CN102740326A - Managing method and device for processing resources in BBU - Google Patents

Managing method and device for processing resources in BBU Download PDF

Info

Publication number
CN102740326A
CN102740326A CN2011100872868A CN201110087286A CN102740326A CN 102740326 A CN102740326 A CN 102740326A CN 2011100872868 A CN2011100872868 A CN 2011100872868A CN 201110087286 A CN201110087286 A CN 201110087286A CN 102740326 A CN102740326 A CN 102740326A
Authority
CN
China
Prior art keywords
resource
dsp
processing
bbu
resource pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100872868A
Other languages
Chinese (zh)
Other versions
CN102740326B (en
Inventor
王东
许灵军
程广辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201110087286.8A priority Critical patent/CN102740326B/en
Publication of CN102740326A publication Critical patent/CN102740326A/en
Application granted granted Critical
Publication of CN102740326B publication Critical patent/CN102740326B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Abstract

Embodiments of the invention disclose a managing method and a device for processing resources in a BBU. According to technical schemes provided in embodiments of the invention, processing resources in the BBU can be divided into DSP resource pools according to processing functions, and according to the resource amount required currently, corresponding resources are called and other DSP devices are turned off. Thus, sharing of the processing resources are realized in multiple sectors which correspond to the BBU, which can increase the utilization rate of hardware resources and realize reasonable scheduling and managing of the processing resources; and when load of a sector is relatively light, part of DSP devices can be turned off according to business conditions, which can achieve the goal of saving power consumption without influencing network businesses.

Description

The management method and the equipment of the processing resource among a kind of BBU
Technical field
The present invention relates to communication technical field, particularly relate to the management method and the equipment of the processing resource among a kind of BBU.
Background technology
BBU (Building Base band Unit is generally adopted in existing base station; Indoor baseband processing unit)+and RRU (Radio Remote Unit, Remote Radio Unit) framework, promptly single BBU connects a plurality of RRU; Each RRU connects antenna respectively and covers different sectors; Wherein BBU is responsible for Base-Band Processing, and RRU is responsible for radio frequency processing, and the two connects through optical fiber interface.
Present 2G (2nd Generation; Second generation mobile communication technology)/3G (3rd Generation; Third generation mobile communication technology) system belongs to traditional narrowband systems; Base-Band Processing is comparatively simple, and ((Digital Signal Processing, Digital Signal Processing) device processing apparatus can be accomplished whole Base-Band Processing of one or more sectors to single DSP in interior monolithic base band integrated circuit board of BBU or the integrated circuit board.
As shown in Figure 1, be the sketch map of traditional base station of the prior art hardware composition structure.
Base-Band Processing generally can be divided into modules such as protocol processes, coding, decoding, modulation, demodulation, many antenna processing by logic function in wherein every sector, and is as shown in Figure 2, is the sketch map of traditional B BU logical architecture of the prior art.
Each sectors process structure and hardware resource be symmetry fully, and unique difference is to handle different sectors different user data.Because processing complexity is not high; Get final product whole base band logic function treatment of a complete above-mentioned sector or a plurality of sectors in the general single DSP device; Also improved device integration so simultaneously; It is the BBU framework that is complementary with GSM (Global System for Mobile communications, global system for mobile communications)/TD-SCDMA narrowband systems such as (Time Division Synchronous Code Division Multiple Access, TD SDMAs).
But for LTE (Long Term Evolved, Long Term Evolution) broadband system, it is that (the LTE bandwidth is 20M to more than tens of times of TD-SCDMA that single sector hardware handles requires; TD-SCDMA 1.6M bandwidth), although the logic function module is formed basically identical, each module data treating capacity sharply rises; This moment, single DSP device can't be accomplished whole Base-Band Processing of single sector, need share a plurality of DSP devices and handle respectively, for example; As shown in Figure 3, be the sketch map of LTE traditional B BU hardware structure in the prior art, wherein; This moment, DSP device 1 responsible upper-layer protocol was handled, and DSP device 2 is responsible for coding, decoding, the 3 responsible modulation of DSP device and many antenna processing etc.
Network load and number of users real-time change during practical application; Full load and light hours are huge to handling the resource requirement difference, and for example: number of users was more when the LTE system hurried daytime, and the peak-peak treating capacity requires to reach 100Mbps; And to morning at night; Number of users is less, and the data throughout that needs to handle possibly be merely several Mbp, device resource is taken requirement reduce greatly.But in order to guarantee the sector operate as normal and the network coverage; Each logic function module of base band (DSP device 1, DSP device 2, DSP device 3) all needs normal the unlatching to form an integral baseband and handle, and difference only is that each logic function module by day or the data volume size of handling night.Therefore; When load is light, although actual required processing resource is less, based on existing logical architecture; Each DSP device of being responsible for this sectors process all needs operate as normal; Any one all can not turn-off or dormancy with power saving, processing apparatus such as DSP occupy base band integrated circuit board 70% above power consumption, have big power wastage.On the other hand, because the base band integrated circuit board independent process of three sectors, can't shared resource; Therefore every sector base band all need design by peaking capacity; And in fact three sectors often reach peak load seldom simultaneously, and promptly certain moment sector 1 number of users is more, and sector 2,3 numbers of users are less; Thereby base band integrated circuit board 2 possessed the ability of accomplishing sector 2,3 base band and can base band integrated circuit board 3 be freed out and turn-off or dormancy this moment in view of processing demands; But be limited to the existing hardware framework,, also all must dealing with complete carrying out on the integrated circuit board separately even each sector treating capacity is littler.
In realizing process of the present invention, the inventor finds that there is following problem at least in prior art:
As stated,,, can't carry out hardware resource optimization or shutoff according to the situation that traffic load changes for the LTE broadband system based on existing logic and hardware structure, traffic load height no matter, each hardware module is worked all the time, has more high-power waste.
Summary of the invention
The object of the present invention is to provide the management method and the equipment of the processing resource among a kind of BBU, can be issued to energy-saving and cost-reducing target in the prerequisite that does not influence the network coverage and customer service according to the in good time cutoff DSP of the variation device of load.
For this reason, the embodiment of the invention adopts following technical scheme:
The management method of the processing resource among a kind of BBU may further comprise the steps:
A plurality of DSP devices that BBU comprised are divided into a plurality of DSP resource pools; Comprise one or more DSP devices in each DSP resource pool respectively; Resource in each DSP resource pool is respectively applied for the processing that realizes one or more types, and the processing capacity that resource realized in said each DSP resource pool is different;
When said BBU need handle current institute information transmitted, said BBU selected corresponding resource to realize said processing in the pairing DSP resource pool of the type of said processing according to current said processing resource needed amount.
A kind of BBU comprises a plurality of DSP devices, and said BBU comprises:
A plurality of DSP resource pools; Wherein, Comprise one or more DSP devices in each DSP resource pool respectively, the resource in each DSP resource pool is respectively applied for the processing that realizes one or more types, and the processing capacity that resource realized in said each DSP resource pool is different;
Administration module; Be used for when needs are handled current institute information transmitted; According to current said processing resource needed amount, in the DSP resource pool that the pairing said division module of the type of said processing is divided, select corresponding resource to realize said processing.
Compared with prior art, the technical scheme that the embodiment of the invention proposed has the following advantages:
Through using the technical scheme that the embodiment of the invention proposed, can be the DSP resource pool with the processing resource division among the BBU according to processing capacity, call corresponding resource according to current resource needed amount; And close remaining DSP device, thereby sharing of resource handled in pairing many sectors realization to BBU; Can promote hardware resource utilization; Realize to handle reasonable resources scheduling and management, and in the sector when load is light, according to service conditions cutoff DSP device; Do not influencing under the Network situation, reaching the purpose of saving power consumption.
Description of drawings
Fig. 1 is the sketch map that traditional base station of the prior art hardware is formed structure;
Fig. 2 is the sketch map of traditional B BU logical architecture of the prior art;
Fig. 3 is the sketch map of LTE traditional B BU hardware structure in the prior art;
Fig. 4 is the schematic flow sheet of the management method of the processing resource among a kind of BBU that the embodiment of the invention proposed;
Fig. 5 is the logical construction sketch map of a kind of BBU that the embodiment of the invention proposed;
Fig. 6 is the sketch map of the DSP resource pool splitting scheme among a kind of BBU that the embodiment of the invention proposed;
Fig. 7 is the sketch map of the DSP resource pool splitting scheme among the another kind of BBU that the embodiment of the invention proposed;
Fig. 8 is the sketch map of a kind of practical implementation scene that the embodiment of the invention proposed;
Fig. 9 is the structural representation of a kind of BBU that the embodiment of the invention proposed.
Embodiment
To combine the accompanying drawing among the present invention below, the technical scheme among the present invention is carried out clear, complete description, obviously, described embodiment is a part of embodiment of the present invention, rather than whole embodiment.Based on the embodiment among the present invention, the every other embodiment that those of ordinary skills are obtained under the prerequisite of not making creative work belongs to the scope that the present invention protects.
As shown in Figure 4, the schematic flow sheet for the management method of the processing resource among a kind of BBU that the embodiment of the invention proposed specifically may further comprise the steps:
Step S401, a plurality of DSP devices that BBU comprised are divided into a plurality of DSP resource pools.
Wherein, comprise one or more DSP devices in each DSP resource pool respectively, the resource in each DSP resource pool is respectively applied for the processing that realizes one or more types, and the processing capacity that resource realized in each DSP resource pool is different.
With concrete enforcement scene is example, and above-mentioned DSP resource pool is divided, and the function allocative decision specifically comprises:
Resource in the one DSP resource pool is used to realize the processing of all upper-layer protocols;
Resource in the 2nd DSP resource pool is used to realize the encoding and decoding processing, and modulation is handled;
Resource in the 3rd DSP resource pool is used to realize the processing that all many antennas are relevant;
The common completion among the said BBU of a said DSP resource pool, said the 2nd DSP resource pool and said the 3rd DSP resource pool need be carried out complete information process.
Above-mentioned processing is a kind of preferred realization scene, and in practical application, the division numbers of DSP resource pool and function are distributed and can be adjusted according to actual needs, and such variation can't influence protection scope of the present invention.
Need further be pointed out that; Can be according to actual needs; Each logical process function is independently of one another fully, set up corresponding DSP resource pool respectively, also can a plurality of logical process functions be combined according to resource requirement amount or the position in handling process; Form treatment combination, and use a DSP resource pool to realize the processing of each logic function in the treatment combination.
In practical application; For the complete process flow that need carry out among the BBU; Fully independently the form of a treatment type is divided, and also can be divided into a plurality of treatment combinations, and the mode that perhaps combines with independently treatment type and treatment combination is divided; The criteria for classifying of corresponding D SP resource pool is corresponding with it, and the variation of such division foundation can't influence protection scope of the present invention.
In concrete enforcement scene, the processing of this step specifically comprises:
The number of types of the processing that realizes as required and/or the quantity of treatment combination with a plurality of DSP devices that this BBU comprised, are divided into the DSP resource pool of respective numbers.
Wherein, concrete dividing mode comprises following two kinds:
Mode one, the average division.
The DSP resource pool quantity of setting up as required on average is divided into the set of respective numbers with the DSP device among the BBU, and the DSP device in each set is formed a DSP resource pool, and the quantity of the DSP device that comprised of each DSP resource pool of obtaining of division is identical like this.
Such dividing mode can have easier partition process, and higher division efficient also can be convenient aspect the circuit deployment.
Mode two, division in proportion.
The quantity of the DSP device of confirming according to certain rule to be comprised in each DSP resource pool; For example; According to the processing and/or the treatment combination resource needed ratio of the required realization of each DSP resource pool, confirm the ratio of the quantity of the DSP device that each DSP resource pool is comprised.
Because the quantity of the resource that DSP device can provide is certain; So,, can distribute more DSP device for the DSP resource pool that needs take more resources through such dividing mode; It is had more can arrange resource, realize more reasonably resource allocation.
Have above explanation to know, two kinds of above-mentioned dividing mode respectively have the advantage of self, in concrete enforcement scene, can confirm as required to select which kind of dividing mode, specifically select which kind of dividing mode can not influence protection scope of the present invention.
Step S402, when said BBU need handle current institute information transmitted; Said BBU is according to current said processing resource needed amount; In the pairing DSP resource pool of the type of said processing, select corresponding resource to realize said processing, and close the pairing DSP device of residual resource.
Because the resource in the DSP resource pool is provided by each DSP device; So; For the management of resource, be actually dispatching management, in the present technique scheme to each the DSP device in the DSP resource pool; In order to realize better practicing thrift well, be presented as the startup during each DSP and close for the dispatching management of each DSP device.
Based on above-mentioned technological thought, the actual mechanical process of this step is following:
Said BBU is according to current said processing resource needed amount; In the pairing DSP resource pool of the type of said processing; Startup can provide the DSP device with the corresponding resource of said stock number; And the resource of the DSP device that passes through to be started realizes said processing, and closes the pairing DSP device of residual resource.
After accomplishing above-mentioned processing; Also further comprise follow-up dynamic resource management process in the technical scheme that the embodiment of the invention proposed; Promptly, open or close the DSP device, realize the more effective utilization of resources according to the variation adjustment resource allocation of occupation condition.
According to the difference of set concrete resource management rule, follow-up dynamic resource management process comprises following two kinds of situation:
Situation one, the situation that takies of only considering the DSP device are carried out resource management.
Occupation condition among each DSP that the detection that BBU implements has started judges whether to exist idle DSP device, and wherein, said idle DSP device is specially the DSP device that own resource is entirely idling-resource.
When the idle DSP device of current existence in the DSP device that said BBU confirms to have started, said BBU closes idle DSP device.
When the resource that the DSP device of confirming to have started as said BBU is provided can not satisfy when pre-treatment resource needed amount, said BBU selected a current DSP device of closing to start in said DSP resource pool, and new resource is provided.
Situation two, combination sector service conditions are taken all factors into consideration the occupation condition of idling-resource reservation and DSP device and are carried out resource management.
At first, said BBU monitor current institute information transmitted the service conditions of corresponding sector, it is interval to confirm as the idling-resource that said sector keeps.
Interval definite can the making of such idling-resource reserves the resource requirement that corresponding standby resources guarantees that the service traffics variation is brought in the DSP resource pool; The raising system guarantees professional carrying out smoothly for the adaptibility to response of flowed fluctuation, and; Interval in conjunction with the determined idling-resource of sector service conditions; Be according to the business statistics situation in the sector and definite, make the idling-resource that is kept be in reasonable range, can not cause the too much wasting of resources.
On the other hand, said BBU detects the current idling-resource amount in the DSP device that has started.
When said BBU confirms that current idling-resource amount is lower than the minimum idle resource value in the said idling-resource interval; Said BBU selects a current DSP device of closing to start in said DSP resource pool, and with the resource of the DSP device of new startup as new idling-resource;
When said BBU confirmed that current idling-resource amount is higher than the highest idle resource value in the said idling-resource interval, said BBU closed the DSP device that only comprises idling-resource.
In the application scenarios of reality, the idling-resource interval can be a numerical value interval that comprises the highest idle resource value and minimum idle resource value, also can be a concrete numerical value, and promptly the highest idle resource value and minimum idle resource value are same numerical value.Such variation does not influence protection scope of the present invention.
Compared with prior art, the technical scheme that the embodiment of the invention proposed has the following advantages:
Through using the technical scheme that the embodiment of the invention proposed, can be the DSP resource pool with the processing resource division among the BBU according to processing capacity, call corresponding resource according to current resource needed amount; And close remaining DSP device, thereby sharing of resource handled in pairing many sectors realization to BBU; Can promote hardware resource utilization; Realize to handle reasonable resources scheduling and management, and in the sector when load is light, according to service conditions cutoff DSP device; Do not influencing under the Network situation, reaching the purpose of saving power consumption.
Below, the application scenarios in conjunction with concrete further specifies the technical scheme that the embodiment of the invention proposed.
Of background technology, based on existing logic and hardware structure, can't carry out hardware resource optimization or shutoff according to the situation that traffic load changes, there is more high-power waste.
Based on such defective; The embodiment of the invention has proposed a kind of to the new BBU realization framework of LTE broadband system; Can under the prerequisite that does not influence the network coverage and customer service, reach energy-saving and cost-reducing target according to the DSP device of closing the free time of load variations in good time.
Target based on abundant lifting Base-Band Processing device utilance, reduction BBU power consumption; Realize identical logic function module in view of all adopting identity unit in the former different baseband processing units with structure; Therefore under the prerequisite that guarantees the backboard exchange capacity; Can consider to adopt the Base-Band Processing framework based on resource pool, Base-Band Processing all among the promptly same BBU are divided into the different logical functional pool according to the Different Logic function, are distributed to identity logic function in the different base band integrated circuit boards and concentrate by the device of smaller amounts and handle former; The not corresponding fixing Base-Band Processing hardware of each sector RRU, but from above-mentioned baseband pool, distribute the corresponding resource of handling according to the actual requirements.Concrete logical construction sketch map is as shown in Figure 5.
Further; With reference to two kinds of dividing mode among the aforesaid step S401; The embodiment of the invention is an example with the BBU structure that comprises 9 DSP devices, explains respectively according to two kinds of dividing mode resulting DSP resource pool splitting schemes and follow-up processing resource management scheme.
Mode one, the average division.
Confirm that at first whole logical process process comprises two logical process functions and a treatment combination, according to corresponding execution sequence, is respectively:
(1) upper-layer protocol is handled;
(2) treatment combination of being formed is handled in encoding and decoding, modulation;
(3) many antennas relevant treatment.
Divide based on above flow process, in BBU, need set up 3 DSP functional pools; To realize above-mentioned function and function combinations respectively; Hardware configuration is formed as shown in Figure 6, and wherein, DSP functional pool 1 is responsible for all upper-layer protocols and is handled; DSP functional pool 2 is responsible for all encoding and decoding, modulation is handled, and DSP functional pool 3 is responsible for all many antennas relevant treatment.
Owing to be average division, so each DSP functional pool is made up of 3 DSP devices shown in Fig. 6.
When concrete the realization, can start one or more DSP devices and bear corresponding processing according to the real resource demand.At this moment, the processing resource of each DSP functional pool is three sectors and shares, and can distribute the handled resource according to each sector active user and business demand, avoids must distributing in the similar traditional structure whole DSP device resource to give certain sector.
Mode two, division in proportion.
Similar with mode one, confirm that equally whole logical process process comprises two logical process functions and a treatment combination, according to corresponding execution sequence, is respectively:
(1) upper-layer protocol is handled;
(2) treatment combination of being formed is handled in encoding and decoding, modulation;
(3) many antennas relevant treatment.
Further consider that each handles and treatment combination resource needed amount, it is the highest to obtain (2) middle resource needed amount, secondly is (3), need stock number minimum be (1).Consider among the BBU that one has during 9 DSP, confirm that thus (1), (2), the needed DSP number of devices of (3) pairing DSP resource pool are respectively 2,4,3.
Divide based on above flow process, in BBU, need set up 3 DSP functional pools; To realize above-mentioned function and function combinations respectively; Hardware configuration is formed as shown in Figure 7, and wherein, DSP functional pool 1 is responsible for all upper-layer protocols and is handled; DSP functional pool 2 is responsible for all encoding and decoding, modulation is handled, and DSP functional pool 3 is responsible for all many antennas relevant treatment.
When concrete the realization, can in each DSP resource pool, start one or more DSP devices and bear corresponding processing according to the real resource demand.At this moment, the processing resource of each DSP functional pool is three sectors and shares, and can distribute the handled resource according to each sector active user and business demand, avoids must distributing in the similar traditional structure whole DSP device resource to give certain sector.
After accomplishing above-mentioned DSP resource pool division, for the application process of reality, each DSP resource pool is born the service traffics of three sectors simultaneously, as long as three sectors do not reach 100% load simultaneously, all can have the processing resource redundancy in each DSP functional pool.
So, according to preset DSP device shuts off rule (being the situation one and situation two among the aforesaid step S402), respectively the DSP device in each DSP resource pool is carried out resource management.
For situation one, as long as idle fully DSP device occurs, promptly close, reach resources conservation to greatest extent; But, in situation as shown in Figure 8, might cause owing to there is not reserved resource; After making that the current business flow increases, must realize replenishing of resource, can need the time owing to DSP device start-up course through starting new DSP device; Can cause the situation that occurs inadequate resource during this period, thereby traffic affecting is realized normally.
For situation two, need to have confirmed the idling-resource of reservation in advance, so; In each DSP resource pool, each DSP device of startup not only requires to guarantee normal Business Processing resource needed, also need provide enough idling-resource as standby resources; Thereby, guarantee when service traffics increase, can directly call standby resources and proceed Business Processing; And when idling-resource is too much, can close the DSP device, to reduce the idling-resource total amount; And when current idling-resource is not enough, then need start new DSP device, replenish idling-resource.Such scheme has improved the resource reliability of Business Processing, and still, the existence of idling-resource has still caused certain extra energy consumption.
In concrete realization scene, specifically adopt above-mentioned which kind of scheme to adjust according to actual needs, such variation does not influence protection scope of the present invention.
Through above-mentioned processing procedure; Save the usage quantity of DSP device or FPGA device on the one hand through the logical function treatment of centralization based on the BBU of said structure; Reduce the integral device power consumption; Simultaneously can be according to the traffic load situation of change of each sector, flexible allocation is handled resource and is given different sectors, for example: only need distribute and activate a spot of processing resource at night when telephone traffic is low; The corresponding device of remaining processing resource then can carry out dormancy or shutoff, does not influence network when saving power consumption and normally moves.
In addition, along with wireless communication system future to broadband development, every sector Base-Band Processing requires increasingly high; For example: the follow-up evolution system LTE-A of LTE bandwidth reaches 100MHz; The software and hardware architecture that adopts the present technique scheme to propose, more effectively the boost device utilance is saved power consumption.
Compared with prior art, the technical scheme that the embodiment of the invention proposed has the following advantages:
Through using the technical scheme that the embodiment of the invention proposed, can be the DSP resource pool with the processing resource division among the BBU according to processing capacity, call corresponding resource according to current resource needed amount; And close remaining DSP device, thereby sharing of resource handled in pairing many sectors realization to BBU; Can promote hardware resource utilization; Realize to handle reasonable resources scheduling and management, and in the sector when load is light, according to service conditions cutoff DSP device; Do not influencing under the Network situation, reaching the purpose of saving power consumption.
In order to realize the technical scheme of the embodiment of the invention, the embodiment of the invention also provides a kind of BBU, comprises a plurality of DSP devices, and its structural representation is as shown in Figure 9, comprising:
A plurality of DSP resource pools 91; Wherein, Comprise one or more DSP devices in each DSP resource pool 91 respectively, the resource in each DSP resource pool 91 is respectively applied for the processing that realizes one or more types, and the processing capacity that resource realized in each DSP resource pool 91 is different.
In concrete enforcement scene, above-mentioned division can be to carry out logical partitioning through corresponding Indication message, also can be to dispose but the physical division that seems through circuit in advance, and the variation of concrete dividing mode does not influence protection scope of the present invention.
Administration module 92; Be used for when needs are handled current institute information transmitted; According to current said processing resource needed amount; In the DSP resource pool 91 that the pairing said division module 91 of the type of said processing is divided, select corresponding resource to realize said processing, and close the pairing DSP device of residual resource.
It is pointed out that said a plurality of DSP resource pool 91, be specially:
The number of types of the processing that realizes as required, and/or the quantity of treatment combination with a plurality of DSP devices that comprised, are divided into the DSP resource pool 91 of respective numbers;
Wherein, the quantity of the DSP device that each DSP resource pool 91 is comprised is identical, or the ratio of the quantity of the DSP device that comprised of each DSP resource pool 91 equals the ratio of each DSP resource pool 91 pairing processing and/or treatment combination resource needed amount.
In the application scenarios of reality, said administration module 92 specifically is used for:
According to current said processing resource needed amount; In the pairing DSP resource pool 91 of the type of said processing; Startup can provide the DSP device with the corresponding resource of said stock number; And the resource of the DSP device that passes through to be started realizes said processing, and closes the pairing DSP device of residual resource.
On the other hand, said administration module 92 also is used for:
When the idle DSP device of current existence in the DSP device that has started, close said idle DSP device, wherein, said idle DSP device is specially the DSP device that own resource is entirely idling-resource;
When the resource that is provided when the DSP device that has started can not satisfy when pre-treatment resource needed amount, in said DSP resource pool 91, select a current DSP device of closing to start, new resource is provided.
Further, this BBU also comprises:
Monitoring module 93, be used to monitor current institute information transmitted the service conditions of corresponding sector, it is interval to confirm as the idling-resource that said sector keeps;
Said administration module 92; Also be used for detecting the current idling-resource amount of the DSP device that has started; When current idling-resource amount is lower than the minimum idle resource value in the said idling-resource interval, in said DSP resource pool 91, select a current DSP device of closing to start, and with the resource of the DSP device of new startup as new idling-resource; When current idling-resource amount is higher than the highest idle resource value in the said idling-resource interval, close the DSP device that only comprises idling-resource.
Compared with prior art, the technical scheme that the embodiment of the invention proposed has the following advantages:
Through using the technical scheme that the embodiment of the invention proposed, can be the DSP resource pool with the processing resource division among the BBU according to processing capacity, call corresponding resource according to current resource needed amount; And close remaining DSP device, thereby sharing of resource handled in pairing many sectors realization to BBU; Can promote hardware resource utilization; Realize to handle reasonable resources scheduling and management, and in the sector when load is light, according to service conditions cutoff DSP device; Do not influencing under the Network situation, reaching the purpose of saving power consumption.
Through the description of above execution mode, those skilled in the art can be well understood to the embodiment of the invention and can realize through hardware, also can realize by the mode that software adds necessary general hardware platform.Based on such understanding; The technical scheme of the embodiment of the invention can be come out with the embodied of software product, this software product can be stored in a non-volatile memory medium (can be CD-ROM, USB flash disk; Portable hard drive etc.) in; Comprise some instructions with so that computer equipment (can be personal computer, server, or the network equipment etc.) each implements the described method of scene to carry out the embodiment of the invention.
It will be appreciated by those skilled in the art that accompanying drawing is a preferred sketch map of implementing scene, module in the accompanying drawing or flow process might not be that embodiment of the present invention embodiment is necessary.
It will be appreciated by those skilled in the art that the module in the device of implementing in the scene can be distributed in the device of implementing scene according to implementing scene description, also can carry out respective change and be arranged in the one or more devices that are different from this enforcement scene.The module of above-mentioned enforcement scene can be merged into a module, also can further split into a plurality of submodules.
The invention described above embodiment sequence number is not represented the quality of implementing scene just to description.
More than the disclosed several practical implementation scenes that are merely the embodiment of the invention, still, the embodiment of the invention is not limited thereto, any those skilled in the art can think variation all should fall into the traffic limits scope of the embodiment of the invention.

Claims (11)

1. the management method of the processing resource among the BBU is characterized in that, may further comprise the steps:
A plurality of DSP devices that BBU comprised are divided into a plurality of DSP resource pools; Comprise one or more DSP devices in each DSP resource pool respectively; Resource in each DSP resource pool is respectively applied for the processing that realizes one or more types, and the processing capacity that resource realized in said each DSP resource pool is different;
When said BBU need handle current institute information transmitted; Said BBU is according to current said processing resource needed amount; In the pairing DSP resource pool of the type of said processing, select corresponding resource to realize said processing, and close the pairing DSP device of residual resource.
2. the method for claim 1 is characterized in that, said a plurality of DSP devices that BBU comprised is divided into a plurality of DSP resource pools, specifically comprises:
The number of types of the processing that realizes as required, and/or the quantity of treatment combination with a plurality of DSP devices that said BBU comprised, are divided into the DSP resource pool of respective numbers;
Wherein, the quantity of the DSP device that each DSP resource pool is comprised is identical, or the ratio of the quantity of the DSP device that comprised of each DSP resource pool equals the ratio of pairing processing of each DSP resource pool and/or treatment combination resource needed amount.
3. the method for claim 1 is characterized in that, selects corresponding resource to realize said processing in the pairing DSP resource pool of said type in said processing, and closes the pairing DSP device of residual resource, is specially:
In the pairing DSP resource pool of the type of said processing, startup can provide the DSP device with the corresponding resource of said stock number, and the resource of the DSP device that passes through to be started realizes said processing, and closes the pairing DSP device of residual resource.
4. method as claimed in claim 3 is characterized in that, said startup can provide after the DSP device with the corresponding resource of said stock number, also comprises:
When the idle DSP device of current existence in the DSP device that said BBU confirms to have started, said BBU closes said idle DSP device, and wherein, said idle DSP device is specially the DSP device that own resource is entirely idling-resource;
When the resource that the DSP device of confirming to have started as said BBU is provided can not satisfy when pre-treatment resource needed amount, said BBU selected a current DSP device of closing to start in said DSP resource pool, and new resource is provided.
5. method as claimed in claim 3 is characterized in that, said startup can provide after the DSP device with the corresponding resource of said stock number, also comprises:
Said BBU monitor current institute information transmitted the service conditions of corresponding sector, it is interval to confirm as the idling-resource that said sector keeps;
Said BBU detects the current idling-resource amount in the DSP device that has started;
When said BBU confirms that current idling-resource amount is lower than the minimum idle resource value in the said idling-resource interval; Said BBU selects a current DSP device of closing to start in said DSP resource pool, and with the resource of the DSP device of new startup as new idling-resource;
When said BBU confirmed that current idling-resource amount is higher than the highest idle resource value in the said idling-resource interval, said BBU closed the DSP device that only comprises idling-resource.
6. the method for claim 1 is characterized in that, the resource in said each DSP resource pool is respectively applied for the processing that realizes one or more types, and the processing capacity that resource realized in said each DSP resource pool is different, specifically comprises:
Resource in the one DSP resource pool is used to realize the processing of all upper-layer protocols;
Resource in the 2nd DSP resource pool is used to realize the encoding and decoding processing, and modulation is handled;
Resource in the 3rd DSP resource pool is used to realize the processing that all many antennas are relevant;
The common completion among the said BBU of a said DSP resource pool, said the 2nd DSP resource pool and said the 3rd DSP resource pool need be carried out complete information process.
7. a BBU comprises a plurality of DSP devices, it is characterized in that said BBU comprises:
A plurality of DSP resource pools; Wherein, Comprise one or more DSP devices in each DSP resource pool respectively, the resource in each DSP resource pool is respectively applied for the processing that realizes one or more types, and the processing capacity that resource realized in said each DSP resource pool is different;
Administration module; Be used for when needs are handled current institute information transmitted; According to current said processing resource needed amount; In the DSP resource pool that the pairing said division module of the type of said processing is divided, select corresponding resource to realize said processing, and close the pairing DSP device of residual resource.
8. BBU as claimed in claim 7 is characterized in that, said a plurality of DSP resource pools are specially:
The number of types of the processing that realizes as required, and/or the quantity of treatment combination with a plurality of DSP devices that comprised, are divided into the DSP resource pool of respective numbers;
Wherein, the quantity of the DSP device that each DSP resource pool is comprised is identical, or the ratio of the quantity of the DSP device that comprised of each DSP resource pool equals the ratio of pairing processing of each DSP resource pool and/or treatment combination resource needed amount.
9. BBU as claimed in claim 7 is characterized in that, said administration module specifically is used for:
According to current said processing resource needed amount; In the pairing DSP resource pool of the type of said processing; Startup can provide the DSP device with the corresponding resource of said stock number; And the resource of the DSP device that passes through to be started realizes said processing, and closes the pairing DSP device of residual resource.
10. BBU as claimed in claim 9 is characterized in that, said administration module also is used for:
When the idle DSP device of current existence in the DSP device that has started, close said idle DSP device, wherein, said idle DSP device is specially the DSP device that own resource is entirely idling-resource;
When the resource that is provided when the DSP device that has started can not satisfy when pre-treatment resource needed amount, in said DSP resource pool, select a current DSP device of closing to start, new resource is provided.
11. BBU as claimed in claim 9 is characterized in that, also comprises:
Monitoring module, be used to monitor current institute information transmitted the service conditions of corresponding sector, it is interval to confirm as the idling-resource that said sector keeps;
Said administration module; Also be used for detecting the current idling-resource amount of the DSP device that has started; When current idling-resource amount is lower than the minimum idle resource value in the said idling-resource interval, in said DSP resource pool, select a current DSP device of closing to start, and with the resource of the DSP device of new startup as new idling-resource; When current idling-resource amount is higher than the highest idle resource value in the said idling-resource interval, close the DSP device that only comprises idling-resource.
CN201110087286.8A 2011-04-07 2011-04-07 Managing method and device for processing resources in BBU Active CN102740326B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110087286.8A CN102740326B (en) 2011-04-07 2011-04-07 Managing method and device for processing resources in BBU

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110087286.8A CN102740326B (en) 2011-04-07 2011-04-07 Managing method and device for processing resources in BBU

Publications (2)

Publication Number Publication Date
CN102740326A true CN102740326A (en) 2012-10-17
CN102740326B CN102740326B (en) 2015-02-04

Family

ID=46994918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110087286.8A Active CN102740326B (en) 2011-04-07 2011-04-07 Managing method and device for processing resources in BBU

Country Status (1)

Country Link
CN (1) CN102740326B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103916909A (en) * 2013-01-04 2014-07-09 中国移动通信集团公司 Base band pool system
WO2015035811A1 (en) * 2013-09-10 2015-03-19 中兴通讯股份有限公司 Power saving control method and apparatus for base station bbu
CN104581823A (en) * 2013-10-17 2015-04-29 中兴通讯股份有限公司 Wireless baseband processing method and device capable of realizing dynamic scalability
CN105786482A (en) * 2016-01-06 2016-07-20 侯昭正 Artificial intelligence system
CN105912397A (en) * 2016-03-31 2016-08-31 乐视控股(北京)有限公司 Resources management method and device
CN108174047A (en) * 2017-12-27 2018-06-15 广州芯德通信科技股份有限公司 A kind of VOIP equipment DSP resource allocation methods
CN110928649A (en) * 2018-09-19 2020-03-27 北京国双科技有限公司 Resource scheduling method and device
CN112291806A (en) * 2020-11-03 2021-01-29 比科奇微电子(杭州)有限公司 Service migration method and device
WO2021128596A1 (en) * 2019-12-23 2021-07-01 京信通信技术(广州)有限公司 Energy-saving method and apparatus, computer device and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1842180A (en) * 2005-03-31 2006-10-04 上海华为技术有限公司 Method for distributing baseband channel processing resource in mobile communication system base station
WO2009009996A1 (en) * 2007-07-19 2009-01-22 Huawei Technologies Co., Ltd. A method, device and system for dynamically configuring algorithm channels of a digital signal processor

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1842180A (en) * 2005-03-31 2006-10-04 上海华为技术有限公司 Method for distributing baseband channel processing resource in mobile communication system base station
WO2009009996A1 (en) * 2007-07-19 2009-01-22 Huawei Technologies Co., Ltd. A method, device and system for dynamically configuring algorithm channels of a digital signal processor

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103916909B (en) * 2013-01-04 2017-09-05 中国移动通信集团公司 Base band cell system
CN103916909A (en) * 2013-01-04 2014-07-09 中国移动通信集团公司 Base band pool system
WO2015035811A1 (en) * 2013-09-10 2015-03-19 中兴通讯股份有限公司 Power saving control method and apparatus for base station bbu
CN104581823B (en) * 2013-10-17 2019-06-21 中兴通讯股份有限公司 It is a kind of can dynamic retractility radio base band processing method and processing device
US10348629B2 (en) 2013-10-17 2019-07-09 Sanechips Technology Co., Ltd. Method and device for processing wireless baseband capable of expanding dynamically
CN104581823A (en) * 2013-10-17 2015-04-29 中兴通讯股份有限公司 Wireless baseband processing method and device capable of realizing dynamic scalability
EP3059880A4 (en) * 2013-10-17 2016-11-16 Zte Microelectronics Technology Co Ltd Method and device for processing wireless baseband capable of expanding dynamically
US20160359748A1 (en) * 2013-10-17 2016-12-08 Zte Microelectronics Technology Co., Ltd Method and Device for Processing Wireless Baseband Capable of Expanding Dynamically
JP2017501604A (en) * 2013-10-17 2017-01-12 ゼットティーイー マイクロエレクトロニクス テクノロジー カンパニー リミテッド Method and apparatus for dynamically expanding and contracting wireless baseband processing
KR20160073400A (en) * 2013-10-17 2016-06-24 지티이 마이크로일렉트로닉스 테크놀로지 컴퍼니 리미티드 Method and device for processing wireless baseband capable of expanding dynamically
KR101879111B1 (en) * 2013-10-17 2018-07-16 세인칩스 테크놀로지 컴퍼니 리미티드 Method and device for processing wireless baseband capable of expanding dynamically
CN105786482A (en) * 2016-01-06 2016-07-20 侯昭正 Artificial intelligence system
CN105912397A (en) * 2016-03-31 2016-08-31 乐视控股(北京)有限公司 Resources management method and device
CN108174047A (en) * 2017-12-27 2018-06-15 广州芯德通信科技股份有限公司 A kind of VOIP equipment DSP resource allocation methods
CN108174047B (en) * 2017-12-27 2020-08-21 广州芯德通信科技股份有限公司 VOIP equipment DSP resource allocation method
CN110928649A (en) * 2018-09-19 2020-03-27 北京国双科技有限公司 Resource scheduling method and device
WO2021128596A1 (en) * 2019-12-23 2021-07-01 京信通信技术(广州)有限公司 Energy-saving method and apparatus, computer device and storage medium
CN112291806A (en) * 2020-11-03 2021-01-29 比科奇微电子(杭州)有限公司 Service migration method and device
CN112291806B (en) * 2020-11-03 2023-03-14 比科奇微电子(杭州)有限公司 Service migration method and device

Also Published As

Publication number Publication date
CN102740326B (en) 2015-02-04

Similar Documents

Publication Publication Date Title
CN102740326B (en) Managing method and device for processing resources in BBU
CN112804739B (en) Base station energy saving method, device, equipment and system and storage medium
CN101897131B (en) Method, system and device of mapping system information block
EP3962032B1 (en) Method and apparatus for balancing server load in cloud ran systems
US10827430B2 (en) Signaling for controlling power usage in radio access networks
RU2690162C2 (en) Self-optimizing mobile satellite communication systems
CN101772177B (en) Method, system and device for managing base band resources
US20230164637A1 (en) Partial sensing method and apparatus, terminal device, and storage medium
KR20100059842A (en) Method for energy saving in a telecommunication system
CN104168623A (en) Method, apparatus and system for managing wireless connection of WiFi mobile apparatus
EP4057667A1 (en) Method for controlling active room distribution system, electronic device, and storage medium
CN101568122A (en) Method for realizing base station electricity saving in time division synchronous code division multiple access (TDS-CDMA) system
CN112911691A (en) Cell energy saving method, equipment and storage medium
CN102256258A (en) Allocation method for carrier frequency resource and allocation device for carrier frequency resource
CN104123185A (en) Resource scheduling method, device and system
Hajisami et al. Elastic-net: Boosting energy efficiency and resource utilization in 5G C-RANs
WO2012097630A1 (en) Ring network configuration method and apparatus
CN112105059B (en) Shunting method and shunting control base station
US9710052B2 (en) Dynamic energy savings for digital signal processor modules using plural energy savings states
CN113766619B (en) RRU dynamic scheduling method and device, electronic equipment and storage medium
CN109348511B (en) Method and device for allocating baseband resources
CN102131201A (en) Information source automatic selection method and system for solution of indoor wireless network
CN104699521A (en) Online migration method, system and device of virtual machine
CN104735704A (en) Carrier wave migration method and device
CN103442458A (en) Service processing method, system and equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant