CN102378296B - Method for carrying out frequency band switching in communication system - Google Patents

Method for carrying out frequency band switching in communication system Download PDF

Info

Publication number
CN102378296B
CN102378296B CN 201010252631 CN201010252631A CN102378296B CN 102378296 B CN102378296 B CN 102378296B CN 201010252631 CN201010252631 CN 201010252631 CN 201010252631 A CN201010252631 A CN 201010252631A CN 102378296 B CN102378296 B CN 102378296B
Authority
CN
China
Prior art keywords
frequency band
terminal
base station
message
control message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010252631
Other languages
Chinese (zh)
Other versions
CN102378296A (en
Inventor
于小红
莫勇
冯绍鹏
王永明
闫亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Potevio Institute of Technology Co Ltd
Original Assignee
Potevio Institute of Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potevio Institute of Technology Co Ltd filed Critical Potevio Institute of Technology Co Ltd
Priority to CN 201010252631 priority Critical patent/CN102378296B/en
Publication of CN102378296A publication Critical patent/CN102378296A/en
Application granted granted Critical
Publication of CN102378296B publication Critical patent/CN102378296B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a method for carrying out frequency band switching in a communication system, wherein a control channel of the communication system takes up a part of frequency bands of a whole system bandwidth, and the control channel currently takes up a first frequency band. The method comprises the following steps that: a base station sends a control message to a terminal on a first frequency band and a second frequency band until a confirmation message fed back by the terminal is received; the control message instructs the terminal to switch the control channel from the first frequency band to the second frequency band; and the confirmation message instructs the terminal that the control message is received correctly. By using the method provided by the invention, the frequency band switching reliability of the terminal can be improved.

Description

Method for carrying out frequency band switching in a kind of communication system
Technical field
The present invention relates to communication technical field, relate in particular to the method for carrying out frequency band switching in a kind of communication system.
Background technology
In Long Term Evolution (Long Term Evolution, LTE) communication system, control information is transmitted on the whole system bandwidth, and business information is transmitted on the partial-band of system bandwidth.Before base station and terminal communicated, terminal can be distributed to the partial-band of whole system bandwidth in the base station, and then terminal utilizes these frequency bands to come transmitting and receiving service information.When the decline of transmitting on these frequency bands when business information was larger, the base station sent control information to terminal, and notification terminal switches on other frequency bands of better performances, thereby guaranteed that base station and communicating by letter of terminal remain a performance preferably.
Fig. 1 is that the LTE system carries out the method flow diagram that frequency band switches.
As shown in Figure 1, the method comprises:
Step 101, base station send to terminal the control message that frequency band switches on the whole system bandwidth.
Step 102, base station on the frequency band after switching with described terminal interaction business information.
Step 103, base station judge whether mutual business information satisfies expected results, if so, returns to step 102, otherwise, return to step 101.
Expected results wherein refers to, after the described control message that terminal sends according to the base station correctly switches to corresponding frequency band, and the result of base station and described terminal interaction business information.
In end side, terminal receives the frequency band switching message that the base station sends in the whole system bandwidth, if receive described switching message, switch to corresponding frequency band, and utilize the frequency band after switching to receive and send business information, if do not receive described switching message, receive and send business information on original frequency band.
Because the control channel of LTE system has taken the whole system bandwidth, therefore no matter the business information of terminal is received and dispatched on which frequency band, and terminal can receive the control information that the base station sends.
In some system, due to the restriction of the conditions such as hardware, require terminal simple as much as possible, thereby in order to simplify the handling process cost saving.For the purpose of simplifying, terminal can only work in one section narrower spectral range, and control information and business information be sending and receiving in this spectral range all, and namely control channel and Traffic Channel only take the partial-band of whole system bandwidth.When the frequency band decline that takies when control channel and the Traffic Channel of terminal is larger, base station side need to send frequency band to terminal and switch message, notification terminal switches to other frequency band transmitting and receiving service information and control information, base station side also can transmitting and receiving service information and control information on these other frequency band, specifically sees also Fig. 2.
Fig. 2 is the changing method flow chart when in prior art, control channel takies the partial-band of whole system bandwidth.
As shown in Figure 2, the method comprises:
Step 201, base station send to terminal the control message that frequency band switches on the current frequency band that takies.
Step 202, the base station sends control information and business information to terminal on the frequency band after switching, the business information of receiving terminal on the frequency band after switching.
In this step, if terminal has correctly received described control message, carry out frequency band and switch, and on the frequency band after switching with the mutual control information in base station.
Yet if terminal could not correctly receive described control message, terminal will be at the sending and receiving of the enterprising industry business of original frequency band information.
As seen, when the control channel of communication system takies the partial-band of whole system bandwidth, if terminal could not correctly receive the frequency band switching controls message that the base station sends first, to cause also can't receiving the frequency band switching controls message that the base station sends again after terminal, thereby it is lower to cause terminal to carry out the reliability that frequency band switches.
And, because terminal can't be carried out the frequency band switching reliably, also will cause terminal transmitting and receiving service information on original frequency band, and the base station sending transmitting and receiving service information on the frequency band after switching, communication system can't normally be carried out communication.
Summary of the invention
In view of this, the invention provides the method for carrying out frequency band switching in a kind of communication system, carry out to improve terminal the reliability that frequency band switches.
Method for carrying out frequency band switching in a kind of communication system, the control channel of this communication system takies the partial-band of whole system bandwidth, current first frequency band that takies of control channel, the method comprises:
The base station transmits control message to terminal on the first frequency band and the second frequency band, until receive the confirmation message of described terminal feedback;
Described control message indicating terminal switches to described the second frequency band with control channel from described the first frequency band; Described acknowledge message indicates this terminal correctly to receive described control message.
As seen from the above technical solution, when the control channel of communication system takies the partial-band of whole system bandwidth, the base station sends to terminal on the current frequency band that takies of control channel and target band and is used for carrying out the control message that frequency band switches, until receive the confirmation message of described terminal feedback.because the base station is not only at the current frequency band that takies or only send described control message to terminal on target band, but all send described control message to terminal on the described current frequency band that takies and described target band, therefore no matter described terminal is at the described current frequency band that takies or works on described target band, can receive described control message, and, if do not receive the confirmation message of terminal feedback after the described control message of base station transmission, the base station can send described control message to described terminal again, until receive the confirmation message of terminal feedback, further improve terminal and carried out the reliability that frequency band switches.
Description of drawings
Fig. 1 is that the LTE system carries out the method flow diagram that frequency band switches.
Fig. 2 is the changing method flow chart when in prior art, control channel takies the partial-band of whole system bandwidth.
Fig. 3 is the detail flowchart of base station side in method for carrying out frequency band switching in communication system provided by the invention.
Fig. 4 is the detail flowchart of end side in method for carrying out frequency band switching in communication system provided by the invention.
Embodiment
Method for carrying out frequency band switching provided by the invention is applied in the communication system of partial-band that control channel takies the whole system bandwidth.Particularly, the frequency band that terminal is carried out taking before frequency band switches is designated as the first frequency band, the frequency band that terminal is carried out taking after frequency band switches is designated as the second frequency band, the base station transmits control message to terminal on described the first frequency band and described the second frequency band, until receive the confirmation message of described terminal feedback, wherein, described control message indicating terminal switches to described the second frequency band with control channel from described the first frequency band, and described acknowledge message indicates this terminal correctly to receive described control message.
In Fig. 3 and flow process shown in Figure 4, the frequency band that terminal is carried out taking before frequency band switches is designated as the first frequency band, and the frequency band that terminal is carried out taking after frequency band switches is designated as the second frequency band.
Fig. 3 is the detail flowchart of base station side in method for carrying out frequency band switching in communication system provided by the invention.
As shown in Figure 3, this flow process comprises:
Step 301, base station send to terminal on described the first frequency band and are used for carrying out the control message that frequency band switches.
Wherein, described control message indicating terminal switches to the second frequency band with control channel from described the first frequency band, and this control message further indicating terminal switches to the second frequency band with Traffic Channel from described the first frequency band.
The confirmation message of step 302, base station receiving terminal feedback on described the first frequency band.
Step 303 judges whether the base station receives described acknowledge message within a predetermined period of time, if so, and execution in step 307, if not, execution in step 304.
Step 304, base station send described control message to terminal on described the first frequency band and described the second frequency band.
Step 305, base station receive described acknowledge message on described the first frequency band and described the second frequency band.
Step 306 judges whether the base station receives described acknowledge message on described the first frequency band or described the second frequency band, if so, execution in step 307 if not, is returned to step 305.
Step 307, base station switch to described the second frequency band and described terminal communicates.
Method shown in Figure 3 is that the base station first only issues control message on the first frequency band, after not receiving within a predetermined period of time the confirmation message of terminal feedback, transmit control message on the first frequency band and the second frequency band again, in fact, for the ease of unified flow process, simplify the operation of base station end, the base station can all transmit control message to terminal on the first frequency band and the second frequency band at every turn.
Fig. 4 is the detail flowchart of end side in method for carrying out frequency band switching in communication system provided by the invention.
As shown in Figure 4, this flow process comprises:
Step 401, terminal receive the control message that is used for carrying out the frequency band switching that the base station sends.
Step 402, terminal have been received the confirmation message of described control message to base station feedback.
Wherein, if terminal does not also switch to described the second frequency band, on described the first frequency band to the described acknowledge message of base station feedback, if terminal has switched to described the second frequency band, on described the second frequency band to the described acknowledge message of base station feedback.
After base station and terminal are all completed the frequency band handover operation, can be on described the second frequency range mutual business information of base station and terminal.Particularly: after the confirmation message of terminal feedback is received in the base station, can be on described the second frequency band send dispatching command to terminal, terminal according to this dispatching command on described the second frequency band with base station interactive service information; Perhaps, terminal is after the described acknowledge message of feedback, if terminal has been received other control information different with last time that the base station sends or has not been received within a predetermined period of time the identical control message of described control message of receiving with the last time, illustrate that the base station received the confirmation message of terminal feedback, and the base station has also switched to described the second frequency range work, thus terminal and described base station can be on described the second frequency band mutual business information; Perhaps, after described acknowledge message is received in the base station, wait for predetermined amount of time to be used for carrying out the time slot of business transmission corresponding with terminal, on described the second frequency band with the terminal interaction business information.
By the present invention, when in the communication system of terminal works in the arrowband, can not increase on the complexity basis of system, guarantee that with less control signal expense terminal carries out the reliability that frequency is switched.
The above is only preferred embodiment of the present invention, and is in order to limit the present invention, within the spirit and principles in the present invention not all, any modification of making, is equal to replacement, improvement etc., within all should being included in the scope of protection of the invention.

Claims (7)

1. the method for carrying out frequency band switching in a communication system, the control channel of this communication system takies the partial-band of whole system bandwidth, and current first frequency band that takies of control channel is characterized in that, and the method comprises:
The base station transmits control message to terminal on the first frequency band and the second frequency band, until receive the confirmation message of described terminal feedback;
Described control message indicating terminal switches to described the second frequency band with control channel from described the first frequency band; Described acknowledge message indicates this terminal correctly to receive described control message;
Wherein, described base station transmits control message to terminal on the first frequency band and the second frequency band and comprises:
The base station sends described control message to terminal on described the first frequency band, receive described acknowledge message at described the first frequency band, if the base station is not received described acknowledge message within a predetermined period of time, the base station sends described control message to terminal on described the first frequency band and described the second frequency band.
2. method according to claim 1, is characterized in that,
The base station receives described acknowledge message on described the first frequency band and described the second frequency band.
3. method according to claim 1, is characterized in that, the method further comprises:
After the described acknowledge message of terminal feedback is received in the base station, switch to described the second frequency band and described terminal and communicate.
4. method according to claim 1, is characterized in that,
After terminal receives described control message, if terminal does not also switch to described the second frequency band, on described the first frequency band to the described acknowledge message of base station feedback, if terminal has switched to described the second frequency band, on described the second frequency band to the described acknowledge message of base station feedback.
5. the described method of arbitrary claim of according to claim 1 to 4, is characterized in that, the further indicating terminal of described control message switches to described the second frequency band with Traffic Channel from described the first frequency band, and the method further comprises:
After the confirmation message of terminal feedback is received in the base station, send dispatching command to terminal on described the second frequency band, terminal according to this dispatching command on described the second frequency band with base station interactive service information.
6. the described method of arbitrary claim of according to claim 1 to 4, is characterized in that, the further indicating terminal of described control message switches to described the second frequency band with Traffic Channel from described the first frequency band, further carries dispatching command in described control message; The method further comprises:
Terminal is after the described acknowledge message of feedback, if terminal received other control information different with last time that the base station sends or do not received within a predetermined period of time the identical control message of described control message of receiving with the last time, terminal and described base station business information alternately on described the second frequency band.
7. method according to claim 6, is characterized in that, the method further comprises:
After described acknowledge message is received in the base station, directly send the control information of other different with last time to terminal on described the second frequency band, perhaps wait for predetermined amount of time, on described the second frequency band with the terminal interaction business information.
CN 201010252631 2010-08-12 2010-08-12 Method for carrying out frequency band switching in communication system Expired - Fee Related CN102378296B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010252631 CN102378296B (en) 2010-08-12 2010-08-12 Method for carrying out frequency band switching in communication system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010252631 CN102378296B (en) 2010-08-12 2010-08-12 Method for carrying out frequency band switching in communication system

Publications (2)

Publication Number Publication Date
CN102378296A CN102378296A (en) 2012-03-14
CN102378296B true CN102378296B (en) 2013-06-05

Family

ID=45796074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010252631 Expired - Fee Related CN102378296B (en) 2010-08-12 2010-08-12 Method for carrying out frequency band switching in communication system

Country Status (1)

Country Link
CN (1) CN102378296B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018126453A1 (en) * 2017-01-06 2018-07-12 广东欧珀移动通信有限公司 Handover method, base station, and terminal
CN109691200B (en) * 2017-09-14 2020-10-30 Oppo广东移动通信有限公司 Method for activating bandwidth part BWP and related product

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1496148A (en) * 1995-04-19 2004-05-12 ����ɭ�绰�ɷ����޹�˾ Multiple super high frequency band radio communication system
CN101483917A (en) * 2008-01-10 2009-07-15 华为技术有限公司 Frequency band access switching method, terminal and base station
CN101536577A (en) * 2006-11-08 2009-09-16 富士通株式会社 Base station apparatus, user equipment and method used in mobile communication system performing inter-band handover

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2384052A1 (en) * 2009-01-16 2011-11-02 Sharp Kabushiki Kaisha Mobile station apparatus, base station apparatus, handoff method, and mobile communication system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1496148A (en) * 1995-04-19 2004-05-12 ����ɭ�绰�ɷ����޹�˾ Multiple super high frequency band radio communication system
CN101536577A (en) * 2006-11-08 2009-09-16 富士通株式会社 Base station apparatus, user equipment and method used in mobile communication system performing inter-band handover
CN101483917A (en) * 2008-01-10 2009-07-15 华为技术有限公司 Frequency band access switching method, terminal and base station

Also Published As

Publication number Publication date
CN102378296A (en) 2012-03-14

Similar Documents

Publication Publication Date Title
CN102045862B (en) Carrier aggregation realizing method, device and system
EP2068585B1 (en) Mobile station, wireless base station, mobile communication system and notification information transmitting/receiving method
CN101841872B (en) Method and relay equipment for implementing cell switch
US7787433B2 (en) Wireless communication method, wireless communication system using the same, and wireless terminal thereof
CN103856302A (en) Intelligent-equipment control method
US20220159643A1 (en) Apparatus and method of controlling sidelink communication of same
CN102378296B (en) Method for carrying out frequency band switching in communication system
CN101123804B (en) A relay-based network access method and system and a relay station
CN103702362B (en) Multichannel operation method in WAVE (wireless access in vehicular environments) system
CN203387687U (en) Base-station device
CN101650872B (en) System and method for collecting power utilization information
CN105101418A (en) Method, system and equipment for determining reference subframe
JP5174799B2 (en) Radio base station system and relay device
CN103686863A (en) Control signaling transfer method and control signaling transfer system
CN103095424B (en) A kind of control signal transmission method, base station, terminal and system
CN104683064A (en) Method and system for transmitting multiple uplink scheduling requests on basis of joint encoding way
EP3922055B1 (en) User equipment and method of wireless communication
US8676184B2 (en) Method for remotely controlling a device by means of a fixed transceiver station, device, use of a fixed transceiver station and program
MX2012004979A (en) Method of control signaling in a wireless communication system.
CN103001753A (en) Communication method, communication device, communication base station and communication terminals
US20100091741A1 (en) WiFi system and method with high-speed mobile voice and video data communication
CN201479156U (en) Information transmission control device with dissymmetrical channels
CN107241739B (en) Configuration method and device of network node
CN112544104B (en) Data transmission method and terminal
CN103051429A (en) Method and device for configuring uplink transmission diversity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20210812