CN102521715B - A kind of method and system controlling application system Resourse Distribute - Google Patents

A kind of method and system controlling application system Resourse Distribute Download PDF

Info

Publication number
CN102521715B
CN102521715B CN201110453654.6A CN201110453654A CN102521715B CN 102521715 B CN102521715 B CN 102521715B CN 201110453654 A CN201110453654 A CN 201110453654A CN 102521715 B CN102521715 B CN 102521715B
Authority
CN
China
Prior art keywords
application system
data center
data
running
resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110453654.6A
Other languages
Chinese (zh)
Other versions
CN102521715A (en
Inventor
袁兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CETC Digital Technology Co.,Ltd.
Original Assignee
SHANGHAI EAST-CHINA COMPUTER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI EAST-CHINA COMPUTER Co Ltd filed Critical SHANGHAI EAST-CHINA COMPUTER Co Ltd
Priority to CN201110453654.6A priority Critical patent/CN102521715B/en
Publication of CN102521715A publication Critical patent/CN102521715A/en
Application granted granted Critical
Publication of CN102521715B publication Critical patent/CN102521715B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of method and system controlling application system Resourse Distribute, the method comprises: the operation solicited message receiving application system, resource requirement is run according to operation solicited message determination application system, obtain the running state data of the energy consumption data of data center and the equipment of data center, the Resourse Distribute that resource requirement controls application system is run according to the running state data of the energy consumption data of data center and the equipment of data center and application system, adopt this technical scheme, solving can not according to the characteristic of application system in prior art, operation demand and energy consumption carry out Resourse Distribute to it, cause the problem that data center resource can not be fully utilized, achieve, according to the actual conditions of data center and application system, Resourse Distribute is carried out to it, improve the utilization factor of data center resource, reach the object promoting energy use efficiency of data center.

Description

A kind of method and system controlling application system Resourse Distribute
Technical field
The present invention relates to data center's energy management field, in particular to a kind of method and system controlling application system Resourse Distribute.
Background technology
Current, the energy resource consumption of data center mainly concentrates on the aspect such as consumption of the energy of IT load, cooling device, controller switching equipment, in prior art, generally according to the structure of data center's energy resource consumption, carry out the research of power-saving technology from data center environment construction and data center's physical equipment two links, reach the object of energy precision management and energy conservation.
Wherein, for the energy management that data center environment is built, mainly take measures from electric power and cooling two aspects in prior art, promote data center's energy management effect, the measure that concerned power is taked comprises: the illumination etc. of line transmission, efficiently UPS (UninterruptiblePowerSupply, no-break power unit), intelligence efficiently; The measure that cooling aspect is taked comprises: low-temperature receiver design, front end operational efficiency control, free cooling technology, Airflow Pattern Designing, building heat preservation process, thermal management etc.For the energy management of data center's physical equipment, prior art then mainly concentrates on the energy management to server, and emphasis considers the energy consumption reducing server.Current server is in order to adapt to the needs of scientific algorithm, traditional server designs and contains the equipment such as processor, storage, IO, power supply, fan in its framework, have employed a large amount of parts repeated, make current server while having high computing power, there is the shortcoming of high energy consumption.Prior art reduces the means of energy consumption for server and mainly adopts the technology such as low power processor, express network, hardware virtualization, will calculate, and store, and exchange, and manage, equilibrium is integrated, thus reach the target significantly reducing power consumption.
Above-mentioned energy management means mainly consider the energy consumption problem of data center from physics and static angle, by reaching the target of energy conservation to the change of environment and equipment.And from the essence of data center's operation, all environment and physical equipment are all serve for the application system of data center, the ability of more application systems provides, more energy resource consumptions will be caused, therefore, the principal element of the real consumption data center energy is the application system coming from data center.Complicated along with application system, user's user demand increases, the operation support of data center is also more and more huger, energy resource consumption is also in quick ascendant trend, in this case, the energy management means of existing data center can not take into full account that the characteristic of application system, operation demand and energy consumption carry out resource allocation management to it, and the utilization of resources of data center can be caused so insufficient, thus cause the problem of the waste of resource, reduce energy use efficiency of data center.
For existing the problems referred to above in the art, not yet effective solution is proposed at present.
Summary of the invention
The invention provides a kind of method and system controlling application system Resourse Distribute, control in order to solve characteristic not according to the application system in data center in prior art, operation demand and the distribution of energy consumption to its resource, cause the insufficient efficiency of energy utilization problem brought of the utilization of resources of data center.
Provide a kind of method controlling application system Resourse Distribute according to an aspect of the present invention to comprise: the operation solicited message receiving application system; Determine that described application system runs resource requirement according to described operation solicited message; Obtain the running state data of the energy consumption data of data center and the equipment of described data center, the energy consumption data of described data center comprises: the energy consumption data of the application system existed in the energy consumption data of the energy consumption data of the equipment of described data center, the environment of described data center and described data center; The Resourse Distribute that resource requirement controls described application system is run according to the running state data of the energy consumption data of described data center and the equipment of described data center and described application system.
Described operation solicited message comprises: the time that the title of described application system, described application system needs run and described application system require the performance index reached.
Described method also comprises: before determining that according to described operation solicited message described application system runs resource requirement, judge whether described application system was run in described data center, if so, then the step determining described application system operation resource requirement according to described operation solicited message is performed.
The energy consumption data of described application system comprises: in the application system existed in described data center, the actual value of the energy resource consumption of the application system run in described data center and the estimated value of the energy resource consumption of application system do not run in described data center.
The running state data of the equipment of the described energy consumption data according to described data center and described data center and described application system are run the Resourse Distribute that resource requirement controls described application system and are comprised: the running example judging whether to exist in described data center described application system, if so, be then that this running example Resources allocation is maybe using the backed-up instance of this running example as the new running example created; If not, then the running example of described application system is created.
Described method also comprises: after running resource requirement according to the running state data of the energy consumption data of described data center and the equipment of described data center and described application system and controlling the Resourse Distribute of described application system, also comprise: the running state information obtaining the application system existed in described data center; According to the energy consumption data of described running state information, described data center and the equipment running status data of described data center, the device resource that described application system takies is adjusted.
According to another aspect of the present invention, provide a kind of system controlling application system Resourse Distribute, comprising: receiver module, for receiving the operation solicited message of application system; First determination module, for determining that according to described operation solicited message described application system runs resource requirement; First acquisition module, for the running state data of the equipment of the energy consumption data and described data center that obtain data center, the energy consumption data of described data center comprises: the energy consumption data of the application system existed in the energy consumption data of the energy consumption data of the equipment of described data center, the environment of described data center and described data center; Control module, for running according to the running state data of the energy consumption data of described data center and the equipment of described data center and described application system the Resourse Distribute that resource requirement controls described application system.
Described system also comprises: judge module, before determining that described application system runs resource requirement at described determination module according to described operation solicited message, judges whether described application system was run in described data center; Second determination module, out-of-date for running in described data center when the described application system of judgement of described judge module, then perform and determine that described application system runs the step of resource requirement according to described operation solicited message.
Described control module comprises: judging unit, for judging the running example that whether there is described application system in described data center; Control module, for when described judging unit judges the running example that there is described application system in data center, for this running example Resources allocation is maybe using the backed-up instance of this running example as the new running example created; When described judging unit judges the running example that there is not described application system in data center, create the running example of described application system.
Described system also comprises: the second acquisition module, for to run after resource requirement controls the Resourse Distribute of described application system according to the running state data of the equipment of the energy consumption data of data center and described data center and described application system in described control module, obtain the running state information of the application system existed in described data center; Adjusting module, for adjusting the device resource that described application system takies according to the energy consumption data of described running state information, described data center and the equipment running status data of described data center.
The present invention is by receiving the operation solicited message of application system, resource requirement is run according to operation solicited message determination application system, obtain the running state data of the energy consumption data of data center and the equipment of data center, the technical scheme that resource requirement controls the Resourse Distribute of application system is run according to the running state data of the energy consumption data of data center and the equipment of data center and application system, solve in prior art the characteristic not taking into full account application system, operation demand and energy consumption carry out to it problem that Resourse Distribute causes the resource of data center not to be fully utilized, achieve the Expenditure Levels according to data center's energy, the ruuning situation of equipment and the resource requirement situation of application system carry out Resourse Distribute to application system, improve the utilization factor of data center resource, reach the object promoting energy use efficiency of data center.
Accompanying drawing explanation
Fig. 1 is the process flow diagram of the method for control application system Resourse Distribute according to the embodiment of the present invention;
Fig. 2 is the structural representation of the system of control application system Resourse Distribute according to the embodiment of the present invention 1;
Fig. 3 is the structural representation of the control module according to the embodiment of the present invention 1;
Fig. 4 is the structural representation of the system of control application system Resourse Distribute according to the embodiment of the present invention 2; And
Fig. 5 is the structural representation of the system of control application system Resourse Distribute according to the embodiment of the present invention 3.
Embodiment
For enabling above-mentioned purpose of the present invention, feature and advantage become apparent more, are described in further detail the embodiment of the present invention below in conjunction with the drawings and specific embodiments.
Fig. 1 is the process flow diagram of the method for control application system Resourse Distribute according to the embodiment of the present invention.
As shown in Figure 1, the method for control application system Resourse Distribute of the present invention comprises the steps:
Step 101: the operation solicited message receiving application system.
Above-mentioned operation solicited message specifically comprises: the time that the title of the application system that request runs, application system needs run and application system require the performance index reached.
Step 102: run resource requirement according to operation solicited message determination application system.
Rough handling is being carried out to the operation solicited message of above-mentioned application system, before judging that above-mentioned application system runs resource requirement, need to inquire about this application system current overall situation in the global scope of the heart in the data, whether data query center exists the related resource needed for this application system, judge application system whether in the data the heart ran, if, the information applying for accepting then is returned to this application system, and then the step performed according to running solicited message determination application system operation resource requirement, if there is not the resource can running this application system in data center, then return application and accept failure information, process ends.Can grasp by the analysis of the operation solicited message of above-mentioned application system the conditions of demand that application system runs resource more accurately, thus can realize being required to be its Resources allocation according to it, application system can be made better to run.
Step 103: the running state data obtaining the energy consumption data of data center and the equipment of data center.
The energy consumption data of above-mentioned data center comprises: the energy consumption data of the application system existed in the energy consumption data of the energy consumption data of the equipment of data center, the environment of data center and data center.Wherein, first energy resource consumption in the unit interval in the hardware device of data center in the past statistics period is added up, this hardware device comprises: CPU, internal memory, the network equipment, memory device etc., in order to improve the statistical precision of energy resource consumption, the statistics of this energy resource consumption can be specialized each physical location in the said equipment.Secondly, energy resource consumption in unit interval in the environmental energy of data center in the past statistics period is added up, comprise: data center IT back-up environment, intellectualizing system environment and other facilities etc., the degree of accuracy of Corpus--based Method is considered, the statistics of this energy resource consumption can be specialized each physical location in above-mentioned environment.Again, the energy resource consumption of the application system in data center is added up, specifically comprise: in the application system existed in data center, the actual value of the energy resource consumption of application system run of the heart and the not estimated value of the energy resource consumption of application system run of the heart in the data in the data, this estimated value can be carried out theoretical analysis according to the parameter of application system and be drawn.By the above-mentioned acquisition to data center's energy consumption data and analysis, more comprehensively can recognize the energy consumption trend of data center, be convenient to carry out energy management and Resourse Distribute to data center.
The analysis of the running status of the equipment of data center is mainly comprised: in conjunction with current data center actual operating data, obtain the running status of current server, the load state information of server; Obtain other status informations of the spatiality of current storage devices, memory device load condition and memory device; Obtain the equipment connection state of current network device, memory device load condition with other status informations of memory device.
Step 104: run the Resourse Distribute that resource requirement controls application system according to the running state data of the energy consumption data of data center and the equipment of data center and application system.
Acquisition according to the above-mentioned consumption statistics to data center's energy and equipment running status information can draw the energy demand trend of the operational system that application runs and use the trend of device resource, based on this, can comprise for system assignment resource for above-mentioned: the running example judging whether to exist in data center application system, if so, then for this running example distributes more multiple resource maybe using the backed-up instance of this running example as the new running example created; If not, then the running example of application system is newly created.
Control based on the above-mentioned Resourse Distribute to application system can realize the control other application systems existed in data center being carried out to Resourse Distribute equally, all status informations of the application system of data center are all kept in application service bus, can obtain the running state information of the application system existed in data center from this application service bus; Wherein, this information can comprise: the attribute of application system, the load of application system, application system are to the energy resource consumption statistical information of the service condition of resource and application system.According to this running state information, in conjunction with the energy consumption data of data center and the equipment running status data of data center, the device resource that application system takies is adjusted.(1), such as, the running example of application system is in the free time, or when multiple application system running example is in low load condition, terminates the running example of this application system, release physical device resource.(2), can adjust according to the network equipment of above-mentioned information to data center, such as, the adjustment that can CPU, internal memory, storage, the network bandwidth be increased, reduce or be stopped.
Embodiment 1
Fig. 2 is the structural representation of the system of control application system Resourse Distribute according to the embodiment of the present invention 1.
As shown in Figure 2, the system 200 of this control application system Resourse Distribute comprises:
Receiver module 201, for receiving the operation solicited message of application system;
First determination module 202, for running resource requirement according to operation solicited message determination application system;
First acquisition module 203, for the running state data of the equipment of the energy consumption data and data center that obtain data center, the energy consumption data of data center comprises: the energy consumption data of the application system existed in the energy consumption data of the energy consumption data of the equipment of data center, the environment of data center and data center.
Control module 204, for running according to the running state data of the energy consumption data of data center and the equipment of data center and application system the Resourse Distribute that resource requirement controls application system.Such as, can according to the service condition of the equipment of data center, in conjunction with the Expenditure Levels of the energy, equipment component in dormant data center, reaches the object of saving resource.
Fig. 3 is the structural representation of the control module according to the embodiment of the present invention 1.
As shown in Figure 3, this control module 204 can also comprise: judging unit 301, for judging the running example that whether there is application system in data center; Control module 302, during for judging the running example that there is application system in data center at judging unit, for this running example Resources allocation is maybe using the backed-up instance of this running example as the new running example created; When judging unit judges the running example that there is not application system in data center, create the running example of application system.
Can resource needed for the energy resource consumption trend of determining data center and the actual motion of device resource usage trend and application system by the analysis running state data of the energy consumption data of data center, the equipment of data center and application system being run to resource requirement, in conjunction with the resource of actual conditions reasonably needed for application system distribution operation of data center resource, to avoid the waste of resource.
Embodiment 2
Fig. 4 is the structural representation of the system of control application system Resourse Distribute according to the embodiment of the present invention 2.
As shown in Figure 4, the system 400 of this control application system Resourse Distribute also comprises except the modules comprising said system 200 and comprise:
Judge module 401, before running resource requirement at determination module according to operation solicited message determination application system, before running resource requirement according to operation solicited message determination application system, judge application system whether in the data the heart ran;
Second determination module 402, for the judgement application system when judge module, heart operation is out-of-date in the data, then perform the step according to running solicited message determination application system operation resource requirement.
If so, then the step according to running solicited message determination application system operation resource requirement is performed.
This module can judge the operation application whether accepting application system, by the screening of this module, applies for that the application system by accepting can enter Resourse Distribute flow process.
Embodiment 3
Fig. 5 is the structural representation of the system of control application system Resourse Distribute according to the embodiment of the present invention 3.
As shown in Figure 5, the system 500 of this control application system Resourse Distribute also comprises except each module comprising said system 200:
Second acquisition module 501, for to run after resource requirement controls the Resourse Distribute of application system according to the running state data of the energy consumption data of data center and the equipment of data center and application system in control module, obtain the running state information of the application system existed in data center; Regularly can be obtained the running state data of application system from application service bus by this module, particularly, this application service bus preserves all data of application system in the data in heart operational process, can be monitored the operation of each application system in data center by the running state data of the application system obtained, moment grasps its running status, is convenient to the control it being used to resource.
Adjusting module 502, for adjusting the device resource that application system takies according to the energy consumption data of running state information, data center and the equipment running status data of data center, the equipment component that this module can be selected in dormant data in the heart according to data center apparatus practical operation situation, reaches the object of saving resource.
According to technical scheme of the present invention, the Resourse Distribute that resource requirement controls application system can be run according to the running state data of the equipment of the energy consumption data of data center and data center and application system, the reasonable distribution of resource can be realized, thus make more application system concentrate operate in a few devices, decrease the quantity of the equipment in the data center of operation, reduce the energy consumption of the resource of the equipment of data center, and then improve the utilization factor of data center's energy.
It should be noted that, in this article, the such as relational terms of first and second grades and so on is only used for an entity or operation to separate with another entity or operational zone, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or equipment and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or equipment.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment comprising described key element and also there is other identical element.
The foregoing is only preferred embodiment of the present invention, be not intended to limit protection scope of the present invention.All any amendments done within the spirit and principles in the present invention, equivalent replacement, improvement etc., be all included in protection scope of the present invention.

Claims (7)

1. control a method for application system Resourse Distribute, it is characterized in that, comprising:
Receive the operation solicited message of application system, described operation solicited message comprises: the time that the title of described application system, described application system needs run and described application system require the performance index reached;
Determine that described application system runs resource requirement according to described operation solicited message;
Obtain the running state data of the energy consumption data of data center and the equipment of described data center, the energy consumption data of described data center comprises: the energy consumption data of the application system existed in the energy consumption data of the energy consumption data of the equipment of described data center, the environment of described data center and described data center; Wherein, first energy resource consumption in the unit interval in the equipment of described data center in the past statistics period is added up, secondly, energy resource consumption in unit interval in the environmental energy of described data center in the past statistics period is added up, again, the energy resource consumption of the application system in described data center is added up;
The Resourse Distribute that resource requirement controls described application system is run according to the running state data of the energy consumption data of described data center and the equipment of described data center and described application system;
Wherein, before determining that according to described operation solicited message described application system runs resource requirement, the global scope of the heart is interior in the data inquires about this application system current overall situation, whether data query center exists the related resource needed for this application system, judge application system whether in the data the heart ran, if, the information applying for accepting then is returned to this application system, and then the step performed according to running solicited message determination application system operation resource requirement, if there is not the resource can running this application system in data center, then return application and accept failure information, process ends.
2. method according to claim 1, is characterized in that, the energy consumption data of described application system comprises:
In the application system existed in described data center, the actual value of the energy resource consumption of the application system run in described data center and the estimated value of the energy resource consumption of application system do not run in described data center.
3. method according to claim 1, it is characterized in that, the running state data of the equipment of the described energy consumption data according to described data center and described data center and described application system are run the Resourse Distribute that resource requirement controls described application system and are comprised:
Judging the running example that whether there is described application system in described data center, if so, is then that this running example Resources allocation is maybe using the backed-up instance of this running example as the new running example created; If not, then the running example of described application system is created.
4. the method according to claims 1 to 3 any one, is characterized in that, described method also comprises:
After running resource requirement according to the running state data of the energy consumption data of described data center and the equipment of described data center and described application system and controlling the Resourse Distribute of described application system, also comprise:
Obtain the running state information of the application system existed in described data center;
According to the energy consumption data of described running state information, described data center and the equipment running status data of described data center, the device resource that described application system takies is adjusted.
5. control a system for application system Resourse Distribute, it is characterized in that, comprising:
Receiver module, for receiving the operation solicited message of application system, described operation solicited message comprises: the time that the title of described application system, described application system needs run and described application system require the performance index reached;
First determination module, for determining that according to described operation solicited message described application system runs resource requirement;
First acquisition module, for the running state data of the equipment of the energy consumption data and described data center that obtain data center, the energy consumption data of described data center comprises: the energy consumption data of the application system existed in the energy consumption data of the energy consumption data of the equipment of described data center, the environment of described data center and described data center; Wherein, first energy resource consumption in the unit interval in the equipment of described data center in the past statistics period is added up, secondly, energy resource consumption in unit interval in the environmental energy of described data center in the past statistics period is added up, again, the energy resource consumption of the application system in described data center is added up;
Control module, for running according to the running state data of the energy consumption data of described data center and the equipment of described data center and described application system the Resourse Distribute that resource requirement controls described application system;
Judge module, before determining that described application system runs resource requirement at described determination module according to described operation solicited message, the global scope of the heart is interior in the data inquires about this application system current overall situation, whether data query center exists the related resource needed for this application system, judges whether described application system was run in described data center;
Second determination module, out-of-date for running in described data center when the described application system of judgement of described judge module, the information applying for accepting then is returned to this application system, and then perform the step determining described application system operation resource requirement according to described operation solicited message, if there is not the resource can running this application system in data center, then return application and accept failure information, process ends.
6. system according to claim 5, is characterized in that, described control module comprises:
Judging unit, for judging the running example that whether there is described application system in described data center;
Control module, for when described judging unit judges the running example that there is described application system in data center, for this running example Resources allocation is maybe using the backed-up instance of this running example as the new running example created; When described judging unit judges the running example that there is not described application system in data center, create the running example of described application system.
7. the system according to claim 5 to 6 any one, is characterized in that, described system also comprises:
Second acquisition module, for to run after resource requirement controls the Resourse Distribute of described application system according to the running state data of the equipment of the energy consumption data of data center and described data center and described application system in described control module, obtain the running state information of the application system existed in described data center;
Adjusting module, for adjusting the device resource that described application system takies according to the energy consumption data of described running state information, described data center and the equipment running status data of described data center.
CN201110453654.6A 2011-12-29 2011-12-29 A kind of method and system controlling application system Resourse Distribute Active CN102521715B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110453654.6A CN102521715B (en) 2011-12-29 2011-12-29 A kind of method and system controlling application system Resourse Distribute

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110453654.6A CN102521715B (en) 2011-12-29 2011-12-29 A kind of method and system controlling application system Resourse Distribute

Publications (2)

Publication Number Publication Date
CN102521715A CN102521715A (en) 2012-06-27
CN102521715B true CN102521715B (en) 2016-04-13

Family

ID=46292626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110453654.6A Active CN102521715B (en) 2011-12-29 2011-12-29 A kind of method and system controlling application system Resourse Distribute

Country Status (1)

Country Link
CN (1) CN102521715B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104461744B (en) * 2014-12-18 2018-01-19 曙光云计算技术有限公司 A kind of resource allocation methods and device
CN105553732B (en) * 2015-12-23 2019-03-22 中国科学院信息工程研究所 A kind of distributed network analogy method and system
CN115499388B (en) * 2022-08-30 2024-04-12 阿里巴巴(中国)有限公司 Virtual host resource allocation method, device, equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7162509B2 (en) * 2003-03-06 2007-01-09 Microsoft Corporation Architecture for distributed computing system and automated design, deployment, and management of distributed applications
CN101098255A (en) * 2007-05-25 2008-01-02 清华大学 Option pricing model scheduling algorithm based implementation in interactive gridding system
CN101964812A (en) * 2010-09-14 2011-02-02 浪潮(北京)电子信息产业有限公司 Method, device and system for accessing resources
CN102004671A (en) * 2010-11-15 2011-04-06 北京航空航天大学 Resource management method of data center based on statistic model in cloud computing environment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7162509B2 (en) * 2003-03-06 2007-01-09 Microsoft Corporation Architecture for distributed computing system and automated design, deployment, and management of distributed applications
CN101098255A (en) * 2007-05-25 2008-01-02 清华大学 Option pricing model scheduling algorithm based implementation in interactive gridding system
CN101964812A (en) * 2010-09-14 2011-02-02 浪潮(北京)电子信息产业有限公司 Method, device and system for accessing resources
CN102004671A (en) * 2010-11-15 2011-04-06 北京航空航天大学 Resource management method of data center based on statistic model in cloud computing environment

Also Published As

Publication number Publication date
CN102521715A (en) 2012-06-27

Similar Documents

Publication Publication Date Title
Xie et al. Minimizing energy consumption of real-time parallel applications using downward and upward approaches on heterogeneous systems
Zhu et al. A three-dimensional virtual resource scheduling method for energy saving in cloud computing
US8001403B2 (en) Data center power management utilizing a power policy and a load factor
CN103345298B (en) Method of data center energy saving system based on virtual IT resource distribution technology
CN103150003B (en) The power-saving control method of information handling system, this information handling system and device
WO2018137402A1 (en) Cloud data centre energy-saving scheduling implementation method based on rolling grey prediction model
US20120226922A1 (en) Capping data center power consumption
CN104657215A (en) Virtualization energy-saving system in Cloud computing
CN103076870B (en) Scheduling and dynamic resource allocation method are merged in the application that in data center, energy consumption drives
CN108361885B (en) Dynamic planning method for ice storage air conditioning system
CN104035542B (en) A kind of virtual machine migration method and system calculated with energy consumption for cooling balance
CN102759984A (en) Power supply and performance management system for virtualization server cluster
CN107239127A (en) A kind of VRM method for managing power supply based on server B MC
CN105426241A (en) Cloud computing data center based unified resource scheduling energy-saving method
CN103645795A (en) Cloud computing data center energy saving method based on ANN (artificial neural network)
Zhang et al. A new energy efficient VM scheduling algorithm for cloud computing based on dynamic programming
CN102521715B (en) A kind of method and system controlling application system Resourse Distribute
Le Boudec et al. A demand-response calculus with perfect batteries
Chen et al. Power and thermal-aware virtual machine scheduling optimization in cloud data center
Peng et al. Energy-efficient management of data centers using a renewable-aware scheduler
CN111935952B (en) Large machine room energy consumption regulation and control method and device
Zhou et al. Greengear: Leveraging and managing server heterogeneity for improving energy efficiency in green data centers
CN103973784A (en) Method for effectively utilizing cloud storage server resources
CN102902878B (en) A kind of energy cost perception dispatching method
CN106227600B (en) A kind of multidimensional virtual resource allocation method based on Energy-aware

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 200001 23rd floor, East Building, science and technology capital, no.668, Beijing East Road, Huangpu District, Shanghai

Patentee after: CETC Digital Technology Co.,Ltd.

Address before: 200001 23rd floor, East Building, science and technology capital, no.668, Beijing East Road, Huangpu District, Shanghai

Patentee before: SHANGHAI EAST CHINA COMPUTER Co.,Ltd.