CN102377455A - Boiler and central cooling device provided with power line communication for energy management - Google Patents
Boiler and central cooling device provided with power line communication for energy management Download PDFInfo
- Publication number
- CN102377455A CN102377455A CN2010105705975A CN201010570597A CN102377455A CN 102377455 A CN102377455 A CN 102377455A CN 2010105705975 A CN2010105705975 A CN 2010105705975A CN 201010570597 A CN201010570597 A CN 201010570597A CN 102377455 A CN102377455 A CN 102377455A
- Authority
- CN
- China
- Prior art keywords
- power line
- boiler
- line module
- building structure
- letter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
The present invention relates to a system used for communicating between an indoor unit/a plurality of indoor units and an indoor unit/a plurality of indoor units. The system is provided with a boiler device arranged inside a building structure in the space. In a specific embodiment, the boiler comprises a boiler control and energy generating area. The boiler is at least used in a first DC operation. The system is also provided with an air regulating unit arranged outside the building structure in the space. The air regulating unit comprises compressor equipment and an air regulating control, and the air regulating control is at least used in a second DC operation. The system is provided with a first power line module for communicating with the boiler control and a second power line module for communicating with the air regulating control. A power line network is communicated between the first power line module and the second power line module.
Description
Technical field
The present invention relates generally to energy management technology, more particularly, the present invention relates to a kind of system of between one or more indoor units and one or more outdoor units, communicating by letter of being used for.
Background technology
The invention provides a kind of method and system; Said method and system is used in building structure, using at least power line and other networking technologies between boiler at least and conditioner, to communicate by letter, but will be appreciated that the present invention has range of application more widely.In addition, other networking technologies comprise local area network (LAN) (such as Ethernet) technology, short range and long distance wireless technology and other technical combinations.
Summary of the invention
According to the present invention, the technology that relates generally to energy management is provided.More particularly; The present invention provides a kind of method and system; Said method and system is used in building structure, using at least power line and other networking technologies between boiler at least and conditioner, to communicate by letter, but will be appreciated that the present invention has range of application more widely.In addition, other networking technologies comprise local area network (LAN) (such as Ethernet) technology, short range and long distance wireless technology and other technical combinations.
In specific embodiment, the present invention provides a kind of system of between one or more indoor units and one or more indoor units, communicating by letter of being used for.This system has the boiler plant that spatially is arranged in the building structure.In specific embodiment, this boiler comprises boiler control and power-producing zone territory.This boiler control is arranged at least the first dc operation.This system also has and spatially is arranged in building structure air outside regulon.This air-conditioning unit comprises compressor apparatus and air conditioning control, and this air conditioning control is arranged at least the second dc operation.This system has and is configured to first power line module of communicate by letter with boiler control and is configured to control second power line module of communicating by letter with air conditioning.Power line network is configured between first power line module and second power line module, communicate by letter.
The present invention has realized these and other beneficial effects under the known process technical background.Yet essence of the present invention and advantage can come with reference to the subsequent section of specification and accompanying drawing further to understand.
Description of drawings
Fig. 1 is used between one or more indoor sets and one or more outdoor locations, communicating by letter sketch with the energy system that carries out energy management.
Fig. 2 is used between one or more indoor sets and one or more outdoor locations, communicating by letter sketch with the substituting energy system that carries out energy management.
Fig. 3 and Fig. 4 are the sketches of power line interface and power supply according to an embodiment of the invention.
Fig. 5 to Fig. 7 is the simplified block diagram of thermostat (PCT), boiler, air conditioning and power line module/power supply at least according to an embodiment of the invention.
Embodiment
According to the present invention, the technology that relates generally to energy management is provided.More particularly; The present invention provides a kind of method and system; Said method and system is used in building structure, using at least power line and other networking technology between boiler at least and conditioner, to communicate by letter, but will be appreciated that the present invention has range of application more widely.In addition, other networking technology comprises local area network (LAN) (such as Ethernet) technology, short range and long distance wireless technology and other technical combinations.
Since bulk of worldwide electricity relax control rise with the prevailing price since, government regulator makes the approach that consumes with the generating coupling in searching always.The tradition ammeter is only measured wastage in bulk or weight, and the few information that when consumes or how to consume about energy likewise only is provided.Intelligence table provides the method for measuring energy consumption in each time interval, thus allow price mechanism based on the same day constantly with introduce different consumption prices season.
Electricity price usually some predictable same day constantly and reach peak value season.Specifically, if generating is restricted, then price possibly significantly rise in these times, and this is because bought more expensive electric power source from other compass of competency, has perhaps introduced the cost greater power generation.According to thinking, charging to client according to concrete time on consumption and the same day will force the consumer to adjust its consumption habit to respond more the market price.Supervision and market design organization hope that these " price signals " can delay the construction of extra generating or delay at least to buy energy from the source of higher price, thereby control the stable of power price and increase fast.
The cost that uses along with the family energy rise and from electric power enterprise service time (TOU) bill be about to release; Need know the service time and the consumption of various household electrical appliance institute consumption of electric power; Use so that can eliminate the poor efficiency of electric power, and can forward electricity usage to peak absences.The intelligence table of limited use nowadays provides some solutions to these problems.Even if but new intelligence table also only provides the wastage in bulk or weight based on the same day moment and season.This type of intelligence table does not provide and allows the user accurately to find out the detailed energy use information that which equipment family or office in or electrical equipment have consumed maximum electric power.This has hindered the user to know about closing which equipment or electrical equipment in the higher peak period of price.
When solving the problem of these energy consumption measurements and control, EMS (EMS) provides the catabiotic real-time measurement of various electric load in the distribution system.Measure through these, the user can accurately find out the source that energy uses, and comes the electric load in the Long-distance Control distribution system through opening or closing electrical equipment.Majority EMS system is used for industry and Commercial Load by customization, such as heating and ventilation in hotel or the factory and air conditioning (HVAC).
In addition, under the situation that software possibly lock, the network equipment is in a period of time often out of service traditionally, thereby need be through opening or closing device or equipment extracted or insert carry out some physics and reset.Because this has made problem to the service supplier, so appropriate solution need be provided.
In addition, really not so though home automation is quite appreciated when electric power is enough in electricity shortage or outage, especially for the home automation that is connected to critical function such as safety system.Therefore, also appropriate solution need be provided.Through this method and system, these and other limitation of traditional energy monitoring technology have been overcome according to one or more embodiment.
Fig. 1 is used between one or more indoor sets and one or more outdoor locations, communicating by letter sketch with the energy system that carries out energy management.This figure only is an instance, and it should not limit claims of this paper irrelevantly.Those of ordinary skill in the art will recognize many other modification, modification and alternative.As shown in the figure, provide to be used for the energy system of between one or more indoor units and one or more outdoor units, communicating by letter.This system also has the boiler plant that spatially is arranged in the building structure.In specific embodiment, this boiler plant is in the subterranean zone of building structure or other interior zone.In specific embodiment, this boiler plant comprises boiler control and power-producing zone territory.In specific embodiment, this boiler control is arranged at least the first dc operation.In specific embodiment, this system has also that spatially to be arranged in building structure outside or partly be arranged in the air-conditioning unit in the building structure.Modification, modification and the alternative that can have in addition, other.In specific embodiment, air-conditioning unit comprises compressor apparatus and air conditioning control, and this air conditioning control is arranged to second dc operation.Through this explanation and hereinafter the more details that can obtain native system are described more specifically.
In specific embodiment, this system configuration has and is couple to one or more power lines to form the power line module of power line network.In specific embodiment, this system comprises and is configured to control first power line module of communicating by letter with boiler.According to one or more embodiment, this system also has and is configured to second power line module of communicating by letter with air conditioning control.This system has and is configured to the power line network of between first power line module and second power line module, communicating by letter.Modification, modification and the alternative that certainly, can have other.
In another alternate embodiment, Fig. 2 is used between one or more indoor sets and one or more outdoor locations, communicating by letter sketch with the substituting energy system that carries out energy management.This figure only is an instance, and it should not limit claims of this paper irrelevantly.Those of ordinary skill in the art will recognize many other modification, modification and alternative.As shown in the figure, provide to be used for the energy system of between one or more indoor units and one or more outdoor units, communicating by letter.This system also has the boiler plant that spatially is arranged in the building structure.In specific embodiment, this boiler plant is in the subterranean zone of building structure or other interior zone.In specific embodiment, this boiler plant comprises boiler control and power-producing zone territory.In specific embodiment, this boiler control is arranged at least the first dc operation.In specific embodiment, this system has also that spatially to be arranged in building structure outside or partly be arranged in the air-conditioning unit in the building structure.Modification, modification and the alternative that can have in addition, other.In specific embodiment, air-conditioning unit comprises compressor apparatus and air conditioning control, and this air conditioning control is arranged to second dc operation.Through this explanation and hereinafter the more details that can obtain native system are described more specifically.
In specific embodiment, this system configuration has and is couple to one or more power lines to form the power line module of power line network.In specific embodiment, this system comprises and is configured to control first power line module of communicating by letter with boiler.According to one or more embodiment, this system also has and is configured to second power line module of communicating by letter with air conditioning control.This system has and is configured to the power line network of between first power line module and second power line module, communicating by letter.In a preferred embodiment, each in the power line module all is configured in its power transformer (as shown in the figure), to form single integrated unit for efficient.Modification, modification and the alternative that certainly, can have other.
Fig. 3 and Fig. 4 are the sketches of power line interface and power supply according to an embodiment of the invention.These figure only are instances, and it should not limit the scope of claims of this paper irrelevantly.Those of ordinary skill in the art will recognize other modification, modification and alternative.
Fig. 5 to Fig. 7 is the simplified block diagram of thermostat (PCT), boiler, air conditioning and power line module/power supply at least according to an embodiment of the invention.These figure only are instances, and it should not limit the scope of claims of this paper irrelevantly.Those of ordinary skill in the art will recognize other modification, modification and alternative.
Though the complete specific embodiment of having described of preceding text, but still can use various modifications, alternative constructions and equivalent.For instance, sealed in unit can comprise any combination of said elements, and comprises the element that this specification is not described.Modification, modification and the alternative that certainly, can have other.Therefore, preceding text are described and explanation should not be regarded as limitation of the scope of the invention, and the scope of the invention is to be limited appended claims.
Claims (14)
1. one kind is used for the system that between one or more indoor units and one or more outdoor units, communicates by letter, and said system comprises:
Spatially be arranged in the boiler plant in the building structure, said boiler plant comprises boiler control and power-producing zone territory, and said boiler control is arranged at least the first dc operation;
Spatially be arranged in said building structure air outside regulon, said air-conditioning unit comprises compressor apparatus and air conditioning control, and said air conditioning control is arranged at least the second dc operation;
First power line module is configured to communicate by letter with said boiler control;
Second power line module is configured to communicate by letter with said air conditioning control; And
Power line network is configured between said first power line module and said second power line module, communicate by letter.
2. system according to claim 1, wherein said first power line module is arranged to said first dc operation.
3. system according to claim 1, wherein said second power line module is arranged to said second dc operation.
4. system according to claim 1, wherein said power line network comprises the one or more power line cables that pass said building structure.
5. system according to claim 1, wherein said boiler plant spatially is arranged in the subterranean zone of said building structure.
6. system according to claim 1, wherein said air-conditioning unit spatially partly is arranged in the said building structure.
7. system according to claim 1, wherein said first power line module comprises the power line integrated circuit that is couple to AFE(analog front end).
8. system according to claim 1, wherein said second power line module comprises the power line integrated circuit that is couple to AFE(analog front end).
9. system according to claim 1, wherein said first power line module comprise be configured to be couple to first mutually with second mutually first power line signal.
10. system according to claim 1, wherein said second power line module comprise be configured to be couple to first mutually with second mutually second power line signal.
11. system according to claim 1, wherein said first dc operation is under 24 volts, to carry out.
12. system according to claim 1, wherein said second dc operation is under 12 volts, to carry out.
13. system according to claim 1, wherein said power line network is arranged to 240 volts ac.
14. system according to claim 1, wherein said power line network is arranged to 120 volts ac.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/858,378 | 2010-08-17 | ||
US12/858,378 US20110042469A1 (en) | 2009-08-18 | 2010-08-17 | Furnace and central cooling apparatus configured with powerline communication for energy management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102377455A true CN102377455A (en) | 2012-03-14 |
Family
ID=45795943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105705975A Pending CN102377455A (en) | 2010-08-17 | 2010-11-29 | Boiler and central cooling device provided with power line communication for energy management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102377455A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103901836A (en) * | 2012-12-27 | 2014-07-02 | (株)庆东One | Wireless rooms control system based on BCM |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006065834A2 (en) * | 2004-12-14 | 2006-06-22 | Comverge, Inc | Hvac communication system |
US20070131784A1 (en) * | 2005-12-12 | 2007-06-14 | Garozzo James P | Low voltage power line communication for climate control system |
JP2007311894A (en) * | 2006-05-16 | 2007-11-29 | Sumitomo Electric Ind Ltd | Network group and network system for power line communication |
US20090261174A1 (en) * | 2007-06-22 | 2009-10-22 | Butler William P | Control system protocol for an hvac system |
CN201550111U (en) * | 2009-08-12 | 2010-08-11 | 刘骏 | Network data converting device based on power line carrier communication |
-
2010
- 2010-11-29 CN CN2010105705975A patent/CN102377455A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006065834A2 (en) * | 2004-12-14 | 2006-06-22 | Comverge, Inc | Hvac communication system |
US20070131784A1 (en) * | 2005-12-12 | 2007-06-14 | Garozzo James P | Low voltage power line communication for climate control system |
JP2007311894A (en) * | 2006-05-16 | 2007-11-29 | Sumitomo Electric Ind Ltd | Network group and network system for power line communication |
US20090261174A1 (en) * | 2007-06-22 | 2009-10-22 | Butler William P | Control system protocol for an hvac system |
CN201550111U (en) * | 2009-08-12 | 2010-08-11 | 刘骏 | Network data converting device based on power line carrier communication |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103901836A (en) * | 2012-12-27 | 2014-07-02 | (株)庆东One | Wireless rooms control system based on BCM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8290635B2 (en) | Reducing power consumption in a network by detecting electrical signatures of appliances | |
US10656663B2 (en) | Apparatuses including utility meter, power electronics, and communications circuitry, and related methods of operation | |
US8515383B2 (en) | Utility powered communications gateway | |
EP2903297A1 (en) | System for remotely monitoring household appliance | |
Diskin et al. | Conservation voltage reduction and voltage optimisation on Irish distribution networks | |
JP6243029B2 (en) | Electronic device operation control device | |
US20120215371A1 (en) | Method of controlling network system | |
KR101251794B1 (en) | Power measuring system | |
WO2014147420A2 (en) | Electrical energy storage device and system | |
KR20180103617A (en) | Smart power metering system | |
KR20120000011A (en) | Network system and energy consumption component | |
US20120204044A1 (en) | Method of controlling network system | |
US11616391B2 (en) | Energy management device and operation method therefor | |
KR101537620B1 (en) | An Electric power supply network system and a control method thereof | |
KR20130063153A (en) | Smart home distributing panel | |
CN102377455A (en) | Boiler and central cooling device provided with power line communication for energy management | |
JP2017118610A (en) | Control system, control method, and program | |
KR20170111368A (en) | Power network system | |
JP2018078713A (en) | Apparatus control device, apparatus control method, and program | |
JP6067278B2 (en) | Power management apparatus, power management system, and power management method | |
Govindarajan et al. | Energy management techniques in smart grid | |
KR101830895B1 (en) | Multi Channel Watt-Hour Meter | |
US8823213B2 (en) | Electric power selling system | |
JP2014157496A (en) | Remote meter-reading system | |
KR20120016740A (en) | Smart device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |