CN103177391A - Equipment monitoring system based on three-dimensional real scenes and system integration method based on three-dimensional real scenes - Google Patents

Equipment monitoring system based on three-dimensional real scenes and system integration method based on three-dimensional real scenes Download PDF

Info

Publication number
CN103177391A
CN103177391A CN201310036817XA CN201310036817A CN103177391A CN 103177391 A CN103177391 A CN 103177391A CN 201310036817X A CN201310036817X A CN 201310036817XA CN 201310036817 A CN201310036817 A CN 201310036817A CN 103177391 A CN103177391 A CN 103177391A
Authority
CN
China
Prior art keywords
module
data
dimensional
facilities
outdoor scene
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310036817XA
Other languages
Chinese (zh)
Other versions
CN103177391B (en
Inventor
李生林
张恒
魏小涪
钟蔚
罗凯文
黎星辰
邓韧
蔡晖
谢昌华
李咏治
王朝霞
龚俊
陈扶明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Logistical Engineering University of PLA
Original Assignee
李生林
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李生林 filed Critical 李生林
Priority to CN201310036817.XA priority Critical patent/CN103177391B/en
Publication of CN103177391A publication Critical patent/CN103177391A/en
Application granted granted Critical
Publication of CN103177391B publication Critical patent/CN103177391B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The invention discloses an equipment monitoring system based on three-dimensional real scenes and a system integration method based on three-dimensional real scenes. A database technology is fully utilized, and static data of a three-dimensional real scene model library is integrated and associated with dynamic data in an equipment monitoring subsystem to realize dynamism and instantaneity of three-dimensional real scene object information display; physical modeling is performed to smart equipment to form identifiable equipment three-dimensional pixel, feature information of the smart equipment is extracted to build a visual information data structure of the smart equipment; an industrial data bridge and an SOA (semiconductor optical amplifier) technology are utilized to integrate real-time date collected by the smart equipment to a three-dimensional real scene image so as to realize information display control and statistical analysis, accurate visualized dynamic information is provided for administrators in real time, and omnibearing monitoring requirements are met.

Description

A kind of facilities and equipment supervisory system and system integration method based on three-dimensional outdoor scene
Technical field
The invention belongs to field of computer technology, relate to three-dimensional real scene simulation technology, technology of Internet of things, database technology and meta-synthetic engineering field, be specifically related to a kind of facilities and equipment supervisory system and system integration method based on three-dimensional outdoor scene.
Background technology
Along with the development of three-dimensional outdoor scene technology, geography information and visualization technique, three-dimensional outdoor scene model replaces traditional two dimensional model just gradually, is widely used in the fields such as traffic system, Digital Campus, city management.Three-dimensional outdoor scene model has the characteristics such as directly perceived, true, abundant in content, can make the user visually produce sensation on the spot in person, things to real world carries out modeling and simulation, be exactly target and the emphasis according to research, the attributes such as its shape, material, illumination, color are studied the process of reproducing to reach 3D in three dimensions.Real-world object is carried out the outdoor scene three-dimensional modeling, and in conjunction with technology such as network, software, controls, model is carried out secondary development and use, realize also just development and the application in people's live and work of technology of monitoring real-world object in the three-dimensional model scene.
But, all there is following problem in the three-dimensional realistic picture of most: the one, only pay attention to making and the modeling of three-dimensional outdoor scene, make it more true to nature, lack the research three-dimensional model how with database in object properties related, make the content of model display abundanter, more closing to reality; The 2nd, only possess amplification on three-dimensional realistic picture, dwindle, move, the anglec of rotation, the function such as browse, lack integrated with other management information system, such as Generalized Database System, industrial control system etc.; The 3rd, only pay attention to topography and geomorphology, road piping, be located minute, the entity such as water system greening carries out modeling and play up, modeling and sign to special pel have been ignored, for example intellectual water meter, ammeter, valve, calorimeter, temperature-humidity monitoring instrument, the first-class facilities and equipment of monitoring camera; The 4th, only pay attention to showing static constant model information on three-dimensional realistic picture, ignored the real time data Dynamic Display on three-dimensional realistic picture how research gather intelligent facilities and equipment, allow the user can intuitively see the variation of data, make decision-making more directly perceived.
In sum, present three-dimensional outdoor scene technology mainly exists can not be with database association, integration is inadequate, real-time is poor, reaction velocity waits problem slowly, has seriously restricted three-dimensional outdoor scene technology in the development in industrial control field and management information system field.
Summary of the invention
The objective of the invention is to overcome the defective of prior art, a kind of facilities and equipment supervisory system and system integration method based on three-dimensional outdoor scene is provided.
Its technical scheme is:
A kind of facilities and equipment supervisory system based on three-dimensional outdoor scene comprises facilities and equipment Monitor And Control Subsystem, three-dimensional outdoor scene integral subsystem, three-dimensional outdoor scene model bank and integrated database management subsystem, wherein:
Described facilities and equipment Monitor And Control Subsystem is used for gathering the real-time accurate data of passing back from various intelligent facilities and equipments, and described data are used to indicate the parameters such as power consumption, water consumption, heating amount, humiture, liquid level, pressure, valve state, motor start and stop, frequency converter ruuning situation, air quality situation, neighbourhood noise, monitoring camera situation;
Described three-dimensional outdoor scene integral subsystem is for functions such as the control that realizes three-dimensional realistic picture, navigation, basic setups, and realization and integrated database management subsystem and facilities and equipment Monitor And Control Subsystem is integrated;
Described three-dimensional outdoor scene model bank is used for storing whole entity objects and the facilities and equipment pel of showing on three-dimensional realistic picture, and described entity object and facilities and equipment pel mainly comprise topography and geomorphology, road piping, be located minute, water system is afforested and all kinds of intelligent facilities and equipment sterogram meta-model;
The integrated database management subsystem is used for the real time data that storage entity object properties, facilities and equipment information and facilities and equipment gather.
Further preferred, described facilities and equipment Monitor And Control Subsystem adopts the B/S framework, with WinCC as Web server, client can be carried out remote monitoring to equipment by browser, comprise real-time data acquisition module, intelligent power supply monitoring module, intelligent water supply monitoring module, intelligent heating monitoring module, central air-conditioner monitoring module, ambient intelligence sensing module and video monitoring module, wherein:
Described real-time data acquisition module, be used for barracks area installation equipment parameters is carried out Real-time Collection, and give collating sort with the data that collect and give described intelligent power supply monitoring module, intelligent water supply monitoring module, intelligent heating monitoring module, central air-conditioner monitoring module, ambient intelligence sensing module and video monitoring module;
described intelligent power supply monitoring module mainly is comprised of change distribution monitoring station, transformer economic operation monitoring station, user power utilization amount monitoring station, and described change distribution monitoring station can be realized the real-time electric power data sampling and processing, complete parameters of electric power calculating, statistics, analyze, manage and storage, utilize the oracle database technology, realization is reliably integrated with other system, on the spot, the remote centralized anti-misoperation controls, operation, alarm procedure voice reading, need not to install any client software, realize the functions such as long-range man-machine interface display, warning are inquired about, the electric energy collection is copied, provide and become switchgear building monitoring of tools historical data curve map, various reading statistical graphs, realize electric energy historical data analysis statistics intuitively, described transformer economic operation monitoring station is applicable to the switchgear building of 2-3 platform parallel operation of transformers, the transformer economic operation monitoring station becomes the state of each switch of switchgear building by collection, the step down side three-phase voltage, current value, calculate respectively 2 transformer current, voltage effective value, active power, reactive power, applied power, power factor (PF) and transformer load coefficient, active energy, reactive energy, as 2 transformers are monitored, the master data of control and load prediction, because electric load changes constantly, and to the supervision of Transformer Operation Status, control, need to consider and the mean value in calculating a period of time.Therefore, consider and get time period T=24h and calculate a mean value, adopt by the calculated value so the processed basic data as monitoring device, with safety, effectively realize the monitoring and controlling of distribution substation transformer economic operation.Described user power utilization amount monitoring station can realize that each carries out Real-Time Monitoring with the electricity consumption data of electric unit to the post, and whole system has that real-time is good, the reliability high;
Described intelligent water supply monitoring module, be used for automatic gauge and supervision to pump house discharge pressure, water supply network pressure, post total water amount, each minute family water consumption, landscaping of barracks area spray, bathroom, and give the Decision Control workstation with reduced data, thereby realize the control of pump house water outlet constant voltage, automatically regulate the user side taps for the Decision Control workstation according to user's water quota, water consumption, the situation of paying the fees, realize that the automatic management of post water supply and the expense of the taking over management of water expense provide reference;
described intelligent heating monitoring module, the important service data that is used for the heating subsystem is stored, analyze, can complete simultaneously the data acquisition process work to the terminal temperature difference calorimeter, described heating subsystem monitoring station adopts the WinCC configuration software, basic load to each heat supply center, historical energy consumption record, the data such as weather conditions are carried out real time monitoring, by data transfer layer, data are passed to the Decision Control workstation simultaneously, can the reasonable power consumption values of automatic analysis, and contrast with actual operating data, finally for providing the energy-saving effect assessment, managerial personnel provide foundation, if energy consumption extremely provide warning message, meanwhile, the user can formulate corresponding form and trend record curve according to management process, the management documents such as histogram,
Described central air-conditioner monitoring module, can be to being arranged on the air-conditioning temperature controller in management and control building, frequency-variable controller, climate compensator, pipe temperature sensor, pipe pressure sensor and the electric control valve that is arranged on the air-conditioner host group carries out in real time, remote visualization monitors, by data transfer layer, data are passed to the Decision Control workstation simultaneously, can carry out Decision Control according to central air conditioner subsystem terminal ruuning situation in real time, automatically regulate the main frame running according to refrigeration or heating demand and working environment, energy-saving and cost-reducing;
Described ambient intelligence sensing module, formed by water quality in-service monitoring, air quality supervision, detection supervision, elevator operation monitoring and humiture supervision, neighbourhood noise supervision, illuminance supervision etc., the real-time perception that is used for barracks environment, data filing and on-line analysis, described water quality in-service monitoring is by carrying out data acquisition to sampling of water quality unit, analytical test element (detecting instrument), can carry out the water quality condition of post in real time, telemonitoring, for the post provides reference with quality; Described air quality monitors and refers to gather and be uploaded to data server by data transfer layer by the parameters of observing and controlling extension set to the air quality instrument at scene, post, data server is passed to environmental monitoring subsystem monitoring station through after taxonomic revision, thereby realizes the telemonitoring to the post air quality; Described fire alarm monitors the parameters that refers to by the real time monitoring fire detection unit, realize the remote monitoring of fire alarm, and data and Decision Control workstation are carried out real-time, interactive, for parameter reaches alarm threshold value, provide visual warning message reference is provided; Described neighbourhood noise monitors the noise monitoring terminal that refers to by gathering and uploading, the noise data that comprises front-end noise sampling unit and data processing unit, realize long-range, Real-Time Monitoring and the warning of barracks environment noise, described elevator operation monitoring is used for the elevator service data that gathers is carried out telemonitoring, simultaneously data are passed to the Decision Control workstation, monitoring with, new lift-mounting operation for the Based Intelligent Control of elevator, post, described video monitoring is the real-time exhibition for video image.
Further preferred, described three-dimensional outdoor scene integral subsystem comprises that entity object relating module, real-time data integration module, pel labeling module, figure layer control module, scene navigation module and three-dimensional arrange module, wherein:
The entity object relating module is the mode of calling by Web service, realizes that the object in the object properties storehouse in three-dimensional outdoor scene object and integrated database management subsystem is related one by one;
The real-time data integration module is used for the real time data of integrated database management subsystem is corresponding with the real-time device pel on three-dimensional realistic picture, the situation of change of dynamically accurate display data;
The pel labeling module is used for the characteristic type according to facilities and equipment, and the actual installation position marks facilities and equipment on three-dimensional realistic picture;
Figure layer control module is used for the entity object on three-dimensional realistic picture is classified by the figure layer, controls its lamination order and display effect;
The scene navigation module be used for to realize carrying out the location, key area on three-dimensional realistic picture, simulate according to the route of user annotation and cruise, the function such as search for according to keyword;
Three-dimensional arranges module and is used for three-dimensional realistic picture is safeguarded, the loading of the importing of entity attribute, the control of figure layer and facilities and equipment, pipeline control, three-dimensional outdoor scene etc.
Further preferred, described three-dimensional outdoor scene model bank comprises live-action image acquisition module, data preprocessing module, scene modeling module, baked mapping module, outdoor scene rendering module, outdoor scene object memory module, wherein:
The live-action image acquisition module is used for gathering the pictorial information of digital elevation model (DEM), digital orthoimage (DOM) and actual scene, and is stored as the file layout that corresponding computing machine can be identified;
Data preprocessing module is for processing that three-dimensional outdoor scene material is classified, the one, select the topomap of proper ratio chi as the map basis, and import in d-making software, the information such as point, line, mark and filling pattern of dislocation, deviation or non-key key element are deleted and simplified; The 2nd, the local feature information with presentation of the photo of extraction shoot on location forms fixing material and stores;
The scene modeling module is used for scene substance feature information pretreated according to data, and the mode that adopts polygon modeling, dough sheet modeling and NURBS modeling to combine is carried out modeling to various outdoor scene objects, makes it possess actual scene object essential characteristic;
It is synthetic with the formed object model of scene modeling module that the baked mapping module is used for material that the data pre-service is formed, creates the multi-effects such as reflection, refraction, concavo-convex and hollow out, and the texture of increase model makes the three-dimensional scenic of establishment more close to reality;
The outdoor scene rendering module is used for increasing bitmap texture, procedural texture, illumination or Z-Correct bump mapping Z-correct mapping texts on three-dimensional outdoor scene model, finally form scene effect true, true to nature;
The three-dimensional outdoor scene category of model that outdoor scene object memory module is used for finally generating arrives three-dimensional outdoor scene model bank with stored in file format, and is published on server shared.
Further preferred, described three-dimensional outdoor scene model bank comprises that also primitive features abstraction module and graphical element model set up module, wherein:
The primitive features abstraction module is used for extracting the common feature of all kinds of facilities and equipments, forms the unified pel with words identification, symbol logo and three-dimensional picture sign;
Graphical element model is set up module for the classification according to pel, sets up corresponding facilities and equipment graphical element model.
Further preferred, described integrated database management subsystem comprises entity object attribute library, facilities and equipment information bank and real-time data base, wherein:
Described entity object attribute is used to indicate title, purposes, building structure, quality, address, classification, personnel, land property right, land deeds, time, length, area, capacity, lives the information such as use, lease;
Described facilities and equipment information is used to indicate title, specifications and models, technical indicator, classification, quantity, price, production firm, purchases the information such as information, supply of material information, repair message, purposes, state, installation site;
Described real time data is used to indicate the parameters such as power consumption, water consumption, heating amount, humiture, liquid level, pressure, valve state, motor start and stop, frequency converter ruuning situation, air quality situation, neighbourhood noise, monitoring camera situation.
A kind of facilities and equipment supervisory system integrated approach based on three-dimensional outdoor scene is completed according to the facilities and equipment supervisory system based on three-dimensional outdoor scene of the present invention, specifically comprises the following steps:
1) use three-dimensional outdoor scene modeling technique, pictorial information with the digital elevation model (DEM), digital orthoimage (DOM) and the actual scene that gather, use the d-making software of specialty to carry out pre-service, modeling, baked mapping, play up, final formation scene effect true, true to nature, and store three-dimensional outdoor scene model bank into, call for three-dimensional outdoor scene integral subsystem;
2) extract the common feature of all kinds of facilities and equipments, form the unified pel with words identification, symbol logo and three-dimensional picture sign;
3) according to the classification of pel, set up corresponding facilities and equipment graphical element model, and the facilities and equipment pel that uses the pel labeling module to have set up marks on three-dimensional realistic picture;
4) will support parameters data (such as power consumption, water consumption, gas consumption, pressure, flow velocity, liquid level, temperature, the humidity etc.) collection of the field apparatus of different communication protocol and standard analog signal output to come up by described real-time data acquisition module; Utilize the object that is used for process control to connect and embed OPC (Object Linking and Embedding for ProcessControl,) the real-time data communication technology, set up opc server, give opc server with gathering the data of coming up through after collating sort; The WinCC server obtains the real time data of opc server end as the OPC client, and shows intuitively and store in visual man-machine interface;
5) by the industrial data bridge, set up opc server to the connection of described integrated database management subsystem, and the real time data that opc server is obtained with relational storage one to one in the described real-time data base of being set up;
6) realize the comprehensive integration of facilities and equipment Monitor And Control Subsystem and three-dimensional outdoor scene integral subsystem: at code layer, use a large amount of the sharing that the JavaEE platform provides to share control, realize that the assembling of three-dimensional outdoor scene integral subsystem and facilities and equipment Monitor And Control Subsystem basic function is merged;
7) in service layer, by the SOA technology, realize from the data source header to the database, then merge to the full-range service of three-dimensional outdoor scene integral subsystem.At first, by described entity object relating module, in the mode that Web service is called, realize that the object in the object properties storehouse in three-dimensional outdoor scene object and integrated database management subsystem is related one by one; Secondly, by described real-time data integration module, set up the corresponding relation of facilities and equipment pel and true facilities and equipment object in the integrated database management subsystem, described corresponding relation comprises the content of two aspects: the one, realize the corresponding relation of the static data in three-dimensional outdoor scene pel and object properties storehouses; The 2nd, realize the corresponding relation of the dynamic data in three-dimensional outdoor scene pel and real-time data base;
8) in system layer, by message passing mechanism, realize synchronizeing of real time data and three-dimensional outdoor scene integral subsystem, realize the comprehensive integration of facilities and equipment Monitor And Control Subsystem and three-dimensional outdoor scene integral subsystem, form the facilities and equipment supervisory system based on three-dimensional outdoor scene.
Beneficial effect of the present invention: in terms of existing technologies, in the three-dimensional outdoor scene object that the present invention sets up and database, object properties are related one by one, not only comprise static data, but also comprise the data of dynamic change, make the content of model display abundanter, closing to reality more, and really realized and the industrial facility equipment control system integration, real time data Dynamic Display on three-dimensional realistic picture that intelligent facilities and equipment is gathered, allow the user can intuitively see the variation of data, make decision-making more quick directly perceived.
Description of drawings
Fig. 1 is the structural representation that the present invention is based on the facilities and equipment supervisory system of three-dimensional outdoor scene.
Embodiment
Describe technical scheme of the present invention in detail below in conjunction with the accompanying drawing specific embodiment.
Embodiment:
1) gather the digital elevation model (DEM) of certain location, warehouse, the pictorial information of digital orthoimage (DOM) and actual scene, use again the d-making software (3DMarks of specialty, OpenGL etc.) material that gathers is carried out pre-service, modeling, baked mapping, play up, final formation truly, certain warehouse scene effect true to nature, and with the outdoor scene photo in the warehouse made, picture, or the image material such as video interception, the digital elevation model of warehouse periphery, digital orthoimage, the topography and landform character model, and buildings, the water system greening, the matter emulation models such as road piping store three-dimensional outdoor scene model bank into, call for three-dimensional outdoor scene integral subsystem,
2) utilize described primitive features abstraction module, for facilities and equipments such as the water supply of installing in certain warehouse, power supply, heating, central air conditioner, environmental monitoring, video monitorings, analyze the feature of all kinds of facilities and equipments, and extract general character and the exclusive feature of all kinds of facilities and equipments, according to feature, facilities and equipment is classified, utilize described graphical element model to set up module, set up the unified graphical element model with words identification, symbol logo and three-dimensional picture sign;
3) according to the installation site of the graphical element model that forms in step 2 and facilities and equipment reality, the facilities and equipment graphical element model that uses described pel labeling module to have set up marks on three-dimensional realistic picture;
4) will be arranged in the parameters data acquisition of field apparatus of certain warehouse internal support different communication protocol and standard analog signal output by described real-time data acquisition module; Utilize the object that is used for process control to connect and embed OPC (ObjectLinking and Embedding for Process Control,) the real-time data communication technology, set up opc server, give opc server with gathering the data of coming up through after collating sort; The WinCC server obtains the real time data of opc server end as the OPC client, and shows intuitively and store in visual man-machine interface;
5) by the industrial data bridge, set up opc server to the connection of described integrated database management subsystem, and the real time data that opc server is obtained is with in relational storage one to one and the described real-time data base of being set up;
6) realize the comprehensive integration of certain warehouse facility monitoring of tools subsystem and three-dimensional outdoor scene integral subsystem:
A) at code layer, use a large amount of the sharing that Java EE platform provides to share control, realize that the assembling of three-dimensional outdoor scene integral subsystem and facilities and equipment Monitor And Control Subsystem basic function is merged;
B) in service layer, by the SOA technology, realize from the data source header to the database, then merge to the full-range service of three-dimensional outdoor scene integral subsystem.At first, by described entity object relating module, the mode of calling with Web service, realize that the object in the object properties storehouse in three-dimensional outdoor scene object and integrated database management subsystem is related one by one, make the matter emulation models such as buildings, water system greening, road piping in warehouse have more abundant attribute data, reflect more truly the objective world; Secondly, by described real-time data integration module, set up the corresponding relation of facilities and equipment pel and true facilities and equipment object in the integrated database management subsystem, described corresponding relation comprises the content of two aspects: the one, realize the corresponding relation of the static data in three-dimensional outdoor scene pel and object properties storehouses; The 2nd, realize the corresponding relation of the dynamic data in three-dimensional outdoor scene pel and real-time data base;
C) in system layer, pass through message passing mechanism, realize synchronizeing of real time data and three-dimensional outdoor scene integral subsystem, the comprehensive integration of Implementation repository facilities and equipment Monitor And Control Subsystem and three-dimensional outdoor scene integral subsystem, the final facilities and equipment supervisory system that forms based on three-dimensional outdoor scene.
7) utilize described figure layer control module that the entity object on the three-dimensional realistic picture in warehouse is classified by the figure layer, control its lamination order and display effect;
8) utilize described scene navigation module to realize carrying out the location, key area on the three-dimensional realistic picture in warehouse, simulate according to the route of user annotation and cruise, the display function such as search for according to keyword.
The above; only be the better embodiment of the present invention; protection scope of the present invention is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses, the simple change of the technical scheme that can obtain apparently or equivalence are replaced and are all fallen within the scope of protection of the present invention.

Claims (7)

1. the facilities and equipment supervisory system based on three-dimensional outdoor scene, is characterized in that, comprises facilities and equipment Monitor And Control Subsystem, three-dimensional outdoor scene integral subsystem, three-dimensional outdoor scene model bank and integrated database management subsystem, wherein:
Described facilities and equipment Monitor And Control Subsystem is used for gathering the real-time accurate data of passing back from various intelligent facilities and equipments, and described data are used to indicate power consumption, water consumption, heating amount, humiture, liquid level, pressure, valve state, motor start and stop, frequency converter ruuning situation, air quality situation, neighbourhood noise, monitoring camera situation;
Described three-dimensional outdoor scene integral subsystem is used for realizing control, navigation, the basic setup function of three-dimensional realistic picture, and realization and integrated database management subsystem and facilities and equipment Monitor And Control Subsystem is integrated;
Described three-dimensional outdoor scene model bank is used for storing whole entity objects and the facilities and equipment pel of showing on three-dimensional realistic picture, and described entity object and facilities and equipment pel mainly comprise topography and geomorphology, road piping, be located minute, water system is afforested and all kinds of intelligent facilities and equipment sterogram meta-model;
The integrated database management subsystem is used for the real time data that storage entity object properties, facilities and equipment information and facilities and equipment gather.
2. the facilities and equipment supervisory system based on three-dimensional outdoor scene according to claim 1, it is characterized in that, described facilities and equipment Monitor And Control Subsystem adopts the B/S framework, with WinCC as Web server, client can be carried out remote monitoring to equipment by browser, comprise real-time data acquisition module, intelligent power supply monitoring module, intelligent water supply monitoring module, intelligent heating monitoring module, central air-conditioner monitoring module, ambient intelligence sensing module and video monitoring module, wherein:
Described real-time data acquisition module, be used for barracks area installation equipment parameters is carried out Real-time Collection, and give collating sort with the data that collect and give described intelligent power supply monitoring module, intelligent water supply monitoring module, intelligent heating monitoring module, central air-conditioner monitoring module, ambient intelligence sensing module and video monitoring module;
described intelligent power supply monitoring module mainly is comprised of change distribution monitoring station, transformer economic operation monitoring station, user power utilization amount monitoring station, and described change distribution monitoring station can be realized the real-time electric power data sampling and processing, complete parameters of electric power calculating, statistics, analyze, manage and storage, utilize the oracle database technology, realization is reliably integrated with other system, on the spot, the remote centralized anti-misoperation controls, operation, alarm procedure voice reading, realize that long-range man-machine interface display, warning are inquired about, the electric energy collection is copied function, provide and become switchgear building monitoring of tools historical data curve map, various reading statistical graphs, realize electric energy historical data analysis statistics intuitively, described transformer economic operation monitoring station is applicable to the switchgear building of 2-3 platform parallel operation of transformers, the transformer economic operation monitoring station becomes the state of each switch of switchgear building by collection, the step down side three-phase voltage, current value, calculate respectively 2 transformer current, voltage effective value, active power, reactive power, applied power, power factor (PF) and transformer load coefficient, active energy, reactive energy, as 2 transformers are monitored, the master data of control and load prediction, described user power utilization amount monitoring station can realize that each carries out Real-Time Monitoring with the electricity consumption data of electric unit to the post,
Described intelligent water supply monitoring module, be used for automatic gauge and supervision to pump house discharge pressure, water supply network pressure, post total water amount, each minute family water consumption, landscaping of barracks area spray, bathroom, and give the Decision Control workstation with reduced data, thereby realize the control of pump house water outlet constant voltage, automatically regulate the user side taps for the Decision Control workstation according to user's water quota, water consumption, the situation of paying the fees, realize that the automatic management of post water supply and the expense of the taking over management of water expense provide reference;
described intelligent heating monitoring module, the important service data that is used for the heating subsystem is stored, analyze, can complete simultaneously the data acquisition process work to the terminal temperature difference calorimeter, described heating subsystem monitoring station adopts the WinCC configuration software, basic load to each heat supply center, historical energy consumption record, weather conditions are carried out real time monitoring, by data transfer layer, data are passed to the Decision Control workstation simultaneously, can the reasonable power consumption values of automatic analysis, and contrast with actual operating data, finally for providing the energy-saving effect assessment, managerial personnel provide foundation, if energy consumption extremely provide warning message, meanwhile, the user can formulate corresponding form and trend record curve according to management process, histogram,
Described central air-conditioner monitoring module, can be to being arranged on the air-conditioning temperature controller in management and control building, frequency-variable controller, climate compensator, pipe temperature sensor, pipe pressure sensor and the electric control valve that is arranged on the air-conditioner host group carries out in real time, remote visualization monitors, by data transfer layer, data are passed to the Decision Control workstation simultaneously, can carry out Decision Control according to central air conditioner subsystem terminal ruuning situation in real time, automatically regulate the main frame running according to refrigeration or heating demand and working environment, energy-saving and cost-reducing;
Described ambient intelligence sensing module, formed by water quality in-service monitoring, air quality supervision, detection supervision, elevator operation monitoring and humiture supervision, neighbourhood noise supervision, illuminance supervision etc., the real-time perception that is used for barracks environment, data filing and on-line analysis, described water quality in-service monitoring is by carrying out data acquisition to sampling of water quality unit, analytical test element, can carry out the water quality condition of post in real time, telemonitoring, for the post provides reference with quality; Described air quality monitors and refers to gather and be uploaded to data server by data transfer layer by the parameters of observing and controlling extension set to the air quality instrument at scene, post, data server is passed to environmental monitoring subsystem monitoring station through after taxonomic revision, thereby realizes the telemonitoring to the post air quality; Described fire alarm monitors the parameters that refers to by the real time monitoring fire detection unit, realize the remote monitoring of fire alarm, and data and Decision Control workstation are carried out real-time, interactive, for parameter reaches alarm threshold value, provide visual warning message reference is provided; Described neighbourhood noise monitors the noise monitoring terminal that refers to by gathering and uploading, the noise data that comprises front-end noise sampling unit and data processing unit, realize long-range, Real-Time Monitoring and the warning of barracks environment noise, described elevator operation monitoring is used for the elevator service data that gathers is carried out telemonitoring, simultaneously data are passed to the Decision Control workstation, monitoring with, new lift-mounting operation for the Based Intelligent Control of elevator, post, described video monitoring is the real-time exhibition for video image.
3. the facilities and equipment supervisory system based on three-dimensional outdoor scene according to claim 1, it is characterized in that, described three-dimensional outdoor scene integral subsystem comprises that entity object relating module, real-time data integration module, pel labeling module, figure layer control module, scene navigation module and three-dimensional arrange module, wherein:
The entity object relating module is the mode of calling by Web service, realizes that the object in the object properties storehouse in three-dimensional outdoor scene object and integrated database management subsystem is related one by one;
The real-time data integration module is used for the real time data of integrated database management subsystem is corresponding with the real-time device pel on three-dimensional realistic picture, the situation of change of dynamically accurate display data;
The pel labeling module is used for the characteristic type according to facilities and equipment, and the actual installation position marks facilities and equipment on three-dimensional realistic picture;
Figure layer control module is used for the entity object on three-dimensional realistic picture is classified by the figure layer, controls its lamination order and display effect;
The scene navigation module be used for to realize carrying out the location, key area on three-dimensional realistic picture, simulate according to the route of user annotation and cruise, carry out function of search according to keyword;
Three-dimensional arranges module and is used for three-dimensional realistic picture is safeguarded, entity attribute, figure layer are controlled and importing, the pipeline of facilities and equipment are controlled, the loading of three-dimensional outdoor scene.
4. the facilities and equipment supervisory system based on three-dimensional outdoor scene according to claim 1, it is characterized in that, described three-dimensional outdoor scene model bank comprises live-action image acquisition module, data preprocessing module, scene modeling module, baked mapping module, outdoor scene rendering module, outdoor scene object memory module, wherein:
The live-action image acquisition module is used for gathering the pictorial information of digital elevation model (DEM), digital orthoimage (DOM) and actual scene, and is stored as the file layout that corresponding computing machine can be identified;
Data preprocessing module is for processing that three-dimensional outdoor scene material is classified, the one, select the topomap of proper ratio chi as the map basis, and import in d-making software, the information such as point, line, mark and filling pattern of dislocation, deviation or non-key key element are deleted and simplified; The 2nd, the local feature information with presentation of the photo of extraction shoot on location forms fixing material and stores;
The scene modeling module is used for scene substance feature information pretreated according to data, and the mode that adopts polygon modeling, dough sheet modeling and NURBS modeling to combine is carried out modeling to various outdoor scene objects, makes it possess actual scene object essential characteristic;
It is synthetic with the formed object model of scene modeling module that the baked mapping module is used for material that the data pre-service is formed, creates the multi-effects such as reflection, refraction, concavo-convex and hollow out, and the texture of increase model makes the three-dimensional scenic of establishment more close to reality;
The outdoor scene rendering module is used for increasing bitmap texture, procedural texture, illumination or Z-Correct bump mapping Z-correct mapping texts on three-dimensional outdoor scene model, finally form scene effect true, true to nature;
The three-dimensional outdoor scene category of model that outdoor scene object memory module is used for finally generating arrives three-dimensional outdoor scene model bank with stored in file format, and is published on server shared.
5. the facilities and equipment supervisory system based on three-dimensional outdoor scene according to claim 4, is characterized in that, described three-dimensional outdoor scene model bank comprises that also primitive features abstraction module and graphical element model set up module, wherein:
The primitive features abstraction module is used for extracting the common feature of all kinds of facilities and equipments, forms the unified pel with words identification, symbol logo and three-dimensional picture sign;
Graphical element model is set up module for the classification according to pel, sets up corresponding facilities and equipment graphical element model.
6. the facilities and equipment supervisory system based on three-dimensional outdoor scene according to claim 1, is characterized in that, described integrated database management subsystem comprises entity object attribute library, facilities and equipment information bank and real-time data base, wherein:
Described entity object attribute is used to indicate title, purposes, building structure, quality, address, classification, personnel, land property right, land deeds, time, length, area, capacity, lives use, information of lease;
Described facilities and equipment information is used to indicate title, specifications and models, technical indicator, classification, quantity, price, production firm, purchases information, supply of material information, repair message, purposes, state, installation site information;
Described real time data is used to indicate power consumption, water consumption, heating amount, humiture, liquid level, pressure, valve state, motor start and stop, frequency converter ruuning situation, air quality situation, neighbourhood noise, monitoring camera situation parameter.
7. the facilities and equipment supervisory system integrated approach based on three-dimensional outdoor scene, is characterized in that, the facilities and equipment supervisory system based on three-dimensional outdoor scene according to claim 1 is completed, and specifically comprises the following steps:
1) use three-dimensional outdoor scene modeling technique, pictorial information with the digital elevation model (DEM), digital orthoimage (DOM) and the actual scene that gather, use the d-making software of specialty to carry out pre-service, modeling, baked mapping, play up, final formation scene effect true, true to nature, and store three-dimensional outdoor scene model bank into, call for three-dimensional outdoor scene integral subsystem;
2) extract the common feature of all kinds of facilities and equipments, form the unified pel with words identification, symbol logo and three-dimensional picture sign;
3) according to the classification of pel, set up corresponding facilities and equipment graphical element model, and the facilities and equipment pel that uses the pel labeling module to have set up marks on three-dimensional realistic picture;
4) will support in the parameters data acquisition of the field apparatus that different communication protocol and standard analog signal are exported by described real-time data acquisition module; Utilize the object that is used for process control to connect and embed OPC (Object Linking andEmbedding for Process Control,) the real-time data communication technology, set up opc server, give opc server with gathering the data of coming up through after collating sort; The WinCC server obtains the real time data of opc server end as the OPC client, and shows intuitively and store in visual man-machine interface;
5) by the industrial data bridge, set up opc server to the connection of described integrated database management subsystem, and the real time data that opc server is obtained with relational storage one to one in the described real-time data base of being set up;
6) realize the comprehensive integration of facilities and equipment Monitor And Control Subsystem and three-dimensional outdoor scene integral subsystem: at code layer, use a large amount of the sharing that the JavaEE platform provides to share control, realize that the assembling of three-dimensional outdoor scene integral subsystem and facilities and equipment Monitor And Control Subsystem basic function is merged;
7) in service layer, by the SOA technology, realization is from the data source header to the database, the full-range service that arrives again three-dimensional outdoor scene integral subsystem merges, at first, by described entity object relating module, in the mode that Web service is called, realize that the object in the object properties storehouse in three-dimensional outdoor scene object and integrated database management subsystem is related one by one; Secondly, by described real-time data integration module, set up the corresponding relation of facilities and equipment pel and true facilities and equipment object in the integrated database management subsystem, described corresponding relation comprises the content of two aspects: the one, realize the corresponding relation of the static data in three-dimensional outdoor scene pel and object properties storehouses; The 2nd, realize the corresponding relation of the dynamic data in three-dimensional outdoor scene pel and real-time data base;
8) in system layer, by message passing mechanism, realize synchronizeing of real time data and three-dimensional outdoor scene integral subsystem, realize the comprehensive integration of facilities and equipment Monitor And Control Subsystem and three-dimensional outdoor scene integral subsystem, form the facilities and equipment supervisory system based on three-dimensional outdoor scene.
CN201310036817.XA 2013-01-31 2013-01-31 A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method Expired - Fee Related CN103177391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310036817.XA CN103177391B (en) 2013-01-31 2013-01-31 A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310036817.XA CN103177391B (en) 2013-01-31 2013-01-31 A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method

Publications (2)

Publication Number Publication Date
CN103177391A true CN103177391A (en) 2013-06-26
CN103177391B CN103177391B (en) 2016-01-27

Family

ID=48637224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310036817.XA Expired - Fee Related CN103177391B (en) 2013-01-31 2013-01-31 A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method

Country Status (1)

Country Link
CN (1) CN103177391B (en)

Cited By (69)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761683A (en) * 2014-01-17 2014-04-30 广东电网公司电力科学研究院 Three-dimensional virtual visualization display method of thermal power plant
CN104135387A (en) * 2014-08-12 2014-11-05 浪潮通信信息系统有限公司 Visual monitoring method of network management data processing based on meta model topology
CN104166697A (en) * 2014-08-04 2014-11-26 上海国际航运服务中心开发有限公司 Three-dimensional interactive navigation lock monitoring system
CN104616343A (en) * 2015-01-20 2015-05-13 武汉大势智慧科技有限公司 Real-time acquiring and online mapping method and system for texture
CN104609134A (en) * 2015-02-04 2015-05-13 中交一航局安装工程有限公司 Intelligent temperature measuring monitoring system for belt conveyor rollers
CN104680337A (en) * 2015-03-25 2015-06-03 上海化学工业区公共管廊有限公司 Common pipe rack comprehensive information operation system based on geographic information system
CN104680252A (en) * 2015-02-13 2015-06-03 北京清控人居环境研究院有限公司 Online architecture system and online architecture system-based real-time water supply scheduling method
CN104760853A (en) * 2014-03-11 2015-07-08 北京博锐尚格节能技术股份有限公司 Monitoring and controlling method, device and system for elevator running
CN104768276A (en) * 2014-03-11 2015-07-08 北京博锐尚格节能技术股份有限公司 3D lighting monitoring method, 3D lighting monitoring device and 3D lighting monitoring system
CN104766173A (en) * 2015-04-16 2015-07-08 淄博市淄川区自来水公司 Digital water supply management system and method
CN105318196A (en) * 2014-07-21 2016-02-10 上海弘特自动化电气仪表有限公司 Simulation monitoring method and system for oil transportation pipelines
CN105824281A (en) * 2016-05-04 2016-08-03 周德恩 Fire-fighting real-time monitoring system
CN105868211A (en) * 2015-01-22 2016-08-17 北京华烽泰特科技有限公司 Factory displaying method
CN105893588A (en) * 2016-04-05 2016-08-24 东南大学 Method for manufacturing and displaying large-scale urban space energy consumption digital map
CN105975591A (en) * 2016-05-09 2016-09-28 东南大学 Urban global energy consumption digital map making and displaying method and system
CN106096121A (en) * 2016-06-07 2016-11-09 武汉虹信技术服务有限责任公司 Intelligent building project method for drawing map based on universal map control
CN106384194A (en) * 2016-09-09 2017-02-08 国家电网公司 Electric power regulation and control method
CN106412526A (en) * 2016-11-15 2017-02-15 武汉市公安局公共交通分局 Police oblique-photography real 3D platform system and interface system thereof
CN106444593A (en) * 2016-12-12 2017-02-22 合肥华耀广告传媒有限公司 Building energy consumption monitor system based on 3D technology
CN106597860A (en) * 2015-10-19 2017-04-26 上海澜腾智能科技有限公司 Household electrical appliance control system, and control device, construction method and control method thereof
CN106911682A (en) * 2017-02-17 2017-06-30 深圳市嘉力达节能科技股份有限公司 Building convergence method and device
CN107038754A (en) * 2017-03-15 2017-08-11 武汉华安科技股份有限公司 A kind of wisdom garden management system and method based on three-dimensional live
CN107146168A (en) * 2017-07-11 2017-09-08 大连锐勃电子科技有限公司 Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology
CN107291766A (en) * 2016-04-10 2017-10-24 国网山东省电力公司经济技术研究院 Laterally specialty fusion, longitudinal province ground power network panoramic information display systems for running through of county
CN107544383A (en) * 2017-09-08 2018-01-05 北京时代凌宇科技股份有限公司 A kind of residential property apparatus monitoring method and system
CN107633423A (en) * 2017-08-31 2018-01-26 珠海格力电器股份有限公司 Method for processing resource and device
CN107729065A (en) * 2017-11-02 2018-02-23 港珠澳大桥管理局 The method and system of a kind of 3 D monitoring
CN107842908A (en) * 2017-09-26 2018-03-27 国网浙江省电力公司杭州供电公司 A kind of real-time heating demand control method based on ambient parameter compensation
CN108205265A (en) * 2018-01-05 2018-06-26 日立楼宇技术(广州)有限公司 A kind of method, apparatus, computer equipment and the storage medium of elevator scenario simulation
CN108241749A (en) * 2018-01-12 2018-07-03 新华智云科技有限公司 By the method and apparatus of sensing data generation information
CN108306414A (en) * 2018-01-10 2018-07-20 温州大学 A kind of monitoring of intelligent power distribution and control method and system
CN108389241A (en) * 2018-03-01 2018-08-10 网易(杭州)网络有限公司 The methods, devices and systems of textures are generated in scene of game
CN108520474A (en) * 2018-04-12 2018-09-11 重庆电子工程职业学院 A kind of power analysis system and power analysis method
CN108537877A (en) * 2018-03-07 2018-09-14 北京中科紫宸睿达科技有限公司 Visualizing monitor interface customizing generation method based on threedimensional model and device
CN108604323A (en) * 2015-10-30 2018-09-28 环球设计有限公司 Resource consumption monitors system, platform and method
CN109059200A (en) * 2018-06-27 2018-12-21 珠海格力电器股份有限公司 Air-conditioner centralized control system and its control method based on AR
CN109099552A (en) * 2018-08-13 2018-12-28 南京优助智能科技有限公司 Merge the central air conditioner end equipment control system and working method of spatial information
CN109445891A (en) * 2018-10-09 2019-03-08 北京国电智深控制技术有限公司 Picture configuration and methods of exhibiting, device, computer readable storage medium
CN109542736A (en) * 2018-12-21 2019-03-29 嘉兴蓝匠仓储系统软件有限公司 A kind of monitoring method for 3D monitoring software of storing in a warehouse
WO2019114191A1 (en) * 2017-12-14 2019-06-20 特斯联(北京)科技有限公司 Internet of things-based building operation device status monitoring and visual analysis system
CN110225296A (en) * 2019-04-15 2019-09-10 广东康云科技有限公司 Garden three-dimensional live intelligent control method, system and device
CN110274565A (en) * 2019-04-04 2019-09-24 王彬 Object area on-site test platform
CN110415334A (en) * 2019-06-26 2019-11-05 广东康云科技有限公司 A kind of outdoor scene threedimensional model application system and method
CN110446022A (en) * 2019-08-16 2019-11-12 许昌学院 A kind of cost budget facilities box for construction engineering
CN111025962A (en) * 2019-11-26 2020-04-17 上海欣能信息科技发展有限公司 Panoramic-map-based indoor visual monitoring method for power transformation and distribution station
CN111104622A (en) * 2019-11-29 2020-05-05 武汉虹信技术服务有限责任公司 WEBGL-based three-dimensional GIS intelligent monitoring method and device
CN111144849A (en) * 2019-12-28 2020-05-12 镇江新一代信息技术产业研究院有限公司 Campus big data management system
CN111581196A (en) * 2020-04-29 2020-08-25 深圳市双合电气股份有限公司 Supply and distribution power grid intelligent data acquisition and arrangement system based on intelligent factory framework
WO2020199077A1 (en) * 2019-04-01 2020-10-08 Honeywell International Inc. Building management system using video analytics
CN111783187A (en) * 2019-04-03 2020-10-16 中山市京灯网络科技有限公司 Brightening sharing platform application system
CN111858799A (en) * 2020-06-28 2020-10-30 江苏核电有限公司 Dynamic positioning method, system and equipment for panoramic image of nuclear power plant
CN111930056A (en) * 2020-07-31 2020-11-13 贵州优特云科技有限公司 Power monitoring system and method for intelligent building
CN112079214A (en) * 2020-09-01 2020-12-15 日立楼宇技术(广州)有限公司 Elevator waiting management system and control method thereof
CN112134355A (en) * 2020-09-03 2020-12-25 珠海许继芝电网自动化有限公司 Intelligent power distribution room visual display method and system
CN112291528A (en) * 2020-10-30 2021-01-29 天津飞眼无人机科技有限公司 Monitoring system map modular management method and management system
CN112689804A (en) * 2018-09-13 2021-04-20 西门子股份公司 Method, digital platform and computer program product for integrating data of assets of a technical facility into a platform
CN112696787A (en) * 2020-12-29 2021-04-23 中国兵器装备集团自动化研究所 Panoramic three-dimensional visual intelligent monitoring system and method for medicament cleaning workshop
CN113393352A (en) * 2021-05-19 2021-09-14 江苏星月测绘科技股份有限公司 Smart city system based on digital twin technology
CN113554755A (en) * 2021-07-30 2021-10-26 招商局重庆交通科研设计院有限公司 Remote online patrol method for electromechanical facilities of highway tunnel
CN113726732A (en) * 2021-07-14 2021-11-30 华迪计算机集团有限公司 Monitoring and decision-making assisting system and method for data machine room
CN113949847A (en) * 2021-09-30 2022-01-18 合肥佳讯科技有限公司 Three-dimensional model-based station intelligent monitoring system
CN114283251A (en) * 2021-12-28 2022-04-05 航天科工智能运筹与信息安全研究院(武汉)有限公司 Real-time data access method of camp Internet of things sensing equipment based on three-dimensional scene
CN114545872A (en) * 2021-12-15 2022-05-27 云南昆船烟草设备有限公司 Visual monitoring method and system for running state in production process of cigarette making machine equipment
CN114863275A (en) * 2022-04-27 2022-08-05 北京良安科技有限公司 Three-dimensional mapping method, system, equipment and storage medium for granary
CN115115352A (en) * 2022-08-29 2022-09-27 山东中鲁实业有限公司 Public equipment operation control system based on digital city operation management service
CN115186315A (en) * 2022-07-25 2022-10-14 成都安讯智服科技有限公司 Method and system for accurately positioning equipment in factory diagram by configuration software
CN115410328A (en) * 2022-10-31 2022-11-29 北京中海兴达建设有限公司 Fire early warning method, device and equipment for construction site and readable storage medium
CN116934180A (en) * 2023-09-15 2023-10-24 恒实建设管理股份有限公司 Whole process consultation information management method, system, device and storage medium
CN108681781B (en) * 2018-07-06 2024-01-30 南京航空航天大学 Subway operation and maintenance management information system and method based on three-dimensional Internet of things technology

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110069045A (en) * 2019-04-11 2019-07-30 广州番禺职业技术学院 The unattended method of sewage treatment plant and intelligent management platform based on BIM, VR and Internet of Things

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101034494A (en) * 2006-03-06 2007-09-12 上海宝信软件股份有限公司 Method for implementing real time monitoring using three-dimensional sight simulation
CN101256590A (en) * 2008-04-03 2008-09-03 北京艺龙天地文化传播有限公司 Simulation system for three-dimensional on-line virtual reality of environment combining with WebGis and method thereof
CN101714262A (en) * 2009-12-10 2010-05-26 北京大学 Method for reconstructing three-dimensional scene of single image
CN101820532A (en) * 2010-03-17 2010-09-01 上海大学 Method for realizing full three-dimensional intelligent virtual computer room
CN102833117A (en) * 2012-09-10 2012-12-19 山东省计算中心 Data center dynamic environment monitoring system and method on basis of IOT (Internet Of Things) technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101034494A (en) * 2006-03-06 2007-09-12 上海宝信软件股份有限公司 Method for implementing real time monitoring using three-dimensional sight simulation
CN101256590A (en) * 2008-04-03 2008-09-03 北京艺龙天地文化传播有限公司 Simulation system for three-dimensional on-line virtual reality of environment combining with WebGis and method thereof
CN101714262A (en) * 2009-12-10 2010-05-26 北京大学 Method for reconstructing three-dimensional scene of single image
CN101820532A (en) * 2010-03-17 2010-09-01 上海大学 Method for realizing full three-dimensional intelligent virtual computer room
CN102833117A (en) * 2012-09-10 2012-12-19 山东省计算中心 Data center dynamic environment monitoring system and method on basis of IOT (Internet Of Things) technology

Cited By (99)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761683B (en) * 2014-01-17 2017-02-01 广东电网公司电力科学研究院 Three-dimensional virtual visualization display method of thermal power plant
CN103761683A (en) * 2014-01-17 2014-04-30 广东电网公司电力科学研究院 Three-dimensional virtual visualization display method of thermal power plant
CN104768276B (en) * 2014-03-11 2018-04-03 北京博锐尚格节能技术股份有限公司 A kind of 3D illumination monitorings method, apparatus and system
CN104760853A (en) * 2014-03-11 2015-07-08 北京博锐尚格节能技术股份有限公司 Monitoring and controlling method, device and system for elevator running
CN104768276A (en) * 2014-03-11 2015-07-08 北京博锐尚格节能技术股份有限公司 3D lighting monitoring method, 3D lighting monitoring device and 3D lighting monitoring system
CN105318196B (en) * 2014-07-21 2019-08-02 上海弘特自动化电气仪表有限公司 A kind of oil pipeline simulative surveillance method and system
CN105318196A (en) * 2014-07-21 2016-02-10 上海弘特自动化电气仪表有限公司 Simulation monitoring method and system for oil transportation pipelines
CN104166697A (en) * 2014-08-04 2014-11-26 上海国际航运服务中心开发有限公司 Three-dimensional interactive navigation lock monitoring system
CN104135387B (en) * 2014-08-12 2017-06-16 浪潮通信信息系统有限公司 A kind of network management data based on meta-model topology processes method for visually monitoring
CN104135387A (en) * 2014-08-12 2014-11-05 浪潮通信信息系统有限公司 Visual monitoring method of network management data processing based on meta model topology
CN104616343A (en) * 2015-01-20 2015-05-13 武汉大势智慧科技有限公司 Real-time acquiring and online mapping method and system for texture
CN104616343B (en) * 2015-01-20 2017-09-22 武汉大势智慧科技有限公司 A kind of texture gathers the method and system mapped online in real time
CN105868211A (en) * 2015-01-22 2016-08-17 北京华烽泰特科技有限公司 Factory displaying method
CN104609134A (en) * 2015-02-04 2015-05-13 中交一航局安装工程有限公司 Intelligent temperature measuring monitoring system for belt conveyor rollers
CN104680252A (en) * 2015-02-13 2015-06-03 北京清控人居环境研究院有限公司 Online architecture system and online architecture system-based real-time water supply scheduling method
CN104680337A (en) * 2015-03-25 2015-06-03 上海化学工业区公共管廊有限公司 Common pipe rack comprehensive information operation system based on geographic information system
CN104766173B (en) * 2015-04-16 2018-08-10 淄博海源电子科技有限公司 Water system user cuts off the water the digitalized processing method of alarm
CN104766173A (en) * 2015-04-16 2015-07-08 淄博市淄川区自来水公司 Digital water supply management system and method
CN106597860A (en) * 2015-10-19 2017-04-26 上海澜腾智能科技有限公司 Household electrical appliance control system, and control device, construction method and control method thereof
CN108604323A (en) * 2015-10-30 2018-09-28 环球设计有限公司 Resource consumption monitors system, platform and method
CN105893588B (en) * 2016-04-05 2019-04-30 东南大学 A kind of production of large scale city space energy consumption numerical map and display methods
CN105893588A (en) * 2016-04-05 2016-08-24 东南大学 Method for manufacturing and displaying large-scale urban space energy consumption digital map
CN107291766A (en) * 2016-04-10 2017-10-24 国网山东省电力公司经济技术研究院 Laterally specialty fusion, longitudinal province ground power network panoramic information display systems for running through of county
CN105824281A (en) * 2016-05-04 2016-08-03 周德恩 Fire-fighting real-time monitoring system
CN105975591B (en) * 2016-05-09 2019-03-12 东南大学 A kind of production of urban global energy consumption numerical map and display methods and system
CN105975591A (en) * 2016-05-09 2016-09-28 东南大学 Urban global energy consumption digital map making and displaying method and system
CN106096121A (en) * 2016-06-07 2016-11-09 武汉虹信技术服务有限责任公司 Intelligent building project method for drawing map based on universal map control
CN106096121B (en) * 2016-06-07 2019-03-19 武汉虹信技术服务有限责任公司 Intelligent building project method for drawing map based on universal map control
CN106384194A (en) * 2016-09-09 2017-02-08 国家电网公司 Electric power regulation and control method
CN106384194B (en) * 2016-09-09 2020-07-10 国家电网公司 Electric power regulation and control method
CN106412526A (en) * 2016-11-15 2017-02-15 武汉市公安局公共交通分局 Police oblique-photography real 3D platform system and interface system thereof
CN106444593A (en) * 2016-12-12 2017-02-22 合肥华耀广告传媒有限公司 Building energy consumption monitor system based on 3D technology
CN106911682A (en) * 2017-02-17 2017-06-30 深圳市嘉力达节能科技股份有限公司 Building convergence method and device
CN107038754A (en) * 2017-03-15 2017-08-11 武汉华安科技股份有限公司 A kind of wisdom garden management system and method based on three-dimensional live
CN107146168A (en) * 2017-07-11 2017-09-08 大连锐勃电子科技有限公司 Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology
CN107633423A (en) * 2017-08-31 2018-01-26 珠海格力电器股份有限公司 Method for processing resource and device
CN107544383A (en) * 2017-09-08 2018-01-05 北京时代凌宇科技股份有限公司 A kind of residential property apparatus monitoring method and system
CN107842908B (en) * 2017-09-26 2020-01-03 国网浙江省电力公司杭州供电公司 Real-time heat supply load control method based on environmental parameter compensation
CN107842908A (en) * 2017-09-26 2018-03-27 国网浙江省电力公司杭州供电公司 A kind of real-time heating demand control method based on ambient parameter compensation
CN107729065B (en) * 2017-11-02 2021-07-20 港珠澳大桥管理局 Three-dimensional monitoring method and system
CN107729065A (en) * 2017-11-02 2018-02-23 港珠澳大桥管理局 The method and system of a kind of 3 D monitoring
WO2019114191A1 (en) * 2017-12-14 2019-06-20 特斯联(北京)科技有限公司 Internet of things-based building operation device status monitoring and visual analysis system
CN108205265A (en) * 2018-01-05 2018-06-26 日立楼宇技术(广州)有限公司 A kind of method, apparatus, computer equipment and the storage medium of elevator scenario simulation
CN108306414A (en) * 2018-01-10 2018-07-20 温州大学 A kind of monitoring of intelligent power distribution and control method and system
CN108306414B (en) * 2018-01-10 2021-08-10 温州大学 Intelligent power distribution monitoring and control method and system
CN108241749A (en) * 2018-01-12 2018-07-03 新华智云科技有限公司 By the method and apparatus of sensing data generation information
CN108389241A (en) * 2018-03-01 2018-08-10 网易(杭州)网络有限公司 The methods, devices and systems of textures are generated in scene of game
CN108537877A (en) * 2018-03-07 2018-09-14 北京中科紫宸睿达科技有限公司 Visualizing monitor interface customizing generation method based on threedimensional model and device
CN108520474A (en) * 2018-04-12 2018-09-11 重庆电子工程职业学院 A kind of power analysis system and power analysis method
CN109059200A (en) * 2018-06-27 2018-12-21 珠海格力电器股份有限公司 Air-conditioner centralized control system and its control method based on AR
CN108681781B (en) * 2018-07-06 2024-01-30 南京航空航天大学 Subway operation and maintenance management information system and method based on three-dimensional Internet of things technology
CN109099552A (en) * 2018-08-13 2018-12-28 南京优助智能科技有限公司 Merge the central air conditioner end equipment control system and working method of spatial information
CN112689804A (en) * 2018-09-13 2021-04-20 西门子股份公司 Method, digital platform and computer program product for integrating data of assets of a technical facility into a platform
CN112689804B (en) * 2018-09-13 2024-04-09 西门子股份公司 Method for integrating data of assets of a technical installation into a platform, digital platform and computer program product
CN109445891B (en) * 2018-10-09 2022-08-12 北京国电智深控制技术有限公司 Picture configuration and display method, device and computer readable storage medium
CN109445891A (en) * 2018-10-09 2019-03-08 北京国电智深控制技术有限公司 Picture configuration and methods of exhibiting, device, computer readable storage medium
CN109542736A (en) * 2018-12-21 2019-03-29 嘉兴蓝匠仓储系统软件有限公司 A kind of monitoring method for 3D monitoring software of storing in a warehouse
GB2596674B (en) * 2019-04-01 2023-12-27 Honeywell Int Inc Building management system using video analytics
GB2596674A (en) * 2019-04-01 2022-01-05 Honeywell Int Inc Building management system using video analytics
WO2020199077A1 (en) * 2019-04-01 2020-10-08 Honeywell International Inc. Building management system using video analytics
CN111783187A (en) * 2019-04-03 2020-10-16 中山市京灯网络科技有限公司 Brightening sharing platform application system
CN111783187B (en) * 2019-04-03 2023-12-22 京灯(广东)信息科技有限公司 Brightening sharing platform application system
CN110274565A (en) * 2019-04-04 2019-09-24 王彬 Object area on-site test platform
CN110225296A (en) * 2019-04-15 2019-09-10 广东康云科技有限公司 Garden three-dimensional live intelligent control method, system and device
CN110415334B (en) * 2019-06-26 2023-03-10 广东康云科技有限公司 Real-scene three-dimensional model application system and method
CN110415334A (en) * 2019-06-26 2019-11-05 广东康云科技有限公司 A kind of outdoor scene threedimensional model application system and method
CN110446022A (en) * 2019-08-16 2019-11-12 许昌学院 A kind of cost budget facilities box for construction engineering
CN111025962A (en) * 2019-11-26 2020-04-17 上海欣能信息科技发展有限公司 Panoramic-map-based indoor visual monitoring method for power transformation and distribution station
CN111025962B (en) * 2019-11-26 2021-05-11 上海欣能信息科技发展有限公司 Panoramic-map-based indoor visual monitoring method for power transformation and distribution station
CN111104622A (en) * 2019-11-29 2020-05-05 武汉虹信技术服务有限责任公司 WEBGL-based three-dimensional GIS intelligent monitoring method and device
CN111144849A (en) * 2019-12-28 2020-05-12 镇江新一代信息技术产业研究院有限公司 Campus big data management system
CN111581196A (en) * 2020-04-29 2020-08-25 深圳市双合电气股份有限公司 Supply and distribution power grid intelligent data acquisition and arrangement system based on intelligent factory framework
CN111858799A (en) * 2020-06-28 2020-10-30 江苏核电有限公司 Dynamic positioning method, system and equipment for panoramic image of nuclear power plant
CN111858799B (en) * 2020-06-28 2022-10-21 江苏核电有限公司 Dynamic marking and positioning method, system and equipment for panoramic image for nuclear power plant
CN111930056A (en) * 2020-07-31 2020-11-13 贵州优特云科技有限公司 Power monitoring system and method for intelligent building
CN111930056B (en) * 2020-07-31 2024-02-06 贵州优特云科技有限公司 Electric power monitoring system and method for intelligent building
CN112079214A (en) * 2020-09-01 2020-12-15 日立楼宇技术(广州)有限公司 Elevator waiting management system and control method thereof
CN112079214B (en) * 2020-09-01 2022-09-06 日立楼宇技术(广州)有限公司 Elevator waiting management system and control method thereof
CN112134355A (en) * 2020-09-03 2020-12-25 珠海许继芝电网自动化有限公司 Intelligent power distribution room visual display method and system
CN112291528A (en) * 2020-10-30 2021-01-29 天津飞眼无人机科技有限公司 Monitoring system map modular management method and management system
CN112291528B (en) * 2020-10-30 2023-03-24 天津飞眼无人机科技有限公司 Monitoring system map modular management method
CN112696787A (en) * 2020-12-29 2021-04-23 中国兵器装备集团自动化研究所 Panoramic three-dimensional visual intelligent monitoring system and method for medicament cleaning workshop
CN113393352B (en) * 2021-05-19 2022-02-01 江苏星月测绘科技股份有限公司 Smart city system based on digital twin technology
CN113393352A (en) * 2021-05-19 2021-09-14 江苏星月测绘科技股份有限公司 Smart city system based on digital twin technology
CN113726732A (en) * 2021-07-14 2021-11-30 华迪计算机集团有限公司 Monitoring and decision-making assisting system and method for data machine room
CN113726732B (en) * 2021-07-14 2023-05-19 华迪计算机集团有限公司 Monitoring and auxiliary decision making system and method for data machine room
CN113554755A (en) * 2021-07-30 2021-10-26 招商局重庆交通科研设计院有限公司 Remote online patrol method for electromechanical facilities of highway tunnel
CN113949847A (en) * 2021-09-30 2022-01-18 合肥佳讯科技有限公司 Three-dimensional model-based station intelligent monitoring system
CN114545872A (en) * 2021-12-15 2022-05-27 云南昆船烟草设备有限公司 Visual monitoring method and system for running state in production process of cigarette making machine equipment
CN114283251A (en) * 2021-12-28 2022-04-05 航天科工智能运筹与信息安全研究院(武汉)有限公司 Real-time data access method of camp Internet of things sensing equipment based on three-dimensional scene
CN114283251B (en) * 2021-12-28 2024-04-09 航天科工智能运筹与信息安全研究院(武汉)有限公司 Real-time access method for data of barracks and Internet of things sensing equipment based on three-dimensional scene
CN114863275B (en) * 2022-04-27 2022-12-09 北京良安科技有限公司 Three-dimensional mapping method, system, equipment and storage medium for granary
CN114863275A (en) * 2022-04-27 2022-08-05 北京良安科技有限公司 Three-dimensional mapping method, system, equipment and storage medium for granary
CN115186315A (en) * 2022-07-25 2022-10-14 成都安讯智服科技有限公司 Method and system for accurately positioning equipment in factory diagram by configuration software
CN115115352B (en) * 2022-08-29 2022-11-08 山东中鲁实业有限公司 Public equipment operation control system based on digital city operation management service
CN115115352A (en) * 2022-08-29 2022-09-27 山东中鲁实业有限公司 Public equipment operation control system based on digital city operation management service
CN115410328A (en) * 2022-10-31 2022-11-29 北京中海兴达建设有限公司 Fire early warning method, device and equipment for construction site and readable storage medium
CN116934180A (en) * 2023-09-15 2023-10-24 恒实建设管理股份有限公司 Whole process consultation information management method, system, device and storage medium
CN116934180B (en) * 2023-09-15 2023-12-08 恒实建设管理股份有限公司 Whole process consultation information management method, system, device and storage medium

Also Published As

Publication number Publication date
CN103177391B (en) 2016-01-27

Similar Documents

Publication Publication Date Title
CN103177391B (en) A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method
CN105938613B (en) Intelligent city pipe network comprehensive platform based on BIM and VR and management method and construction method thereof
CN114139264B (en) Building water system informatization wisdom fortune maintenance system based on BIM+GIS technique
CN104899922A (en) Three-dimensional holographic generation method for intelligent power grid visualization application
CN106710001A (en) Substation inspection robot based centralized monitoring and simulation system and method thereof
CN103778566A (en) Heat-engine plant monitoring and measuring method based on three-dimensional visualization demonstration
KR101876114B1 (en) Terminal, server, system for 3d modeling and 3d modeling method using the same
CN109460834A (en) Build operation management system and its management method
CN109446290A (en) A kind of intelligent three-dimensional virtual visualization meteorological equipment comprehensive coverage method
CN109840684A (en) Management method, equipment, system and the storage medium of architecture information
CN112507444B (en) AI-construction-based digital urban building night scene generation method and system
CN107392993A (en) A kind of power consumer digitizes panoramic view construction method
CN115758522A (en) Digital twin city management system and method
CN107544383A (en) A kind of residential property apparatus monitoring method and system
CN113885698A (en) Pipeline informatization management and control system
CN108073996B (en) Urban energy panoramic interactive big data platform management system and method
Li et al. Construction of smart city street landscape big data-driven intelligent system based on industry 4.0
CN206021354U (en) One kind is based on BIM and VR smart cities pipeline coordination platform
CN117351521A (en) Digital twinning-based power transmission line bird detection method, system, medium and equipment
CN113992891A (en) Visual application system based on video monitoring multi-information fusion
CN112328666A (en) Intelligent building supervision operation and maintenance system based on cloud platform technology
CN115859689B (en) Panoramic visualization digital twin application method
CN116542387A (en) Intelligent hydrologic system based on Unity3D
KR102359512B1 (en) Apparatus for providing integrated information on energy facilities of smart city and method thereof
CN113177086A (en) Three-dimensional visualization method applied to intelligent operation and maintenance system of transformer substation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: RARE SERVICE ENGINEERING COLLEGE OF CHINESE PLA.

Free format text: FORMER OWNER: LI SHENGLIN

Effective date: 20130723

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 401311 YUZHONG, CHONGQING TO: 400010 SHAPINGBA, CHONGQING

TA01 Transfer of patent application right

Effective date of registration: 20130723

Address after: 400010 Department of information engineering, PLA Logistics Engineering College, Shapingba University District, Chongqing

Applicant after: Logistical Engineering University of PLA

Address before: 401311 Yuzhong District, Chongqing, No. two Changjiang Road, No. 174

Applicant before: Li Shenglin

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127

Termination date: 20220131