CN102567922A - Construction project management system platform based on BIM (Building Information Modeling) network technology and application method of construction project management system - Google Patents
Construction project management system platform based on BIM (Building Information Modeling) network technology and application method of construction project management system Download PDFInfo
- Publication number
- CN102567922A CN102567922A CN2012100136801A CN201210013680A CN102567922A CN 102567922 A CN102567922 A CN 102567922A CN 2012100136801 A CN2012100136801 A CN 2012100136801A CN 201210013680 A CN201210013680 A CN 201210013680A CN 102567922 A CN102567922 A CN 102567922A
- Authority
- CN
- China
- Prior art keywords
- management system
- bim
- project management
- main frame
- system platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to a construction project management system platform based on a BIM (Building Information Modeling) network technology, which comprises a local area network server consisting of hardware, a host, a working station dual-screen computer and accessory equipment, wherein the local area network server, the host, the working station dual-screen computer and the auxiliary equipment are networked through a wireless router; video and audio signals of the host and a projector are transmitted through wireless video-audio equipment; sound signals of the host and a sound system are transmitted through a wireless sound device; the host is provided with a wireless mouse; and the invention further relates to an application method of the construction project management system, namely, the application method of the construction project management system is developed by taking the system platform as a support and aims at finishing an establishing work of a construction information model in a short time by reasonably decomposing and organizing large-size construction projects and rapidly modeling on the same platform under synergy of multiple persons. The construction project management system platform and the application method thereof disclosed by the invention are computer-aided scientific research, production and teaching system platform and method without limitation by time and space and are certainly and widely applied in future.
Description
Technical field
The present invention relates to the BIM applied technical field, specifically, relate to a kind of Project Management System platform based on the BIM network technology, and the application process of this platform.
Background technology
BIM is Building Information Modeling (BIM), is the technological layer that International Union of Architects (UIA) tries hard to recommend.BIM is as one of construction project complete information-bearing body, and it is a kind of architectural design, construction and management method of innovation.Its principal feature is to continue immediately to provide high-quality, consistent, reliable Project design scale, process and cost information.Architect, structure teacher and engineering project Whole Course Management each side realize seamless link, shared data and information through the BIM collaborative platform.Utilize BIM skill upgrading fine-grained management, reduce resource consumption, energy resource consumption.BIM has become building field project Whole Course Management important techniques means.
The present invention just is based on above-mentioned background, is intended to design a kind of Project Management System platform based on the BIM network technology, and the application process of this platform.
Summary of the invention
The objective of the invention is to adapt to the needs of reality; A kind of Project Management System platform based on the BIM network technology is provided, is intended to make the collaborative work, rapid modeling technology platform of domestic present BIM technology of China and BIM support Network Based to form a cover industry standard and is applied.
Another free-revving engine of the present invention also is, as the basis, is support with the Project Management System platform of developing among the present invention based on the BIM network technology with the BIM technology, develops the application process of this platform.Be intended to through big construction item is rationally decomposed and tissue; Multi-person synergy rapid modeling on same platform; Accomplish the work of setting up of BIM at short notice; Greatly shortened the time cycle of modeling, on this meaning, this platform is actual to be exactly an engineering management quick response system based on BIM and network technology.
In order to realize the object of the invention, the technical scheme that the present invention adopts is:
A kind of Project Management System platform based on the BIM network technology; Comprise LAN server, main frame, workstation double screen computing machine, the auxiliary device formed by hardware; Between said LAN server, main frame, workstation double screen computing machine, the auxiliary device through wireless route networking; Through the wireless voice device transmission, main frame is equipped with the cordless key mouse through wireless image-sound device transmission, main frame and sound system voice signal for main frame and projector video and sound signal.
Said auxiliary device comprises projector, printing and plotting equipment, stereo set, notebook computer.
Two of said main frame outfits add three with projector and shield above the demonstration.
Said LAN server is equipped with plural array of rear-projectors or display screen array, and said each workstation computer is equipped with two above displays.
Also comprise the Wide Area Network expansion unit that is based upon on VPN VPN technology or the FPT server technology basis, share at wide area network for the resource on the said LAN server.
A kind of application process of the Project Management System platform based on the BIM network technology comprises the steps,
The first step; With between LAN server, main frame, workstation double screen computing machine, the auxiliary device through wireless route networking; Through the wireless voice device transmission, main frame is equipped with the cordless key mouse through wireless image-sound device transmission, main frame and sound system voice signal for main frame and projector video and sound signal;
In second step, on the network memory in LAN server goal task is set, the preservation task;
In the 3rd step, workstation double screen computer real-time is obtained the task on the LAN server, through the modeling of the online many people fast synergistic of wireless network;
The 4th step; After each workstation double screen collaborative computer is accomplished assignment task separately; Preserve in real time and be back in the shared goal task file path of network memory; Through to the reintegrating and the data of BIM are handled and analyzed of all data, finally form complete BIM engineering data base.
Also comprise the steps,
In the 5th step, built-in video teaching, the order Instant Help of BIM software and software shows through two above display screens or projection screen simultaneously.
Said auxiliary device comprises projector, printing and plotting equipment, stereo set, notebook computer, and two of said main frame outfits add three with projector and shield above the demonstration.
Said LAN server is equipped with plural array of rear-projectors or display screen array, and said each workstation computer is equipped with two above displays.
Also comprise the Wide Area Network expansion unit that is based upon on VPN VPN technology or the FPT server technology basis, share at wide area network for the resource on the said LAN server.
Beneficial effect of the present invention is:
1. do not receive time and space constraint, can be long-range service be provided for the user
System platform of the present invention is the open area of computer aided scientific research, production and the tutoring system that do not receive time, space constraint, can 24 hours, multi-user's (50 of existing websites) studies carefully with application for distributed collaborative work that strong technical support is provided.In fact, the network fast synergistic modeling that combines computer networking technology and CAD modeling will be the direction of cad technique future development, and will be widely used;
2. software and hardware resources is shared in the LAN scope
Resource sharing is very easy to the user.Through interconnected, can hold more user and share the BIM information processing platform simultaneously with the computer client of the computer graphical process chamber of concentrating.The BIM information platform extends to the dispersion client in the LAN through LAN, just can make full use of the computer resource that the individual has, and for they provide real-time service and guidance, software and hardware resources is fully utilized.Significantly reduced fund input simultaneously to public resource;
3. multi-screen, multi job mode
Three screen+the double-throws of main frame one machine, workstation one machine double screen, under multitask, multiple-person cooperative work pattern, no matter be interactive teaching, still many people fast synergistic modeling can both be in the equal time, and the amount that the information that makes is transmitted efficient bigger, work is higher.But if any specific demand also multi-screen (close screen) in groups the utilization;
4. also has the interconnected wireless networking of intercomputer, characteristics such as audio wireless transmission, the transmission of projector wireless image-sound;
5. adopt platform of the present invention and method to impart knowledge to students; Traditional pouring-in-process in instruction mode is changed into brand-new true-time operation and experience type teaching; And can be at any time interactive with teach, the guiding student operation of taking action on one's own while explain, with reach intensive training, more thoroughly geography is separated the purpose of theoretical knowledge; While also makes the student obtain more technical ability exercise and does not forget later, has realized by theoretical type to applied transformation right-about;
6. simultaneously, a plurality of display windows show various tasks simultaneously, also make display effect more directly perceived, for the display effect of big figure or super large figure, can show partial enlarged drawing simultaneously, and need not frequently to switch, and are convenient to the student and understand.
Description of drawings
Fig. 1 is the schematic diagram of integrated application platform of the present invention.
Embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further specified:
Embodiment: referring to Fig. 1.
A kind of Project Management System platform based on the BIM network technology; Comprise LAN server, main frame, workstation double screen computing machine, the auxiliary device formed by hardware; Between said LAN server, main frame, workstation double screen computing machine, the auxiliary device through wireless route networking; Through the wireless voice device transmission, main frame is equipped with the cordless key mouse through wireless image-sound device transmission, main frame and sound system voice signal for main frame and projector video and sound signal.Its basic principle schematic is referring to Fig. 1.
Said auxiliary device comprises projector, printing and plotting equipment, stereo set, notebook computer.
Two of said main frame outfits add three with projector and shield above the demonstration.
Said LAN server is equipped with plural array of rear-projectors or display screen array, and said each workstation computer is equipped with two above displays.Referring to workstation1 among Fig. 1, workstation 2 is the double screen demonstration that two displays are formed, and the quantity of workstation can be set according to actual needs, a plurality of displays also can be set show side by side.
Also comprise the Wide Area Network expansion unit that is based upon on VPN VPN technology or the FPT server technology basis, share at wide area network for the resource on the said LAN server.
Integrated application platform of the present invention puts into operation at present; Present embodiment mainly is applicable to the modeling of multiple person cooperational pool completion fast synergistic; For example, the integrated application platform and the method for application thereof of a typical large-scale house construction engineering fast synergistic modeling calculation amount valuation employing are summarized as follows:
A kind of application process of the Project Management System platform based on the BIM network technology comprises the steps,
The first step; With between LAN server, main frame, workstation double screen computing machine, the auxiliary device through wireless route networking; Through the wireless voice device transmission, main frame is equipped with the cordless key mouse through wireless image-sound device transmission, main frame and sound system voice signal for main frame and projector video and sound signal;
In second step, on the network memory in LAN server goal task is set, the preservation task;
In the 3rd step, workstation double screen computer real-time is obtained the task on the LAN server, through the modeling of the online many people fast synergistic of wireless network;
The 4th step; After each workstation double screen collaborative computer is accomplished assignment task separately; Preserve in real time and be back in the shared goal task file path of network memory; Through to the reintegrating and the data of BIM are handled and analyzed of all data, finally form complete BIM engineering data base.
Present embodiment has successfully been realized multi-person synergy pool completion rapid modeling; Overcome medium-and-large-sized modeling cycle of conventional art long, task is heavy, respectively divide the work team links up defectives such as untimely, inconvenience; Successful applying in the practice, and obtained good Expected Results.
Also comprise the steps,
In the 5th step, built-in video teaching, the order Instant Help of BIM software and software shows through two above display screens or projection screen simultaneously.Each student is through in the middle of wherein any one link that can both initiatively participate in case teaching, and the teaching of giving lessons of this sort of passive type of giving a lesson in traditional classroom is different resolutely.
For example under traditional teaching mode, tell about an order or operation; The time that possibly spend is that tens minutes or dozens of minutes are just finished, and forms notion by the time and also has a time course, and also only be to rest on the aspect of knowledge this moment in student's the brain; Can't be converted into a kind of technical ability (skill ability); Even it also is extremely limited can transforming,, when practice, also have a lot of skills to be particular about because in fact.So in very limited teaching period plan, on top of the application expertise of the three-dimensional calculation amount of construction costs software almost is impossible.And under BIM operating room condition, just taken on a new look fully; Three-dimensional calculation amount software is implanted real-time command and is assisted, cooperates the electronic document of video teaching courseware, case drawing to show simultaneously through the dual-projection pattern; The student can be through notebook computer synchronous operation and the experience that carries; Also can be through the computer real-time operation of each branch website; If teacher need control the Computer for teachers that is projected on the giant-screen to student's question or the interactive student of letting, just can realize as long as pass teacher cordless key mouse on hand this moment.Teacher also can omnibearingly cruise among the student, and real-time guidance is carried out in real-time each student front that needs to instruct by doing and illustrating of going to.Simultaneously, also can be as required, to the mode that projector and computer monitor adopt multi-screen to show side by side, can open a plurality of task windows simultaneously, avoided between a plurality of windows, carrying out frequent switching.
Said auxiliary device comprises projector, printing and plotting equipment, stereo set, notebook computer, and two of said main frame outfits add three with projector and shield above the demonstration.
Said LAN server is equipped with plural array of rear-projectors or display screen array, and said each workstation computer is equipped with two above displays.
Also comprise the Wide Area Network expansion unit that is based upon on VPN VPN technology or the FPT server technology basis, share at wide area network for the resource on the said LAN server.At this moment, teacher and student also can break away from classroom, remote teaching.
What embodiments of the invention were announced is preferred embodiment, but is not limited thereto those of ordinary skill in the art; Very easily, understand spirit of the present invention, and make different amplifications and variation according to the foregoing description; But only otherwise break away from spirit of the present invention, all in protection scope of the present invention.
Claims (10)
1. Project Management System platform based on the BIM network technology; It is characterized in that: comprise LAN server, main frame, workstation double screen computing machine, the auxiliary device formed by hardware; Between said LAN server, main frame, workstation double screen computing machine, the auxiliary device through wireless route networking; Through the wireless voice device transmission, main frame is equipped with the cordless key mouse through wireless image-sound device transmission, main frame and sound system voice signal for main frame and projector video and sound signal.
2. the Project Management System platform based on the BIM network technology according to claim 1, it is characterized in that: said auxiliary device comprises projector, printing and plotting equipment, stereo set, notebook computer.
3. the Project Management System platform based on the BIM network technology according to claim 1 is characterized in that: two of said main frame outfits add three with projector and shield above the demonstration.
4. the Project Management System platform based on the BIM network technology according to claim 1; It is characterized in that: said LAN server is equipped with plural array of rear-projectors or display screen array, and said each workstation computer is equipped with two above displays.
5. according to claim 1 or the described Project Management System platform of claim 2 based on the BIM network technology; It is characterized in that: also comprise the Wide Area Network expansion unit that is based upon on VPN VPN technology or the FPT server technology basis, share at wide area network for the resource on the said LAN server.
6. application process based on the Project Management System platform of BIM network technology is characterized in that: comprises the steps,
The first step; With between LAN server, main frame, workstation double screen computing machine, the auxiliary device through wireless route networking; Through the wireless voice device transmission, main frame is equipped with the cordless key mouse through wireless image-sound device transmission, main frame and sound system voice signal for main frame and projector video and sound signal;
In second step, on the network memory in LAN server goal task is set, the preservation task;
In the 3rd step, workstation double screen computer real-time is obtained the task on the LAN server, through the modeling of the online many people fast synergistic of wireless network;
The 4th step; After each workstation double screen collaborative computer is accomplished assignment task separately; Preserve in real time and be back in the shared goal task file path of network memory; Through to the reintegrating and the data of BIM are handled and analyzed of all data, finally form complete BIM engineering data base.
7. application process according to claim 6 is characterized in that: also comprises the steps,
In the 5th step, built-in video teaching, the order Instant Help of BIM software and software shows through two above display screens or projection screen simultaneously.
8. application process according to claim 6 is characterized in that: said auxiliary device comprises projector, printing and plotting equipment, stereo set, notebook computer, and two of said main frame outfits add three with projector and shield above the demonstration.
9. application process according to claim 6 is characterized in that: said LAN server is equipped with plural array of rear-projectors or display screen array, and said each workstation computer is equipped with two above displays.
10. application process according to claim 6 is characterized in that: also comprise the Wide Area Network expansion unit that is based upon on VPN VPN technology or the FPT server technology basis, share at wide area network for the resource on the said LAN server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100136801A CN102567922A (en) | 2012-01-17 | 2012-01-17 | Construction project management system platform based on BIM (Building Information Modeling) network technology and application method of construction project management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100136801A CN102567922A (en) | 2012-01-17 | 2012-01-17 | Construction project management system platform based on BIM (Building Information Modeling) network technology and application method of construction project management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102567922A true CN102567922A (en) | 2012-07-11 |
Family
ID=46413278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100136801A Pending CN102567922A (en) | 2012-01-17 | 2012-01-17 | Construction project management system platform based on BIM (Building Information Modeling) network technology and application method of construction project management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102567922A (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103118114A (en) * | 2013-02-02 | 2013-05-22 | 中铁建设集团有限公司 | BIM (building information modeling) collaborative designing system based on cloud servers |
CN103400001A (en) * | 2013-07-30 | 2013-11-20 | 中铁建设集团有限公司 | Device with solid state disk for BIM (building information modeling) graphic design |
CN103400228A (en) * | 2013-08-07 | 2013-11-20 | 中铁第一勘察设计院集团有限公司 | Method for creating post engineering information model for railway and urban railway traffic station |
CN103440526A (en) * | 2013-07-05 | 2013-12-11 | 北京建筑大学 | Power generation prediction method and device based on building information model |
CN103514409A (en) * | 2012-06-29 | 2014-01-15 | 东芝电梯株式会社 | BIM system, server device, terminal device, method and program |
CN103955174A (en) * | 2014-03-31 | 2014-07-30 | 湖南大学 | Building health monitoring system based on building information model technology |
CN104765904A (en) * | 2015-02-13 | 2015-07-08 | 上海同筑信息科技有限公司 | BIM (Building Information Modeling) technology adopted multi-specialty combination and transparent visualization method and system |
CN104778316A (en) * | 2015-04-01 | 2015-07-15 | 浙江理工大学 | Photovoltaic power generation equipment radiation analysis method based on building information model |
CN105243485A (en) * | 2015-09-23 | 2016-01-13 | 河北科技师范学院 | BIM network technology based architecture engineering management system platform |
CN106779476A (en) * | 2017-01-11 | 2017-05-31 | 江苏省第建筑安装股份有限公司 | A kind of Construction Schedule management platform and method based on BIM IFC technologies |
CN107146065A (en) * | 2017-03-20 | 2017-09-08 | 中国铁道科学研究院电子计算技术研究所 | Railway engineering management platform system |
CN107888575A (en) * | 2017-10-31 | 2018-04-06 | 广州市新誉工程咨询有限公司 | Terminal platform information interacting method and its application in BIM collaborative platforms |
CN110213641A (en) * | 2019-05-21 | 2019-09-06 | 北京睿格致科技有限公司 | The micro- class playback method of 4D and device |
CN112685862A (en) * | 2020-10-21 | 2021-04-20 | 升维科技有限公司 | BIM-based pipeline arrangement optimization method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080281573A1 (en) * | 2007-05-11 | 2008-11-13 | Paul Eric Seletsky | Digital design ecosystem |
CN101553862A (en) * | 2006-09-13 | 2009-10-07 | 国际在线设计与建筑有限公司 | Computer-based system and method for providing situational awareness for a structure using three-dimensional modeling |
CN102204163A (en) * | 2008-09-03 | 2011-09-28 | 西门子工业公司 | Passive and active wireless building management system and method |
-
2012
- 2012-01-17 CN CN2012100136801A patent/CN102567922A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101553862A (en) * | 2006-09-13 | 2009-10-07 | 国际在线设计与建筑有限公司 | Computer-based system and method for providing situational awareness for a structure using three-dimensional modeling |
US20080281573A1 (en) * | 2007-05-11 | 2008-11-13 | Paul Eric Seletsky | Digital design ecosystem |
CN102204163A (en) * | 2008-09-03 | 2011-09-28 | 西门子工业公司 | Passive and active wireless building management system and method |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103514409A (en) * | 2012-06-29 | 2014-01-15 | 东芝电梯株式会社 | BIM system, server device, terminal device, method and program |
CN103514409B (en) * | 2012-06-29 | 2016-08-17 | 东芝电梯株式会社 | BIM system, server unit, termination and method |
CN103118114A (en) * | 2013-02-02 | 2013-05-22 | 中铁建设集团有限公司 | BIM (building information modeling) collaborative designing system based on cloud servers |
CN103440526A (en) * | 2013-07-05 | 2013-12-11 | 北京建筑大学 | Power generation prediction method and device based on building information model |
CN103440526B (en) * | 2013-07-05 | 2016-04-20 | 北京建筑大学 | A kind of power generation prediction method based on BIM and device |
CN103400001A (en) * | 2013-07-30 | 2013-11-20 | 中铁建设集团有限公司 | Device with solid state disk for BIM (building information modeling) graphic design |
CN103400228A (en) * | 2013-08-07 | 2013-11-20 | 中铁第一勘察设计院集团有限公司 | Method for creating post engineering information model for railway and urban railway traffic station |
CN103400228B (en) * | 2013-08-07 | 2016-04-13 | 中铁第一勘察设计院集团有限公司 | The creation method of engineering information model after railway and city rail traffic station |
CN103955174A (en) * | 2014-03-31 | 2014-07-30 | 湖南大学 | Building health monitoring system based on building information model technology |
CN104765904A (en) * | 2015-02-13 | 2015-07-08 | 上海同筑信息科技有限公司 | BIM (Building Information Modeling) technology adopted multi-specialty combination and transparent visualization method and system |
CN104778316B (en) * | 2015-04-01 | 2017-12-01 | 浙江理工大学 | A kind of photovoltaic power generation equipment radiation analysis method based on BIM |
CN104778316A (en) * | 2015-04-01 | 2015-07-15 | 浙江理工大学 | Photovoltaic power generation equipment radiation analysis method based on building information model |
CN105243485A (en) * | 2015-09-23 | 2016-01-13 | 河北科技师范学院 | BIM network technology based architecture engineering management system platform |
CN106779476A (en) * | 2017-01-11 | 2017-05-31 | 江苏省第建筑安装股份有限公司 | A kind of Construction Schedule management platform and method based on BIM IFC technologies |
CN107146065A (en) * | 2017-03-20 | 2017-09-08 | 中国铁道科学研究院电子计算技术研究所 | Railway engineering management platform system |
CN107888575A (en) * | 2017-10-31 | 2018-04-06 | 广州市新誉工程咨询有限公司 | Terminal platform information interacting method and its application in BIM collaborative platforms |
CN110213641A (en) * | 2019-05-21 | 2019-09-06 | 北京睿格致科技有限公司 | The micro- class playback method of 4D and device |
CN110213641B (en) * | 2019-05-21 | 2022-03-29 | 北京睿格致科技有限公司 | 4D micro-course playing method and device |
CN112685862A (en) * | 2020-10-21 | 2021-04-20 | 升维科技有限公司 | BIM-based pipeline arrangement optimization method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102567922A (en) | Construction project management system platform based on BIM (Building Information Modeling) network technology and application method of construction project management system | |
Huang | Framework for a smart adult education environment | |
Wang et al. | Application of VR technology in civil engineering education | |
Fruchter | Dimensions of teamwork education | |
CN104575142A (en) | Experiential digitalized multi-screen seamless cross-media interactive opening teaching laboratory | |
CN105243485A (en) | BIM network technology based architecture engineering management system platform | |
CN106297445A (en) | A kind of mobile learning system based on big data | |
CN109994012A (en) | Immersion cluster interaction training system and its method | |
Song et al. | Smart classroom: From conceptualization to construction | |
CN110889788A (en) | Wisdom classroom based on augmented reality technique | |
CN103426346A (en) | Theory and experiment integration synchronous teaching system | |
CN106297444A (en) | A kind of mobile learning system | |
Li et al. | Immersive virtual reality as a tool to improve bridge teaching communication | |
Ma et al. | Design a network architectural teaching system by auto CAD | |
Walls et al. | Hacking spaces: Place as interface | |
Cuny | Transforming k-12 computing education: an update and a call to action | |
CN202838435U (en) | Construction project management system platform based on BIM (Building Information Modeling) network technology | |
CN116229788A (en) | Design method, system and application method of virtual server assembly simulation training system | |
Halatsch et al. | Value Lab: A collaborative environment for the planning of Future Cities | |
Chen | Construction of English Resource Database Based on Virtual Reality Technology | |
Wang et al. | Multimedia teaching platform for urban planning utilizing 3D technology | |
Halatsch et al. | ETH Value Lab-A Framework For Managing Large-Scale Urban Projects | |
Zhaobin et al. | Cooperation sharing platform of network teaching resources based on cloud computing | |
Alrasheedi et al. | Developing a mobile learning maturity model | |
Vermisso et al. | Immersive environments for persistent modelling and generative design strategies in an informal settlement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120711 |