CN103761612B - Project release method and system - Google Patents
Project release method and system Download PDFInfo
- Publication number
- CN103761612B CN103761612B CN201410010157.2A CN201410010157A CN103761612B CN 103761612 B CN103761612 B CN 103761612B CN 201410010157 A CN201410010157 A CN 201410010157A CN 103761612 B CN103761612 B CN 103761612B
- Authority
- CN
- China
- Prior art keywords
- project
- issue
- server
- item version
- issued
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 55
- 238000009826 distribution Methods 0.000 claims abstract description 11
- 230000008859 change Effects 0.000 claims description 12
- 230000008569 process Effects 0.000 claims description 11
- 238000012544 monitoring process Methods 0.000 claims description 6
- 230000000694 effects Effects 0.000 abstract description 5
- 239000004744 fabric Substances 0.000 description 10
- 230000006870 function Effects 0.000 description 7
- 230000008901 benefit Effects 0.000 description 4
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000004590 computer program Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Information Transfer Between Computers (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of project release method and systems.Wherein, this method includes:The issue instruction of reception project, determines Item version to be released;According to definite Item version, definite project is published in server;The project of monitors distribution obtains the Item version information issued every time and stores.It can be reached using project release method provided in an embodiment of the present invention and project is issued automatically, save manpower and time, reduce issue error rate, it allows users to as early as possible using project more perfect after update, and can avoid issuing the unsuccessful advantageous effect that influence user is caused to use.
Description
Technical field
The present invention relates to the Internet, applications field, more particularly to a kind of project release method and system.
Background technology
As the development and people of various terminals are for the application that uses in the terminal either product or software et al.
Property, personal settings requirement raising, the perfect in shape and functions of various application either product or softwares continue to introduce new.It is existing
Have in technology, developer is needed to carry out coding work to the research and development for applying either product or software, and it is perfect to needing
Part or the part progress manual amendment there are problem to be solved.After modification, also needing manually will be amended
Product either repacked and be published on server by software or application, so that user is upgraded.
By the above process, it can be seen that needing to spend a large amount of manpowers to the update for applying either product or software with timely
Between, and after the completion of update, due to needing manually to be published in server, target environment can not be reached in time.Because of manually issue
It is more long when project accounts for, and unstability is higher, is easy to cause project issue error so that user can not be more rapidly using more
Application after new either product or software, reduce user experience.
The content of the invention
In view of the above problems, it is proposed that the present invention overcomes the above problem in order to provide one kind or solves at least partly
State the project release method of problem and corresponding project delivery system.
According to the one side of the embodiment of the present invention, a kind of project release method is provided, including:The issue of reception project refers to
Order, determines Item version to be released;According to definite Item version, definite project is published in server;Monitoring hair
The project of cloth obtains the Item version information issued every time and stores.
Optionally, shown project release method further includes:Reception project faulting instruction determines that current issue Item version goes out
It is wrong;Succeeded the Item version issued before being searched in stored Item version information, is successfully sent out described in issue again
The Item version of cloth.
Optionally, the Item version of the issue that succeeded in stored Item version information before lookup, including:
The project with the immediate issue that succeeded of current issue Item version on the time is searched in stored Item version information
Version.
Optionally, after the reception project faulting instruction, further include:The inventory of Resolving probiems is extracted from repository,
Tissue generation issue list supporting paper.
Optionally, it is described definite project is published in server before, further include:Monitor at least one server
Operating status;According to the operating status of at least one server, it is determined whether carried out at least one server
Project is issued.
Optionally, according to the operating status of at least one server, it is determined whether at least one server
Upper carry out project issue, including:Monitor in the operating status of at least one server that there are part servers to run
When, definite project is published on the part server that can be run.
Optionally, it is described that definite project is published in server, including:Item code is obtained from configuration bank interface
Bag, publishes in server, and the item code bag is compiled into machine by the server performs code, generation issue
Program file.
Optionally, the project release method further includes:Monitoring project issues situation, if only part is successfully sent out in the project
The part issued not successfully in the project is distributed to the server by cloth again to the server.
Optionally, the requirement that the project to be released is issued according to the actual content and product version of change issue, from
Supporting paper needed for dynamic tissue products edition upgrading code bag and issue.
Other side according to the invention additionally provides a kind of project delivery system, including:Receiver is configured to connect
The issue instruction of receipts project, determines Item version to be released;Distributor is configured to the project version determined according to the receiver
This, definite project is published in server;Monitor is configured to monitor the project of the distributor issue, obtains each
The Item version information of issue;Memory is configured to store the Item version information that the monitor is monitored and obtained.
Optionally, the receiver is additionally configured to reception project faulting instruction, determines current issue Item version error;Institute
It states distributor and is additionally configured to the Item version issued that succeeded before the memory look-up, successfully sent out described in issue again
The Item version of cloth.
Optionally, the distributor is additionally configured to above most connect with current issue Item version from the memory look-up time
It is upper with currently issuing that Item version is immediate successfully have been sent out to issue the time again for the Item version of the near issue that succeed
The Item version of cloth.
Optionally, the monitor is additionally configured to monitor the operating status of at least one server, and monitored results are led to
Know the distributor;The distributor is additionally configured to the operation shape of at least one server monitored according to the monitor
State, it is determined whether project issue is carried out at least one server.
Optionally, the monitor, which is additionally configured to monitor, has part in the operating status of at least one server and takes
Business device can not be run, and monitored results are notified the distributor;The distributor is additionally configured to definite project being published to energy
On the part server enough run.
Optionally, the monitor is additionally configured to monitor the project issue situation of the distributor, if the portion in the project
It is divided into work(and is published to the server, by distributor described in some notifications issued not successfully;The distributor be additionally configured to by
The part issued not successfully in the project is distributed to the server again.
In embodiments of the present invention, project issue instruction can be received, determines Item version to be released, and then according to true
Definite project is published in server by fixed Item version automatically, and the project of monitors distribution, obtains the item issued every time
Mesh version information simultaneously stores, and the plenty of time can only manually be wasted in the prior art by, which solving, is published to project in server, holds
Easily lead to project issue error so that user can not timely use the problem of newer project.In addition, it is supervised in the embodiment of the present invention
The project of issue is controlled, the situation of the project of issue can be understood in real time.For example, the project operation for working as issue goes wrong, judge
The reason for project operation of issue goes wrong.Project release method provided in an embodiment of the present invention stores the item issued every time
The information of mesh version, therefore, if mistake occurs in itself in project, before being searched in stored Item version information
The Item version that success is issued, and is issued again, avoid the project currently issued occur it is wrong after, can not in time will
The project that success is issued is distributed to server, and causing, which influences user, uses, and then influences user's life and either work or learn
The problem of.If the project operation currently issued go wrong be since server is unable to operate normally, can in time will be current
The project of issue is issued in the normal server of operating status, avoids that there are problems to cause more due to server self-operating
New project can not be issued in time, influence the problem of user uses.To sum up, using project publisher provided in an embodiment of the present invention
Method, which can reach, automatically issues project, saves manpower and time, reduces issue error rate so that user can be as early as possible
Using project more perfect after update, and can avoid issuing the unsuccessful advantageous effect that influence user is caused to use.
Above description is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention,
And can be practiced according to the content of specification, and in order to allow above and other objects of the present invention, feature and advantage can
It is clearer and more comprehensible, below the special specific embodiment for lifting the present invention.
According to the accompanying drawings to the detailed description of the specific embodiment of the invention, those skilled in the art will be brighter
The above and other objects, advantages and features of the present invention.
Description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this field
Technical staff will be apparent understanding.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention
Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 shows the process chart of project release method according to an embodiment of the invention;
Fig. 2 shows the process chart of project release method in accordance with a preferred embodiment of the present invention;And
Fig. 3 shows the structure diagram of project delivery system according to an embodiment of the invention.
Specific embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
Completely it is communicated to those skilled in the art.
In order to solve the above technical problems, an embodiment of the present invention provides a kind of project release methods.Fig. 1 is shown according to this
The process chart of the project release method of invention one embodiment.Referring to Fig. 1, which includes step S102 extremely
Step S106.
Step S102, project issue instruction is received, determines Item version to be released.
Step S104, according to the Item version determined in step S102, definite project is published in server.
Step S106, the project of monitors distribution obtains the Item version information issued every time and stores.
In embodiments of the present invention, project issue instruction can be received, determines Item version to be released, and then according to true
Definite project is published in server by fixed Item version automatically, and the project of monitors distribution, obtains the item issued every time
Mesh version information simultaneously stores, and the plenty of time can only manually be wasted in the prior art by, which solving, is published to project in server, holds
Easily lead to project issue error so that user can not timely use the problem of newer project.In addition, it is supervised in the embodiment of the present invention
The project of issue is controlled, the situation of the project of issue can be understood in real time.For example, the project operation for working as issue goes wrong, judge
The reason for project operation of issue goes wrong.Project release method provided in an embodiment of the present invention stores the item issued every time
The information of mesh version, therefore, if mistake occurs in itself in project, before being searched in stored Item version information
The Item version that success is issued, and is issued again, avoid the project currently issued occur it is wrong after, can not in time will
The project that success is issued is distributed to server, and causing, which influences user, uses, and then influences user's life and either work or learn
The problem of.If the project operation currently issued go wrong be since server is unable to operate normally, can in time will be current
The project of issue is issued in the normal server of operating status, avoids that there are problems to cause more due to server self-operating
New project can not be issued in time, influence the problem of user uses.To sum up, using project publisher provided in an embodiment of the present invention
Method, which can reach, automatically issues project, saves manpower and time, reduces issue error rate so that user can be as early as possible
Using project more perfect after update, and can avoid issuing the unsuccessful advantageous effect that influence user is caused to use.
In the embodiment of the present invention, Item version to be released is issued according to the actual content and product version of change issue
It is required that supporting paper needed for automatic tissue products edition upgrading code bag and issue.
For example, the embodiment of the present invention can be according to different issue demands(Such as developing engine, test machine and manufacturing machine), treat
The different release phase of items selection of issue and associated version, and determine to hold in the range of this issue.Afterwards, group
Knit product version upgrade code bag.For example, ant instruments can be started(It is a kind of that work is established based on programming language Java
Tool), and ant instruments are configured according to static configuration item.After being provided with, the project generation compiled will be needed under specified directory
Code is copied in the translation and compiling environment specified, and starts to be compiled item code.For avoid compilation time it is long, waste it is a large amount of when
Between, item code during compiling only for this issue change is compiled.It should be noted that server to item code into
During row compiling, the item code of change is only compiled, but compiles the item code completed to include all item code files, and
Being not only this needs item code to be changed.After compiling is completed, supporting paper needed for automatic tissue issue.In issue explanation
In file, the contents such as version flag, change record can be included.Wherein, version flag can include version number, the date of formation,
Rely on version(I.e. this upgrading is based on which kind of version), etc.;Change record can include sequence number, corresponding version number, raiser,
Date of presentation solves the problems, such as people, solves date, description, solution etc..In the embodiment of the present invention, automatic tissue products version
Supporting paper needed for this upgrade code bag and issue can save the time, avoid the occurrence of file and omit or repeat to issue to cause
Mistake.Also, when user carries out edition upgrading to project, the product for being suitble to terminal system can be selected according to supporting paper
Upgraded, promote user experience.
After specification needed for the automatic tissue products edition upgrading code bag of project to be released and issue, the present invention is real
It applies example and performs step S102 as shown in Figure 1, receive project issue instruction, and Item version to be released is determined according to instruction.
After determining, above-mentioned item code bag is obtained from configuration bank interface, and performs step S104 as shown in Figure 1, by the code
Bag is published in server.After server receives item code bag, which is compiled into machine and performs code,
Generate release process file.
When receiving project error execution, the embodiment of the present invention determines currently to issue Item version error, and is depositing
Succeeded the Item version issued before being searched in the Item version information of storage, issues the Item version for the issue that succeeded again.
As shown in the step S106 in Fig. 1, definite project is published to the project of monitors distribution after server by the embodiment of the present invention,
It obtains the Item version information issued every time and stores.Therefore, after currently issue Item version error, the embodiment of the present invention
Succeeded the Item version issued before can searching, and is issued again, after ensureing current issue Item version error,
User can be installed and used according to the existing Item version for having succeeded issue, avoid the current issue item because being updated to error
Mesh version causes user that can not use product either application and then to working or learning or live to make a very bad impression.
In addition, in the embodiment of the present invention, after current issue Item version error, can believe in stored Item version
The Item version issued that succeeded before being searched arbitrarily in breath is issued, for example, the successful committed memory issued before searching
The Item version of space minimum is issued, and the Item version for the rate minimum that reports an error that success is issued is issued etc. before searching
Deng.Preferably, in the embodiment of the present invention, searched in stored Item version information and issue Item version with current on the time
The Item version of the immediate issue that succeeded.On time with the immediate project issued of succeed of current issue Item version
Version, the newest Item version as in addition to the Item version currently issued.After the Item version error currently issued, adopt
The Item version that can ensure currently to issue with above-mentioned Item version newest in addition to the Item version currently issued is current
The most comprehensive version of function.In practice, the upgrading to product either application be usually to being not present in version before or
Incomplete function is further added or perfect and system mistake present in version before etc. is repaiied
Change.Therefore, the Item version currently issued can ensure that user currently downloads for the most comprehensive version of current function and install and use
Item version for the function that current success is issued is most perfect and the minimum Item version of mistake such as system mistake.Therefore, originally
In inventive embodiments, after current issue Item version error, searched preferably in stored Item version information on the time
With the Item version of the immediate issue that succeeded of current issue Item version.
It is mentioned above, in the embodiment of the present invention, after current issue Item version error, believe in stored Item version
The Item version that the issue that succeeded is searched in breath is issued.In addition, the embodiment of the present invention extracts Resolving probiems from repository
Inventory, tissue generation issue list supporting paper, can be according to problem in repository after ensureing current issue project error
The inventory of solution finds the problem of current issue Item version in time, and then expeditiously solves the problems, such as.If it will can currently send out
The problem of cloth Item version, solves, then can be issued again to currently issuing Item version, if can not, it timely feedbacks
Problem is further modified or perfect to backstage to currently issuing project.
It has been described above after definite project is published to server, if the Item version error such as where currently issued
Reason.When project is published in server, except the Item version currently issued is present with the project version that mistake causes currently to issue
Originally outside being unable to operate normally, if the operation of server in itself, there are problem, the project of also resulting in is unable to operate normally.Therefore,
The embodiment of the present invention can also be monitored the operating status of server.The embodiment of the present invention monitors at least one server
Operating status, and according to the operating status of at least one server, it is determined whether project hair is carried out at least one server
Cloth.When according to monitored results, monitor can not be run there are part server in the operating status of at least one server when, this
Definite project is published on the part server that can be run by inventive embodiments.The operating status of server is monitored
It can ensure to find the operating status of server in itself in time with the presence or absence of problem, and then can avoid issuing definite project
In the server that can not extremely run, the problem of definite project is caused not issue in time.
In addition, the embodiment of the present invention is monitored project issue situation.If according to monitored results, the project currently issued
In only part be successfully published to server, then the part issued not successfully in the project is distributed to server again.The present invention
Embodiment monitors project issue situation in real time, can ensure to find the item of issue in time during project is issued
The part issued not successfully in mesh, and it is issued again, guarantee the project version that efficiently and rapidly will currently issue
This is intactly distributed in server, and user is facilitated to be downloaded installation and use to project.
For the project release method of the embodiment of the present invention is illustrated must become apparent from it is clearer, now with a particular flow sheet pair
It is illustrated.Fig. 2 shows the process chart of project release method in accordance with a preferred embodiment of the present invention.Referring to figure
2, flow includes at least step S202 to step S224.
Step S202, the requirement that project to be released is issued according to the actual content and product version of change issue, automatically
Supporting paper needed for tissue products edition upgrading code bag and issue.
Step S204, the item code bag organized automatically in obtaining step S202 from configuration bank interface.
Step S206, project issue instruction is received, determines Item version to be released.
Step S208, the operating status of monitoring server.
Step S210, according to, to the monitored results of operation condition of server, judging operation condition of server in step S208
Whether normal operation.If so, step S212 is performed, if it is not, flow terminates.
For example, tri- presence server A, server B and server C servers.To above three in step S208
The operating status of server is monitored respectively.If according to the monitored results of step S208, server A and server C operations
State is normal, and server B can not be run, then this preferred embodiment only performs step S212 to server A and server C,
Its operation is then terminated for server B, issues project not in the server B until server B normal operation.
Step S212, definite project is published in server.
Specifically, after definite project is published in server, item code bag is compiled into machine by server
Code is performed, generates release process file.
Step S214, obtain the Item version information issued every time and store.
The Item version information issued every time is stored, can ensure when newest issue project exist mistake or
During the problem of there is an urgent need for improving, the Item version for the issue that succeeded before can issuing in time is avoided to server when on server
The successful project of any issue there is no the product either application causes user that can not be downloaded to the product or application
Installation and use, and then study and work or the life of user are influenced, it makes a very bad impression to user, reduces user experience.
Step S216, judge whether to receive project faulting instruction.If so, perform step S218.If it is not, perform step
S220。
Step S218, succeeded the Item version issued before searching, and issues again.
Specifically, after receiving project faulting instruction, this preferred embodiment determines currently to issue Item version error, and
Succeeded the Item version issued before being searched in stored Item version information, issues the project for the issue that succeeded again
Version.It is that function that current success is issued is most perfect and be to ensure that user is currently able to download the Item version installed and used
The minimum Item version of the mistake such as mistake of uniting, this preferred embodiment are searched on the time in stored Item version information with working as
The Item version of the preceding immediate issue that succeeded of issue Item version.
Step S220, project issue situation is monitored.
In the embodiment of the present invention, after definite project is distributed in server, project issue situation is monitored,
It is not limited to perform the step after reception faulting instruction is judged whether.In this example, for by the processing stream of project release method
Journey, which illustrates, to be more clearly understood, which is placed in judge whether receive faulting instruction after.
Step S222, whether the project currently issued according to the judgement of the monitored results of step S220 is all issued successfully.If
It is that flow terminates.If it is not, perform step S224.
It step S224, will be failed in the project when only part is successfully published to server in the project currently issued
The part of issue is distributed to server again, and flow terminates.
For example, the project currently issued of chat application includes dialog box chat part A, voice-enabled chat part B and remote
Journey Video chat C portion.When the project currently issued to the chat application is issued, if the monitoring according to step S220
As a result, step S222 judges that only dialog box chat part A and voice-enabled chat part B are successfully distributed in server, and it is long-range
Chat C portion fails issue.This preferred embodiment issues the remote chat C portion to server again, ensures the chat
Dialog box chat part A, voice-enabled chat part B and the long-distance video chat C portion of application are all completely distributed to server
In.
Based on same inventive concept, the embodiment of the present invention additionally provides a kind of project delivery system, for supporting above-mentioned
Project release method of one preferred embodiment of meaning or its combination.Fig. 3 shows project hair according to an embodiment of the invention
The structure diagram of distribution system.Referring to Fig. 3, which includes at least:
Receiver 310 is configured to the issue instruction of reception project, determines Item version to be released.
Distributor 320 is coupled with receiver 310, is configured to the Item version determined according to receiver, by definite item
Mesh is published in server.
Monitor 330 is coupled with distributor 320, is configured to the project of the issue of monitors distribution device 320, obtains hair every time
The Item version information of cloth.
Memory 340 is coupled with monitor 330, is configured to the Item version letter that control store monitor 330 is monitored and obtained
Breath.
In a preferred embodiment, receiver 310 is additionally configured to reception project faulting instruction, determines current issue item
Mesh version malfunctions;
Distributor 320 is additionally configured to the Item version issued that succeeded before being searched from memory 340, and issue again has become
The Item version of work(issue.
In a preferred embodiment, distributor 320 is additionally configured to search the time above with currently issuing from memory 340
The Item version of the immediate issue that succeeded of Item version, it is again immediate with current issue Item version in issuing time
Succeeded the Item version issued.
In a preferred embodiment, monitor 330 is additionally configured to monitor the operating status of at least one server, and
Monitored results are notified into distributor 320;
Distributor 320 is additionally configured to the operating status of at least one server monitored according to monitor 330, it is determined whether
Project issue is carried out at least one server.
In a preferred embodiment, monitor 330 is additionally configured to monitor in the operating status of at least one server
There are part servers to run, and monitored results are notified distributor 320;
Distributor 320 is additionally configured to definite project being published on the part server that can be run.
In a preferred embodiment, monitor 330 is additionally configured to the project issue situation of monitors distribution device 320, if
Part in the project is successfully published to server, some notifications distributor 320 that will be issued not successfully;
Distributor 320 is additionally configured to the part issued not successfully in the project being distributed to server again.
In summary, it can reach following beneficial to effect using project release method provided in an embodiment of the present invention and system
Fruit:
In embodiments of the present invention, project issue instruction can be received, determines Item version to be released, and then according to true
Definite project is published in server by fixed Item version automatically, and the project of monitors distribution, obtains the item issued every time
Mesh version information simultaneously stores, and the plenty of time can only manually be wasted in the prior art by, which solving, is published to project in server, holds
Easily lead to project issue error so that user can not timely use the problem of newer project.In addition, it is supervised in the embodiment of the present invention
The project of issue is controlled, the situation of the project of issue can be understood in real time.For example, the project operation for working as issue goes wrong, judge
The reason for project operation of issue goes wrong.Project release method provided in an embodiment of the present invention stores the item issued every time
The information of mesh version, therefore, if mistake occurs in itself in project, before being searched in stored Item version information
The Item version that success is issued, and is issued again, avoid the project currently issued occur it is wrong after, can not in time will
The project that success is issued is distributed to server, and causing, which influences user, uses, and then influences user's life and either work or learn
The problem of.If the project operation currently issued go wrong be since server is unable to operate normally, can in time will be current
The project of issue is issued in the normal server of operating status, avoids that there are problems to cause more due to server self-operating
New project can not be issued in time, influence the problem of user uses.To sum up, using project publisher provided in an embodiment of the present invention
Method, which can reach, automatically issues project, saves manpower and time, reduces issue error rate so that user can be as early as possible
Using project more perfect after update, and can avoid issuing the unsuccessful advantageous effect that influence user is caused to use.
In the specification provided in this place, numerous specific details are set forth.It is to be appreciated, however, that the implementation of the present invention
Example can be put into practice without these specific details.In some instances, well known method, structure is not been shown in detail
And technology, so as not to obscure the understanding of this description.
Similarly, it should be understood that in order to simplify the disclosure and help to understand one or more of each inventive aspect,
Above in the description of exemplary embodiment of the present invention, each feature of the invention is grouped together into single implementation sometimes
In example, figure or descriptions thereof.However, the method for the disclosure should be construed to reflect following intention:I.e. required guarantor
Shield the present invention claims the more features of feature than being expressly recited in each claim.It is more precisely, such as following
Claims reflect as, inventive aspect is all features less than single embodiment disclosed above.Therefore,
Thus the claims for following specific embodiment are expressly incorporated in the specific embodiment, wherein each claim is in itself
Separate embodiments all as the present invention.
Those skilled in the art, which are appreciated that, to carry out adaptively the module in the equipment in embodiment
Change and they are arranged in one or more equipment different from the embodiment.It can be the module or list in embodiment
Member or component be combined into a module or unit or component and can be divided into addition multiple submodule or subelement or
Sub-component.In addition at least some in such feature and/or process or unit exclude each other, it may be employed any
Combination is to this specification(Including adjoint claim, summary and attached drawing)Disclosed in all features and so disclosed appoint
Where all processes or unit of method or equipment are combined.Unless expressly stated otherwise, this specification(Including adjoint power
Profit requirement, summary and attached drawing)Disclosed in each feature can be by providing the alternative features of identical, equivalent or similar purpose come generation
It replaces.
In addition, it will be appreciated by those of skill in the art that although some embodiments described herein include other embodiments
In included some features rather than other feature, but the combination of the feature of different embodiments means in of the invention
Within the scope of and form different embodiments.For example, in detail in the claims, embodiment claimed it is one of arbitrary
It mode can use in any combination.
The all parts embodiment of the present invention can be with hardware realization or to be run on one or more processor
Software module realize or realized with combination thereof.It will be understood by those of skill in the art that it can use in practice
Microprocessor or digital signal processor(DSP)Come realize in project delivery system according to embodiments of the present invention some or
The some or all functions of person's whole component.The present invention is also implemented as performing one of method as described herein
Divide either whole equipment or program of device(For example, computer program and computer program product).Such this hair of realization
Bright program can may be stored on the computer-readable medium or can have the form of one or more signal.It is such
Signal can be downloaded from internet website to be obtained either providing on carrier signal or providing in the form of any other.
It should be noted that the present invention will be described rather than limits the invention for above-described embodiment, and ability
Field technique personnel can design alternative embodiment without departing from the scope of the appended claims.In the claims,
Any reference symbol between bracket should not be configured to limitations on claims.Word "comprising" does not exclude the presence of not
Element or step listed in the claims.Word "a" or "an" before element does not exclude the presence of multiple such
Element.The present invention can be by means of including the hardware of several different elements and being come by means of properly programmed computer real
It is existing.If in the unit claim for listing equipment for drying, several in these devices can be by same hardware branch
To embody.The use of word first, second, and third does not indicate that any order.These words can be explained and run after fame
Claim.
So far, although those skilled in the art will appreciate that detailed herein have shown and described multiple showing for the present invention
Example property embodiment, still, without departing from the spirit and scope of the present invention, still can according to the present disclosure directly
Determine or derive many other variations or modifications consistent with the principles of the invention.Therefore, the scope of the present invention is understood that and recognizes
It is set to and covers other all these variations or modifications.
The embodiment of the invention also discloses A1, a kind of project release method, including:
The issue instruction of reception project, determines Item version to be released;
According to definite Item version, definite project is published in server;
The project of monitors distribution obtains the Item version information issued every time and stores.
A2, the method according to A1, wherein, it further includes:
Reception project faulting instruction determines current issue Item version error;
Succeeded the Item version issued before being searched in stored Item version information, is had become again described in issue
The Item version of work(issue.
A3, the method according to A2, wherein, it is described successfully to have been sent out before lookup in stored Item version information
The Item version of cloth, including:It is searched in stored Item version information closest with current issue Item version on the time
Succeeded issue Item version.
A4, the method according to A2 or A3, wherein, after the reception project faulting instruction, further include:From repository
The inventory of middle extraction Resolving probiems, tissue generation issue list supporting paper.
A5, according to A1 to A4 any one of them methods, wherein, it is described that definite project is published to it in server
Before, it further includes:
Monitor the operating status of at least one server;
According to the operating status of at least one server, it is determined whether carry out item at least one server
Mesh is issued.
A6, the method according to A5, wherein, according to the operating status of at least one server, it is determined whether
Project issue is carried out at least one server, including:
It monitors when can not be run there are part server in the operating status of at least one server, item that will be definite
Mesh is published on the part server that can be run.
A7, according to A1 to A6 any one of them methods, wherein, it is described that definite project is published in server, wrap
It includes:
Item code bag is obtained from configuration bank interface, is published in server, by the server by the item
Mesh code bag is compiled into machine and performs code, generates release process file.
A8, according to A1 to A7 any one of them methods, wherein, further include:
Monitoring project issue situation, if in the project only part be successfully published to the server, by the project not into
The part of work(issue is distributed to the server again.
A9, according to A1 to A8 any one of them methods, wherein, the project to be released according to change issue reality
Content and the requirement of product version issue, supporting paper needed for automatic tissue products edition upgrading code bag and issue.
The embodiment of the invention also discloses B10, a kind of project delivery system, including:
Receiver is configured to the issue instruction of reception project, determines Item version to be released;
Distributor is configured to the Item version determined according to the receiver, and definite project is published in server;
Monitor is configured to monitor the project of the distributor issue, obtains the Item version information issued every time;
Memory is configured to store the Item version information that the monitor is monitored and obtained.
B11, the system according to B10, wherein,
The receiver is additionally configured to reception project faulting instruction, determines current issue Item version error;
The distributor is additionally configured to the Item version issued that succeeded before the memory look-up, issues institute again
State the Item version for the issue that succeeded.
B12, the system according to B11, wherein, the distributor be additionally configured to from the memory look-up time it is upper with
The Item version of the current immediate issue that succeed of issue Item version, issues that the time is upper and current issue project again
The Item version of the immediate issue that succeeded of version.
B13, according to B10 to B12 any one of them systems, wherein, the monitor is additionally configured to monitor at least one
The operating status of server, and monitored results are notified into the distributor;
The distributor is additionally configured to the operating status of at least one server monitored according to the monitor, really
It is fixed whether project issue to be carried out at least one server.
B14, the system according to B13, wherein, the monitor is additionally configured to monitor at least one server
There are part servers in operating status to run, and monitored results are notified the distributor;
The distributor is additionally configured to definite project being published on the part server that can be run.
B15, according to B10 to B14 any one of them systems, wherein,
The monitor is additionally configured to monitor the project issue situation of the distributor, if the part in the project is successfully sent out
Cloth is to the server, by distributor described in some notifications issued not successfully;
The distributor is additionally configured to the part issued not successfully in the project being distributed to the server again.
Claims (9)
1. a kind of project release method, including:
Grassroot project delivery system, the project delivery system receive project issue instruction, determine Item version to be released,
In, the project to be released is according to the actual content of change issue and the requirement of product version issue, automatic tissue products version
Supporting paper needed for this upgrade code bag and issue;
The project delivery system monitors the operating status of at least one server, and according to the fortune of at least one server
Row state, it is determined whether project issue is carried out at least one server;
Wherein, according to the operating status of at least one server, it is determined whether carried out at least one server
Project is issued, including:It monitors when can not be run there are part server in the operating status of at least one server, it will be true
Fixed project is published on the part server that can be run;
Definite project is published in the server that can be run by the project delivery system according to definite Item version;
The project of the project delivery system monitors distribution obtains the Item version information issued every time and stores;
The project delivery system receives project faulting instruction, and the inventory of Resolving probiems is extracted from repository, and tissue generation is asked
The problem of inscribing inventory supporting paper, and determining currently to issue Item version according to the inventory, issues again for described problem
The Item version;
Wherein, the Item version is issued again for described problem, including:If the problem of can currently issuing Item version
It solves, is then issued again to currently issuing Item version, if cannot solve, feedback problem to backstage, further to working as
Preceding issue project is modified.
2. it according to the method described in claim 1, wherein, further includes:
Determine current issue Item version error;Succeeded the project issued before being searched in stored Item version information
Version, the Item version for the issue that succeeded again described in issue.
3. according to the method described in claim 2, wherein, it is described searched in stored Item version information before succeeded
The Item version of issue, including:It searches in stored Item version information and is most connect with current issue Item version on the time
The Item version of the near issue that succeeded.
4. method according to any one of claims 1 to 3, wherein, it is described that definite project is published to what can be run
In server, including:
Item code bag is obtained from configuration bank interface, is published in the server that can be run, it will by the server
The item code bag is compiled into machine and performs code, generates release process file.
5. method according to any one of claims 1 to 3, wherein, it further includes:
Monitoring project issues situation, if only part is successfully published to the server that can be run in the project, by the project
In the part issued not successfully be distributed to the server again.
6. a kind of project delivery system, including:
Receiver is configured to the issue instruction of reception project, determines Item version to be released, wherein, the project to be released
According to the requirement that the actual content of change issue and product version are issued, automatic tissue products edition upgrading code bag and issue
Required supporting paper;
Distributor is configured to monitor the operating status of at least one server, and according to the operation of at least one server
State, it is determined whether project issue is carried out at least one server;
Wherein, according to the operating status of at least one server, it is determined whether carried out at least one server
Project is issued, including:It monitors when can not be run there are part server in the operating status of at least one server, it will be true
Fixed project is published on the part server that can be run, and the Item version determined according to the receiver, by what is determined
Project is published in the server that can be run;
Monitor is configured to monitor the project of the distributor issue, obtains the Item version information issued every time;
Memory is configured to store the Item version information that the monitor is monitored and obtained;
The receiver is additionally configured to reception project faulting instruction;The distributor is additionally configured to extract solution from repository
Inventory certainly, tissue generation issue list supporting paper, and the problem of determine currently to issue Item version according to the inventory, pin
Issue the Item version again to described problem;
Wherein, the Item version is issued again for described problem, including:If the problem of can currently issuing Item version
It solves, is then issued again to currently issuing Item version, if cannot solve, feedback problem to backstage, further to working as
Preceding issue project is modified.
7. system according to claim 6, wherein,
The receiver is additionally configured to determine current issue Item version error;
The distributor is additionally configured to the Item version issued that succeeded before the memory look-up, again described in issue
The Item version that success is issued.
8. system according to claim 7, wherein, the distributor be additionally configured to from the memory look-up time it is upper with
The Item version of the current immediate issue that succeed of issue Item version, issues that the time is upper and current issue project again
The Item version of the immediate issue that succeeded of version.
9. according to claim 6 to 8 any one of them system, wherein,
The monitor is additionally configured to monitor the project issue situation of the distributor, if the part in the project is successfully published to
The server that can be run, by distributor described in some notifications issued not successfully;
The distributor is additionally configured to the part issued not successfully in the project being distributed to the server again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410010157.2A CN103761612B (en) | 2014-01-09 | 2014-01-09 | Project release method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410010157.2A CN103761612B (en) | 2014-01-09 | 2014-01-09 | Project release method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103761612A CN103761612A (en) | 2014-04-30 |
CN103761612B true CN103761612B (en) | 2018-05-25 |
Family
ID=50528846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410010157.2A Expired - Fee Related CN103761612B (en) | 2014-01-09 | 2014-01-09 | Project release method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103761612B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105025033A (en) * | 2015-07-31 | 2015-11-04 | 成都亿信标准认证集团有限公司 | Project releasing device capable of preventing illegal access |
CN105138434A (en) * | 2015-07-31 | 2015-12-09 | 成都亿信标准认证集团有限公司 | Dual-machine hot-standby project publishing system |
CN106020896A (en) * | 2016-05-30 | 2016-10-12 | 浪潮软件股份有限公司 | Automated program issuing method based on private cloud |
CN107992420B (en) * | 2017-12-07 | 2021-05-25 | 北京奇虎科技有限公司 | Management method and system for test item |
CN109144524B (en) * | 2018-07-25 | 2022-08-23 | 深圳点猫科技有限公司 | Version release method of subject game on education platform and electronic equipment |
CN109101267B (en) * | 2018-07-31 | 2021-11-23 | 上海携程金融信息服务有限公司 | Application release management method and device, electronic equipment and storage medium |
CN111104125B (en) * | 2019-11-19 | 2023-09-08 | 泰康保险集团股份有限公司 | Intelligent integrated version management method, device, medium and electronic equipment |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7913247B2 (en) * | 2007-02-13 | 2011-03-22 | International Business Machines Corporation | Software updates based on RSS feeds |
CN101420325B (en) * | 2008-11-21 | 2012-03-07 | 华为技术有限公司 | Automatic deployment method, apparatus and system for software package |
CN103064666B (en) * | 2012-11-30 | 2016-08-24 | 北京奇虎科技有限公司 | One software distribution method by all kinds of means and system |
-
2014
- 2014-01-09 CN CN201410010157.2A patent/CN103761612B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103761612A (en) | 2014-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103761612B (en) | Project release method and system | |
US10824521B2 (en) | Generating predictive diagnostics via package update manager | |
CN104156244B (en) | A kind of method and apparatus of software upgrading | |
US8209564B2 (en) | Systems and methods for initiating software repairs in conjunction with software package updates | |
EP2932374B1 (en) | Systems, methods, and computer program products for a software build and load process using a compilation and deployment service | |
US20080244565A1 (en) | Dynamic software installation and configuration | |
US9116802B2 (en) | Diagnostic notification via package update manager | |
CN106293811A (en) | A kind of packing and issuing method and device automatically | |
CN107193607B (en) | Method and apparatus for updating code file, storage medium, processor, and terminal | |
US9542173B2 (en) | Dependency handling for software extensions | |
CN103034512A (en) | Method and device for updating programs | |
CN104915285A (en) | Container process monitoring method, device and system | |
CN113703730A (en) | Continuous integration method and device, computer equipment and storage medium | |
CN107704396A (en) | The method of testing and device of application program | |
CN112104501A (en) | Remote software upgrading method for agricultural machinery subsoiling Internet of things terminal equipment | |
CN105808278A (en) | Client version upgrading method and device | |
CN108268570A (en) | A kind of method and device of development interface | |
CN108037941A (en) | Application program update method, electronic equipment based on public plug-in unit, storage medium | |
CN108616391A (en) | Method and system for upgrading equipment firmware at server side | |
CN116820493A (en) | Mirror image file deployment method, system, equipment and storage medium | |
CN108874429B (en) | Android system integrated automatic packaging method | |
US20160335068A1 (en) | Checks for software extensions | |
CN103500114A (en) | Method and device for installing application program | |
CN107678969B (en) | Test version release method and device, version control equipment and test machine | |
CN104484176B (en) | A kind of Android system window object acquisition methods and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180525 Termination date: 20190109 |
|
CF01 | Termination of patent right due to non-payment of annual fee |