A kind of formwork erection pouring concrete material distributing machine
technical scheme
The present invention relates to constructional engineering machinery technical field, be specifically related to a kind of formwork erection concrete pouring device.
Background technology
at present in the prefabricated building of assembled integrated building, wallboard industryization are manufactured, to need in the formwork erection chamber fixed cast concrete with the building of pre-formed certain specification, wallboard.And be all by artificial to fill concrete in mold cavity in the past, this operating type labor strength is large, and efficiency is not high, wastes time and energy, and casting quality is difficult to be guaranteed, and can not meet the needs of housing industrialization.
Summary of the invention
Technical problem to be solved by this invention is: solve above-mentioned prior art Problems existing, and provide a kind of formwork erection pouring concrete material distributing machine, and work is automatically reliable; easy to operate, cloth is flexible, and cast efficiency is high; quality is good, is convenient to realize prefabricated building, wallboard manufacture industrialization pipelining.
The technical solution used in the present invention is:
A kind of formwork erection pouring concrete material distributing machine, comprise cloth bucket assembly, cloth bracket assembly, fixed mount assembly, locating rack assembly and ground light rail track, cloth bracket assembly is contained on the light rail track of ground, and can walk thereon, cloth bucket assembly is contained in again two of cloth bracket assembly directly on parallel light rail track, locating rack assembly is arranged on one of cloth bracket assembly, two of point being listed in cloth bracket assembly corresponding to fixed mount assembly, and fixed mount assembly is arranged on below mixing plant discharging opening, described cloth bucket assembly structure is: cloth bucket shell and two cloth bucket walking beams are welded and fixed, cloth bucket walking beam is arranged on the cloth bracket light rail track of cloth bracket assembly, stand material axle is arranged on bottom in cloth bucket shell by two large bearing blocks, heavy motor reductor connects to drive to spread out expects axle, shaft is arranged on middle part in cloth bucket shell by two small bearing brackets, small machine reductor connects driving shaft, in the bottom of cloth bucket shell, multiple discharging opening door is installed, multiple discharging opening door connects driving by multiple cylinder respectively, in the below of multiple discharging opening door, feeding chute is installed, feeding chute connects driving by chute oil cylinder, described cloth bracket assembly structure is: install cloth bracket walking beam bottom cloth bracket steel construction, and cloth bracket steel construction top is provided with cloth bracket light rail track, and at cloth bracket steel construction top, two ends is also provided with block set, described fixed mount assembly structure is: fixed mount steel construction top is provided with fixed mount light rail track and rotates light rail track, is also provided with rotates light rail track driving oil cylinder, top driving oil cylinder and taper top in termination, fixed mount steel construction top, described locating rack assembly structure is: the top of locating rack steel construction is provided with locating rack top and drives oil cylinder and locating rack taper top.
In technique scheme, the multiple discharging opening doors installed bottom described cloth bucket shell are 15, connected respectively drive by 15 cylinders.
Operation principle:
Formwork erection pouring concrete material distributing machine of the present invention, first be that the light rail track that cloth bracket assembly runs on cloth bracket assembly top along ground light rail track aligns with the light rail track on fixed mount assembly, then be that the locating rack top driving oil cylinder on locating rack assembly and the top on fixed mount assembly drive oil cylinder to stretch out, make the taper on it come directly towards jacking respectively and be positioned at different block set on cloth bracket assembly, then being rotation light rail track on fixed mount assembly drives the driving backspin of oil cylinder to go to align with the light rail track on cloth bracket assembly and on fixed mount assembly rotating light rail track, cloth bucket assembly runs on fixed mount assembly along above-mentioned light rail track again, namely concrete material is accessed under mixing plant.Oppositely be back on cloth bracket assembly along track after having connect concrete material, now rotate light rail track and reversely rotate 90o again under rotating light rail track to drive the effect of oil cylinder, namely rotate to vertical with the light rail track on fixed mount assembly, so just can ensure that cloth bracket assembly is unlikely when fixed mount assembly is left in light rail track walking in ground and interfere with swing-around trajectory.That cloth bracket assembly runs to the position, formwork erection chamber that need pour into a mould on the light rail track of ground along X-direction with that, cloth bucket assembly is walked along Y direction on cloth bracket assembly track simultaneously, feeding chute puts down under the effect of chute oil cylinder, implements cast cloth in formwork erection chamber.Process like this is carried out repeatedly.
Advantageous effect:
Structure is simple, and reliable, cloth efficiency is high, automatically controls flexibly, than time saving and energy saving by the artificial fill concrete that goes, can meet the demand of prefabricated building, wallboard industry production line in modern assembled integrated building completely.
Accompanying drawing explanation
Fig. 1 is that structure of the present invention is always schemed;
Fig. 2 is cloth bucket assembly structure schematic diagram;
Fig. 3 is cloth bucket assembly structure side view;
Fig. 4 is cloth bracket assembly structure schematic diagram;
Fig. 5 is cloth bucket assembly structure side view;
Fig. 6 is fixed mount assembly structure schematic diagram;
Fig. 7 is fixed mount assembly structure side view;
Fig. 8 is locating rack assembly structure schematic diagram.
Accompanying drawing mark illustrates:
1-facility floor, 2-locating rack assembly, 3-formwork erection group, 4-ground light rail track, 5-cloth bucket assembly, 6-fixed mount assembly, 7-cloth bracket assembly, 8-discharging opening door, 9-heavy motor reductor, 10-small bearing bracket, 11-cloth bucket shell, 12-shaft, 13-small machine reductor, 14-cloth bucket walking beam, 15-stand material axle, 16-chute oil cylinder, 17-feeding chute, 18-cylinder, 19-cylinder, the large bearing block of 20-, the left cloth bracket walking beam of 21-, the right cloth bracket walking beam of 22-, block set in 23-, the left block set of 24-, the left cloth bracket light rail track of 25-, the right cloth bracket light rail track of 26-, the right block set of 27-, 28-cloth bracket steel construction, 29-fixed mount steel construction, 30-top drives oil cylinder, 31-taper comes directly towards, 32-anticlockwise light rail track drives oil cylinder, 33-anticlockwise light rail track, 34-right rotation light rail track, the right fixed mount light rail track of 35-, 36-right rotation light rail track drives oil cylinder, the left fixed mount light rail track of 37-, 38-locating rack steel construction, the taper of 39-locating rack comes directly towards, 40-locating rack top drives oil cylinder.
Detailed description of the invention
See Fig. 1-Fig. 8, formwork erection pouring concrete material distributing machine of the present invention, adopts a cloth bucket assembly, cloth bracket assembly, fixed mount assembly, locating rack assembly to form a complete formwork erection material distributing machine.First install in facility floor two parallel, directly to ground light rail track, cloth bracket assembly is contained on the light rail track of facility floor, and can realize the walking of X-direction.Cloth bucket assembly is contained in again two of cloth bracket assembly directly on, parallel light rail track, and can realize the walking of Y direction, so just can make the cloth demand that cloth bucket realization is walked along X, Y direction.Cloth bucket assembly is made up of two cloth bucket walking beams, cloth bucket shell steel construction, stand material axle, shaft, heavy motor reductor, small machine reductor, 15 discharging opening doors, 15 cylinders, cylinder, 2 large bearing blocks, 2 small bearing brackets, feeding chute, 2 chute oil cylinders etc.Two cloth bucket walking beams and cloth bucket shell are weldingly connected, and being responsible for cloth bucket assembly can walk along Y direction; Splendid attire concrete is responsible for by cloth bucket shell steel construction; Stand material axle is provided with heavy motor reductor, 2 large bearing blocks, and axle is fixed on the bottom of cloth bucket shell by 2 large bearing blocks, stand to be expected, is rotated and realize the discharge of cloth bucket shell inner concrete, stand material by heavy motor reductor driving stand material axle; Shaft is provided with small machine reductor, 2 small bearing brackets, make shaft be fixed on stand in cloth bucket shell by 2 small bearing brackets and expect the position on axle, drive shaft to rotate by small machine reductor and realize the stirring of cloth bucket shell inner concrete, prevent the condensation of bucket inner concrete first, another then has the effect making bucket inner concrete stir further; 15 discharging opening doors are arranged on the bottom of cloth bucket shell, realize switch discharging respectively, and 15 doors can realize controlling separately its Push And Release by 15 air cylinder driven; Feeding chute is contained under discharging opening door, controls it mention and put down by 2 chute oil cylinders, and when needing feeding, chute puts down, and when not needing feeding, chute is mentioned and set level.Cloth bracket assembly is made up of two cloth bracket walking beams, two light rail track, cloth bracket steel constructions etc.Two cloth bracket walking beams are responsible for cloth bracket assembly and can be walked along X-direction; The weight of cloth bracket steel construction load-bearing cloth bucket assembly.Fixed mount assembly is fixedly mounted on below mixing plant, when splicing is gone in the walking of cloth bucket needs under mixing plant, first be that cloth bracket assembly runs to along ground rail and makes the track on cloth bracket assembly and the track alignment on fixed mount assembly, locating rack top on locating rack assembly drives the top on oil cylinder and fixed mount assembly to drive oil cylinder to stretch out, make in block set respective on its each taper top difference jacking cloth bracket assembly, cloth bracket assembly and fixed mount assembly relative position are fixed, location, then the driving backspin that the rotation light rail track on fixed mount assembly is rotating light rail track driving oil cylinder goes to and the track alignment on the track on cloth bracket assembly and fixed mount assembly, cloth bucket assembly is again along above-mentioned track travel on fixed mount assembly, i.e. splicing under mixing plant.After having connect material, cloth bucket assembly is oppositely back on cloth bracket assembly again, rotate light rail track and reversely rotate 90 o again under rotating light rail track to drive the driving of oil cylinder, retract in taper top on locating rack assembly and on fixed mount assembly, cloth bracket assembly leaves fixed mount along the walking of ground light rail track again and goes cloth to pour into a mould.Fixed mount assembly drives oil cylinder, 2 taper tops etc. to form by fixed mount steel construction, 2 rotation light rail track, 2 fixing light rail track, 2 rotation light rail track driving oil cylinders, 2 tops.Fixed mount steel construction is used for load-bearing; 2 rotate light rail track and are used for docking the track on cloth bracket assembly and fixed mount assembly, rotating setting up of light rail track is because considering that cloth bracket assembly has the possibility of deflection in position when walking, so certain spacing should be provided with between cloth bracket assembly and fixed mount assembly, do not have interference during to ensure relative motion between them, this spacing just docks compensation by rotation light rail track.Rotating light rail track drives oil cylinder to be used for driving rotation light rail track to rotate; Top drives oil cylinder to be used for driving the flexible of taper top.Locating rack assembly is arranged on one of cloth bracket assembly, two of point being listed in cloth bracket assembly corresponding to fixed mount assembly.Locating rack assembly is come directly towards by locating rack steel construction, locating rack and drives oil cylinder, taper top etc. to form, and locating rack top drives oil cylinder, location, stationary cloth bin assembly are assisted in the effect of taper top.A complete material distributing machine is formed and the automatic casting cloth realized formwork erection by the said equipment.