CN102542122B - Rendering method and device for power failure area - Google Patents

Rendering method and device for power failure area Download PDF

Info

Publication number
CN102542122B
CN102542122B CN201210030538.8A CN201210030538A CN102542122B CN 102542122 B CN102542122 B CN 102542122B CN 201210030538 A CN201210030538 A CN 201210030538A CN 102542122 B CN102542122 B CN 102542122B
Authority
CN
China
Prior art keywords
transformer
buildings
data
subelement
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210030538.8A
Other languages
Chinese (zh)
Other versions
CN102542122A (en
Inventor
翁格平
李丰伟
周宏辉
徐重酉
裴传逊
李红祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Electric Power Bureau
Original Assignee
Ningbo Electric Power Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Electric Power Bureau filed Critical Ningbo Electric Power Bureau
Priority to CN201210030538.8A priority Critical patent/CN102542122B/en
Publication of CN102542122A publication Critical patent/CN102542122A/en
Application granted granted Critical
Publication of CN102542122B publication Critical patent/CN102542122B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The embodiment of the invention provides a rendering method for a power failure area. The rendering method comprises the following steps of: obtaining a transformer having power failure in a power grid topology, wherein the power grid topology is of a graphic topologic structure of a power device and comprises attribute data of the power device; obtaining meter box data having relationship with the transformer according to the attribute data of the transformer, and obtaining building data having the relationship with a meter box according to the meter box data; determining a building to be rendered in the power grid topology according to the attribute data of the transformer; and rendering the building according a preset power failure rendering rule. The embodiment of the invention further provides a rendering device for the power failure area. According to the embodiment of the invention, the problem of inexact rendering of the power failure area in the prior art is solved.

Description

A kind of power supply interrupted district rendering intent and device
Technical field
The present invention relates to the pattern exhibiting technical field of electric system, relate in particular to a kind of power supply interrupted district rendering intent and related device.
Background technology
Pattern exhibiting technology is widely used in various fields, and after especially Geographic Information System (GIS, geographic information system) occurs, pattern exhibiting technology obtains important development.Geographic Information System integrates geographical science, computer technology, remote sensing technology and information science, sets up a set of data acquisition corresponding with physical world, after to these data analysis, processing, transformation for instructing real work.In recent years, pattern exhibiting technology is used widely in electric power equipment management system, electric power equipment management system first according to actual conditions by the power equipment extensively distributing abstract be one by one model, then gather the real data of these models, comprise actual physics coordinate data, device type data, with the annexation data of other equipment etc., utilize these data construct to go out an electric system computer topology network.After establishing such topological network, can carry out on this basis various application.A kind of common application mode is: in electrical equipment fault or overhaul of the equipments, stop transport while causing power failure, for the ease of finding in time faulty section or delineation maintenance district, need to be in network topological diagram intuitively show the scope of power failure, the decision references of usining as production run and management, so that repairing in time or maintenance, restore electricity as early as possible.
For playing up power supply interrupted district, current methods of exhibiting is the transformer that highlighted demonstration has a power failure.Yet, when the region of a transformer administration is not close to, highlighted demonstration transformer can not reflect the power-off condition of transformer compass of competency exactly, thereby can not accurately know concrete power failure range, has limited the applying in field of power of pattern exhibiting technology.
Summary of the invention
Because the problem that prior art exists, the goal of the invention of the embodiment of the present invention is to provide a kind of power supply interrupted district rendering intent and related device, the method and device, by setting up the relation between transformer and table case, table case and buildings, are played up the inaccurate problem of scope to solve power supply interrupted district in prior art.
The power supply interrupted district rendering intent that the embodiment of the present invention provides comprises:
Obtain the transformer having a power failure in power network topology, the graphical topological structure that described power network topology is power equipment, comprises the attribute data of power equipment;
According to the attribute data of described transformer, obtain the table case data with transformer with corresponding relation, and the buildings data according to table case data acquisition and table case with corresponding relation;
Determine buildings to be rendered in power network topology;
According to default power failure, play up rule and play up described buildings.
Preferably, described in, obtaining the transformer having a power failure in power network topology comprises:
By reading the mode of power network monitoring result, obtain the transformer having a power failure in power network topology, or the mode of inputting by receiving transformer identification number is obtained the transformer having a power failure in power network topology.
Preferably, the described attribute data according to transformer obtains the table case data that have a corresponding relation with transformer and comprises:
According to the attribute data of transformer, in power network topology, carry out the electric topology in downstream and follow the trail of, obtain the table case data with transformer with corresponding relation.
Further preferably, describedly according to table case data acquisition buildings data corresponding with described table case, comprise:
Read the coordinate data of described table case;
According to the buildings in the coordinate search preset range of described table case;
Judge that described table case whether within the scope of the buildings searching, if so, obtains this buildings data.
Further preferably, described according to table case coordinate search preset range in buildings comprise:
Centered by described table case coordinate, the buildings within the scope of the square area that the length of side is preset length.
Further preferably, described preset length is 20 meters.
The present invention also provides a kind of power supply interrupted district rendering device.This device comprises: the first acquiring unit, second acquisition unit, the 3rd acquiring unit, determining unit and rendering unit, wherein:
Described the first acquiring unit, the transformer having a power failure for obtaining power network topology, the graphical topological structure that described power network topology is power equipment, comprises the attribute data of power equipment;
Described second acquisition unit, for obtaining the table case data with described transformer with corresponding relation according to the attribute data of described transformer;
Described the 3rd acquiring unit, for having the buildings data of corresponding relation according to table case data acquisition and described table case;
Described determining unit, for determining power network topology buildings to be rendered;
Described rendering unit, plays up described buildings for playing up rule according to default power failure.
Preferably, described the first acquiring unit comprises and reads subelement and obtain subelement, wherein:
The described subelement that reads, for reading power network monitoring result;
The described subelement that obtains, for obtaining according to power network monitoring result the transformer that power network topology has a power failure; Or,
Described the first acquiring unit comprises to be inputted subelement and obtains subelement, wherein:
Described input subelement, for receiving the transformer identification number of user's input;
The described subelement that obtains, for obtaining according to described transformer identification number the transformer that power network topology has a power failure.
Preferably, described second acquisition unit comprises to be followed the trail of subelement and obtains subelement, wherein:
Described tracking subelement, follows the trail of for carrying out the electric topology in downstream according to the attribute data of transformer at power network topology;
The described subelement that obtains, for identifying to obtain the table case data with transformer with corresponding relation to following the trail of result.
Preferably, described the 3rd acquiring unit comprises and reads subelement, searches for subelement and obtain subelement, wherein:
The described subelement that reads, for reading the coordinate data of described table case;
Described search subelement, for according to the buildings in the coordinate search preset range of described table case;
The described subelement that obtains, for judging that described table case whether within the scope of the buildings searching, if so, obtains this buildings data.
After the transformer that the method and apparatus of the embodiment of the present invention has a power failure in obtaining power network topology, according to the attribute data of transformer, obtain table case data and buildings data, determine after the buildings to be rendered in power network topology, buildings is played up.Compared with prior art, the embodiment of the present invention is after obtaining transformer data, by further obtaining buildings data, buildings is played up, rather than directly transformer is played up, more precision power supply interrupted district, improved the accuracy that image conversion is shown power supply interrupted district, be conducive to further expand the application of graphical display technique in electric system.
Accompanying drawing explanation
Fig. 1 is the process flow diagram of an embodiment of the method for the present invention;
Fig. 2 is a bandwagon effect figure of the inventive method embodiment;
Fig. 3 is the composition frame chart of system embodiment of the present invention.
Embodiment
Embodiments of the invention provide a kind of power supply interrupted district rendering intent and have installed accordingly, after the transformer that the method and device have a power failure in obtaining power network topology, according to the attribute data of transformer, obtain table case data and buildings data, determine after the buildings to be rendered in power network topology, buildings is played up, avoided directly transformer being played up, more made power supply interrupted district clear, the accuracy and efficiency that has improved image conversion displaying power supply interrupted district, is conducive to further expand the application of graphical display technique in electric system.
In order to be expressly understood technical scheme of the present invention and technical characterictic, below in conjunction with drawings and Examples, describe in detail.
In actual applications, Power network construction complexity is various, and a Big Residential District in city may exist many transformer-supplied, also may the public transformer in a plurality of communities.As can be seen here, when transformer or other electrical equipment faults cause power failure, because transformer and power supply interrupted district do not have direct corresponding relation, the transformer that highlighted demonstration has a power failure, therefore the user of pattern exhibiting technology can not understand concrete power failure range.Suppose that a transformer A is because of scheduled overhaul.At this moment, it may be because transformer A scheduled overhaul may be that circuit generation problem or other transformers between other transformers and user is out of order that certain user has a power failure, if be highlighted demonstration power failure transformer A, is difficult to problem to judge accurately.For this reason, the embodiment of the present invention provides a kind of power supply interrupted district rendering intent, by the method, can obtain exactly power supply interrupted district.
Referring to accompanying drawing 1, the figure shows one embodiment of the present of invention, the power supply interrupted district rendering intent that this embodiment provides comprises:
Step S101: obtain the transformer having a power failure in power network topology, the graphical topological structure that described power network topology is power equipment, comprises the attribute data of power equipment;
Power network topology power equipment is carried out to abstract modeling, Data Collection is built on basis, it has reflected the physical structure of electrical network truly.This physical structure can represent on computers by graph technology, to grasp quickly and easily electrical network situation according to intuitively representing.The attribute data of power equipment is used for describing power equipment, these data comprise identification number, graph data, coordinate data (geodata) and the categorical data etc. of power equipment, in order to carry out pattern exhibition, need to carry out in advance Data Collection, build power equipment database, to describe the topological diagram of electrical network by computing machine.Obtaining the transformer having a power failure in power network topology has several different methods, can invent preferably and obtain by reading the mode of power network monitoring result the transformer having a power failure in power network topology.In order to realize the robotization of network system, in existing network system, be conventionally provided with equipment alarm device, this warning device can be located faulty equipment, after power equipment breaks down, monitoring system can obtain the transformer of the power failure being connected with this faulty equipment, form power network monitoring result and feed back to needs person, the embodiment of the present invention can obtain by reading the mode of power network monitoring result the transformer of power failure.The embodiment of the present invention also preferably obtains by receiving transformer identification number input mode the transformer having a power failure in power network topology.This mode is applicable to planned maintenance conventionally, need to have a power failure as requested, and in such cases, the embodiment of the present invention can directly receive the transformer identification number of user's input, thus the location of realizing power failure transformer.
Step S102: obtain the table case data with transformer with corresponding relation according to the attribute data of described transformer;
Transformer is as a kind of power equipment, in power network topology, there is corresponding attribute data, these attribute datas have characterized the data such as the type, position, connected other equipment of transformer, by this attribute data, can obtain the table case data with transformer with corresponding relation.While specifically obtaining, first the embodiment of the present invention is carried out the electric topology in downstream according to the attribute data of transformer and is followed the trail of in power network topology, electric tracking can obtain and the direct-connected power equipment of transformer, by the type of these direct connection devices is differentiated, can identify table case equipment, identifying can acquisition table case data after table case equipment.It should be noted that: a transformer may connect a plurality of table casees, these a plurality of table casees may be arranged in Yi Ge community in actual power network topology, also may be positioned at a plurality of communities, that is to say, the region within the jurisdiction of a transformer may be a plurality of regions that isolate.
Step S103: the buildings data according to table case data acquisition and table case with corresponding relation;
Obtain after table case data, due to table case with user's (user's building) directly to associated, therefore, by this table case, can obtain and the buildings data of showing case and have corresponding relation.While specifically obtaining, the present invention preferably realizes in such a manner: the coordinate data that reads described table case; According to the buildings in the coordinate search preset range of described table case; Judge that described table case whether within the scope of the buildings searching, if so, obtains this buildings data.Here " preset range " set according to actual electric network structure, to the way of search of preset range, also can select according to actual conditions, such as adopting round type search procedure, frame search procedure etc., round type search procedure be the coordinate of showing case be initial point, to preset radius, do circle search; Frame search procedure be the coordinate of showing case be initial point, with preset length (width), do frame search, " frame " of frame search can be square, such as the length of side is 20 meters, can be also rectangle.Here also it is emphasized that: according to one table case coordinate search to buildings may comprise a plurality of, but these buildingss in preset range are all not the buildingss corresponding with table case, and only only comprise the buildings of showing case coordinate, just there is corresponding relation with table case.
Step S104: determine buildings to be rendered in power network topology;
Obtain after above-mentioned data, according to the attribute data of transformer and table case data, determine buildings to be rendered in power network topology, so that next step is played up these buildingss.Here " buildings " is corresponding with the residing physics buildings of actual electric network framework, in pattern exhibiting field, by having carried out Data Collection such as generalized information system, in the time of need to showing corresponding buildings, directly calls.Concrete display platform can adopt OMS system.
Step S105: play up rule according to default power failure and play up described buildings.
Determine after buildings to be rendered, can play up rule according to default power failure buildings is played up.Different according to practical application scene, the mode that buildings is played up comprises various ways, and its fundamental purpose is the buildings after playing up and the buildings of not playing up to distinguish, so that intuitively determine quickly power supply interrupted district.Such as, the buildings that needs are played up carries out highlighted demonstration, region labeling, or in pattern exhibiting interface output, plays up concrete physical coordinates data, pattern identification of buildings etc.
Referring to accompanying drawing 2, the rendering effect figure when the figure shows some electrical networks unit in network system and occurring having a power failure.In this figure, circular ringlet represents the power equipment in network system, such as pole line, cable, switch, transformer etc., each power equipment can be considered a node, voltage device equipment connection wherein has a plurality of table casees, each table case is used bar shaped box indicating in the figure, and the square frame outside bar shaped square frame is to comprise the buildings of showing case, totally 5 the table casees that clearly illustrate in figure, these table casees are one-level table case a bit, and some is secondary table case (submeter under summary table).When having a power failure appears in transformer, the buildings (actual corresponding certain one residential or some architecture storey) that connects the table case place of this transformer is played up, in this figure, with the coloured buildings of oblique wire frame representation, show that having a power failure appears in the illumination in these buildingss.
After the transformer that the method for the present embodiment has a power failure in obtaining power network topology, according to the attribute data of transformer, obtain table case data and buildings data, and then after the buildings to be rendered in definite power network topology, buildings is played up.Compared with prior art, the present embodiment is at least obtained following technique effect;
(1) the present embodiment is after obtaining transformer data, by further obtaining buildings data, buildings is played up, rather than directly transformer is played up, play up rank and refine to buildings rank by transformer rank, make playing up of power supply interrupted district more accurate, improved the accuracy that image conversion is shown power supply interrupted district, be conducive to further expand the application of graphical display technique in electric system.
(2) the present embodiment is owing to directly buildings being played up, rather than simply transformer is carried out to highlighted demonstration, indicated more intuitively power supply interrupted district, by observing playing up partly in topological diagram, can know quickly that in time in actual electric network, which partly breaks down, be conducive to improve the work efficiency that electrical equipment fault is overhauled.
(3) the present embodiment is taked the mode of playing up to buildings by transformer, that is to say, while only having transformer to occur having a power failure, just can on pattern exhibiting interface, render corresponding region.When certain user causes power failure because self power circuit breaks down, because voltage device work is still normal, can on pattern exhibiting interface, not play up power supply interrupted district, therefore, the embodiment of the present invention is conducive to distinguish the type of power-off fault.
Describe embodiment of the method for the present invention above in detail, correspondingly, the present invention also provides a kind of power supply interrupted district rendering device embodiment.Referring to Fig. 3, this device 300 comprises: the first acquiring unit 301, second acquisition unit 302, the 3rd acquiring unit 303, determining unit 304 and rendering unit 305, wherein:
Described the first acquiring unit 301, the transformer having a power failure for obtaining power network topology, the graphical topological structure that described power network topology is power equipment, comprises the attribute data of power equipment;
Described second acquisition unit 302, for obtaining the table case data with described transformer with corresponding relation according to the attribute data of described transformer;
Described the 3rd acquiring unit 303, for according to table case data acquisition buildings data corresponding with described table case;
Described determining unit 304, for determining according to the attribute data of described transformer the buildings that power network topology is to be rendered;
Described rendering unit 305, plays up described buildings for playing up rule according to default power failure.
The course of work of native system embodiment is: the first acquiring unit 301 obtains the transformer having a power failure in power network topology, and the graphical topological structure that described power network topology is power equipment comprises the attribute data of power equipment; Second acquisition unit 302 obtains the table case data with described transformer with corresponding relation according to the attribute data of described transformer; The 3rd acquiring unit 303 is according to the table case data acquisition buildings data corresponding with described table case; Determining unit 304 is determined buildings to be rendered in power network topology according to the attribute data of described transformer; Rendering unit 305 is played up rule according to default power failure and is played up described buildings.
After the transformer that this device embodiment has a power failure in obtaining power network topology, according to the attribute data of transformer, obtain table case data and buildings data, and then after the buildings to be rendered in definite power network topology, buildings is played up.Compared with prior art, this device embodiment is after obtaining transformer data, by further obtaining buildings data, buildings is played up, rather than directly transformer is played up, make playing up of power supply interrupted district more accurate, improved the accuracy that image conversion is shown power supply interrupted district, be conducive to further expand the application of graphical display technique in electric system.Other effects that this device embodiment obtains can, referring to the introduction of embodiment of the method part, for avoiding repetition, be narrated here no longer one by one.
The first acquiring unit 301 in said apparatus embodiment can have various structures according to actual conditions, and the present invention preferably forms the first acquiring unit according to following two kinds of modes.A kind of mode is: the first acquiring unit comprises and read subelement 3011 and obtain subelement 3012, wherein: described in read subelement, for reading power network monitoring result; The described subelement that obtains, for obtaining according to power network monitoring result the transformer that power network topology has a power failure.This mode is mainly used in network system has monitoring device, can automatically realize the monitoring of power-off fault in electrical network, when monitoring device monitors after power down mode, by read subelement read monitoring result by corresponding transformer feedback to the first acquiring unit.Another kind of mode is: the first acquiring unit comprises to be inputted subelement and obtains subelement, wherein: and described input subelement, for receiving the transformer identification number of user's input; The described subelement that obtains, for obtaining according to described transformer identification number the transformer that power network topology has a power failure.This mode is mainly applicable to planned power failure to some network segment of electrical network is keeped in repair to renewal, owing to can clearly needing in advance the transformer of barrier gate, therefore, can directly by input operation, the identification number of transformer be input in pattern exhibiting platform, by receiving user's input, obtain the transformer of power failure.Above-mentioned two kinds of modes can adopt separately, and employing according to actual needs also can walk abreast.
Second acquisition unit in said apparatus embodiment can have various structures according to actual conditions, and the present invention preferably forms second acquisition unit in the following manner.Second acquisition unit 302 comprises to be followed the trail of subelement 3021 and obtains subelement 3022, wherein: described tracking subelement, for carrying out the electric topology in downstream according to the attribute data of transformer at power network topology, follow the trail of; The described subelement that obtains, for identifying to obtain the table case data with transformer with corresponding relation to following the trail of result.Pattern exhibiting technology constructs after power network topology according to actual electric network composition, each node on power network topology has electrical specification, therefore, while showing case data acquisition, can carry out the electric topology in downstream to transformer and follow the trail of, thereby obtain and the direct-connected power equipment with electric meaning of transformer.But these power equipments that track had both comprised table case, also comprise non-table case equipment, need to filter following the trail of result.The type that comprises power equipment due to power equipment database, therefore, can show case identification according to the type of power equipment, and identifying can acquisition table case data after table case.
The 3rd acquiring unit 303 in said apparatus embodiment also can have various structures according to actual conditions, and the present invention preferably forms the 3rd acquiring unit in the following manner.The 3rd acquiring unit 303 comprises and reads subelement 3031, search subelement 3032 and obtain subelement 3033, wherein: described in read subelement, for reading the coordinate data of described table case; Described search subelement, for according to the buildings in the coordinate search preset range of described table case; The described subelement that obtains, for judging that described table case whether within the scope of the buildings searching, if so, obtains this buildings data.Obtain after table case data, need to be by table case data scaling buildings, the mode of demarcating is that first to take table case coordinate be initial point (central point), according to default way of search, buildings is searched for, search and further judge that table case is whether in these buildingss in buildings, if so, obtain the data of this buildings as next step the foundation of playing up.
The foregoing is only preferred embodiment of the present invention, in order to limit the present invention, within the spirit and principles in the present invention not all, any modification of doing, be equal to replacement, improvement etc., within all should being included in the protection domain of invention.

Claims (8)

1. a power supply interrupted district rendering intent, is characterized in that, described method comprises:
Obtain the transformer having a power failure in power network topology, the graphical topological structure that described power network topology is power equipment, comprises the attribute data of power equipment;
According to the attribute data of described transformer, in power network topology, carry out the electric topology in downstream and follow the trail of acquisition and the direct-connected power equipment of transformer, by being differentiated, the type of direct-connected power equipment identifies table case equipment to obtain the table case data with transformer with corresponding relation, and the buildings data according to table case data acquisition and table case with corresponding relation;
According to the attribute data of described transformer, determine buildings to be rendered in power network topology;
According to default power failure, play up rule and play up described buildings.
2. method according to claim 1, is characterized in that, described in obtain the transformer having a power failure in power network topology and comprise:
By reading the mode of power network monitoring result, obtain the transformer having a power failure in power network topology, or the mode of inputting by receiving transformer identification number is obtained the transformer having a power failure in power network topology.
3. method according to claim 1, is characterized in that, the described buildings data that have a corresponding relation according to table case data acquisition and described table case comprise:
Read the coordinate data of described table case;
According to the buildings in the coordinate search preset range of described table case;
Judge that described table case whether within the scope of the buildings searching, if so, obtains this buildings data.
4. method according to claim 3, is characterized in that, described according to table case coordinate search preset range in buildings comprise:
Centered by described table case coordinate, the buildings within the scope of the square area that the length of side is preset length.
5. method according to claim 4, is characterized in that, described preset length is 20 meters.
6. a power supply interrupted district rendering device, is characterized in that, described device comprises: the first acquiring unit, second acquisition unit, the 3rd acquiring unit, determining unit and rendering unit, wherein:
Described the first acquiring unit, the transformer having a power failure for obtaining power network topology, the graphical topological structure that described power network topology is power equipment, comprises the attribute data of power equipment;
Described second acquisition unit, for obtaining the table case data with described transformer with corresponding relation according to the attribute data of described transformer;
Described the 3rd acquiring unit, for having the buildings data of corresponding relation according to table case data acquisition and described table case;
Described determining unit, for determining according to the attribute data of described transformer the buildings that power network topology is to be rendered;
Described rendering unit, plays up described buildings for playing up rule according to default power failure;
Described second acquisition unit comprises to be followed the trail of subelement and obtains subelement, wherein: described tracking subelement, for carrying out the electric topology in downstream according to the attribute data of transformer at power network topology, follow the trail of; The described subelement that obtains, for identifying to obtain the table case data with transformer with corresponding relation to following the trail of result.
7. device according to claim 6, is characterized in that, described the first acquiring unit comprises and read subelement and obtain subelement, wherein:
The described subelement that reads, for reading power network monitoring result;
The described subelement that obtains, for obtaining according to power network monitoring result the transformer that power network topology has a power failure; Or,
Described the first acquiring unit comprises to be inputted subelement and obtains subelement, wherein:
Described input subelement, for receiving the transformer identification number of user's input;
The described subelement that obtains, for obtaining according to described transformer identification number the transformer that power network topology has a power failure.
8. device according to claim 6, is characterized in that, described the 3rd acquiring unit comprises and read subelement, search for subelement and obtain subelement, wherein:
The described subelement that reads, for reading the coordinate data of described table case;
Described search subelement, for according to the buildings in the coordinate search preset range of described table case;
The described subelement that obtains, for judging that described table case whether within the scope of the buildings searching, if so, obtains this buildings data.
CN201210030538.8A 2012-02-10 2012-02-10 Rendering method and device for power failure area Active CN102542122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210030538.8A CN102542122B (en) 2012-02-10 2012-02-10 Rendering method and device for power failure area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210030538.8A CN102542122B (en) 2012-02-10 2012-02-10 Rendering method and device for power failure area

Publications (2)

Publication Number Publication Date
CN102542122A CN102542122A (en) 2012-07-04
CN102542122B true CN102542122B (en) 2014-03-12

Family

ID=46348997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210030538.8A Active CN102542122B (en) 2012-02-10 2012-02-10 Rendering method and device for power failure area

Country Status (1)

Country Link
CN (1) CN102542122B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955865A (en) * 2014-04-22 2014-07-30 国网电力科学研究院 Scheduled and faulted power outage range visualization method based on information interaction
CN104392388B (en) * 2014-11-11 2018-03-23 国家电网公司 The automatic mapping method and its device of transformer station's communication chart in power grid GIS
CN104599093A (en) * 2015-03-02 2015-05-06 国电南瑞科技股份有限公司 Distribution network power failure range visualization method based on GIS (geographic information system) imaging
CN104967818B (en) * 2015-06-18 2018-05-29 国家电网公司 A kind of distribution repairing video directing quick positioning system based on GIS
CN106529794A (en) * 2016-10-28 2017-03-22 上海金智晟东电力科技有限公司 Power distribution network fault impact scope visualization method and system
CN108647234B (en) * 2018-04-02 2020-06-23 广州供电局有限公司 Method and device for acquiring power failure range, computer equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009015033A1 (en) * 2007-07-26 2009-01-29 Areva T & D, Inc. Energy management system that provides real time situation awareness of a potential energy management failure
CN102044869A (en) * 2009-10-13 2011-05-04 上海电机学院 Special topology analysis method and device for distribution network
CN102208048A (en) * 2011-03-15 2011-10-05 福建省电力有限公司 Technology support system of marketing and distribution integration power supply service and method thereof
CN102236841A (en) * 2011-06-28 2011-11-09 中国电力科学研究院 Method for handling accidents of electric power system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009015033A1 (en) * 2007-07-26 2009-01-29 Areva T & D, Inc. Energy management system that provides real time situation awareness of a potential energy management failure
CN102044869A (en) * 2009-10-13 2011-05-04 上海电机学院 Special topology analysis method and device for distribution network
CN102208048A (en) * 2011-03-15 2011-10-05 福建省电力有限公司 Technology support system of marketing and distribution integration power supply service and method thereof
CN102236841A (en) * 2011-06-28 2011-11-09 中国电力科学研究院 Method for handling accidents of electric power system

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
"基于GIS的城乡电网管理系统";王洪源、张武等;《微计算机信息》;20051130;第21卷(第7-3期);第96-98页 *
"基于GIS的配电网故障定位系统";黄舒浩;《广东电力》;20071130;第20卷(第11期);第48-51页 *
"宁波电网运行风险分析及决策支持系统";张云晓、郑春莹、郭瑞鹏、李丰伟等;《电力系统保护与控制》;20110601;第39卷(第11期);第90-94页 *
张云晓、郑春莹、郭瑞鹏、李丰伟等."宁波电网运行风险分析及决策支持系统".《电力系统保护与控制》.2011,第39卷(第11期),第90-94页.
王洪源、张武等."基于GIS的城乡电网管理系统".《微计算机信息》.2005,第21卷(第7-3期),第96-98页.
黄舒浩."基于GIS的配电网故障定位系统".《广东电力》.2007,第20卷(第11期),第48-51页.

Also Published As

Publication number Publication date
CN102542122A (en) 2012-07-04

Similar Documents

Publication Publication Date Title
CN102542122B (en) Rendering method and device for power failure area
Ashkezari et al. Development of an enterprise Geographic Information System (GIS) integrated with smart grid
CN104166942B (en) Trans-regional supply district searching method and its system based on CIM
US11049195B2 (en) Modeling analysis method based on geographic targets
CN107346917A (en) Secondary device based on virtual machine integrates joint debugging method
CN103646355A (en) Rapid construction and analysis method for power-grid topology relation
CN106980071A (en) Repairing system and its method of work are visualized based on power grid GIS
CN104166892A (en) Engineering management and control method and system based on three-dimensional design system
CN111478324B (en) Power station alarm analysis system
CN104539047A (en) Intelligent substation fault diagnosing and positioning method based on multi-factor comparison visualization
CN111027834A (en) Power cable informatization management system and method based on three-dimensional detection technology
CN111585349B (en) Power grid model management and monitoring system
CN108921239A (en) Duct size information monitoring system based on two dimensional code
CN104599093A (en) Distribution network power failure range visualization method based on GIS (geographic information system) imaging
CN104361184A (en) Automatic layout and wiring system and method of power grid
CN104992007A (en) Automatic evaluation method for power supply scheme design drawing
CN109784622A (en) Power grid project process monitoring method and system based on geographical wiring diagram
CN109447466B (en) Overall process visual management and control system based on power distribution network communication network construction
CN103616616A (en) Fault detection method for large-scale grounding grid
CN206021354U (en) One kind is based on BIM and VR smart cities pipeline coordination platform
CN111384776A (en) VR-based transformer substation three-dimensional panoramic state monitoring method and system
CN112308736B (en) Information processing method and device for complex environments of areas
Bai et al. Automatic modeling and optimization for the digital twin of a regional multi-energy system
CN113553486A (en) Power transmission line running state visualization method, device, equipment and storage medium
CN111401789A (en) Building construction intelligent supervision system based on BIM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant