribution agriculture products assignment
If achievement data meets normal distribution, application method of percentiles calculates 95% reference range.Within the scope of being in , index is entered as 1;It is in outside scope, index is entered as 0.6.
There are average total assets, employment chance rate, average annual contract amount etc. with the index of the method assignment.
3. use Poisson distribution agriculture products assignment
If achievement data meets Poisson distribution, this data occur probability be located at distribution curve 90% position and more than, refer to Mark is entered as 0.8;The probability that data occurs is located between distribution curve 90% and 10%, and index is entered as 1;The probability that data occurs Positioned at distribution curve 10% and below, index is entered as 0.6.
There is professional work engagement etc. with the index of the method assignment.
(2) method of expertise
1. set up index weights collection
According to method of expertise agriculture products weight sets.Method of expertise has certain subjectivity and randomness, in order to The objectivity of assessment result and accuracy, need subjective weight to be modified to objective weight, because comentropy is probabilistic Tolerance, according to the degree of variation of each index weights, using comentropy correction subjectivity weight, thus obtain index weights collection iw= (k1, k2..., kn).
2. agriculture products assignment principle
Set the unified dimension that a reference value " 1 " is index assignment, this dimension represents sets up standard team pipe by undertaking of construction One standard engineering project (standard engineering divides power transformation engineering and line project) of reason.Index assignment is according to expertise on " 1 " Lower setting, is modified by system synthesis feedback of the information.
(3) perunit value method
The perunit value commonly used in Power System Analysis method is applied in standard engineering conversion, innovates translation method.
The workload that actual value puts on concrete engineering for professional team, a reference value is standard team in standard engineering The workload putting into.Design companies are with reference to prospective design work day quota statistic perunit value;Construction and Supervision Enterprise are made with reference to engineering Valency (building installation engineering is taken) adjusts perunit value.
Determine the index in module shown in Fig. 2 according to said method, index set, weight sets value preset are set according to index definition Collection, calculates management desired value (eiv) and project team level of control collection (tig) of this design companies.
Qualification and scope of business index set={ enterprise level is won a prize feelings for all kinds of qualifications and its grade, practical business scope Condition };Weight sets={ 30%, 50%, 20% };Value collection={ 0.85,1,1 }.
Human resource management index set={ professional age composition, professional practicing requirements, talent's equal yield density };Weight sets= { 20%, 40%, 40% };Value collection={ 0.815,0.5,0.897 }.
Financial management index set={ average total assets, employment chance rate, contract amount per capita };Weight sets=25%, 40%, 35% };Value collection={ 1,0.6,0.6 }.
Plant asset management index set={ enterprise's purpose balance, professional equipment instrument };Weight sets={ 30%, 70% };Value collection= { 0.941,0.875 }.
Enterprise operation and management index set={ qualification and the scope of business, human resource management, financial management, asset of equipments Management }, weight sets={ 30%, 45%, 10%, 15% }, value collection={ 0.955,0.722,0.7,0.895 }.
Then enterprise operation and management desired value.
Project leader's index set=personnel's age, the professional posts entire period of actual operation, occupational qualification, equivalent qualification (ability), Professional work engagement, professional work achievement (prize-winning situation) };Weight sets={ 5%, 10%, 15%, 25%, 25%, 20% };This enterprise The value collection of Pre-Engineering Design of Long Distance chief engineer ldc1={ 1,1,0.72,1,0.8,0.6 }.
Then
Draw circuit design chief engineer's number and index set, { nop1 ldc1 }={ 1 0.828 } successively
Project team personnel's index set={ personnel's age, the professional posts entire period of actual operation, occupational qualification, professional work puts into Degree };Weight sets={ 15%, 30%, 20%, 35% };The value collection of this enterprise line structure design lad1={ 1,0.6,0.82,1 }.
Then,
Draw line construction design number and index set successively, { nop2 lad1, lad2, lad3 }=3 0.774, 0.615,0.615 };Circuit electric designer number and index set, { nop3 led1, led2, led3, led4 }=4 0.794, 0.868,0.709,0.615 }
Then { circuit sets overall performane value, electrical design desired value, design indices to project team level of control collection tig= Value }={ 0.828 × 3,0.794+0.868+0.709+0.615,0.774+0.615+0.615 }={ 2.484,2.986,2.004 }
The design companies line project standard team that this preferred embodiment sets comprises circuit design chief engineer, electrically sets The professional posts such as meter, structure design, communication scheme, cost person, standard team's quantity is shown in Table 3.Wherein, design chief engineer Cheng Shi value 1/3, represents that 1 personnel can undertake 3 standard engineerings simultaneously;Line project need 1 electrical design personnel, 1 Structure design personnel;Communication scheme, cost person, Surveyor value 1/5 respectively, represents that 1 personnel can undertake 5 standard works simultaneously Journey;Other specialty requirements at least configure 1 people.The key posts such as electrical design, structure design do not allow part-time;Other posies allow Possess this project of corresponding qualification or part-time across project personnel, the measuring and calculating of standard team can not be entered.
(3) determine standard engineering conversion index, and setup measures conversion factor is converted to standard engineering;
Pre-Engineering Design of Long Distance still to weigh the workload of design objective using Electric Design work day quota.Using two-dimemsional number According to analysis method, different majors (electrically, structure, communication etc.) designer adjusts and designs unit length circuit institute under specified conditions The work day number paid, through accumulation calculating, obtains design objective workload.Changed by the ratio between design objective workload Calculate, obtain line standard engineering design conversion factor.Overhead transmission line and the cable run design conversion table of comparisons are shown in Table 1 and table respectively 2.
On the basis of standard engineering conversion is built upon unit line length, it is long that actual track engineering has different circuits Degree, it may have different built on stilts, cable run accountings.Overhead transmission line comprises newly-built circuit and existing circuit stringing;Cable run Comprise newly-built circuit and existing passage cable laying.
Thus, Practical Project conversion factor=newly-built overhead transmission line reduced value × overhead transmission line accounting+newly-built cable run folding Calculation value × cable run accounting.
Wherein, newly-built overhead transmission line reduced value=overhead transmission line length assignment × standard engineering conversion factor;Newly-built cable Road reduced value=cable run length assignment × standard engineering conversion factor.
Definition overhead transmission line length assignment: less than be equal to 15 kilometers=0.6;It is less than or equal to 25 kilometers=0.8 more than 15 kilometers; It is less than or equal to 35 kilometers=1 more than 25 kilometers;More than 35 kilometers=1.2.
Definition cable run length assignment: less than be equal to 5 kilometers=0.8;It is less than or equal to 15 kilometers=1 more than 5 kilometers;It is more than 15 kilometers=1.2.
Taking certain 220 KV new construction design as a example
6.3 kilometers of total track length.Wherein, 0.3 kilometer of newly-built overhead transmission line, accounts for total track length 4.8%;Newly-built cable run 6 Kilometer, accounts for total track length 84.8%.Overhead transmission line 100% is in level land residential block;Cable run 95.2% is carried out using cable tunnel Cable laying.
Newly-built overhead transmission line reduced value=0.6 × 1.1=0.66.
Newly-built cable run reduced value=1 × 1=1.
Practical Project conversion factor=0.66 × 4.8%+1 × 95.2%=0.98.
This engineering is 0.98 with the design conversion factor of standard engineering, and that is, the design efforts would of this engineering is equivalent to 0.98 The design efforts would of standard engineering.
(4) the index collection master data being determined according to step (2) and (3);Described master data includes enterprise level base Notebook data, professional's master data and engineering project basic data, correspond to the enterprise's warp determining in step (2) and (3) respectively Battalion's level of control, project team level of control and standard engineering conversion index;
(5) enterprise level that enterprise operation and management desired value and weighted value gather to step (4) is arranged according to step (2) Master data is weighted and assignment operation;Project Team Management desired value and weighted value are arranged to step (4) according to step (2) Professional's master data of collection is weighted and assignment operation;The conversion factor being arranged according to step (3) is to engineering project Basic data carries out converting computing;
(6) operation result according to step (5) builds bearing capacity evaluation model, carries out bearing capacity evaluation measuring and calculating, is held Load power entry evaluation result;
Bearing capacity evaluation model is one and represents the coordinate schematic diagram (Fig. 4) that construction team undertakes standard engineering ability, sits Mark on a map with the time as transverse axis, with standard engineering quantity as the longitudinal axis, in figure covers three curves, three regions.Wherein, dotted line represents Construction team's theoretical maximum bearing capacity, it is point professional posts statistician's quantity, draws theoretical standard according to " wooden pail effect " Team's quantity;Solid line represents construction team's reality bearing capacity, and it is that point professional posts calculate profile, additional enterprise operation pipe After reason Index Influence, real standard team quantity is drawn according to " wooden pail effect ";During broken line represents that construction team is actual and undertakes Standard engineering quantity, it be practical engineering project is converted as standard engineering project after, by the standard work of monthly or season statistics Number of passes amount.Dotted region represents place of safety, and the standard engineering quantity that is, construction team undertakes is within the scope of its bearing capacity;Oblique line Region representation alert zone, the standard engineering quantity that is, construction team undertakes has exceeded the limit of power of its assigned personnel, but has foot Enough personnel can undertake, and should watch out for engineering safety, quality and Schedule schema at any time;Mesh-like area represents hazardous area, that is, build team 5 overload operations, do not have enough personnel to set up standard team to undertake the standard engineering exceeding it is proposed that implementing engineering duty Shunting.
By the comparative analysis to coordinate curve, export undertaking of construction bearing capacity evaluation conclusion.Fully with reference to undertaking of construction Undertake the historical data of engineering project, when assessment result and real data deviation are larger, suitably adjustment index weights and its tax Value, thus assuming scientific and reasonable performance analysis plot, provides accurate bearing capacity evaluation for undertaking of construction.
{ circuit sets total number of persons, electrical design number, structure design people to this example Plays team quantity collection nop= Number }={ 1 × 3,4 × 1,3 × 1 }
Then, standard engineering theory bearing capacity=min { 3,4,3 }=3
Standard team's index set tig={ circuit sets overall performane value, electrical design desired value, design indices value }= { 0.828 × 3,0.794+0.868+0.709+0.615,0.774+0.615+0.615 }={ 2.484,2.986,2.004 }
Then, standard engineering reality bearing capacity=min { 2.484,2.986,2.004 } × 0.815=1.633
Actual carrying capacity performance graph is to convert actual track engineering in standard circuit engineering, enters according to timing node The cumulative statistics of row, with reference to Fig. 5.Taking in August, 2013 part as a example, the engineering simultaneously undertaking has b, c, f engineering, and its standard engineering is converted Value is respectively 1.83,0.98,0.98, the cumulative standard engineering amount 3.79 drawing this month.
Pre-Engineering Design of Long Distance task is counted in units of monthly, this enterprise actual line standard work undertaking in 2013 Number of passes quantity set={ 1.83,1.83,1.64,1.78,1.78,0.87,2.7,3.79,2.81,2.1,1.12,1.99 }
(7) step (6) bearing capacity entry evaluation result is analyzed, exports bearing capacity final assessment result.
The theoretical maximum that this design companies undertakes line standard engineering design is 3, and reality is worth for 1.633, actual bearer Power performance graph average is 2.02.The line standard engineering design quantity that this enterprise's August part undertakes reaches 3.79, beyond theory Big value, enters cross hatch hazardous area, the overload operation within these time periods of this enterprise is described, there is certain risk hidden danger, As shown in Figure 6.
Thus analyze, take targetedly measure, on the one hand, in the design objective heavy stage, by working extra shifts or extra hours, mending Fill the modes such as people power and strengthen short-term designed capacity;On the other hand, short slab, such as this design companies circuit are searched by analysis On structure design personnel, personnel amount and personnel ability all have deficiency to the short slab that design team is set up, and are set by reinforcement structure Business contest, exchange and the training of meter specialty, makes up short slab, lifts global design ability.
The above be only the preferred embodiment of the present invention it should be pointed out that: for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (8)

1. a kind of power grid enterprises bearing capacity evaluation system is it is characterised in that include:
Enterprise operation and management module, for setting enterprise operation and management index, and is carried out to the enterprise level master data of input Weighted sum assignment is processed, and then exports result to bearing capacity evaluation module;
Standard engineering converts module, converts index for established standardses engineering, and the engineering project basic data of input is carried out Conversion is processed, and then exports result to bearing capacity evaluation module;
Project team management module, for setting item Team Management index, and is carried out to professional's master data of input Weighted sum assignment is processed, and then exports result to bearing capacity evaluation module;
Bearing capacity evaluation module, for according to enterprise operation and management module, standard engineering conversion module and project team management mould The result of block input builds bearing capacity evaluation model, and obtains bearing capacity entry evaluation result, then that bearing capacity is preliminary Assessment result sends to bearing capacity evaluation analysis module;
Bearing capacity evaluation analysis module, for undertaking engineering project historical data from history data store module calls enterprise, and Enterprise is undertaken engineering project historical data and bearing capacity entry evaluation result is compared, when enterprise undertakes engineering project history When the difference of data and bearing capacity entry evaluation result is optimum, when that is, the accumulated value of difference is minimum, export bearing capacity final review Estimate result, otherwise readjust index weights and its assignment of enterprise operation and management module and project team management module;
History data store module, undertakes engineering project historical data for storing enterprise;
Described standard engineering conversion module includes power transformation engineering project unit and line project project unit;Described power transformation engineering item Mesh unit sets power transformation essential information index and power transformation multidate information index, and described power transformation essential information index includes electric pressure Index, construction scale index, wiring patterns index, general arrangement and power distribution equipment index, intelligent Plan index and transformer station face Long-pending index;Described power transformation multidate information index includes design phase chaining key index, purchase of goods and materials stage chaining key index, construction And acceptance phase chaining key index;Described line project project unit sets circuit essential information index and circuit multidate information refers to Mark, described circuit essential information index includes electric pressure index, overhead transmission line index, cable run index and line corridor ring Border index, described circuit multidate information index includes design phase chaining key index, purchase of goods and materials stage chaining key index, construction And acceptance phase chaining key index.
2. a kind of power grid enterprises bearing capacity evaluation system according to claim 1 it is characterised in that: described enterprise operation pipe Reason module includes qualification and scope of business unit, human resource management unit, financial management unit and plant asset management Unit;Described qualification sets all kinds of qualification of enterprise and its grading index, practical business range specifications and enterprise with scope of business unit Industry aspect is won a prize situation index;Described human resource management unit sets professional age composition index, all kinds of Specialized profession qualification Index and talent's equal yield density index;Described financial management unit sets average total assets index, employment chance rate refers to Mark and per capita contract amount index;Described plant asset management unit sets enterprise's purpose balance index and professional equipment instrument refers to Mark.
3. a kind of power grid enterprises bearing capacity evaluation system according to claim 1 it is characterised in that: described project team pipe Reason module includes project leader person's unit and project team personnel's unit;Described project leader person's unit sets personnel's age Index, professional posts entire period of actual operation index, professional practicing requirements index, equivalent standard of qualification, professional work engagement index, specially Industry work achievement and prize-winning situation index;Described project team personnel's unit sets personnel's Age Indices, professional posts working year Limit index, occupational qualification and professional work engagement index.
4. a kind of power grid enterprises bearing capacity evaluation method is it is characterised in that comprise the steps:
(1) determine bearing capacity evaluation scope, confirm arrying main body and carry object;
(2) enterprise operation and management index and project team level of control are determined, and to enterprise operation and management index and project team Level of control is respectively provided with weight and assignment;
(3) determine standard engineering conversion index, and setup measures conversion factor is converted to standard engineering;
(4) the index collection master data being determined according to step (2) and (3);Described master data includes enterprise level basic number According to, professional's master data and engineering project basic data, correspond to enterprise operation pipe of determination in step (2) and (3) respectively Reason index, project team level of control and standard engineering conversion index;
(5) the enterprise level basic number that enterprise operation and management desired value and weighted value gather to step (4) is arranged according to step (2) According to being weighted and assignment operation;According to step (2) setting project Team Management desired value and weighted value, step (4) is gathered Professional's master data is weighted and assignment operation;The conversion factor being arranged according to step (3) is to engineering project basis number According to carry out convert computing;
(6) operation result according to step (5) builds bearing capacity evaluation model, carries out bearing capacity evaluation measuring and calculating, obtains bearing capacity Entry evaluation result;
(7) undertake engineering project historical data to step (6) bearing capacity entry evaluation result with enterprise to be analyzed, output Bearing capacity final assessment result;
Described step (3) standard engineering conversion index includes power transformation engineering project unit and line project project unit;Described change Electrical engineering project unit includes power transformation essential information index and power transformation multidate information index, and described power transformation essential information index includes Electric pressure index, construction scale index, wiring patterns index, general arrangement and power distribution equipment index, intelligent Plan index and Transformer station's area index;Described power transformation multidate information index includes design phase chaining key index, purchase of goods and materials stage chaining key Index, construction and acceptance phase chaining key index;Described line project project unit includes circuit essential information index and circuit Multidate information index, described circuit essential information index include electric pressure index, overhead transmission line index, cable run index and Line corridor environmental index, described circuit multidate information index includes design phase chaining key index, purchase of goods and materials stage key Chain index, construction and acceptance phase chaining key index.
5. a kind of power grid enterprises bearing capacity evaluation method according to claim 4 it is characterised in that: described step (2) enterprise Industry is managed level of control and is included qualification and scope of business unit, human resource management unit, financial management unit and equipment Asset management unit;Described qualification and scope of business unit include all kinds of qualification of enterprise and its grading index, practical business scope Index and the prize-winning situation index of enterprise level;Described human resource management unit includes professional age composition index, all kinds of specialty Occupational qualification index and talent's equal yield density index;Described financial management unit includes average total assets index, per capita Profit margin index and per capita contract amount index;Described plant asset management unit includes enterprise's purpose balance index and professional equipment Instrument index
6. a kind of power grid enterprises bearing capacity evaluation method according to claim 4 it is characterised in that: described step (2) item Mesh Team Management index includes project leader person's unit and project team personnel's unit;Described project leader person's unit includes Personnel's Age Indices, professional posts entire period of actual operation index, professional practicing requirements index, equivalent standard of qualification, professional work put into Degree index, professional work achievement and prize-winning situation index;Described project team personnel's unit includes personnel's Age Indices, professional hilllock Position entire period of actual operation index, occupational qualification and professional work engagement index.
7. a kind of power grid enterprises bearing capacity evaluation method according to claim 4 it is characterised in that: described bearing capacity evaluation Model is the operation result analysis company standard engineering quantity and company standard team quantity according to step (5), obtains enterprise's reason By bearing capacity, enterprise's reality bearing capacity and actual undertake in standard engineering quantity, and then obtain bearing capacity entry evaluation result.
8. a kind of power grid enterprises bearing capacity evaluation method according to claim 4 it is characterised in that: described step (7) is right When bearing capacity entry evaluation result and enterprise undertake engineering project historical data and be analyzed, enterprise undertakes engineering project and goes through When the difference of history data and bearing capacity entry evaluation result is optimum, when that is, the accumulated value of difference is minimum, export bearing capacity Whole assessment result, otherwise readjusts index weights and its assignment of enterprise operation and management module and project team management module.
CN201410121542.4A 2014-03-28 2014-03-28 System and method for bearing capacity evaluation of power grid enterprise Active CN103903094B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410121542.4A CN103903094B (en) 2014-03-28 2014-03-28 System and method for bearing capacity evaluation of power grid enterprise

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410121542.4A CN103903094B (en) 2014-03-28 2014-03-28 System and method for bearing capacity evaluation of power grid enterprise

Publications (2)

Publication Number Publication Date
CN103903094A CN103903094A (en) 2014-07-02
CN103903094B true CN103903094B (en) 2017-01-18

Family

ID=50994404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410121542.4A Active CN103903094B (en) 2014-03-28 2014-03-28 System and method for bearing capacity evaluation of power grid enterprise

Country Status (1)

Country Link
CN (1) CN103903094B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108764639A (en) * 2018-04-26 2018-11-06 国网浙江省电力有限公司经济技术研究院 Project of transmitting and converting electricity construction cost assessment method based on space-time big data

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104680432A (en) * 2015-03-24 2015-06-03 国家电网公司 Method and device for determining service bearing condition of dispatching speciality
CN104794234B (en) * 2015-05-06 2019-02-15 华北电力大学 Data processing method and device for fellow peers' evaluation
CN106779401A (en) * 2016-12-13 2017-05-31 北京恒华龙信数据科技有限公司 Power construction troop service bearer power analysis method and system based on big data
CN107093018A (en) * 2017-04-20 2017-08-25 湖北电信工程有限公司 Communication engineering project information method for visualizing and device based on health model
CN107274071A (en) * 2017-05-24 2017-10-20 华为技术有限公司 Set up the method and device of team
CN107527157A (en) * 2017-09-19 2017-12-29 国网四川省电力公司 A kind of dynamic digitalized evaluation method of Electric Power Construction Enterprises production capacity
CN107784603A (en) * 2017-09-27 2018-03-09 国家电网公司信息通信分公司 A kind of intellectual property operation system and method
CN110443508A (en) * 2019-08-07 2019-11-12 山东贵望电子科技有限公司 A kind of Electric Power Project Management system
CN111652517A (en) * 2020-06-05 2020-09-11 广东电网有限责任公司 Quantitative evaluation method and device for engineering bearing capacity
CN111882240A (en) * 2020-08-05 2020-11-03 湖北安源安全环保科技有限公司 Basic power supply enterprise service bearing capacity evaluation system and method
CN113780731A (en) * 2021-08-04 2021-12-10 周浩 Digital twin management and evaluation system
CN114595976A (en) * 2022-03-11 2022-06-07 国网福建省电力有限公司 Design unit bearing capacity analysis and evaluation system
CN116402345B (en) * 2023-03-31 2024-05-28 华能信息技术有限公司 Safety alarm management method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440401A (en) * 2013-07-31 2013-12-11 南京南瑞集团公司 Risk quantitative assessment method for emergency control measure for improving power transmission capacity of power grid

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040158417A1 (en) * 2002-11-06 2004-08-12 Bonet Antonio Trias System and method for monitoring and managing electrical power transmission and distribution networks

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440401A (en) * 2013-07-31 2013-12-11 南京南瑞集团公司 Risk quantitative assessment method for emergency control measure for improving power transmission capacity of power grid

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
班组安全承载能力分析系统开发与应用;吴霆锋;《科技创新与应用》;20140118(第2期);全文 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108764639A (en) * 2018-04-26 2018-11-06 国网浙江省电力有限公司经济技术研究院 Project of transmitting and converting electricity construction cost assessment method based on space-time big data

Also Published As

Publication number Publication date
CN103903094A (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN103903094B (en) System and method for bearing capacity evaluation of power grid enterprise
Ribas et al. Multi-criteria risk assessment: Case study of a large hydroelectric project
CN107977789A (en) Based on the audit work method under big data information
CN109428344B (en) Multi-power-supply investment planning method and device comprising wind power plant
CN106780140A (en) Electric power credit assessment method based on big data
CN102930482A (en) Investment effect evaluation method for county power distribution networks
CN105930931A (en) Electric power engineering cost management method
CN102063563B (en) Network-province-local integrative bus load predicting method
CN106127377A (en) A kind of intelligent grid multiple-energy-source comprehensive coordination level evaluation method
CN106940833A (en) A kind of power grid enterprises' sale of electricity side methods of risk assessment based on fuzzy number and improved AHP method
CN106991524A (en) A kind of platform area line loss per unit predictor method
CN108229787A (en) Power industry field operation methods of risk assessment and system based on big data
CN106228286A (en) A kind of data analysing method for the assessment of artificial customer service work quality
CN107909253A (en) Intelligent distribution network scheduling controlling effect evaluation method based on interval based AHP
CN103544537B (en) Based on the cumulative short-term load forecasting method of comprehensive subnet of reliability forecasting assessment
CN106952047A (en) A kind of data processing method and device for electric grid investment benefit
CN108631295A (en) The online accurate calculation system of theory wire loss of measured data
CN105469194A (en) Power distribution network main equipment operation efficiency evaluation method based on load duration curve
Shafiei Kaleibari et al. A framework for performance evaluation of energy supply chain by a compatible network data envelopment analysis model
CN106934559A (en) A kind of assessment indicator system for water project management modernization
CN108038615A (en) A kind of colliery sector Post Value appraisal procedure
CN106529769A (en) Power grid planning method based on comprehensive assessment
CN110309945A (en) Power distribution station project optimizing evaluation method based on G1- entropy assessment
CN109272419A (en) A kind of power distribution network formula investing methods of comparison and selection based on optimal solution
CN108510200A (en) The computational methods and device of data assets operation benefits based on Life cycle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant