Prior art keywords
test
test case
case
data
sorter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310320295.6A
Other languages
Chinese (zh)
Other versions
CN103391225A (en
Inventor
孙瑞超
田江
李洪威
王冠
王阳
吕勇
贾凡
刘欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dashangsuo Feitai Testing Technology Co.,Ltd.
Original Assignee
DALIAN FUTURES INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN FUTURES INFORMATION TECHNOLOGY Co Ltd filed Critical DALIAN FUTURES INFORMATION TECHNOLOGY Co Ltd
Priority to CN201310320295.6A priority Critical patent/CN103391225B/en
Publication of CN103391225A publication Critical patent/CN103391225A/en
Application granted granted Critical
Publication of CN103391225B publication Critical patent/CN103391225B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The invention discloses a kind of futures and the parallel automatization test system of securities industry test case, there is test queue, sorter, multiple execution machine and resources bank, test system is after receiving the test checking command of test case of execution machine transmission, from described resources bank, transfer test data support that test case is run, generate test result;Perform the ruuning situation of machine monitoring test case, obtain test result, this result is back to sorter;After having tested, the test data resource release that will take, re-flag as upstate;Change postrun test case state, delete in described test queue, when after the whole testing cases success in test queue, after i.e. test queue is sky, complete the concurrent testing of multiple test case.The present invention has the utilization rate improving system under test (SUT), makes full use of various test resource, the advantage being obviously improved execution efficiency.

Description

Futures and the parallel automatization test system of securities industry test case
Technical field
The present invention relates to a kind of futures and the method for testing of securities industry test case and system, particularly relate to one Plant the method and system using parallel automatic test.Relate to Patent classificating number H04 electrical communication technology H04L12/00 data switching networks H04L12/26 monitoring arrangement;Test device.
Background technology
Along with the development of futures Yu securities industry information technology, automatization testing technique is the most progressively each transaction Starting application in Suo, substantial amounts of manual test use-case is converted into corresponding automatic test cases, by tradition Serial perform use-case mode tentatively improve the efficiency of test and the accuracy of test.
But when emergent project, urgent change generation, on-line time is urgent, needs to complete at short notice entirely The regression test in face, guarantee software quality, only efficient test process, just can ensure that system is timely Reach the standard grade.And traditional serial executive mode, test system can only perform in certain test assignment in the same time A test case, performed one test with after could start the next one test case execution, show and It is clear to test system utilization rate too low.
A test case, whole regression tested can only be processed within a time owing to serial performs system Time and the quantity linearly relation with increase of test case, the test case quantity that regression test comprises is the most, Whole regression tested is the longest, when in the face of the test case task of flood tide, and traditional serial test System cannot accomplish to obtain test result at short notice, especially at the finance card the most urgent to time requirement Certificate industry, often causes immeasurable loss.Even the serial that instead of manual test performs automatically Change test in the face of the inefficiency that also seems when taking turns urgent regression test task the most more.
Therefore, one can executed in parallel futures and securities industry automatic test cases, improve test system Utilization rate, make full use of various test resource, the executed in parallel method being obviously improved execution efficiency just becomes Necessity.
Summary of the invention
The present invention is directed to the proposition of problem above, and a kind of futures developed are parallel with securities industry test case Automatization test system, has:
Storage comprises the test queue of multiple test case without test data;Each test case includes: Data query instruction and test checking command;
Sorter, has multiple end-around carry inside this sorter, each end-around carry is from the head of described queue Portion is transferred the test case in test queue successively by the order of FIFO;
Receive the test case that in sorter, end-around carry is transferred, according to Vehicles Collected from Market stateful transaction, test is used Example sends the multiple execution machines to corresponding test system;
Receive and run the test system of multiple multithreadings of the test case that execution machine sends and be positioned at test In system, storing the resources bank testing data resource, the arbitrary test resource in this resources bank is in a period of time In, can only be called by a test case;
Described sorter is according to the test hang-up rate of data resource corresponding to test case and hit rate, to right The execution machine distribution test case answered;
Execution machine sends data query instruction to test system, inquires conjunction in the resources bank from test system After suitable data, the machine that performs sends the test checking command in test case to test system;
Test system is after receiving the test checking command of test case of execution machine transmission, from described resource Storehouse is transferred test data and supports that test case is run, generate test result;Perform machine monitoring test case Ruuning situation, obtains test result, this result is back to sorter;After having tested, the survey that will take Examination data resource release, re-flags as upstate;Change postrun test case state, described Test queue in delete, when in test queue whole testing cases success after, i.e. test queue is After sky, complete the concurrent testing of multiple test case.
The quantity of described execution machine is consistent with the end-around carry quantity in sorter;Each execution machine the most only connects Receive a test case.
Described execution facility have the non-excluded mechanism of secondary: when a certain execution machine prepares the test system to its correspondence Transmission use-case time, first inquiry meet test case test data take situation;
If there being the test data meeting test case Call Condition to be in idle condition, then the machine that performs is to test system Test checking command described in system transmission;
If the whole test data meeting test case Call Condition are in seizure condition, then when the machine that performs sets Between threshold value waiting, when waiting the threshold value time of advent, accounting for of the test data that secondary inquiry can be called Use situation;
If there being test data to be in idle condition, then the machine that performs sends the test school of test case to test system Test instruction;
If all test data called are all in seizure condition, then current test case is sent by the machine that performs Return sorter, sorter the afterbody that this test case sends back described test queue is requeued.
Described test case includes:
Single state use-case and many in transaction of test can be completed under a stateful transaction in the day of trade Many stateful transactions test case of test is completed under individual stateful transaction.
When run described in many stateful transactions test case time, described execution prow first detects described resources bank In current many stateful transactions test case spendable test data whether be in idle condition and current city Whether state is one of the state of market that can run in many stateful transactions test case;
If spendable test data are in idle condition and state of market meets, then the machine that performs is by current many The test checking command of stateful transaction test case sends to the system of testing, and calls one group of test in resources bank Data are tested, and after completing the test of Vehicles Collected from Market state, return the tail end of test case extremely described queue, Recirculate;The test data called by use-case input exclusive pond, and labelling this test data and test case Corresponding relation, treat under next state of market, continue to call for described test case.
Described hang-up rate is: execution machine is that current test case does not inquire and suitably tests data resource Or the test data resource that this use-case is corresponding is taken by many stateful transactions use-case, then at described test case In suspended state;Hang-up rate is and is in the test case of suspended state and accounts for the percentage ratio of test case sum;
Described hit rate is: execution machine be test data resource corresponding to current test case inquiry be in by The state that many stateful transactions test case takies, then described test case is in hit condition;Hit rate is i.e. The percentage ratio of test case sum is accounted for for being in the test case of hit condition;
Described sorter sets hang-up rate and the threshold value of hit rate, when the test case in a certain execution machine reaches During to threshold value, sorter stops distributing test case to this execution machine.
Owing to have employed technique scheme, the futures that the present invention provides are parallel with securities industry test case certainly Dynamicization test system, have employed concurrent testing mechanism, when processing substantial amounts of test case, relative to tradition The method of operation of serial, is greatly saved the testing time.And introduce the merit judging Vehicles Collected from Market state The obstruction of test case can be effectively avoided with test data set suspending mechanism.
Accompanying drawing explanation
For clearer explanation embodiments of the invention or the technical scheme of prior art, below will be to enforcement The accompanying drawing used required in example or description of the prior art does one and introduces simply, it should be apparent that, retouch below Accompanying drawing in stating is only some embodiments of the present invention, for those of ordinary skill in the art, not On the premise of paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the change schematic diagram of stateful transaction in a day of trade
Fig. 2 is the network architecture schematic diagram of the present invention
Fig. 3 is the test flow chart of list state of market use-case of the present invention
Fig. 4 is the test flow chart of the present invention many state of markets use-case
Fig. 5 is hit rate and the hang-up rate calculating schematic diagram of test case in the present invention
Fig. 6 is the structural representation of test case of the present invention
Detailed description of the invention
For making the purpose of embodiments of the invention, technical scheme and advantage clearer, below in conjunction with the present invention Accompanying drawing in embodiment, carries out the most complete description to the technical scheme in the embodiment of the present invention:
As shown in Figure 2: a kind of futures and the parallel automatization test system of securities industry test case, mainly wrap Include:
Comprise the test queue of multiple test case for storage, whole queue is as when time use of execution Example set.All test cases in the present invention are all the test cases without test data, each survey (test case of a corresponding state of market is that single state is used to the most corresponding one or more state of markets of example on probation Example;Multiple state of markets for many stateful transactions test case), test case is only at corresponding state of market Lower could run, when test system is run, test system call test data, test.
Call the sorter of test queue, be provided with multiple end-around carry in the inside of sorter, each circulate into Journey transfers the test case test queue successively from the stem of described queue, i.e. presses the suitable of FIFO FIFO Sequence calls the test case in test queue.
Receive the test case that in sorter, end-around carry is transferred, according to Vehicles Collected from Market stateful transaction, test is used Example sends the multiple execution machines to corresponding test system, performs in the present invention in quantity and the sorter of machine The quantity of end-around carry is consistent.
Receive and run multiple test systems of the test case that execution machine sends, test system in the present invention System can run multiple use-case in described test queue, i.e. multiple threads simultaneously.
Also including the resources bank storing many group test data, in data base, the test data of storage are once only Can be called by a test case, after test case completes test, test data are distributed machine and perform total Discharge after control amendment state.
Under duty:
Test system, after the test case receiving the transmission of execution machine, transfers test number from described resources bank According to supporting that test case is run, generate test result;Perform the ruuning situation of machine monitoring test case, obtain Test result, is back to sorter by this result;After having tested, the test data resource release that will take, Re-flag as upstate.
Further, it is contemplated that needed for each futures and security class testing-case, algorithm is the most, required Hardware resource is more, and for ensureing use-case operation efficiency, every execution machine the most only runs a test case.
The quantity of described execution machine is consistent with the end-around carry quantity in sorter;Each execution machine the most only connects Receive a test case.
It is considered that test data are once merely able to be called by a test case, can not during calling Accessed by other test case.When parallel multiple test case, can produce test data calls conflict.
At the machine of execution before test system sends test case, perform prow and first send data to test system Query statement, inquires in the resources bank from test system after suitably can calling test data, performs machine The test checking command in test case is sent to test system.
Further, in order to solve test data call conflict, multiple actuators of the present invention have The non-excluded mechanism of secondary:
When a certain execution machine prepares to the test system transfers use-case of its correspondence, first inquiry meets test use Example one or more groups test data take situation.
If there being one or more groups test data meeting test case Call Condition to be in idle condition, then hold Row machine sends test case to test system, and test system calls test data, and bring into operation test case, Until completing the test of this use-case, release test data.
If meet test case Call Condition whole test data all in seizure condition, then perform machine set A fixed time threshold, does not carry out any action to the test case held and waits, when waiting arrival Between threshold value time, the situation that takies of test data that secondary inquiry can be fallen, the process repeating last time and inquiring about.
Further, in order to ensure the testing efficiency of test case, described sorter accounting for according to data resource By situation, set distribution rules and mainly include setting hit rate and hang-up rate.
Hang-up is the execution state of a kind of use-case, represents: test machine is inquiring about data for current test case During resource, do not inquire suitable data or find that corresponding test data resource is accounted for by many stateful transactions use-case Ratio.
Hang-up rate is made up of cardinal sum percentage ratio.Such as radix is 10, and percentage ratio is 60%, represents continuous ten The upper limit of individual use-case hang-up rate is 60%, this hang-up rate, it is believed that set, and when arriving this hang-up rate, holds Row machine sends prompting.The calculation of hang-up rate, as shown in Figure 5.
The definition of hit: described hang-up include execution machine do not inquire suitably test data resource or Suitably test data resource is taken by many stateful transactions test case.Wherein, the latter's many stateful transactions test Use-case takies the use-case caused and hangs up is exactly hit at first time.I.e. hang-up rate contains hit rate.
Hit rate is made up of cardinal sum percentage ratio equally.Such as radix is 10, and percentage ratio is 60%, represents even Continuous ten use-cases hit upper limit is 60%, reaches this upper limit and the resource in this test system is then described (the most just It is test data resource) occupied too much it is no longer appropriate for being called by use-case, the machine that now performs is to distribution Machine sends cue, and at it, sorter monitors that the page provides Current resource occupied too much, is unsuitable for calling Prompting.
Further, it is contemplated that As time goes on hit rate can decline, in order to ensure test case Distribution efficiency, do not affect the distribution of test case, when hit rate or hang-up rate decline, in the present invention with Sample has a similar notification mechanisms:
Execution machine sends current hit rate or the information of hang-up rate decline to sorter, and sorter (monitors at it The page gives a warning prompting, reminds operator or is revised distribution policy by sorter voluntarily, it is to avoid causing money The waste in source.
When hit rate or hang-up rate reach the threshold value set, distribution mechanisms thinks that this test system is the most uncomfortable Conjunction is reruned use-case, the most no longer distributes use-case toward the execution machine corresponding to this test system.
As in figure 2 it is shown, when hit rate and the hang-up rate of environment Env1 reach threshold value, then sorter will not Can be again to circulation 1,2,3 distribution use-case.
If there being test data to be in idle condition, then the machine that performs sends test case to test system, starts to adjust Use data run use-case, test.
Further, if all test data called are all in seizure condition, current survey is shown Examination data by shared by many state of markets use-case the longest, may be constantly in suspended state, The time of continuing waiting for may be the longest, so execution machine sends current test case back to sorter, by dividing The afterbody that this test case sends back described test queue is requeued by the machine of sending out, and is again circulated.
Owing to have employed the non-excluded mechanism of above-mentioned secondary, can effectively solve to test data can not be by simultaneously The generation of the test case blocking used and cause, makes whole use-case test process more smooth and easy.
Under actual test environment, test case can be divided into two kinds: a stateful transaction in the day of trade Can complete down to complete under single state use-case of test and the multiple stateful transactions in transaction many transaction of test State verification use-case.
When run described in many stateful transactions test case time, described execution prow first detects described resources bank In current many stateful transactions test case spendable test data whether be in idle condition and current city Whether state is one of the state of market that can run in many stateful transactions test case;
If spendable test data are in idle condition and state of market meets, then the machine that performs is by current many The test verification instruction that stateful transaction test case comprises sends to test system, calls a group in resources bank Test data are tested, and after completing the test of Vehicles Collected from Market state, return test case to described queue Tail end, recirculates;Test data described in hang-up, treat under next state of market, for described test Example continues to call.
As shown in Figure 6: each test case can mark its required state of market when designing and writing.
For single state of market use-case, mark its required state of market use-case in use-case stem.
For many stateful transactions test case, market shape needed for its subsequent step can be indicated in the middle of subsequent step State, such as step4 and step5 needs could perform under the second stateful transaction, step6 and step7 needs Could perform under 3rd stateful transaction.
This policy definition performed is had, i.e. according to selected test before each test case performs Use-case Automatic sieve selects this performs to need which market transaction state, subsequently by these market transaction states It is stored in sequence in script:
The most current all of test case performs to need tri-state of markets of A, B, C.Script starts to perform Time, first can select to need A state of market use-case (including single state and many stateful transactions test case), Whether the stateful transaction subsequently determining whether current test system is A, if A, then these use-cases can be by Performing, otherwise these use-cases will be not carried out.
After the A condition part of many stateful transactions test case is finished, it is arranged into team with regular meeting by script In row, and it is in higher priority.If the alone example of A condition and the A portion of many stateful transactions test case Dividing after being all finished, system can point out use-case to be switched to next stateful transaction B, script operation suspension.When After switching, user notifies that system is complete stateful transaction switching, and present system stateful transaction is in B. At this moment, script continues to run with, and starts to perform to meet the alone example of B state of market, and performs in A condition Many stateful transactions test case of complete expectation B state.
After test completion, having updated the state of the test case of test, primary operational is as shown in the table:
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention not office Being limited to this, any those familiar with the art is in the technical scope that the invention discloses, according to this The technical scheme of invention and inventive concept thereof in addition equivalent or change, all should contain the protection in the present invention Within the scope of.

Claims (6)

1. futures and the parallel automatization test system of securities industry test case, has:
Storage comprises the test queue of multiple test case without test data;Each test case includes: Data query instruction and test checking command;
Sorter, has multiple end-around carry inside this sorter, each end-around carry is from the head of described queue Portion is transferred the test case in test queue successively by the order of FIFO;
Receive the test case that in sorter, end-around carry is transferred, will survey according at least to Vehicles Collected from Market stateful transaction Example on probation sends the multiple execution machines to corresponding test system;
Receive and run the test system of multiple multithreadings of the test case that execution machine sends and be positioned at test In system, storing the resources bank testing data resource, the arbitrary test resource in this resources bank is in a period of time In, can only be called by a test case;
Described sorter is according to the test hang-up rate of data resource corresponding to test case and hit rate, to right The execution machine distribution test case answered;
Perform prow and first send data query instruction to test system, the resources bank from test system is inquired about After suitable data, the machine that performs sends the test checking command in test case to test system;
Test system is after receiving the test checking command of test case of execution machine transmission, from described resource Storehouse is transferred test data and supports that test case is run, generate test result;Perform machine monitoring test case Ruuning situation, obtains test result, this result is back to sorter;After having tested, the survey that will take Examination data resource release, re-flags as upstate;Change postrun test case state, described Test queue in delete, when in test queue whole testing cases success after, i.e. test queue is After sky, complete the concurrent testing of multiple test case;
Described hang-up rate is: execution machine is that current test case does not inquire and suitably tests data resource Or the test data resource that this use-case is corresponding is taken by many stateful transactions use-case, then at described test case In suspended state;Hang-up rate is and is in the test case of suspended state and accounts for the percentage ratio of test case sum;
Described hit rate is: execution machine be test data resource corresponding to current test case inquiry be in by The state that many stateful transactions test case takies, then described test case is in hit condition;Hit rate is i.e. The percentage ratio of test case sum is accounted for for being in the test case of hit condition.
A kind of futures the most according to claim 1 and securities industry test case parallel automatic test system System, is further characterized in that:
The quantity of described execution machine is consistent with the end-around carry quantity in sorter;Each execution machine the most only connects Receive a test case.
A kind of futures the most according to claim 1 and 2 are surveyed with the parallel automatization of securities industry test case Test system, is further characterized in that described execution facility have the non-excluded mechanism of secondary: when a certain execution machine prepare to During the test system transfers use-case of its correspondence, first inquiry meet test case test data take situation;
If there being the test data meeting test case Call Condition to be in idle condition, then the machine that performs is to test system Test checking command described in system transmission;
If the whole test data meeting test case Call Condition are in seizure condition, then when the machine that performs sets Between threshold value waiting, when waiting the threshold value time of advent, accounting for of the test data that secondary inquiry can be called Use situation;
If there being test data to be in idle condition, then the machine that performs sends the test school of test case to test system Test instruction;
If all test data called are all in seizure condition, then current test case is sent by the machine that performs Return sorter, sorter the afterbody that this test case sends back described test queue is requeued.
A kind of futures the most according to claim 1 and securities industry test case parallel automatic test system System, is further characterized in that described test case includes:
Single state use-case and many in transaction of test can be completed under a stateful transaction in the day of trade Many stateful transactions test case of test is completed under individual stateful transaction.
A kind of futures the most according to claim 4 and securities industry test case parallel automatic test system System, is further characterized in that:
When run described in many stateful transactions test case time, described execution prow first detects described resources bank In current many stateful transactions test case spendable test data whether be in idle condition and current city Whether state is one of the state of market that can run in many stateful transactions test case;
If spendable test data are in idle condition and state of market meets, then the machine that performs is by current many The test checking command of stateful transaction test case sends to the system of testing, and calls one group of test in resources bank Data are tested, and after completing the test of Vehicles Collected from Market state, return the tail end of test case extremely described queue, Recirculate;The test data called by use-case input exclusive pond, and labelling this test data and test case Corresponding relation, treat under next state of market, continue to call for described test case.
A kind of futures the most according to claim 3 and securities industry test case parallel automatic test system System, is further characterized in that:
Described sorter sets hang-up rate and the threshold value of hit rate, when the test case in a certain execution machine reaches During to threshold value, sorter stops distributing test case to this execution machine.
CN201310320295.6A 2013-07-26 2013-07-26 Futures and the parallel automatization test system of securities industry test case Active CN103391225B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310320295.6A CN103391225B (en) 2013-07-26 2013-07-26 Futures and the parallel automatization test system of securities industry test case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310320295.6A CN103391225B (en) 2013-07-26 2013-07-26 Futures and the parallel automatization test system of securities industry test case

Publications (2)

Publication Number Publication Date
CN103391225A CN103391225A (en) 2013-11-13
CN103391225B true CN103391225B (en) 2016-09-14

Family

ID=49535388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310320295.6A Active CN103391225B (en) 2013-07-26 2013-07-26 Futures and the parallel automatization test system of securities industry test case

Country Status (1)

Country Link
CN (1) CN103391225B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105930274B (en) * 2016-05-05 2018-09-07 中国银行股份有限公司 A kind of automated testing method and system
CN112988558A (en) * 2019-12-16 2021-06-18 迈普通信技术股份有限公司 Test execution method and device, electronic equipment and storage medium
CN111258891A (en) * 2020-01-11 2020-06-09 苏州浪潮智能科技有限公司 Method and system for improving execution efficiency of automatic test

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101727389A (en) * 2009-11-23 2010-06-09 中兴通讯股份有限公司 Automatic test system and method of distributed integrated service
US8418000B1 (en) * 2012-03-13 2013-04-09 True Metrics LLC System and methods for automated testing of functionally complex systems
CN103136101A (en) * 2012-12-31 2013-06-05 博彦科技(上海)有限公司 Software automated testing unified operation platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101727389A (en) * 2009-11-23 2010-06-09 中兴通讯股份有限公司 Automatic test system and method of distributed integrated service
US8418000B1 (en) * 2012-03-13 2013-04-09 True Metrics LLC System and methods for automated testing of functionally complex systems
CN103136101A (en) * 2012-12-31 2013-06-05 博彦科技(上海)有限公司 Software automated testing unified operation platform

Also Published As

Publication number Publication date
CN103391225A (en) 2013-11-13

Similar Documents

Publication Publication Date Title
CN107450971A (en) Task processing method and device
CN101017546A (en) Method and device for categorical data batch processing
CN105892996A (en) Assembly line work method and apparatus for batch data processing
CN106598705A (en) Asynchronous task scheduling method, device and system and electronic equipment
US20230266999A1 (en) Resource scheduling method, resource scheduling system, and device
CN110162388A (en) A kind of method for scheduling task, system and terminal device
CN103391225B (en) Futures and the parallel automatization test system of securities industry test case
CN110347602B (en) Method and device for executing multitasking script, electronic equipment and readable storage medium
DE112012003961T5 (en) Simultaneous processing of queued messages
CN104615684B (en) A kind of mass data communication concurrent processing method and system
CN105933408A (en) Implementation method and device of Redis universal middleware
CN114091941A (en) Task allocation method and device, electronic equipment and storage medium
CN111143143A (en) Performance test method and device
CN103473848B (en) Network invoice checking framework and method based on high concurrency
CN113886034A (en) Task scheduling method, system, electronic device and storage medium
CN110570158A (en) power grid standing book electronic transfer method and system and computer readable storage medium
CN110083536A (en) Test resource distribution method and device, electronic equipment and storage medium
CN109582467A (en) Processing method, system and the relevant apparatus of I/O request in a kind of storage system
CN107168788A (en) The dispatching method and device of resource in distributed system
CN110430591B (en) Intelligent deployment and reconstruction method for baseband resource pool
CN114896295B (en) Data desensitization method, desensitization device and desensitization system in big data scene
CN105955816A (en) Event scheduling method and device
CN106502842A (en) Data reconstruction method and system
CN106484879B (en) A kind of polymerization of the Map end data based on MapReduce
CN112884382B (en) Resource quota management method, device and equipment of cloud platform and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210315

Address after: No. 178, Huanghai Avenue, Dalian Economic and Technological Development Zone, Liaoning, 116600

Patentee after: Dashangsuo Feitai Testing Technology Co.,Ltd.

Address before: 116023 44th and 46th floors, 129 Huizhan Road, Shahekou District, Dalian City, Liaoning Province

Patentee before: DALIAN FUTURES INFORMATION TECHNOLOGY Co.,Ltd.