CN102647263B - A kind of transmission method of ACK/NACK information and equipment - Google Patents

A kind of transmission method of ACK/NACK information and equipment Download PDF

Info

Publication number
CN102647263B
CN102647263B CN201210110391.3A CN201210110391A CN102647263B CN 102647263 B CN102647263 B CN 102647263B CN 201210110391 A CN201210110391 A CN 201210110391A CN 102647263 B CN102647263 B CN 102647263B
Authority
CN
China
Prior art keywords
terminal equipment
base station
equipment
type
uplink
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210110391.3A
Other languages
Chinese (zh)
Other versions
CN102647263A (en
Inventor
王勇
王继征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN201210110391.3A priority Critical patent/CN102647263B/en
Publication of CN102647263A publication Critical patent/CN102647263A/en
Priority to PCT/CN2012/085158 priority patent/WO2013155839A1/en
Application granted granted Critical
Publication of CN102647263B publication Critical patent/CN102647263B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/18Automatic repetition systems, e.g. Van Duuren systems
    • H04L1/1829Arrangements specially adapted for the receiver end
    • H04L1/1854Scheduling and prioritising arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a kind of transmission method and equipment of ACK/NACK information, the method comprises: base station equipment obtains type of service corresponding to terminal equipment; When the type of service that terminal equipment is corresponding is specified services type, described base station equipment sends the schedule information for sub-frame of uplink to described terminal equipment; By described terminal equipment receive described for the schedule information of sub-frame of uplink after, send ACK/NACK information by Physical Uplink Shared Channel PUSCH to described base station equipment.In the embodiment of the present invention, can feeding back ACK/nack message in time, reduce feedback latencies, and meet web page browsing, visual telephone, namely take the photograph the business need of the low time delay such as i.e. biography, the use sense that improve user is subject to.

Description

A kind of transmission method of ACK/NACK information and equipment
Technical field
The present invention relates to communication technical field, especially relate to a kind of ACK(ACKnowledgement, positive acknowledgement)/NACK(Negative ACKnowledgement, Negative Acknowledgement) transmission method of information and equipment.
Background technology
At LTE(Long Term Evolution, Long Term Evolution) in system, in order to support the normal work of up-downgoing channel, terminal equipment needs to send the control information (i.e. positive acknowledgement ACK/ Negative Acknowledgement nack message) relevant to transmission to base station equipment, for replying PDSCH(Physical Downlink Shared Channel, Physical Downlink Shared Channel) transmission of business datum; Wherein, if terminal equipment correctly receives and the data of demodulation transmission, then to base station equipment feeding back ACK information, otherwise feedback nack message.
In prior art, terminal equipment is after access network, if terminal equipment needs to base station equipment feeding back ACK/nack message, then judge whether to there is up PUSCH(Physical Uplink Shared Channel, Physical Uplink Shared Channel) business, if there is up PUSCH business, then after ACK/NACK information and upstream data are encoded by terminal equipment respectively, multiplexing transmission in PUSCH; If there is no up PUSCH business, then terminal equipment uses special PUCCH(Physical Uplink Control Channel in this subframe, Physical Uplink Control Channel) transferring ACK/nack message.
It should be noted that, if arrange feedback cycle to PUCCH, according to protocol requirement, terminal equipment needs the transmission carrying out ACK/NACK information at setting cycle time point, otherwise enter waiting process, and terminal equipment is when waiting until that PUCCH puts cycle time, reports ACK/NACK information to base station equipment.
Realizing in process of the present invention, inventor finds at least there is following problem in prior art:
Owing to just reporting ACK/NACK information to base station equipment when needs wait until that PUCCH puts cycle time, cannot feeding back ACK/nack message in time, thus there is poor real, the shortcomings such as service delay height; Such as, according to reality test feedback, have the time delay of 20ms nearly, and this time to postpone a meeting or conference the perception of the applied business (such as, online and visual telephone etc.) badly influencing user.
Summary of the invention
The embodiment of the present invention provides a kind of transmission method and equipment of ACK/NACK information, with timely feeding back ACK/nack message, reduces feedback latencies, meets the business need of low time delay.
In order to achieve the above object, the embodiment of the present invention provides a kind of transmission method of positive acknowledgement ACK/ Negative Acknowledgement nack message, and the method comprises:
Base station equipment obtains type of service corresponding to terminal equipment;
When the type of service that terminal equipment is corresponding is specified services type, described base station equipment sends the schedule information for sub-frame of uplink to described terminal equipment;
By described terminal equipment receive described for the schedule information of sub-frame of uplink after, send ACK/NACK information by Physical Uplink Shared Channel PUSCH to described base station equipment.
The embodiment of the present invention provides a kind of base station equipment, comprising:
Obtain module, for obtaining type of service corresponding to terminal equipment;
Sending module, when being specified services type for the type of service corresponding at terminal equipment, sends the schedule information for sub-frame of uplink to described terminal equipment;
By described terminal equipment receive described for the schedule information of sub-frame of uplink after, send positive acknowledgement ACK/ Negative Acknowledgement nack message by Physical Uplink Shared Channel PUSCH to described base station equipment.
Compared with prior art, the embodiment of the present invention at least has the following advantages: in the embodiment of the present invention, can feeding back ACK/nack message in time, reduces feedback latencies, and meet web page browsing, visual telephone, namely take the photograph the business need of the i.e. low time delay such as biography, the use sense that improve user is subject to.
Accompanying drawing explanation
In order to be illustrated more clearly in technical scheme of the present invention, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the transmission method flow chart of a kind of ACK/NACK information that the embodiment of the present invention one provides;
Fig. 2 is the transmission method flow chart of a kind of ACK/NACK information that the embodiment of the present invention two provides;
Fig. 3 is the structural representation of a kind of base station equipment that the embodiment of the present invention three provides.
Embodiment
Below in conjunction with the accompanying drawing in the present invention, be clearly and completely described the technical scheme in the present invention, obviously, described embodiment is only a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Embodiment one
The embodiment of the present invention one provides a kind of transmission method of ACK/NACK information, based on the PDSCH uplink feedback technology of LTE system and the requirement of consensus standard, with business demand that is high for real-time and low time delay, propose a kind of processing method of the reduction service delay based on pre-scheduling mechanism, thus meet the business need of low time delay, as shown in Figure 1, the method comprises the following steps:
Step 101, base station equipment obtains type of service corresponding to terminal equipment.
Step 102, when the type of service that terminal equipment is corresponding is specified services type, base station equipment sends the schedule information for sub-frame of uplink to terminal equipment.It should be noted that in the type of service that terminal equipment is corresponding it is not, when specifying type of service, repeat no more in corresponding processing mode the present embodiment.
In the embodiment of the present invention, this specified services type specifically includes but not limited to: require that time delay is less than the type of service of predetermined threshold value; In actual applications, a kind of preferred predetermined threshold value is 10ms; Be less than the type of service of predetermined threshold value for time delay, its real-time that can meet the demands is high and require the demand of low time delay; Such as, web page browsing, visual telephone, namely take the photograph namely pass etc.
Step 103, terminal equipment, after receiving the schedule information for sub-frame of uplink, sends ACK/NACK information by PUSCH to base station equipment.
It should be noted that, if the schedule information for sub-frame of uplink that terminal equipment As-received station equipment sends, then illustrate to there is up PUSCH business, after now terminal equipment needs ACK/NACK information and upstream data to encode respectively, and by PUSCH to base station equipment multiplexing transmission ACK/NACK information and upstream data; If the schedule information for sub-frame of uplink that the non-As-received station equipment of terminal equipment sends, then illustrate there is not up PUSCH business, now terminal equipment needs in this sub-frame of uplink, use special PUCCH transferring ACK/nack message.
Based on this, in the embodiment of the present invention, for specified services type (as web page browsing, visual telephone, namely take the photograph and namely to pass etc. that to there is real-time high, the traffic performance of low time delay), base station equipment is by sending the schedule information for sub-frame of uplink to terminal equipment, make terminal equipment can As-received station equipment send the schedule information for sub-frame of uplink, then by PUSCH to base station equipment transferring ACK/nack message, overcome the time Holding Problem existed when using PUCCH periodic feedback ACK/NACK information, can feeding back ACK/nack message in time, meet the requirement of the low time delay business utilizing LTE technology to carry out.
In the embodiment of the present invention, according to service needed dynamic conditioning pre-scheduling switch, to revise the uplink feedback mode of terminal equipment in real time, feedback latencies can be reduced; Based on this, base station equipment sends to terminal equipment and comprises for the schedule information of sub-frame of uplink: base station equipment is after knowing that type of service that terminal equipment is corresponding is specified services type, for pre-scheduling switch opened by terminal equipment, and after pre-scheduling switch open, base station equipment sends the schedule information for sub-frame of uplink to terminal equipment.
In the embodiment of the present invention, pre-scheduling traffic carrying capacity size can be dynamically arranged according to the priority height of terminal equipment, and then ensure that the terminal equipment that priority is high can minimize service delay; Based on this, described method comprises further: the base station equipment priority corresponding according to terminal equipment is that terminal equipment arranges pre-scheduling traffic carrying capacity, and priority corresponding to terminal equipment is higher, then pre-scheduling traffic carrying capacity is larger; And this base station equipment when sending the schedule information for sub-frame of uplink to this terminal equipment, then carries the pre-scheduling traffic carrying capacity of setting in this schedule information; And by terminal equipment after receiving the schedule information for sub-frame of uplink, utilize the pre-scheduling traffic carrying capacity arranged to send ACK/NACK information to base station equipment.
Concrete, the base station equipment priority corresponding according to terminal equipment is that terminal equipment arranges pre-scheduling traffic carrying capacity and comprises: base station equipment is after knowing that type of service that terminal equipment is corresponding is specified services type, for pre-scheduling switch opened by terminal equipment, and after pre-scheduling switch open, the priority corresponding according to terminal equipment is that terminal equipment arranges pre-scheduling traffic carrying capacity.
In sum, in the embodiment of the present invention, when can avoid terminal equipment based on PUCCH channel cycle feeding back ACK/nack message, if the feedback moment is not some cycle time of PUCCH setting, then need the situation of continuous wait, thus solve terminal equipment cannot feeding back ACK/nack message in time, and then the poor real brought, the problems such as service delay is high.
Base station equipment passes through the size of dynamic conditioning pre-scheduling switch and pre-scheduling traffic carrying capacity, the terminal equipment of real-time ensuring different priorities can have and lasting carry out PUSCH scheduling, thus without prejudice under the prerequisite of consensus standard, make terminal equipment can on PUSCH channel timely feeding back ACK/nack message, and then meet such as web page browsing, visual telephone, namely take the photograph business needs to low time delay such as namely passing.
Consider from specific implementation, the technical scheme that the embodiment of the present invention provides does not relate to distorting of privately owned interface message of eating dishes without rice or wine, and arranging of pre-scheduling switch realizes simply, to DSP(Digital Signal Processing, Digital Signal Processing) process and can not form load, do not affect the demodulation coding performance of base station equipment and terminal equipment, the treating capacity of the program is little, complexity is low, realizes simple.
Embodiment two
The embodiment of the present invention two provides a kind of transmission method of ACK/NACK information, by arranging pre-scheduling switch to the terminal equipment of new access network, (this pre-scheduling switch is before and after community is set up, all come into force before and after terminal equipment access) and the size of pre-scheduling traffic carrying capacity, and real-time On/Off pre-scheduling switch, thus ensure that terminal equipment can receive the schedule information to current sub-frame of uplink of base station equipment transmission all the time, further guarantee terminal equipment is to the timely feedback of ACK/NACK information, need not some cycle time of latent period PUCCH, reduce the stand-by period, meet the requirement of real-time of business.
As shown in Figure 2, the transmission method of this ACK/NACK information can comprise the following steps:
Step 201, terminal equipment successfully accesses LTE network, sets up multiple service bearer.
Step 202, base station equipment is that terminal equipment arranges pre-scheduling switch, and opens pre-scheduling switch according to type of service or close pre-scheduling switch.Wherein, when the type of service that terminal equipment is corresponding is specified services type, then base station equipment is that pre-scheduling switch opened by terminal equipment; When the type of service that terminal equipment is corresponding is not when specifying type of service, then base station equipment is that pre-scheduling switch closed by terminal equipment.
In the embodiment of the present invention, if the current application carried out of terminal equipment such as web page browsing, visual telephone, namely take the photograph namely to pass etc. and there is the business need (i.e. specified services type) of the high and low time delay of real-time, then open pre-scheduling switch, to ensure the schedule information to current sub-frame of uplink of terminal equipment As-received station equipment transmission all the time, thus ensure that the ACK/NACK information of terminal equipment is fed back in time on PUSCH channel.
It should be noted that, if pre-scheduling switch is closed, then need on the control software design of base station equipment, arrange the corresponding PUCCH feedback time cycle, now can not ensure the schedule information to current sub-frame of uplink of terminal equipment As-received station equipment transmission all the time, and can not ensure that the ACK/NACK information of terminal equipment is fed back in time on PUSCH channel; In this case, terminal equipment can carry out feeding back ACK/nack message by PUCCH, namely cannot ensure the business need of the high and low time delay of real-time.
In the embodiment of the present invention, carry out follow-up explanation to open pre-scheduling switch, then the method can also comprise the following steps:
Step 203, the base station equipment priority corresponding according to terminal equipment is that terminal equipment arranges pre-scheduling traffic carrying capacity, and priority corresponding to terminal equipment is higher, then pre-scheduling traffic carrying capacity is larger.
In the embodiment of the present invention, when arranging corresponding pre-scheduling traffic carrying capacity according to the height of priority corresponding to terminal equipment, if terminal equipment is the terminal equipment of high priority, then open high traffic pre-scheduling; If terminal equipment is the terminal equipment of low priority, then open little traffic carrying capacity pre-scheduling.
It should be noted that, pre-scheduling traffic carrying capacity settings larger (this value according to 3GPP TS36.213 protocol between 0 ~ 63), then the resource of terminal equipment single distribution is more, and the propagation delay time of big data quantity uplink packet is less, and namely the propagation delay time of ACK/NACK information is less.
Step 204, base station equipment sends the schedule information for sub-frame of uplink to terminal equipment, and carries the pre-scheduling traffic carrying capacity of setting in this schedule information.Wherein, terminal equipment, after receiving the schedule information for sub-frame of uplink, sends ACK/NACK information by PUSCH to base station equipment.
It should be noted that terminal equipment is when opening pre-scheduling switch, will by PUSCH channel to base station equipment feeding back ACK/nack message; Terminal equipment, will by PUCCH channel to base station equipment feeding back ACK/nack message when closing pre-scheduling switch.
In sum, in the embodiment of the present invention, when can avoid terminal equipment based on PUCCH channel cycle feeding back ACK/nack message, if the feedback moment is not some cycle time of PUCCH setting, then need the situation of continuous wait, thus solve terminal equipment cannot feeding back ACK/nack message in time, and then the poor real brought, the problems such as service delay is high.Base station equipment passes through the size of dynamic conditioning pre-scheduling switch and pre-scheduling traffic carrying capacity, the terminal equipment of real-time ensuring different priorities can have and lasting carry out PUSCH scheduling, thus without prejudice under the prerequisite of consensus standard, make terminal equipment can on PUSCH channel timely feeding back ACK/nack message, and then meet such as web page browsing, visual telephone, namely take the photograph business needs to low time delay such as namely passing.Consider from specific implementation, the technical scheme that the embodiment of the present invention provides does not relate to distorting of privately owned interface message of eating dishes without rice or wine, and arranging of pre-scheduling switch realizes simply, load can not be formed to DSP process, the demodulation coding performance of base station equipment and terminal equipment is not affected, the treating capacity of the program is little, and complexity is low, realizes simple.
Embodiment three
Based on the inventive concept same with said method, additionally provide a kind of base station equipment in the embodiment of the present invention, as shown in Figure 3, this base station equipment comprises:
Obtain module 11, for obtaining type of service corresponding to terminal equipment;
Sending module 12, when being specified services type for the type of service corresponding at terminal equipment, sends the schedule information for sub-frame of uplink to described terminal equipment;
By described terminal equipment receive described for the schedule information of sub-frame of uplink after, send positive acknowledgement ACK/ Negative Acknowledgement nack message by Physical Uplink Shared Channel PUSCH to described base station equipment.
Described sending module 12, specifically for after knowing that type of service that terminal equipment is corresponding is specified services type, for pre-scheduling switch opened by described terminal equipment, and after described pre-scheduling switch open, send the schedule information for sub-frame of uplink to described terminal equipment.
In the embodiment of the present invention, this base station equipment also comprises: arrange module 13, is that described terminal equipment arranges pre-scheduling traffic carrying capacity for the priority corresponding according to described terminal equipment; The priority that described terminal equipment is corresponding is higher, and described pre-scheduling traffic carrying capacity is larger;
Described sending module 12, when sending the schedule information for sub-frame of uplink to described terminal equipment, carries the pre-scheduling traffic carrying capacity of described setting in described schedule information;
By described terminal equipment receive described for the schedule information of sub-frame of uplink after, utilize the pre-scheduling traffic carrying capacity of described setting to send ACK/NACK information to described base station equipment.
Described module 13 is set, specifically for after knowing that type of service that terminal equipment is corresponding is specified services type, for pre-scheduling switch opened by described terminal equipment, and after described pre-scheduling switch open, the priority corresponding according to described terminal equipment is that described terminal equipment arranges pre-scheduling traffic carrying capacity.
In the embodiment of the present invention, described specified services type is specially: require that time delay is less than the type of service of predetermined threshold value.
Wherein, the modules of apparatus of the present invention can be integrated in one, and also can be separated deployment.Above-mentioned module can merge into a module, also can split into multiple submodule further.
Through the above description of the embodiments, those skilled in the art can be well understood to the mode that the present invention can add required general hardware platform by software and realize, and can certainly pass through hardware, but in a lot of situation, the former is better execution mode.Based on such understanding, technical scheme of the present invention can embody with the form of software product the part that prior art contributes in essence in other words, this computer software product is stored in a storage medium, comprising some instructions in order to make a computer equipment (can be personal computer, server, or the network equipment etc.) perform method described in each embodiment of the present invention.
It will be appreciated by those skilled in the art that accompanying drawing is the schematic diagram of a preferred embodiment, the module in accompanying drawing or flow process might not be that enforcement the present invention is necessary.
It will be appreciated by those skilled in the art that the module in the device in embodiment can carry out being distributed in the device of embodiment according to embodiment description, also can carry out respective change and be arranged in the one or more devices being different from the present embodiment.The module of above-described embodiment can merge into a module, also can split into multiple submodule further.
The invention described above embodiment sequence number, just to describing, does not represent the quality of embodiment.
Be only several specific embodiment of the present invention above, but the present invention is not limited thereto, the changes that any person skilled in the art can think of all should fall into protection scope of the present invention.

Claims (8)

1. a transmission method for positive acknowledgement ACK/ Negative Acknowledgement nack message, is characterized in that, described method is applied in Long Term Evolution LTE system, and the method comprises:
Base station equipment obtains type of service corresponding to terminal equipment;
When the type of service that terminal equipment is corresponding is specified services type, described base station equipment sends the schedule information for sub-frame of uplink to described terminal equipment;
By described terminal equipment receive described for the schedule information of sub-frame of uplink after, send ACK/NACK information by Physical Uplink Shared Channel PUSCH to described base station equipment;
Described specified services type is specially: require that time delay is less than the type of service of predetermined threshold value.
2. the method for claim 1, is characterized in that, described base station equipment sends the schedule information for sub-frame of uplink to described terminal equipment, comprising:
Described base station equipment is after knowing that type of service that terminal equipment is corresponding is specified services type, for pre-scheduling switch opened by described terminal equipment, and after described pre-scheduling switch open, described base station equipment sends the schedule information for sub-frame of uplink to described terminal equipment.
3. the method for claim 1, is characterized in that, described method comprises further:
The described base station equipment priority corresponding according to described terminal equipment is that described terminal equipment arranges pre-scheduling traffic carrying capacity; Wherein, the priority that described terminal equipment is corresponding is higher, and described pre-scheduling traffic carrying capacity is larger;
Described base station equipment, when sending the schedule information for sub-frame of uplink to described terminal equipment, carries the pre-scheduling traffic carrying capacity of described setting in described schedule information;
By described terminal equipment receive described for the schedule information of sub-frame of uplink after, utilize the pre-scheduling traffic carrying capacity of described setting to send ACK/NACK information to described base station equipment.
4. method as claimed in claim 3, is characterized in that, the described base station equipment priority corresponding according to described terminal equipment is that described terminal equipment arranges pre-scheduling traffic carrying capacity, comprising:
Described base station equipment is after knowing that type of service that terminal equipment is corresponding is specified services type, for pre-scheduling switch opened by described terminal equipment, and after described pre-scheduling switch open, the priority corresponding according to described terminal equipment is that described terminal equipment arranges pre-scheduling traffic carrying capacity.
5. a base station equipment, is characterized in that, described base station equipment is applied in Long Term Evolution LTE system, also comprises:
Obtain module, for obtaining type of service corresponding to terminal equipment;
Sending module, when being specified services type for the type of service corresponding at terminal equipment, sends the schedule information for sub-frame of uplink to described terminal equipment;
By described terminal equipment receive described for the schedule information of sub-frame of uplink after, send positive acknowledgement ACK/ Negative Acknowledgement nack message by Physical Uplink Shared Channel PUSCH to described base station equipment;
Described specified services type is specially: require that time delay is less than the type of service of predetermined threshold value.
6. base station equipment as claimed in claim 5, is characterized in that,
Described sending module, specifically for after knowing that type of service that terminal equipment is corresponding is specified services type, for pre-scheduling switch opened by described terminal equipment, and after described pre-scheduling switch open, send the schedule information for sub-frame of uplink to described terminal equipment.
7. base station equipment as claimed in claim 5, is characterized in that, also comprise:
Arranging module, is that described terminal equipment arranges pre-scheduling traffic carrying capacity for the priority corresponding according to described terminal equipment; The priority that described terminal equipment is corresponding is higher, and described pre-scheduling traffic carrying capacity is larger;
Described sending module, when sending the schedule information for sub-frame of uplink to described terminal equipment, carries the pre-scheduling traffic carrying capacity of described setting in described schedule information;
By described terminal equipment receive described for the schedule information of sub-frame of uplink after, utilize the pre-scheduling traffic carrying capacity of described setting to send ACK/NACK information to described base station equipment.
8. base station equipment as claimed in claim 7, is characterized in that,
Described module is set, specifically for after knowing that type of service that terminal equipment is corresponding is specified services type, for pre-scheduling switch opened by described terminal equipment, and after described pre-scheduling switch open, the priority corresponding according to described terminal equipment is that described terminal equipment arranges pre-scheduling traffic carrying capacity.
CN201210110391.3A 2012-04-16 2012-04-16 A kind of transmission method of ACK/NACK information and equipment Active CN102647263B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201210110391.3A CN102647263B (en) 2012-04-16 2012-04-16 A kind of transmission method of ACK/NACK information and equipment
PCT/CN2012/085158 WO2013155839A1 (en) 2012-04-16 2012-11-23 Ack/nack information transmission method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210110391.3A CN102647263B (en) 2012-04-16 2012-04-16 A kind of transmission method of ACK/NACK information and equipment

Publications (2)

Publication Number Publication Date
CN102647263A CN102647263A (en) 2012-08-22
CN102647263B true CN102647263B (en) 2015-08-12

Family

ID=46659854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210110391.3A Active CN102647263B (en) 2012-04-16 2012-04-16 A kind of transmission method of ACK/NACK information and equipment

Country Status (2)

Country Link
CN (1) CN102647263B (en)
WO (1) WO2013155839A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102647263B (en) * 2012-04-16 2015-08-12 大唐移动通信设备有限公司 A kind of transmission method of ACK/NACK information and equipment
US9445227B2 (en) 2013-08-30 2016-09-13 Qualcomm Incorporated Passive positioning utilizing round trip time information
US9661603B2 (en) 2013-08-30 2017-05-23 Qualcomm Incorporated Passive positioning utilizing beacon neighbor reports
CN107431578B (en) * 2015-04-09 2020-09-18 瑞典爱立信有限公司 Method and apparatus for scheduling feedback
CN107040557B (en) 2016-02-03 2020-10-09 中兴通讯股份有限公司 Resource application and allocation method, UE and network control unit
CN107484249B (en) * 2016-06-07 2020-08-18 大唐移动通信设备有限公司 Pre-scheduling method and system based on service type
KR102238467B1 (en) 2016-09-28 2021-04-08 후아웨이 테크놀러지 컴퍼니 리미티드 Method for feeding back downlink data and ACK/NACK information for related devices
US10492182B2 (en) 2016-09-30 2019-11-26 Telefonaktiebolaget Lm Ericsson (Publ) Method and device for determining uplink control channel
US11038657B2 (en) 2016-11-11 2021-06-15 Beijing Xiaomi Mobile Software Co., Ltd. Method and apparatus for transmitting and obtaining uplink HARQ feedback

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101873200A (en) * 2007-09-06 2010-10-27 夏普株式会社 Communication device and communication method
CN102064921A (en) * 2010-12-28 2011-05-18 中兴通讯股份有限公司 Sending method of response information and user terminal

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101175301B (en) * 2006-11-01 2010-06-16 中兴通讯股份有限公司 Sharing method for unscheduled and scheduled resource in ascending reinforcement system
KR100905385B1 (en) * 2008-03-16 2009-06-30 엘지전자 주식회사 Method for effective transmission of a control signal in a wireless communication system
CN101989898A (en) * 2010-11-15 2011-03-23 中兴通讯股份有限公司 Method and device for transmitting response message
CN102647263B (en) * 2012-04-16 2015-08-12 大唐移动通信设备有限公司 A kind of transmission method of ACK/NACK information and equipment

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101873200A (en) * 2007-09-06 2010-10-27 夏普株式会社 Communication device and communication method
CN102064921A (en) * 2010-12-28 2011-05-18 中兴通讯股份有限公司 Sending method of response information and user terminal

Also Published As

Publication number Publication date
WO2013155839A1 (en) 2013-10-24
CN102647263A (en) 2012-08-22

Similar Documents

Publication Publication Date Title
CN102647263B (en) A kind of transmission method of ACK/NACK information and equipment
CN107333282B (en) 5G terminal universal platform optimization method and system based on GPP
CN102438318B (en) Method, equipment and system for adjusting feedback cycle of channel quality indicator (CQI)
CN110495114A (en) Method and apparatus for code block grouping
CN101772102A (en) Selecting method for isomeric wireless network
CN110290561A (en) A kind of sending method and the network equipment of local service
US11089604B2 (en) Communication resource management method and device
CN105323857A (en) HARQ information configuration method and related device
CN103687025A (en) Resource allocation method used for LTE system
CN104104485A (en) D2D data transmission method
KR102207118B1 (en) Cross-carrier scheduling method and apparatus
JP2019528618A (en) Method and apparatus for feedback of downlink data
CN104581970A (en) Adaptive-scheduling method and equipment
CN102196551B (en) The method and apparatus that a kind of power is shared
CN104066193A (en) Scheduling method and device
JP2021516910A (en) Optimized URLLC scheduling policy for multi-node connectivity with data replication
CN103596277A (en) Method, main dispatcher, base band unit and base station for achieving cell combination
CN105208602A (en) Load balancing method and device
CN108833167B (en) Communication optimization system and method based on edge calculation
Ganjalizadeh et al. An RL-based joint diversity and power control optimization for reliable factory automation
CN105792359A (en) Resource distribution method and device, and data mapping method and device
CN105356980A (en) Response message sending method and device
US10200510B2 (en) Method and apparatus for loading web page
CN103973417A (en) Data transmission method and user equipment
CN105323038A (en) Method for controlling channel state information sending, base station and terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant