CN103049820B CN201210559109.XA CN201210559109A CN103049820B CN 103049820 B CN103049820 B CN 103049820B CN 201210559109 A CN201210559109 A CN 201210559109A CN 103049820 B CN103049820 B CN 103049820B
Authority
CN
China
Prior art keywords
index
power supply
heterogeneous system
supply mode
powering mode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210559109.XA
Other languages
Chinese (zh)
Other versions
CN103049820A (en
Inventor
段祥骏
冯德志
李运硕
苏培栋
王逢浩
王金宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201210559109.XA priority Critical patent/CN103049820B/en
Publication of CN103049820A publication Critical patent/CN103049820A/en
Application granted granted Critical
Publication of CN103049820B publication Critical patent/CN103049820B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the filed of rural power grid informationization, specifically to a construction method of a district power supply mode of a heterogeneous system. The construction method comprises the following steps of: (1) screening indexes of the heterogeneous system; (2) quantifying the indexes by utilizing a heterogeneous data extraction point location method and screening the indexes by utilizing a district power supply mode constant current method; and (3) determining an optimal power supply mode engineering model by combining the index quantification and the district power supply mode location determination. According to the construction method of the district power supply mode of the heterogeneous system, disclosed by the invention, problems of a management layer during control of rural power grid engineering and a client layer during design implementation of the rural power grid engineering are solved, so that operation manners and flows in each level are simplified, and the work efficiency is improved; the synchronous index relationship of the heterogeneous system is solved by the heterogeneous data extraction point location method; the intelligent mode selection for automatically corresponding a typical power supply mode is realized by the district power supply mode constant current method, and an unintelligent operation mode of the existing typical power supply mode is effectively changed.

Description

A kind of construction method of heterogeneous system block supply pattern
Technical field
The present invention relates to rural power grids informatization, be specifically related to a kind of construction method of heterogeneous system block supply pattern.
Background technology
Along with the gradual perfection to power informatization, the demand emphasis of various information system has started to shift to " open, interconnected, integrated ", and the new technologies such as cross-platform, WEB technology, application integration are dropped into larger concern.And the J2EE technology reaching its maturity has really embodied these features, become the main flow scheme of current structure enterprise-level application.
Especially J2EE architecture provides middle layer integrated framework to be used for meeting the demand without the application of too many expense and needs high availability, high reliability and extensibility.Provide the integrated strong support of existing application simultaneously.
Along with the Efforts To Develop of new round upgrading of rural power grids upgrading engineering, the further fine-grained management demand of rural power grids engineering management is more and more tighter; The senior application of new rural area typical case's powering mode, has promoted the fast development of rural power grids engineerings; The application of informationization technology means, has accelerated the paces of rural power grids engineering management, effectively exploit information technological means, and compatible existing engineering managing and control system, the peculiar geography of combination of rationalization, intelligence is divided the application of typical powering mode automatically.
Summary of the invention
For having heterogeneous system disunity in current rural power grids engineering management and application process, typical case's powering mode kind changes, the problems such as geographic area situation complexity, application message development technique of the present invention, further investigate, develop, relation for trans-regional, heterogeneous system, typical powering mode is carried out deep excavation, a kind of information interacting method of the isomery intelligent synchronization region typical case's powering mode that is more suitable for the management and control of rural power grids engineering is provided, realizes by the construction method of heterogeneous system block supply pattern.
The object of the invention is to adopt following technical proposals to realize:
A construction method for heterogeneous system block supply pattern, its improvements are, described method comprises the steps:
(1) screen heterogeneous system index;
(2) adopt isomeric data extraction point position method to quantification of targets and adopt block supply pattern constant current method to index screening;
(3) determine optimal power pattern engineering model in conjunction with quantification of targets and block supply Pattern localization.
Wherein, in described step (1), heterogeneous system index and typical powering mode index are compared from index definition, index cycle, index computing various dimensions, screen heterogeneous system index and whether extract;
Described heterogeneous system index comprises project data index, positioning index and environmental index;
Described project data index comprises engineering managing and control system index and Enterprise Resource Planning index;
Described positioning index comprises the typical powering mode index of 96 kinds of region;
Described environmental index comprises geographical environment index.
Wherein, in described step (2), adopt isomeric data extraction point position method to comprise the steps: quantification of targets
1. heterogeneous system index is built to interface and extract IIE;
2. adopt described interface to extract IIE and extract index;
3. extract index transfer check;
4. with powering mode storehouse in project data index check and compare;
5. by comparison result parallel aligned;
6. set up index coordinates matrix to extracting interface, and to the data tracking correspondence in matrix.
Wherein, described step 4. in, check to compare with project data index in powering mode storehouse and comprise: the index of extraction is carried out to degree of correlation comparison with the project data index in powering mode storehouse, establish the achievement data relation of one-to-many, then, index calculation check method preferential according to heterogeneous system, by uniqueization of achievement data.
Wherein, in described step (2), adopt block supply pattern constant current method to comprise the steps: index screening
<1>, for powering mode provincial characteristics index, introduces the design of power supply reliability constraint condition, sets up power supply reliability non-linearity network flow;
<2> defines for branch, introduces successful modelling network flow, sets up power supply reliability branching networks stream; Described successful modelling network flow, refers to network flow algorithm model;
<3> is by described power supply reliability non-linearity network flow and power supply reliability branching networks stream constant current combination;
<4> carries out type selecting to block supply pattern;
<5> block supply Pattern localization.
Wherein, in described step <3>, described power supply reliability non-linearity network flow and power supply reliability branching networks stream constant current combination are comprised: the tracking that power supply reliability non-linearity network flow is set up high, normal, basic die pressing type, power supply reliability branching networks stream builds A/B/C model type selecting, constant current combination is that high, normal, basic die pressing type and A/B/C model are carried out to optimization permutation and combination sequence screening, determine optimum combination, for final powering mode type selecting provides scheme.
Compared with the prior art, the beneficial effect that the present invention reaches is:
1, the present invention can well solve administration and supervision authorities in the management and control of rural power grids engineering, the problem that client layer is implemented in rural power grids engineering design, thus simplify modes of operation at different levels and flow process, increase work efficiency.
2, the some position method that isomeric data provided by the invention extracts has solved the relation of heterogeneous system coincident indicator.
3, block supply pattern constant current method provided by the invention has realized the Intelligent Model Selection of the typical powering mode of automatic correspondence, efficiently solves the operator scheme of current typical non intelligentization of powering mode.
4, to client layer, the use of the inventive method, solve user and in work management/implementation process, be difficult to select the present situation of the optimization route that is applicable to local powering mode, and ensured the mutual of the original achievement data layer of heterogeneous system, ensured the quick of user's construction project.
5, to administration and supervision authorities, the use of the inventive method, has solved engineering customization procedure and has issued while management, and to the unified management and control of engineering, the verification with region typical case's powering mode, ensures carrying out smoothly of engineering progress.
Brief description of the drawings
Fig. 1 is the construction method process flow diagram of heterogeneous system block supply pattern provided by the invention;
Fig. 2 is the some position method process flow diagram that isomeric data provided by the invention extracts;
Fig. 3 is block supply pattern constant current method process flow diagram provided by the invention.
Embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in further detail.
The present invention adopts J2EE as technological core, heterogeneous system index is carried out to intelligence screens, carry out quantification of targets by typical module storehouse point position method again, carry out constant current method self-adaptation in conjunction with Midwest, China east zones of different feature, complete " A B C high pressure in press low pressure " etc. the screening of 96 kinds of typical powering modes, in conjunction with index application, build and be applicable to local optimal power pattern engineering model.
The construction method flow process of heterogeneous system block supply pattern provided by the invention as shown in Figure 1, comprises the steps:
(1) screen heterogeneous system index: heterogeneous system index and typical powering mode index are compared from index definition, index cycle, index computing various dimensions, screen heterogeneous system index and whether extract;
Heterogeneous system index comprises project data index, positioning index and environmental index;
Described project data index comprises engineering managing and control system index and Enterprise Resource Planning index;
Described positioning index comprises 96 kinds of powering mode indexs in region; 96 kinds of typical powering mode indexs are according to the ISBN:9787508372976 of China Electric Power Publishing House " new rural area typical case's powering mode ", and publication time: 2008-05-01 determines.
Described environmental index comprises geographical environment index.
(2) adopt isomeric data extraction point position method to quantification of targets and adopt block supply pattern constant current method to index screening;
One, adopt isomeric data extraction point position method to quantification of targets: the data based on a position method shift parallel aligned method, the data basic point repeating is followed the tracks of to interface correspondence, realize index coordinates matrix, jointly realize the corresponding one by one of heterogeneous system index and project data.
The realization of some position method has built locate between multilayer heterogeneous system data mutual, and it is mainly realized in the following manner:
Multi-tier Heterogeneous systems engineering index builds interface and extracts IIE(Index interface extraction), extract index and carry out transfer check, complete with typical powering mode storehouse in the check of engineering key index compare, by comparison result parallel aligned, set up data tracking correspondence to extracting interface, guarantee to realize accuracy and the uniqueness of project data index.
Isomeric data extraction point position method flow process as shown in Figure 2, specifically comprises the steps:
1. heterogeneous system index is built to interface and extract IIE;
2. adopt described interface to extract IIE and extract index;
3. extract index transfer check;
4. with powering mode storehouse in project data index check and compare: check to compare with project data index in powering mode storehouse and comprise: the index of extraction is carried out to degree of correlation comparison with the project data index in powering mode storehouse, establish the achievement data relation of one-to-many, then, index calculation check method preferential according to heterogeneous system, by uniqueization of achievement data.
5. by comparison result parallel aligned;
6. set up index coordinates matrix to extracting interface, and to the data tracking correspondence in matrix.
IIE is the peripheral interface for Process Control System.
Two, adopt block supply pattern constant current method to index screening: based on the boundary of constant current method, in conjunction with region situation, by introducing the design of power supply reliability constraint condition, for typical powering mode provincial characteristics index, set up non-linearity network model, and define and introduce successful modelling network flow by branch, affluent-dividing is combined with nonlinear network stream, solve the Intelligent Model Selection of block supply pattern.
The realization of constant current method has built the mutual location of 96 kinds of typical powering modes, and it is mainly realized in the following way:
Our each disunity in geographical form Midwest, east, environmental factor is to the relative restraint of rural power grids engineering restriction condition, the key index of constant current method constructing environment factor, index and typical powering mode storehouse core positioning index are carried out to location, region, the tracking that power supply reliability non-linearity network flow is set up high, normal, basic die pressing type, branch model network flow builds A/B/C model type selecting, the location that completes block supply pattern by constant current optimal combination.
Block supply pattern constant current method flow process as shown in Figure 3, specifically comprises the steps:
<1>, for powering mode provincial characteristics index, introduces the design of power supply reliability constraint condition, sets up power supply reliability non-linearity network flow; Power supply reliability constraint condition is according to the ISBN:9787508348438 of China Electric Power Publishing House " rural power grids power supply reliability training materials ", and publication time: 2007-06-01 determines.
<2> defines for branch, introduces successful modelling network flow, sets up power supply reliability branching networks stream; Success modelling network flow, refers to and has designed the also network flow algorithm model of successful Application, i.e. the reasonably optimizing algorithm of power supply reliability at present;
<3> combines described power supply reliability non-linearity network flow and the constant current of power supply reliability branching networks stream: the tracking that power supply reliability non-linearity network flow is set up high, normal, basic die pressing type, power supply reliability branching networks stream builds A/B/C model type selecting, constant current combination is that high, normal, basic die pressing type and A/B/C model are carried out to optimization permutation and combination sequence screening, determine optimum combination, for final powering mode type selecting provides scheme.
<4> carries out type selecting to block supply pattern: the powering modes different according to different regions carry out type selecting; Due to zones of different typical case operated type difference, and be to start to powering mode fixation and recognition from large class, so first judge that from globality typical powering mode attribute selects;
<5> block supply Pattern localization.
(3) determine optimal power pattern engineering model in conjunction with quantification of targets and block supply Pattern localization.
The construction method of heterogeneous system block supply pattern provided by the invention, solves administration and supervision authorities in the management and control of rural power grids engineering, the problem that client layer is implemented in rural power grids engineering design, thus simplify modes of operation at different levels and flow process, increase work efficiency.The point position method that isomeric data extracts has solved the relation of heterogeneous system coincident indicator.Block supply pattern constant current method has realized the Intelligent Model Selection of the typical powering mode of automatic correspondence, efficiently solves the operator scheme of current typical non intelligentization of powering mode.
Finally should be noted that: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit, although the present invention is had been described in detail with reference to above-described embodiment, those of ordinary skill in the field are to be understood that: still can modify or be equal to replacement the specific embodiment of the present invention, and do not depart from any amendment of spirit and scope of the invention or be equal to replacement, it all should be encompassed in the middle of claim scope of the present invention.

Claims (1)

1. a construction method for heterogeneous system block supply pattern, is characterized in that, described method comprises the steps:
(1) screen heterogeneous system index;
(2) adopt isomeric data extraction point position method to quantification of targets and adopt block supply pattern constant current method to index screening;
(3) determine optimal power pattern engineering model in conjunction with quantification of targets and block supply Pattern localization;
In described step (1), heterogeneous system index and typical powering mode index are compared from index definition, index cycle, index computing various dimensions, screen heterogeneous system index and whether extract;
Described heterogeneous system index comprises project data index, positioning index and environmental index;
Described project data index comprises engineering managing and control system index and Enterprise Resource Planning index;
Described positioning index comprises the typical powering mode index of 96 kinds of region;
Described environmental index comprises geographical environment index;
In described step (2), adopt isomeric data extraction point position method to comprise the steps: quantification of targets
1. heterogeneous system index is built to interface and extract IIE;
2. adopt described interface to extract IIE and extract index;
3. extract index transfer check;
4. with powering mode storehouse in project data index check and compare;
5. by comparison result parallel aligned;
6. set up index coordinates matrix to extracting interface, and to the data tracking correspondence in matrix;
Described step 4. in, check to compare with project data index in powering mode storehouse and comprise: the index of extraction is carried out to degree of correlation comparison with the project data index in powering mode storehouse, establish the achievement data relation of one-to-many, then, index calculation check method preferential according to heterogeneous system, by uniqueization of achievement data;
In described step (2), adopt block supply pattern constant current method to comprise the steps: index screening
<1>, for powering mode provincial characteristics index, introduces the design of power supply reliability constraint condition, sets up power supply reliability non-linearity network flow;
<2> defines for branch, introduces successful modelling network flow, sets up power supply reliability branching networks stream; Described successful modelling network flow, refers to network flow algorithm model;
<3> is by described power supply reliability non-linearity network flow and power supply reliability branching networks stream constant current combination;
<4> carries out type selecting to block supply pattern;
<5> block supply Pattern localization;
In described step <3>, described power supply reliability non-linearity network flow and power supply reliability branching networks stream constant current combination are comprised: the tracking that power supply reliability non-linearity network flow is set up high, normal, basic die pressing type, power supply reliability branching networks stream builds A/B/C model type selecting, constant current combination is that high, normal, basic die pressing type and A/B/C model are carried out to optimization permutation and combination sequence screening, determine optimum combination, for final powering mode type selecting provides scheme.
CN201210559109.XA 2012-12-20 2012-12-20 Construction method of district power supply mode of heterogeneous system Active CN103049820B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210559109.XA CN103049820B (en) 2012-12-20 2012-12-20 Construction method of district power supply mode of heterogeneous system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210559109.XA CN103049820B (en) 2012-12-20 2012-12-20 Construction method of district power supply mode of heterogeneous system

Publications (2)

Publication Number Publication Date
CN103049820A CN103049820A (en) 2013-04-17
CN103049820B true CN103049820B (en) 2014-10-08

Family

ID=48062451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210559109.XA Active CN103049820B (en) 2012-12-20 2012-12-20 Construction method of district power supply mode of heterogeneous system

Country Status (1)

Country Link
CN (1) CN103049820B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901431A (en) * 2010-07-23 2010-12-01 南京国电南自轨道交通工程有限公司 Full-configuration power scheduling management information system and structuring method thereof
CN102063509A (en) * 2011-01-12 2011-05-18 南京南瑞继保电气有限公司 Model and modeling method of multi-dimensional data integration of heterogeneous databases of electric power information system
WO2012161804A1 (en) * 2011-02-24 2012-11-29 Clean Urban Energy, Inc. Integration of commercial building operations with electric system operations and markets

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901431A (en) * 2010-07-23 2010-12-01 南京国电南自轨道交通工程有限公司 Full-configuration power scheduling management information system and structuring method thereof
CN102063509A (en) * 2011-01-12 2011-05-18 南京南瑞继保电气有限公司 Model and modeling method of multi-dimensional data integration of heterogeneous databases of electric power information system
WO2012161804A1 (en) * 2011-02-24 2012-11-29 Clean Urban Energy, Inc. Integration of commercial building operations with electric system operations and markets

Also Published As

Publication number Publication date
CN103049820A (en) 2013-04-17

Similar Documents

Publication Publication Date Title
CN102254056B (en) Method for designing cable path of nuclear power station
CN102098713B (en) Method for quickly tolerating disaster for base station in mobile communication network
CN103329063A (en) System and method for monitoring and managing data center resources in real time
Liu et al. Strategic analysis and development plan design on digital transformation in the energy industry: A global perspective
CN109635127A (en) A kind of power equipment portrait knowledge mapping construction method based on big data technology
CN103218753A (en) Modeling method and information interaction method of ultra-high voltage grid information model
CN106060176A (en) Cloud computing application architecture and cloud computing service method based on mixed cloud
CN110489493A (en) A kind of cloudy data center services quality identification based on block chain
CN103729732A (en) Distributed energy resource information modeling and information interacting method
CN103886398A (en) Service monitoring method and system in cross-system heterogeneous environment
CN101493764A (en) Business events flow path visual dynamic model building and functional operations linkage method
CN114615718A (en) Network topology construction method and device based on digital twin technology
CN103729742B (en) A kind of Data Resources Management System based on SOA framework and executing model drive structure
CN103605044A (en) Coding engine realization method based on GIS electric power fault positioning
CN104104146A (en) On-line monitoring data modeling method of bulk grid transformer equipment
CN103473711A (en) Centralized operation system adapted to multiple electricity markets
CN110061874A (en) A kind of method of alliance&#39;s block chain visualization channel management
CN103049820B (en) Construction method of district power supply mode of heterogeneous system
TWI608442B (en) Software definition driven cloud computing network component service assembly system
CN102928689B (en) Method for testing IEC 61970CIS interface of power distribution management system
CN107423920A (en) A kind of method of Power Project process management and the analysis of stage degree of conformity
CN107786390A (en) Networking node regulation method and device
CN102594851A (en) Method for dynamically building marine application service chain
Wang et al. A new field-levelling procedure to minimize spillages in hydropower reservoir operation
CN109088954B (en) Distributed object identification information registration and analysis method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant