Prior art keywords
well
oil
pressure
gas
drifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310559782.8A
Other languages
Chinese (zh)
Other versions
CN103590768A (en
Inventor
何力
陈陆根
郑清川
宋文健
王永杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LOCAL COAL Corp OF CHINA
Original Assignee
LOCAL COAL Corp OF CHINA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LOCAL COAL Corp OF CHINA filed Critical LOCAL COAL Corp OF CHINA
Priority to CN201310559782.8A priority Critical patent/CN103590768B/en
Publication of CN103590768A publication Critical patent/CN103590768A/en
Application granted granted Critical
Publication of CN103590768B publication Critical patent/CN103590768B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention provides a treatment method for abandoned uncased wells in a coal mining area. The treatment method comprises the four steps of well-mouth recovery, well unblocking and sweeping, well logging and three-section plugging. By means of the treatment of the abandoned oil and gas uncased wells in the coal mining area, as for each abandoned uncased well, about 100 thousands of tons of accumulated coal can be released, and direct economic loss of more than 50-million yuan can be reduced. In addition, by effectively treating the abandoned oil and gas uncased wells in the method, oil and gas leakage and various potential safety hazards are also avoided during mining, and various types of loss caused by movement are reduced.

Description

The discarded open hole well administering method in coal mining region
Technical field
The present invention relates to the management domain of Oil/gas Well, particularly to a kind of before mining in discarded Oil/gas Well area to discard The administering method of oil gas open hole well.
Background technology
The exploration and development of coal in China and petroleum gas is the energy industry system separate by two:Coal system Independently undertake with petroleum gas system.Because coal and petroleum gas are each imbedded in the objective preservation bar of underground Part difference and territorial characteristics, general coal seam is in underground shallow part, and deep below 1000 meters of underground for the oil-gas Layer, coal is occurring Layer and some areas of oil and gas field layer overlap, mutually have a great impact to exploitation each other.Generally, open respective Adopt in planning and designing, both sides take quarantine measures, colliery sets isolated coal pillar in the certain limit in close oil field, do not exploit Coal deposits in the range of oil field after isolated coal pillar.Also kept at a distance with colliery in oil field as far as possible.In coal mining design according to Pertinent regulations reserve large area barrier pillar and can not exploit, in addition the whole ore deposit in colliery having will due to oilfield exploitation or its leave Problem putting off development, even do not develop, great waste is caused for development of resources.Wherein, phase in these discarded Oil/gas Wells When a part belongs to open hole well, its Crack cause due to not getting to target zone, is abandoned halfway or is beaten mainly during well-digging To target zone but oil/gas show is weak for well, no extraction value, and drilling well troop does not enter production casing down, directly discards.The spy of open hole well Putting is:1st, under normal circumstances, in such pit shaft, oil gas stressor layer is little, but is produced Oil/gas Well water injection pressure by periphery and affected, ground Stressor layer may be stepped up;2nd, due to not entering down production casing, cave-in and drilling mud deposit the middle and lower part making pit shaft Blocked closely knit, drifting difficulty is larger;3rd, uncased wellbore no production casing intercepts, and such as there is artesian aquifer in stratum, should Pit shaft, as conduit pipe direct UNICOM coal mine down-hole tunnel, threatens greatly to Safety of Coal Mine Production.Such useless near colliery Abandon the oil and gas leakage of oil gas open hole well, the water in water layer along oil well enter colliery the problems such as, be to cause overlapping Areas For Coal great One of immediate causes of accident potential such as fire, blast, toxic and harmful and water damage, for colliery normal design, produce band Great inconvenience and potential safety hazard are come, the exploitation in colliery simultaneously will also result in certain safe prestige to the Oil/gas Well producing The side of body.The coal column pressure coal of liberation flood tide, improves coal resources utilization rate it is ensured that the doulbe-sides' victory of coal and Oil Safety environmental protection and economy is developed Become major issue anxious to be resolved in industry.
Content of the invention
In order to solve the above problems, the present invention provides a kind of underground coal money overlapping with oil gas field for safety economy exploitation Source, the method effectively administering discarded open hole well in the range of the field with "nine squares" of colliery, to guarantee channel of coal mining working surface safety Oil/gas Well, And prevent to occur oil gas leakage to cause environmental pollution accident.The present invention is directed to and does not carry out oil-gas mining, no production casing in pit shaft Isolation, the open hole well that discarded rear spontaneous corrosion effect is obvious, situation is complicated, concrete administering method comprises the steps:
(A) recover well head;
(B) through wash well:Drifting and mud deposition section are disposed and well-flushing;
(C) log well:Obtain oil-gas Layer position and formation information and the oil gas such as pressure, water layer position and pressure, coal seam position The casing programme data such as well well depth, hole deviation;
(D) three-stage closure:First paragraph, the oil-gas Layer closure of bore hole well shaft bottom section, insulate oil gas;Second segment, pit shaft Stage casing blocks, and pressure is checked and accepted;3rd section;Surface pipe and well head closure.
Wherein, step (B) specifically includes following two steps:
(1)Drifting and mud deposition section are disposed:With drifting vehicle in normal pressures(4MPa about:3.5-4.5MPa)Lower boring is ground Drifting.Because open hole well is typically due to cave-in and drilling mud residual can deposit thicker mud cake, drifting in pit shaft Difficulty is big, bit freezing, top brill accident easily occurs it is therefore desirable to judge according to site operation during drifting, when running in pit shaft Deposit thicker mud cake, drifting difficulty is big, when drilling rod reversion, back attack phenomenon occur, exchange to bore for scraper and mud cake is smashed, Meanwhile, cementing truck pressure is increased to 5~6MPa, make the mud smashed take ground out of by drifting circulation fluid;
(2)Well-flushing:Drifting to desired depth, under enter to cover washing cylinder and instrument oil pipe, with cementing truck by clear water by under pit shaft Portion's closed section starts, and rinses back and forth paragraph by paragraph, till flushing liquor that aperture is returned out does not contaminate handss.
Wherein, step (D) specifically includes following four steps:
(1)Oil-gas Layer blocks:Prepare 10% HTYT-1 High hydrophilous resin granule, squeeze, to wellbore bottom, the note that this configures Plugging material;
(2)Well wellbore stage casing blocks:
1. inject cement mortar:It is configured to the cement mortar of density >=1.82Kg/L with oil-well cement, by instrument oil pipe from well Bottom is returned and is noted to well head, Hou Ning 72 hours;
2. pressure is checked and accepted:Use cementing truck pressure testing, verify plugging effect, press 15Mpa, and in 30 minutes, pressure drop is less than 0.5Mpa is qualified, if pressure drop is more than 0.5Mpa, injects low-viscosity high-strength gel plugging material(As:Amphion Frozen glue profile control agent), Hou Ning, after 24 hours, tests pressure again, until pressure is not only reduced to;
(3)Surface pipe and well head closure:Dial-out utility oil pipe, discharges well head, prepares the common of density >=1.82Kg/L The full surface pipe of cement mortar tank and pit shaft;(3)Beat 0.5m × 0.5m × 0.5m clump above well head, clump is indicated on face Pound sign and shut-in well date, recover well site landforms.
Beneficial effect:
Through the above-mentioned improvement to coal mining region abandoned oil gas open hole well, every mouthful of abandoned well solution can bleed off pressure coal amount 10 Ten thousand tons about, reduce more than 5,000 ten thousand yuan of direct economic loss.Additionally, by the method for the present invention to having that discarded Oil/gas Well is carried out Effect improvement also avoid the various potential safety hazards such as oil gas leakage in exploitation, decreases the every loss causing because of removal of home stopping surface.
Current oil-gas mining mostly takes water filling to keep stratum energy production technique, is in the discarded oil gas of the same area , when coal mining is passed through, there are hydraulic oil, the major safety risks of gas and water leakage in well.It may happen that oil gas quick-fried Fried, toxic and harmful, water etc. invade the major security threat such as tunnel.These safety can be reduced by administering to greatest extent Hidden danger.Provide reliable guarantee for safety in production, simultaneously can also reclaiming coal resource to greatest extent.
Brief description
The underground structure schematic diagram of the administering method of open hole well discarded by accompanying drawing 1 for the present invention.
Wherein, A is topsoil;B is coal seam;C is artesian aquifer;D is oil-gas Layer;
1 is bore hole well shaft;2 is cement;3 is High hydrophilous resin granule.
Specific embodiment
With reference to specific embodiment, to the present invention, the discarded Oil/gas Well administering method work in coal mining region is more detailed Most explanation.And protection scope of the present invention is not intended to be limited to implementation below.The ordinary skill of described technical field Personnel, according to above the disclosure, all can achieve the purpose of the present invention.
It is specific as follows that XX ore deposit abandoned well open hole well administers implementation steps:
Preparation of construction
1. repair passway, be easy to drifting Operation Van and pass through.
2. drifting troop prepares
1. drifting vehicle one, 700 type cementing trucks are a set of, more than instrument oil pipe 1200m;
2. Ф 73mm beveled tip 1;
3. high-pressure fire hose, elbow, joint are on deck, flexibly handy;
4. 15 tons of oil-well cement, HTYT-1 High hydrophilous resin granule;
5. yb-250 well head is a set of;
6. instrument and fire-fighting equipment are pressed normal construction and are needed on deck;
7. Ф 100 screw drill is a set of, Ф 118 tricone bit one, and Ф 118 scraper bores one, 190 sets of washing cylinders of Ф;
8. 60m is excavated in well site3Blowdown cheat one.
Concrete steps:
(A) recover this abandoned well well head, and yb-250 well head is installed;
(B) through wash well
(1)Drifting and mud deposition section are disposed:With drifting vehicle, using Ф 118 tricone bit and Ф 100 screw drill, bore Mill drifting.Because open hole well is typically due to cave-in and drilling mud residual can deposit thicker mud cake in pit shaft, lead to Well difficulty is big, bit freezing, top brill accident easily occurs it is therefore desirable to when drilling rod reversion, back attack phenomenon during drifting, exchange For drill bits such as Ф 118 scraper brill, Ф 73mm beveled tips, mud cake is smashed, meanwhile, 700 type cementing truck pressure are increased to 5~ 6MPa, makes the mud smashed take ground out of by drifting circulation fluid;
(2)Well-flushing:Drifting to desired depth, under enter 190 sets of washing cylinders of Ф and instrument oil pipe, will be clear with 700 type cementing trucks Water, by lower wellbore closed section, rinses paragraph by paragraph back and forth, till flushing liquor that aperture is returned out does not contaminate handss.
(C) log well
Carry out engineering log, the dependency number such as admission reservoir depth, coal seam depth, water layer and casing programme with engineering logging truck According to.
(D) block(Three-stage blocks)
(1)Oil-gas Layer blocks
Prepare 10% HTYT-1 High hydrophilous resin granule with cementing truck hopper, inject, to wellbore bottom, the note that this configures Plugging material, this resin material imbibition plays soft seal effect to oil gas interval, insulates oil gas;
(2)Well wellbore stage casing blocks
1. inject cement mortar:With cementing truck, the oil-well cement bought is configured to the cement mortar of density >=1.82Kg/L, leads to Cross instrument oil pipe and return note to well head, Hou Ning 72 hours from shaft bottom, realize the closure to oil reservoir pit shaft stage casing.
2. pressure is checked and accepted:With 700 type cementing truck pressure testings, verify plugging effect, press 15Mpa, pressure drop in 30 minutes It is qualified less than 0.5Mpa, if pressure drop is more than 0.5Mpa, inject amphion frozen glue profile control agent as plugging material, After Hou Ning 24 hours, again test pressure, until pressure is not only reduced to;
(3)Surface pipe and well head closure:Dial-out utility oil pipe, discharges well head, prepares the common of density >=1.82Kg/L The full surface pipe of cement mortar tank and pit shaft;Beat 0.5m × 0.5m × 0.5m clump above well head, clump indicates well on face Number and the shut-in well date, recover well site landforms.
The scheme that above-mentioned embodiment is recorded can be applied not only to the abandoned oil open hole well in coal mining area, gas bore hole Well, is applied equally to oil-gas mining unit to discarded open hole well environment protection treating etc..

Claims (3)

1. a kind of useless open hole well administering method in coal mining region is it is characterised in that the method comprises the steps:
(A) recover well head;
(B) through wash well:Drifting and mud deposition section are disposed and well-flushing;
(C) log well:Obtain oil-gas Layer position and pressure, water layer position and pressure, coal seam position formation information and Oil/gas Well well depth, Hole deviation casing programme data;
(D) three-stage closure:First paragraph, the oil-gas Layer closure of bore hole well shaft bottom section, insulate oil gas;Second segment, pit shaft stage casing Closure, and pressure examination;3rd section;Surface pipe and well head closure;
Wherein, step (D) specifically includes following four steps:
(1) oil-gas Layer closure:Prepare 10% HTYT-1 High hydrophilous resin granule, the closure material having configured to wellbore bottom injection Material;
(2) well wellbore stage casing closure:
1. inject cement mortar:It is configured to the cement mortar of density >=1.82Kg/L with oil-well cement, returned from shaft bottom by instrument oil pipe Note to well head, Hou Ning 72 hours;
2. pressure is checked and accepted:Use cementing truck pressure testing, verify plugging effect, press 15Mpa, and in 30 minutes, pressure drop is less than 0.5Mpa is qualified, if pressure drop is more than 0.5Mpa, injects amphion frozen glue profile control agent plugging material, Hou Ning 24 hours Afterwards, again test pressure, until pressure is not only reduced to;
(3) surface pipe and well head closure:Dial-out utility oil pipe, discharges well head, prepares the ordinary cement of density >=1.82Kg/L The full surface pipe of slurry tank and pit shaft;(4) beat 0.5m × 0.5m × 0.5m clump above well head, clump indicates pound sign on face With shut-in well date, recovery well site landforms.
2. the useless open hole well administering method in coal mining region according to claim 1 is it is characterised in that step (B) has Body includes following two steps:
(1) drifting and mud deposition section are disposed:Bore mill drifting under normal pressures, deposit thicker mud cake in pit shaft when running into, Drifting difficulty is big, when drilling rod reversion, back attack phenomenon, exchanges and for drag bit, mud cake is smashed, meanwhile, pressure increases to 5-6MPa, makes the mud smashed take ground out of by drifting circulation fluid;
(2) well-flushing:Drifting to desired depth, under enter to cover washing cylinder and instrument oil pipe, with cementing truck, clear water is sealed by lower wellbore Close section to start, rinse back and forth paragraph by paragraph, till flushing liquor that aperture is returned out does not contaminate handss.
3. the useless open hole well administering method in coal mining region according to claim 2 is it is characterised in that described routine is pressed Power is 3.5-4.5MPa.
CN201310559782.8A 2013-11-12 2013-11-12 Treatment method for abandoned uncased wells in coal mining area Expired - Fee Related CN103590768B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310559782.8A CN103590768B (en) 2013-11-12 2013-11-12 Treatment method for abandoned uncased wells in coal mining area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310559782.8A CN103590768B (en) 2013-11-12 2013-11-12 Treatment method for abandoned uncased wells in coal mining area

Publications (2)

Publication Number Publication Date
CN103590768A CN103590768A (en) 2014-02-19
CN103590768B true CN103590768B (en) 2017-02-15

Family

ID=50081065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310559782.8A Expired - Fee Related CN103590768B (en) 2013-11-12 2013-11-12 Treatment method for abandoned uncased wells in coal mining area

Country Status (1)

Country Link
CN (1) CN103590768B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153731B (en) * 2014-07-11 2016-05-25 东营市华翰石油技术开发有限公司 A kind of well drilling waste mud reuse water plugging and profile controlling process
CN106014330B (en) * 2016-06-27 2019-05-07 中国石油天然气股份有限公司 A method of improving leakage casing damaged well chemical plugging success rate
CN107420127B (en) * 2017-08-10 2018-03-27 中节能宁夏新能源股份有限公司 A kind of discarded coal mine ground destressing borehole gas control new technology
CN108331573B (en) * 2017-12-22 2021-03-26 神华宁夏煤业集团有限责任公司 Waste oil well treatment method for coal mining area
CN109057747A (en) * 2018-08-02 2018-12-21 中国海洋石油集团有限公司 Four, which open time deep water naked eye, completes the method that well is thrown aside safely
CN109372465A (en) * 2018-09-29 2019-02-22 中国石化江汉油田分公司江汉采油厂 A kind of method for blocking for empty well cylinder abandoned well
CN109779606A (en) * 2018-12-27 2019-05-21 中国地方煤矿有限公司 A kind of hazard prediction method in oil/gas well approaches the working surface mining active process
CN112145146A (en) * 2020-10-15 2020-12-29 西安科技大学 Method for exploring inclined columnar danger source in kerosene overlapping area
CN112709565B (en) * 2021-01-27 2022-07-29 国家能源集团宁夏煤业有限责任公司双马煤矿 Method for determining plugging depth of waste petroleum well in coal mining area
CN114322927A (en) * 2021-12-28 2022-04-12 四川盐业地质钻井大队 Rock salt water-soluble mine ground settlement advanced monitoring method
CN114961632B (en) * 2022-04-24 2023-01-24 中国石油天然气集团有限公司 Underground three-level environment-friendly treatment method for difficult and complicated well

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1548700A (en) * 2003-05-13 2004-11-24 军 金 Plugging technology of high infiltration layer
CN1664306A (en) * 2005-02-23 2005-09-07 胡振起 Method for redevelopment of junked drowned oil field
CN101387193A (en) * 2007-09-13 2009-03-18 西部钻探克拉玛依钻井工艺研究院 Oil and gas well cementation and completion method
CN103244071A (en) * 2012-02-09 2013-08-14 中国石油天然气股份有限公司 Method for plugging old underground gas storage well

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7111685B2 (en) * 2003-07-25 2006-09-26 Schlumberger Technology Corporation Downhole sampling apparatus and method
WO2011149597A1 (en) * 2010-05-26 2011-12-01 Exxonmobil Upstream Research Company Assembly and method for multi-zone fracture stimulation of a reservoir using autonomous tubular units

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1548700A (en) * 2003-05-13 2004-11-24 军 金 Plugging technology of high infiltration layer
CN1664306A (en) * 2005-02-23 2005-09-07 胡振起 Method for redevelopment of junked drowned oil field
CN101387193A (en) * 2007-09-13 2009-03-18 西部钻探克拉玛依钻井工艺研究院 Oil and gas well cementation and completion method
CN103244071A (en) * 2012-02-09 2013-08-14 中国石油天然气股份有限公司 Method for plugging old underground gas storage well

Also Published As

Publication number Publication date
CN103590768A (en) 2014-02-19

Similar Documents

Publication Publication Date Title
CN103590768B (en) Treatment method for abandoned uncased wells in coal mining area
CN103590817B (en) The abandoned oil gas well administering method in coal mining region
CN110145233B (en) Rock burst coal seam drilling-cutting-pressing-pumping-injecting multi-disaster cooperative prevention and control method
CN108678747B (en) A kind of method and apparatus of pulsed water fracturing control Top coal caving characteristic
CN102619552B (en) Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove
CN108952796B (en) One kind being based on the antireflective modularization pumping method of pectination bottom plate layer-through drilling pressure break
WO2018201706A1 (en) Method for efficient gas drainage in coal roadway strips and regional outburst elimination through staged fracturing with long borehole floor beddings
CN106194244B (en) Lower permeability seam liquid phase CO2Phase transformation fracturing is anti-reflection grid type gas pumping method
CN104790951B (en) Weaken the method and device away from the high-order tight roofs of 100 ~ 350m of coal seam
CN112392431A (en) Technology for preventing and treating water damage of coal seam roof by dynamic pressure-maintaining grouting and plugging of horizontal long drill hole in mining fracture zone
CN108643877A (en) Coal mine underground coal bed long drilled holes staged fracturing is anti-reflection and mash gas extraction method
CN103590778B (en) The method for blocking of abandoned oil gas well
CN103195468A (en) System process for conducting efficient strengthened extraction in surrounding rock
CN105201448A (en) Method for water-stopping grouting plugging in high-pressure high-flow water gush channel
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN104389559B (en) Method and device for preventing and controlling gas transfinite in thick-coal-seam mining process
CN106761852A (en) Wide area coal petrography deep hole pressure-bearing microexplosion grouting water blocking method under water
CN105221129B (en) A kind of hydraulic pressure demolition, which is opened, splits CO2Take the reservoir anti-reflection method of proppant pressure break
CN107816365A (en) A kind of quick-fried pumping integration anti-burst method of coal seam drilling
CN102678092A (en) Method for commonly extracting coal and coal bed gas by up-hole and down-hole joint construction
CN105199685A (en) Water-based drilling fluid for leakage protection and sealing of induced fissures
CN111764960B (en) Coal mining separation layer water damage prevention and control method
CN104153807B (en) A kind of placement method of thick seam slicing system Coal Face Passing Through lower leaf old working
CN115749855A (en) Method for recovering fault coal pillar resources based on advanced pre-grouting
CN110486049A (en) A kind of rich water sandstone tunnel passing fault crushed zone comprehensive processing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170215

Termination date: 20181112

CF01 Termination of patent right due to non-payment of annual fee