CN102780570A - Achieving method and system for management of cloud computing devices - Google Patents
Achieving method and system for management of cloud computing devices Download PDFInfo
- Publication number
- CN102780570A CN102780570A CN2011101196805A CN201110119680A CN102780570A CN 102780570 A CN102780570 A CN 102780570A CN 2011101196805 A CN2011101196805 A CN 2011101196805A CN 201110119680 A CN201110119680 A CN 201110119680A CN 102780570 A CN102780570 A CN 102780570A
- Authority
- CN
- China
- Prior art keywords
- cloud computing
- equipment
- facility information
- gent
- computing equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
- G06F9/5072—Grid computing
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/02—Standardisation; Integration
- H04L41/0213—Standardised network management protocols, e.g. simple network management protocol [SNMP]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/04—Network management architectures or arrangements
- H04L41/046—Network management architectures or arrangements comprising network management agents or mobile agents therefor
Abstract
The invention discloses an achieving method and a system for management of cloud computing devices. The system comprises a device Master, a device Agent, and a network management server, wherein the device Master is used for receiving and storing information of the cloud computing devices managed by the Master and uploading the information to the device Agent; and the device Agent is used for storing the received information of the cloud computing devices and uploading information to the network management server which is used for obtaining and storing the information of the cloud computing devices from the device Agent. Through adoption of the technical scheme, inconvenience due to manual intervention can be avoided, and the working efficiency can be improved.
Description
Technical field
The present invention relates to network management technology, particularly a kind of implementation method of cloud computing equipment control and system.
Background technology
The cloud computing product is progressively used in the service product field.The essence of cloud computing is exactly by numerous equipment collaboration organization works, accomplishes a distributed system of calculation task jointly, and it has advantages such as dilatation is simple, dilatation is with low cost.Equipment in the cloud computing generally is the undetermined number purpose, need be according to traffic carrying capacity increase and decrease at any time.
What at present existing cloud computing was adopted is the traditional device management system; Usually only comprise NM server and cloud computing equipment in the traditional device management system; Wherein NM server is in charge of cloud computing equipment, all regards each cloud computing equipment as a network element.But NM server can only be managed the network element of known fixed number, when occurring that network element increases or during situation about deleting, need be on NM server revises the information such as alarm and performance statistics of network element through manual operation.Yet the number of cloud computing equipment is normally uncertain, can change along with traffic carrying capacity; Therefore; Use the traditional device management system, information such as the alarm of interpolation or deletion network element and performance statistics all need manual intervention, and this can bring huge workload undoubtedly; Thereby the reduction operating efficiency is brought sizable inconvenience simultaneously.
Summary of the invention
In view of this, main purpose of the present invention is to provide a kind of implementation method and system of cloud computing equipment control, solves the inconvenience that manual intervention brought, and increases work efficiency.
For achieving the above object, technical scheme of the present invention is achieved in that
The invention provides a kind of realization system of cloud computing equipment control, comprising:
Equipment Master is used to receive and preserve the facility information of the cloud computing equipment of self-management, is uploaded to device A gent then;
Device A gent is used to preserve the facility information of the cloud computing equipment of receiving, and is uploaded to NM server;
NM server is used for obtaining through device A gent the facility information and the preservation of cloud computing equipment.
Further comprise in the such scheme: cloud computing equipment,
Said cloud computing equipment is used for initiatively sending registration message to equipment Master;
Said equipment Master specifically is used for: facility information is registered and preserved to the facility information according to registration message to cloud computing equipment.
In the such scheme, said cloud computing equipment is further used for: send heartbeat message and the heartbeat message that equipment Master sends is replied response message to equipment Master;
Said equipment Master is further used for: send heartbeat message and the heartbeat message that cloud computing equipment is sent is replied response message to cloud computing equipment.
In the such scheme, said device A gent specifically is used for: obtain message to equipment Master transmitting apparatus information, and the facility information of the equipment of preservation Master transmission; Said equipment Master specifically is used for: the facility information that sends the cloud computing equipment of self managing to device A gent;
And/or,
Said NM server specifically is used for: obtain message to device A gent transmitting apparatus, preserve the facility information that device A gent sends; Device A gent specifically is used for: after the equipment of receiving obtains message, the facility information of preserving is uploaded to NM server.
In the such scheme, the cloud computing equipment of said equipment Master management occurs increasing when perhaps deleting,
Said equipment Master specifically is used for: the facility information that upgrades is initiatively sent to device A gent;
Said device A gent specifically is used for: the facility information of the renewal of sending according to equipment Master upgrades the facility information of preserving, and the facility information that upgrades is uploaded to NM server;
Said NM server specifically is used for: the facility information of the renewal of sending according to device A gent upgrades the facility information of preserving.
The present invention also provides a kind of implementation method of cloud computing equipment control, may further comprise the steps:
Equipment Master receives and preserves the facility information of the cloud computing equipment of self-management, is uploaded to device A gent then;
Device A gent preserves the facility information of the cloud computing equipment of receiving, and is uploaded to NM server, and NM server is preserved the facility information of receiving.
In the such scheme, said equipment Master receives and preserves the facility information of the cloud computing equipment of self-management, comprising:
Cloud computing device start or add fashionablely initiatively sends registration message to equipment Master;
Equipment Master registers and preserves facility information according to the facility information in the registration message to cloud computing equipment.
In the such scheme, said equipment Master management cloud computing equipment comprises:
The cloud computing equipment of equipment Master and the management jumping message of making up one's mind mutually receives that a side of heartbeat message replys response message.
In the such scheme, the said device A gent that is uploaded to comprises: when device A gent starts, obtain message to equipment Master transmitting apparatus information, equipment Master uploads the facility information of the cloud computing equipment of self managing to device A gent; And/or,
NM server obtains message to device A gent transmitting apparatus, and device A gent is uploaded to NM server with the facility information of preserving, and NM server is preserved the facility information that device A gent sends.
In the such scheme, the cloud computing equipment of said equipment Master management occurs increasing when perhaps deleting, this method specifically comprises:
Equipment Master initiatively sends to device A gent with the facility information that upgrades;
Device A gent upgrades the facility information of preserving according to the facility information of the renewal that equipment Master sends, and the facility information that upgrades is uploaded to NM server;
NM server upgrades the facility information of preserving according to the facility information of the renewal that device A gent sends.
Therefore, the implementation method of a kind of cloud computing equipment control provided by the present invention and system have following characteristics and advantage:
The present invention gets up the equipment control of hundreds of continuous variation in the cloud computing; The increase of cloud computing equipment and deleting; Will in time notify and upload to NM server automatically, so just improve the operating efficiency of system, avoid the inconvenience of manual intervention.
Description of drawings
Fig. 1 is the structure chart of the realization system of cloud computing equipment control of the present invention;
Fig. 2 is the flow chart of the implementation method of cloud computing equipment control of the present invention;
Fig. 3 is the data flowchart of the implementation method of cloud computing equipment control of the present invention.
Embodiment
Basic thought of the present invention is: equipment Master receives and preserves the facility information of the cloud computing equipment of self-management, is uploaded to device A gent then; NM server obtains the facility information of cloud computing equipment through device A gent and preserves.Like this, when the situation of cloud computing equipment increase and decrease occurring, the facility information of the cloud computing equipment after equipment Master will upgrade is uploaded to device A gent, passes to NM server by device A gent again.
Below in conjunction with accompanying drawing and specific embodiment the present invention is remake further detailed explanation.
As shown in Figure 1, the realization system of cloud computing equipment control of the present invention comprises equipment Master 12, device A gent 13 and NM server 14.Wherein,
Equipment Master 12 is used to receive and preserve the facility information of the cloud computing equipment of self-management, is uploaded to device A gent 13 then;
Device A gent 13, are used to preserve the facility information of the cloud computing equipment of receiving, and are uploaded to NM server 14;
Said system further comprises: cloud computing equipment 11 is used for initiatively sending registration message to equipment Master 12 response message that succeeds in registration that receiving equipment Master 12 responds;
Equipment Master 12 specifically is used for: facility information is registered and preserved to the facility information according to registration message to cloud computing equipment 11, sends the response message that succeeds in registration to cloud computing equipment 11, includes cloud computing equipment 11 in management.
Equipment Master 12 is further used for: send heartbeat message and the heartbeat message that cloud computing equipment 11 is sent is replied response message to cloud computing equipment 11.
Here, said cloud computing equipment 11 is meant any in a plurality of cloud computing equipment in the realization system of cloud computing equipment control.
Equipment Master 12; Specifically be used for: be responsible for management and monitoring work cloud computing equipment 11; Receive the registration message that cloud computing equipment 11 initiatively sends to equipment Master 12; According to the facility information in the registration message facility information is registered and preserved to cloud computing equipment, return the response message that succeeds in registration to cloud computing equipment 11 then, include cloud computing equipment 11 in management; When the realization system of cloud computing equipment control normally moves, all cloud computing equipment 11 of its management are monitored, increase or when deleting cloud computing equipment, equipment Master 12 upgrades the facility information of preserving.
After device A gent 13 started, device A gent 13 specifically was used for: obtain message to equipment Master 12 transmitting apparatus information, and the facility information of the equipment of preservation Master 12 transmissions;
Equipment Master 12 specifically is used for: the facility information that sends the own cloud computing equipment of being managed to device A gent 13.
When the realization system of cloud computing equipment control normally moved, the cloud computing equipment of equipment Master 12 management occurred increasing when perhaps deleting, equipment Master 12 specifically is used for: the facility information that upgrades is initiatively sent to device A gent 13; Device A gent 13 specifically is used for: the facility information of the renewal of sending according to equipment Master 12 upgrades the facility information of preserving, and gives NM server 14 with the facility information active upload of upgrading; NM server 14 specifically is used for: the facility information of the renewal of sending according to device A gent 13 upgrades the facility information of preserving.
After NM server 14 starts, specifically be used for: obtain (SNMPGET) message to device A gent 13 transmitting apparatus, preserve the facility information that device A gent 13 sends; Device A gent 13 specifically is used for: after receiving SNMP GET message, the facility information of preserving is uploaded to NM server 14.
The implementation method of cloud computing equipment control of the present invention is as shown in Figure 2, may further comprise the steps:
Step 201: send registration message to equipment Master behind the cloud computing device start, equipment Master registers and preserves facility information according to the facility information in the registration message to cloud computing equipment, cloud computing equipment is included in the management of equipment Master.
Step 202: device A gent obtains message to equipment Master transmitting apparatus information after starting, and equipment Master is uploaded to device A gent with the facility information of the own cloud computing equipment of being managed, and device A gent preserves the facility information of receiving.
Step 203: after NM server starts, send SNMP GET message to device A gent, device A gent is carried at the facility information of oneself preserving in the SNMP GET ACK message and sends to NM server, and NM server is preserved the equipment message of receiving.
Step 204: after the realization system of cloud computing equipment control got in the normal operating conditions, equipment Master knows that the cloud computing equipment of being managed has to be increased or when deleting, equipment Master initiatively uploads the facility information of renewal to device A gent; Device A gent upgrades the facility information of preserving according to the facility information of the renewal of receiving, and gives NM server with the facility information active upload of upgrading, and NM server upgrades the facility information of preserving according to the facility information of the renewal of receiving.
The facility information of the renewal that equipment Master uploads to device A gent can be the equipment full dose information of all cloud computing equipment of the current management of equipment Master; Promptly before the equipment Master on the facility information basis that device A gent sends; Comprise the facility information of the cloud computing equipment of current increase, or removed the facility information of the current cloud computing equipment of deleting; Also can be the facility information of the facility information of the cloud computing equipment of current increase or the cloud computing equipment of deleting.
The relevant device information that device A gent uploads to NM server can be the equipment full dose information of all cloud computing equipment of the current management of equipment Master; Promptly before the device A gent on the facility information basis that NM server sends; Comprise the facility information of the cloud computing equipment of current increase, or removed the facility information of the current cloud computing equipment of deleting; Also can be the facility information of the facility information of the cloud computing equipment of current increase or the cloud computing equipment of deleting.
Based on foregoing description, below in conjunction with Fig. 3 and specific embodiment the present invention is remake further detailed explanation, concrete data flow is following:
Step 301: behind the cloud computing device start, send registration message, cloud computing equipment is registered according to the facility information in the registration message to equipment Master.
Dispose the IP address of equipment Master in the cloud computing equipment; And it is the cloud computing equipment disposition is back to equipment Master transmission registration message for starting; Like this, the cloud computing device start is initiatively set up link with equipment Master; After link is successfully set up, will send registration message to equipment Master according to the IP address of the equipment Master that disposes.Wherein, facility information comprises: information such as device category, machine name, IP address, port numbers, OS Type.Communicate based on TCP/IP between cloud computing equipment and the equipment Master.
Step 302: equipment Master preserves the facility information in the registration message.
Said equipment Master can form by two-shipper is active and standby.
Step 303: equipment Master returns the response message that succeeds in registration to the cloud computing equipment that sends registration message, this cloud computing equipment is then included in the management of equipment Master.
After step 304: device A gent starts, initiatively obtain message to equipment Master transmitting apparatus information.
Device A gent disposes the IP address of equipment Master, and device A gent is configured to obtain message to equipment Master transmitting apparatus information after the startup.Device A gent is the OAMAgent of cloud computing equipment, is the true network element in the realization system of cloud computing equipment control.After device A gent starts, initiatively link, after link is set up successfully, will obtain message to equipment Master transmitting apparatus information according to the IP address of the equipment Master that disposes with equipment Master foundation.Communicate based on TCP/IP between device A gent and the equipment Master.
Step 305: after equipment Master receives apparatus information acquiring message, give device A gent with the equipment full dose information uploading of self-administered cloud computing equipment.
Said equipment full dose information is meant the facility information of all cloud computing equipment of the current management of equipment Master.Equipment Master by the agreement form to device A gent upload device full dose information, said agreement form can for: each field such as the facility information of current device number, each equipment, reserved field is arranged in order transmission.
Step 306: device A gent is kept at it in own internal memory after receiving equipment full dose information.
Step 307: after NM server starts, initiate the request of obtaining facility information to device A gent through SNMP Get message.
NM server disposes the IP address of device A gent.After NM server starts, when the user clicks the device A gent item on the network management interface that NM server provides, trigger NM server and send SNMP Get message to device A gent according to the IP address of the device A gent of configuration.Communicate based on SNMP between device A gent and the NM server.
After step 308: device A gent receives the request of NM server, from own internal memory, read out equipment full dose information, send to NM server through SNMP GETACK message.
After device A gent receives SNMP GET message, give NM server through SNMP GET ACK message synchronization with the equipment full dose information of preserving in the own internal memory.
Step 309: NM server is preserved equipment full dose information.
NM server is kept at equipment full dose information in the cloud computing equipment list of oneself after receiving SNMP GET ACK message.After this; When the user clicks the device A gent item on the network management interface that NM server provides again; NM server will be from the cloud computing equipment list fetch equipment information, and be illustrated on the network management interface, do not need to send SNMP GET message to device A gent again and obtain facility information.
Step 310: when increasing in the realization system of cloud computing equipment control or deleting cloud computing equipment, equipment Master initiatively uploads the equipment full dose information of self-administered renewal to device A gent.
Particularly; When increasing cloud computing equipment in the realization system of cloud computing equipment control; Cloud computing equipment at first sends registration message to equipment Master; Equipment Master preserves the facility information in the registration message, on the basis of original equipment full dose information, increases relevant device information, and the equipment full dose information after equipment Master will upgrade initiatively is uploaded to device A gent; When deleting cloud computing equipment in the realization system of cloud computing equipment control, equipment Master removes the facility information of the cloud computing equipment of deleting in original equipment full dose information, and the equipment full dose information uploading after will upgrading is then given device A gent.
After equipment Master includes cloud computing equipment in management; Can monitor the cloud computing equipment of its management; Be all cloud computing equipment of equipment Master and its management jumping message of making up one's mind mutually, receive that a side of heartbeat message in time replys response message, to confirm link condition and equipment situation.Whether normally equipment Master jumps message authentication management between the two with each cloud computing equipment through regularly making up one's mind mutually and by administrative relationships, through the timing heartbeat, can confirm the other side's operation.
Specifically comprise: when the heartbeat message of a certain cloud computing equipment transmission is not received the response message of equipment Master answer; Or do not receive when number of times that equipment Master replys response message reaches set point; Confirm and equipment Master between link fails; Then initiatively after the chain rupture, rebulid and equipment Master between link and send registration message to equipment Master, equipment Master registers cloud computing equipment according to the facility information in the registration message of receiving; And, include cloud computing equipment in management to cloud computing device replied response message;
When the heartbeat message of equipment Master transmission is not received the response message of corresponding cloud computing device replied; Or the number of times of not receiving corresponding cloud computing device replied response message is when reaching set point; Equipment Master confirms corresponding cloud computing equipment out of control, then from self-administered equipment full dose information, removes the facility information of this cloud computing equipment.
Equipment full dose information after the renewal that step 311: device A gent preservation equipment Master uploads;
Wherein, the equipment full dose information of the original storage of the device A gent equipment full dose information that will be updated to after the renewal that equipment Master uploads substitutes.
Step 312: device A gent is to the equipment Master Returning equipment full dose information updating response message that finishes.
Step 313: device A gent is through the equipment full dose information of SNMP Trap message active after NM server is uploaded renewal.
Step 314: the equipment full dose information after NM server will upgrade is preserved, and reads for the user.
After NM server is received SNMP Trap message, the original equipment full dose information of preserving in the cloud computing equipment list is replaced with the equipment full dose information after the renewal.
Describe by above-mentioned execution mode visible, through this implementation of the present invention, the cloud computing equipment control that can easily uncertain number or number in the cloud computing be changed at any time.Wherein adopt at present general SNMP to transmit information between the device A gent calcaneus rete pipe server, make that the device A gent among the present invention can insert various NM servers easily, ease for use and expandability are good.After the cloud computing equipment control got up, just can easily collect about facility informations such as the relevant alarm of equipment increase and decrease, performance statisticses.
The above is merely preferred embodiment of the present invention, is not to be used to limit protection scope of the present invention.
Claims (10)
1. the realization system of a cloud computing equipment control is characterized in that, comprising:
Equipment Master is used to receive and preserve the facility information of the cloud computing equipment of self-management, is uploaded to device A gent then;
Device A gent is used to preserve the facility information of the cloud computing equipment of receiving, and is uploaded to NM server;
NM server is used for obtaining through device A gent the facility information and the preservation of cloud computing equipment.
2. system according to claim 1 is characterized in that, further comprises: cloud computing equipment,
Said cloud computing equipment is used for initiatively sending registration message to equipment Master;
Said equipment Master specifically is used for: facility information is registered and preserved to the facility information according to registration message to cloud computing equipment.
3. system according to claim 2 is characterized in that,
Said cloud computing equipment is further used for: send heartbeat message and the heartbeat message that equipment Master sends is replied response message to equipment Master;
Said equipment Master is further used for: send heartbeat message and the heartbeat message that cloud computing equipment is sent is replied response message to cloud computing equipment.
4. system according to claim 1 is characterized in that,
Said device A gent specifically is used for: obtain message to equipment Master transmitting apparatus information, and the facility information of the equipment of preservation Master transmission; Said equipment Master specifically is used for: the facility information that sends the cloud computing equipment of self managing to device A gent;
And/or,
Said NM server specifically is used for: obtain message to device A gent transmitting apparatus, preserve the facility information that device A gent sends; Device A gent specifically is used for: after the equipment of receiving obtains message, the facility information of preserving is uploaded to NM server.
5. according to the arbitrary described system of claim 1 to 4, it is characterized in that the cloud computing equipment of said equipment Master management occurs increasing when perhaps deleting,
Said equipment Master specifically is used for: the facility information that upgrades is initiatively sent to device A gent;
Said device A gent specifically is used for: the facility information of the renewal of sending according to equipment Master upgrades the facility information of preserving, and the facility information that upgrades is uploaded to NM server;
Said NM server specifically is used for: the facility information of the renewal of sending according to device A gent upgrades the facility information of preserving.
6. the implementation method of a cloud computing equipment control is characterized in that, may further comprise the steps:
Equipment Master receives and preserves the facility information of the cloud computing equipment of self-management, is uploaded to device A gent then;
Device A gent preserves the facility information of the cloud computing equipment of receiving, and is uploaded to NM server, and NM server is preserved the facility information of receiving.
7. method according to claim 6 is characterized in that, said equipment Master receives and preserve the facility information of the cloud computing equipment of self-management, comprising:
Cloud computing device start or add fashionablely initiatively sends registration message to equipment Master;
Equipment Master registers and preserves facility information according to the facility information in the registration message to cloud computing equipment.
8. method according to claim 7 is characterized in that, this method also comprises:
The cloud computing equipment of equipment Master and the management jumping message of making up one's mind mutually receives that a side of heartbeat message replys response message.
9. method according to claim 6 is characterized in that,
The said device A gent that is uploaded to comprises: when device A gent starts, obtain message to equipment Master transmitting apparatus information, equipment Master uploads the facility information of the cloud computing equipment of self managing to device A gent; And/or,
NM server obtains message to device A gent transmitting apparatus, and device A gent is uploaded to NM server with the facility information of preserving, and NM server is preserved the facility information that device A gent sends.
10. according to the arbitrary described method of claim 6 to 9, it is characterized in that the cloud computing equipment of said equipment Master management occurs increasing when perhaps deleting, this method specifically comprises:
Equipment Master initiatively sends to device A gent with the facility information that upgrades;
Device A gent upgrades the facility information of preserving according to the facility information of the renewal that equipment Master sends, and the facility information that upgrades is uploaded to NM server;
NM server upgrades the facility information of preserving according to the facility information of the renewal that device A gent sends.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101196805A CN102780570A (en) | 2011-05-10 | 2011-05-10 | Achieving method and system for management of cloud computing devices |
PCT/CN2011/081135 WO2012151855A1 (en) | 2011-05-10 | 2011-10-21 | Method and system for managing cloud computing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101196805A CN102780570A (en) | 2011-05-10 | 2011-05-10 | Achieving method and system for management of cloud computing devices |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102780570A true CN102780570A (en) | 2012-11-14 |
Family
ID=47125336
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011101196805A Pending CN102780570A (en) | 2011-05-10 | 2011-05-10 | Achieving method and system for management of cloud computing devices |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN102780570A (en) |
WO (1) | WO2012151855A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108880856A (en) * | 2018-05-04 | 2018-11-23 | 江西山水光电科技股份有限公司 | A kind of DCN protection system based on vlan management passage |
CN110380928A (en) * | 2019-07-12 | 2019-10-25 | 苏州浪潮智能科技有限公司 | A kind of the host monitoring and managing method and device of monitoring system |
CN110535911A (en) * | 2019-07-30 | 2019-12-03 | 北京大学 | A kind of distribution management method of open wireless network |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110582750A (en) * | 2017-04-28 | 2019-12-17 | 北京嘀嘀无限科技发展有限公司 | system and method for task scheduling and device management |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1422040A (en) * | 2001-11-23 | 2003-06-04 | 华为技术有限公司 | Remote equipment controlling method |
US20040120265A1 (en) * | 2002-11-06 | 2004-06-24 | Nokia Corporation | Method for controlling terminal fault corrections in cellular system |
CN1794647A (en) * | 2005-05-19 | 2006-06-28 | 华为技术有限公司 | Method and its system upload terminal information in equipment management |
CN101958805A (en) * | 2010-09-26 | 2011-01-26 | 中兴通讯股份有限公司 | Terminal access and management method and system in cloud computing |
-
2011
- 2011-05-10 CN CN2011101196805A patent/CN102780570A/en active Pending
- 2011-10-21 WO PCT/CN2011/081135 patent/WO2012151855A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1422040A (en) * | 2001-11-23 | 2003-06-04 | 华为技术有限公司 | Remote equipment controlling method |
US20040120265A1 (en) * | 2002-11-06 | 2004-06-24 | Nokia Corporation | Method for controlling terminal fault corrections in cellular system |
CN1794647A (en) * | 2005-05-19 | 2006-06-28 | 华为技术有限公司 | Method and its system upload terminal information in equipment management |
CN101958805A (en) * | 2010-09-26 | 2011-01-26 | 中兴通讯股份有限公司 | Terminal access and management method and system in cloud computing |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108880856A (en) * | 2018-05-04 | 2018-11-23 | 江西山水光电科技股份有限公司 | A kind of DCN protection system based on vlan management passage |
CN110380928A (en) * | 2019-07-12 | 2019-10-25 | 苏州浪潮智能科技有限公司 | A kind of the host monitoring and managing method and device of monitoring system |
CN110535911A (en) * | 2019-07-30 | 2019-12-03 | 北京大学 | A kind of distribution management method of open wireless network |
Also Published As
Publication number | Publication date |
---|---|
WO2012151855A1 (en) | 2012-11-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107547589B (en) | Data acquisition processing method and device | |
US10200506B2 (en) | Method, system and device for monitoring data | |
CN110830283B (en) | Fault detection method, device, equipment and system | |
US11218541B2 (en) | Data storage method, storage server, and storage medium and system | |
EP3101872B1 (en) | Load balancing server for forwarding prioritized traffic from and to one or more prioritized auto-configuration servers | |
JP2014519273A5 (en) | ||
CN102215132A (en) | Embedded SNMP (Simple Network Management Protocol) management end data collecting device, system and method based on database | |
CN102780570A (en) | Achieving method and system for management of cloud computing devices | |
WO2022062807A1 (en) | Device control method, server, and storage medium | |
CN101409654B (en) | Method for processing SNMP information in network management system | |
CN113259493B (en) | Ukey information acquisition method, device, equipment and storage medium based on Ukey cabinet | |
CN104410657A (en) | Data transmission method and device in distributed central monitoring system | |
CN101159676B (en) | Data transmission method and system | |
EP3660679B1 (en) | Data backup method, device and system | |
CN112153146B (en) | Operation notification method and apparatus, storage medium, and electronic apparatus | |
US20150277892A1 (en) | Multi-phase software delivery | |
CN104683479A (en) | Distributed content pushing system | |
KR20140125223A (en) | Method for collecting information with management interface in contents network based on information centric networking, content network management system, and node apparatus | |
US20170286560A1 (en) | Method, device and system for device troubleshooting service of the internet of things | |
JP5162686B2 (en) | Method for retrieving object from DM client and device management system related thereto | |
CN102594611B (en) | Trap session chain table updating method for webmaster agent | |
CN105847039A (en) | Network monitoring method and network monitoring system based on dynamic executable script | |
CN109783538A (en) | Data processing system | |
US20140143264A1 (en) | Policy event driven remote desktop recording across a data network | |
CN105721531A (en) | Message synchronization method and apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121114 |