CN103186849A - Automatic work plan calendar generator - Google Patents

Automatic work plan calendar generator Download PDF

Info

Publication number
CN103186849A
CN103186849A CN2013101238506A CN201310123850A CN103186849A CN 103186849 A CN103186849 A CN 103186849A CN 2013101238506 A CN2013101238506 A CN 2013101238506A CN 201310123850 A CN201310123850 A CN 201310123850A CN 103186849 A CN103186849 A CN 103186849A
Authority
CN
China
Prior art keywords
module
calendar
solid
information acquisition
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101238506A
Other languages
Chinese (zh)
Inventor
张益�
张利民
朱毅
曾军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2013101238506A priority Critical patent/CN103186849A/en
Publication of CN103186849A publication Critical patent/CN103186849A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an automatic work plan calendar generator comprising a solid data module, an information collection module, a treatment module, a storage module and an output module, wherein the solid data module consists of a solid calendar data module and a solid work data module; the information collection module consists of an internal information collection module and an external information collection module; the solid calendar data module and the solid work data module are connected to the internal information collection module in parallel; the internal information collection module and the external information collection module are connected to the treatment module in parallel; and the treatment module, the storage module and the output module are connected in series one after another. The automatic work plan calendar generator disclosed by the invention can be used for collecting, arranging and treating calendar information and work plan information and automatically generating, storing and outputting work plan calendars meeting actual work demands, so that manual arranging time is greatly saved, the efficiency is increased, and the automation level of works is increased.

Description

A kind of work program calendar automatic generator
Technical field
The present invention relates to a kind of work program calendar automatic generator.
Background technology
Work rhythm in the present age is constantly accelerated, and the people's work plan information need be recorded on the calendar more and more.Present existing calendar mostly is in advance and blanks, and needs temporarily by manually manually adding work program information, and is very inconvenient.Along with the arrival of information age, need a kind of work program calendar automatic generator, can gather, calendar information is handled in layout and work program information and generate the work program calendar of realistic need of work automatically.
Summary of the invention
At above-mentioned prior art, the invention provides a kind of work program calendar automatic generator, it can be gathered, calendar information is handled in layout and work program information and generate automatically, store, the work program calendar of the realistic need of work of output.
The present invention is achieved by the following technical solutions:
A kind of work program calendar automatic generator, comprise solid-state data module, information acquisition module, processing module, storage module and output module, wherein, solid-state data module is made up of solid-state calendar data module and solid-state operational data module, and information acquisition module is made up of internal information acquisition module and external information acquisition module; Solid-state calendar data module, the parallel internal information acquisition module that is connected in of solid-state operational data module, internal information acquisition module, external information acquisition module walk abreast and are connected in processing module, and processing module, storage module, output module are connected in series successively.
Further, described solid-state calendar data module is storer, such as hard disk, USB flash disk.
Further, described solid-state operational data module is storer, such as hard disk, USB flash disk.
Further, described internal information acquisition module is digital information acquisition equipment, and as single-chip microcomputer, load has the software that can read numerical information from solid-state calendar data module and solid-state operational data module on the single-chip microcomputer.
Further, described external information acquisition module is selected from digital information acquisition equipment, audio-frequency information collecting device, video information collecting device, laser scanning information acquisition equipment, infrared scan sign indicating number information acquisition equipment or/and two-dimension code scanning information collecting device.
Further, described processing module is embedded microcontroller, and such as single-chip microcomputer, load has and can carry out logical operation, layout and generate the software of information such as literal, form according to data on the single-chip microcomputer.
Further, described storage module is storer, such as hard disk, USB flash disk.
Further, described output module is output port.
Further, described solid-state data module, information acquisition module, processing module, storage module and output module are integrated in the same hardware.
The effect of described solid-state calendar data module is: storage calendar date static information.
Described calendar date refer on the calendar with the sky be the date of unit or with week, month be the set on the date of unit.
The effect of described solid-state operational data module is: storage work static information, and as the constant information such as standardization flow process, step, every step duration scope and working node of a certain work.
The effect of described internal information acquisition module is: gather the calendar static information in the solid-state calendar data module, and the work static information in the solid-state operational data module, and send the information that collects to processing module.
The effect of described external information acquisition module is: the multidate information of gathering (by the mode of typing or scanning) concrete work program, as variable informations such as work title, work program start time, work program concluding times, send the full detail of gathering to processing module then.
The effect of described processing module is: according to the information (static information and multidate information) of internal information acquisition module, the transmission of external information acquisition module, carrying out layout with certain logical relation handles, generate the work program calendar of realistic need of work, and be stored in storage module with the form of electronic edition.
The effect of described storage module is: the information (work program calendar electronic edition) that processing module generates is preserved.
The effect of described output module is: with display device or/and after printer is connected, the information in the storage module is outputed to display device or/and in the printer.
During work, at first utilize the internal information acquisition module to gather calendar static information, the work static information in the solid-state operational data module (as constant information such as woprk standardization flow process, step, every step duration scope and working nodes) in the solid-state calendar data module respectively, utilize the multidate information (as variable informations such as work title, work program start time, work program concluding times) of the concrete work program of external information acquisition module collection, the above-mentioned full detail that will gather then sends processing module to.Processing module adopts embedded OS, in the relevant application program of this system's exploitation, the information that front end is sent carries out handling according to the layout of certain logical relation, generates the work program calendar of realistic need of work and is stored in storage module with the form of electronic edition.The work program calendar electronic edition that is stored in the storage module can output to display device and printer by output module, shows or/and print job plan calendar.
Work program calendar by work program calendar automatic generator generation of the present invention, the plan information that can comprise work in multinomial minute, also can split into the plan information that respectively comprises a branch job, be convenient to instruct respectively relatively independent each minute work to implement according to plan.Work in described minute refers to the every relatively independent forked working that a job comprises, a job can comprise work in a plurality of minutes, the two is subordinate relation, the two work period is identical, each minute work can be carried out in the same work period simultaneously, and the set of the job step of each minute work is exactly all job steps of this work.
Work program calendar automatic generator of the present invention, can gather, calendar information is handled in layout and work program information and generate automatically, store, the work program calendar of the realistic need of work of output, have following beneficial effect:
1, can realize generating automatically the work program calendar, save the artificial time of working out greatly, raise the efficiency, promote the working automation level.
2, can woprk standardization, the level of IT application have been promoted with having the working stamndard information databaseization of work period.
3, the work program calendar of Sheng Chenging guarantees that each job step in the work period all can list calendar date in according to schedule, the omission of working node and step can not occur, has promoted work lean level.
4, the work program calendar of Sheng Chenging can intuitively be grasped all working plan node and the step on a certain date, is convenient to the enforcement that overall arrangement should the date work program.
5, the work program calendar cycle of Sheng Chenging corresponding one by one with the work program cycle, got rid of the date of work program outside the cycle, the effect that the guiding work of this calendar is implemented according to plan of having given prominence to the key points.
Description of drawings
Fig. 1 is the structural representation of work program calendar automatic generator of the present invention.
Wherein, 101, solid-state calendar data module; 102, solid-state operational data module; 201, internal information acquisition module; 202, external information acquisition module; 3, processing module; 4, storage module; 5, output module.
Embodiment
The present invention is further illustrated below in conjunction with accompanying drawing.
A kind of work program calendar automatic generator, comprise solid-state data module, information acquisition module, processing module 3, storage module 4 and output module 5, as shown in Figure 1, wherein, solid-state data module is made up of solid-state calendar data module 101 and solid-state operational data module 102, and information acquisition module is made up of internal information acquisition module 201 and external information acquisition module 202; Solid-state calendar data module 101, the solid-state operational data module 102 parallel internal information acquisition modules 201 that are connected in, internal information acquisition module 201, the external information acquisition module 202 parallel processing modules 3 that are connected in, processing module 3, storage module 4, output module 5 are connected in series successively.
Described solid-state calendar data module 101 is hard disk.
Described solid-state operational data module 102 is hard disk.
Described internal information acquisition module 201 is single-chip microcomputer, and load has the software that can read numerical information from solid-state calendar data module and solid-state operational data module on the single-chip microcomputer.
Described external information acquisition module 202 is digital information acquisition equipment, as keyboard.
Described processing module 3 is single-chip microcomputer, and load has and can carry out logical operation, layout and generate the software of information such as literal, form according to data on the single-chip microcomputer.
Described storage module 4 is hard disk.
Described output module 5 is output port.
Described solid-state data module, information acquisition module, processing module 3, storage module 4 and output module 5 are integrated in the same hardware.
The effect of described solid-state calendar data module 101 is: storage calendar date static information.
Described calendar date refer on the calendar with the sky be the date of unit or with week, month be the set on the date of unit.
The effect of described solid-state operational data module 102 is: storage work static information, and as the constant information such as standardization flow process, step, every step duration scope and working node of a certain work.
The effect of described internal information acquisition module 201 is: gather the calendar static information in the solid-state calendar data module 101, and the work static information in the solid-state operational data module 102, and send the information that collects to processing module 3.
The effect of described external information acquisition module 202 is: the multidate information of gathering (by the mode of typing or scanning) concrete work program, as variable informations such as work title, work program start time, work program concluding times, send the full detail of gathering to processing module 3 then.
The effect of described processing module 3 is: according to the information (static information and multidate information) of internal information acquisition module 201,202 transmission of external information acquisition module, carrying out layout with certain logical relation handles, generate the work program calendar of realistic need of work, and be stored in storage module 4 with the form of electronic edition.
The effect of described storage module 4 is: the information (work program calendar electronic edition) that processing module 3 generates is preserved.
The effect of described output module 5 is: with display device or/and after printer is connected, the information in the storage module 4 is outputed to display device or/and in the printer.
During work, at first utilize internal information acquisition module 201 to gather calendar static information, the work static information in the solid-state operational data module 102 (as constant information such as woprk standardization flow process, step, every step duration scope and working nodes) in the solid-state calendar data module 101 respectively, utilize external information acquisition module 202 to gather the multidate information (as variable informations such as work title, work program start time, work program concluding times) of concrete work program, the above-mentioned full detail that will gather then sends processing module 3 to.Processing module 3 adopts embedded OS, in the relevant application program of this system's exploitation, the information that front end is sent carries out handling according to the layout of certain logical relation, generates the work program calendar of realistic need of work and is stored in storage module 4 with the form of electronic edition.The work program calendar electronic edition that is stored in the storage module 4 can output to display device and printer by output module 5, shows or/and print job plan calendar.
Work program calendar by work program calendar automatic generator generation of the present invention, the plan information that can comprise work in multinomial minute, also can split into the plan information that respectively comprises a branch job, be convenient to instruct respectively relatively independent each minute work to implement according to plan.Work in described minute refers to the every relatively independent forked working that a job comprises, a job can comprise work in a plurality of minutes, the two is subordinate relation, the two work period is identical, each minute work can be carried out in the same work period simultaneously, and the set of the job step of each minute work is exactly all job steps of this work.
Though above-mentionedly by reference to the accompanying drawings the specific embodiment of the present invention is described; but be not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various modifications that creative work can make or distortion still in protection scope of the present invention.

Claims (9)

1. work program calendar automatic generator, it is characterized in that: comprise solid-state data module, information acquisition module, processing module, storage module and output module, wherein, solid-state data module is made up of solid-state calendar data module and solid-state operational data module, and information acquisition module is made up of internal information acquisition module and external information acquisition module; Solid-state calendar data module, the parallel internal information acquisition module that is connected in of solid-state operational data module, internal information acquisition module, external information acquisition module walk abreast and are connected in processing module, and processing module, storage module, output module are connected in series successively.
2. a kind of work program calendar automatic generator according to claim 1, it is characterized in that: described solid-state calendar data module is storer.
3. a kind of work program calendar automatic generator according to claim 1, it is characterized in that: described solid-state operational data module is storer.
4. a kind of work program calendar automatic generator according to claim 1, it is characterized in that: described internal information acquisition module is digital information acquisition equipment.
5. a kind of work program calendar automatic generator according to claim 1, it is characterized in that: described external information acquisition module is selected from digital information acquisition equipment, audio-frequency information collecting device, video information collecting device, laser scanning information acquisition equipment, infrared scan sign indicating number information acquisition equipment or/and two-dimension code scanning information collecting device.
6. a kind of work program calendar automatic generator according to claim 1, it is characterized in that: described processing module is embedded microcontroller.
7. a kind of work program calendar automatic generator according to claim 1, it is characterized in that: described storage module is storer.
8. a kind of work program calendar automatic generator according to claim 1, it is characterized in that: described output module is output port.
9. utilize the method for each described a kind of work program calendar automatic generator generation work program calendar electronic edition in the claim 1~8, it is characterized in that: at first utilize the internal information acquisition module to gather the calendar static information in the solid-state calendar data module, the work static information in the solid-state operational data module respectively, utilize the multidate information of the concrete work program of external information acquisition module collection, the above-mentioned full detail that will gather then sends processing module to.Processing module is carried out layout to the information that sends and is handled, and generates the work program calendar of realistic need of work and is stored in storage module with the form of electronic edition.
CN2013101238506A 2013-04-10 2013-04-10 Automatic work plan calendar generator Pending CN103186849A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101238506A CN103186849A (en) 2013-04-10 2013-04-10 Automatic work plan calendar generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101238506A CN103186849A (en) 2013-04-10 2013-04-10 Automatic work plan calendar generator

Publications (1)

Publication Number Publication Date
CN103186849A true CN103186849A (en) 2013-07-03

Family

ID=48678008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101238506A Pending CN103186849A (en) 2013-04-10 2013-04-10 Automatic work plan calendar generator

Country Status (1)

Country Link
CN (1) CN103186849A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000222507A (en) * 1999-02-01 2000-08-11 Mitsubishi Electric Corp Radiotherapy scheduling system
CN1500239A (en) * 2001-03-26 2004-05-26 ��ʽ������Ϣ���� Multimedia calender system
CN1674025A (en) * 2004-03-25 2005-09-28 东芝解决方案株式会社 Planning operation management support system, and planning operation management support program
CN1908968A (en) * 2005-08-01 2007-02-07 吕理志 Calendar automatic production device and method
CN101228501A (en) * 2005-06-06 2008-07-23 奥姆尼图雷有限公司 User interface for Web analytics tools and methods for automatic generation of calendar notes, targets and alerts

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000222507A (en) * 1999-02-01 2000-08-11 Mitsubishi Electric Corp Radiotherapy scheduling system
CN1500239A (en) * 2001-03-26 2004-05-26 ��ʽ������Ϣ���� Multimedia calender system
CN1674025A (en) * 2004-03-25 2005-09-28 东芝解决方案株式会社 Planning operation management support system, and planning operation management support program
CN101228501A (en) * 2005-06-06 2008-07-23 奥姆尼图雷有限公司 User interface for Web analytics tools and methods for automatic generation of calendar notes, targets and alerts
CN1908968A (en) * 2005-08-01 2007-02-07 吕理志 Calendar automatic production device and method

Similar Documents

Publication Publication Date Title
CN102254024A (en) Mass data processing system and method
CN109739818A (en) A kind of portable high-throughput big data acquisition method and system
CN110781184A (en) Data table construction method, device, equipment and storage medium
CN106293541A (en) A kind of blog management method storing system and system
CN103744730A (en) Task scheduling method and device
CN116401417B (en) Hierarchical storage method based on massive agricultural product data
SE0300353D0 (en) Method and system for managing energy information
CN101645024B (en) Dispatching method of annular propulsion timer
CN109919826B (en) Graph data compression method for graph computation accelerator and graph computation accelerator
CN102478951A (en) Intelligent electric quantity management method of portable terminal
CN102937956A (en) Method and device for storing real-time messages in intelligent substation
CN102685222B (en) A kind of cloud SRM device for electric power system
CN104281932A (en) Intelligent shift acquisition device and method
CN103645983B (en) A kind of generation method and device of journal file
CN105426407A (en) Web data acquisition method based on content analysis
CN103186849A (en) Automatic work plan calendar generator
CN106599222B (en) Method and equipment for processing logs in streaming parallel
CN101894161A (en) Recurring event access method and device for real-time monitoring
CN109753314B (en) Configurable automatic flow execution method and system
CN106227857B (en) Data-pushing and loading method and device
CN205427965U (en) Attendance management system
CN102591631A (en) Method for quickly positioning free time from schedule information
CN103942125A (en) Automatic backup method and system
CN103152189B (en) A kind of collecting method based on business association and system
CN207926699U (en) A kind of face list typing cell phone apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130703