CN103322295A - Method for laying long-distance coal delivery pipeline and communication optical fiber cables in one ditch - Google Patents

Method for laying long-distance coal delivery pipeline and communication optical fiber cables in one ditch Download PDF

Info

Publication number
CN103322295A
CN103322295A CN2013101739764A CN201310173976A CN103322295A CN 103322295 A CN103322295 A CN 103322295A CN 2013101739764 A CN2013101739764 A CN 2013101739764A CN 201310173976 A CN201310173976 A CN 201310173976A CN 103322295 A CN103322295 A CN 103322295A
Authority
CN
China
Prior art keywords
coal pipe
convey coal
optical cable
ditch
laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101739764A
Other languages
Chinese (zh)
Inventor
周秀隆
刘睿
刘姣
王师伟
苏华
朱志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Original Assignee
Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Design and Research Institute of China Coal Technology and Engineering Group filed Critical Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Priority to CN2013101739764A priority Critical patent/CN103322295A/en
Publication of CN103322295A publication Critical patent/CN103322295A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Light Guides In General And Applications Therefor (AREA)

Abstract

The invention discloses a method for laying a long-distance coal delivery pipeline and communication optical fiber cables in one ditch, which includes the three types, namely laying cables in a non-rock stratum with the depth less than 5 mm, laying cables in a non-rock stratum with the depth more than 5 mm, and laying cables in a rock-soil stratum, and mainly relates to steps of relative position, horizontal spacing, depth and construction of the cables and the coal delivery pipeline when the coal delivery pipeline and the cables are laid in one ditch. According to the invention, the coal delivery pipeline and the cables are laid in one ditch, the excavated volume is reduced, the construction period is shortened, labor and time are saved, and the method can be widely applied in the pipeline transportation industry.

Description

Long method apart from convey coal pipe and communication optical cable laying in one ditch
Technical field
The invention belongs to convey coal pipe and communications system line arrangement, be specifically related to long method apart from convey coal pipe and communication optical cable laying in one ditch.
Background technique
Defectives such as existing communication optical cable lays and is single directly buried type, does not have special requirement, if single directly buried type method is applied to the present invention, exists the human and material resources waste big, and is long in time limit.
Summary of the invention
The purpose of this invention is to provide a kind of saving human and material resources, the single relatively directly buried type duration is short, excavates the little length of workload apart from the method for convey coal pipe and communication optical cable laying in one ditch.
In order to overcome above-mentioned deficiency, technological scheme of the present invention is to solve like this: long method apart from convey coal pipe and communication optical cable laying in one ditch, and this method is carried out according to the following steps:
1), the convey coal pipe buried depth is apart from ground surface 2m~5m;
2), optical cable is positioned at the convey coal pipe both sides, and is and concordant with the convey coal pipe top, is not less than 300mm with the horizontal clear distance of convey coal pipe tube wall; Be not less than 1.2m apart from the natural ground degree of depth, will satisfy being embedded in the following requirement of frozen soil layer simultaneously;
3), excavation is during highway crossing, buried depth is not less than 1.2m apart from the side drain bottom of trench; When passing through irrigation canals and ditches, pool, buried depth should be at dredging or the following 1.2m of the plan degree of depth that dredges; When passing through streams etc. and being subject to wash away the location, buried depth should be at the following 1.2m of erosion line;
4), optical cable static buckling least radius is 10 times of cable outer diameters, the dynamic bending least radius is 20 times of cable outer diameters;
5), the step of laying of optical cable is: convey coal pipe elder generation hyposulculus lays, the part backfill is to the convey coal pipe top, choose the twice ditch in the place that the horizontal clear distance of convey coal pipe tube wall is not less than 300mm then, lay again in the silicon core pipe and wear optical cable, 300mm laying optical cable colored belt above silicon core pipe is backfilled to the face of land at last greatly.
The distance of described convey coal pipe bottom surface and bottom of trench is 180 ㎜~210 ㎜, and the distance of convey coal pipe top and optical cable colored belt is 300 ㎜.
The distance of described convey coal pipe bottom surface and bottom of trench is 0 ㎜, and the distance of convey coal pipe top and optical cable colored belt is 300 ㎜.
The invention has the beneficial effects as follows: at least 2 24 core optical fiber cable for direct burials of laying in one ditch, the lightguide cable link total length is 727km at least, and optical cable and convey coal pipe laying in one ditch can reduce excavated volume, shorten the construction period, the saving of labor, save time, and are widely used in the pipeline transport industry.
Description of drawings
Fig. 1 is the non-lithostratigraphy laying in one ditch sectional view of buried depth<5m;
Fig. 2 is the non-lithostratigraphy laying in one ditch sectional view of buried depth>5m;
Fig. 3 is lithostratigraphy laying in one ditch sectional view.
Among the figure, 1 is nature ground; 2 is the optical cable colored belt; 3 is optical cable; 4 is pipeline; 5 is the undisturbed soil of piece footpath<250mm.
Embodiment
Below in conjunction with drawings and Examples summary of the invention is described further:
With reference to Fig. 1, Fig. 2, shown in Figure 3, long method apart from convey coal pipe and communication optical cable laying in one ditch, this method is carried out according to the following steps:
1), convey coal pipe 4 buried depths are apart from ground 1 surperficial 2m~5m;
2), optical cable 3 is positioned at convey coal pipe 4 both sides, and is and concordant with convey coal pipe 4 tops, is not less than 300mm with the horizontal clear distance of convey coal pipe 4 tube walls; Be not less than 1.2m apart from the natural ground degree of depth, will satisfy being embedded in the following requirement of frozen soil layer simultaneously;
3), excavation is during highway crossing, buried depth is not less than 1.2m apart from the side drain bottom of trench; When passing through irrigation canals and ditches, pool, buried depth should be at dredging or the following 1.2m of the plan degree of depth that dredges; When passing through streams etc. and being subject to wash away the location, buried depth should be at the following 1.2m of erosion line;
4), optical cable 3 static buckling least radiuses are 10 times of cable outer diameters, the dynamic bending least radius is 20 times of cable outer diameters;
5), the step of laying of optical cable 3 is: convey coal pipe 4 first hyposulculuses lay, the part backfill is to convey coal pipe 4 tops, choose the twice ditch in the place that the horizontal clear distance of convey coal pipe 4 tube walls is not less than 300mm then, lay again in the silicon core pipe and wear optical cable, 300mm laying optical cable colored belt 2 above silicon core pipe is backfilled to the face of land at last greatly.
The distance of described convey coal pipe 4 bottom surfaces and bottom of trench is 180 ㎜~210 ㎜, and the distance of convey coal pipe 4 tops and optical cable colored belt 2 is 300 ㎜.
The distance of described convey coal pipe 4 bottom surfaces and bottom of trench is 0 ㎜, and the distance of convey coal pipe 4 tops and optical cable colored belt 2 is 300 ㎜.
Embodiment 1
Optical cable is positioned at the position concordant with the pipeline top, convey coal pipe both sides, is not less than 300mm with the horizontal clear distance of pipe wall; Be not less than 1.2m apart from the natural ground degree of depth, will satisfy being embedded in the following requirement of frozen soil layer simultaneously, the distance of described convey coal pipe bottom surface and bottom of trench is 0 ㎜, and the distance of convey coal pipe top and optical cable colored belt is 300 ㎜.
Embodiment 2
During the excavation highway crossing, buried depth is not less than 1.2m apart from the side drain bottom of trench; When passing through irrigation canals and ditches, pool, buried depth should be at dredging or the following 1.2m of the plan degree of depth that dredges; When passing through streams etc. and being subject to wash away the location, buried depth should be at the following 1.2m of erosion line.
Embodiment 3
Optical cable static buckling least radius is 10 times of cable outer diameters, and the dynamic bending least radius is 20 times of cable outer diameters.
Embodiment 4
The step of laying of optical cable is: convey coal pipe elder generation hyposulculus lays, the part backfill is to the convey coal pipe top, choose the twice ditch in the place that the horizontal clear distance of convey coal pipe tube wall is not less than 300mm then, lay again in the silicon core pipe and wear optical cable, 300mm laying optical cable colored belt above silicon core pipe is backfilled to the face of land at last greatly.

Claims (3)

1. length is apart from the method for convey coal pipe and communication optical cable laying in one ditch, and this method is carried out according to the following steps:
1), the convey coal pipe buried depth is apart from ground surface 2m~5m;
2), optical cable is positioned at the convey coal pipe both sides, and is and concordant with the convey coal pipe top, is not less than 300mm with the horizontal clear distance of convey coal pipe tube wall; Be not less than 1.2m apart from the natural ground degree of depth, will satisfy being embedded in the following requirement of frozen soil layer simultaneously;
3), excavation is during highway crossing, buried depth is not less than 1.2m apart from the side drain bottom of trench; When passing through irrigation canals and ditches, pool, buried depth should be at dredging or the following 1.2m of the plan degree of depth that dredges; When passing through streams etc. and being subject to wash away the location, buried depth should be at the following 1.2m of erosion line;
4), optical cable static buckling least radius is 10 times of cable outer diameters, the dynamic bending least radius is 20 times of cable outer diameters;
5), the step of laying of optical cable is: convey coal pipe elder generation hyposulculus lays, the part backfill is to the convey coal pipe top, choose the twice ditch in the place that the horizontal clear distance of convey coal pipe tube wall is not less than 300mm then, lay again in the silicon core pipe and wear optical cable, 300mm laying optical cable colored belt above silicon core pipe is backfilled to the face of land at last greatly.
2. length according to claim 1 is apart from the method for convey coal pipe and communication optical cable laying in one ditch, and the distance that it is characterized in that described convey coal pipe bottom surface and bottom of trench is 180 ㎜~210 ㎜, and the distance of convey coal pipe top and optical cable colored belt is 300 ㎜.
3. length according to claim 2 is apart from the method for convey coal pipe and communication optical cable laying in one ditch, and the distance that it is characterized in that described convey coal pipe bottom surface and bottom of trench is 0 ㎜, and the distance of convey coal pipe top and optical cable colored belt is 300 ㎜.
CN2013101739764A 2013-05-11 2013-05-11 Method for laying long-distance coal delivery pipeline and communication optical fiber cables in one ditch Pending CN103322295A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101739764A CN103322295A (en) 2013-05-11 2013-05-11 Method for laying long-distance coal delivery pipeline and communication optical fiber cables in one ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101739764A CN103322295A (en) 2013-05-11 2013-05-11 Method for laying long-distance coal delivery pipeline and communication optical fiber cables in one ditch

Publications (1)

Publication Number Publication Date
CN103322295A true CN103322295A (en) 2013-09-25

Family

ID=49191226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101739764A Pending CN103322295A (en) 2013-05-11 2013-05-11 Method for laying long-distance coal delivery pipeline and communication optical fiber cables in one ditch

Country Status (1)

Country Link
CN (1) CN103322295A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284246A (en) * 2016-08-29 2017-01-04 山东胜伟园林科技有限公司 Collector pipe method for embedding
CN108173167A (en) * 2017-11-13 2018-06-15 武汉船用机械有限责任公司 A kind of electrical-optical cable laying method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03271703A (en) * 1990-03-22 1991-12-03 Sumitomo Electric Ind Ltd Laying method for cable and cable
CN1202280A (en) * 1995-11-13 1998-12-16 西门子公司 Method of introducing optical cable into solid bed
CN1304573A (en) * 1998-06-05 2001-07-18 罗伯蒂克斯电缆铺设有限公司 Method for installing of least one pipe line and/or empty conduct in supply and sanitation pipes which have already been laid, especially in sewer pipe systems or networks and similar
CN1389009A (en) * 2000-08-07 2003-01-01 芦森工业株式会社 Method and structure for laying communication cable in underground line, and members used for laying
CN1588152A (en) * 2004-07-08 2005-03-02 上海交通大学 Hanging method for communication light cable in water drainining pipeline
CN102878351A (en) * 2012-10-18 2013-01-16 中煤科工集团武汉设计研究院 Pipeline laying method of long-distance coal conveying pipeline

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03271703A (en) * 1990-03-22 1991-12-03 Sumitomo Electric Ind Ltd Laying method for cable and cable
CN1202280A (en) * 1995-11-13 1998-12-16 西门子公司 Method of introducing optical cable into solid bed
CN1304573A (en) * 1998-06-05 2001-07-18 罗伯蒂克斯电缆铺设有限公司 Method for installing of least one pipe line and/or empty conduct in supply and sanitation pipes which have already been laid, especially in sewer pipe systems or networks and similar
CN1389009A (en) * 2000-08-07 2003-01-01 芦森工业株式会社 Method and structure for laying communication cable in underground line, and members used for laying
CN1588152A (en) * 2004-07-08 2005-03-02 上海交通大学 Hanging method for communication light cable in water drainining pipeline
CN102878351A (en) * 2012-10-18 2013-01-16 中煤科工集团武汉设计研究院 Pipeline laying method of long-distance coal conveying pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284246A (en) * 2016-08-29 2017-01-04 山东胜伟园林科技有限公司 Collector pipe method for embedding
CN108173167A (en) * 2017-11-13 2018-06-15 武汉船用机械有限责任公司 A kind of electrical-optical cable laying method

Similar Documents

Publication Publication Date Title
CN105586859B (en) Integral irrigation and drainage pipe system of saline-alkali soil farmland and construction method
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN103184747B (en) Method and structure for leakage seepage prevention construction for two-walls-in-one structure of deep-underground engineering
CN107780425A (en) A kind of large-scale yard drain french drain method to set up of banketing in Gullied Rolling Loess Region
CN104895173A (en) Sandy soil buried corrugated pipe subsidence prevention method
CN105888693A (en) Treating construction method for water burst of small underground river of highway tunnel
CN102425175B (en) Reinforcement protective structure of large spoil disposal area in mountainous area
CN103322295A (en) Method for laying long-distance coal delivery pipeline and communication optical fiber cables in one ditch
CN109056767A (en) A kind of rich water powder land floor precipitation and recharge construction method
CN204898465U (en) Ecological drainage facility of permafrost region dish
CN204356738U (en) A kind of concrete face rockfill dam upstream face structure of preventing face slab dislocation
CN101141054A (en) Compaction grouting method for preventing land subsidence after non-digging horizontal drilling
CN204212103U (en) A kind of slag field draining and spoil disposal rock glacier structure
CN106869165A (en) City integrated prefabricated piping lane open cut formula is from construction of prevention work method and self-propelled laydown machine
CN103235379A (en) Method for laying new pipeline and communication optical cable in same ditch or single ditch across embedded optical cable
CN104480905A (en) Upstream surface structure of concrete face rockfill dam for preventing face from disengagement and construction method thereof
CN109119943A (en) System of laying optimization method of the cable at push pipe both ends
CN101749485A (en) Pipeline laying construction method combining non-excavation jacking and liquid nitrogen horizontal freezing excavation laying
CN212114733U (en) Protection device for shallow pipeline that buries around subway station foundation ditch excavation
CN103246035A (en) Laying method for one-channel river-crossing of coal chute and communication optical cable
CN208815550U (en) A kind of rich water powder land floor precipitation and recharge construction system
CN104790430B (en) Construction method of underground continuous wall
CN103336347A (en) Communication optical cable separate laying method between pumping station and water supply station
CN210049276U (en) Soil slope retaining wall system structure
CN202451974U (en) Anti-floating structure of buried pipeline

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 430064 Hubei Province, Wuhan city Wuchang District Wuluo Road No. 442

Applicant after: Wuhan Design and Research Institute Co., Ltd. pf China Coal Technology & Engineering Group

Address before: 430064 Hubei Province, Wuhan city Wuchang District Wuluo Road No. 442

Applicant before: Wuhan Design and Research Institute of China Coal Technology & Engineering Group

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: WUHAN DESIGN AND RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY + ENGINEERING GROUP TO: WUHAN DESIGN AND RESEARCH INSTITUTE CO., LTD. PF CHINA COAL TECHNOLOGY + ENGINEERING GROUP

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130925