CN102542413B - A kind of freedom and steady job stream building method - Google Patents
A kind of freedom and steady job stream building method Download PDFInfo
- Publication number
- CN102542413B CN102542413B CN201110444226.7A CN201110444226A CN102542413B CN 102542413 B CN102542413 B CN 102542413B CN 201110444226 A CN201110444226 A CN 201110444226A CN 102542413 B CN102542413 B CN 102542413B
- Authority
- CN
- China
- Prior art keywords
- data
- service equipment
- node
- terminal device
- judges whether
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of freedom of the present invention and steady job stream building method, a kind of Workflow system, comprises service equipment, the network equipment and terminal device, and described service equipment is for storing data; Described terminal device to be called the data that service equipment stores by the network equipment and checks and change operation; The described network equipment comprises at least one network insertion instrument.System of the present invention is to the breakthrough lifting of work on hand stream, especially flowage structure can be changed in the process of implementation, novelty of the present invention and creativeness are fully demonstrated, this Workflow system that the present invention proposes, ordinary people also can be arranged fast and organization work, and can change flowage structure in the process of implementation, the Workflow system of the method using the present invention to propose, the work efficiency of enterprise greatly, reduces personnel's input cost, has practicality.
Description
Technical field
The present invention relates to a kind of freedom and steady job stream building method.
Background technology
Workflow belongs to a part for computer supported cooperative work (ComputerSupportedCooperativeWork, CSCW).Workflow (WorkFlow) is exactly the computation model of workflow, carries out representing in a computer and to the calculation that in fact plays tricks by the logic Sum fanction organized together before and after the work in workflow how with appropriate model.Current working flow system probably can be summarized as two classes.1) mail is driving; 2) event driven:
(1), mail is driving.Be exactly by mailing system, working to circulate another point from a point with the form of mail.Its representative is the LotusNotes of IBM.But the obvious problem of the workflow that mail is driving is, cannot see the overall flow state of work, complicated flow process cannot be carried out in the process of mail circulation and judge, need too much manual intervention.Such as: reimbursed sum is greater than 5000 and walks flow process A, reimbursed sum is less than 5000 and walks flow process B, this flow process, workflow cannot be driven to realize by mail.And, if this kind of flow process needs to suit enterprise's needs, also need a large amount of program development, by modeling, program design, program development, then could Client application.
(2), event driven.The representative of event driven workflow is exactly the SharePoint2010 of Microsoft.Here we are for SharePoint2010, but are not limited to SharePoint2010.But SharePoint2010 is in this kind of workflow state-of-the-art one.She proposes workflow packages containing system workflow and human interaction flow process.(as shown in Figure 2) but, she is complicated and well-separated for the setting up procedure of system workflow and human interaction.This kind of workflow, by using the Visio software (or similar flow process software for drawing) of Microsoft, draw the workflow comprising beginning, branch's judgement, but, when this workflow of drafting, contains only the carrying out of event, branch and the relation of termination, do not comprise the post of the people in event, post, department and reciprocal role.Because the workflow of drawing at Visio (or similar flow process software for drawing) is the relation only had between event before not importing to SharePoint, the relation between nobody exists, and this does not meet actual working condition.Actual working condition is that people and event mix, and is difficult to well-separated.After flow process is drawn, this workflow is imported in SharePoint, set various parameter, and the treatment people of each node.But this workflow is in use very complicated, certain programming basis or Basic Programming is had, have very high threshold, need professional to configure.The establishment or the change that are workflow are all very complicated and difficult.Current enterprise, unit, life, more there is communication problem in knowledge concentrated industry.In most enterprise, in especially on the middle and senior level, the time of 80% is that the result of communication is to allow people and thing effectively combine in communication.
Summary of the invention
The object of the invention is, simple for function in prior art, to create complexity deficiency, provides a kind of Workflow system.
A kind of Workflow system of the present invention, comprises service equipment, the network equipment and terminal device, and described service equipment is for storing data; Described terminal device to be called the data that service equipment stores by the network equipment and checks and change operation; The described network equipment comprises at least one network insertion instrument, and network insertion instrument refers to the network access device such as router, switch.
The invention has the beneficial effects as follows: system of the present invention is to the breakthrough lifting of work on hand stream, especially flowage structure can be changed in the process of implementation, easy to use and temporary changes, this Workflow system that the present invention proposes, ordinary people also can be arranged fast and organization work, and can change flowage structure in the process of implementation, the Workflow system of the method using the present invention to propose, the work efficiency of enterprise greatly, reduces personnel's input cost, has practicality.
On the basis of technique scheme, the present invention can also do following improvement.
Further, described service equipment comprises the first operational module and service module, described first operational module stores data for controlling service equipment, described service module is for controlling the work of the first operational module and the instruction transmitted by the network equipment of receiving terminal equipment, and described service module calls according to described instruction the data in the first operational module and changes.
Further, described service module comprises the network communication module that bi-directional data connects, application module and flow engine unit, also comprise the data module be connected with application module bi-directional data, described data module is connected with the first operational module bi-directional data, described network communication module and the network equipment communicate mutually and the decoding data transferred to the network equipment and coding the data after processing are transferred to application module, data after network communication module process are transferred to flow engine module and send data to the first operational module by data module by described application module, described flow engine module is for storing the data transferred to.
Further, described terminal device comprises mixed-media network modules mixed-media, display module and the second operational module that data double-way successively connects, also comprise the data memory module be bi-directionally connected with display module, described mixed-media network modules mixed-media is by the network communication module bidirectional data communication of the network equipment and service equipment, described display module is for showing the data transferred to, described second operational module calls the data in service equipment for inputting instruction, and described data memory module stores the data transferred to and instruction.
Another object of the present invention is, provides a kind of free workflow building method, specifically comprises the following steps:
Instruction is transferred to service equipment by the network equipment by step 1. user operation terminal device, conducts interviews and change the data in service equipment;
Step 2. service equipment is by data genaration process flow diagram and feed back to terminal device and show.
On the basis of technique scheme, the present invention can also do following improvement.
Further, described step 1 specifically comprises the following steps:
Step 1.1. is by the data in terminal device input instruction calls service equipment, and set up node according to different pieces of information and call node data, mode of operation is selected in input instruction;
Step 1.2. service equipment controls the data called to be presented on display module, and carries out selection operation to node data;
Step 1.3. judges whether to repeat call node data and whether select multiple benches pattern;
Step 1.4. is checked by display module and whether selects node and mode of operation, non-selectedly jumps to step 1.1, has selected to proceed step 1.5;
Step 1.5. judges whether to carry out authority editor, if so, arranges authority by service equipment to specified node input instruction, if not, proceed step 2.
Further, described step 2 specifically comprises the following steps:
The free flow process that step 2.1. user edits transfers to service equipment by the network equipment;
What step 2.2. service equipment was finished the work and flowed building and starting.
Further, described step 1.3 specifically comprises the following steps:
Step 1.3.1. judges whether to repeat to call node data, if so, jumps to step 1.2, if not, proceed step 1.4;
Step 1.3.2. judges whether to select multiple benches pattern, if so, edits flow process, adds new node and show in parallel mode after node, if not, proceed step 1.4; Described concurrent operating modes: after promoter's start flow, each node receives information simultaneously; Described work in series pattern: after promoter's start flow, in flow process, each node processes (after a upper node processing, next node just can receive) successively; Described multiple benches pattern: have connected applications that is parallel and serial in a flow process, select multilayer can directly enter flow process editing interface.
Another object of the present invention is, provides a kind of steady job stream building method, specifically comprises the following steps:
Instruction is transferred to service equipment by the network equipment by step 1. user operation terminal device, conducts interviews and change the data in service equipment;
Step 2. service equipment is by data genaration process flow diagram and feed back to terminal device and show.
On the basis of technique scheme, the present invention can also do following improvement.
Further, described step 1 specifically comprises the following steps:
Instruction is transferred to the data module of service equipment by step 1.1. user operation terminal device by web-transporting device;
Step 1.2. is by terminal device input data creation event-template;
Step 1.3. sets up node by terminal device according to different pieces of information, and inputs the node data in instruction calls service equipment;
Step 1.4. judges whether to repeat to call node data, if so, jumps to step 1.3, if not, proceed step 1.5;
Step 1.5. judges whether to need editing authority or judge whether to arrange branch condition.
Further, described step 2 specifically comprises the following steps:
The process flow diagram of generation is transferred to service equipment by step 2.1. terminal device;
Step 2.2. arranges special instruction in flow charts, and is associated with authorized person by special instruction and is stored to service equipment.
Further, described step 1.5 specifically comprises the following steps:
Step 1.5.1. judges whether to carry out editing authority to node data, if so, selects node data to carry out arranging authority; If not, proceed step 2.1;
Step 1.5.2. judges whether to arrange branch condition, if so, arranges branch instruction and calls corresponding data; If not, proceed step 2.1.
The invention has the beneficial effects as follows: method of the present invention, to the breakthrough lifting of work on hand stream, especially can change flowage structure in the process of implementation, easy to use and temporary changes.This method of building the workflow of free and fixing flow process that the present invention proposes, can allow ordinary people, also can arrange fast and organization work, and can flowage structure be changed in the process of implementation, the working flow software of the method using the present invention to propose, the work efficiency of enterprise greatly, reduces personnel's input cost, has practicality.
Another object of the present invention is, provides a kind of operation method of workflow, specifically comprises the following steps:
Step 1. user operation terminal device obtains data, and user, and to be edited node decoding data and coded treatment by operation terminal device;
Step 2. circulates and arrives next node, and process data are stored to service equipment.
Further, described step 1 comprises the following steps:
Step 1.1 judges that present node is the need of selection branch data, if so, selects next node data, if not, proceed step 2;
Step 1.2 judges whether present node wants changing process process, if so, after present node, increase other nodes, delete follow-up a certain node, stop current process flow process is no longer circulated to next node, rollback current process is to a upper node, if not, proceed step 2.
The invention has the beneficial effects as follows: the operation method of the workflow that the present invention relates to, flowage structure can be changed in the process of implementation, easy to use and temporary changes.
Accompanying drawing explanation
Fig. 1 is the structural drawing of a kind of Workflow system of the present invention;
Fig. 2 is the process flow diagram of a kind of free workflow building method of the present invention;
Fig. 3 is the process flow diagram of a kind of steady job stream building method of the present invention;
Fig. 4 is the operation method of a kind of workflow of the present invention.
Embodiment
Be described principle of the present invention and feature below in conjunction with accompanying drawing, example, only for explaining the present invention, is not intended to limit scope of the present invention.
As shown in Figure 1, a kind of Workflow system described in the embodiment of the present invention 1, comprises service equipment, the network equipment and terminal device, and described service equipment is for storing data; Described terminal device to be called the data that service equipment stores by the network equipment and checks and change operation; The described network equipment comprises at least one network insertion instrument.
Described service equipment comprises the first operational module and service module, described first operational module stores data for controlling service equipment, described service module is for controlling the work of the first operational module and the instruction transmitted by the network equipment of receiving terminal equipment, and described service module calls according to described instruction the data in the first operational module and changes.
Described service module comprises the network communication module that bi-directional data successively connects, application module and flow engine unit, also comprise the data module be connected with application module bi-directional data, described data module is connected with the first operational module bi-directional data, described network communication module and the network equipment communicate mutually and the decoding data transferred to the network equipment and coding the data after processing are transferred to application module, data after network communication module process are transferred to flow engine module and send data to the first operational module by data module by described application module, described flow engine module is for storing the data transferred to.
Described terminal device comprises mixed-media network modules mixed-media, display module and the second operational module that data double-way successively connects, also comprise the data memory module be bi-directionally connected with display module, described mixed-media network modules mixed-media is by the network communication module bidirectional data communication of the network equipment and service equipment, described display module is for showing the data transferred to, described second operational module calls the data in service equipment for inputting instruction, and described data memory module stores the data transferred to and instruction.
As shown in Figure 2, a kind of free workflow building method described in the embodiment of the present invention 2, specifically comprises the following steps:
Instruction is transferred to the data module of service equipment by the terminal device in step 1. user operation terminal device by web-transporting device;
Step 2., by the data in terminal device input instruction calls service equipment, is set up node according to different pieces of information and calls node data, inputting instruction simultaneously and select mode of operation;
Step 3. judges whether to repeat to call node data, if so, jumps to step 2, if not, proceed step 5;
Step 4. judges whether to select multiple benches pattern, if so, edits flow process, adds new node and show in parallel mode after node, if not, proceed step 5;
Step 5. is checked by display module and whether is selected node and mode of operation, non-selectedly jumps to step 1, has selected to proceed step 6;
Step 6. judges whether to carry out authority editor, if so, arranges authority by service equipment to specified node input instruction, if not, proceed step 7;
The free flow process that step 7. user edits transfers to service equipment by the network equipment;
What step 8. service equipment was finished the work and flowed building and starting.
As shown in Figure 3, a kind of steady job stream building method described in the embodiment of the present invention 3, specifically comprises the following steps:
Instruction is transferred to the data module of service equipment by the terminal device in step 1. user operation terminal device by web-transporting device;
Step 2. is by terminal device input data creation event-template;
Step 3. sets up node by terminal device according to different pieces of information, and inputs the node data in instruction calls service equipment;
Step 4. judges whether to repeat to call node data, if so, jumps to step 3, if not, proceed step 5;
Step 5. judges whether to carry out editing authority to node data, if so, selects node data to carry out arranging authority; If not, proceed step 7;
Step 6. judges whether to arrange branch condition, if so, arranges branch instruction and calls corresponding data; If not, proceed step 7;
The free flow process that step 7. user edits transfers to service equipment by the network equipment;
Step 8. arranges special instruction in flow charts, and is associated with authorized person by special instruction and is stored to service equipment.
As shown in Figure 4, the operation method of a kind of workflow described in the embodiment of the present invention 4, specifically comprises the following steps:
Step 1. user operation terminal device obtain data, user by operation terminal device to decoding data and coded treatment;
Step 2. judges that present node is chosen the need of branch, if so, selects next node executor, if not, proceed step 4;
Step 3. judges whether present node wants changing process process, if so, after present node, increase other nodes, delete follow-up a certain node, stop current process flow process is no longer circulated to next node, rollback current process is to a upper node, if not, proceed step 4;
Step 4. circulates and arrives next node, and process data are stored to service equipment.
These are only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (6)
1. a free workflow building method, is characterized in that, specifically comprises the following steps:
Step 1. is by the data in terminal device input instruction calls service equipment, and set up node according to different pieces of information and call node data, mode of operation is selected in input instruction;
Step 2. service equipment controls the data called to be presented on display module, and carries out selection operation to node data;
Step 3. judges whether to repeat call node data and whether select multiple benches pattern;
Step 4. is checked by display module and whether is selected node and mode of operation, non-selectedly jumps to step 1, has selected to proceed step 5;
Step 5. judges whether to carry out authority editor, if so, arranges authority by service equipment to specified node input instruction, if not, proceed step 6;
Step 6. service equipment is by data genaration process flow diagram and feed back to terminal device and show.
2. according to free workflow building method according to claim 1, it is characterized in that, described step 6 specifically comprises the following steps:
The free flow process that step 6.1. user edits transfers to service equipment by the network equipment;
What step 6.2. service equipment was finished the work and flowed building and starting.
3. according to free workflow building method according to claim 2, it is characterized in that, described step 3 specifically comprises the following steps:
Step 3.1. judges whether to repeat to call node data, if so, jumps to step 2, if not, proceed step 4;
Step 3.2. judges whether to select multiple benches pattern, if so, edits flow process, adds new node and show in parallel mode after node, if not, proceed step 4.
4. a steady job stream building method, is characterized in that, specifically comprises the following steps:
Instruction is transferred to the data module of service equipment by step 1. user operation terminal device by web-transporting device;
Step 2. is by terminal device input data creation event-template;
Step 3. sets up node by terminal device according to different pieces of information, and inputs the node data in instruction calls service equipment;
Step 4. judges whether to repeat to call node data, if so, jumps to step 3, if not, proceed step 5;
Step 5. judges whether to need editing authority or judge whether to arrange branch condition;
Step 6. service equipment is by data genaration process flow diagram and feed back to terminal device and show.
5., according to steady job stream building method according to claim 4, it is characterized in that, described step 6 specifically comprises the following steps:
The process flow diagram of generation is transferred to service equipment by step 6.1. terminal device;
Step 6.2. arranges special instruction in flow charts, and is associated with authorized person by special instruction and is stored to service equipment.
6., according to steady job stream building method according to claim 4, it is characterized in that, described step 5 specifically comprises the following steps:
Step 5.1. judges whether to carry out editing authority to node data, if so, selects node data to carry out arranging authority; If not, proceed step 6;
Step 5.2. judges whether to arrange branch condition, if so, arranges branch instruction and calls corresponding data; If not, proceed step 6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110444226.7A CN102542413B (en) | 2011-12-27 | 2011-12-27 | A kind of freedom and steady job stream building method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110444226.7A CN102542413B (en) | 2011-12-27 | 2011-12-27 | A kind of freedom and steady job stream building method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102542413A CN102542413A (en) | 2012-07-04 |
CN102542413B true CN102542413B (en) | 2016-01-27 |
Family
ID=46349254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110444226.7A Active CN102542413B (en) | 2011-12-27 | 2011-12-27 | A kind of freedom and steady job stream building method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102542413B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103714414B (en) * | 2013-11-30 | 2018-01-16 | 北京科东电力控制系统有限责任公司 | A kind of flow nodes backing method for intelligent grid scheduling |
CN105183447A (en) * | 2015-07-13 | 2015-12-23 | 国云科技股份有限公司 | Light weight flow engine implementation method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1479902A (en) * | 2001-10-18 | 2004-03-03 | ���Ͽع�����˾ | System and method for mining work flow |
CN1487435A (en) * | 2002-10-03 | 2004-04-07 | 鸿富锦精密工业(深圳)有限公司 | Operation process distributing system and method |
CN101593294A (en) * | 2008-05-29 | 2009-12-02 | 国际商业机器公司 | The method and system of dynamic-configuration workflow |
-
2011
- 2011-12-27 CN CN201110444226.7A patent/CN102542413B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1479902A (en) * | 2001-10-18 | 2004-03-03 | ���Ͽع�����˾ | System and method for mining work flow |
CN1487435A (en) * | 2002-10-03 | 2004-04-07 | 鸿富锦精密工业(深圳)有限公司 | Operation process distributing system and method |
CN101593294A (en) * | 2008-05-29 | 2009-12-02 | 国际商业机器公司 | The method and system of dynamic-configuration workflow |
Also Published As
Publication number | Publication date |
---|---|
CN102542413A (en) | 2012-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108053144A (en) | Open operation flow implementation method and workflow engine | |
CN105404949B (en) | System and method for self-defining flow | |
CN105893593B (en) | A kind of method of data fusion | |
CN103984818B (en) | AUV (autonomous underwater vehicle) design flow visualization modeling method based on Flex technology | |
CN106371918A (en) | Task cluster scheduling management method and apparatus | |
CN103645909A (en) | Handling method and device for timed task | |
CN105760991A (en) | Workflow engine establishment method of changeable service flow | |
CN109933310A (en) | A kind of configurable JAVA development platform based on data template | |
CN102314349A (en) | Spatial information functional plug-in workflow construction method | |
CN102542413B (en) | A kind of freedom and steady job stream building method | |
CN104978622A (en) | Business process management system and method | |
CN104809551B (en) | A kind of cross-system workflow Synergistic method based on mobile Agent client | |
CN103345952A (en) | Model-based operator auxiliary computing system | |
CN103905521B (en) | A kind of information processing system and method for network service | |
CN103853559B (en) | Semantic Web service composite automatic validation method and system | |
CN107896242A (en) | One kind service sharing method and device | |
CN104992271A (en) | Different-process-instance coordinated operation system and different-process-instance coordinated operation implementation method | |
CN101714236A (en) | Method and device for automatically extending participant types | |
CN103369166B (en) | A kind of batch recharge system and method | |
CN106814696B (en) | A kind of digital control system man-machine interface secondary developing platform system and its implementation | |
CN104486117B (en) | A kind of the configuration order exchange method and system of more board core switch | |
CN101026842A (en) | Task management device and method for mobileterminal | |
CN106529788A (en) | Project plan chart generation method and device | |
CN115220715A (en) | Heterogeneous simulation system for realizing interconnection by constructing data bridging software | |
CN112884455A (en) | Task plan processing system, method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100195 Haidian District, Beijing, North Village, a road, a static core Park, block N Patentee after: Beijing Zhiyuan Internet software Limited by Share Ltd Address before: 100195 Haidian District, Beijing, North Village, a road, a static core Park, block N Patentee before: Beijing Seeyon Software Co., Ltd. |