CN102999820B - A kind of assets management method for electric system and system - Google Patents

A kind of assets management method for electric system and system Download PDF

Info

Publication number
CN102999820B
CN102999820B CN201210553872.1A CN201210553872A CN102999820B CN 102999820 B CN102999820 B CN 102999820B CN 201210553872 A CN201210553872 A CN 201210553872A CN 102999820 B CN102999820 B CN 102999820B
Authority
CN
China
Prior art keywords
assets
equipment
bom
information
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210553872.1A
Other languages
Chinese (zh)
Other versions
CN102999820A (en
Inventor
黄海潮
李建刚
蒋锦霞
钟一俊
褚大可
张弛
李晓慧
杨自强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU YIHE ELECTRIC POWER TECHNOLOGY INFORMATION Co Ltd
State Grid Corp of China SGCC
Zhejiang Electric Power Co
Original Assignee
HANGZHOU YIHE ELECTRIC POWER TECHNOLOGY INFORMATION Co Ltd
State Grid Corp of China SGCC
Zhejiang Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU YIHE ELECTRIC POWER TECHNOLOGY INFORMATION Co Ltd, State Grid Corp of China SGCC, Zhejiang Electric Power Co filed Critical HANGZHOU YIHE ELECTRIC POWER TECHNOLOGY INFORMATION Co Ltd
Priority to CN201210553872.1A priority Critical patent/CN102999820B/en
Publication of CN102999820A publication Critical patent/CN102999820A/en
Application granted granted Critical
Publication of CN102999820B publication Critical patent/CN102999820B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention discloses a kind of assets management method for electric system and system, belong to electric network information management field, comprise the PS module for providing project information, for providing the MM module of material information, for the equipment alteration module of apparatus for establishing machine account, for the PM module of apparatus for establishing card, for setting up the AM module of assets card; And for setting up the assets BOM administration module of material, equipment, assets interaction relation, adopt " material-equipment-assets " trigram joint-action mechanism, set up assets BOM according to Classification of materials, the rule of correspondence between device type and statement of assets and BOM hierarchal model, improve project, material, the automatic corresponding rate of equipment; Decrease checking work artificial in a large number; By to the continuous consumption of equipment and equipment hierarchical information and the perfect of information, change by the maintenance mode of the maintenance of traditional-handwork machine account to the machine account information with reference to assets BOM.

Description

A kind of assets management method for electric system and system
Technical field
The present invention relates to a kind of assets management method for electric system and system, belong to electric network information management field.
Background technology
Power grid enterprises belong to typical asset intensive enterprise, there is the features such as asset equipment quantity is various, multi-point and wide-ranging, assets class is complicated, simultaneously along with the fast development of national economy, the asset size of enterprise increases day by day, asset transition speed is also accelerated along with the reinforcement of technological transformation dynamics, the complicacy that huge asset equipment has itself, brings managerial difficulty.In field of power, assets BOM refers to the set of relationship of power grid enterprises' each staple (project, material, assets, main equipment and important composition equipment) in equipment resource management process, and this pass ties up to the evolution process in practical business management process.
Exist following not enough in the asset management process of current power grid enterprises:
The maintenance of Unit account of plant is collected by the department that runs and is safeguarded, lacking with project is the equipment alteration flow process of foundation; The project such as capital construction, technological transformation turns money and adopts manual type, fails to realize automatically turning money by project information; Lack material, joint-action mechanism between equipment and assets and method.
In view of this, the present inventor studies this, and develop a kind of assets management method for electric system and system specially, this case produces thus.
Summary of the invention
The object of this invention is to provide a kind of assets management method for electric system and system, material can be realized, trigram linkage management between equipment and assets, from before afterwards manual corresponding mode to the transformation of the mode of dynamic management in advance, achieve logistics, monetary value flow, information flow three flow unification.
To achieve these goals, solution of the present invention is:
For an assets management method for electric system, comprise the steps:
1) first according to the material information that project is received, determine transformation rule, by the clear and definite unique corresponding device type of transformation rule, BOM hierarchal model is searched according to device type, if transformation rule, BOM hierarchal model all exist, then automatically generate initial assets BOM, if transformation rule does not exist, then according to material determination device type, manually set up initial wealth BOM;
2) according to the situation of waste material more than engineering, and existing material and equipment room corresponding relation, adjustment assets BOM, if the corresponding multiple equipment of material, then determined the equipment corresponding to material return by equipment factory number, thus guarantee that logistics, information flow are consistent;
3) after being completed according to project, device context situation of checking and accepting adjusts assets BOM again, thus determines the quantity of equipment in assets BOM, and whether the set membership of assets BOM and relevant information and field erected equipment are consistent;
4) according to checking and accepting the rear final assets BOM Automatic generation of information Unit account of plant confirmed, and declaring, audit and examining by equipment alteration flow process, interlock generation equipment card;
5) with project or position for querying condition, tabulating equipment card image, carries out the verification of information norm, if check information is correct according to remittance the long and batch, equipment card then links and generates assets card, thus sets up " material-equipment-assets " trigram interaction relation.
Wherein, in step 1) in, create initial wealth BOM according to material information and comprise the steps:
1. the relevant information of synchronizing project from PS module, comprises project definition, item description, item types, electric pressure etc.;
2. the information of synchronous materiel warehouse-out voucher from MM module, comprises delivery order number, material number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value etc.;
3. according to the material that project is received, determine unique corresponding device type by transformation rule, set up initial assets BOM, set up item, material, relation between equipment and subset; Initial wealth BOM information comprises project definition, item description, delivery order number, material number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value, device numbering, device description, assets class etc.; Described transformation rule comprises the mapping relations such as device class, Classification of materials, material characteristic.
In step 2) in, comprise the steps: according to waste material adjustment assets BOM more than engineering
1. the information of synchronous material refund vouchers from MM module, comprises refund vouchers number, material number, material description, material unit, material group, material cancelling stocks quantity etc.;
2. according to the engineering material returned, and existing material and equipment room corresponding relation, adjustment assets BOM, the information of adjustment comprises the kind of the engineering material returned, corresponding equipment etc.
In step 3) in, check and accept more new assets BOM according to device context and comprise the steps:
1. equipment leading out acceptance list from assets BOM management, the information of derivation comprises: item description, device numbering, device description, device type, factory number, equipment technical parameters etc.;
2. carry out scene to check, improve assets BOM information, and above-mentioned information is imported the asset management system, the information of importing comprises: device numbering, device description, device type, factory number, equipment technical parameters etc.
In step 4) in, generate Unit account of plant according to assets BOM and comprise the steps:
1. Asynchronous Transfer Mode is adopted by facility information from assets BOM module synchronization to equipment alteration administration module;
2. at equipment alteration administration module according to the response mechanism of the synchronous information of assets BOM by resource and assets, comprise and automatically generate Unit account of plant by interval and device type, and adjust, the relevant information of Improving Equipment machine account, comprise device description, affiliated station institute/circuit, equipment technical parameters etc.;
3. adopt Asynchronous Transfer Mode that the facility information of adjustment is synchronized to assets BOM administration module from equipment alteration administration module;
4. automatically created the equipment card of PM module by interface according to the assets BOM relevant information of assets BOM administration module.
In step 5) in, produce assets card according to equipment card and comprise the steps:
1. according to the information of the querying condition tabulating equipment card such as project or electric substation, system is believed equipment card
Submit to after breath verifies;
2. after receiving equipment card image, information of carrying out is perfect, and the errorless rear batch of confirmation creates assets
Card, turns back to the asset number field of the equipment card asset number field of PM module and the assets BOM of assets BOM administration module by asset number information, thus set up material, interaction relation between equipment and assets.
For an asset management system for electric system, comprise the PS module for providing project information, the process management of finished item; For providing the MM module of material information, it is the information source of materiel warehouse-out voucher and material refund vouchers; For the equipment alteration module of apparatus for establishing machine account, for Unit account of plant creates and the examination & approval of equipment alteration process; For the PM module of apparatus for establishing card, it is the tie that equipment and assets link; For setting up the AM module of assets card; And for setting up the assets BOM administration module of material, equipment, assets interaction relation, be interlock and the corresponding important bridge of material code, device coding, assets coding.Wherein, PS module is connected the input end of assets BOM administration module with the output terminal of MM module, and equipment alteration module and PM module are bi-directionally connected with assets BOM administration module respectively, and AM module and device management module are bi-directionally connected.
Method and system of the present invention adopts " material-equipment-assets " trigram joint-action mechanism, set up assets BOM according to Classification of materials, the rule of correspondence between device type and statement of assets and BOM hierarchal model, improve project, material, the automatic corresponding rate of equipment; Specify that the equipment vein structure of equipment and important composition equipment, achieve the fine-grained management of apparatus value, automatic (the assisting) that improve finance turns accuracy and the convenience of money, decreases checking work artificial in a large number; By to the continuous consumption of equipment and equipment hierarchical information and the perfect of information, change by the maintenance mode of the maintenance of traditional-handwork machine account to the machine account information with reference to assets BOM.
Below in conjunction with drawings and the specific embodiments, the present invention is described in further detail.
Accompanying drawing explanation
Fig. 1 is the assets management method process flow diagram for electric system of the present embodiment;
Fig. 2 is the asset management system's module frame chart for electric system of the present embodiment.
Embodiment
As shown in Figure 1, a kind of assets management method for electric system, comprises the steps:
1) first according to the material information that project is received, determine transformation rule, transformation rule comprises the mapping relations such as device class, Classification of materials, material characteristic, by the clear and definite unique corresponding device type of transformation rule, search BOM hierarchal model according to device type, if transformation rule, BOM hierarchal model all exist, then automatically generate initial assets BOM, if transformation rule does not exist, then according to material determination device type, manually set up initial wealth BOM;
Receive material according to project automatically to create initial wealth BOM and comprise the steps:
1. the relevant information of synchronizing project from PS module 2, comprises project definition, item description, item types, electric pressure etc.;
2. the information of synchronous materiel warehouse-out voucher from MM module 3, comprises delivery order number, material number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value etc.;
3. according to the material that project is received, determine unique corresponding device type by transformation rule, set up initial assets BOM, set up item, material, relation between equipment and subset; Initial wealth BOM information comprises project definition, item description, delivery order number, material number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value, device numbering, device description, assets class etc.; Described transformation rule comprises the mapping relations such as device class, Classification of materials, material characteristic.
2) according to the situation of waste material more than engineering, and existing material and equipment room corresponding relation, adjustment assets BOM, if the corresponding multiple equipment of material, then determined the equipment corresponding to material return by equipment factory number, thus guarantee that logistics, information flow are consistent;
Comprise the steps: according to waste material adjustment assets BOM more than engineering
1. the information of synchronous material refund vouchers from MM module, comprises refund vouchers number, material number, material description, material unit, material group, material cancelling stocks quantity etc.;
2. according to the engineering material returned, and existing material and equipment room corresponding relation, adjustment assets BOM, the information of adjustment comprises the kind of the engineering material returned, corresponding equipment etc.
3) after being completed according to project, device context situation of checking and accepting adjusts assets BOM again, thus determines the quantity of equipment in assets BOM, and whether the set membership of assets BOM and relevant information and field erected equipment are consistent;
According to device context check and accept situation more new assets BOM comprise the steps:
1. equipment leading out acceptance list from assets BOM management, the information of derivation comprises: item description, device numbering, device description, device type, factory number, equipment technical parameters etc.;
2. carry out scene to check, improve assets BOM information, import system from assets BOM administration module, the information of importing comprises: device numbering, device description, device type, factory number, equipment technical parameters etc.
4) according to checking and accepting the rear final assets BOM Automatic generation of information Unit account of plant confirmed, and declaring, audit and examining by equipment alteration flow process, interlock generation equipment card;
Generate Unit account of plant according to assets BOM to comprise the steps:
1. Asynchronous Transfer Mode is adopted by facility information from assets BOM module synchronization to equipment alteration administration module;
2. at equipment alteration administration module according to the response mechanism of the synchronous information of assets BOM by resource and assets, comprise and automatically generate Unit account of plant by interval and device type, and adjust, the relevant information of Improving Equipment machine account, comprise device description, affiliated station institute/circuit, equipment technical parameters etc.;
3. adopt Asynchronous Transfer Mode that the facility information of adjustment is synchronized to assets BOM administration module from equipment alteration administration module;
4. automatically created the equipment card of PM module by interface according to the assets BOM relevant information of assets BOM administration module.
5) with project or position for querying condition, tabulating equipment card image, carries out the verification of information norm, if check information is correct according to remittance the long and batch, equipment card then links and generates assets card, thus sets up " material-equipment-assets " trigram interaction relation.
Produce assets card according to equipment card to comprise the steps:
1. according to the information of the querying condition tabulating equipment card such as project or electric substation, system is believed equipment card
Submit to after breath verifies;
2. after receiving equipment card image, carry out the perfect of information, the errorless rear batch of confirmation creates assets
Card, and return asset number to the assets BOM of the equipment card of PM module and assets BOM administration module, thus set up material, interaction relation between equipment and assets.
As shown in Figure 2, a kind of asset management system for electric system, comprises the PS module 2 for providing project information, the process management of finished item; For providing the MM module 3 of material information, be configured to materiel warehouse-out voucher, the information source of material refund vouchers; For the equipment alteration module 4 of apparatus for establishing machine account, be configured to the examination & approval of Unit account of plant establishment and equipment alteration process; For the PM module 5 of apparatus for establishing card, be configured to the tie that equipment and assets link; For setting up the AM module 6 of assets card; And for setting up the assets BOM administration module 1 of material, equipment, assets interaction relation, be configured to material code, device coding, assets coding interlock and corresponding important bridge.Wherein, PS module 2 is connected the input end of assets BOM administration module 1 with the output terminal of MM module 3, and equipment alteration module 4 and PM module 5 manage mould 1 piece with assets BOM respectively and be bi-directionally connected, and AM module 6 and PM module 5 are bi-directionally connected.
Above-described embodiment and graphic and non-limiting product form of the present invention and style, any person of an ordinary skill in the technical field, to its suitable change done or modification, all should be considered as not departing from patent category of the present invention.

Claims (4)

1., for an assets management method for electric system, it is characterized in that comprising the steps:
1) first according to the material information that project is received, determine transformation rule, by the clear and definite unique corresponding device type of transformation rule, BOM hierarchal model is searched according to device type, if transformation rule, BOM hierarchal model all exist, then automatically generate initial assets BOM, if transformation rule does not exist, then according to material determination device type, manually set up initial wealth BOM;
2) according to the situation of waste material more than engineering, and existing material and equipment room corresponding relation, adjustment assets BOM, if the corresponding multiple equipment of material, then determined the equipment corresponding to material return by equipment factory number, thus guarantee that logistics, information flow are consistent;
3) after being completed according to project, device context situation of checking and accepting adjusts assets BOM again, thus determines the quantity of equipment in assets BOM, and whether the set membership of assets BOM and relevant information and field erected equipment are consistent;
4) according to checking and accepting the rear final assets BOM Automatic generation of information Unit account of plant confirmed, and declaring, audit and examining by equipment alteration flow process, interlock generation equipment card;
5) with project or position for querying condition, tabulating equipment card image, carries out the verification of information norm, if check information is correct according to remittance the long and batch, equipment card then links and generates assets card, thus sets up " material-equipment-assets " trigram interaction relation;
In step 1) in, create initial wealth BOM according to material and comprise the steps:
1. the relevant information of synchronizing project from PS module, comprises project definition, item description, item types, voltage level;
2. the information of synchronous materiel warehouse-out voucher from MM module, comprises delivery order number, material number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out is worth;
3. according to the material that project is received, determine unique corresponding device type by transformation rule, set up initial assets BOM, set up item, material, relation between equipment and subset; Information comprises project definition, item description, delivery order number, material number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value, device numbering, device description, assets class, and described transformation rule comprises device class, Classification of materials, material characteristic mapping relations;
In step 4) in, generate Unit account of plant according to assets BOM and comprise the steps:
1. Asynchronous Transfer Mode is adopted by facility information from assets BOM module synchronization to equipment alteration administration module;
2. at equipment alteration administration module according to the response mechanism of the synchronous information of assets BOM by resource and assets, comprise and automatically generate Unit account of plant by interval and device type, and adjust, the relevant information of Improving Equipment machine account, comprise device description, affiliated station institute/circuit, equipment technical parameters;
3. adopt Asynchronous Transfer Mode that the facility information of adjustment is synchronized to assets BOM administration module from equipment alteration administration module;
4. automatically created the equipment card of PM module by interface according to the assets BOM relevant information of assets BOM administration module.
2. a kind of assets management method for electric system as claimed in claim 1, is characterized in that in step 2) in, comprise the steps: according to waste material adjustment assets BOM more than engineering
1. the information of synchronous material refund vouchers from MM module, comprises refund vouchers number, material number, material description, material unit, material group, material cancelling stocks quantity;
2. according to the engineering material returned, and existing material and equipment room corresponding relation, adjustment assets BOM, the information of adjustment comprises the kind of the engineering material returned, corresponding equipment.
3. a kind of assets management method for electric system as claimed in claim 1, is characterized in that in step 3) in, check and accept more new assets BOM according to device context and comprise the steps:
1. equipment leading out acceptance list from assets BOM management, the information of derivation comprises: item description, device numbering, device description, device type, factory number, equipment technical parameters;
2. carry out scene to check, improve assets BOM information, import system from assets BOM administration module, the information of importing comprises: device numbering, device description, device type, factory number, equipment technical parameters.
4. a kind of assets management method for electric system as claimed in claim 1, is characterized in that: in step 5) in, produce assets card according to equipment card and comprise the steps:
1. according to the information of project or electric substation's querying condition tabulating equipment card, system is submitted to after verifying equipment card image;
2. after receiving equipment card image, the information of carrying out is perfect, the errorless rear batch of confirmation creates assets card, asset number information is turned back to the asset number field of the equipment card asset number field of PM module and the assets BOM of assets BOM administration module, thus set up material, interaction relation between equipment and assets.
CN201210553872.1A 2012-12-19 2012-12-19 A kind of assets management method for electric system and system Active CN102999820B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210553872.1A CN102999820B (en) 2012-12-19 2012-12-19 A kind of assets management method for electric system and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210553872.1A CN102999820B (en) 2012-12-19 2012-12-19 A kind of assets management method for electric system and system

Publications (2)

Publication Number Publication Date
CN102999820A CN102999820A (en) 2013-03-27
CN102999820B true CN102999820B (en) 2015-11-25

Family

ID=47928364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210553872.1A Active CN102999820B (en) 2012-12-19 2012-12-19 A kind of assets management method for electric system and system

Country Status (1)

Country Link
CN (1) CN102999820B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077727B (en) * 2014-06-27 2017-11-10 中国能源建设集团广东省电力设计研究院有限公司 Substation Electric Equipment account intelligence input method and system
CN104182835A (en) * 2014-08-22 2014-12-03 国家电网公司 Three-dimensional material goods classification model based on entire life-cycle management and type determination method
CN205427588U (en) * 2014-10-04 2016-08-03 布里斯托公司商用名远程自动化解决方案 System for be used for making up equipment level for process mill
CN104331426B (en) * 2014-10-20 2018-06-19 国电南瑞科技股份有限公司 A kind of method for quickly retrieving of the electric system searcher based on browser
CN105631563A (en) * 2014-10-29 2016-06-01 北京临近空间飞行器系统工程研究所 Informationized management method for measuring and control system products
CN105160458A (en) * 2015-08-12 2015-12-16 中国南方电网有限责任公司 Information processing system and method supporting seven-dimensional ledger equipment management
CN105590173A (en) * 2015-12-29 2016-05-18 国网浙江省电力公司 Association relation modeling method between power grid main network device and productive material
CN106599203B (en) * 2016-12-15 2021-01-01 中国南方电网有限责任公司超高压输电公司 Data quality improvement method for asset full life cycle
CN107274098A (en) * 2017-06-20 2017-10-20 国网江苏省电力公司无锡供电公司 A kind of method of the grid equipment information intelligent storage based on dispatching of power netwoks technology
CN111597777B (en) * 2020-05-15 2023-06-02 上海电机系统节能工程技术研究中心有限公司 Material data processing method and device and electronic equipment
CN113095686A (en) * 2021-04-15 2021-07-09 广联达科技股份有限公司 Multi-standard-section cost adjusting method and device for power engineering

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102142108A (en) * 2010-02-03 2011-08-03 上海市电力公司 Information processing method of corresponding relationship among materials and equipment suitable for power system
CN102142109A (en) * 2010-02-03 2011-08-03 上海市电力公司 Decommissioning equipment recycling information data processing method suitable for power system
CN102184473A (en) * 2011-05-03 2011-09-14 中国南方电网有限责任公司 Comprehensive supervisory system for secondary power system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102142108A (en) * 2010-02-03 2011-08-03 上海市电力公司 Information processing method of corresponding relationship among materials and equipment suitable for power system
CN102142109A (en) * 2010-02-03 2011-08-03 上海市电力公司 Decommissioning equipment recycling information data processing method suitable for power system
CN102184473A (en) * 2011-05-03 2011-09-14 中国南方电网有限责任公司 Comprehensive supervisory system for secondary power system

Also Published As

Publication number Publication date
CN102999820A (en) 2013-03-27

Similar Documents

Publication Publication Date Title
CN102999820B (en) A kind of assets management method for electric system and system
CN103020873B (en) A kind of turn money method and system automatically for electric system
CN104850940B (en) Budget needed for the completion of projects preparation method and system based on engineering Whole Course Management
CN108564207B (en) BIM-based construction engineering intelligent bidding decision management system
CN105426300B (en) Standard conformance test system and method for CIM/E model of power system
CN108736465A (en) A kind of future-state electric network model construction method and device
CN112270550A (en) New energy electric power source tracing method and system based on block chain
CN102289743A (en) Computer simulation system and method in product production process
CN102496083B (en) Credit rating report manuscript manufacturing method
CN107067170A (en) A kind of cost accounting and quotation system based on assembling decomposition texture
CN103294568A (en) Distribution network model incremental storage method based on E language
CN101930481A (en) Method used for generating CIM model describing power grid change in designated time slot and system thereof
CN101364284A (en) Production management system for electrical power system
CN107181284A (en) The method of adjustment and device of a kind of out-of-limit electricity of circuit
CN103208050A (en) Decision platform for implementing comprehensive power-cut maintenance plan
CN104021455A (en) Equipment asset fine management system and method
CN102142108A (en) Information processing method of corresponding relationship among materials and equipment suitable for power system
CN101447067A (en) Method for controlling capital transfer of power system
CN104504491A (en) Meter reading control method and system
CN101916401A (en) Time traceable power grid economic model management method
CN104392384A (en) Substation engineering two-stage engineering quantity synchronous calculation system and method
CN110910008B (en) One-key cost accounting management system and management method for visual accounting flow
CN108898473A (en) A kind of project transferring method and device
CN107169620A (en) Model version circulation method between power network the superior and the subordinate scheduling system based on workflow
CN107330648A (en) The preparation method and scheduling apparatus of the vehicle trial-manufactured material inventory configured based on multi-vehicle-type

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant