CN103455871B - Resource scheduling system and method - Google Patents

Resource scheduling system and method Download PDF

Info

Publication number
CN103455871B
CN103455871B CN201310329195.XA CN201310329195A CN103455871B CN 103455871 B CN103455871 B CN 103455871B CN 201310329195 A CN201310329195 A CN 201310329195A CN 103455871 B CN103455871 B CN 103455871B
Authority
CN
China
Prior art keywords
performance
directory
data
time
arenas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310329195.XA
Other languages
Chinese (zh)
Other versions
CN103455871A (en
Inventor
蒋玉暕
蒋伟
张晶晶
亓超
周斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Communication University of China
Original Assignee
Communication University of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Communication University of China filed Critical Communication University of China
Priority to CN201310329195.XA priority Critical patent/CN103455871B/en
Publication of CN103455871A publication Critical patent/CN103455871A/en
Application granted granted Critical
Publication of CN103455871B publication Critical patent/CN103455871B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of resource scheduling system and method.Wherein, this system includes: resource input system, is used for obtaining performance resource data;Dispatching patcher, it is connected with resource input system, obtain directory performance data for carrying out performance time layout according to the directory priority in performance resource data and performance time information, and the mapping relations set up between performance resource data and directory performance data obtain working days marshal data.Use the present invention, solve in prior art and performance resource is carried out the problem that layout speed is slow, efficiency is low, cost is high, realize the simple layout result obtaining performance resource accurately and efficiently, thus the optimization realizing numerous performance resources such as troupe, arenas, the directory is coordinated.

Description

Resource scheduling system and method
Technical field
The present invention relates to data processing field, in particular to a kind of resource scheduling system and method.
Background technology
Along with the development of China's Cultural Services industry, culture performance is also the most flourishing, presents more and more prosperous gesture.So And, along with the prosperity of culture performance, increasing of performance group, performer, arenas and the class of the performance directory and quantity, arenas with drill Go out group's independence, operating mechanism traditional conservative, service function are disperseed with Service Source, service mode is single with the means of services, letter Breath service slowly highlights with the problem such as transactional services disappearance, and these problems often result in culture and perform the waste of resource, such as part The performance directory due to the reasons such as information is the most smooth cause not having suitable arenas to perform on time, part arenas because scheduling of resource not Freely, causing part-time to concentrate performance, part-time arenas is idle, has had a strong impact on China's culture performance cinemas service trade Development.Although existing performance resource is numerous, but resource distribution and management relatively disperse, and existing performance directory layout is also It is the mode mainly using layout manually, i.e. single directory resource is arranged in conjunction according to the experience of working days layout personnel Suitable time suitable arenas.
Culture performance cinemas are positioned " cooperation with service ", it is desirable to by integrating scattered performance resource, break away from performance main body All drawbacks during independent management, get through performance industrial chain, form scale management, and the proposition of culture performance cinemas causes performance The complication of resource scheduling, i.e. under the complex environment of many demanding parties and many suppliers, relate to arenas, performance directory scale, Many restraining factors such as performance cost, need by obtaining the data of directory working days arrangement accurately.Working days layout relates to Many restraining factors such as performance theater, performance directory scale, performance time, traffic, transport, but, traditional culture is drilled Going out the working days arranges, and mainly uses the manual mode rehearsed, and rehearses and be also only limitted to arenas administration section in this arenas Performance in a period of time from now on arranges situation to carry out schedule ahead, utilizes artificial mode to make the performance arrangement of this arenas Table.Along with the increase of performance resource, under the complex environment of many demanding parties and many suppliers, the performance to each performance main body is pacified one by one Discharging into row tabulation, efficiency is low, and the resource contention between each main body also cannot be avoided.
From the foregoing, it will be observed that along with the increase of performance resource, by the way of making form by hand, carry out artificial performance resource Scheduling, cost is high, the longest, it is impossible to meet the requirement of quick obtaining performance calendar.
For in prior art, performance resource is carried out the problem that layout speed is slow, efficiency is low, cost is high, the most not yet carry Go out effective solution.
Summary of the invention
For correlation technique, performance resource is carried out the problem that layout speed is slow, efficiency is low, cost is high, the invention provides A kind of resource scheduling system and method, to solve the problems referred to above.
To achieve these goals, according to an aspect of the invention, it is provided a kind of resource scheduling system, this system bag Include: resource input system, be used for obtaining performance resource data;Dispatching patcher, is connected with resource input system, for according to performance Directory priority and performance time information in resource data carry out performance time layout and obtain directory performance data, and foundation is drilled The mapping relations gone out between resource data and directory performance data obtain working days marshal data.
Further, performance resource data includes: arenas information and troupe's information, wherein, dispatching patcher includes: priority Sequencing unit, is connected with resource input system, obtains excellent for all directorys being carried out prioritization according to directory priority First level sequence;Time-sequencing unit, is connected with prioritization unit, for according to the order of the directory in priority sequence respectively According to the very first time information in arenas information and the second temporal information in troupe's information, the directory is carried out performance time sequence, To obtain directory performance data;First working days arranging unit, is connected with time-sequencing unit, be used for setting up performance resource data with Mapping relations between directory performance data obtain working days marshal data.
Further, performance resource data also includes: directory information, and directory information includes: maximum time array, and the time arranges Sequence unit includes: the first processing unit, is connected with prioritization unit, for obtaining the arenas collection corresponding with the directory, wherein, The arenas including one or more performance matching criteria with the directory concentrated by arenas, and temporal information corresponding for arenas is denoted as the Three temporal informations;Computing unit, is connected with the first processing unit, for according to the second temporal information, the 3rd temporal information and The maximum time array calculating time of rehearsing obtains time common factor;Second processing unit, is connected with computing unit, for according to first Pre-conditioned occur simultaneously with the time to carry out mating obtain directory performance data, wherein, maximum time array be the performance of the directory Big time range.
Further, computing unit includes: the first computation subunit, is connected with the first processing unit, for each is acute 3rd temporal information of field correspondence carries out logic and operation with maximum time array respectively and obtains very first time array;Second calculates Subelement, is connected with the first processing unit, for the second temporal information of troupe and maximum time array are carried out logical AND fortune Calculation obtains the second time array;3rd computation subunit, is connected between the first computation subunit and the second computation subunit, uses Occur simultaneously in obtaining the very first time array time with the second time array.
Further, performance resource data includes: the first directory set and the second directory set, directory priority includes play Purpose weight parameter, performance time information includes path data, and the first directory set includes: path data, and dispatching patcher includes: First directory sequencing unit, is connected with resource input system, for the path data in the first directory set is carried out layout, with Obtain the first performance sequence of troupe, and obtain the first performance time of all performance plays in the first performance sequence, preserve the Arenas data, troupe's data and the first incidence relation between the first performance time in one performance sequence obtain first directory drills Go out data;Second directory sequencing unit, is connected with resource input system, for obtaining the of all directorys in the second directory set Two weight parameter;It is ranked up the second weight parameter obtaining the second performance sequence;Obtain each performance in the second performance sequence 3rd performance time of play and arenas data;Preserve the second incidence relation between the 3rd performance time and arenas data, with Obtain the second directory performance data;Second working days arranging unit, is connected to the first directory sequencing unit and the sequence of second directory is single Between unit, perform the arenas data in data, directory data, troupe's number for setting up the first directory performance data and second directory Mapping relations according to this and between time data, generate working days marshal data, and wherein, the first directory collection is combined into troupe in multiple plays The acute destination aggregation (mda) of field performance, the second directory collection is combined into troupe only at the acute destination aggregation (mda) of an arenas performance.
Further, system also includes: check system, is connected with dispatching patcher, is used for detecting working days marshal data with pre- If assessment data whether consistent, wherein, in the case of working days marshal data is inconsistent with the assessment data preset, return is held Row carries out performance time layout according to the directory priority in performance resource data and performance time information and obtains directory performance number According to.
To achieve these goals, according to a further aspect in the invention, it is provided that a kind of resource regulating method, the method bag Include: obtain performance resource data;The performance time is carried out according to the directory priority in performance resource data and performance time information Layout obtains directory performance data;The mapping relations set up between performance resource data and directory performance data obtain working days layout Data.
Further, performance resource data includes: arenas information and troupe's information, wherein, according in performance resource data Directory priority and performance time information carry out performance time layout obtain the directory performance data step include: according to the directory All directorys are carried out prioritization and obtain priority sequence by priority;Press respectively according to the order of the directory in priority sequence According to the very first time information in arenas information and the second temporal information in troupe's information, the directory is carried out performance time sequence, with Obtain directory performance data.
Further, performance resource data also includes: directory information, directory information includes: maximum time array, according to excellent In first level sequence, the order of the directory is respectively according to the second time letter in the very first time information in arenas information and troupe's information Breath the directory is carried out performance time sequence, with obtain the directory performance data step include: obtain the arenas collection corresponding with the directory, Wherein, the arenas including one or more performance matching criteria with the directory concentrated by arenas, by temporal information corresponding for arenas It is denoted as the 3rd temporal information;Obtain according to the second temporal information, the 3rd temporal information and the maximum time array calculating time of rehearsing Occur simultaneously to the time;According to first pre-conditioned occur simultaneously to carry out mating with the time obtain directory performance data, wherein, maximum time number Group is the maximum time scope of the performance of the directory.
Further, obtain according to the second temporal information, the 3rd temporal information and the maximum time array calculating time of rehearsing The step occured simultaneously to the time includes: with maximum time array, the 3rd corresponding for each arenas temporal information is carried out logical AND respectively Computing obtains very first time array;Second temporal information of troupe and maximum time array are carried out logic and operation and obtains second Time array;Obtain the time common factor of very first time array and the second time array.
Using the present invention, obtain performance resource data by resource input system, then dispatching patcher is according to performance resource Directory priority and performance time information in data carry out performance time layout and obtain directory performance data, and set up performance money Mapping relations between source data and directory performance data obtain working days marshal data.Solve in prior art performance resource Carry out the problem that layout speed is slow, efficiency is low, cost is high, it is achieved the simple layout result obtaining performance resource accurately and efficiently, Thus the optimization realizing numerous performance resources such as troupe, arenas, the directory is coordinated.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this Bright schematic description and description is used for explaining the present invention, is not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of resource scheduling system according to embodiments of the present invention;
Fig. 2 is the schematic diagram of the resource scheduling system according to shown in Fig. 1 embodiment;
Fig. 3 is the schematic diagram of the resource scheduling system according to another embodiment shown in Fig. 1;
Fig. 4 is the structural representation of the working days data processing equipment based on performance resource according to embodiment illustrated in fig. 3;
Fig. 5 is the flow chart of resource regulating method according to embodiments of the present invention;
Fig. 6 is the flow chart of the resource regulating method according to shown in Fig. 5 embodiment;
Fig. 7 is the flow chart of the resource regulating method according to shown in Fig. 6 embodiment;
Fig. 8 is the flow chart of the resource regulating method according to another embodiment shown in Fig. 5;
Fig. 9 is the flow chart of the resource regulating method according to embodiment illustrated in fig. 8;
Figure 10 is the schematic diagram of acquisition first directory performance data according to embodiment illustrated in fig. 8;And
Figure 11 is the schematic diagram of acquisition second directory performance data according to embodiment illustrated in fig. 8.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can phases Combination mutually.Describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
Fig. 1 is the schematic diagram of resource scheduling system according to embodiments of the present invention, as it is shown in figure 1, this resource scheduling system May include that resource input system 100, be used for obtaining performance resource data;Dispatching patcher 300, with resource input system 100 even Connect, obtain the directory drill for carrying out performance time layout according to the directory priority in performance resource data and performance time information Go out data, and the mapping relations set up between performance resource data and directory performance data obtain working days marshal data.
Use the resource scheduling system of the present invention, obtain performance resource data by resource input system, then dispatch system System carries out performance time layout according to the directory priority in performance resource data and performance time information and obtains directory performance number According to, and set up performance resource data and the directory performance data between mapping relations obtain working days marshal data.Solve existing Technology carries out, to performance resource, the problem that layout speed is slow, efficiency is low, cost is high, it is achieved simply obtain performance accurately and efficiently The layout result of resource, thus the optimization realizing numerous performance resources such as troupe, arenas, the directory is coordinated, and use this system, The performance resource data process got is obtained working days marshal data and can carry out working days layout for different user's requests And programming time is short, low cost, and the output of working days marshal data can be diversified, such as, excel form etc..
Wherein, the performance resource data in above-described embodiment can include build-in attribute (such as, the arenas performing resource Light units, attend a banquet), these build-in attributes can be saved in default data base, such as default arenas information bank, performance Resource data can also include the directory information in following embodiment, arenas information and troupe's information, and these information can be User by resource input system after Successful login system, the information inputted according to the demand of user.Wherein, above-mentioned use Family can be troupe user, it is also possible to be arenas user.The most in the present embodiment, performance resource is obtained by resource input system Information includes two ways: by reading the performance resource data in the data base preset and user by resource input system root According to user's request input performance resource data.
Fig. 2 is the schematic diagram of the resource scheduling system according to shown in Fig. 1 embodiment.Embodiment as shown in Figure 2, drills Going out resource data and may include that arenas information and troupe's information, wherein, dispatching patcher 300 includes: prioritization unit 310, It is connected with resource input system 100, obtains priority sequence for all directorys being carried out prioritization according to directory priority Row;Time-sequencing unit 320, is connected with prioritization unit 310, for according to the order of the directory in priority sequence respectively According to the very first time information in arenas information and the second temporal information in troupe's information, the directory is carried out performance time sequence, To obtain directory performance data;First working days arranging unit 330, is connected with time-sequencing unit 320, is used for setting up performance resource Mapping relations between data and directory performance data obtain working days marshal data.
In the above-described embodiment shown in Fig. 2, performance resource data can also include: directory information, directory information is permissible Including: maximum time array, time-sequencing unit 320 includes: the first processing unit 321, with prioritization unit 310 even Connecing, for obtaining the arenas collection corresponding with the directory, wherein, arenas is concentrated and is included one or more performance condition phase with the directory The arenas joined, is denoted as the 3rd temporal information by temporal information corresponding for arenas;Computing unit 323, with the first processing unit 321 even Connect, for obtaining time common factor according to the second temporal information, the 3rd temporal information and the maximum time array calculating time of rehearsing; Second processing unit 325, is connected with computing unit 323, for pre-conditioned common factor carries out mating obtaining with the time according to first Directory performance data, wherein, maximum time array is the maximum time scope of the performance of the directory.
According to the abovementioned embodiments of the present invention, computing unit 323 includes: the first computation subunit, with the first processing unit Connect, obtain first for the 3rd corresponding for each arenas temporal information is carried out logic and operation with maximum time array respectively Time array;Second computation subunit, is connected with the first processing unit, for by the second temporal information of troupe and maximum time Array carries out logic and operation and obtains the second time array;3rd computation subunit, is connected to the first computation subunit and second Between computation subunit, for obtaining the time common factor of very first time array and the second time array.
Wherein, above-mentioned very first time information, the second temporal information and maximum time array are performance time information.
Specifically, in order to reduce computing unit calculate complexity, resource input system obtain performance resource data it After, performance resource data is carried out Initialize installation, Initialize installation mainly can be realized by following method:
(1) similar directory set is divided: drawn by performance time requirement and classification by all directorys in performance resource data Dividing equivalence class, will have being divided in same directory set of same alike result, the directory in similar directory set only has on place Conflict not free on conflict, thus each directory set can be rehearsed respectively, thus greatly reduce calculation The complexity of method, improves and rehearses efficiency of algorithm.
(2) initial time is set: time initial setting up includes obtaining very first time information, the second temporal information and maximum Time array.
Arrange above-mentioned very first time information, the second temporal information and maximum time array to arrange to improve the directory Reasonability, the ageing pattern arranged for the different directorys.Such as, the performance time of directory every day is arranged to three, permissible The performance time section of one day is divided into first time period, the second time period and the 3rd time period, specifically, the very first time Section, represents with " 01 ", its time period can be 9:00-12:00;Second time period, representing with " 02 ", its time period can be 14:00-17:00;3rd time period, representing with " 03 ", its time period can be 19:00-22:00.Every month 1 day to No. 30 points Yong not represent " 01 "-" 30 ".Annual January represents to December " 01 "-" 12 ".In this embodiment, it is possible to during with one Between string represent the runtime pattern of certain directory, such as: " 010101 " represents morning January 1, and " 201307280 " represent The first time period on July 28th, 2013, it is preferable that when the directory arranges for the directory showed continuously, will try one's best and pacify every other day Row.
Wherein, very first time information and the second temporal information are for arenas, the rehearsed time of troupe, it is preferable that the One temporal information and the second temporal information can be three-dimensional array, such as, and respectively very first time information and the second temporal information Set up the three-dimensional array of 3 × 30 × 12, wherein, the drilled time number of one-dimensional representation arenas every day, two-dimensional representation one The natural law of individual month, the third dimension represents the moon number of a year.
Furthermore it is also possible to be respectively provided with the value of the field that makes fruitless efforts of arenas, troupe, the value of this field can be a two dimension Array (X, Y), is used for indicating whether to rehearse, if for " 1 ", the value of this position represents that this time quantum can be rehearsed, for " 0 " represents that this time quantum is with not rehearsing.
(3) priority is set: according to arenas, troupe application situation (i.e. performance resource data in application information) and The expection of the directory prevails degree, set directory priority (i.e. the directory, arenas rehearse priority).
In the above embodiment of the present invention, obtain the maximum time array of certain directory, then from performance resource data In find out arenas collection, the arenas including one or more performance matching criteria with the directory concentrated by arenas, and arenas is corresponding Temporal information is denoted as the 3rd temporal information, and above-mentioned arenas collection includes all arenas that can perform this directory, according to each arenas The 3rd temporal information, obtain the time of row of arenas, and it obtained as logic "and" operation with the maximum time array of the directory To very first time array, then the second temporal information and maximum time array to troupe obtained for the second time as logic and operation Array, the time of very first time array and the second time array occur simultaneously be this directory final can scheduled time array.Root According to the directory rehearse first pre-conditioned the above-mentioned time occur simultaneously in coupling obtain the directory performance data (i.e. this directory can be performed Reasonable time pattern).
After dispatching patcher obtains directory performance data, determine that runtime and the place of the directory, set up performance Mapping relations between resource data and directory performance data obtain working days marshal data.
According to the abovementioned embodiments of the present invention, system can also include: check system 500, is connected with dispatching patcher 300, The most consistent with the assessment data preset for detecting working days marshal data, wherein, in working days marshal data and the assessment preset In the case of data are inconsistent, return and perform to drill according to the directory priority in performance resource data and performance time information Go out time sequential routine and obtain directory performance data.Check system in above-described embodiment, can perform number to the directory of initial acquisition According to verifying, in the case of data layout makes mistakes, the directory devious performance data can be carried out weight by this system New layout, to revise the directory performance data that output devious obtains, so that the directory performance data of system output are more Add accurately.
In the resource scheduling system of the present invention, after verifying working days marshal data by check system 500, it is also possible to logical Cross the output devices such as display working days marshal data to be exported.
Specifically, by the above embodiment of the present invention, if there is deadlock during obtaining directory performance data, Namely in the case of working days marshal data is inconsistent with the assessment data preset, return the play performed according in performance resource data Mesh priority and performance time information carry out performance time layout and obtain directory performance data, specifically, can upwards recall and search This error logging, to a nearest error logging (the nearest record i.e. clashed), is then compiled by rope again Row, to solve deadlock fault, if deadlock fault still can not solve, then exports conflict list by the relevant information of this directory In, wherein, relevant information includes the application performance time of this directory, application performance theater, performs the information such as troupe of this directory.
During above-mentioned dispatching patcher obtains working days marshal data, user can be arranged in similar directory set Parameter, the parameter etc. in arenas type, the pattern of performance time information, pri function, user can concrete according to oneself Require these parameters, pattern are configured.Additionally, user can select working days marshal data output form (such as: word or Excel etc.), even the part data of working days marshal data suitably can be adjusted, so that working days marshal data can expire The needs of foot user.
Wherein, first in above-described embodiment pre-conditioned can include two parts: hard constraint condition and soft-constraint bar Part, by the restriction of hard constraint condition, can solve to rehearse sequencing problem when multiple directory received by arenas, i.e. arenas can close Reason arrange its place the right to use, solution be to ensure that the problem that performance site is fully used;By soft-constraint condition Limit, solve the problem rehearsing order when multiple performance site introduces the same directory, i.e. can the directory be showed at arenas: makes The directory is reasonably showed at arenas, be unlikely to have caused the directory without place, solution be to ensure that what the performance directory made full use of asks Topic.
Specifically, hard constraint condition may include that performance site barnyard within a certain period of time, and the directory mates with stage condition (stage size, stage machinery), the directory administrative examination and approval by relevant departments, the same arenas same time can not arrange two to drill Going out, the same group same time can not arrange two performances simultaneously, the time upper limit that each arenas is showed continuously, same city The time interval that arenas is showed;Soft-constraint condition may include that performance site barnyard, Spectator interest collection of illustrative plates (include residing for spectators The level of economic development in area, the cultural consumption custom of spectators, esthetic sentiment), the market analysis (performance play, admission fee, Guan Zhongren Dynamic relationship analysis between number factor), Optimum cost: traffic costs for accommodation and dining access, troupe joins expense, fee for showing up etc., performs Maximizing the benefits: arenas is the most vacant, group does not leaves unused, directory arrangement is the most rationally.
In the above embodiment of the present invention, specifically can resource input system obtain performance resource data after, Obtain directory priority, the very first time information of arenas, the second temporal information of the directory and the maximum time array of the directory.
Wherein, directory priority can be by requiring and arenas Shen the fee for showing up use of the directory, the special performance of the directory Please the priority of number of times be calculated.Because the optional arenas that the directory preferentially rehearsed faces is many, it is likely to result in performance and receives Greatest differences in benefit and performance expenditure cost, therefore, designs rational directory order of presentation, according to directory priority to play Mesh reasonably performs arrangement design, and the most rational directory arranges the design of scheme.Specifically, the highest from priority level The directory start to rehearse, residue can be arranged by the first pre-conditioned constraint for the identical directory of the rank of priority The directory, so by retraining the arrangement finally realizing all directorys layer by layer.
Wherein, the very first time information of arenas may include that the performance time particular/special requirement sequence of arenas and important joint Special arrangement of time holiday sequence.Such as: the Party building commemoration day can arrange with individual name is about the play of subject matter at old revolutinary base area arenas Mesh;Second temporal information of the directory may include that the directory performance time particular/special requirement sequence and targetedly the directory rehearse peace Sorted list (such as, for the special directory rehearsed a certain festivals or holidays).
Wherein, the maximum time array of the directory, be each arenas the directory maximum performance bear the time, this maximum perform hold Can be determined according to arenas number, troupe's number, economic level, troupe's dispatching requirement etc. by the time.Specifically, can basis Arenas number, troupe's number calculate the maximum performance time continuously of each arenas, then drill continuously according to local economy level calculation The time gone out, calculating this directory maximum performance time continuously at this arenas finally according to the concrete directory, i.e. maximum performance is held By the time, namely maximum time array.The maximum of performance continuously obtaining each arenas is born the time, is on the one hand easy to arrange troupe Number, on the other hand be easy to cost-effective.Wherein, troupe's dispatching requirement namely the dispatching requirement of troupe user.
In the above embodiment of the present invention, can also will perform during dispatching patcher obtains directory performance data Route scheduling cost is as a first pre-conditioned part: the cost main when going on tour between different arenas of each troupe is Traffic, board and lodging, calculate the performance cost analysis of this cost of two, by calculating the cost during line arrangement between each arenas Analysis is easy to design rational route.
As it is shown on figure 3, present invention also offers a kind of system obtaining working days marshal data, the most equally may be used To arrange a check system 500.
As it is shown on figure 3, performance resource data may include that the first directory set and the second directory set, directory priority Including the weight parameter of the directory, performance time information includes path data, and the first directory set includes: path data, scheduling system System includes: the first directory sequencing unit 340, is connected with resource input system 100, for the number of path in the first directory set According to carrying out layout, to obtain the first performance sequence of troupe, and obtain in the first performance sequence the first of all performance plays and drill Go out the time, preserve arenas data, troupe's data and the first incidence relation between the first performance time in the first performance sequence Obtain the first directory performance data;Second directory sequencing unit 350, is connected with resource input system 100, acute for obtaining second Second weight parameter of all directorys in mesh set;It is ranked up the second weight parameter obtaining the second performance sequence;Obtain the Two the 3rd performance time performing each performance play in sequences and arenas data;Preserve the 3rd performance time and arenas data it Between the second incidence relation, with obtain second the directory performance data;Second working days arranging unit 360, is connected to the first directory row Between sequence unit 340 and the second directory sequencing unit 350, it is used for setting up the first directory performance data and second directory performance data In arenas data, directory data, mapping relations between troupe's data and time data, generate working days marshal data, its In, the first directory collection is combined into the acute destination aggregation (mda) that troupe performs at multiple arenas, and the second directory collection is combined into troupe only a play The acute destination aggregation (mda) of field performance.
Fig. 4 is the structural representation of working days data processing equipment based on performance resource according to embodiments of the present invention.As Shown in Fig. 4, the system in above-described embodiment can include working days data processing equipment, and wherein, this device may include that collection mould Block 10, for gathering the first directory set and the second directory set, the first directory collection is combined into the play that troupe performs at multiple arenas Destination aggregation (mda), the second directory collection is combined into troupe only at the acute destination aggregation (mda) of an arenas performance;First processing module 30, for right Directory data in first directory set carry out layout by performance path, to obtain the first corresponding directory performance data;Second Processing module 50, for being ranked up by directory weight the directory data in the second directory set, to obtain corresponding second Directory performance data;Output module 70, for setting up the arenas number in the first directory performance data and second directory performance data According to, directory data, mapping relations between troupe's data and time data, generate working days marshal data.Wherein, above-mentioned enforcement Acquisition module in example can be arranged in resource input system 100.First processing module, the second processing module and output mould Block all can be arranged in dispatching patcher 300.
Use the working days data processing equipment based on performance resource of the present invention, processed by the first processing module and second Module carries out layout to the directory data in the first directory set by performance path, and to the directory data in the second directory set It is ranked up by directory weight, obtains the first directory performance data and second directory performance data of correspondence, then by output Module set up first the directory performance data and second directory performance data in arenas data, directory data, troupe's data and Mapping relations between time data, generate working days marshal data.Solve in prior art and performance resource is carried out layout Process is loaded down with trivial details, thus causes the speed problem slow, inefficient obtaining layout result, it is achieved simply obtain performance accurately and efficiently The layout result of resource, thus the optimization realizing numerous performance resources such as troupe, arenas, the directory is coordinated.
It addition, by the directory data in the first directory set are carried out layout by performance path, and to the second directory collection Directory data in conjunction are ranked up obtaining the first directory performance data of correspondence and second directory performance data by directory weight, According to the performance constraints of each troupe, the priority of each performance resource can be ranked up, ultimately form and meet each use The working days marshal data that family needs, it is possible to according to the various boundary conditions of each user with finally perform target, from working days volume Row evidence filters out and meets the prioritization scheme that user meets, such that it is able to realize performance money numerous to troupe, arenas, the directory etc. The integrated dispatch in source, can improve the work efficiency to performance resource working days layout to a great extent, save the substantial amounts of time, Improve quality and the efficiency of performance scheduling of resource, thus vitalize all kinds of performance resources of culture performing market, and then promote culture Performing market is developed.
Specifically, this device can also include output module 70, is used for exporting working days marshal data.More specifically, by shelves Phase marshal data is presented to user with the form of form, word, it is possible to according to the working days layout of the demand printout of user Data.
According to the abovementioned embodiments of the present invention, as it is shown on figure 3, the first directory set may include that path data, at first Reason module includes: the first sub-processing module 341, for path data is carried out layout, to obtain the first performance sequence of troupe; First acquisition module 343, for obtaining the first performance time of all performance plays in the first performance sequence;First preserves module 345, for preserving arenas data, troupe's data and first the associating between the first performance time in the first performance sequence System, obtains the first directory performance data.Wherein, first sub-processing module the 341, first acquisition module 343 and first preserves module Can be arranged in the first processing module in the first directory sequencing unit 340.
Specifically, the first sub-processing module may include that read module, for reading all plays from the first directory set First weight parameter of field;Second sub-processing module, for obtaining the first performance sequence to all first weight parameter sequences.? The first weight parameter in this embodiment can also be default weight parameter, and this parameter can also be saved in default data base In.
Specifically, the first directory set can also include: performance time data, and wherein, the first acquisition module 343 can wrap Include: the second acquisition module, for obtaining the performance interval between twice performance adjacent in the first performance sequence;3rd obtains mould Block, for obtaining the second performance time of first performance in the first performance sequence;First computing module, for according to the second performance Time and each performance interval calculation obtain the first performance time of all performance plays in the first performance sequence.
In the above embodiment of the present invention, the second processing module 50 can be arranged in the second directory sequencing unit 350, It may include that the 4th acquisition module 351, for obtaining the second weight parameter of all directorys in the second directory set;3rd Sub-processing module 353, for being ranked up obtaining the second performance sequence to the second weight parameter;5th acquisition module 355, is used for Obtain the 3rd performance time and the arenas data of each performance play in the second performance sequence;Second preserves module 357, is used for protecting Deposit the second incidence relation between the 3rd performance time and arenas data, to obtain the second directory performance data.
In the above embodiment of the present invention, device can also include: matching module, for by the first directory set and the Data in two directory set carry out the first directory collection after matching treatment is processed respectively with default theatre equipment data Close and the second directory set.
Fig. 5 is the flow chart of resource regulating method according to embodiments of the present invention.As it is shown in figure 5, the method can include Following steps:
Step S402, obtains performance resource data.
Step S404, carries out performance time layout according to the directory priority in performance resource data and performance time information Obtain directory performance data.
Step S406, the mapping relations set up between performance resource data and directory performance data obtain working days layout number According to.
Use the resource regulating method of the present invention, obtain performance resource data by resource input system, then dispatch system System carries out performance time layout according to the directory priority in performance resource data and performance time information and obtains directory performance number According to, and set up performance resource data and the directory performance data between mapping relations obtain working days marshal data.Solve existing The process that performance resource carries out in technology layout is loaded down with trivial details, thus causes the speed problem slow, inefficient obtaining layout result, Realize the simple layout result obtaining performance resource accurately and efficiently, thus realize numerous performance resources such as troupe, arenas, the directory Optimization coordinate.
Fig. 6 is the flow chart of the resource regulating method according to shown in Fig. 5 embodiment.Above-mentioned enforcement according to the present invention Example, performance resource data may include that arenas information and troupe's information, wherein, preferential according to the directory in performance resource data Level and performance time information carry out performance time layout obtain the directory performance data step include:
Step S408: according to directory priority, all directorys are carried out prioritization and obtain priority sequence.
Step S410: according to the order of the directory in priority sequence respectively according to the very first time information in arenas information and The second temporal information in troupe's information carries out performance time sequence to the directory, to obtain directory performance data.
In the above embodiment of the present invention, according to directory priority, all directorys are carried out prioritization and obtain preferentially Level sequence, then according to the order of the directory is believed according to the very first time information in arenas information and troupe respectively in priority sequence The second temporal information in breath carries out performance time layout to the directory, to obtain directory performance data, thus solves existing skill Art carries out, to performance resource, the problem that layout speed is slow, efficiency is low, cost is high, it is achieved simple acquisition accurately and efficiently performs money The layout result in source, thus the optimization realizing numerous performance resources such as troupe, arenas, the directory is coordinated.
As shown in Figure 6, in the above embodiment of the present invention, performance resource data can also include: directory information, the directory Information may include that maximum time array, according to the order of the directory in priority sequence respectively according to first in arenas information The second temporal information in temporal information and troupe's information carries out performance time sequence to the directory, to obtain directory performance data Step includes:
Step S412: obtain the arenas collection corresponding with the directory, wherein, arenas is concentrated and is included one or more drilling with the directory Go out the arenas of matching criteria, temporal information corresponding for arenas is denoted as the 3rd temporal information.
Step S414: obtain according to the second temporal information, the 3rd temporal information and the maximum time array calculating time of rehearsing Occur simultaneously to the time.
Step S416: according to first pre-conditioned occur simultaneously to carry out mating with the time obtain directory performance data, wherein, maximum Time array is the maximum time scope of the performance of the directory.
According to the abovementioned embodiments of the present invention, as it is shown in fig. 7, according to the second temporal information, the 3rd temporal information and The step that the big time array calculating time of rehearsing obtains time common factor may include steps of:
Step S418: the 3rd corresponding for each arenas temporal information is carried out logic and operation with maximum time array respectively Obtain very first time array.
Step S420: the second temporal information of troupe and maximum time array are carried out logic and operation and obtained for the second time Array.
Step S422: obtain the time common factor of very first time array and the second time array.
Fig. 8 is the flow chart of the resource regulating method according to another embodiment shown in Fig. 5.Fig. 9 is to implement according to shown in Fig. 8 The flow chart of the resource regulating method of example.
As shown in Figure 8 and Figure 9, the method may include steps of:
Step S102, gathers the first directory set and the second directory set, and the first directory collection is combined into troupe at multiple arenas The acute destination aggregation (mda) of performance, the second directory collection is combined into troupe only at the acute destination aggregation (mda) of an arenas performance.In this embodiment Performance resource information is divided into the first directory set and the second directory set according to the directory in the feature that arenas is performed.
Directory data in first directory set are carried out layout by performance path by step S104, to obtain corresponding the One directory performance data.
Directory data in second directory set are ranked up by step S106 by directory weight, to obtain corresponding the Two directory performance data.
Step S108, set up first the directory performance data and second directory performance data in arenas data, directory data, Mapping relations between troupe's data and time data, generate working days marshal data.
Use the detailed description of the invention of above-mentioned resource regulating method, by the directory data in the first directory set are pressed Performance path carries out layout, and is ranked up the directory data in the second directory set by directory weight, obtains the of correspondence One directory performance data and second directory performance data, then set up in the first directory performance data and second directory performance data Arenas data, directory data, mapping relations between troupe's data and time data, generate working days marshal data.Solve The process that performance resource carries out in prior art layout is loaded down with trivial details, thus causes that the speed obtaining layout result is slow, efficiency is low Problem, it is achieved the simple layout result obtaining performance resource the most accurately and efficiently, thus it is numerous to realize troupe, arenas, the directory etc. The optimization of performance resource is coordinated.
It addition, by the directory data in the first directory set are carried out layout by performance path, and to the second directory collection Directory data in conjunction are ranked up by directory weight, obtain the first directory performance data and second directory performance number of correspondence According to, according to the performance constraints of each troupe, the priority of each performance resource can be ranked up, ultimately form satisfied The working days marshal data that each user needs, it is possible to by the various boundary conditions of each user with finally perform target, from shelves Phase marshal data filters out and meets the prioritization scheme that user meets, such that it is able to realize drilling troupe, arenas, the directory etc. are numerous Go out the integrated dispatch of resource, the work efficiency to performance resource working days layout can be improved to a great extent, save substantial amounts of Time, improve quality and the efficiency of performance scheduling of resource, thus vitalize all kinds of performance resources of culture performing market, and then promote The development of culture performing market.
Specifically, in the above embodiment of the present invention, the directory data in the first directory set are entered by performance path Row layout, and the directory data in the second directory set are ranked up by directory weight, obtain the first directory performance of correspondence During data and second directory performance data (during i.e. performing step S104 and S106), it is required to directory data It is ranked up according to weight parameter with arenas data, as shown in Figure 10 and Figure 11.
Specifically, before gathering the first directory set and the second directory set, said method can also include: joins literary composition The troupe user or the arenas user that change performance cinemas can register at resource input system and log in, by manager's Title examination, and after getting corresponding user right, troupe user and arenas user's typing directory information and arenas information.
In the above embodiment of the present invention, the step gathering the first directory set and the second directory set is the most permissible Realized by resource input system typing information by troupe user or arenas user.It addition, the first directory set and second Can also include some build-in attribute data in directory set, such as performance duration, the device data etc. of arenas of the directory, these are solid There is attribute data can be saved in default data base, such as default arenas information bank, the most above-mentioned collection first directory set Can also include that the data read in the data base preset realize with the step of the second directory set.
More specifically, troupe user or arenas user can perform within the typing time that resource input system specifies The typing of resource information, inquire about, delete, the operation such as amendment, wherein, performance resource information includes: directory information and arenas information. Then the information of the first directory set collected and the second directory set is stored in data analysis layer by resource input system, is inciting somebody to action Information is stored in the data in the first directory set and the second directory set and the theatre equipment number preset after data analysis layer According to carrying out matching treatment, the first directory set after being processed and the second directory set, afterwards in the first directory set Data are by performance path, and are ranked up the directory data in the second directory set by directory weight, obtain the first of correspondence Directory performance data and second directory performance data, and set up the play in the first directory performance data and second directory performance data Field data, directory data, mapping relations between troupe's data and time data, by mapping relations arenas data, directory number Preserve according to the mapping relations between, mapping relations and above-mentioned data between troupe's data and time data, generate Working days marshal data.Wherein, to the data in the first directory set by performance path, and to the directory number in the second directory set During being ranked up by directory weight, can be in conjunction with the time data pair in the first directory set and the second directory set Directory data in first directory set and the second directory set are ranked up, and obtain first directory performance data and the of correspondence Two directory performance data.Wherein, the theatre equipment data preset can be saved in arenas information bank, and (this arenas information bank is above-mentioned The word bank of data base) in;Time data may include that performance effective time data, working days programming time element length Data, every directory performance play, performance single game time span data etc..
Wherein, the first directory set and the second directory set may each comprise following data: the directory performance single game time is long Degree (such as 150 minutes), troupe's tour perform website number (such as 4 stations), website performance session data (such as 5) is performed in troupe's tour, Directory categorical data (such as opera), the special performance directory, special arenas data (arenas as big in country), special performance time data And performance scale (namely attendance).Wherein, the directory information of troupe's user's typing generates directory data, is stored in performance play Mesh data pool;The arenas information of arenas user's typing generates arenas data, is stored in performance theater data pool.
Specifically, the directory data in troupe's information can be numbered: g1 (a)(p1),g2 (a)(p2),g3 (a) (p3),……,gi (a)(pj), wherein, pjRepresenting the directory, a represents the performance number of times of the directory, giRepresent the troupe performing this directory, Such as, g1 (a)(p1) represent troupe g1Directory p is performed at a arenas1;As a=1, represent directory pjOnly by troupe giPerformance one Secondary;Particularly, g is worked asiIdentical, and pjTime different, represent that the different directory is performed by same troupe;Work as giDifference, and pjTime identical, Represent that the same directory is by the performance of different troupies.Wherein, i, j are natural number.
After the directory data in troupe's information and arenas information are completed numbering, sentencing as shown in Figure 7 can be carried out Whether disconnected directory data are the data in the first directory set, if the performance number of times a > 1 in directory data, or troupe applies for simultaneously Perform 2 or the directory of more than 2, i.e. pjDifferent but giIdentical directory data preserve, and form the first directory set;If the directory Performance number of times a=1 in data and troupe giOnly one directory p of performancejDirectory data preserve, form the second directory set.
Such as, when having 12 directorys, p1 (3)(g1), p2(g2), p3(g3), p4(g4), p5(g4), p13(g4), p6(g5), p7 (g6), p8(g7), p9(g8), p10(g9), p11(g10), p12(g11), wherein, p1 (3)(g1), p4(g4), p5(g4), p13(g4) it is The directory in one directory set, represents troupe g respectively1Directory p is performed at 3 different arenas1;Troupe g4At 3 different arenas tables Act in a play mesh p4、p5、p13;Other the directory is the directory in the second directory set.
In the above embodiment of the present invention, the first directory set may include that path data, in the first directory set Directory data carry out layout by performance path, may include that and satisfy the need obtaining the step of the first corresponding directory performance data Footpath data carry out layout, to obtain the first performance sequence of troupe;Obtain first performance sequence in all performance plays first Performance time;Preserve arenas data, troupe's data and first the associating between the first performance time in the first performance sequence System, obtains the first directory performance data.
Specifically, as shown in Figure 10, above-described embodiment can be realized by step S202 to step S218:
Step S202, obtains the first performance sequence.Specifically, by path data is carried out layout, to obtain troupe First performance sequence.
Step S204, it is judged that whether the first performance sequence is empty, in the case of the first performance sequence is sky, performs step S216, in the case of the first performance sequence is not sky, performs step S206.
Step S206, obtains the first directory data in the first performance sequence successively.Carry from the first performance sequence successively Take the first directory data, i.e. first extract the first directory data being ordered as first, the first directory data row to sequence first After entering in arenas timetable, then the first directory data of extraction sequence second, until by acute for first in the first performance sequence Mesh data all enter arenas timetable.
Step S208, obtains all of first arenas data that current first directory data are corresponding.Namely obtain work as premise The first directory data taken can carry out all first arenas data of working days layout.
Step S210, according to Weight Acquisition the first arenas data sequence of corresponding current first directory data of the first arenas data Row.Specifically can use what example below provided according to arenas weight parameter, the method for arenas data sorting to be obtained first Arenas data sequence.
Step S212, the working days checking the first arenas data in the first arenas data sequence are the fullest.Acute first In the case of the working days of field data are full, perform step S218;The first arenas data working days less than in the case of, perform step Rapid S214.
First directory data are entered arenas timetable by step S214.In this step, current first directory can be obtained Incidence relation between data and the first arenas data, is saved into arenas timetable by this incidence relation.
Step S216, obtains and exports the first directory performance data.
Step S218, deletes these working days the fullest the first arenas data.
Specifically, path data is carried out layout, may include that from the obtaining the step of the first performance sequence of troupe One directory set is read the first weight parameter of all arenas;All first weight parameter sequences are obtained the first performance sequence Row.
Wherein, path data can include arenas data, specifically, first obtains and all directorys in the first directory set The arenas data that data are corresponding, then to the arenas data label got: gi(t1,t2,t2,……,tk), i.e. troupe giNeed To arenas t1,t2,t2,……,tkPerform, and obtain corresponding arenas tkArenas weight parameter bx(tk) (the i.e. first power Weight parameter), wherein, k is natural number.
Wherein, arenas weight parameter bx(tk) (wherein, x is natural number) calculate according to following factor: (1) arenas is known The attributes such as name degree: arenas popularity is the highest, and weight is the biggest;Arenas the highest grade, and weight is the biggest;Theatrical stage facility matching degree is more Height, weight is the biggest;(2) attribute such as urban economic level residing for arenas: residing city's GDP is the highest, and weight is the biggest;Residing city row Political affairs rank is the highest, and weight is the biggest;Residing urban population is the most, and weight is the biggest;Residing city spectators see and drill interest and the performance directory Matching degree is the highest, and weight is the biggest;(3) attribute such as arenas degree of cooperation: arenas is the most with performance group cooperation number of times, and weight is more Greatly;Arenas rent field expense is the lowest, and weight is the biggest.
Specifically, arenas weight parameter bx(tk) influence factor that calculates is as shown in table 1:
Table 1
More specifically, the weight of each influence factor in table 1 can calculate, it is also possible to read from default table Taking, table 2 shows a kind of mode of the weighted value obtaining influence factor, certainly, different shadows in the specific embodiment shown in table 2 The evaluation content evaluating concentration and fractional value that the factor of sound is corresponding can become according to the demand of user or economic development Change.
Table 2
By in the weights influence factor shown in table 2, some factors condition to arenas own is relevant, and once arenas builds up point Numerical value typically will not be changed, and other factor (such as matching degrees etc. such as stage machinery facilities) has relation with the concrete directory, institute It is different with the arenas sequence that each directory is corresponding.
Arenas weight parameter bx(tk)=C1 × C1 fractional value+C2 × C2 fractional value+C3 × C3 fractional value+C4 × C4 mark Value+D1 × D1 fractional value+D2 × D2 fractional value+D3 × D3 fractional value+D4 × D4 fractional value+D5 × D5 fractional value+D6 × D6 divides Numerical value+C6 × C6 fractional value+C7 × C7 fractional value+C8 × C8 fractional value+C9 × C9 fractional value.
Wherein, C1+C2+C3+C4+D1+D2+D3+D4+D5+D6+C6+C7+C8+C9=1.0.
The fractional value of C1~C9 shown in table 2 can also be that the computational methods using " Fuzzy AHP " calculate Go out.
Getting arenas weight parameter b of arenas datax(tkAfter), by all arenas weight parameter bx(tk) according to Order correspondence arrangement arenas t from big to smallkOrder (can be the first arenas data sequence in above-described embodiment), obtain Troupe giAt arenas tkFirst performance sequence of performance.Specifically, path data can also include cost data, at bx(tk) When being worth equal or close, calculate procurement cost data according to factors such as the traffic of troupe and performance group's lodgings, to cost data According to order from big to small, obtain the first weight parameter bx(tk) order.
Such as, troupe g as shown in table 31Showtime, troupe g1Application is at arenas t1、t2And t3Performance directory p1, root The troupe g sequence of arenas weight parameter drawn according to said method1Performance order is t1、t2And t3, utilize identical way permissible Calculate troupe g4Performance order be t2、tkAnd t1, after completing the sequence to all of directory data, obtain the first performance Sequence.
Table 3:
Performance time d1 Performance time d2 Performance time d3
Performance directory p1 Performance directory p1 Performance directory p1
Arenas t1 Arenas t2 Arenas t3
In the above embodiment of the present invention, the first directory set can also include: performance time data, wherein, obtains In first performance sequence, the step of the first performance time of all performance plays is adjacent in may include that acquisition the first performance sequence Twice performance between performance interval;Obtain the second performance time of first performance in the first performance sequence;Drill according to second Go out the time and each performance interval calculation obtains the first performance time of all performance plays in the first performance sequence.Wherein, drill Go out to be spaced traffic time between C=city+have a dress rehearsal the time on the spot+stage dress platform pull away a prop the time+other prepare the time of having a rest.
Specifically, the second performance time of first performance in the first performance sequence is obtained, then according to the second performance time It is spaced plus the performance between first performance and second time performance and obtains the performance time that second time is performed, and in this manner Order derives third time performance, the 4th performance ... the first performance time of last performance.
In the above embodiment of the present invention, the directory data in the second directory set are ranked up by directory weight, The second power obtaining all directorys in the second directory set is may include that with the step of the second directory performance data of acquisition correspondence Weight parameter;It is ranked up the second weight parameter obtaining the second performance sequence;Obtain each performance play in the second performance sequence The 3rd performance time and arenas data;Preserve the second incidence relation between the 3rd performance time and arenas data, to obtain Second directory performance data.
For the directory data in the second directory set, because it is only performed once in a certain arenas certain time period, so Only need by the layout of certain rule, the directory therein is entered the suitable arenas suitable time period.Specifically, second is obtained acute Second weight parameter of all directorys in mesh set, after being ranked up the second weight parameter obtaining the second performance sequence, Obtain the 3rd performance time of each performance play and arenas data in the second performance sequence, then preserve the 3rd performance time and The second incidence relation between arenas data, to obtain the second directory performance data.
Specifically, as shown in figure 11, above-described embodiment can be realized by step S302 to step S318:
Step S302, obtains the second performance sequence.Specifically, by path data is carried out layout obtain troupe second Performance sequence.
Step S304, it is judged that whether the second performance sequence is empty, in the case of the second performance sequence is sky, performs step S316, in the case of the second performance sequence is not sky, performs step S306.
Step S306, obtains the second directory data in the second performance sequence successively.Carry from the second performance sequence successively Take the second directory data, i.e. first extract the second directory data being ordered as first, the second directory data row to sequence first After entering in arenas timetable, then the second directory data of extraction sequence second, until by acute for second in the second performance sequence Mesh data all enter arenas timetable.
Step S308, obtains all of second arenas data that current second directory data are corresponding.Namely obtain work as premise The second directory data taken can carry out all second arenas data of working days layout.
Second arenas data are carried out by step S310 according to the weight of corresponding current second directory data of the second arenas data Sequence obtains the second arenas data sequence.Specifically can use in example below provide according to arenas weight parameter to arenas The method of data sorting obtains the second arenas data sequence.
Step S312, checks the working days of the second arenas data of sequence first in the second arenas data sequence the fullest. In the case of the working days of the second arenas data are full, perform step S318;The second arenas data working days less than situation Under, perform step S314.
Second directory data are entered arenas timetable by step S314.In this step, current second directory can be obtained Incidence relation between data and the second arenas data, is saved into arenas timetable by this incidence relation.
Step S316, obtains and exports the second directory performance data.
Step S318, deletes these working days the fullest the second arenas data.
More specifically, after being ranked up obtaining the second performance sequence according to directory weight to the second directory data, right Each second directory data in second performance sequence carry out working days layout the most successively.Getting the second performance sequence In second directory data after, obtain all second arenas data corresponding with current second directory data, according to The weight sequencing of corresponding current second directory data of two arenas data, obtains the second arenas data sequence, obtains current second acute Mesh data and the incidence relation of the second arenas data sequence, fill in a form according to this incidence relation.To owning in the second performance sequence After second directory data carry out above-mentioned process, obtain and export the second directory performance data.
Include more specifically, obtain the step of the second weight parameter of all directorys in the second directory set: first, obtain The value of the static weight parameter of all directorys in second directory set, i.e. draws according to the directory, the property calculation of performance group own The value of weight parameter, performance directory scale is the biggest, and weight is the biggest;Performance group's the highest grade, and the value of weight parameter is the biggest;Drill Going out group's center heart personage (star or director etc.) popularity the highest, the value of weight parameter is the biggest.Secondly, second is obtained acute The value of the changeable weight parameter of all directorys in mesh set: the directory of advanced industry business application, the value of weight parameter is the biggest.
Specifically, illustrate, by combining table 4, the static weight parameter how obtained in the second weight parameter.
Table 4
The static weight parameter E=E1*E1 scoring+E2*E2 scoring+E3*E3 scoring+E4*E4 scoring that each directory is final, Wherein E1+E2+E3+E4+E5=1.0.And E1~E5 therein can be calculated by " Fuzzy AHP ".
Then the above-mentioned value of the static weight parameter got and the value of changeable weight parameter is used to calculate the second directory collection Each directory p in conjunctionj(gi) the second weight parameter by, wherein, y is natural number.
Getting the second weight parameter byAfterwards, by byValue is descending to be ranked up, and obtains the second performance sequence.
Such as, the p of each directory in the second directory set is calculatedj(gi) priority by, and the directory is ordered as p2 (g2), p3(g3), p6(g5), p7(g6), p8(g7), p9(g8), p10(g9), p11(g10), p12(g11)。
In the above embodiment of the present invention, before performing step S106, described method can also include: creates the working days Programming time sky table.Specifically, time data, directory data, arenas data and troupe's data association relation can be set up Data in first directory performance data and second directory performance data are saved in working days layout sky table by working days layout sky table Relevant position, obtains working days marshal data.
Specifically, working days programming time sky table can include troupe's time sky table, directory time sky table and arenas time Empty table.
In the above embodiment of the present invention, set up the arenas in the first directory performance data and second directory performance data Data, directory data, mapping relations between troupe's data and time data, the step generating working days marshal data can be led to Cross following method to realize: by directory pj(gi) be mapped to (arenas, time) to upper, arenas-time is to (tk,dl), work as pj(gi) reflect It is mapped to (tk,dl) time, represent troupe giThe directory p of performancejAt time dlInherent arenas tkShow.Wherein, above-mentioned time dlCan To represent the date, it is also possible to represent the concrete time period.
More specifically, by the above-mentioned arenas time completed to being labeled as taking, and lock, in the second directory set, acute The place of typing wish performance or performance time during group's user typing directory information, it is also possible to by corresponding arenas-time pair It is labeled as taking, and locks.Then by the most vacant arenas-time pair, weight and each according to each performance time are acute The weight of field, calculates comprehensive weight bw, calculating principle is as follows: arenas popularity is the highest, and weight is the biggest;Arenas the highest grade, power The biggest;Theatrical stage facility matching degree is the highest, and weight is the biggest;Residing for arenas, city's GDP is the highest, and weight is the biggest;Residing city Administrative grade is the highest, and weight is the biggest;Residing urban population is the most, and weight is the biggest;Performance time is red-letter day, and weight is big;Performance Time box office expection is high, weight big (such as Friday, weight Saturday greatly, Sunday to Thursday, weight was little).Wherein, w is natural number.
Specifically, in above-described embodiment, the weighted value of the parameter of performance time can read from default table, such as table 5 institute Show, it is also possible to calculated by Fuzzy AHP.
Table 5
The fractional value of the fractional value+F2*F2 of performance time weight F=F1*F1 in above-described embodiment.
Then by comprehensive weight bwSort successively according to size order, it is thus achieved that arenas-time is to sequence (tk,dl), i.e. complete The foundation of mapping relations, obtains working days marshal data.Specifically, the performance of a certain troupe can be extracted from working days marshal data Schedule, or extract the performance time calendar of a certain arenas.
Specifically, performance time and arenas to the directory in the second directory set carry out layout, by the arenas performance time The most occupied (arenas-time to) in table lock, (the t as shown in table 61, d1) etc., and to remaining (arenas- Time to) according to element factor calculation weight.Make in aforementioned manners, the directory in the second directory set is ranked up, ranking results For obtaining (t1, d2)、(t1, d3)、(t2, d3)、(t2, dl)、(t3, d1)、(t3, d2)、(t3, dl)、(tk, d1)、(tk, d2).Table 7 illustrates Arenas t1Showtime.
Table 6:
Table 7:
Performance time d1 Performance time d2 Performance time d3 Performance time dl
Performance directory p1 Performance directory p2 Performance directory p3 Performance directory p4
Performance troupe g1 Performance troupe g2 Performance troupe g3 Performance troupe g4
Wherein, the l in table 7 is natural number.
More specifically, in the above-described embodiments, the play in the first directory performance data and second directory performance data is set up During field data, directory data, mapping relations between troupe's data and time data, it may be considered that following factor: Arenas task is divided equally, it is to avoid occur that the performance directory layout of certain several arenas is too much, and the other arenas performance directory is very few Situation;The while that each arenas utilization rate maximizing, the performance time is evenly distributed, and the utilization rate that should as far as possible improve arenas i.e. performs number of times, But in should avoiding arenas certain time period, performance is the most intensive, and other times section is the most idle;Each arenas performance task is not Exceed the arenas bearing capacity upper limit.
In the above embodiment of the present invention, after gathering the first directory set and the second directory set, method also may be used To include: step S114: by the data in the first directory set and the second directory set respectively with default theatre equipment data Carry out the first directory set after matching treatment is processed and the second directory set.Wherein, the theatre equipment data preset can To include entablature size, stage size, suspension rod number, signal light control way.
Wherein, the first directory set and the second directory set may each comprise arenas data, directory data and time Data.Specifically, can be by the data in the first directory set collected and the second directory set and the theatre equipment preset Data are mated, and the arenas data inconsistent with default theatre equipment data, directory data and time data are rejected, The first directory set after being processed and the second directory set, the first directory set after processing afterwards and the second directory collection Conjunction is stored in the resource matched storehouse of performance, only to the number being stored in the first directory set and the second directory set performing resource matched storehouse According to the operation performing step S104.
Play in the above embodiment of the present invention, in setting up the first directory performance data and second directory performance data Field data, directory data, mapping relations between troupe's data and time data, after generating working days marshal data, method Can also include: step S110: detection working days marshal data is the most consistent, wherein, in working days layout with the assessment data preset In the case of data are inconsistent with the assessment data preset, return and perform step S104 and 106.Wherein, the assessment data preset Can be troupe user or executable working days marshal data that arenas user pre-deposits.
Specifically, after getting working days marshal data, the method also includes being estimated working days marshal data And inspection, more specifically, detection working days marshal data is the most consistent with the assessment data preset, hold if it is inconsistent, return Row step carries out layout by performance path respectively to the directory data in the first directory set and the second directory set, right to obtain The first directory performance data answered and second directory performance data, so that the working days marshal data got is adjusted, thus Obtain more accurate more reasonably working days marshal data, preferably to distribute performance resource;If consistent, then execution step S112: Output working days marshal data.
It addition, said method can also include: by the most consistent with the assessment data preset for detection working days marshal data Testing result generates assessment result data, and these assessment result data is exported to user by output module.Wherein, assessment knot Really data can include the consistent degree of working days marshal data and the assessment data preset.Such as, user specifies according to C troupe (this Place C troupe by way of example only) performance tour shortest path be that evaluation index is estimated, it is thus achieved that assessment result data;As Really assessment result data include the suggestion being adjusted working days marshal data, then return and perform the first directory set and the Directory data in two directory set carry out layout by performance path respectively, to obtain the first corresponding directory performance data and the The step of two directory performance data, otherwise can export working days marshal data.
Specifically, the mode of output working days marshal data can have multiple, usually, and can be with form, the form of word It is presented to user, it is possible to according to the requirement printout list of user, (D arenas herein is only and lifts such as printout D arenas Example illustrates) in the working days calendar on January 31st, 1 day 1 January in 2013.
The above embodiment of the present invention, it is also possible to realize the backward compatible of working days marshal data to single many arenas of the directory, During January 1 to 31 days January in 2013 in 2013, select the path planning of 4 arenas performances as being directed to directory A, also may be used To realize the directory working days layout to many directorys list arenas, as obtained 4 directorys to be arranged January 1 day to 2013 January in 2013 Working days marshal data in the performance of B arenas on the 31st.
Above-described embodiment of the application can pass through the skills such as computer networking technology, web data storehouse, computer programming language Art realizes.
It should be noted that can be at such as one group of computer executable instructions in the step shown in the flow chart of accompanying drawing Computer scheduling system performs, and, although show logical order in flow charts, but in some cases, permissible To be different from the step shown or described by order execution herein.
As can be seen from the above description, present invention achieves following technique effect: use the present invention, pass through resource Input system obtains performance resource data, and then dispatching patcher is according to the directory priority in performance resource data and performance time Information carries out performance time layout and obtains directory performance data, and sets up reflecting between performance resource data and directory performance data The relation of penetrating obtains working days marshal data.Solve that in prior art, performance resource to be carried out the process of layout loaded down with trivial details, thus cause Obtain the problem that speed is slow, efficiency is low, cost is high of layout result, it is achieved the simple layout obtaining performance resource accurately and efficiently As a result, thus realize numerous performance resources such as troupe, arenas, the directory optimization coordinate.
Obviously, those skilled in the art should be understood that each module of the above-mentioned present invention or each step can be with general Calculating device realize, they can concentrate on single calculating device, or be distributed in multiple calculating device and formed Network on, alternatively, they can with calculate the executable program code of device realize, it is thus possible to by they store Performed by calculating device in the storage device, or they are fabricated to respectively each integrated circuit modules, or by them In multiple modules or step be fabricated to single integrated circuit module and realize.So, the present invention be not restricted to any specifically Hardware and software combines.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, that is made any repaiies Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (8)

1. a resource scheduling system, it is characterised in that including:
Resource input system, is used for obtaining performance resource data;
Dispatching patcher, is connected with described resource input system, for according to the directory priority in described performance resource data and Performance time information carries out performance time layout and obtains directory performance data, and sets up described performance resource data and the described directory Mapping relations between performance data obtain working days marshal data;
Described performance resource data includes: arenas information and troupe's information, and wherein, described dispatching patcher includes: prioritization Unit, is connected with described resource input system, obtains for all directorys being carried out prioritization according to described directory priority To priority sequence;Time-sequencing unit, is connected with described prioritization unit, for according to institute in described priority sequence State the order of the directory respectively according to the second time letter in the very first time information in described arenas information and described troupe information Breath carries out performance time sequence to the described directory, to obtain described directory performance data;First working days arranging unit, and time described Between sequencing unit connect, for set up described performance resource data and the described directory performance data between mapping relations obtain institute State working days marshal data.
Resource scheduling system the most according to claim 1, it is characterised in that described performance resource data also includes: the directory Information, described directory information includes: maximum time array, and described time-sequencing unit includes:
First processing unit, is connected with described prioritization unit, for obtaining the arenas collection corresponding with the described directory, its In, the arenas including one or more performance matching criteria with the described directory concentrated by described arenas, and described arenas is corresponding Temporal information be denoted as the 3rd temporal information;
Computing unit, is connected with described first processing unit, for according to described second temporal information, described 3rd temporal information And described maximum time array calculates the time of rehearsing and obtains the time and occur simultaneously;
Second processing unit, is connected with described computing unit, for carrying out according to the first pre-conditioned occur simultaneously with the described time Join and obtain directory performance data,
Wherein, described maximum time array is the maximum time scope of performance of the described directory.
Resource scheduling system the most according to claim 2, it is characterised in that described computing unit includes:
First computation subunit, is connected with described first processing unit, for during by the corresponding for each described arenas the described 3rd Between information carry out logic and operation with described maximum time array respectively and obtain very first time array;
Second computation subunit, is connected with described first processing unit, for by described second temporal information of described troupe with Described maximum time array carries out logic and operation and obtains the second time array;
3rd computation subunit, is connected between described first computation subunit and described second computation subunit, is used for obtaining The described time of described very first time array and described second time array occurs simultaneously.
Resource scheduling system the most according to claim 1, it is characterised in that described performance resource data includes: first is acute Mesh set and the second directory set, described directory priority includes that the weight parameter of the directory, described performance time information include road Footpath data, described first directory set includes: path data, and described dispatching patcher includes:
First directory sequencing unit, is connected with described resource input system, for the described road in described first directory set Footpath data carry out layout, to obtain the first performance sequence of troupe, and obtain all performance plays in described first performance sequence The first performance time, preserve the arenas data in described first performance sequence, troupe's data and described first performance time it Between the first incidence relation obtain described first the directory performance data;
Second directory sequencing unit, is connected with described resource input system, is used for obtaining all plays in described second directory set Purpose the second weight parameter;It is ranked up obtaining the second performance sequence to described second weight parameter;Obtain described second performance 3rd performance time of each performance play and described arenas data in sequence;Preserve described 3rd performance time and described arenas The second incidence relation between data, to obtain described second directory performance data;
Second working days arranging unit, is connected between described first directory sequencing unit and described second directory sequencing unit, uses In the arenas data set up in described first directory performance data and described second directory performance data, directory data, troupe's number Mapping relations according to this and between time data, generate described working days marshal data,
Wherein, described first directory collection is combined into the acute destination aggregation (mda) that troupe performs at multiple arenas, and described second directory collection is combined into Described troupe is only at the acute destination aggregation (mda) of an arenas performance.
Resource scheduling system the most as claimed in any of claims 1 to 4, it is characterised in that described system also includes:
With the assessment data preset whether check system, is connected with described dispatching patcher, for detecting described working days marshal data Unanimously, wherein, in the case of described working days marshal data and described default assessment data are inconsistent, return and perform according to institute State the directory priority in performance resource data and performance time information carries out performance time layout and obtains directory performance data.
6. a resource regulating method, it is characterised in that including:
Obtain performance resource data;
Carry out performance time layout according to the directory priority in described performance resource data and performance time information and obtain the directory Performance data;
The mapping relations set up between described performance resource data and described directory performance data obtain working days marshal data;
Described performance resource data includes: arenas information and troupe's information, wherein, according to the directory in described performance resource data Priority and performance time information carry out performance time layout obtain the directory performance data step include: excellent according to the described directory All directorys are carried out prioritization and obtain priority sequence by first level;According to the order of the directory in described priority sequence respectively According to the second temporal information in the very first time information in described arenas information and described troupe information, the described directory is carried out Performance time sorts, to obtain described directory performance data.
Resource regulating method the most according to claim 6, it is characterised in that described performance resource data also includes: the directory Information, described directory information includes: maximum time array, according to the order of the directory in described priority sequence respectively according to described Very first time information in arenas information and the second temporal information in described troupe information carry out the performance time to the described directory Sequence, with obtain the described directory performance data step include:
Obtaining the arenas collection corresponding with the described directory, wherein, described arenas is concentrated and is included drilling of the one or more and described directory Go out the arenas of matching criteria, temporal information corresponding for described arenas is denoted as the 3rd temporal information;
Obtain according to described second temporal information, described 3rd temporal information and the described maximum time array calculating time of rehearsing Time occurs simultaneously;
Occur simultaneously according to the first pre-conditioned and described time to carry out mating and obtain described directory performance data,
Wherein, described maximum time array is the maximum time scope of performance of the described directory.
Resource regulating method the most according to claim 7, it is characterised in that according to described second temporal information, described Three temporal informations and the described maximum time array calculating time of rehearsing obtain the step of time common factor and include:
Described 3rd temporal information corresponding for each described arenas is carried out logic and operation with described maximum time array respectively Obtain very first time array;
Described second temporal information of described troupe and described maximum time array are carried out logic and operation and obtained for the second time Array;
Obtain the common factor of described time of described very first time array and described second time array.
CN201310329195.XA 2013-07-31 2013-07-31 Resource scheduling system and method Active CN103455871B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310329195.XA CN103455871B (en) 2013-07-31 2013-07-31 Resource scheduling system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310329195.XA CN103455871B (en) 2013-07-31 2013-07-31 Resource scheduling system and method

Publications (2)

Publication Number Publication Date
CN103455871A CN103455871A (en) 2013-12-18
CN103455871B true CN103455871B (en) 2016-12-28

Family

ID=49738209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310329195.XA Active CN103455871B (en) 2013-07-31 2013-07-31 Resource scheduling system and method

Country Status (1)

Country Link
CN (1) CN103455871B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105279697A (en) * 2014-06-25 2016-01-27 中演票务通文化发展有限责任公司 Cultural performance schedule matching system
CN110503332B (en) * 2019-08-21 2022-12-30 谷元(上海)文化科技有限责任公司 Information screening processing method
CN114881578B (en) * 2022-07-06 2022-09-23 国网浙江省电力有限公司 Overstocked material automatic inventory method based on multi-element collaborative traceability

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100368344B1 (en) * 1999-01-28 2003-01-24 마츠시타 덴끼 산교 가부시키가이샤 Television receiver
CN1592403A (en) * 1999-03-30 2005-03-09 提维股份有限公司 Data storage management and program system and method
US7394968B2 (en) * 2002-01-24 2008-07-01 Lsi Corporation Enhanced personal video recorder including user play programming

Also Published As

Publication number Publication date
CN103455871A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
Kipnis From village to city: Social transformation in a Chinese county seat
CN103885983B (en) Determination method, optimization method and the device of a kind of travelling route
Hossain et al. Potential unexplored? Tourism and economic growth of Bangladesh
Krakover A heritage site development model: Jewish heritage product formation in south-central Europe
Huertas et al. Which destination is smarter? Application of the (SA) 6 framework to establish a ranking of smart tourist destinations
CN106682236A (en) Machine learning based patent data processing method and processing system adopting same
Bonino et al. The city after Chinese New Towns: Spaces and imaginaries from contemporary urban China
CN103455871B (en) Resource scheduling system and method
CN103455551B (en) Working days data processing method based on performance resource and device
Zhang et al. Effects of destination resource combination on tourist perceived value: in the context of Chinese ancient towns
Rodenbiker Ecological states: Politics of science and nature in urbanizing China
CN104765763B (en) A kind of semantic matching method of the Heterogeneous Spatial Information classification of service based on concept lattice
Petrei et al. Cultural tourism: an integrated analysis based on official data
CN109308567A (en) A kind of full dimension service evaluation system of travelling products and method
Simchenko et al. Theoretical concepts of digital regulation of extreme vibrations in consumer demand on the market of services
Oh et al. Convergence and integration of the MICE and maritime industries: An analysis of the MICE industry of Busan
Ciolac et al. The organization of Romanian agritourism.
Anikasari et al. Tourism village: Economic activity increases?
RAMONA et al. THE ORGANIZATION OF ROMANIAN AGRITOURISM.
CN100382080C (en) Data processing method supporting quick retrieve of education source metadata
Barreto et al. An Analysis of Indian Hospitality Sector using ABCD Framework
Chen et al. Cultural Perception of the Historical and Cultural Blocks of Beijing Based on Weibo Photos. Land 2022, 11, 495
Silva et al. Systematic literature review: Customer’s requirements for social housing design
Collins et al. A Civic Lantern to engage civic and civil society in goal-setting for sustainability in Cornwall: A research report
Chudyk et al. A cultural landscape information system developed with open source tools

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant