CN103825755A - Power secondary system modeling method and system - Google Patents

Power secondary system modeling method and system Download PDF

Info

Publication number
CN103825755A
CN103825755A CN201310618436.2A CN201310618436A CN103825755A CN 103825755 A CN103825755 A CN 103825755A CN 201310618436 A CN201310618436 A CN 201310618436A CN 103825755 A CN103825755 A CN 103825755A
Authority
CN
China
Prior art keywords
model
secondary system
business
kinds
service
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310618436.2A
Other languages
Chinese (zh)
Other versions
CN103825755B (en
Inventor
苏扬
温柏坚
谢善益
刘玮
邓大为
黄红远
陈宏辉
黄曙
周安
孙超
杨骥
卓顺城
张延佳
邬怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd filed Critical Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority to CN201310618436.2A priority Critical patent/CN103825755B/en
Publication of CN103825755A publication Critical patent/CN103825755A/en
Application granted granted Critical
Publication of CN103825755B publication Critical patent/CN103825755B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a power secondary system modeling method and a system. A model which is established according to the method and the system comprises a data model, a resource model and a dependence relationship model. The problems in the three aspects of classification object management, the combination of management object organization and power grid architecture, and the description of a complex relationship are solved. The complexity and the maintenance difficulty, which are caused by the fact that the same model is used to solve the problems in the three aspects, are avoided. Related concepts of an IEC61970 CIM model is introduced into the resource model. Each management object of a secondary system is combined with a power grid primary model. A unified model of primary and secondary models of a power grid are provided. For a business dependence relationship description method, four kinds of basic services are summarized. Public infrastructure services are abstracted. The complex multi-to-multi dependence relationship is decomposed to various kinds of services. Re-organization is carried out under the guidance of finally reflecting the business operation condition. The problem of defining the dependence relationship among a business, software and hardware and between the business and other businesses is solved.

Description

The modeling method of electric power secondary system and system
Technical field
The present invention relates to power technology field, particularly relate to a kind of electric power secondary system modeling method and system.
Background technology
Nearly ten years, the development of electric power system and information technology, the monitoring range of electric power secondary system (hereinafter to be referred as electrical secondary system) is constantly expanded, technical merit improves constantly.The progress of Information & Communication Technology (hereinafter to be referred as ICT) has become the great motive force of modern power network technical development, take present information and the communication technology as the constructed electric power secondary system in basis, in quite large degree, change the foundation structure of power infrastructures, become the important technology guarantee of electric power primary system safety, reliable, stable, economical operation.In the case, due to widespread deployment and the interconnection of electrical secondary system, the problem of the aspects such as its appearance such as physical security, security of operation, information security, all likely involves the stable of electric power system, affects the reliable power supply of electrical network.
Along with continuous increase and the expansion of intelligent operation main station system and digital transformer substation application, electric power secondary system hardware device is increasing, and business interconnection form is increasingly sophisticated, in the urgent need to building the Monitoring and Management system that meets electric power secondary system feature.
Supervisory systems is collected various service datas, such as electrical secondary system service operation state, secondary device operation conditions, network interconnection situation, system information safety, building environment parameter etc.Service data or Alarm Classification are showed O&M librarian use by supervisory systems.Because electric power secondary system technology is all multi-specialized across electric power system, automation control, computer science, communication technology etc., supervisory systems by Data Integration, offers the librarian use of different majors according to specialty.In the time there is resultant fault, need O&M personnel not only to there is higher level professional technology, also need to possess professional face quite widely.ICT industry has general safety management system, network management system etc. instrument at present, itself also has traditional monitoring module power industry production control system, supervisory systems can be by each side's Data Integration, but due to various supervisory control system business visual angle difference, monitoring range and analysis strategy are also different, the difficulty of coordinating analysis is larger each other, sometimes also can produce inapplicable noise data, affects the actual efficiency of O&M work.
Current supervisory systems majority is based on universal network management system extension, inherited the configuration modeling mechanism in the CMDB of universal network management system, and lower mask body is introduced this technology.
CMDB configuration modeling technique: the various configuration informations of equipment in CMDB (CMDB) storage and management enterprise IT architecture, it and all service supports are all closely linked to service delivery process, support the running of these flow processs, the value of performance configuration information, depend on the accuracy of related procedure assurance data simultaneously.In actual project, CMDB is usually considered to build the basis of other ITIL flow process and pays the utmost attention to, the success or failure of ITIL project with whether successfully set up CMDB and have very large relation.
70%~80% IT relevant issues and the change of environment have direct relation.Difficult point and the emphasis of implementing change management are not instrument, but flow process.By an automation, repeatably workflow management is changed, making, when changing when occurring, has a standardized flow process to go to carry out, and can predict this and change the impact on whole system management generation, and these impacts are assessed and controlled.And the realization key of change management process automation is exactly CMDB modeling.
As shown in Figure 1, operation system is split as from level to level correlation module and assembly by it to a typical CMDB allocation models, and ICT infrastructure and operation system are associated.Wherein modeling process is the classification of process configuration item, attribute definition, organization definition under clear and definite range of management prerequisite, is finally that concrete steps are as follows by configuration item instantiation:
CI classification: whole O&M objects is done to a logical partitioning so that management is distinguished management by its physical aspect.Utilize CI classification action, specify scope and the granularity of configuration management, one-level classification determines the scope of configuration management, and reclassify determines the granularity of configuration management.The design of CI classification, can farthest meet management statistics demand and various query composition flexibly.Utilize the intermediate link of CI classification as bridge joint attribute and CI example, be convenient to the structure CMDB of efficiency.By independent to structure and relation, be convenient to administration extensions and extension in the future, accomplish application foci solely point be convenient to safeguard and split, can play again the effect of efficient combination simultaneously.
CI attribute definition: for each CI classification, design attributes, so that CI example is inherited.CI attribute itself is with level (public, one-level, secondary, three grades).CI attribute has father and son's succession.CI attribute can be divided according to logicality (management attribute, technical attributes etc.), and each CI attribute needs design attributes value tied mechanism, fills in standard and efficiency, is convenient to follow-up statistics and calculating simultaneously.CI attribute has point (at technological layer, structure attribute, attribute of a relation also can be included attribute line management in) of narrow and broad sense.
CI organization definition: along with allocation models further excavates, considered at present further to deepen structural information, by original simple father and son's structure type, expanded to three kinds of structure types:
Form, father and son truly, certain module is the some of a program, such as CPU is the some of computer.
Connect (Is connected to), annexation between the two, such as the node of computer and network.
Need (Is needed for), the supporting role of a side to the opposing party, such as operating system and computer, project and a station server.
According to these three kinds of structure types, build CI cluster.
CI instantiation: complete after above three steps the pattern of model substantially definite, according to the initialization that is specifically monitored object and completes object instance, comprise the work such as the initialization of object properties, relation.
Can realize the top-down refinement of IT system is split based on CMDB modeling technique, form multi-layer C I object cluster, thereby support for management and supervision IT system provides basic model.
The limitation of CMDB modeling: first, CMDB modeling pattern is configuration information and the incidence relation take operation system as the various information technoloy equipments of unit description, in electric power system, between main station system and substation system, have between close longitudinal incidence relation and main station system and also have close horizontal incidence relation, this kind is associated in more difficult description in CMDB modeling pattern; Secondly, CMDB modeling pattern is focused on the decomposition of CI, it is a kind of static classification model, and what in the process of power system analysis electrical secondary system fault, pay close attention to is incidence relation logic or physics, and need to carry out cutting and reconstruct to model, need model to possess good dynamic characteristic.
In conventional solution, the method of taking configuration management object to decompose layer by layer for operation system, system decomposition is become to hardware and software, and hardware resolves into the concrete equipment such as server, graphics workstation, the network equipment, safety means, and for its common configuration object of every kind of device abstract; Same also can resolve into application and module one by one to software; And representing the deployment relation of software and hardware by independent CI inter-item relationship, Fig. 1 is a typical case of EMS system.
Wherein EMS system is disassembled as hardware components, as the HISserver in figure, PASserver, SCADAserver, the server of every type can also be refined into multiple servers, as SCADA1, SCADA2, can the computer configuration item of abstract its common configuration item for Servers-all type, comprise CPU, internal memory, hard disk, mainboard, operating system; SCADA subsystem branch is used for representing the deployment relation between hardware and software, and SCADA subsystem comprises SCADA and two application of ALARM, is all deployed on SCADA1 and SCADA2 main frame; SCADA program branches represents that SCADA application comprises two examples, and its functional module has comprised data receiver, data processing, data loading etc., can further refine to function point.Problem in this mode is:
1. a system need to be disposed three aspects descriptions from hardware, software and hardware and software will at least three branches, if the dependence between expansion software will be expanded a branch again, in the time that the angle of describing increases, numbers of branches can be a lot, redundant node is more, is unfavorable for regular maintenance and the expansion of model;
2. often there is the business relations between a large amount of boss station in electric power secondary system, can only in substation system and main station system, describe separately and the other side's relation in existing scheme, and the maintenance of relation is more difficult, the descriptive power of shortage cross-system;
3. the distinctive electrical network framework of electric power system, such as the compass of competency concept such as controlled area, Zi Kong district can only realize by the mode that increases branch in existing scheme, cannot on the whole the model entirety of each system be brought in the existing administrative mechanism of electric power system.
4. existing scheme is limited in one's ability to the auxiliary judgment of accident analysis, in above model, if certain assembly of certain hardware goes wrong, such as SCADA1 node cpu load too high, can date back to SCADAserver class server from its branch goes wrong, if but the module instance of further associated correlation subsystem must travel through other branches, this traversal in the time that model is huge (such as up to a hundred nodes, the system of a hundreds of module composition) inefficiency, thereby and cannot speed and accuracy that the fault effects scope of business is analyzed be reduced with other alarm associations.
Summary of the invention
Based on above-mentioned situation, the present invention proposes a kind of modeling method and system of electric power secondary system, to solve the following problem of conventional model:
1. branch is more, and data redundancy is safeguarded complicated;
2. cross-system descriptive power is low;
3. cannot incorporate the peculiar electrical network framework of electric power system;
4. a little less than model interaction analysis ability.
A modeling for electric power secondary system, comprises connected successively data model unit, resource model unit and dependence model unit,
Described data model unit, classifies for all kinds of monitoring targets to described electrical secondary system, forms data model;
Described resource model unit, for expand all kinds of monitoring targets described in described data model on IEC61970 CIM primary equipment model basis, forms resource model;
Described dependence model unit, for on described resource model basis, described electrical secondary system is divided into different business, in every business, comprise all kinds of services that service operation relies on, serve refinement again and be associated with all kinds of monitoring targets that it relies on, form dependence model.
A modeling method for electric power secondary system, comprises step:
Set up successively data model, resource model and the dependence model of described electrical secondary system,
The method for building up of described data model is the process that all kinds of monitoring targets of described electrical secondary system are classified;
The method for building up of described resource model is the process of expanding all kinds of monitoring targets described in described data model on IEC61970 CIM primary equipment model basis;
The method for building up of described dependence model, on described resource model basis, described electrical secondary system is divided into different business, in every business, comprises all kinds of services that service operation relies on, serve refinement again and be associated with the process of its all kinds of monitoring targets that rely on.
Adopt the modeling method of electric power secondary system of the present invention and the model that system is set up, comprise data model, resource model and dependence model, solve respectively the problem of the description three aspects: of object classification management, the tissue of management object and the combination of electrical network framework, complex relationship, avoided solving with same model complexity and the maintenance difficulties that three aspects: problem is brought.Wherein, in resource model, introduce IEC61970CIM model related notion, model of each management object of electrical secondary system and electrical network is combined, provide electrical network one secondary model unified model; The dependence describing method of service-oriented, sum up four class infrastructure services, abstract common base service, by complicated multi-to-multi dependence, decompose in all kinds of services, and take finally reflect service operation situation as guiding reorganize, solved business and software, hardware, and and other business between dependence define problem.
Accompanying drawing explanation
Fig. 1 is a typical CMDB allocation models schematic diagram;
Fig. 2 is the structural representation of the modeling of electric power secondary system of the present invention;
Fig. 3 is the schematic flow sheet of the modeling method of electric power secondary system of the present invention;
Fig. 4 is resource classification schematic diagram in data model;
Fig. 5 is operational relation classification schematic diagram in data model;
Fig. 6 is function/business in data model/classification of service schematic diagram;
Fig. 7 is rule classification schematic diagram in data model;
Fig. 8 is resource model schematic diagram;
Fig. 9 is dependence model schematic diagram.
Embodiment
Core concept of the present invention is: build a kind of feature of summing up information technoloy equipment, electric grid secondary equipment, common software and business software by conclusion, abstract public characteristic forms hierarchical structure, set up the model that has clear and definite syntax and semantics definition including electrical secondary system main website end and substation end operation system, ICT infrastructure, electric grid secondary equipment, this model is used for describing running status and the health indicator of the each part of electrical secondary system.Model is divided into three parts: data model, resource model and dependence model.Wherein data model solves the description of all software and hardware classification in electrical secondary system, the problem how model of resource model solution electrical secondary system docks with model of existing electrical network, and dependence model solves complicated association and describes, and is conducive to accident analysis.Below in conjunction with drawings and Examples, the present invention is described in further detail.Should be appreciated that embodiment described herein, only in order to explain the present invention, does not limit protection scope of the present invention.
The monitoring system of electric power secondary system of the present invention, as shown in Figure 2, comprises connected successively data model unit, resource model unit and dependence model unit.
Described data model unit, classifies for all kinds of monitoring targets to described electrical secondary system, forms data model;
Described resource model unit, for expand all kinds of monitoring targets described in described data model on IEC61970 CIM primary equipment model basis, forms resource model;
Described dependence model unit, for on described resource model basis, described electrical secondary system is divided into different business, in every business, comprise all kinds of services that service operation relies on, serve refinement again and be associated with all kinds of monitoring targets that it relies on, form dependence model.
As a preferred embodiment, in the time setting up described data model, all kinds of monitoring targets of described electrical secondary system are divided into resource, operation information, function/business/service and regular four classes.
As a preferred embodiment, in the method for building up of described dependence model, in every business, comprise the service of all kinds of services package includes network, calculation services, database service and application service four class infrastructure services that service operation relies on.
Electric power secondary system modeling method of the present invention, as shown in Figure 3, comprises step:
Step S101, set up the data model of described electrical secondary system, the method for building up of described data model, is the process that all kinds of monitoring targets of described electrical secondary system are classified;
Step S102, set up the resource model of described electrical secondary system, the method for building up of described resource model, is the process of expanding all kinds of monitoring targets described in described data model on IEC61970 CIM primary equipment model basis;
Step S103, set up the dependence model of described electrical secondary system, the method for building up of described dependence model, on described resource model basis, described electrical secondary system is divided into different business, in every business, comprise all kinds of services that service operation relies on, serve refinement again and be associated with the process of its all kinds of monitoring targets that rely on.
Figure BDA0000423729510000071
data model
Data model is by the main website end in electrical secondary system and substation end monitored object, comprise the signature analysis of information technoloy equipment, electric grid secondary equipment, common software and professional software, form a kind of disaggregated model of describing electrical secondary system, it is the basis that builds resource model and dependence model.Data model in electrical secondary system health model is divided into resource, operation information, function/business/service and four classification of rule.
1. resource
From the angle of electric power secondary system O&M and management system, in electrical secondary system, each part is a kind of resource, the operation that they are electrical secondary system provides certain function, the ruuning situation of electrical secondary system and health degree can obtain by the function ruuning situation of weighing each resource, and therefore resource is the fundamental unit of observation electrical secondary system operation conditions.The mode that this standard exists according to resource is divided into software and the logic module of logic-oriented resource, and towards equipment and the apparatus assembly of physical resource, it forms as shown in Figure 4.
2. operation information
In the running of electric power secondary system, can produce all kinds of running state information, while O&M and management platform also will utilize this category information to write result category information through calculating and analyze to produce to divide.Two category informations have all reflected the ruuning situation of all kinds of resources of electric power secondary system.This standard is divided into raw information and analysis result according to the characteristic of operation information, and it forms as shown in Figure 5.
3. function/business/service
Function/business/service is, from the angle of service operation, the resource of all kinds of supporting businesses is divided into common base service according to its attributive character, comprises calculation services, database service and network service, and application service.Wherein calculation services refers to the service that computational resource is provided, such as main frame; Database service refers to as service operation provides data access class resource, comprises real-time storehouse, timing sequence library and relational database etc.; Network service refers to the resource that network environment is provided for service operation, comprises switch, router and all kinds of safety means etc.; Application service is the business function of supporting business operation, and such as supporting the station end telemechanical business of front service operation, a business also can become the application service of an other business, and such as front service supports SCADA, therefore preposition is also a kind of application service.Classification of service as shown in Figure 6.
4. rule
Rule definition analyze the criterion of the dynamic operation data of electric power secondary system each part, it is divided into business conduct rule, security association rule, performance evaluation rule and accident analysis rule.Wherein business conduct rule is the various actions feature from business angle analysis electric power secondary system operation, and according to the state of this characteristic evaluating service operation; Security association rule is from information security angle analysis electric power secondary system running status, and all kinds of indexs of computationally secure operation; Performance evaluation rule is from systematic function angle analysis electric power secondary system overall operation state, and the running performance index of all kinds of resources of computing system; Accident analysis rule is the running status from each business of service operation angle analysis electric power secondary system of system, and in conjunction with the operation information analysis of fault warning and all kinds of resources and locate fault rootstock.Rule classification as shown in Figure 7.
Figure BDA0000423729510000081
resource model
Resource model is all kinds of monitored object models described in growth data model on the basis of IEC61970 CIM model, thereby has formed the entire object model of one or two combinations of electrical network, for the supervision to electrical secondary system and statistical analysis.It has solved existing scheme and cannot incorporate the problem of the peculiar electrical network framework of electric power system.
Resource model is all kinds of monitored objects described in growth data model on the basis of CIM model, such as expand secondary device model under each electrical network primary equipment in transformer station, under plant stand He under control centre, expand electrical secondary system branch, subsystem, equipment and public infrastructure are comprised, the ICT infrastructure resources that is mainly used in describing the software systems resource of main website or substation and supports its operation.Structure as shown in Figure 8.
Wherein, comprise subsystem, equipment, three classes of public infrastructure in the electrical secondary system in control centre and plant stand, the secondary device in plant stand under primary equipment is classified as equipment class.In model, under each class, can comprise analog quantity, quantity of state etc. and measure data class.
Figure BDA0000423729510000091
dependence model
Dependence model is on the basis of resource model, electrical secondary system is divided into different business, in every business, comprise all kinds of services that service operation relies on, serve refinement again and be associated with all kinds of monitored objects that it relies on, for accident analysis and the location of electrical secondary system.
Dependence model is on the basis of resource model, electrical secondary system is divided into different business, in every business, comprise all kinds of services that service operation relies on, serve refinement again and be associated with all kinds of monitored objects that it relies on, for accident analysis and the location of electrical secondary system.Its framework as shown in Figure 9.
Wherein, the business comprising under control centre and transformer station is from operational angle, application to be reclassified, such as front service, SCADA business, AGC business etc., in every, business is to support by a series of relevant resources such as software module and hardware facility in existing system, the Resource Abstract of these supports is become various services by dependence model, every kind of service provides a kind of service ability for relevant business, such as network service provides the network interconnection and ability to communicate, calculation services provides the ability of data processing and computing, database service provides data access ability, application service provides business required various application functions.
Every kind of service joins with concrete resource dependency again, such as network service is associated with concrete switch, router, spacer assembly etc., calculation services is associated with server, and database service is associated with concrete database instance, and application service is associated with concrete subsystem or functional module.
Rely on this intermediary layer of service, dependence model is business and relevant logic OR physical resource decoupling zero, thereby is the method for having divided these Resource Supplies flexibly.Such as a main frame can dispose preposition application, as the calculation services of front service, also can dispose the calculation services of SCADA application as SCADA business simultaneously, therefore such host resource just can be placed under the calculation services in common base service, association in this common base service be can arrive and use relevant service in other business, data redundancy and the appearance of inconsistent situation that multiple spot association easily causes reduced.
A kind of business also can be for another one business provides support, and in this case, front a kind of business is exactly the application service of rear a kind of business.Utilize the concept of application service the miscellaneous service that has dependence can be associated, comprise between all kinds of business in main website or substation, and between main website and substation between relevant business, such as the telemechanical business of substation just supports main website front service, therefore can think that substation telemechanical business is the application service of main website front service, set up dependence.
Can set up the dependence between business and all kinds of resource according to the incidence relation between business and service, thereby realize in the time that certain resource breaks down, association analysis is to the related service that relies on this resource, for fault location provides a kind of clustering method rapidly.There are business dependence, secondary device and relevant primary equipment to have dependence due between substation and main website, therefore use the dependence model can impact, the impact of secondary device fault on the other side of analysis substation fault on main website, for electric network fault analysis and early warning provide analytical model support flexibly.
Figure BDA0000423729510000101
system feature
This programme there is following characteristics:
1. scheme adopts data model, resource model and dependence model to solve respectively a difficult problem for the description three aspects: of combination, the complex relationship of object classification management, the existing framework of electrical network, has avoided complexity and the maintenance difficulties brought by same model solution three aspects: problem.
2. data model is summed up according to the feature sorted generalization of software and hardware in electric grid secondary system, can comparatively comprehensively react the classification relation of all kinds of object of observations that electrical secondary system comprises, comprise electric grid secondary equipment, general purpose I T equipment, operation system and module, all kinds of services etc., and comprised the rule of the electrical secondary system supervision data processing to gathering.
3. resource model is according to existing electric network model IEC61970 CIM model, electrical network framework and electrical secondary system framework can be merged mutually, main website and substation utilize the control centre of CIM and plant stand branch to be brought in unified resource model in the vertical, and different transformer stations or main station system are expanded in plant stand branch and branch of control centre in the horizontal; Simultaneously according to the He Zikong district of master control district of CIM by unified in a resource model dispatching of power netwoks at different levels department, thereby electrical secondary system and electrical network framework and Utilities Electric Co.'s organizational structure are combined.
4. dependence model adopts the modeling pattern of service-oriented, according to the sorting technique of system operation required service, take out network service, calculation services, database service and application service four class infrastructure services, and operation system is decomposed into miscellaneous service, utilize electrical network framework concept in resource model by all kinds of work organizations simultaneously, dependence is set up in every class business and four kinds of infrastructure services, thereby solved business and software, hardware, and and other business between dependence problem definition.
Scheme compared to existing technology, the present invention has the following advantages:
1. solved branch more, data redundancy, safeguards complicated problem, adopts three models to solve the problem of three aspects :s, sets up associated with each otherly, reduces redundant node, safeguards and also can separate as required maintenance separately.Data model has defined various classification, just needs to safeguard in the time that classification changes; Resource model is described all kinds of monitored objects, does not comprise complicated incidence relation, just needs to safeguard in the time that object changes; Dependence model service-oriented, concludes relation according to four class infrastructure services, and takes out common base service, to the relation centralized management of common source, thereby makes the maintenance conditioning of relation clear.
2. solve the low problem of cross-system descriptive power, utilized on the one hand the electrical network framework concept of IEC61970 CIM model by organic combination between longitudinal boss station; Transversely break on the other hand system boundary, according to the dependence between the each resource of service management, for ruuning situation and the fault of analyzing electrical secondary system provide unified horizontal, longitudinally Extended model support.
3. solved the problem that cannot incorporate the peculiar electrical network framework of electric power system, utilize the primary equipment model of IEC61970 CIM, the secondary device of transformer station's end can be associated to relevant primary equipment, solved secondary device method for organizing how with the problem of electrical network architecture combined, for judging that electrical secondary system provides model support to the impact of electrical network overall operation situation.
4. solved the weak problem of model interaction analysis ability, with the dependence model of special service-oriented, the four class infrastructure services that move by combing supporting business, abstract common base service, by complicated multi-to-multi dependence, decomposes in all kinds of services, and finally to reflect that service operation situation is as guiding reorganization, both played and simplified, improved maintainable object, strengthened again the model enabling capabilities of analyzing service operation situation.
Note: the present invention has carried out dependence test in intra-company, empirical tests can realize above-mentioned beneficial effect, has good practicality and market prospects.
Except this programme, also can, by first set up the model of individual system on original basis based on CMDB modeling technique, realize similar effect in the method for model between system of setting up.But due to the intrinsic restriction of model solution all problems for CMDB modeling technique, along with its extensibility of increase of scale of model with can safeguard and will greatly reduce, can not really meet the modeling demand of electrical network user to whole electrical secondary system.
The above embodiment has only expressed several execution mode of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection range of patent of the present invention should be as the criterion with claims.

Claims (6)

1. a modeling for electric power secondary system, is characterized in that, comprises connected successively data model unit, resource model unit and dependence model unit,
Described data model unit, classifies for all kinds of monitoring targets to described electrical secondary system, forms data model;
Described resource model unit, for expand all kinds of monitoring targets described in described data model on IEC61970 CIM primary equipment model basis, forms resource model;
Described dependence model unit, for on described resource model basis, described electrical secondary system is divided into different business, in every business, comprise all kinds of services that service operation relies on, serve refinement again and be associated with all kinds of monitoring targets that it relies on, form dependence model.
2. the modeling of electric power secondary system according to claim 1, is characterized in that,
In the time setting up described data model, all kinds of monitoring targets of described electrical secondary system are divided into resource, operation information, function/business/service and regular four classes.
3. the modeling of electric power secondary system according to claim 1 and 2, is characterized in that,
In the method for building up of described dependence model, in every business, comprise the service of all kinds of services package includes network, calculation services, database service and application service four class infrastructure services that service operation relies on.
4. a modeling method for electric power secondary system, is characterized in that, comprises step:
Set up successively data model, resource model and the dependence model of described electrical secondary system,
The method for building up of described data model is the process that all kinds of monitoring targets of described electrical secondary system are classified;
The method for building up of described resource model is the process of expanding all kinds of monitoring targets described in described data model on IEC61970 CIM primary equipment model basis;
The method for building up of described dependence model, on described resource model basis, described electrical secondary system is divided into different business, in every business, comprises all kinds of services that service operation relies on, serve refinement again and be associated with the process of its all kinds of monitoring targets that rely on.
5. the modeling method of electric power secondary system according to claim 4, is characterized in that,
In the time setting up described data model, all kinds of monitoring targets of described electrical secondary system are divided into resource, operation information, function/business/service and regular four classes.
6. according to the modeling method of the electric power secondary system described in claim 4 or 5, it is characterized in that,
In the method for building up of described dependence model, in every business, comprise the service of all kinds of services package includes network, calculation services, database service and application service four class infrastructure services that service operation relies on.
CN201310618436.2A 2013-11-27 2013-11-27 Power secondary system modeling method and system Active CN103825755B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310618436.2A CN103825755B (en) 2013-11-27 2013-11-27 Power secondary system modeling method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310618436.2A CN103825755B (en) 2013-11-27 2013-11-27 Power secondary system modeling method and system

Publications (2)

Publication Number Publication Date
CN103825755A true CN103825755A (en) 2014-05-28
CN103825755B CN103825755B (en) 2017-02-15

Family

ID=50760602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310618436.2A Active CN103825755B (en) 2013-11-27 2013-11-27 Power secondary system modeling method and system

Country Status (1)

Country Link
CN (1) CN103825755B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104579784A (en) * 2015-01-15 2015-04-29 珠海市鸿瑞信息技术有限公司 Electric power industry control system network management method based on multi-dimensional virtual link
CN105160119A (en) * 2015-09-16 2015-12-16 中国电力科学研究院 Policy file based secondary electric power equipment simulation modeling method
CN105629103A (en) * 2015-12-23 2016-06-01 广州市优普计算机有限公司 Online monitoring method based on transformer substation operation and maintenance network shutdown
CN105824279A (en) * 2016-03-15 2016-08-03 江苏方天电力技术有限公司 Method for establishing flexible and effective CMDB (Configuration Management Database) of machine room monitoring system
CN107071013A (en) * 2017-03-30 2017-08-18 国网福建省电力有限公司 A kind of the service response method and service system of intelligent substation access regulation and control main website
CN107480883A (en) * 2017-08-11 2017-12-15 国电南瑞科技股份有限公司 A kind of transformer station secondary system resource allocation method and system
CN107729939A (en) * 2017-10-17 2018-02-23 广东电网有限责任公司电力科学研究院 A kind of CIM extended method and device towards newly-increased power network resources
CN107918835A (en) * 2017-12-13 2018-04-17 国网辽宁省电力有限公司电力科学研究院 Become the universal secondary device platform of the more scenes of adapted towards electric power
CN111985558A (en) * 2020-08-19 2020-11-24 安徽蓝杰鑫信息科技有限公司 Electric energy meter abnormity diagnosis method and system
CN112055065A (en) * 2020-08-27 2020-12-08 国电南瑞科技股份有限公司 Relay protection SaaS layer application data processing method based on regulation and control cloud
CN112052294A (en) * 2019-06-05 2020-12-08 烽火通信科技股份有限公司 General data configuration method and system for service calling
CN112215523A (en) * 2020-10-29 2021-01-12 中国人民解放军国防科技大学 Method and device for analyzing capability dependency relationship in complex system architecture
CN112231705A (en) * 2020-09-23 2021-01-15 四川中电启明星信息技术有限公司 Information system reliability improving method based on primary and secondary division
CN113535680A (en) * 2021-07-16 2021-10-22 国家电网有限公司 Configuration management data processing system and method
CN113672203A (en) * 2021-08-26 2021-11-19 优维科技(深圳)有限公司 Model inheritance method for CMDB configuration management

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710735A (en) * 2009-12-11 2010-05-19 江西省电力科学研究院 Sharing modeling method of intelligent substation and primary station
CN102510127B (en) * 2011-10-21 2013-09-18 南京南瑞继保电气有限公司 Method for unifying models of on-line monitored first and secondary equipment of power grid
CN103366051B (en) * 2013-06-26 2016-12-28 中国南方电网有限责任公司 Primary equipment and the method and system of secondary device modeling

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴国沛: "电力网一、二次系统可靠性分析与应用", 《中国博士学位论文全文数据库工程科技Ⅱ辑》 *
毛鹏等: "基于 IEC61970 的电力系统二次设备 CIM 建模初探", 《继电器》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104579784B (en) * 2015-01-15 2017-12-22 珠海市鸿瑞信息技术股份有限公司 Power industry Control System NetWork management method based on multidimensional virtual link
CN104579784A (en) * 2015-01-15 2015-04-29 珠海市鸿瑞信息技术有限公司 Electric power industry control system network management method based on multi-dimensional virtual link
CN105160119A (en) * 2015-09-16 2015-12-16 中国电力科学研究院 Policy file based secondary electric power equipment simulation modeling method
WO2017045469A1 (en) * 2015-09-16 2017-03-23 中国电力科学研究院 Policy file based simulation modeling method of power system secondary equipment
CN105160119B (en) * 2015-09-16 2019-01-11 中国电力科学研究院 A kind of second power equipment emulation modelling method based on strategy file
CN105629103A (en) * 2015-12-23 2016-06-01 广州市优普计算机有限公司 Online monitoring method based on transformer substation operation and maintenance network shutdown
CN105824279A (en) * 2016-03-15 2016-08-03 江苏方天电力技术有限公司 Method for establishing flexible and effective CMDB (Configuration Management Database) of machine room monitoring system
CN107071013A (en) * 2017-03-30 2017-08-18 国网福建省电力有限公司 A kind of the service response method and service system of intelligent substation access regulation and control main website
CN107480883A (en) * 2017-08-11 2017-12-15 国电南瑞科技股份有限公司 A kind of transformer station secondary system resource allocation method and system
CN107480883B (en) * 2017-08-11 2020-11-10 国电南瑞科技股份有限公司 Transformer substation secondary system resource configuration method and system
CN107729939B (en) * 2017-10-17 2020-06-02 广东电网有限责任公司电力科学研究院 CIM (common information model) expansion method and device for newly added power grid resources
CN107729939A (en) * 2017-10-17 2018-02-23 广东电网有限责任公司电力科学研究院 A kind of CIM extended method and device towards newly-increased power network resources
CN107918835A (en) * 2017-12-13 2018-04-17 国网辽宁省电力有限公司电力科学研究院 Become the universal secondary device platform of the more scenes of adapted towards electric power
CN112052294B (en) * 2019-06-05 2023-01-31 烽火通信科技股份有限公司 General data configuration method and system for service call
CN112052294A (en) * 2019-06-05 2020-12-08 烽火通信科技股份有限公司 General data configuration method and system for service calling
CN111985558A (en) * 2020-08-19 2020-11-24 安徽蓝杰鑫信息科技有限公司 Electric energy meter abnormity diagnosis method and system
CN112055065A (en) * 2020-08-27 2020-12-08 国电南瑞科技股份有限公司 Relay protection SaaS layer application data processing method based on regulation and control cloud
CN112231705A (en) * 2020-09-23 2021-01-15 四川中电启明星信息技术有限公司 Information system reliability improving method based on primary and secondary division
CN112215523A (en) * 2020-10-29 2021-01-12 中国人民解放军国防科技大学 Method and device for analyzing capability dependency relationship in complex system architecture
CN113535680A (en) * 2021-07-16 2021-10-22 国家电网有限公司 Configuration management data processing system and method
CN113672203A (en) * 2021-08-26 2021-11-19 优维科技(深圳)有限公司 Model inheritance method for CMDB configuration management

Also Published As

Publication number Publication date
CN103825755B (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN103825755A (en) Power secondary system modeling method and system
Guo et al. Complex power system status monitoring and evaluation using big data platform and machine learning algorithms: a review and a case study
CN103559562A (en) Power grid intelligent operation system and achieving method thereof
CN112905685B (en) Informationized construction-oriented architecture management and control system and equipment
CN108197131A (en) A kind of construction method and device of electric power asset portrait
CN112527774A (en) Data center building method and system and storage medium
CN106022617A (en) Inspection control system based on marketing multi-system data center
CN111858713A (en) Object-based government information asset management method and system
CN112579563B (en) Power grid big data-based warehouse visualization modeling system and method
CN110245163A (en) A kind of Operation of Electric Systems hidden troubles removing method
CN110415136B (en) Service capability evaluation system and method for power dispatching automation system
CN111538720A (en) Method and system for cleaning basic data in power industry
CN106649034A (en) Visual intelligent operation and maintenance method and platform
Feng et al. The design and implementation of global energy interconnection digital research platform
CN202795451U (en) Asset entire life-cycle management process control application system based on topic base
CN113706101B (en) Intelligent system architecture and method for power grid project management
CN104933491A (en) Industrial enterprise energy consumption diagnosis early warning system
CN112784129A (en) Pump station equipment operation and maintenance data supervision platform
Li et al. The fast simulation architecture construction for integrated electric transmission and distribution power grid based on big data platform
Peng et al. Research on data quality detection technology based on ubiquitous state grid internet of things platform
Wang et al. The research on electric power control center credit monitoring and management using cloud computing and smart workflow
CN112508276B (en) Power grid rapid diagnosis and optimization system and optimization method
Wang et al. An intelligent DevOps platform research and design based on machine learning
Yu et al. Research on integrated operation and maintenance acquisition and monitoring technology for new generation dispatching control system
Yang Fault Diagnosis Technology of Railway Signal Equipment based on Improved FP-Growth Algorithm

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant