CN103716891A - Method and system for allocating PUCCH resource positions in LTE-A system - Google Patents

Method and system for allocating PUCCH resource positions in LTE-A system Download PDF

Info

Publication number
CN103716891A
CN103716891A CN201310752947.3A CN201310752947A CN103716891A CN 103716891 A CN103716891 A CN 103716891A CN 201310752947 A CN201310752947 A CN 201310752947A CN 103716891 A CN103716891 A CN 103716891A
Authority
CN
China
Prior art keywords
resource location
pucch resource
pucch
treatment
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310752947.3A
Other languages
Chinese (zh)
Other versions
CN103716891B (en
Inventor
李静
周陈芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN201310752947.3A priority Critical patent/CN103716891B/en
Publication of CN103716891A publication Critical patent/CN103716891A/en
Application granted granted Critical
Publication of CN103716891B publication Critical patent/CN103716891B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a method and a system for allocating PUCCH resource positions in an LTE-A system. The LTE-A system comprises a small main cell and a small auxiliary cell. The method comprises the steps of sequentially disposing user devices UE in a user queue waiting for downlink dispatch; looking for available resource positions from the high-level configured PUCCH resource positions if the currently disposed UE belong to carrier aggregation users and have downlink service in the small auxiliary cell; using the available resource positions to allocate downlink resources for the currently disposed UE. The allocating flexibility of the PUCCH resource positions is improved, accordingly resources of a PUCCH can be fully utilized, the uplink handling capacity can be improved, and channels adopted by a PUCCH1B CS can be selected flexibly.

Description

The method and system that in LTE-A system, PUCCH resource location distributes
Technical field
The present invention relates to communication technical field, particularly relate to a kind of method that in LTE-A system, PUCCH resource location distributes, and, the system that in a kind of LTE-A system, PUCCH resource location distributes.
Background technology
At LTE(Long Term Evolution, long evolving system) in system, LTE-A(LTE-Advanced, advanced long evolving system) be the evolution version of LTE, in order to meet the descending peak of LTE-A speed 1Gbps, the requirement of up peak speed 500Mbps, the transmission bandwidth of maximum 100MHz need to be provided, but rare due to the continuous frequency spectrum of so large bandwidth, LTE-A has proposed the solution of carrier aggregation (Carrier Aggregation, CA).So-called carrier aggregation is 2 or more carrier wave unit (Component Carrier, CC) to be condensed together to support to be to the maximum the transmission bandwidth of 100MHz.
PUCCH(Physical Uplink Control CHannel, physical uplink control channel) mainly carry SR(Schedule Request, dispatch request), ACK/NACK(Acknowledgement, positive acknowledgement/Negative Acknowledgement, Negative Acknowledgement) and CQI/PMI(Channel Quality Indicator, down channel quality indication/Precoding Matrix Indicator, pre-coding matrix indication), RI(Rank Indicator, stratum's indication), Format1 corresponding to PUCCH, Format1A/1B and Format2/2A/2B form.
Format1: for UE(User Equipment, subscriber equipment) up transmission dispatch request, base station side only needs to detect whether have such transmission;
Format1A/1B: for the up transmission of UE ACK/NACK;
Format1 is at system L3(layer 3) signal deployment is to the transmitted over resources of SR; Format1A/1B with descending PDCCH(Physical Downlink Control CHannel, physical downlink control channel) CCE(Control Channel Element, control channel unit) corresponding PUCCHACK/NACK transmitted over resources; When SR and uplink ACK/NACK need to transmit simultaneously, the transmitted over resources uplink ACK/NACK at L3 signal deployment to SR.The resource that the upper transmission of PUCCH uplink ACK takies is by RB(Resource Block, Resource Block) ID, frequency domain CDM code(frequency domain code) and field code during time domain CDM code() definite.
Format2: for sending the ACK/NACK information of 20 bits after up CQI feedback encoding, the data process specific search volume of UE-specific search space(subscriber equipment) after scrambling, carry out QPSK(Quadrature Phase Shift Keying, Quadrature Phase Shift Keying) modulation;
Format2A: add the ACK/NACK information of 1 bit for sending 20 bits after up CQI feedback encoding, carry out BPSK(Binary Phase Shift Keying, binary phase shift keying) modulation;
Format2B: add the ACK/NACK information of 2 bits for sending 20 bits after up CQI feedback encoding, adopt QPSK modulation;
PUCCH resource mapping: PUCCH is positioned at the both sides of system bandwidth, and two time slots of a subframe take frequency-hopping mode to obtain frequency diversity gain.
LTE-A agreement is because newly-increased carrier aggregation function has been introduced PUCCH1B CS form (PUCCH Format1B with Channel Selection), for transmitting descending ACK/NACK feedback.By using this form UE can feed back the descending reception result of different carrier.
PUCCH1B CS is that the PUCCH1B form based on LTE R8/9 agreement is derivative and next, although still only carry the feedback information of 2BIT, but base station in each subframe by the resource location of PUCCH1BCS and the content of carrying being detected, according to the mapping form providing in agreement, can confirm that UE is at the descending reception result of each carrier wave.PUCCH1B CS form supports at most 2 lower 2 code words of carrier wave in the reception condition of a plurality of descending sub frames, during terminal feedback reception result, spendable resource-niche is equipped with two kinds: a kind of is the CCE index using by PDCCH, uses the formula that agreement provides to calculate acquisition; Another kind is to configure acquisition by high-level signaling.The resource location in two kinds of sources, UE, according to reception condition, selects corresponding resource location to feed back according to agreement.The problem facing is now, high-level signaling is UE configurable four PUCCH1B CS resource locations at most, base station can specify one of them to UE, to use by the field of carrying in PDCCH flexibly in four resource locations, and how distributorship agreement does not have unified standard to these four resource locations.
In prior art, for the PUCCH1B CS resource location that guarantees to use between different UEs can not conflict, for PUCCH1B CS divides separately one section of fixing resource, use, this section of other PUCCH form of resource can not be used.The resource that this PUCCH1B CS resource distribution mode is wasted very much Physical Uplink Control Channel PUCCH, has direct impact to up throughput, and the channel that PUCCH1B CS adopts can not be selected flexibly by the field of PDCCH.
Therefore, need at present the urgent technical problem solving of those skilled in the art to be exactly: the mechanism that in a kind of LTE-A system, PUCCH resource location distributes is provided, in order to make full use of the resource of Physical Uplink Control Channel PUCCH, increase up throughput, and the channel that can select flexibly PUCCH1B CS to adopt.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of method that in LTE-A system, PUCCH resource location distributes, corresponding, and the present invention also provides the system that in a kind of LTE-A system, PUCCH resource location distributes.
In order to address the above problem, the invention discloses a kind of method that in LTE-A system, physical uplink control channel PUCCH resource location distributes, described LTE-A system comprises He Fu community, main plot, described method comprises:
From the Subscriber Queue of wait descending scheduling, process successively user equipment (UE);
If when the UE of pre-treatment is carrier aggregation user and has downlink business in described auxiliary community, search available resource location in the PUCCH resource location of high level configuration;
Adopt described available resource location for the UE allocation of downlink resource when pre-treatment.
Preferably, described step of searching available resource location in the PUCCH resource location of high level configuration comprises:
When the transmission mode of the described UE when pre-treatment is supported 1 transmission block, in 4 PUCCH resource locations of described high-rise configuration, search 1 PUCCH resource location;
Judge whether described 1 PUCCH resource location is taken by other UE;
If not, judge that described 1 PUCCH resource location is available resource location;
Or, when the transmission mode of the described UE when pre-treatment is supported 2 transmission blocks, in 4 pairs of PUCCH resource locations of described high-rise configuration, search 1 pair of PUCCH resource location;
Judge whether described 1 pair of PUCCH resource location is taken by other UE;
If not, judge that described 1 pair of PUCCH resource location is available resource location.
Preferably, described method also comprises:
If described 1 PUCCH resource location or 1 pair of PUCCH resource location are taken by other UE, it is not the described UE allocation of downlink resource when pre-treatment.
Preferably, described method also comprises:
If when the UE of pre-treatment is not carrier aggregation user, or, when the UE of pre-treatment is carrier aggregation user and there is no downlink business in described auxiliary community, calculate the PUCCH resource location that need to use when inferior;
If described, work as the inferior PUCCH resource location using that needs and by other UE, do not taken, the described UE that works as pre-treatment adopts described PUCCH resource location to carry out descending scheduling.
Preferably, described method also comprises:
If described, working as the inferior PUCCH resource location using that needs and taken by other UE, is not the described UE allocation of downlink resource when pre-treatment.
Preferably, the described available resource location of described employing comprises for working as the step of the UE allocation of downlink resource of pre-treatment:
To the described UE when pre-treatment, send physical downlink control channel PDCCH, described PDCCH comprises the available resource location that adopts TPC indication.
Preferably, described method also comprises:
UE in described Subscriber Queue is disposed, or, when described downlink resource is assigned, finish to distribute described PUCCH resource location.
Preferably, overlapping for the PUCCH resource interval range that feeds back the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK and calculated by control channel unit CCE of described high-rise configuration, described high-rise being determined by dispatch request SR resource, down channel quality indication CQI resource, semi-continuous scheduling SPS resource allocation for feeding back the original position of the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK of configuring.
The invention also discloses the system that in a kind of LTE-A system, physical uplink control channel PUCCH resource location distributes, described LTE-A system comprises He Fu community, main plot, and described system comprises:
UE processing module, for processing successively user equipment (UE) from the Subscriber Queue of wait descending scheduling;
Available resources location lookup module, is carrier aggregation user and while having downlink business in described auxiliary community for the UE when pre-treatment, in the PUCCH resource location of high level configuration, searches available resource location;
The first descending scheduling Executive Module, adopts described available resource location to carry out descending scheduling for the described UE when pre-treatment.
Preferably, described available resources location lookup module comprises:
First searches submodule, while supporting 1 transmission block for the transmission mode at the described UE when pre-treatment, in 4 PUCCH resource locations of described high-rise configuration, searches 1 PUCCH resource location;
First takies judgement submodule, for judging whether described 1 PUCCH resource location is taken by other UE;
The first decision sub-module, for when described 1 PUCCH resource location is not taken by other UE, judges that described 1 PUCCH resource location is available resource location;
Second searches submodule, while supporting 2 transmission blocks for the transmission mode at the described UE when pre-treatment, in 4 pairs of PUCCH resource locations of described high-rise configuration, searches 1 pair of PUCCH resource location;
Second takies judgement submodule, for judging whether described 1 pair of PUCCH resource location is taken by other UE;
The second decision sub-module, for when described 1 pair of PUCCH resource location is not taken by other UE, judges that described 1 pair of PUCCH resource location is available resource location.
Preferably, described available resources location lookup module can also comprise following submodule:
The first downlink resource is forbidden distribution sub module, for being taken by other UE at described 1 PUCCH resource location or 1 pair of PUCCH resource location, is not the described UE allocation of downlink resource when pre-treatment.
Preferably, described system also comprises:
Resource location computing module, is not carrier aggregation user for the UE when pre-treatment, or, when the UE of pre-treatment is carrier aggregation user and there is no downlink business in described auxiliary community, calculate the PUCCH resource location that need to use when inferior;
The second descending scheduling Executive Module, for when the described PUCCH resource location when time need using is not taken by other UE, the described UE when pre-treatment adopts described PUCCH resource location to carry out descending scheduling.
Preferably, described system can also comprise with lower module:
The second downlink resource is forbidden distribution module, for when the described PUCCH resource location using when inferior needs is taken by other UE, is not the described UE allocation of downlink resource when pre-treatment.
Preferably, described the first descending scheduling Executive Module can also comprise following submodule:
Resource location indication submodule, for sending physical downlink control channel PDCCH to the described UE when pre-treatment, described PDCCH comprises the available resource location that adopts TPC indication.
Preferably, described system can also comprise with lower module:
Finish distribution module, for the UE at described Subscriber Queue, be disposed, or, when described downlink resource is assigned, finish to distribute described PUCCH resource location.
Preferably, overlapping for the PUCCH resource interval range that feeds back the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK and calculated by control channel unit CCE of described high-rise configuration, described high-rise being determined by dispatch request SR resource, down channel quality indication CQI resource, semi-continuous scheduling SPS resource allocation for feeding back the original position of the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK of configuring.
Compared with prior art, the present invention includes following advantage:
The present invention is carrier aggregation user and while having downlink business in described auxiliary community by the UE when pre-treatment, in the PUCCH resource location of high level configuration, search available resource location, adopt described available resource location to carry out descending scheduling, high-rise configuration is reduced to auxiliary cell configuration resource and distributes PRB, thereby reduced the PUCCH resource location that high-rise configuration takies, search available resource location, increased the flexibility that PUCCH resource location distributes, thereby can make full use of the resource of Physical Uplink Control Channel PUCCH, increase up throughput, and the channel that can select flexibly PUCCH1B CS to adopt.
The present invention works as the mode of time PUCCH resource location of needs use and the PUCCH resource location combination of high-rise configuration by calculating, when obtaining scheduling, just distributes UE PUCCH resource location, reduced the waste of PUCCH resource location, with PUCCH resource location still less, keep for more carrier aggregation user's access, and, utilize the function of the field flexible dispatching of downlink resource, the channel that can select flexibly PUCCH1B CS to adopt, thereby effectively reduced taking of PUCCH resource location, and then make full use of the resource of Physical Uplink Control Channel PUCCH, increase up throughput.
Accompanying drawing explanation
Fig. 1 shows a kind of PUCCH resource location planning schematic diagram according to prior art;
Fig. 2 shows the flow chart of steps of the embodiment of the method 1 that in a kind of according to an embodiment of the invention LTE-A system, PUCCH resource location distributes;
Fig. 3 shows a kind of according to an embodiment of the invention PUCCH resource location planning schematic diagram;
Fig. 4 shows the flow chart of steps of the embodiment of the method 2 that in a kind of according to an embodiment of the invention LTE-A system, PUCCH resource location distributes;
Fig. 5 shows the structured flowchart of the system embodiment that in a kind of according to an embodiment of the invention LTE-A system, PUCCH resource location distributes.
Embodiment
For above-mentioned purpose of the present invention, feature and advantage can be become apparent more, below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
For LTE-A, agreement 36.213R10 has provided the application scenarios of PUCCH1B CS, is summarized as follows:
When UE is configured to 2 communities of carrier aggregation, can adopt PUCCH1B CS to carry out ACK/NACK feedback to downlink business, feedback takies PUCCH resource
Figure BDA0000451528290000071
in FDD(Frequency Division Duplexing, Frequency Division Duplexing (FDD)) with TDD(Time Division Duplexing, time division duplex) under pattern, UE calculates, selects
Figure BDA0000451528290000072
mode, protocol processes flow process different, below will describe respectively:
Under FDD, the handling process of agreement agreement PUCCH1B CS:
UE selects a PUCCH resource location in A PUCCH resource location
Figure BDA0000451528290000081
feed back, wherein 0≤j≤A-1.
Subframe n-4 in main plot receives PDCCH, the PUCCH resource location of use
Figure BDA0000451528290000082
wherein, n cCEthe first CCE numbering that PDCCH takies for this reason,
Figure BDA0000451528290000083
by high level, configured; When the TM of UE pattern (Transmission Mode, transmission mode) is supported 2 TB(Transmit Block, transmission block) time,
Figure BDA0000451528290000084
Subframe n-4 in main plot receives the PDSCH(Physical Downlink Shared Channel without PDCCH indication, physical down link sharing channel),
Figure BDA0000451528290000085
by high level, configured, when the TM of UE pattern is supported 2 TB,
Figure BDA0000451528290000086
The subframe n-4 of Fu community receives PDCCH, with the field indication UE in PDCCH, uses in 4 PUCCH resources that configured by high level one or a pair of, and when the TM of UE pattern is supported 2 TB, a pair of PUCCH resource is used in field indication:
Figure BDA0000451528290000087
otherwise use a PUCCH resource
Under TDD, the calculating of PUCCH resource location, selection mode because of the difference of downstream feedback set M size different, M is the element number of set K, set K representative be the descending sub frame set of feeding back at same sub-frame of uplink under TDD.
Under TDD, M=1 or 2 o'clock, the handling process of agreement agreement PUCCH1B CS:
When M=1 or M=2, if at main plot subframe n-k mreceive PDCCH, wherein k m∈ K, K is for main plot, k ma minimum value in the subframe of to be UE detect in set K PDCCH, i.e. put the descending sub frame of recent scheduling from the sub-frame of uplink of feedback in feedback set K.Definition n cCE, mthe first CCE numbering that PDCCH takies for this reason.Now, PUCCH resource n PUCCH , j ( 1 ) = ( M - m - 1 ) × N c + m × N c + 1 + n CCE , m + N PUCCH ( 1 ) . Wherein, c ∈ 0,1,2,3}, and need eligible
Figure BDA00004515282900000810
Figure BDA00004515282900000811
for the quantity of PRB on downlink bandwidth,
Figure BDA00004515282900000812
be that a PRB frequency domain is uploaded frequency amount.And when the TM of M=1 and UE pattern is supported 2 TB, PUCCH resource n PUCCH , j + 1 ( 1 ) = ( M - m - 1 ) × N c + m × N c + 1 + n CCE , m + N PUCCH ( 1 ) .
If receive the PDSCH without PDCCH indication at main plot subframe n-k,
Figure BDA00004515282900000814
by high level, configured.
Ruo Fu community subframe n-k receives PDCCH, wherein k ∈ K, gathers K for auxiliary community, with the field indication in PDCCH, uses in 4 PUCCH resources that configured by high level, when the TM of M=1 and UE pattern is supported 2 TB, a pair of PUCCH resource is used in field indication otherwise use a PUCCH resource
Figure BDA0000451528290000092
Under TDD, during M>2, the handling process of agreement agreement PUCCH1B CS:
When M>2, there are 4 PUCCH resource locations: 0≤i≤3.Wherein,
Figure BDA0000451528290000094
with
Figure BDA0000451528290000095
discharge to PDSCH transmission or the PDCCH release(PDCCH of main plot) relevant;
Figure BDA0000451528290000096
with the PDSCH transmission of Yu Fu community is relevant.
For main plot, if receive the PDSCH without PDCCH indication at subframe n-k,
Figure BDA0000451528290000098
by high level, configured, for subframe n-k mreceive PDSCH transmission or PDCCH release, wherein k m∈ K, and the DAI(Downlink Assignment Index in PDCCH, downlink allocation index) value is 1, PUCCH resource location n PUCCH , 1 ( 1 ) = ( M - m - 1 ) × N c + m × N c + 1 + n CCE , m + N PUCCH ( 1 ) ; Otherwise, for subframe n-k mreceive PDSCH transmission or PDCCH release, wherein k m∈ K, and the DAI value in PDCCH is 1 or 2, PUCCH resource n PUCCH , i ( 1 ) = ( M - m - 1 ) × N c + m × N c + 1 + n CCE , m + N PUCCH ( 1 ) , The PDCCH that i=0 is 1 corresponding to DAI value, the PDCCH that i=1 is 2 corresponding to DAI value.
For auxiliary community, if at subframe n-k mreceive by the PDCCH indication of main plot across carrier dispatching PDSCH, wherein k m∈ K, and the DAI value in PDCCH is 1 or 2, PUCCH resource location n PUCCH , i ( 1 ) = ( M - m - 1 ) × N c + m × N c + 1 + n CCE , m + N PUCCH ( 1 ) , The PDCCH that i=2 is 1 corresponding to DAI value, the PDCCH that i=3 is 2 corresponding to DAI value.If it is non-across carrier dispatching PDSCH to receive that at subframe n-k the PDCCH of You Fu community indicates, wherein k ∈ K, PUCCH resource location
Figure BDA00004515282900000912
with
Figure BDA00004515282900000913
by the field indication in PDCCH, use in 4 PUCCH resource locations that configured by high level, the corresponding a pair of PUCCH resource of field indication:
Figure BDA00004515282900000914
Under comprehensive above-mentioned FDD and TDD, PUCCH resource location computing formula has following 8 kinds altogether.With bandwidth 100PRB, DSUUD sub-frame formats (D is descending sub frame, and S is special subframe, and U is sub-frame of uplink) is example, calculates PUCCH Scope of Resources as shown in table 1, wherein, the PUCCH resource location feeding back for subframe n,
Figure BDA00004515282900000916
another PUCCH resource location that subframe n when transmitting 2 RB feeds back, n cCEwith n cCE, mthe first CCE numbering that PDCCH resource location takies for this reason,
Figure BDA00004515282900000917
by high level, configured,
Figure BDA00004515282900000918
Figure BDA00004515282900000919
for the quantity of PRB on downlink bandwidth,
Figure BDA0000451528290000101
be that a PRB frequency domain is uploaded frequency amount, in this example, (M-m-1) * N c+ m * N c+1+ n cCE, mspan be 0-317.
Figure BDA0000451528290000102
Table 1
The major parameter of the PUCCH resource location value while therefore, affecting 2 communities of carrier aggregation is:
Figure BDA0000451528290000103
by high level, by the n1PUCCH-AN in PUCCH configuration parameter, configured, span is 0~2047.
N cCEwith n cCE, m, be the first CCE numbering that corresponding PDCCH resource location takies, span is 0~87.
by high level by SPS(Semi Persist Schedule, semi-continuous scheduling) N1PUCCH-AN-PersistentList configuration in configuration parameter, span is 0~2047, to configurable 4 values of UE.
Figure BDA0000451528290000105
or
Figure BDA0000451528290000106
by high level, by the N1PUCCH-AN-CS-r10 in PUCCH configuration parameter, configured, span is 0~2047, and to the configurable 4 pairs of parameters of UE, every pair containing 2 values.
Wherein, n cCEwith n cCE, mfor the first CCE numbering that corresponding PDCCH takies, this parameter values, except the span by protocols limit, can not limit, otherwise will affect system call.Therefore, as seen from Table 1, the scope of PUCCH resource value depends on the parameter of high-rise configuration: n1PUCCH-AN, N1PUCCH-AN-PersistentList, N1PUCCH-AN-CS-r10.And PUCCH resource location is except for HARQ-ACK(Hybrid Automatic Repeat Request-Acknowledgement, mixed automatic retransfer request-positive acknowledgement) outside feedback, also needing to distribute to UE reports for SR and CQI, SR takies the sr-PUCCH-ResourceIndex of PUCCH resource location in high-rise configuration parameter and configures, and span is 0~2047; CQI takies the cqi-PUCCH-ResourceIndex of PUCCH resource location in high-rise configuration parameter and configures, and span is 0~1185.
Therefore, high level is planned PUCCH resource before resource allocation, as shown in Figure 1, in order to prevent bumping between resource requirement, from 0~2047, all kinds of demands are divided successively, separate between the SR resource of configuration, CQI resource, SPS resource allocation, auxiliary cell configuration resource 4 class resources, there is no overlay area.High level is asserted configuration parameter n1PUCCH-AN by the maximum PUCCH resource value in 4 class resources of configuration, associative list 1 is known, and the maximum of PUCCH resource is
Figure BDA0000451528290000112
span is 0~2047, i.e. high-rise configuration
Figure BDA0000451528290000113
value has been established the maximum occurrences of all PUCCH resource locations, so as long as reduce as far as possible
Figure BDA0000451528290000114
value size can reduce the shared resource of PUCCH, can effectively expand the available resources scope of PUSCH, thereby improve uplink throughput.
High-rise configuration
Figure BDA0000451528290000115
value determined the maximum occurrences of PUCCH resource, its span is 0~2047, PUCCH resource is pressed Format1, Format1A/1B and Format2/2A/2B form, be divided into PUCCH(1) resource and the PUCCH(2 of type) resource of type, the bandwidth of the down channel of 20M equals 100 PRB(Physical Resource Block, Physical Resource Block), when
Figure BDA0000451528290000116
value 2047, can carry at most 36 PUCCH(1 according to each PRB of protocol configuration) during the resource of type, only can take PRB number and just reach 57 of 2047/36 ≈.Therefore,, in order to take less PUCCH resource location as far as possible, just need to make
Figure BDA0000451528290000118
value as far as possible little, the conventional two kinds of technical schemes in this area are as follows:
Scheme one: high-rise is the unique available PUCCH(1 of each UE configuration) resource;
For the N1PUCCH-AN-PersistentList configuration in SPS configuration parameter, to configurable 4 values of UE.High level only configures 1 value to a UE, to reduce occupancy.
For N1PUCCH-AN-CS-r10 configuration, to the configurable 4 pairs of parameters of UE, every pair containing 2 values.High level only configures 1 pair of value to a UE, to reduce occupancy.
Scheme two: high-rise for every 4 UE configure identical 4/to PUCCH(1) resource;
For the N1PUCCH-AN-PersistentList configuration in SPS configuration parameter, to 4 configurable 4 identical values of UE.Between 4 UE, share 4 PUCCH(1) resource, by the field of PDCCH, in 4 positions, select a resource location not conflicting with other 3 UE to use, this method also can effectively reduce occupancy.
For N1PUCCH-AN-CS-r10 configuration, to 4 configurable 4 pairs of parameters of UE, every pair containing 2 values.Between 4 UE of high-rise configuration, share 4 couples of PUCCH(1) resource is also in 4 pairs of positions, to select resource a pair of and that other 3 UE do not conflict to use to reduce occupancy by the field of PDCCH.
Known by above-mentioned two schemes, in scheme one or scheme two
Figure BDA0000451528290000121
by SR resource, CQI resource, SPS resource allocation, auxiliary cell configuration resource 4 class resources, determined, all reduced to a certain extent
Figure BDA0000451528290000122
configuration Values, but along with the number of users supported of systems organization increases, reserved number of resources increases thereupon,
Figure BDA0000451528290000123
value also increases thereupon.For example planning system can be supported 400 survival users, according to scheme one, for each user configures 3 different resource values (containing N1PUCCH-AN-PersistentList configuration and N1PUCCH-AN-CS-r10 configuration), need 3 * 400=1200 resource location.According to scheme two, every 4 users need to configure 3 * 4=12 different resource value (containing N1PUCCH-AN-PersistentList configuration and N1PUCCH-AN-CS-r10 configuration), need 12 * (400/4)=1200 resource location.Can find out that the result that these two schemes are distributed is the same with effect.
Therefore there is the defect of three aspects in above-mentioned two schemes.One, two schemes are all equivalent to and for UE is unique, have configured an available SPS configuration and N1PUCCH-AN-CS-r10 configuration, even like this this UE this do not obtain scheduling, this PUCCH resource location is also still reserved out, causes unnecessary waste; Its two, high-rise configuration
Figure BDA0000451528290000131
value larger, may take up more PRB in order to feedback, cause up PUSCH resource location to reduce and affect system uplink throughput; Its three, scheme one is not utilized the function of PDCCH field flexible dispatching, though scheme two has been utilized the function of PDCCH field flexible dispatching, but actual effect is the same with scheme one, does not also introduce obvious benefit.
With reference to Fig. 1, show a kind of PUCCH resource location planning schematic diagram according to prior art, as shown in Figure 1, upstream bandwidth is divided into sequence number according to PRB unit
Figure BDA0000451528290000132
the quantity that represents PRB on upstream bandwidth, SR resource, CQI resource, SPS resource allocation, auxiliary cell configuration resource are determined the PUCCH resource location of high-rise configuration, when under tdd mode, subframe structure is DSUUD, configure each PRB and can carry at most 36 PUCCH(1) resource location of type, for SR resource, SPS resource allocation, auxiliary cell configuration resource are respectively distributed 2 PRB, so
Figure BDA0000451528290000133
be PUCCH(1) resource location of type need to take at most 216+318=534 index, needs 15 PRB of 534 ÷ 36 ≈ to deposit PUCCH(1), and can only carry 2 * 36=72 carrier aggregation user and access.
Inventor herein finds the seriousness of this problem just, one of core idea that creatively proposes the embodiment of the present invention is, the method and system that in a kind of LTE-A system, PUCCH resource location distributes is proposed, can share 4 pairs of index assignment to 8 UE, utilize to judge whether PUCCH resource location conflicts to realize the distribution of downlink resource, therefore high level is configured
Figure BDA0000451528290000134
become by SR resource, CQI resource, SPS resource allocation 3 class resources and determine, directly reduced
Figure BDA0000451528290000135
maximum occurrences, also just reduced taking of PUCCH resource location, and then reduced taking PUSCH resource location, thereby can carry more carrier aggregation user's access, make full use of the resource of Physical Uplink Control Channel PUCCH, the channel of selecting PUCCH1B CS to adopt flexibly, increases up throughput.
With reference to Fig. 2, show the flow chart of steps of the embodiment of the method 1 that in a kind of according to an embodiment of the invention LTE-A system, PUCCH resource location distributes, described LTE-A system comprises He Fu community, main plot, specifically can comprise the following steps:
Step 101 is processed successively user equipment (UE) from the Subscriber Queue of wait descending scheduling;
In actual applications, user equipment (UE) sends descending scheduling request in Subscriber Queue, according to a definite sequence, arranges and waits for descending scheduling, processes successively user equipment (UE) from Subscriber Queue.
Step 102, is carrier aggregation user and has downlink business in described auxiliary community if work as the UE of pre-treatment, in the PUCCH resource location of high level configuration, searches available resource location;
Carrier aggregation user is the user of the two or more carrier waves of polymerization unit to transmit.In LTE-A system, UE can pass through a plurality of carrier waves unit (CC1 after entering connected state simultaneously, CC2) communicate with source base station, base station can or approximately be decided to be a principal component carrier wave (Primary Component Carrier of UE appointment according to agreement by the configuration of demonstration, PCC), other carrier wave unit is called auxiliary component carrier (Secondary Component Carrier, SCC), Serving cell on principal component carrier wave is called main plot (Primary Cell, Pcell), Serving cell on auxiliary component carrier is called auxiliary community (Secondary Cell, Scell).High level refers to the RRC protocol layer of LTE, the signaling message that RRC protocol layer is stipulated by agreement, by PUCCH resource location by signal deployment to UE, configure to base station simultaneously, when same PUCCH resource location is used with UE in base station, can communicate by letter mutually.In specific implementation, the PUCCH resource location of described high-rise configuration be high-rise configuration for feeding back the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK, can overlapping with the PUCCH resource interval range being calculated by control channel unit CCE for feeding back the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK of described high-rise configuration, by reserved mode that the PUCCH resource location of the PUCCH resource location being calculated by CCE and high-rise configuration is overlapped, the PUCCH resource location being calculated by CCE is distributed to when terminal is used PUCCH1BCS and taken by high level.More preferably, described high-rise configuration can be determined by dispatch request SR resource, down channel quality indication CQI resource, semi-continuous scheduling SPS resource allocation for feeding back the original position of the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK.
When UE is carrier aggregation user and while having downlink business in described auxiliary community, due to 4 pairs of index assignment, give 8 UE and share, need in the PUCCH resource location of high level configuration, search available resource location.
In actual applications, the downlink transfer pattern of LTE mainly comprises following several:
1, TM1, single antenna port transmission: the occasion that is mainly used in single antenna transmissions;
2, TM2, sends diversity mode: be suitable for cell edge channel situation more complicated, disturb larger situation, sometimes, also for situation at a high speed, diversity can provide diversity gain;
3, TM3, large delay diversity: the situation that is appropriate to UE high-speed mobile;
4, TM4, Closed-Loop Spatial Multiplexing: be suitable for the good occasion of channel condition, for high data rate transmission is provided;
5, TM5, multi-user's multiple-input and multiple-output (MU-MIMO) transmission mode: the capacity that is mainly used to improve community.
6, TM6, the transmission of single current (Rank1): the situation that is mainly suitable for cell edge.
7, single current wave beam TM7, Port5(logic port 5) forms (Beamforming) pattern: be also mainly cell edge, and can be effectively to anti-interference.
8, TM8, double-current wave beam forms (Beamforming) pattern: can also can be applied to other scenes for cell edge.
9, TM9, transmission mode 9 is a kind of transmission modes that newly increase in LTE-A, can support to be up to the transmission of 8 layers, mainly for promoting message transmission rate.
10, TM10, transmission mode 10 is also a kind of transmission mode newly increasing in LTE-A, is mainly to support the multi-cell cooperating communication technology in order to be used for, and improves the communication quality of Cell Edge User, the throughput of elevator system.
In current LTE transmission mode, conventional TM2 and TM7 adopt the data that once send single current, TM3 and TM8 adopt and once send double-current data, the data of single current are exactly 1 TB, and the data of double fluid are exactly 2 TB, when downlink business being carried out to ACK/NACK feedback, to for each TB, feed back respectively, feeding back 1 TB needs 1 PUCCH resource location, so when the transmission mode of UE is supported 2TB, need 2 PUCCH resource locations.
According to the transmission mode of UE, support 1 TB, high level has configured 4 PUCCH resource locations accordingly for UE, therefrom search 1 PUCCH resource location, judge whether this 1 PUCCH resource location is taken by other UE, when not taken by other UE, this 1 PUCCH resource location is available resource location.
According to the transmission mode of UE, support 2 TB, high level has configured 4 pairs of PUCCH resource locations accordingly for UE, therefrom search 1 pair of PUCCH resource location, judge whether this 1 pair of PUCCH resource location is taken by other UE, when not taken by other UE, this 1 pair of PUCCH resource location is available resource location.
According to this situation, in the concrete a kind of preferred exemplary implemented of the present invention, described step 102 specifically can comprise following sub-step:
Sub-step S11, when the transmission mode of the described UE when pre-treatment is supported 1 transmission block, in 4 PUCCH resource locations of described high-rise configuration, searches 1 PUCCH resource location;
Sub-step S12, judges whether described 1 PUCCH resource location is taken by other UE;
Sub-step S13, if not, judges that described 1 PUCCH resource location is available resource location.
In the concrete another kind of preferred exemplary of implementing of the present invention, described step 102 specifically can comprise following sub-step:
Sub-step S21, when the transmission mode of the described UE when pre-treatment is supported 2 transmission blocks, in 4 pairs of PUCCH resource locations of described high-rise configuration, searches 1 pair of PUCCH resource location;
Sub-step S22, judges whether described 1 pair of PUCCH resource location is taken by other UE;
Sub-step S23, if not, judges that described 1 pair of PUCCH resource location is available resource location.
Certainly, the decision method of above-mentioned available resource location, just as example, when implementing the embodiment of the present invention, can arrange the decision method of other available resource locations according to actual conditions, and the embodiment of the present invention is not limited this.In addition, except the decision method of above-mentioned available resource location, those skilled in the art can also adopt the decision method of other available resource location according to actual needs, and the embodiment of the present invention is not limited this yet.
Step 103, adopts described available resource location for the UE allocation of downlink resource when pre-treatment.
In specific implementation, UE adopts described available resource location to carry out descending scheduling, is to determine after the PUCCH resource location of uplink feedback, the downlink resource of reentrying.
In a kind of preferred exemplary of the present invention, described step 103 can also comprise following sub-step:
Sub-step S31, sends physical downlink control channel PDCCH to the described UE when pre-treatment, and described PDCCH comprises the available resource location that adopts TPC indication.
A kind of example as embodiment of the present invention specific implementation, if PUCCH resource location is allocated successfully and finds available resource location, this UE adopts 1 PUCCH resource location of the TPC field indication of downlink resource, or 1 pair of PUCCH resource location carries out descending scheduling.
With reference to Fig. 3, show a kind of according to an embodiment of the invention PUCCH resource location planning schematic diagram, as shown in Figure 3, upstream bandwidth is divided into sequence number RB0-NRUBL-1 according to PRB unit, SR resource, CQI resource, SPS resource allocation is determined the PUCCH resource location of high-rise configuration, when under tdd mode, subframe structure is DSUUD, configure each PRB and can carry at most 36 PUCCH(1) resource location of type, it is only SR resource, SPS resource allocation respectively distributes 2 PRB, so, being PUCCH(1) resource location of type need to take at most 144+318=462 index, need 13 PRB of 462 ÷ 36 ≈ to deposit PUCCH(1) resource location of type, and can carry 318*2=636 carrier aggregation user access.
Certainly, above-mentioned index number, PRB number and carrier aggregation user access the computational methods of number just as example, when implementing the embodiment of the present invention, can the computational methods that other index numbers, PRB number and carrier aggregation user access number be set according to actual conditions, the embodiment of the present invention is not limited this.In addition, except above-mentioned index number, PRB number and carrier aggregation user access the computational methods of number, those skilled in the art can also adopt other index number, PRB number and carrier aggregation user to access the computational methods of number according to actual needs, and the embodiment of the present invention is not limited this yet.
The present invention is carrier aggregation user and while having downlink business in described auxiliary community by the UE when pre-treatment, in the PUCCH resource location of high level configuration, search available resource location, adopt described available resource location to carry out descending scheduling, high-rise configuration is reduced to auxiliary cell configuration resource and distributes PRB, thereby reduced the PUCCH resource location that high-rise configuration takies, search available resource location and increased the flexibility that PUCCH resource location distributes, thereby can make full use of the resource of Physical Uplink Control Channel PUCCH, increase up throughput, and the channel that can select flexibly PUCCH1B CS to adopt.
With reference to Fig. 4, show the flow chart of steps of the embodiment of the method 2 that in a kind of according to an embodiment of the invention LTE-A system, PUCCH resource location distributes, described LTE-A system comprises He Fu community, main plot, and described embodiment of the method 2 specifically can comprise the following steps:
Step 201 is processed successively user equipment (UE) from the Subscriber Queue of wait descending scheduling;
Step 202, judge whether the UE in described Subscriber Queue is disposed, or whether described downlink resource is assigned, and if so, performs step 211, if not, performs step 203;
Step 203, judgement, when whether the UE of pre-treatment is carrier aggregation user, if so, performs step 204, if not, performs step 209---step 210;
Step 210 that step 204, judges that whether carrier aggregation user Fu community has downlink business, if so, performs step 205---step 206, if not, performs step 209---;
Step 205 is searched available resource location in the PUCCH resource location of high level configuration;
In a kind of preferred exemplary of the present invention, described step 205 specifically can comprise following sub-step:
Sub-step S41, when the transmission mode of the described UE when pre-treatment is supported 1 transmission block, in 4 PUCCH resource locations of described high-rise configuration, searches 1 PUCCH resource location.
In another kind of preferred exemplary of the present invention, described step 205 specifically can comprise following sub-step:
Sub-step S51, when the transmission mode of the described UE when pre-treatment is supported 2 transmission blocks, in 4 pairs of PUCCH resource locations of described high-rise configuration, searches 1 pair of PUCCH resource location;
Step 206, judges whether described available resource location is taken by other UE; If not, perform step 207, if so, perform step 208;
In a kind of preferred exemplary of the present invention, described step 206 specifically can comprise following sub-step:
Sub-step S61, judges whether described 1 PUCCH resource location is taken by other UE;
Sub-step S62, if not, judges that described 1 PUCCH resource location is available resource location, and execution step 207, if so, performs step 208.
In another kind of preferred exemplary of the present invention, described step 206 specifically can comprise following sub-step:
Sub-step S71, judges whether described 1 pair of PUCCH resource location is taken by other UE;
Sub-step S72, if not, judges that described 1 pair of PUCCH resource location is available resource location, and if not, execution step 207, if so, performs step 208.
Step 207, adopts described available resource location for the UE allocation of downlink resource when pre-treatment, and returns to step 202;
In a kind of preferred exemplary of the present invention, described step 207 specifically can comprise following sub-step:
Sub-step S81, sends physical downlink control channel PDCCH to the described UE when pre-treatment, and described PDCCH comprises the available resource location that adopts TPC indication.
Step 208, is not the described UE allocation of downlink resource when pre-treatment, and returns to step 202;
Step 209, calculates the PUCCH resource location that needs use when inferior;
Whether step 210, work as the inferior PUCCH resource location of use that needs and by other UE, taken described in judging; If not, perform step 207, if so, perform step 208;
Step 211, finishes to distribute described PUCCH resource location.
In concrete application, judge whether this UE carries out carrier aggregation scheduling, if do not carry out carrier aggregation scheduling, this UE is not carrier aggregation user, according to agreement, calculate the PUCCH resource location that this need use, judge whether this PUCCH resource location is taken by other UE, unoccupied this UE can carry out descending scheduling, otherwise is not this UE allocation of downlink resource.
When this UE is that carrier aggregation user Qie Fu community does not have downlink business, according to agreement, calculate the PUCCH resource location that this need use, judge whether this PUCCH resource location is taken by other UE, unoccupied this UE can carry out descending scheduling, otherwise is not this UE allocation of downlink resource.
When this UE is that carrier aggregation user Qie Fu community has downlink business, in 4 PUCCH resource locations or 4 pairs of PUCCH resource locations of high level configuration, search 1 PUCCH resource location or 1 pair of PUCCH resource location, judge whether this 1 PUCCH resource location or 1 pair of PUCCH resource location are taken by other UE, unoccupied this UE can carry out descending scheduling, otherwise be not this UE allocation of downlink resource, to the described UE when pre-treatment, send physical downlink control channel PDCCH, described PDCCH comprises the available resource location that adopts TPC indication.Above-mentioned steps is carried out in circulation, until the UE in Subscriber Queue is disposed, or described downlink resource is assigned, and finishes to distribute PUCCH resource location.
It should be noted that, in a preferred embodiment of the present invention, the PUCCH resource location of described high-rise configuration be high-rise configuration for feeding back the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK, overlapping for the PUCCH resource interval range that feeds back the PUCCH resource interval range of HARQ-ACK and calculated by control channel unit CCE of high-rise configuration, described high-rise configuration for the original position of PUCCH resource interval range of feeding back mixed automatic retransfer request-positive acknowledgement HARQ-ACK by dispatch request SR resource, down channel quality indication CQI resource, semi-continuous scheduling SPS resource allocation is determined.I.e. high-rise configuration for the PUCCH resource location that feeds back mixed automatic retransfer request-positive acknowledgement HARQ-ACK with calculate when time needing the PUCCH resource location using can jointly take the PUCCH resource location being calculated by control channel unit CCE, again because 4 pairs of index assignment give 8 UE shared, therefore need in downlink resource allocation flow, increase the judgement flow process whether PUCCH resource location conflicts, increase the flexibility that PUCCH resource location distributes.
The present invention works as the mode of time PUCCH resource location of needs use and the PUCCH resource location combination of high-rise configuration by calculating, when obtaining scheduling, just distributes UE PUCCH resource location, reduced the waste of PUCCH resource location, with PUCCH resource location still less, keep for more carrier aggregation user's access, and, utilize the function of the field flexible dispatching of downlink resource, the channel that can select flexibly PUCCH1B CS to adopt, thereby effectively reduced taking of PUCCH resource location, and then make full use of the resource of Physical Uplink Control Channel PUCCH, increase up throughput.
It should be noted that, for embodiment of the method, for simple description, therefore it is all expressed as to a series of combination of actions, but those skilled in the art should know, the present invention is not subject to the restriction of described sequence of movement, because according to the present invention, some step can adopt other orders or carry out simultaneously.Secondly, those skilled in the art also should know, the embodiment described in specification all belongs to preferred embodiment, and related action might not be that the present invention is necessary.
With reference to Fig. 5, show the structured flowchart of the system embodiment that in a kind of according to an embodiment of the invention LTE-A system, PUCCH resource location distributes, described LTE-A system comprises He Fu community, main plot, specifically can comprise with lower module:
UE processing module 301, for processing successively user equipment (UE) from the Subscriber Queue of wait descending scheduling;
Available resources location lookup module 302, is carrier aggregation user and while having downlink business in described auxiliary community for the UE when pre-treatment, in the PUCCH resource location of high level configuration, searches available resource location;
The first descending scheduling Executive Module 303, for adopting described available resource location for the UE allocation of downlink resource when pre-treatment.
In a kind of preferred exemplary of the present invention, described available resources location lookup module 302 can comprise following submodule:
First searches submodule, while supporting 1 transmission block for the transmission mode at the described UE when pre-treatment, in 4 PUCCH resource locations of described high-rise configuration, searches 1 PUCCH resource location;
First takies judgement submodule, for judging whether described 1 PUCCH resource location is taken by other UE;
The first decision sub-module, for when described 1 PUCCH resource location is not taken by other UE, judges that described 1 PUCCH resource location is available resource location;
Second searches submodule, while supporting 2 transmission blocks for the transmission mode at the described UE when pre-treatment, in 4 pairs of PUCCH resource locations of described high-rise configuration, searches 1 pair of PUCCH resource location;
Second takies judgement submodule, for judging whether described 1 pair of PUCCH resource location is taken by other UE;
The second decision sub-module, for when described 1 pair of PUCCH resource location is not taken by other UE, judges that described 1 pair of PUCCH resource location is available resource location.
In a kind of preferred exemplary of the present invention, described available resources location lookup module 302 can also comprise following submodule:
The first downlink resource is forbidden distribution sub module, for being taken by other UE at described 1 PUCCH resource location or 1 pair of PUCCH resource location, is not the described UE allocation of downlink resource when pre-treatment.
In a kind of preferred exemplary of the present invention, described system can also comprise with lower module:
Resource location computing module, is not carrier aggregation user for the UE when pre-treatment, or, when the UE of pre-treatment is carrier aggregation user and there is no downlink business in described auxiliary community, calculate the PUCCH resource location that need to use when inferior;
The second descending scheduling Executive Module, for when the described PUCCH resource location using when inferior needs is not taken by other UE, the described UE when pre-treatment adopts described PUCCH resource location to carry out descending scheduling.
In a kind of preferred exemplary of the present invention, described system can also comprise with lower module:
The second downlink resource is forbidden distribution module, for when the described PUCCH resource location using when inferior needs is taken by other UE, is not the described UE allocation of downlink resource when pre-treatment.
In a kind of preferred exemplary of the present invention, described the first descending scheduling Executive Module 303 can also comprise following submodule:
Resource location indication submodule, for sending physical downlink control channel PDCCH to the described UE when pre-treatment, described PDCCH comprises the available resource location that adopts TPC indication.
In a kind of preferred exemplary of the present invention, described system can also comprise with lower module:
Finish distribution module, for the UE at described Subscriber Queue, be disposed, or, when described downlink resource is assigned, finish to distribute described PUCCH resource location.
In a kind of preferred exemplary of the present invention, overlapping for the PUCCH resource interval range that feeds back the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK and calculated by control channel unit CCE of described high-rise configuration, described high-rise being determined by dispatch request SR resource, down channel quality indication CQI resource, semi-continuous scheduling SPS resource allocation for feeding back the original position of the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK of configuring.
For system embodiment, because it is substantially similar to embodiment of the method, so description is fairly simple, relevant part is referring to the part explanation of embodiment of the method.
Each embodiment in this specification all adopts the mode of going forward one by one to describe, and each embodiment stresses is the difference with other embodiment, between each embodiment identical similar part mutually referring to.
Those skilled in the art should understand, embodiments of the invention can be provided as method, device or computer program.Therefore, the present invention can adopt complete hardware implementation example, implement software example or in conjunction with the form of the embodiment of software and hardware aspect completely.And the present invention can adopt the form that wherein includes the upper computer program of implementing of computer-usable storage medium (including but not limited to magnetic disc store, CD-ROM, optical memory etc.) of computer usable program code one or more.
The present invention is with reference to describing according to flow chart and/or the block diagram of the method for the embodiment of the present invention, equipment (system) and computer program.Should understand can be in computer program instructions realization flow figure and/or block diagram each flow process and/or the flow process in square frame and flow chart and/or block diagram and/or the combination of square frame.Can provide these computer program instructions to the processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing device to produce a machine, the instruction of carrying out by the processor of computer or other programmable data processing device is produced for realizing the device in the function of flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame appointments.
These computer program instructions also can be stored in energy vectoring computer or the computer-readable memory of other programmable data processing device with ad hoc fashion work, the instruction that makes to be stored in this computer-readable memory produces the manufacture that comprises command device, and this command device is realized the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame.
These computer program instructions also can be loaded in computer or other programmable data processing device, make to carry out sequence of operations step to produce computer implemented processing on computer or other programmable devices, thereby the instruction of carrying out is provided for realizing the step of the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame on computer or other programmable devices.
Although described the preferred embodiments of the present invention, once those skilled in the art obtain the basic creative concept of cicada, can make other change and modification to these embodiment.So claims are intended to all changes and the modification that are interpreted as comprising preferred embodiment and fall into the scope of the invention.
Finally, also it should be noted that, in this article, relational terms such as the first and second grades is only used for an entity or operation to separate with another entity or operating space, and not necessarily requires or imply and between these entities or operation, have the relation of any this reality or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thereby the process, method, article or the equipment that make to comprise a series of key elements not only comprise those key elements, but also comprise other key elements of clearly not listing, or be also included as the intrinsic key element of this process, method, article or equipment.The in the situation that of more restrictions not, the key element being limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment that comprises described key element and also have other identical element.
The method and system above PUCCH resource location in LTE-A system provided by the present invention being distributed, be described in detail, applied specific case herein principle of the present invention and execution mode are set forth, the explanation of above embodiment is just for helping to understand method of the present invention and core concept thereof; , for one of ordinary skill in the art, according to thought of the present invention, all will change in specific embodiments and applications, in sum, this description should not be construed as limitation of the present invention meanwhile.

Claims (11)

1. the method that in LTE-A system, physical uplink control channel PUCCH resource location distributes, is characterized in that, described LTE-A system comprises He Fu community, main plot, and described method comprises:
From the Subscriber Queue of wait descending scheduling, process successively user equipment (UE);
If when the UE of pre-treatment is carrier aggregation user and has downlink business in described auxiliary community, search available resource location in the PUCCH resource location of high level configuration;
Adopt described available resource location for the UE allocation of downlink resource when pre-treatment.
2. method according to claim 1, is characterized in that, described step of searching available resource location in the PUCCH resource location of high level configuration comprises:
When the transmission mode of the described UE when pre-treatment is supported 1 transmission block, in 4 PUCCH resource locations of described high-rise configuration, search 1 PUCCH resource location;
Judge whether described 1 PUCCH resource location is taken by other UE;
If not, judge that described 1 PUCCH resource location is available resource location;
Or, when the transmission mode of the described UE when pre-treatment is supported 2 transmission blocks, in 4 pairs of PUCCH resource locations of described high-rise configuration, search 1 pair of PUCCH resource location;
Judge whether described 1 pair of PUCCH resource location is taken by other UE;
If not, judge that described 1 pair of PUCCH resource location is available resource location.
3. method according to claim 2, is characterized in that, also comprises:
If described 1 PUCCH resource location or 1 pair of PUCCH resource location are taken by other UE, it is not the described UE allocation of downlink resource when pre-treatment.
4. method according to claim 1, is characterized in that, also comprises:
If when the UE of pre-treatment is not carrier aggregation user, or, when the UE of pre-treatment is carrier aggregation user and there is no downlink business in described auxiliary community, calculate the PUCCH resource location that need to use when inferior;
If described, work as the inferior PUCCH resource location using that needs and by other UE, do not taken, the described UE that works as pre-treatment adopts described PUCCH resource location to carry out descending scheduling.
5. method according to claim 4, is characterized in that, also comprises:
If described, working as the inferior PUCCH resource location using that needs and taken by other UE, is not the described UE allocation of downlink resource when pre-treatment.
6. according to the method in claim 2 or 3, it is characterized in that, the described available resource location of described employing comprises for working as the step of the UE allocation of downlink resource of pre-treatment:
To the described UE when pre-treatment, send physical downlink control channel PDCCH, described PDCCH comprises the available resource location that adopts TPC indication.
7. method according to claim 1, is characterized in that, also comprises:
UE in described Subscriber Queue is disposed, or, when described downlink resource is assigned, finish to distribute described PUCCH resource location.
8. method according to claim 1, it is characterized in that, overlapping for the PUCCH resource interval range that feeds back the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK and calculated by control channel unit CCE of described high-rise configuration, described high-rise being determined by dispatch request SR resource, down channel quality indication CQI resource, semi-continuous scheduling SPS resource allocation for feeding back the original position of the PUCCH resource interval range of mixed automatic retransfer request-positive acknowledgement HARQ-ACK of configuring.
9. the system that in LTE-A system, physical uplink control channel PUCCH resource location distributes, is characterized in that, described LTE-A system comprises He Fu community, main plot, and described system comprises:
UE processing module, for processing successively user equipment (UE) from the Subscriber Queue of wait descending scheduling;
Available resources location lookup module, is carrier aggregation user and while having downlink business in described auxiliary community for the UE when pre-treatment, in the PUCCH resource location of high level configuration, searches available resource location;
The first descending scheduling Executive Module, adopts described available resource location to carry out descending scheduling for the described UE when pre-treatment.
10. system according to claim 9, is characterized in that, described available resources location lookup module comprises:
First searches submodule, while supporting 1 transmission block for the transmission mode at the described UE when pre-treatment, in 4 PUCCH resource locations of described high-rise configuration, searches 1 PUCCH resource location;
First takies judgement submodule, for judging whether described 1 PUCCH resource location is taken by other UE;
The first decision sub-module, for when described 1 PUCCH resource location is not taken by other UE, judges that described 1 PUCCH resource location is available resource location;
Second searches submodule, while supporting 2 transmission blocks for the transmission mode at the described UE when pre-treatment, in 4 pairs of PUCCH resource locations of described high-rise configuration, searches 1 pair of PUCCH resource location;
Second takies judgement submodule, for judging whether described 1 pair of PUCCH resource location is taken by other UE;
The second decision sub-module, for when described 1 pair of PUCCH resource location is not taken by other UE, judges that described 1 pair of PUCCH resource location is available resource location.
11. systems according to claim 9, is characterized in that, also comprise:
Resource location computing module, is not carrier aggregation user for the UE when pre-treatment, or, when the UE of pre-treatment is carrier aggregation user and there is no downlink business in described auxiliary community, calculate the PUCCH resource location that need to use when inferior;
The second descending scheduling Executive Module, for when the described PUCCH resource location when time need using is not taken by other UE, the described UE when pre-treatment adopts described PUCCH resource location to carry out descending scheduling.
CN201310752947.3A 2013-12-31 2013-12-31 The method and system that PUCCH resource position is distributed in LTE A systems Active CN103716891B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310752947.3A CN103716891B (en) 2013-12-31 2013-12-31 The method and system that PUCCH resource position is distributed in LTE A systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310752947.3A CN103716891B (en) 2013-12-31 2013-12-31 The method and system that PUCCH resource position is distributed in LTE A systems

Publications (2)

Publication Number Publication Date
CN103716891A true CN103716891A (en) 2014-04-09
CN103716891B CN103716891B (en) 2017-07-28

Family

ID=50409339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310752947.3A Active CN103716891B (en) 2013-12-31 2013-12-31 The method and system that PUCCH resource position is distributed in LTE A systems

Country Status (1)

Country Link
CN (1) CN103716891B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016050137A1 (en) * 2014-09-30 2016-04-07 大唐移动通信设备有限公司 Tm9-based carrier aggregation method and device
CN105991209A (en) * 2015-01-27 2016-10-05 上海朗帛通信技术有限公司 Physical uplink control channel (PUCCH) method and apparatus for enhanced carrier aggregation (CA)
CN106304350A (en) * 2015-05-26 2017-01-04 普天信息技术有限公司 The PUCCH channel dynamic allocation method of SPS business and device
CN106304347A (en) * 2015-05-18 2017-01-04 普天信息技术有限公司 PUCCH resource collocation method in a kind of LTE-A
CN108347319A (en) * 2017-01-24 2018-07-31 普天信息技术有限公司 A kind of method, apparatus of resource allocation
CN108702768A (en) * 2018-04-24 2018-10-23 北京小米移动软件有限公司 Scheduling request transmission method and device and resource allocation methods and device
CN108834216A (en) * 2018-05-24 2018-11-16 京信通信系统(中国)有限公司 A kind of resource regulating method and device
CN110034865A (en) * 2018-01-12 2019-07-19 维沃移动通信有限公司 The determination method and its method of reseptance of PUCCH resource, terminal device and network side equipment
CN110140324A (en) * 2017-01-05 2019-08-16 夏普株式会社 Long physical uplink control channel (PUCCH) design of 5th generation (5G) new radio (NR)
CN111356232A (en) * 2018-12-21 2020-06-30 中国电信股份有限公司 Parameter configuration method, device and system and computer readable storage medium
CN111385899A (en) * 2018-12-28 2020-07-07 中兴通讯股份有限公司 Resource scheduling method and device, network equipment and readable storage medium
WO2020143245A1 (en) * 2019-01-11 2020-07-16 中国信息通信研究院 Method, device, and signaling for transmitting uplink control information
CN111713152A (en) * 2018-02-13 2020-09-25 华为技术有限公司 Communication method and device
US11166262B2 (en) 2017-01-05 2021-11-02 FG Innovation Company Limited Long physical uplink control channel (PUCCH) design for 5th generation (5G) new radio (NR)
WO2022077304A1 (en) * 2020-10-15 2022-04-21 Zte Corporation Dynamically triggering carrier for uplink control channel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102014505A (en) * 2009-11-03 2011-04-13 大唐移动通信设备有限公司 Method, equipment and system for resource allocation of upstream control channel
CN103068047A (en) * 2011-10-21 2013-04-24 普天信息技术研究院有限公司 Physical uplink control channel resource allocation method
CN103283166A (en) * 2011-01-07 2013-09-04 英特尔公司 Resource allocation for pucch format 1b with channel selection in an LTE- TDD system
CN103384183A (en) * 2012-05-04 2013-11-06 电信科学技术研究院 Uplink control information transmission method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102014505A (en) * 2009-11-03 2011-04-13 大唐移动通信设备有限公司 Method, equipment and system for resource allocation of upstream control channel
CN103283166A (en) * 2011-01-07 2013-09-04 英特尔公司 Resource allocation for pucch format 1b with channel selection in an LTE- TDD system
CN103068047A (en) * 2011-10-21 2013-04-24 普天信息技术研究院有限公司 Physical uplink control channel resource allocation method
CN103384183A (en) * 2012-05-04 2013-11-06 电信科学技术研究院 Uplink control information transmission method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
3GPP: "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 10)", 《3GPP TS 36.213 》 *

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016050137A1 (en) * 2014-09-30 2016-04-07 大唐移动通信设备有限公司 Tm9-based carrier aggregation method and device
US10362578B2 (en) 2014-09-30 2019-07-23 Datang Mobile Communications Equipment Co., Ltd. TM9-based carrier aggregation method and device
CN105991209A (en) * 2015-01-27 2016-10-05 上海朗帛通信技术有限公司 Physical uplink control channel (PUCCH) method and apparatus for enhanced carrier aggregation (CA)
US10798690B2 (en) 2015-01-27 2020-10-06 Sisvel International S.A. PUCCH methods and apparatuses of enhanced CA in UE and base station
CN106304347A (en) * 2015-05-18 2017-01-04 普天信息技术有限公司 PUCCH resource collocation method in a kind of LTE-A
CN106304347B (en) * 2015-05-18 2019-06-28 普天信息技术有限公司 PUCCH resource configuration method in a kind of LTE-A
CN106304350B (en) * 2015-05-26 2019-07-23 普天信息技术有限公司 The PUCCH channel dynamic allocation method and device of SPS business
CN106304350A (en) * 2015-05-26 2017-01-04 普天信息技术有限公司 The PUCCH channel dynamic allocation method of SPS business and device
CN110140324B (en) * 2017-01-05 2021-12-14 夏普株式会社 Long Physical Uplink Control Channel (PUCCH) design for fifth generation (5G) New Radio (NR)
CN110140324A (en) * 2017-01-05 2019-08-16 夏普株式会社 Long physical uplink control channel (PUCCH) design of 5th generation (5G) new radio (NR)
US11166262B2 (en) 2017-01-05 2021-11-02 FG Innovation Company Limited Long physical uplink control channel (PUCCH) design for 5th generation (5G) new radio (NR)
CN108347319B (en) * 2017-01-24 2020-10-20 普天信息技术有限公司 Resource allocation method and device
CN108347319A (en) * 2017-01-24 2018-07-31 普天信息技术有限公司 A kind of method, apparatus of resource allocation
CN110034865A (en) * 2018-01-12 2019-07-19 维沃移动通信有限公司 The determination method and its method of reseptance of PUCCH resource, terminal device and network side equipment
CN110034865B (en) * 2018-01-12 2020-09-15 维沃移动通信有限公司 PUCCH resource determination method, PUCCH resource receiving method, terminal equipment and network side equipment
CN111713152B (en) * 2018-02-13 2023-10-20 华为技术有限公司 Communication method and device
CN111713152A (en) * 2018-02-13 2020-09-25 华为技术有限公司 Communication method and device
CN108702768A (en) * 2018-04-24 2018-10-23 北京小米移动软件有限公司 Scheduling request transmission method and device and resource allocation methods and device
CN108834216A (en) * 2018-05-24 2018-11-16 京信通信系统(中国)有限公司 A kind of resource regulating method and device
CN108834216B (en) * 2018-05-24 2023-05-16 京信网络系统股份有限公司 Resource scheduling method and device
CN111356232B (en) * 2018-12-21 2022-08-30 中国电信股份有限公司 Parameter configuration method, device and system and computer readable storage medium
CN111356232A (en) * 2018-12-21 2020-06-30 中国电信股份有限公司 Parameter configuration method, device and system and computer readable storage medium
CN111385899A (en) * 2018-12-28 2020-07-07 中兴通讯股份有限公司 Resource scheduling method and device, network equipment and readable storage medium
CN111385899B (en) * 2018-12-28 2023-03-14 中兴通讯股份有限公司 Resource scheduling method and device, network equipment and readable storage medium
CN111436125A (en) * 2019-01-11 2020-07-21 中国信息通信研究院 Method, equipment and signaling for sending uplink control information
WO2020143245A1 (en) * 2019-01-11 2020-07-16 中国信息通信研究院 Method, device, and signaling for transmitting uplink control information
WO2022077304A1 (en) * 2020-10-15 2022-04-21 Zte Corporation Dynamically triggering carrier for uplink control channel

Also Published As

Publication number Publication date
CN103716891B (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN103716891A (en) Method and system for allocating PUCCH resource positions in LTE-A system
US11387953B2 (en) Method and apparatus for allocating HARQ-ACK channel resources supporting transmit diversity and channel selection
US10079669B2 (en) Selection of acknowledgment timing in wireless communications
JP6466515B2 (en) Periodic channel state information report for cooperative multipoint (CoMP) systems
US11637659B2 (en) Method and apparatus for transmitting HARQ-ACK feedback information in an enhanced carrier aggregation system
EP3512146B1 (en) Multi-cell periodic/sps csi reporting for wireless network
CN107210857B (en) Method for reporting channel status in wireless communication system and apparatus therefor
JP6543341B2 (en) Method and apparatus for transmitting uplink control information
KR101847671B1 (en) Data transmitting method and device
RU2551669C2 (en) Resource allocation for pucch format 1b with channel selection in lte-a tdd system
US9743389B2 (en) Physical uplink control channel resource allocation for multiple channel state indicators colliding in same subframe
CN101489255B (en) Sending method, apparatus and system for uplink control channel
US8923253B2 (en) Methods for transmitting and receiving channel state information (CSI) and apparatuses thereof
CN105612711B (en) Transmission method, device and the equipment of response message
KR20160107293A (en) Power control method and power control apparatus for uplink channels
CN105191174A (en) Method for canceling interference in wireless communication system and apparatus therefor
CN104396174A (en) Hybrid automatic repeat request-acknowledge (harq-ack) codebook generation for inter-band time division duplex (tdd) carrier aggregation (ca)
CN105323040B (en) Channel selection for carrier wave polymerization
CN110036689A (en) The instruction of uplink chain in wireless communication channel information feedback time
KR20150005530A (en) Method for transceiving data in wireless communication system, and apparatus therefor
CN105099603A (en) Channel state information report method and device
CN102948100A (en) Support of ul ack/nack feedback for carrier aggregation during timing uncertainty component carrier (re-) configuration / activation /de -act i vat ion period
JP6564052B2 (en) Channel state information transmission method, user equipment, and access network device
KR20180077222A (en) Method and apparatus for transmitting uplink control information (UCI)
CN108901071A (en) channel measuring method and user equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant