CN103573244A - Method for fracturing guanidine gum in coal bed gas development based on low-temperature gum breaking - Google Patents

Method for fracturing guanidine gum in coal bed gas development based on low-temperature gum breaking Download PDF

Info

Publication number
CN103573244A
CN103573244A CN201310512525.9A CN201310512525A CN103573244A CN 103573244 A CN103573244 A CN 103573244A CN 201310512525 A CN201310512525 A CN 201310512525A CN 103573244 A CN103573244 A CN 103573244A
Authority
CN
China
Prior art keywords
fluid
discharge capacity
inject
injection rate
gel breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310512525.9A
Other languages
Chinese (zh)
Inventor
李晋平
翟红
肖亚宁
王强
段惠萍
李迎业
李品
佐江宏
李忠群
郝东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN HERUI ENERGY ENGINEERING TECHNOLOGY Co Ltd
WUYANG MINING OF SHANXI LU'AN ENVIRONMENTAL PROTECTION ENERGY DEVELOPMENTS Co Ltd
Original Assignee
TAIYUAN HERUI ENERGY ENGINEERING TECHNOLOGY Co Ltd
WUYANG MINING OF SHANXI LU'AN ENVIRONMENTAL PROTECTION ENERGY DEVELOPMENTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN HERUI ENERGY ENGINEERING TECHNOLOGY Co Ltd, WUYANG MINING OF SHANXI LU'AN ENVIRONMENTAL PROTECTION ENERGY DEVELOPMENTS Co Ltd filed Critical TAIYUAN HERUI ENERGY ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201310512525.9A priority Critical patent/CN103573244A/en
Publication of CN103573244A publication Critical patent/CN103573244A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a method for fracturing guanidine gum in coal bed gas development based on low-temperature gum breaking, belongs to a method suitable for coal bed gas yield increment mining of low-permeability soft coal bed, and mainly solves the technical problems of low gas yield and poor flow conductivity of a conventional coal bed gas mining method. According to the technical scheme, the method comprises the following steps: 1) injecting a drilled gas bleeding well with a pre-ahead fluid-active water through a pump to enable coal bed to generate cracks, wherein the filling pressure is higher than the coal bed fracturing pressure; 2) injecting a sand-carrying fluid; 3) injecting a displacement fluid; 4) stopping the pump for more than 10 minutes, and measuring coal bed pressure drop; 5) injecting a gum breaking agent; 6) filling a displacement fluid. The method has the advantages of long and wide producing gaps, good flow conductivity and high gas yield.

Description

A kind of method that in cbm development based under the broken glue of low temperature, guanidine glue laminated is split
Technical field
The present invention relates to a kind of method that in cbm development based under the broken glue of low temperature, guanidine glue laminated is split, it belongs to a kind of coal-bed-gas production-increase exploitation method that is applicable to hyposmosis soft seam.
Background technology
Coal bed gas, Main Ingredients and Appearance is methane (CH 4), be and a kind of clean energy resource gas of coal association, wherein 90% left and right is to be adsorbed in matrix of coal with adsorbed state, 10% left and right is free between crack with free state.China's coal bed gas resource amount approximately 36.8 trillion m 3, occupy third place in the world, suitable with China's natural gas reserves.It is develop and useedd making up the deficiency of China's conventional energy resource, fundamentally eliminate the disasters such as the gas explosion that causes in coal production, Gas Outburst, reduce the environment pollution that a large amount of drawing-off gas cause and the energy resource structure of improving China, accelerating China, to take coal be that main energy resource system is gradually to the conversion process of the mode of sustainable development of environmentally friendlyization, form the new industry of clear energy sources, all there is important strategic importance.
China is not only coal resources big country, and coal bed gas resource is also extremely abundant, but up to now, the total experiment situation from the whole nation, and most coalbed gas loggings yield poorly, production decline is fast, are difficult to form stable industrialness source of the gas.Its main cause is that the general permeability in China coal seam reset pressure low, that exploit shallow coal bed gas is not high, desorption rate is slow, makes coal bed gas desorb and the migration in coal seam thereof very difficult.Abroad cbm development facts have proved, pressure break, gas injection and slot are three key links in Coal-bed gas stimulation technology.Adopt at present pressure break to improve the mode of permeability, often after pressure break, initial gas production increases to some extent, but the just decay of very fast gas production, therefore simple pressure break has some limitations improving the output of coal bed gas.
Pressure break is the Main Yield-increasing method in hyposmosis, extra-low permeability oil, gas field, is also the main method of cbm development, and wherein main employing is that riverfrac treatment and guanidine glue laminated are split.But China's overwhelming majority coal seam " three is low " situation in low-permeability, low reservoir pressure, low saturation, and ature of coal is softer, belong to soft seam, coal seam temperature lower (generally at 10~20 ℃), adopt traditional guanidine glue laminated to split can to exist fracturing liquid rubber-breaking not in time, not thorough, particularly fracturing fluid injection pressure is greater than coal seam pressure, fracturing fluid leak, guanidine glue forms filter cake in fracture faces, can reduce the problem of flow conductivity.
Summary of the invention
The object of the invention is to solve the low and poor technical problem of flow conductivity of gas production that the method for existing exploiting coal bed methane exists, a kind of method that in the cbm development based under the broken glue of low temperature that seam is long, flow conductivity is strong and gas production is high, guanidine glue laminated is split of making is provided.
For solving the problems of the technologies described above, the technical solution used in the present invention is:
The method that in cbm development under the broken glue of low temperature, guanidine glue laminated is split, it comprises the following steps:
1) injecting pre-prepad fluid, is active water Injection Well under by pump by pre-prepad fluid to the extraction well that completes drilling well, makes generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, and it is 0.5m that pre-prepad fluid injects discharge capacity 3/ min~10m 3/ min, pre-prepad fluid injection rate is 5m 3~500m 3;
2) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min~10m 3/ min, load fluid injection rate 5m 3~500m 3;
3) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min~10m 3/ min, active water injection rate 5m 3~500m 3;
4) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
5) inject gel breaker, it is 0.5m that gel breaker injects discharge capacity 3/ min~10m 3/ min, gel breaker injection rate 5m 3~500m 3;
6) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min~10m 3/ min, displacement fluid injection rate 5m 3~500m 3.
Another breaks based on low temperature the method that in the cbm development under glue, guanidine glue laminated is split the present invention, and it comprises the following steps:
1) injecting pre-prepad fluid, is active water Injection Well under by pump by pre-prepad fluid to the extraction well that completes drilling well, makes generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, and it is 0.5m that pre-prepad fluid injects discharge capacity 3/ min~10m 3/ min, pre-prepad fluid injection rate is 5m 3~500m 3;
2) inject prepad fluid, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 0.5m that viscous liquid injects discharge capacity 3/ min~10m 3/ min, viscous liquid injection rate 1m 3~500m 3;
3) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min~10m 3/ min, load fluid injection rate 5m 3~500m 3;
4) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min~10m 3/ min, active water injection rate 5m 3~500m 3;
5) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
6) inject gel breaker, it is 0.5m that gel breaker injects discharge capacity 3/ min~10m 3/ min, gel breaker injection rate 5m 3~500m 3;
7) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min~10m 3/ min, displacement fluid injection rate 5m 3~500m 3.
Another breaks based on low temperature the method that in the cbm development under glue, guanidine glue laminated is split the present invention, and it comprises the following steps:
1) inject prepad fluid, to the extraction well that completes drilling well by pump by under prepad fluid Injection Well, make generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 0.5m that viscous liquid injects discharge capacity 3/ min~10m 3/ min, viscous liquid injection rate 1m 3~500m 3;
2) inject gel breaker, it is 0.5m that gel breaker injects discharge capacity 3/ min~10m 3/ min, gel breaker injection rate 1m 3~500m 3;
3) inject insulating liquid, described insulating liquid is active water, and it is 0.5m that insulating liquid injects discharge capacity 3/ min~10m 3/ min, insulating liquid injection rate 0.5m 3~500m 3;
4) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min~10m 3/ min, load fluid injection rate 5m 3~500m 3;
5) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min~10m 3/ min, active water injection rate 5m 3~500m 3;
6) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
7) inject gel breaker, it is 0.5m that gel breaker injects discharge capacity 3/ min~10m 3/ min, gel breaker injection rate 5m 3~500m 3;
8) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min~10m 3/ min, displacement fluid injection rate 5m 3~500m 3.
Another breaks based on low temperature the method that in the cbm development under glue, guanidine glue laminated is split again in the present invention, and it comprises the following steps:
1) inject prepad fluid, to the extraction well that completes drilling well by pump by under prepad fluid Injection Well, make generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 0.5m that viscous liquid injects discharge capacity 3/ min~10m 3/ min, viscous liquid injection rate 1m 3~500m 3;
2) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min~10m 3/ min, load fluid injection rate 5m 3~500m 3;
3) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min~10m 3/ min, active water injection rate 5m 3~500m 3;
4) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
5) inject gel breaker, it is 0.5m that gel breaker injects discharge capacity 3/ min~10m 3/ min, HRS gel breaker injection rate 5m 3~500m 3;
6) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min~10m 3/ min, displacement fluid injection rate 5m 3~500m 3.
Described gel breaker is any one in oxidants product or acidification of oil field series products.
Because the present invention has adopted technique scheme, solved the low and poor technical problem of flow conductivity of gas production that existing exploitation method exists, therefore, compare with background technology, the present invention have advantages of make seam long, make that seam is wide, flow conductivity is strong and gas production is high.
The specific embodiment
Embodiment 1
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) injecting pre-prepad fluid, is active water Injection Well under by pump by pre-prepad fluid to the extraction well that completes drilling well, makes generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, and it is 0.5m that pre-prepad fluid injects discharge capacity 3/ min, pre-prepad fluid injection rate is 5m 3;
2) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min, load fluid injection rate 5m 3;
3) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min, active water injection rate 5m 3;
4) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
5) inject gel breaker, described gel breaker is oxidants product, and it is 0.5m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 5m 3;
6) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 5m 3.
Embodiment 2
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) injecting pre-prepad fluid, is active water Injection Well under by pump by pre-prepad fluid to the extraction well that completes drilling well, makes generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, and it is 10m that pre-prepad fluid injects discharge capacity 3/ min, pre-prepad fluid injection rate is 500m 3;
2) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 10m that load fluid injects discharge capacity 3/ min, load fluid injection rate 500m 3;
3) inject displacement fluid, described displacement fluid is active water, and it is 10m that active water injects discharge capacity 3/ min, active water injection rate 500m 3;
4) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
5) inject gel breaker, described gel breaker is oxidants product, and it is 10m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 500m 3;
6) inject displacement fluid, it is 10m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 500m 3.
Embodiment 3
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) injecting pre-prepad fluid, is active water Injection Well under by pump by pre-prepad fluid to the extraction well that completes drilling well, makes generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, and it is 5m that pre-prepad fluid injects discharge capacity 3/ min, pre-prepad fluid injection rate is 150m 3;
2) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 4m that load fluid injects discharge capacity 3/ min, load fluid injection rate 48m 3;
3) inject displacement fluid, described displacement fluid is active water, and it is 4m that active water injects discharge capacity 3/ min, active water injection rate 8m 3;
4) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
5) inject gel breaker, described gel breaker is oxidants product, and it is 5m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 100m 3;
6) inject displacement fluid, it is 4m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 32m 3.
Embodiment 4
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) injecting pre-prepad fluid, is active water Injection Well under by pump by pre-prepad fluid to the extraction well that completes drilling well, makes generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, and it is 0.5m that pre-prepad fluid injects discharge capacity 3/ min, pre-prepad fluid injection rate is 5m 3;
2) inject prepad fluid, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 0.5m that viscous liquid injects discharge capacity 3/ min, viscous liquid injection rate 1m 3;
3) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min, load fluid injection rate 5m 3;
4) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min, active water injection rate 5m 3;
5) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
6) inject gel breaker, described gel breaker is oxidants product, and it is 0.5m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 5m 3;
7) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 5m 3.
Embodiment 5
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) injecting pre-prepad fluid, is active water Injection Well under by pump by pre-prepad fluid to the extraction well that completes drilling well, makes generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, and it is 10m that pre-prepad fluid injects discharge capacity 3/ min, pre-prepad fluid injection rate is 500m 3;
2) inject prepad fluid, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 10m that viscous liquid injects discharge capacity 3/ min, viscous liquid injection rate 500m 3;
3) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 10m that load fluid injects discharge capacity 3/ min, load fluid injection rate 500m 3;
4) inject displacement fluid, described displacement fluid is active water, and it is 10m that active water injects discharge capacity 3/ min, active water injection rate 500m 3;
5) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
6) inject gel breaker, described gel breaker is oxidants product, and it is 10m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 500m 3;
7) inject displacement fluid, it is 10m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 500m 3.
Embodiment 6
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) injecting pre-prepad fluid, is active water Injection Well under by pump by pre-prepad fluid to the extraction well that completes drilling well, makes generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, and it is 5m that pre-prepad fluid injects discharge capacity 3/ min, pre-prepad fluid injection rate is 150m 3;
2) inject prepad fluid, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 4m that viscous liquid injects discharge capacity 3/ min, viscous liquid injection rate 40m 3;
3) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 4m that load fluid injects discharge capacity 3/ min, load fluid injection rate 44m 3;
4) inject displacement fluid, described displacement fluid is active water, and it is 4m that active water injects discharge capacity 3/ min, active water injection rate 10m 3;
5) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
6) inject gel breaker, described gel breaker is oxidants product, and it is 5m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 110m 3;
7) inject displacement fluid, it is 4m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 36m 3.
Embodiment 7
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) inject prepad fluid, to the extraction well that completes drilling well by pump by under prepad fluid Injection Well, make generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 0.5m that viscous liquid injects discharge capacity 3/ min, viscous liquid injection rate 1m 3;
2) inject gel breaker, described gel breaker is oxidants product, and it is 0.5m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 1m 3;
3) inject insulating liquid, described insulating liquid is active water, and it is 0.5m that insulating liquid injects discharge capacity 3/ min, insulating liquid injection rate 0.5m 3;
4) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min, load fluid injection rate 5m 3;
5) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min, active water injection rate 5m 3;
6) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
7) inject gel breaker, described gel breaker is oxidants product, and it is 0.5m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 5m 3;
8) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 5m 3.
Embodiment 8
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) inject prepad fluid, to the extraction well that completes drilling well by pump by under prepad fluid Injection Well, make generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 10m that viscous liquid injects discharge capacity 3/ min, viscous liquid injection rate 500m 3;
2) inject gel breaker, described gel breaker is oxidants product, and it is 10m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 500m 3;
3) inject insulating liquid, described insulating liquid is active water, and it is 10m that insulating liquid injects discharge capacity 3/ min, insulating liquid injection rate 500m 3;
4) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 10m that load fluid injects discharge capacity 3/ min, load fluid injection rate 500m 3;
5) inject displacement fluid, described displacement fluid is active water, and it is 10m that active water injects discharge capacity 3/ min, active water injection rate 500m 3;
6) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
7) inject gel breaker, described gel breaker is oxidants product, and it is 10m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 500m 3;
8) inject displacement fluid, it is 10m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 500m 3.
Embodiment 9
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) inject prepad fluid, to the extraction well that completes drilling well by pump by under prepad fluid Injection Well, make generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 4m that viscous liquid injects discharge capacity 3/ min, viscous liquid injection rate 48m 3;
2) inject gel breaker, described gel breaker is oxidants product, and it is 5m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 110m 3;
3) inject insulating liquid, described insulating liquid is active water, and it is 5m that insulating liquid injects discharge capacity 3/ min, insulating liquid injection rate 50m 3;
4) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 4m that load fluid injects discharge capacity 3/ min, load fluid injection rate 44m 3;
5) inject displacement fluid, described displacement fluid is active water, and it is 4m that active water injects discharge capacity 3/ min, active water injection rate 10m 3;
6) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
7) inject gel breaker, described gel breaker is oxidants product, and it is 5m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 115m 3;
8) inject displacement fluid, it is 4m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 40m 3.
Embodiment 10
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) inject prepad fluid, to the extraction well that completes drilling well by pump by under prepad fluid Injection Well, make generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 0.5m that viscous liquid injects discharge capacity 3/ min, viscous liquid injection rate 1m 3;
2) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min, load fluid injection rate 5m 3;
3) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min, active water injection rate 5m 3;
4) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
5) inject gel breaker, described gel breaker is oxidants product, and it is 0.5m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 5m 3;
6) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 5m 3.
Embodiment 11
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) inject prepad fluid, to the extraction well that completes drilling well by pump by under prepad fluid Injection Well, make generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 10m that viscous liquid injects discharge capacity 3/ min, viscous liquid injection rate 500m 3;
2) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 10m that load fluid injects discharge capacity 3/ min, load fluid injection rate 500m 3;
3) inject displacement fluid, described displacement fluid is active water, and it is 10m that active water injects discharge capacity 3/ min, active water injection rate 500m 3;
4) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
5) inject gel breaker, described gel breaker is oxidants product, and it is 10m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 500m 3;
6) inject displacement fluid, it is 10m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 500m 3.
Embodiment 12
The method that in a kind of cbm development based under the broken glue of low temperature in the present embodiment, guanidine glue laminated is split, it comprises the following steps:
1) inject prepad fluid, to the extraction well that completes drilling well by pump by under prepad fluid Injection Well, make generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 4m that viscous liquid injects discharge capacity 3/ min, viscous liquid injection rate 44m 3;
2) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 4m that load fluid injects discharge capacity 3/ min, load fluid injection rate 56m 3;
3) inject displacement fluid, described displacement fluid is active water, and it is 4m that active water injects discharge capacity 3/ min, active water injection rate 12m 3;
4) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
5) inject gel breaker, described gel breaker is oxidants product, and it is 5m that gel breaker injects discharge capacity 3/ min, gel breaker injection rate 120m 3;
6) inject displacement fluid, it is 4m that displacement fluid injects discharge capacity 3/ min, displacement fluid injection rate 32m 3.
Gel breaker in above-described embodiment is that oxidants product can also replace with acidification of oil field series products.

Claims (5)

1. the method that in the cbm development based under the broken glue of low temperature, guanidine glue laminated is split, is characterized in that: it comprises the following steps:
1) injecting pre-prepad fluid, is active water Injection Well under by pump by pre-prepad fluid to the extraction well that completes drilling well, makes generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, and it is 0.5m that pre-prepad fluid injects discharge capacity 3/ min~10m 3/ min, pre-prepad fluid injection rate is 5m 3~500m 3;
2) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min~10m 3/ min, load fluid injection rate 5m 3~500m 3;
3) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min~10m 3/ min, active water injection rate 5m 3~500m 3;
4) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
5) inject gel breaker, it is 0.5m that gel breaker injects discharge capacity 3/ min~10m 3/ min, gel breaker injection rate 5m 3~500m 3;
6) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min~10m 3/ min, displacement fluid injection rate 5m 3~500m 3.
2. the method that in the cbm development based under the broken glue of low temperature, guanidine glue laminated is split, is characterized in that: it comprises the following steps:
1) injecting pre-prepad fluid, is active water Injection Well under by pump by pre-prepad fluid to the extraction well that completes drilling well, makes generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, and it is 0.5m that pre-prepad fluid injects discharge capacity 3/ min~10m 3/ min, pre-prepad fluid injection rate is 5m 3~500m 3;
2) inject prepad fluid, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 0.5m that viscous liquid injects discharge capacity 3/ min~10m 3/ min, viscous liquid injection rate 1m 3~500m 3;
3) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min~10m 3/ min, load fluid injection rate 5m 3~500m 3;
4) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min~10m 3/ min, active water injection rate 5m 3~500m 3;
5) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
6) inject gel breaker, it is 0.5m that gel breaker injects discharge capacity 3/ min~10m 3/ min, gel breaker injection rate 5m 3~500m 3;
7) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min~10m 3/ min, displacement fluid injection rate 5m 3~500m 3.
3. the method that in the cbm development based under the broken glue of low temperature, guanidine glue laminated is split, is characterized in that: it comprises the following steps:
1) inject prepad fluid, to the extraction well that completes drilling well by pump by under prepad fluid Injection Well, make generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 0.5m that viscous liquid injects discharge capacity 3/ min~10m 3/ min, viscous liquid injection rate 1m 3~500m 3;
2) inject gel breaker, it is 0.5m that gel breaker injects discharge capacity 3/ min~10m 3/ min, gel breaker injection rate 1m 3~500m 3;
3) inject insulating liquid, described insulating liquid is active water, and it is 0.5m that insulating liquid injects discharge capacity 3/ min~10m 3/ min, insulating liquid injection rate 0.5m 3~500m 3;
4) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min~10m 3/ min, load fluid injection rate 5m 3~500m 3;
5) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min~10m 3/ min, active water injection rate 5m 3~500m 3;
6) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
7) inject gel breaker, it is 0.5m that gel breaker injects discharge capacity 3/ min~10m 3/ min, gel breaker injection rate 5m 3~500m 3;
8) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min~10m 3/ min, displacement fluid injection rate 5m 3~500m 3.
4. the method that in the cbm development based under the broken glue of low temperature, guanidine glue laminated is split, is characterized in that: it comprises the following steps:
1) inject prepad fluid, to the extraction well that completes drilling well by pump by under prepad fluid Injection Well, make generation crack, coal seam, injection pressure ﹥ coal seam fracture pressure, described prepad fluid is viscous liquid, and the viscosity of viscous liquid is 5~500mPa.s, and it is 0.5m that viscous liquid injects discharge capacity 3/ min~10m 3/ min, viscous liquid injection rate 1m 3~500m 3;
2) inject load fluid, the average sand ratio of load fluid is more than 10%, and it is 0.5m that load fluid injects discharge capacity 3/ min~10m 3/ min, load fluid injection rate 5m 3~500m 3;
3) inject displacement fluid, described displacement fluid is active water, and it is 0.5m that active water injects discharge capacity 3/ min~10m 3/ min, active water injection rate 5m 3~500m 3;
4) termination of pumping, surveys coal seam pressure drop, and the termination of pumping time is more than 10min;
5) inject gel breaker, it is 0.5m that gel breaker injects discharge capacity 3/ min~10m 3/ min, gel breaker injection rate 5m 3~500m 3;
6) inject displacement fluid, it is 0.5m that displacement fluid injects discharge capacity 3/ min~10m 3/ min, displacement fluid injection rate 5m 3~500m 3.
5. the method that in a kind of cbm development based under the broken glue of low temperature according to claim 3, guanidine glue laminated is split, is characterized in that: described gel breaker is any one in acidifying series products of oxidants product or oil field.
CN201310512525.9A 2013-10-25 2013-10-25 Method for fracturing guanidine gum in coal bed gas development based on low-temperature gum breaking Pending CN103573244A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310512525.9A CN103573244A (en) 2013-10-25 2013-10-25 Method for fracturing guanidine gum in coal bed gas development based on low-temperature gum breaking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310512525.9A CN103573244A (en) 2013-10-25 2013-10-25 Method for fracturing guanidine gum in coal bed gas development based on low-temperature gum breaking

Publications (1)

Publication Number Publication Date
CN103573244A true CN103573244A (en) 2014-02-12

Family

ID=50045886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310512525.9A Pending CN103573244A (en) 2013-10-25 2013-10-25 Method for fracturing guanidine gum in coal bed gas development based on low-temperature gum breaking

Country Status (1)

Country Link
CN (1) CN103573244A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953324A (en) * 2014-04-29 2014-07-30 惠建龙 Fracture height-adjustable acid fracturing method adopting polyatomic acid and steering acid
CN104088616A (en) * 2014-07-09 2014-10-08 中国科学院武汉岩土力学研究所 Coal bed methane hydrofracture method
CN106368733A (en) * 2016-10-21 2017-02-01 山东科技大学 Gas-bearing coal mass hydrofracture and acidification combined strengthening anti-reflection assessment method
CN108373913A (en) * 2018-01-23 2018-08-07 中国石油天然气股份有限公司 One kind is for the efficient gel breaking method of chemical heat production in well fracturing technique
CN108868871A (en) * 2018-05-18 2018-11-23 河南能源化工集团研究总院有限公司 Stress Fast-Balance method after hydraulic flushing in hole
CN115045645A (en) * 2022-05-26 2022-09-13 西南石油大学 Process for improving effective reconstruction volume of ultra-deep high-temperature fractured reservoir

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101078343A (en) * 2007-07-06 2007-11-28 郝东 Fracturing technique for relieving fracturing fluid pollution
CN101173603A (en) * 2006-04-13 2008-05-07 施蓝姆伯格技术公司 Sub-surface coalbed methane well enhancement through rapid oxidation
CN102287176A (en) * 2011-05-09 2011-12-21 河南理工大学 Coal bed pressing crack liquid system
CN102852503A (en) * 2012-06-04 2013-01-02 北京九尊能源技术股份有限公司 Low-temperature coal-layer fracturing fluid composite gel breaking process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101173603A (en) * 2006-04-13 2008-05-07 施蓝姆伯格技术公司 Sub-surface coalbed methane well enhancement through rapid oxidation
CN101078343A (en) * 2007-07-06 2007-11-28 郝东 Fracturing technique for relieving fracturing fluid pollution
CN101333922A (en) * 2007-07-06 2008-12-31 郝东 Fracturing process for removing breakdown fluid contamination
CN102287176A (en) * 2011-05-09 2011-12-21 河南理工大学 Coal bed pressing crack liquid system
CN102852503A (en) * 2012-06-04 2013-01-02 北京九尊能源技术股份有限公司 Low-temperature coal-layer fracturing fluid composite gel breaking process

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953324A (en) * 2014-04-29 2014-07-30 惠建龙 Fracture height-adjustable acid fracturing method adopting polyatomic acid and steering acid
CN103953324B (en) * 2014-04-29 2016-08-31 惠建龙 Polynary turn to acid adjustable slit height acidifying fracturing process
CN104088616A (en) * 2014-07-09 2014-10-08 中国科学院武汉岩土力学研究所 Coal bed methane hydrofracture method
CN104088616B (en) * 2014-07-09 2017-12-05 中国科学院武汉岩土力学研究所 A kind of coal bed gas hydraulic fracturing method
CN106368733A (en) * 2016-10-21 2017-02-01 山东科技大学 Gas-bearing coal mass hydrofracture and acidification combined strengthening anti-reflection assessment method
CN106368733B (en) * 2016-10-21 2017-08-11 山东科技大学 A kind of coal seam with gas hydraulic fracturing is with being acidified combined reinforced anti-reflection appraisal procedure
CN108373913A (en) * 2018-01-23 2018-08-07 中国石油天然气股份有限公司 One kind is for the efficient gel breaking method of chemical heat production in well fracturing technique
CN108868871A (en) * 2018-05-18 2018-11-23 河南能源化工集团研究总院有限公司 Stress Fast-Balance method after hydraulic flushing in hole
CN108868871B (en) * 2018-05-18 2024-03-29 河南能源化工集团研究总院有限公司 Method for quickly balancing stress after hydraulic punching
CN115045645A (en) * 2022-05-26 2022-09-13 西南石油大学 Process for improving effective reconstruction volume of ultra-deep high-temperature fractured reservoir
CN115045645B (en) * 2022-05-26 2023-08-25 西南石油大学 Technology for improving effective reconstruction volume of ultra-deep high Wen Liefeng reservoir

Similar Documents

Publication Publication Date Title
CN103573244A (en) Method for fracturing guanidine gum in coal bed gas development based on low-temperature gum breaking
CN103061730B (en) A kind of multielement hot fluid foam flooding is for coal bed methane exploring method
CN102080526B (en) Method for extracting gas from bedding level fractured well of ground coal seam roof
CN101787864B (en) Method for plugging water from oil reservoir fractured water logging oil well developed by injecting water into low-permeable reservoir stratum
CN102913221A (en) Volume transformation process of low permeability reservoir
CN109505577B (en) Method for exploiting dry hot rock
CN105888641A (en) Carbon dioxide-anti-drag water compound fracturing method
CN109751027B (en) Fracturing method for normal-pressure shale gas horizontal well
CN204140038U (en) A kind of gaseous carbon dioxide injects displacement of reservoir oil equipment continuously
CN103967470A (en) Method for fracturing horizontal well through penetrating shale layers
CN106801597A (en) Heavy crude reservoir combined type flooding method and displacement composition
CN102926701B (en) A kind of mixed matching water-plugging technology method continuously
CN105370256A (en) Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
CN106837274A (en) A kind of method that oil displacement agent injection oil reservoir is improved recovery ratio by utilization pressure break
CN108825197A (en) A method of strengthening shale gas recovery ratio
CN108316915B (en) Method for determining optimal dosage of fiber temporary plugging steering fluid in tight reservoir of oil and gas well
CN103628846A (en) Method for improving CO2 displacement efficiency of low-permeability reservoir
CN104847322A (en) Method for improving recovery efficiency for deep common thickened oil water drive-converting into-steam flooding
CN102627956A (en) Application of curdlan as profile control agent in petroleum exploitation and application method
CN108729893A (en) A kind of foam composite cold mining method improving recovery factor of heavy oil reservoir
CN104895538A (en) A method for increasing the strongly water-sensitive heavy oil reservoir recovery ratio
CN103468237A (en) Clean fracturing fluid and preparation method thereof
CN104612649A (en) Method and device for fracturing and permeability and yield increasing of coal-bed gas well of low-pressure and low permeability reservoir by means of chemical permeability increasing
CN105089573A (en) Recovering method for improving substrate and microfracture oil flooding efficiency in dual medium reservoir gas injection
CN104612648A (en) Method and device for active water-nitrogen foam fracturing of low-pressure and low permeability coal bed gas well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140212