CN103454536A - Power transformer test method - Google Patents

Power transformer test method Download PDF

Info

Publication number
CN103454536A
CN103454536A CN2013104209416A CN201310420941A CN103454536A CN 103454536 A CN103454536 A CN 103454536A CN 2013104209416 A CN2013104209416 A CN 2013104209416A CN 201310420941 A CN201310420941 A CN 201310420941A CN 103454536 A CN103454536 A CN 103454536A
Authority
CN
China
Prior art keywords
transformer
winding
data
resistance value
insulating resistance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013104209416A
Other languages
Chinese (zh)
Inventor
龙洁
杜渝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jiaozuo Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Jiaozuo Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaozuo Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Jiaozuo Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN2013104209416A priority Critical patent/CN103454536A/en
Publication of CN103454536A publication Critical patent/CN103454536A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention discloses a power transformer test method. According to the power transformer test method, a set of data are obtained through measurement and used as 'original data' on the condition that a transformer is not connected with wires on any side before the transformer is put into operation; after the transformer is connected with the wires on all sides, another set of data are obtained through measurement and used as 'essential data'; every time the transformer is tested, obtained test data are contrasted with the 'essential data' under the condition that the wires through which the transformer is connected with other devices are not dismounted. According to the novel power transformer test method, analysis is conducted on the test data, and the fact that the transformer operates normally is determined if the test data are normal; when the test data are abnormal, the test data are contrasted with the 'original data' for further analysis and judgment. According to the power transformer test method, the wires on all the sides of the transformer do not need dismounting whether a regular test or preventive test is conducted on the transformer, therefore, the time of a power failure is shortened, a lot of manpower, material resources and financial resources are saved, and safety is ensured at the same time.

Description

A kind of power transformer test method
Technical field
The present invention relates to a kind of test method during to power transformer regular inspection or preventive trial.
Background technology
At present, in electric system, when no matter transformer is regular inspection or preventive trial, common way is that the lead-in wire that each side of transformer (two circles or three circles) is connected with bus or primary equipment is removed, and then transformer itself is tested routinely.There is following several shortcoming in this classic method that lead-in wire is dismantled to transformer test again: 1, during the demolition, installation lead-in wire, the staff needs ascend operation, particularly 220kV, 500kV and above transformer, the liftoff plane of cannula tip has tens meters even twenties meters, when the people ascends a height the demolition, installation lead-in wire, just exist the danger that the staff falls from high altitude; 2, demolition, installation lead-in wire, to expend a large amount of material resources: need purchase expensive high-altitude operation vehicle, bucket arm vehicle and other guarantees safe Work tool, take a lot of work again, time-consuming simultaneously, according to experience in the past, the time that only the demolition, installation lead-in wire exhausts, just account for 1/3 of whole power off time; When 3, demolition, installation go between, easily cause the device clamp fracture, damage; 4, when lead-in wire dress, as deal with improperly, easily cause the device clamp of lead-in wire overheated with the conducting rod loose contact generation of sleeve pipe.
inventive method
The technical problem to be solved in the present invention is to provide a kind of test method during to power transformer regular inspection or preventive trial, this method can be in the situation that without disconnecting power lead, to power transformer regular inspection or preventive trial, and can effectively overcome the problem that prior art exists.
Solving the technical scheme that problem of the present invention takes is:
Before putting into operation, transformer measures one group of data as " raw data " in the situation that do not connect each side lead-in wire, measure again one group of data as " basic data " after connecting each side lead-in wire, when this transformer is done experiment, in the situation that do not remove the lead-in wire that transformer is connected with miscellaneous equipment, the test figure and " basic data " that draw are compared;
At first oneself is had a power failure and carries out the power transformer of safety practice, remove successively the ground wire of each side, test lead when projects are tested directly is connected on the sleeve pipe top successively, has recorded environment temperature, humidity and transformer body temperature simultaneously, and concrete test method step is:
1) transformer core and clamp insulation are measured: by each side short circuit grounding of transformer;
2) insulation resistance of each winding and sleeve of transformer: by the G of megohmmeter end ground connection, respectively by the winding to be tested of the L of megohmmeter end and transformer, iron core and folder connect, be in series with unilateral diode D between the winding to be tested of L end and transformer, the L end is by the rear ground connection of capacitor C 1, the positive pole of described unilateral diode D is connected with the L end, the E of megohmmeter end is connected with the winding non-to be tested of transformer, described winding to be tested is respectively the high pressure winding, the low pressure winding, without winding, obtain respectively high pressure winding and the iron core insulation resistance R1 to the low pressure winding, low pressure winding and the iron core insulation resistance R2 to the high pressure winding, the insulation resistance R3 of iron core to senior middle school's low pressure winding, this test result is as the insulating resistance value in " measurement data ",
3) analyze the insulating resistance value R of winding: the insulating resistance value in " measurement data " is compared with resistance value corresponding in " raw data ", when the insulating resistance value in " measurement data " is more than or equal to 1.3 times of insulating resistance value corresponding to " raw data ", between each winding, insulation is good, the one group of insulating resistance value that has at least in " measurement data " is less than 1.3 times of insulating resistance value corresponding to " raw data ", but while being greater than " raw data " corresponding insulating resistance value, by the middle insulating resistance value of itself and " basic data " relatively, when the insulating resistance value in " measurement data " is more than or equal to 0.7 times of insulating resistance value corresponding in " basic data ", between each winding, insulation is good, when in " measurement data " one group or two groups of insulating resistance values are less than 0.7 times of insulating resistance value corresponding in " basic data ", carry out the transformer oil test, the hidden danger existed to get rid of transformer, insulation resistance numerical value in " measurement data " all is less than 0.7 times of insulating resistance value corresponding in " basic data ", or the insulating resistance value in " measurement data " is while being less than or equal to insulating resistance value corresponding in " raw data ", transformer is returned to the repair in shop reason,
4) sleeve pipe is together with the leakage current measurement of winding: while surveying high-pressure side, the high-voltage connection of high voltage direct current generator connects step-up side, non-tested winding connects the shielding end of high voltage direct current generator high-voltage connection, in like manner the like measure the leakage current values of other winding;
The winding leakage current recorded is compared with the winding leakage current in " raw data ", when the two the absolute value of measures of dispersion be less than or equal to " raw data " corresponding leakage current 5% the time, leakage current is in safe range, when the two the absolute value of measures of dispersion be greater than " raw data " corresponding leakage current 5% the time, carry out malfunction elimination.
5) sleeve pipe is together with dielectric loss and the measured capacitance value of coil: for the transformer of voltage levels as 110kV and more than, when carrying out sleeve pipe together with the dielectric loss of coil and measured capacitance value, the lightning arrester of each side of transformer is removed; The lOkV lightning arrester is removed from lead-in wire, and 35kV and above lightning arrester are taken apart from lightning arrester base and ground phase short circuit;
The dielectric loss of sleeve pipe and measured capacitance value, winding deformation calibrating, no-load voltage ratio measurement, loaded switch action test, direct current resistance m easurem ent be by the conventional methods test of prior art, finally again transformer carried out to end-of-job after demagnetization;
By the corresponding capacitance of bushing amount of the capacitance of bushing amount in " measurement data " and sleeve pipe in " raw data " relatively, when the two the absolute value of measures of dispersion be less than or equal to electric capacity corresponding in " raw data " 5% the time, think that sleeve pipe is normal, when the measures of dispersion of the two is greater than the electric capacity 5% of " raw data " correspondence, carry out malfunction elimination.
Further, the rated current >=0.8mA of described megohmmeter.
Further, described megohmmeter E end output voltage is 4000V~6000V.
Further, forward conduction electric current >=3A of described unilateral diode D.
Good effect of the present invention is: the test method that has proposed a set of brand-new power transformer, according to test figure, analyzed, as without extremely determining the transformer normal operation, occur when abnormal, then compare and do further minute folding and judgement with " raw data ".This test method, when no matter transformer is regular inspection or preventive trial, can not be torn each example lead-in wire of transformer open transformer is tested, and has so not only reduced power off time but also has saved a large amount of human and material resources, financial resources, has guaranteed again safety simultaneously.
Embodiment
Below in conjunction with specific embodiment, the present invention is described further.
The step of test method of the present invention is:
Before putting into operation, transformer measures one group of data as " raw data " in the situation that do not connect each side lead-in wire, measure again one group of data as " basic data " after connecting each side lead-in wire, when this transformer is done experiment, in the situation that do not remove the lead-in wire that transformer is connected with miscellaneous equipment, the test figure and " basic data " that draw are compared;
At first oneself is had a power failure and carries out the power transformer of safety practice, remove successively the ground wire of each side, test lead when projects are tested directly is connected on the sleeve pipe top successively, has recorded environment temperature, humidity and transformer body temperature simultaneously, and concrete test method step is:
1) transformer core and clamp insulation are measured: by each side short circuit grounding of transformer;
2) insulation resistance of each winding and sleeve of transformer: by the G of megohmmeter end ground connection, respectively by the winding to be tested of the L of megohmmeter end and transformer, iron core and folder connect, be in series with unilateral diode D between the winding to be tested of L end and transformer, the L end is by the rear ground connection of capacitor C 1, the positive pole of described unilateral diode D is connected with the L end, the E of megohmmeter end is connected with the winding non-to be tested of transformer, described winding to be tested is respectively the high pressure winding, the low pressure winding, without winding, obtain respectively high pressure winding and the iron core insulation resistance R1 to the low pressure winding, low pressure winding and the iron core insulation resistance R2 to the high pressure winding, the insulation resistance R3 of iron core to senior middle school's low pressure winding, this test result is as the insulating resistance value in " measurement data ",
3) analyze the insulating resistance value R of winding: the insulating resistance value in " measurement data " is compared with resistance value corresponding in " raw data ", when the insulating resistance value in " measurement data " is more than or equal to 1.3 times of insulating resistance value corresponding to " raw data ", between each winding, insulation is good, the one group of insulating resistance value that has at least in " measurement data " is less than 1.3 times of insulating resistance value corresponding to " raw data ", but while being greater than " raw data " corresponding insulating resistance value, by the middle insulating resistance value of itself and " basic data " relatively, when the insulating resistance value in " measurement data " is more than or equal to 0.7 times of insulating resistance value corresponding in " basic data ", between each winding, insulation is good, when in " measurement data " one group or two groups of insulating resistance values are less than 0.7 times of insulating resistance value corresponding in " basic data ", carry out the transformer oil test, the hidden danger existed to get rid of transformer, insulation resistance numerical value in " measurement data " all is less than 0.7 times of insulating resistance value corresponding in " basic data ", or the insulating resistance value in " measurement data " is while being less than or equal to insulating resistance value corresponding in " raw data ", transformer is returned to the repair in shop reason,
4) sleeve pipe is together with the leakage current measurement of winding: while surveying high-pressure side, the high-voltage connection of high voltage direct current generator connects step-up side, non-tested winding connects the shielding end of high voltage direct current generator high-voltage connection, in like manner the like measure the leakage current values of other winding;
The winding leakage current recorded is compared with the winding leakage current in " raw data ", when the two the absolute value of measures of dispersion be less than or equal to " raw data " corresponding leakage current 5% the time, leakage current is in safe range, when the two the absolute value of measures of dispersion be greater than " raw data " corresponding leakage current 5% the time, carry out malfunction elimination.
5) sleeve pipe is together with dielectric loss and the measured capacitance value of coil: for the transformer of voltage levels as 110kV and more than, when carrying out sleeve pipe together with the dielectric loss of coil and measured capacitance value, the lightning arrester of each side of transformer is removed; The lOkV lightning arrester is removed from lead-in wire, and 35kV and above lightning arrester are taken apart from lightning arrester base and ground phase short circuit;
The dielectric loss of sleeve pipe and measured capacitance value, winding deformation calibrating, no-load voltage ratio measurement, loaded switch action test, direct current resistance m easurem ent be by the conventional methods test of prior art, finally again transformer carried out to end-of-job after demagnetization;
By the corresponding capacitance of bushing amount of the capacitance of bushing amount in " measurement data " and sleeve pipe in " raw data " relatively, when the two the absolute value of measures of dispersion be less than or equal to electric capacity corresponding in " raw data " 5% the time, think that sleeve pipe is normal, when the measures of dispersion of the two is greater than the electric capacity 5% of " raw data " correspondence, carry out malfunction elimination.
Further, the rated current >=0.8mA of described megohmmeter.
Further, described megohmmeter E end output voltage is 4000V~6000V.
Further, forward conduction electric current >=3A of described unilateral diode D.
The foregoing is only preferred embodiment of the present invention, in order to limit the present invention, within the spirit and principles in the present invention not all, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (4)

1. a power transformer test method is characterized in that:
Before putting into operation, transformer measures one group of data as " raw data " in the situation that do not connect each side lead-in wire, measure again one group of data as " basic data " after connecting each side lead-in wire, when this transformer is done experiment, in the situation that do not remove the lead-in wire that transformer is connected with miscellaneous equipment, the test figure and " basic data " that draw are compared;
At first oneself is had a power failure and carries out the power transformer of safety practice, remove successively the ground wire of each side, test lead when projects are tested directly is connected on the sleeve pipe top successively, has recorded environment temperature, humidity and transformer body temperature simultaneously, and concrete test method step is:
1) transformer core and clamp insulation are measured: by each side short circuit grounding of transformer;
2) insulation resistance of each winding and sleeve of transformer: by the G of megohmmeter end ground connection, respectively by the winding to be tested of the L of megohmmeter end and transformer, iron core and folder connect, be in series with unilateral diode D between the winding to be tested of L end and transformer, the L end is by the rear ground connection of capacitor C 1, the positive pole of described unilateral diode D is connected with the L end, the E of megohmmeter end is connected with the winding non-to be tested of transformer, described winding to be tested is respectively the high pressure winding, the low pressure winding, without winding, obtain respectively high pressure winding and the iron core insulation resistance R1 to the low pressure winding, low pressure winding and the iron core insulation resistance R2 to the high pressure winding, the insulation resistance R3 of iron core to senior middle school's low pressure winding, this test result is as the insulating resistance value in " measurement data ",
3) analyze the insulating resistance value R of winding: the insulating resistance value in " measurement data " is compared with resistance value corresponding in " raw data ", when the insulating resistance value in " measurement data " is more than or equal to 1.3 times of insulating resistance value corresponding to " raw data ", between each winding, insulation is good, the one group of insulating resistance value that has at least in " measurement data " is less than 1.3 times of insulating resistance value corresponding to " raw data ", but while being greater than " raw data " corresponding insulating resistance value, by the middle insulating resistance value of itself and " basic data " relatively, when the insulating resistance value in " measurement data " is more than or equal to 0.7 times of insulating resistance value corresponding in " basic data ", between each winding, insulation is good, when in " measurement data " one group or two groups of insulating resistance values are less than 0.7 times of insulating resistance value corresponding in " basic data ", carry out the transformer oil test, the hidden danger existed to get rid of transformer, insulation resistance numerical value in " measurement data " all is less than 0.7 times of insulating resistance value corresponding in " basic data ", or the insulating resistance value in " measurement data " is while being less than or equal to insulating resistance value corresponding in " raw data ", transformer is returned to the repair in shop reason,
4) sleeve pipe is together with the leakage current measurement of winding: while surveying high-pressure side, the high-voltage connection of high voltage direct current generator connects step-up side, non-tested winding connects the shielding end of high voltage direct current generator high-voltage connection, in like manner the like measure the leakage current values of other winding;
The winding leakage current recorded is compared with the winding leakage current in " raw data ", when the two the absolute value of measures of dispersion be less than or equal to " raw data " corresponding leakage current 5% the time, leakage current is in safe range, when the two the absolute value of measures of dispersion be greater than " raw data " corresponding leakage current 5% the time, carry out malfunction elimination.
5) sleeve pipe is together with dielectric loss and the measured capacitance value of coil: for the transformer of voltage levels as 110kV and more than, when carrying out sleeve pipe together with the dielectric loss of coil and measured capacitance value, the lightning arrester of each side of transformer is removed; The lOkV lightning arrester is removed from lead-in wire, and 35kV and above lightning arrester are taken apart from lightning arrester base and ground phase short circuit;
The dielectric loss of sleeve pipe and measured capacitance value, winding deformation calibrating, no-load voltage ratio measurement, loaded switch action test, direct current resistance m easurem ent be by the conventional methods test of prior art, finally again transformer carried out to end-of-job after demagnetization;
By the corresponding capacitance of bushing amount of the capacitance of bushing amount in " measurement data " and sleeve pipe in " raw data " relatively, when the two the absolute value of measures of dispersion be less than or equal to electric capacity corresponding in " raw data " 5% the time, think that sleeve pipe is normal, when the measures of dispersion of the two is greater than the electric capacity 5% of " raw data " correspondence, carry out malfunction elimination.
2. power transformer test method according to claim 1, is characterized in that: the rated current >=0.8mA of described megohmmeter.
3. power transformer test method according to claim 1 is characterized in that: described megohmmeter E end output voltage is 4000V~6000V.
4. power transformer test method according to claim 1, is characterized in that: forward conduction electric current >=3A of described unilateral diode D.
CN2013104209416A 2013-09-16 2013-09-16 Power transformer test method Pending CN103454536A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013104209416A CN103454536A (en) 2013-09-16 2013-09-16 Power transformer test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013104209416A CN103454536A (en) 2013-09-16 2013-09-16 Power transformer test method

Publications (1)

Publication Number Publication Date
CN103454536A true CN103454536A (en) 2013-12-18

Family

ID=49737125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013104209416A Pending CN103454536A (en) 2013-09-16 2013-09-16 Power transformer test method

Country Status (1)

Country Link
CN (1) CN103454536A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107807282A (en) * 2017-10-31 2018-03-16 国网福建省电力有限公司 The method of tested media loss factor and capacitance under transformer non-dismantle high voltages fuse
CN108732512A (en) * 2018-06-13 2018-11-02 任志广 A kind of data collection module applied to high voltage power supply
CN108872771A (en) * 2018-07-11 2018-11-23 云南电网有限责任公司电力科学研究院 A kind of transformer preventive trial equivalent method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4201089A (en) * 1976-10-08 1980-05-06 Elin-Union Aktiengesellschaft Temperature measuring device for transformers and reactors
EP0337171A1 (en) * 1988-04-15 1989-10-18 Daimler-Benz Aktiengesellschaft Method for the contactless measuring of a resistor arranged in the secondary circuit of a transmitter, and device for carrying out the method
CN101354418A (en) * 2008-09-22 2009-01-28 河南省电力公司商丘供电公司 Power transformer test method without disconnecting wire
CN101806841A (en) * 2009-12-30 2010-08-18 四川中鼎科技有限公司 Method for determining test parameter of winding and sleeve of power transformer
CN102735959A (en) * 2012-05-29 2012-10-17 辽宁省电力有限公司 On-line ultrahigh-voltage line power transformer test method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4201089A (en) * 1976-10-08 1980-05-06 Elin-Union Aktiengesellschaft Temperature measuring device for transformers and reactors
EP0337171A1 (en) * 1988-04-15 1989-10-18 Daimler-Benz Aktiengesellschaft Method for the contactless measuring of a resistor arranged in the secondary circuit of a transmitter, and device for carrying out the method
CN101354418A (en) * 2008-09-22 2009-01-28 河南省电力公司商丘供电公司 Power transformer test method without disconnecting wire
CN101806841A (en) * 2009-12-30 2010-08-18 四川中鼎科技有限公司 Method for determining test parameter of winding and sleeve of power transformer
CN102735959A (en) * 2012-05-29 2012-10-17 辽宁省电力有限公司 On-line ultrahigh-voltage line power transformer test method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107807282A (en) * 2017-10-31 2018-03-16 国网福建省电力有限公司 The method of tested media loss factor and capacitance under transformer non-dismantle high voltages fuse
CN108732512A (en) * 2018-06-13 2018-11-02 任志广 A kind of data collection module applied to high voltage power supply
CN108732512B (en) * 2018-06-13 2020-11-24 任志广 Data collection module applied to high-voltage power supply
CN108872771A (en) * 2018-07-11 2018-11-23 云南电网有限责任公司电力科学研究院 A kind of transformer preventive trial equivalent method

Similar Documents

Publication Publication Date Title
CN101354418B (en) Power transformer test method without disconnecting wire
CN103091609A (en) Performance detecting system and method thereof of gas insulated substation (GIS) partial discharge on-line monitoring device
CN102193040A (en) Method for performing insulation preventive test on zinc oxide lightning arrester without dismantling lead wire
CN103323751A (en) High-voltage short-cable insulation terminal partial discharge testing device and using method
CN102901894A (en) Test method and device for testing 500kV zinc oxide arrester
CN103592518A (en) Method for measuring capacitor dielectric loss and capacitance of capacitor voltage transformer
CN205992025U (en) A kind of 220KV and above capacitance type potential transformer test circuit
CN107894519B (en) 220kV and above voltage class multisection zinc oxide arrester comprehensive test box
CN103454536A (en) Power transformer test method
CN104049161A (en) Testing connecting structure and testing method for substation field lightning arrester without demounting primary high-voltage lead
CN202649391U (en) Cable defect simulation test system
CN104007354A (en) Whole-group test circuit and method for 10 kV zinc oxide lightning arrester and cable
CN207908603U (en) A kind of circuit artificial earthing short-circuit test overall process current detecting system
CN105866592A (en) System and method for acquiring dynamic reactive power compensation response waveforms
CN105548821A (en) Lightning arrester live detection method
CN102221652A (en) Method and device for testing 500kV metal oxide arrester
CN102565614B (en) Alternating voltage loop test method
CN107515354B (en) Whole-process current testing system for line manual grounding short circuit test
CN110927528A (en) Transmission line fault simulation test device
CN104316838A (en) Direct current superposition method measurement circuit
CN203786256U (en) Low-frequency superposition type measuring circuit
CN204789785U (en) Portable intelligent substation relay protection testing arrangement
CN202837440U (en) Testing apparatus for testing 500 kV zinc oxide arrester
CN201945652U (en) Tester for testing 500kV zinc oxide arrester
CN205656270U (en) Abundant discharge device of cable fault point

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELE

Effective date: 20131126

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELECTRIC POWER COMPANY

Effective date: 20131126

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 454150 JIAOZUO, HENAN PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20131126

Address after: 100031 West Street, Beijing, Xicheng District, No. 86, No.

Applicant after: State Grid Corporation of China

Applicant after: Jiaozuo Power Supply Company of State Grid Henan Electric Power Company

Address before: 454150 No. 299 South Tower Road, Henan, Jiaozuo

Applicant before: Jiaozuo Power Supply Company of State Grid Henan Electric Power Company

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20131218

RJ01 Rejection of invention patent application after publication