CN103670271B - Two-way Cycle relay-type coal seam drilling method - Google Patents

Two-way Cycle relay-type coal seam drilling method Download PDF

Info

Publication number
CN103670271B
CN103670271B CN201310755047.4A CN201310755047A CN103670271B CN 103670271 B CN103670271 B CN 103670271B CN 201310755047 A CN201310755047 A CN 201310755047A CN 103670271 B CN103670271 B CN 103670271B
Authority
CN
China
Prior art keywords
well
drilling
sleeve
coal seam
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310755047.4A
Other languages
Chinese (zh)
Other versions
CN103670271A (en
Inventor
杨勇
胡书宝
倪元勇
刘永峰
李跃奇
李立昌
蒋海涛
王风锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201310755047.4A priority Critical patent/CN103670271B/en
Publication of CN103670271A publication Critical patent/CN103670271A/en
Application granted granted Critical
Publication of CN103670271B publication Critical patent/CN103670271B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of Two-way Cycle relay-type coal seam drilling method, comprise the following steps: (1) bores mining well: well cementation after spudding in brill completion, setting of casing at twice, expansion cave, coal seam; (2) bore horizontal branch well: by twice brill completion of spudding in, after ending brill two, lower bilayer sleeve, make inner layer sleeve be suspended on outer layer sleeve interior and placed in the middle, end 0.5 ~ 10m more than the casing shoe of outer layer sleeve of inner layer sleeve; Three spud in into time walk around described mining well, be not first communicated with, after completing horizontal branch well construction, drill through described mining well; (3) shut-in well and operation: cementing plug, envelope horizontal branch well well head, utilizes mining down-hole pump, draining and produces coal gas.This boring method forms Two-way Cycle more than casing shoe, Two-way Cycle effect is relied on to accelerate to return from after the ickings arrival casing shoe of horizontal bare hole section, improve the stability of drilling well returning fluid and return output, increasing prop-carrying capacity, reduce or eliminate the generation of lock of tool drilling.

Description

Two-way Cycle relay-type coal seam drilling method
Technical field
The present invention relates to CBM Drilling field of engineering technology, particularly relate to a kind of Two-way Cycle relay-type coal seam drilling method.
Background technology
At present, in CBM exploration and development, the mode that domestic and international drilling technology generally all adopts brill horizontal branch well and mining well to combine.See Fig. 1, brill completion main flow is as follows at present:
1, bore mining well: cement the well after once spud in (hereinafter referred to as " one opens ") bores completion, setting of casing, then secondary spuds in after (opening hereinafter referred to as two) bores completion, setting of casing and cements the well, and expands cave, coal seam afterwards; 2, bore horizontal branch well, setting of casing before entering horizontal segment is also cemented the well, then makes a call to one section of horizontal bare hole well with drilling rod tail band drill bit, by directional technology through after mining straight well, coal seam water plane is beaten the Multilateral Wells of varying number; 3, cementing plug, envelope horizontal branch well well head; 4, mining down-hole pump is utilized, draining and production coal gas.
In said method, mining well mainly plays two effects: one is draining and production coal gas after finishing drilling, and two is air injections in brill horizontal branch well process, assists drilling fluid to take sand and underbalance.This method leaning on the gas injection of mining well to increase circulation prop-carrying capacity can cause the instability of well head pressure and returning fluid, and the risk of aggravation ickings precipitation and bit freezing, facts have proved larger side effect.Through data statistics, in 48 mouthfuls of Multilateral Wells that North China Oilfield company completes over nearly 5 years, only have 14 mouthfuls smoothly, have 14 mouthfuls to collapse and bury drilling tool accident, expense about 20,000,000 RMB is amounted in loss.Cause of accident is mainly as follows: 1, coal seam buried depth shallow (vertical depth < 700m), poor diagenetic grade, and easily collapse block, and this is natural quality; 2, spud in brill bore hole process in horizontal branch well third time, due to annular space between drilling rod sleeve pipe large (spacing 33.0mm), it is low that drilling fluid returns speed, when ickings concentration height, be not enough to whole ickings to recycle well head, cause ickings to block annular space, in addition coal seam bearing capacity is very low again, very easily leaked by pressure, cause well head to lose and return, ickings is understood rapid precipitation and buries dead drilling tool; 3, during mining well air injection, except forming mixed gas drilling fluid, reducing in well except back pressure (i.e. underbalance) effect, also expand by gas itself and help take sand.But, because the bore hole borehole wall is irregular, form air cavity at big hole place, when pressure is low can not with drilling fluid mixed, pressure discharges suddenly after reaching certain value, there will be gas injection pressure and well head returns output cyclic fluctuation, thus exacerbates hole collapse and bit freezing.
Summary of the invention
The object of this invention is to provide a kind of coal seam drilling method of the exploration and development operation for coal bed gas, to solve, mining well air circulation is unstable and annular space is large, return the problem that speed is low and prop-carrying capacity is weak, the impact of easily collapsing in mining well gas injection coal seam can be eliminated again simultaneously, reduce or stop lock of tool drilling generation.
For this reason, technical scheme of the present invention is as follows:
A kind of Two-way Cycle relay-type coal seam drilling method, comprises the following steps:
(1) mining well is bored: well cementation after spudding in brill completion, setting of casing at twice, expansion cave, coal seam;
(2) bore horizontal branch well: by twice brill completion of spudding in, after second time spuds in finishing drilling, lower bilayer sleeve, makes inner layer sleeve be suspended on outer layer sleeve interior and placed in the middle, and the end of inner layer sleeve 0.5 ~ 10m more than the casing shoe of outer layer sleeve; Third time spud in creep into time, Two-way Cycle relay-type is relied on to take sand, walk around mining well, after completing horizontal branch well construction, drill through described mining well, wherein, described Two-way Cycle relay-type takes sand: while drilling rod feed liquor, from feed liquor between described bilayer sleeve, return on after the drilling fluid between bilayer sleeve arrives bottom sleeve footwear and enter between drilling rod and described inner layer sleeve, together with after mixing with drilling circulation liquid, recycle well head;
(3) shut-in well and operation: cementing plug, envelope horizontal branch well well head, utilizes mining down-hole pump, draining and produces coal gas.
Preferably, in brill mining well process, first time spuds in and adopts the drilling well of φ 311.15mm drill bit, and after completion, lower φ 244.5mm sleeve pipe, makes cementing concrete return to ground afterwards; Second time is spudded in and is adopted the drilling well of φ 215.9mm drill bit, and lower φ 177.8mm sleeve pipe after completion, wherein coal seam section uses glass reinforced plastic sleeve, and cementing concrete returns to 200m high, descends drill bit afterwards, and in Chu Kuo cave, coal seam to diameter 0.4 ~ 0.7m, then coal seam section is buried in back-up sand.
Preferably, bore in Completion Operations at horizontal branch well, first time spuds in and adopts the drilling well of φ 444.5mm drill bit, lower φ 339.7mm sleeve pipe after completion, and cementing concrete returns to ground; Second time is spudded in and is adopted the drilling well of φ 311.15mm drill bit, kickoff point (KOP) 50 ~ 600m, the outer layer sleeve of lower φ 244.5mm, cementing concrete is minimum to be returned to 200m high, descends more than the inner layer sleeve of φ 177.8mm to the casing shoe of described φ 244.5mm sleeve pipe 0.5 ~ 10m afterwards, makes it placed in the middle but do not cement the well, only use as circulation, to replace mining well method of gas injection, at the next centralizer of every 3 inner layer sleeves of straight well section, at the next centralizer of every 1 inner layer sleeve of gradient section; Third time spuds in and adopts the drilling well of φ 152.4mm drill bit.
Boring method of the present invention, owing to adding internal layer small casing, many liquid phase circulation passages, in addition original drilling rod circulation, just defines Two-way Cycle more than casing shoe.Rely on the similar relay of Two-way Cycle effect equally to accelerate to return from after the ickings arrival casing shoe of horizontal bare hole section, thus improve the stability of drilling well returning fluid and return output, increase prop-carrying capacity, reduce or eliminate the generation of lock of tool drilling.Owing to taking sand without mining well air assisted, first walking around mining well (later stage is break-through again) when creeping into, doing so avoids the impact that in the cyclic process of mining well, ickings collapses, more ensure that and creep into safely and fast.
Accompanying drawing explanation
Fig. 1 is existing drilled well bore structural representation;
Fig. 2 is the drilled well bore structural representation got out by method of the present invention.
Detailed description of the invention
Two-way Cycle relay-type coal seam drilling method of the present invention is divided into following three phases:
(1) mining well is bored: well cementation after spudding in brill completion, setting of casing at twice, expansion cave, coal seam;
(2) bore horizontal branch well: by twice brill completion of spudding in, after second time spuds in finishing drilling, lower bilayer sleeve, make inner layer sleeve be suspended on outer layer sleeve interior and placed in the middle, and the end of inner layer sleeve is at the above 0.5-10m of the casing shoe of outer layer sleeve; Walk around described mining well when third time spuds in and creeps into, be not first communicated with, after completing horizontal branch well construction, drill through described mining well;
(3) shut-in well and operation: after tripping out inner layer sleeve, at the suitable well section cementing plug of outer layer sleeve, shutoff horizontal branch well well head, utilizes mining down-hole pump, draining and produces coal gas.
Fig. 2 is a specific embodiment of the present invention, is described in further detail method of the present invention below in conjunction with Fig. 2.For clarity sake illustrating with being convenient to, having marked corresponding drill bit and casing size in the drawings.
As shown in Figure 1, Two-way Cycle relay-type coal seam drilling method is divided into following three phases:
(1) the brill completion of mining well:
One opens: adopt drilling fluid, the drilling well of φ 311.15mm drill bit, lower φ 244.5mm sleeve pipe, cementing concrete returns to ground;
Two open: adopt drilling fluid, the drilling well of φ 215.9mm drill bit, lower φ 177.8mm sleeve pipe, and wherein coal seam section uses glass reinforced plastic sleeve, and cementing concrete returns to 200m high, lower drill bit, and in Chu Kuo cave, coal seam, diameter is about φ 0.7m, and coal seam section is buried in back-up sand afterwards.
(2) horizontal branch well bores completion:
One opens: adopt drilling fluid, the drilling well of φ 444.5mm drill bit, lower φ 339.7mm sleeve pipe, cementing concrete returns to ground;
Two open: adopt drilling fluid, the drilling well of φ 311.15mm drill bit, kickoff point (KOP) 400m, lower φ 244.5mm outer layer sleeve, cementing concrete returns to 200m, descend the inner layer sleeve of φ 177.8mm to the above 2m of casing shoe of φ 244.5mm outer layer sleeve afterwards, in straight well section, the next centralizer of every 3 inner layer sleeves, at the next centralizer of every 1 inner layer sleeve of gradient section;
Three open (third time spuds in): adopt drilling fluid, the drilling well of φ 152.4mm drill bit, rely on Two-way Cycle relay-type to take sand, walk around mining well, bore Multilateral Wells, finally drill through mining well.Wherein, described Two-way Cycle relay-type is taken sand and is: from drilling rod feed liquor, (liquid inlet volume is Q 1) while, from feed liquor between described bilayer sleeve, (liquid inlet volume is Q 2), return on after the drilling fluid between bilayer sleeve arrives bottom sleeve footwear and enter between drilling rod and described inner layer sleeve, together with after mixing with drilling circulation liquid, recycle well head.
(3) shut-in well and operation: cementing plug, envelope horizontal branch well well head.Utilize mining down-hole pump, draining and production coal gas.
Below in conjunction with specific embodiments method of the present invention is illustrated.Concrete data in above-described embodiment are only for illustrative purposes, and can not be used for limiting protection scope of the present invention.The corresponding improvement that those skilled in the art does according to aim of the present invention is all included in right of the present invention.

Claims (3)

1. a Two-way Cycle relay-type coal seam drilling method, comprises the following steps:
(1) mining well is bored: well cementation after spudding in brill completion, setting of casing at twice, expansion cave, coal seam;
(2) bore horizontal branch well: by twice brill completion of spudding in, after second time spuds in finishing drilling, lower bilayer sleeve, makes inner layer sleeve be suspended on outer layer sleeve interior and placed in the middle, and the end of inner layer sleeve 0.5 ~ 10m more than the casing shoe of outer layer sleeve; Third time spud in creep into time, Two-way Cycle relay-type is relied on to take sand, walk around mining well, after completing horizontal branch well construction, drill through described mining well, wherein, described Two-way Cycle relay-type takes sand: while drilling rod feed liquor, from feed liquor between described bilayer sleeve, return on after the drilling fluid between bilayer sleeve arrives bottom sleeve footwear and enter between drilling rod and described inner layer sleeve, together with after mixing with drilling circulation liquid, recycle well head;
(3) shut-in well and operation: cementing plug, envelope horizontal branch well well head, utilizes mining down-hole pump, draining and produces coal gas.
2. Two-way Cycle relay-type coal seam drilling method according to claim 1, is characterized in that: in brill mining well process, and first time spuds in and adopts the drilling well of φ 311.15mm drill bit, and after completion, lower φ 244.5mm sleeve pipe, makes cementing concrete return to ground afterwards; Second time is spudded in and is adopted the drilling well of φ 215.9mm drill bit, lower φ 177.8mm sleeve pipe after completion, and wherein coal seam section uses glass reinforced plastic sleeve, cementing concrete returns to 200m high, descending drill bit afterwards, is 0.4m ~ 0.7m at Chu Kuo cave, coal seam to diameter, and then coal seam section is buried in back-up sand.
3. Two-way Cycle relay-type coal seam drilling method according to claim 2, is characterized in that: bore in Completion Operations at horizontal branch well, and first time spuds in and adopts the drilling well of φ 444.5mm drill bit, lower φ 339.7mm sleeve pipe after completion, and cementing concrete returns to ground; Second time is spudded in and is adopted the drilling well of φ 311.15mm drill bit, kickoff point (KOP) 50 ~ 600m, the outer layer sleeve of lower φ 244.5mm, cementing concrete returns to minimum 200m high, descend more than the inner layer sleeve of φ 177.8mm to the casing shoe of described φ 244.5mm sleeve pipe 0.5 ~ 10m afterwards, form bilayer sleeve, at the next centralizer of every 3 inner layer sleeves of straight well section, at the next centralizer of every 1 inner layer sleeve of gradient section; Third time spuds in and adopts the drilling well of φ 152.4mm drill bit.
CN201310755047.4A 2013-12-30 2013-12-30 Two-way Cycle relay-type coal seam drilling method Active CN103670271B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310755047.4A CN103670271B (en) 2013-12-30 2013-12-30 Two-way Cycle relay-type coal seam drilling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310755047.4A CN103670271B (en) 2013-12-30 2013-12-30 Two-way Cycle relay-type coal seam drilling method

Publications (2)

Publication Number Publication Date
CN103670271A CN103670271A (en) 2014-03-26
CN103670271B true CN103670271B (en) 2016-03-09

Family

ID=50308960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310755047.4A Active CN103670271B (en) 2013-12-30 2013-12-30 Two-way Cycle relay-type coal seam drilling method

Country Status (1)

Country Link
CN (1) CN103670271B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060941B (en) * 2014-06-19 2017-01-04 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of implanted slim-hole continuous pipe boring method
CA2978110C (en) * 2014-11-14 2022-08-23 Strada Design Limited Dual circulation fluid hammer drilling system
CN108316910B (en) * 2017-09-20 2024-04-26 中国石油大学(北京) Well pattern structure for gas-driven development of deep block-shaped fractured reservoir and development method
CN110748319A (en) * 2019-10-12 2020-02-04 中国石油大学(北京) Shale gas well casing deformation prevention well cementation method
CN113530438A (en) * 2020-04-16 2021-10-22 中国石油化工股份有限公司 Method for safely tripping up and down gas well nitrogen drilling pipe column and gas well structure
CN112343555B (en) * 2020-11-24 2022-11-18 中国海洋石油集团有限公司 Relay well development method for expanding offshore oil and gas reserve utilization range
CN112627753B (en) * 2020-12-23 2022-05-31 中煤水文局集团有限公司 Method for maintaining mud circulation in lost-return stratum

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1333858A (en) * 1998-11-20 2002-01-30 Cdx天然气有限公司 Method and system for accessing substerranean deposits from the surface
CN1720386A (en) * 2002-12-18 2006-01-11 Cdx天然气有限公司 Method and system for circulating fluid in a well system
FR2895440A1 (en) * 2005-12-22 2007-06-29 Inst Francais Du Petrole Well drilling system has drilling pipes in form of casing tubes that are left in well with inner space used to return drilling fluid to surface
CN101979816A (en) * 2010-09-17 2011-02-23 北京奥瑞安能源技术开发有限公司 Coal bed gas horizontal well and drainage-mining straight well combined well drilling construction method
CN102979498A (en) * 2012-11-12 2013-03-20 中国石油天然气股份有限公司 Coal-bed gas multi-branch horizontal-well system
CN103422812A (en) * 2013-08-02 2013-12-04 奥瑞安能源国际有限公司 Single-well coal bed gas multi-branch horizontal well drilling and completion method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8297377B2 (en) * 1998-11-20 2012-10-30 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US6679322B1 (en) * 1998-11-20 2004-01-20 Cdx Gas, Llc Method and system for accessing subterranean deposits from the surface
US6968893B2 (en) * 2002-04-03 2005-11-29 Target Drilling Inc. Method and system for production of gas and water from a gas bearing strata during drilling and after drilling completion

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1333858A (en) * 1998-11-20 2002-01-30 Cdx天然气有限公司 Method and system for accessing substerranean deposits from the surface
CN1720386A (en) * 2002-12-18 2006-01-11 Cdx天然气有限公司 Method and system for circulating fluid in a well system
FR2895440A1 (en) * 2005-12-22 2007-06-29 Inst Francais Du Petrole Well drilling system has drilling pipes in form of casing tubes that are left in well with inner space used to return drilling fluid to surface
CN101979816A (en) * 2010-09-17 2011-02-23 北京奥瑞安能源技术开发有限公司 Coal bed gas horizontal well and drainage-mining straight well combined well drilling construction method
CN102979498A (en) * 2012-11-12 2013-03-20 中国石油天然气股份有限公司 Coal-bed gas multi-branch horizontal-well system
CN103422812A (en) * 2013-08-02 2013-12-04 奥瑞安能源国际有限公司 Single-well coal bed gas multi-branch horizontal well drilling and completion method

Also Published As

Publication number Publication date
CN103670271A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103670271B (en) Two-way Cycle relay-type coal seam drilling method
CN107401393B (en) Drainage and gas production integrated goaf gas extraction well body structure and construction method thereof
CN104832208B (en) Anti-collapse method for long-distance horizontal hole drilling in soft coal seam of underground coal mine
CN102979498B (en) A kind of multi-lateral horizontal well system for coal bed gas
CN110397428B (en) Displacement coalbed methane yield increasing method for coalbed methane jointly mined by vertical well and U-shaped butt well
CN201705219U (en) Lateral drilling gravel pack completion string
CN105332684A (en) High-pressure water burst and CO2 fracturing combined coal bed gas displacement extraction technology
CN103867119B (en) Coal seam reservoirs completion remodeling method
CN102392677A (en) Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
CN101915072B (en) Method for extracting coal bed gas in stable mining region by ground well drilling
CN207048739U (en) A kind of low gaseous mine gas ground extraction technology drilled well bore structure
CN104929567A (en) Low-cost construction process for passing through goaf
CN102926770A (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN111236904B (en) Geothermal exploitation method for double horizontal wells in butt joint communication to extract heat by water separation
CN107724953A (en) The down-the-hole hammer reverse circulating drilling process construction method of Fluid Sealing
CN103711457A (en) Design method of six-spud-in wellbore structure
CN105986795A (en) Coal bed gas horizontal well coal bed transformation method
CN102434192A (en) Device and method for enhancing coal seam fracturing effect
CN103422813B (en) Individual well eye multi-lateral horizontal well system for coal bed gas and boring method
CN103711473B (en) Two-way Cycle relay-type coal seam compound well bores completion method
Xiumin et al. Research and application of gas-lift reverse circulation drilling technology to geothermal well construction in Dalian Jiaoliu Island
CN108049817A (en) The narrow pressure window well five of deep water opens time Casing Program Design Method
CN111119789B (en) Well completion method for coal bed gas ground L-shaped pre-pumping well with double-well-opening structure
CN111734359A (en) Natural gas hydrate horizontal branch well exploitation method based on deepwater suction anchor
CN207048740U (en) A kind of water pumping gas production integration goaf gas extraction well casing programme

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210720

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Bohai Drilling Engineering Co.,Ltd.

Address before: 300457 Tianjin Binhai New Area Development Zone Huanghai Road 106, Bohai Drilling Engineering Co., Ltd. science and Technology Development Office

Patentee before: CNPC Bohai Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right