CN103869762A - Control system for stone raw material supply - Google Patents

Control system for stone raw material supply Download PDF

Info

Publication number
CN103869762A
CN103869762A CN201210541761.9A CN201210541761A CN103869762A CN 103869762 A CN103869762 A CN 103869762A CN 201210541761 A CN201210541761 A CN 201210541761A CN 103869762 A CN103869762 A CN 103869762A
Authority
CN
China
Prior art keywords
information
raw material
unit
data
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210541761.9A
Other languages
Chinese (zh)
Other versions
CN103869762B (en
Inventor
冯增萍
黄能展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiashan Lianrui Electronic Technology Co., Ltd
Original Assignee
LIANG SANMEI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIANG SANMEI filed Critical LIANG SANMEI
Priority to CN201210541761.9A priority Critical patent/CN103869762B/en
Publication of CN103869762A publication Critical patent/CN103869762A/en
Application granted granted Critical
Publication of CN103869762B publication Critical patent/CN103869762B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/40Minimising material used in manufacturing processes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a control system for stone raw material supply. The control system comprises a data storage module for storing process formula, corresponding product information, raw material information and historical data, a central processing module for receiving information of raw materials to-be-put into production, comparing the raw material information with the data of the data storage module to obtain an optimum process formula, and a man-machine interaction module for providing and/or displaying the data information processed by the central processing module and inputting the raw material information to the central processing module. The control system has relatively high data processing capacity and storage function, and has high reliability. With the control system, investment of manpower and material resources can be reduced; work efficiency can be increased; the quality of products can be guaranteed stable; and the product cost can be kept in the lowest level.

Description

A kind of stone raw material supply control system
Technical field
The present invention relates to stone material production field, relate in particular to a kind of stone raw material supply control system.
Background technology
Along with expanding economy, the construction in house, street is also in vigorous growth, and society is also increasing to the demand of stone material, and each artificial stone's of enterprise kind and turnout strengthen gradually simultaneously.Artificial stone's raw material generally comprises stone flour, sand, silica flour, metallurgical industry mine tailing, industrial residue and active material etc., some of them raw material is owing to forming the equal reason of age difference, region and cause the fluctuation of mineral composition, size composition, chemical composition and other physicochemical property, in production, formula for a product and technological parameter need to constantly be adjusted, and cause product quality fluctuation very large.
For example large-scale artificial stone enterprise, the handling capacity of every day is all sizable, due to the instability of raw materials for production, the allotment that needs a large amount of technician to fill a prescription, guarantee product quality, otherwise, just likely cause order to complete because of the unstable of product quality, thereby affect the prestige of enterprise.Cause and consume a large amount of manpower and materials.Thus, be necessary to provide a kind of standardization raw material supply control system, to increase work efficiency and to ensure the stable of product quality.
Summary of the invention
Embodiment of the present invention technical matters to be solved is, a kind of stone raw material supply control system is provided.Can obviously reduce the input of manpower and materials, increase work efficiency and ensure the stable of artificial stone's product quality.
In order to solve the problems of the technologies described above, the embodiment of the present invention provides a kind of stone raw material supply control system, comprising: for the data memory module of storage technology formula and corresponding product information, raw material information and historical data;
For receiving raw material information to be put into production, the data of described raw material information and described data memory module are contrasted, obtain the central processing module of optimised process formula;
For providing and/or showing through the data message of described central processing module processing and input the human-computer interaction module of described raw material information to described central processing module.
Preferably, described central processing module comprises:
Be used for preserving described raw material information, optimum formula and corresponding product information, raw material information sent to the storage unit of described data memory module;
For the data of the raw material information of described storage unit and described data memory module are contrasted to processing, draw the information process unit of optimised process batching data;
Send to the push unit of described human-computer interaction module for the optimised process formula that described information process unit is sent.
Preferably, described information process unit comprises:
For the contrast unit that the data of described raw material information and described data memory module are contrasted;
For the comparative information of described contrast unit is judged, form the judging unit of optimised process formula according to judged result.
Preferably, described data memory module comprises:
For storing the first storage unit of predefined technique ingredient information and corresponding product information;
For second storage unit of storing predefined raw material information;
For the 3rd storage unit of store historical data.
Preferably, described historical data comprises the historical technical recipe using and corresponding product information, raw material information.
Preferably, described the first storage unit and described information process unit form the first mapping relations;
Described the second storage unit and described information process unit form the second mapping relations;
Described the 3rd storage unit and described information process unit form the 3rd mapping relations.
Preferably, described human-computer interaction module comprises:
Be used for providing Query Information, show the display unit through the data message of described central processing module processing;
For the query unit of data query information;
For inputting the input block of raw material information and solicited message.
Preferably, described query unit comprises:
For inquiring about as required the technical recipe query unit of technical recipe and corresponding product information;
For inquiring about as required the material performance query unit of the information of raw material;
Be used for the inquiry of historical data unit of enquiry of historical data as required.
Implement the embodiment of the present invention, there is following beneficial effect:
A kind of stone raw material supply of the present invention control system comprises human-computer interaction module, central processing module and data memory module, technician only need input the physicochemical property of each raw material that will put into production, and central processing module of the present invention calculates the physicochemical property of optimised process batching data and corresponding product fast according to input message.Avoid a large amount of technician that each raw material consumption is calculated and prepared burden one by one, ensured the stable of product quality.
The first storage unit in central processing module of the present invention in information process unit and data memory module, the second storage unit, the 3rd storage unit form respectively mapping relations, repeatedly contrast and calculate according to the storage information in each storage unit the optimised process formula of confirming.Ensure that the corresponding product physical arrangement of optimum formula and chemical property reach required standard, and ensure that this cost of products is in floor level.
The present invention has stronger data-handling capacity and memory function, and reliability is high.Adopt the present invention can reduce the input of manpower and materials, increase work efficiency, ensure stablizing and making cost of products in floor level of product quality simultaneously.
Brief description of the drawings
Fig. 1 is the structural representation of control system of the present invention;
Fig. 2 is the structural representation of the central processing module of control system of the present invention;
Fig. 3 is the structural representation of the human-computer interaction module of control system of the present invention.
Embodiment
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing, the present invention is described in further detail.
With reference to Fig. 1, Fig. 2 and Fig. 3,, the structural representation of stone raw material supply control system 1 of the present invention, comprising: for the data memory module 13 of storage technology formula and corresponding product information, raw material information and historical data; For receiving raw material information to be put into production, the data of described raw material information and described data memory module 13 are contrasted, obtain the central processing module 12 of optimised process formula.Be used for providing and/or showing the data message of processing through described central processing module 12 and human-computer interaction module 11 from described raw material information to described central processing module 12 that input;
The present invention can be widely used in the production of various stone materials, calculates fast the physicochemical property of optimised process batching data and corresponding product according to the physical composition of each batch of raw materials for production and chemical property.Avoid a large amount of technician to prepare burden, ensured the stable of product quality.
Described central processing module 12 comprises: for preserving described raw material information, optimum formula and corresponding product information, raw material information are sent to the storage unit 121 of described data memory module 13; For the data of the raw material information of described storage unit 121 and described data memory module 13 are contrasted to processing, draw the information process unit 122 of optimised process batching data; Send to the push unit 123 of described human-computer interaction module 11 for the optimised process formula that described information process unit 122 is sent.
Described central processing module 12 make will for the production of the information of raw material especially physico-chemical property and technical recipe information and corresponding product information, historical data compare analysis, obtain best technical recipe, make the physico-chemical property of product and outward appearance reach production requirement.
Described information process unit 122 comprises: for the contrast unit 1221 that the data of described raw material information and described data memory module 13 are contrasted; For the comparative information of described contrast unit 1221 is judged, form the judging unit 1222 of optimised process formula according to judged result;
The comparative information that described contrast unit 1221 obtains is the Data Comparison in raw material information and described data memory module 13, comprises the deviation of the data in the physico-chemical properties such as feedstock particle size, constituent content, hardness and described data memory module 13.If deviation is larger, batch quantity and its supplier that can inquire raw material link up.
Described judging unit 1222 is according to the fluctuation of comparative information Raw physico-chemical property, data analysis judgement with described data memory module 13, and according to the character of corresponding product, determine composition and the content thereof of each raw material in technical recipe, guarantee show that product quality meets standard, and ensures that this cost of products is in floor level.
Described data memory module 13 comprises: for storing the first storage unit 131 of predefined technique ingredient information and corresponding product information; For second storage unit 132 of storing predefined raw material information; For the 3rd storage unit 133 of store historical data.
It should be noted that, technique ingredient information is the technological parameter that technician draws according to need of production, comprises raw material type, each raw material proportioning and operating procedure; Corresponding product information is the finished product information obtaining according to corresponding technique ingredient information, comprises the physico-chemical properties such as the outward appearance, compressive resistance, bending strength, absorption of water, volume density of product; Raw material information comprises batch quantity of raw material and supplier information, grain size, constituent content, hardness.Described historical data comprises the historical technical recipe using and corresponding product information, raw material information.Being convenient to technician inquires about historical data.
Described the first storage unit 131 forms the first mapping relations with described information process unit 122; Described the second storage unit 132 forms the second mapping relations with described information process unit 122; Described the 3rd storage unit 133 forms the 3rd mapping relations with described information process unit 122.
It should be noted that, described information process unit 122 forms respectively mapping relations with described the first storage unit 131, described the second storage unit 132, described the 3rd storage unit 133, and described information process unit 122 contrasts and calculate according to the storage information in each storage unit the optimised process formula of confirming repeatedly.Ensure that the corresponding product physical arrangement of optimum formula and chemical property reach required standard, and ensure that this cost of products is in floor level.
Described human-computer interaction module 11 comprises: for Query Information is provided, show the display unit 111 through the data message of described central processing module processing; For inquiring about the query unit 112 of corresponding data information; For inputting the input block 113 of raw material information and respective request information.
Described query unit 112 comprises: for inquiring about as required the technical recipe query unit 1121 of technical recipe and corresponding product information; For inquiring about as required the material performance query unit 1122 of the information of raw material; Be used for the inquiry of historical data unit 1123 of enquiry of historical data as required.
Query unit 112 facilitates technique ingredient information that staff's immediate inquiring prestores and corresponding product information, raw material information, historical data.
The present invention has stronger data-handling capacity and memory function, and reliability is high.Adopt the present invention can reduce the input of manpower and materials, increase work efficiency, ensure stablizing and making cost of products in floor level of product quality simultaneously.
The above is the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications are also considered as protection scope of the present invention.

Claims (8)

1. a stone raw material supply control system, is characterized in that, described control system comprises:
For the data memory module of storage technology formula and corresponding product information, raw material information and historical data;
For receiving raw material information to be put into production, the data of described raw material information and described data memory module are contrasted, obtain the central processing module of optimised process formula;
For providing and/or showing through the data message of described central processing module processing and input the human-computer interaction module of described raw material information to described central processing module.
2. control system according to claim 1, is characterized in that, described central processing module comprises:
Be used for preserving described raw material information, optimum formula and corresponding product information, raw material information sent to the storage unit of described data memory module;
For the data of the raw material information of described storage unit and described data memory module are contrasted to processing, draw the information process unit of optimised process batching data;
Send to the push unit of described human-computer interaction module for the optimised process formula that described information process unit is sent.
3. control system according to claim 2, is characterized in that, described information process unit comprises:
For the contrast unit that the data of described raw material information and described data memory module are contrasted;
For the comparative information of described contrast unit is judged, form the judging unit of optimised process formula according to judged result.
4. control system according to claim 1, is characterized in that, described data memory module comprises:
For storing the first storage unit of predefined technique ingredient information and corresponding product information;
For second storage unit of storing predefined raw material information;
For the 3rd storage unit of store historical data.
5. control system according to claim 4, is characterized in that, described historical data comprises the historical technical recipe using and corresponding product information, raw material information.
6. control system according to claim 4, is characterized in that, described the first storage unit and described information process unit form the first mapping relations;
Described the second storage unit and described information process unit form the second mapping relations;
Described the 3rd storage unit and described information process unit form the 3rd mapping relations.
7. control system according to claim 1, is characterized in that, described human-computer interaction module comprises:
Be used for providing Query Information, show the display unit through the data message of described central processing module processing;
For the query unit of data query information;
For inputting the input block of raw material information and solicited message.
8. control system according to claim 7, is characterized in that, described query unit comprises:
For inquiring about as required the technical recipe query unit of technical recipe and corresponding product information;
For inquiring about as required the material performance query unit of the information of raw material;
Be used for the inquiry of historical data unit of enquiry of historical data as required.
CN201210541761.9A 2012-12-14 2012-12-14 A kind of stone raw material supply control system Active CN103869762B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210541761.9A CN103869762B (en) 2012-12-14 2012-12-14 A kind of stone raw material supply control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210541761.9A CN103869762B (en) 2012-12-14 2012-12-14 A kind of stone raw material supply control system

Publications (2)

Publication Number Publication Date
CN103869762A true CN103869762A (en) 2014-06-18
CN103869762B CN103869762B (en) 2016-12-21

Family

ID=50908407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210541761.9A Active CN103869762B (en) 2012-12-14 2012-12-14 A kind of stone raw material supply control system

Country Status (1)

Country Link
CN (1) CN103869762B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107291037A (en) * 2017-07-26 2017-10-24 仁怀市攀峰石材加工厂 A kind of production and processing system for stone material

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998032064A2 (en) * 1996-12-27 1998-07-23 Tandem Computers, Inc. A system and method for database query optimization
CN1584888A (en) * 2004-06-07 2005-02-23 李德平 Raw material intelligent blanking systems
CN101329578A (en) * 2008-07-17 2008-12-24 上海交通大学 Rubber seal strip extrusion production line process parameter management system
CN201654571U (en) * 2010-04-15 2010-11-24 上海凌犀电子科技有限公司 General batching controller
CN102066923A (en) * 2008-04-25 2011-05-18 E-燃料公司 Micro refinery system for ethanol production

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998032064A2 (en) * 1996-12-27 1998-07-23 Tandem Computers, Inc. A system and method for database query optimization
CN1584888A (en) * 2004-06-07 2005-02-23 李德平 Raw material intelligent blanking systems
CN102066923A (en) * 2008-04-25 2011-05-18 E-燃料公司 Micro refinery system for ethanol production
CN101329578A (en) * 2008-07-17 2008-12-24 上海交通大学 Rubber seal strip extrusion production line process parameter management system
CN201654571U (en) * 2010-04-15 2010-11-24 上海凌犀电子科技有限公司 General batching controller

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107291037A (en) * 2017-07-26 2017-10-24 仁怀市攀峰石材加工厂 A kind of production and processing system for stone material
CN107291037B (en) * 2017-07-26 2019-05-17 仁怀市攀峰石材加工厂 A kind of production and processing system for stone material

Also Published As

Publication number Publication date
CN103869762B (en) 2016-12-21

Similar Documents

Publication Publication Date Title
CN101920530B (en) Continuous proportioning system and method for refractory synthesis material
CN108053154A (en) Supply-chain management system based on cloud platform
CN103869762B (en) A kind of stone raw material supply control system
CN103745327A (en) High-efficiency logistics information management method based on internet of things
CN108563866A (en) A kind of mould steel milling Prediction of Surface Roughness system based on GA-ELM algorithms
CN102508839A (en) Data processing device and data processing method
CN203024800U (en) Multi-parameter measurement system for fermentation process of fermented grains
CN101900993B (en) Steel sintering and pre-proportioning multipurpose optimal method considering inventory factor
CN103854160A (en) Solder paste control system
CN205146175U (en) Liquid feeding metrological control system
CN201737372U (en) Storage tank with liquid level prompt function
CN110703713B (en) Method for improving switching efficiency of single-device multi-product processing scheme
CN204384388U (en) For the pendulum structure of screw conveying materials device
CN202306264U (en) Information system for commercial concrete stirring plant based on web environment
CN203818335U (en) Automatic control device for conveying amount of cement grinding aid
CN102109514A (en) Fungus environmental soil control device
KR101839609B1 (en) Apparatus for distributing goods based on assorting box, method thereof, and computer recordable medium storing the method
CN205785470U (en) A kind of batching weighing device
CN202230377U (en) Control system for copper pipe production line
CN103594028A (en) Storage type multi-screen electronic tag display system and using method
CN110866635B (en) Method for improving switching prediction precision of device processing scheme
CN204155262U (en) A kind of electronic information display label
CN102519541B (en) Methods for determining Chinese liquor filling standard height and reducing Chinese liquor filling loss
CN205572879U (en) Automatic change feed proportioning system
CN207473766U (en) A kind of dining room consumption POS

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Shi Shuqin

Inventor before: Feng Zengping

Inventor before: Huang Nengzhan

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161019

Address after: 362300 Nanan, Fujian, the United States and the United States along the River Road, No. 97

Applicant after: Shi Shuqin

Address before: Foshan City, Guangdong province 528500 city streets Gaoming District Yonghua Street No. 36 building 6 room 402

Applicant before: Liang Sanmei

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191031

Address after: 314100 east side of No.33, sanjibang, Huitong village, Huimin street, Jiashan County, Jiaxing City, Zhejiang Province

Patentee after: Jiashan Lianrui Electronic Technology Co., Ltd

Address before: 362300 Nanan, Fujian, the United States and the United States along the River Road, No. 97

Patentee before: Shi Shuqin