CN102073768A - Automatic arch dam pouring block plotting device and plotting method - Google Patents

Automatic arch dam pouring block plotting device and plotting method Download PDF

Info

Publication number
CN102073768A
CN102073768A CN 201110005919 CN201110005919A CN102073768A CN 102073768 A CN102073768 A CN 102073768A CN 201110005919 CN201110005919 CN 201110005919 CN 201110005919 A CN201110005919 A CN 201110005919A CN 102073768 A CN102073768 A CN 102073768A
Authority
CN
China
Prior art keywords
arch dam
pour
information
dimensional
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110005919
Other languages
Chinese (zh)
Inventor
王仁坤
郑声安
张燕
赵永刚
赵文光
叶发明
胡云明
黄志澎
陈万涛
张志伟
唐忠敏
尹华安
牟高翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN 201110005919 priority Critical patent/CN102073768A/en
Publication of CN102073768A publication Critical patent/CN102073768A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to the technology of modeling, and discloses an automatic arch dam pouring block plotting method, and solves the problems of heavy workload, high difficulty and prone errors caused by manual drawing in the prior art. The technical scheme comprises the main points that: the arch dam pouring block plotting method comprises the following steps of: a. constructing a basic database including arch dam modeling-related data information; b. establishing a three-dimensional model of an overall arch dam; c. inputting the information of a pouring block which needs to be plotted, and extracting the three-dimensional structural information of the pouring block from the three-dimensional model of the overall arch dam; d. outputting the acquired three-dimensional structural information of the pouring block, and generating two-dimensional drawing paper through a two-dimensional plotting module; and e. marking the generated two-dimensional drawing paper and counting basic information, and indicating on a drawing. In addition, the invention also discloses an automatic arch dam pouring block plotting device. The method and the device realize automatic arch dam pouring block plotting, speed up a design schedule, reduce design cost, reduce error rate, improve production efficiency and are suitable for planning to build an arch dam.

Description

Arch dam pour automatic map delivery device and go out drawing method
Technical field
The present invention relates to modeling technique, relate to a kind of arch dam pour automatic map delivery device specifically and go out drawing method.
Background technology
Along with the planning to build and setting up of some large-scale arch dams in recent years, the arch dam construction has obtained developing rapidly.Arch dam is because the requirement of topographic(al) feature and section stress optimal design, often make cross dimensions design more complicated, particularly dome dam, its up and down dam facing be space curved surface.Because the build complexity, design and construction need a large amount of high-precision project data and engineering drawing.And these project data and engineering drawing are to be finished by very vast and numerous calculating and drawing work, and especially being plotted in of drawing remains in the conventional art by manually finishing, and workload is big, and difficulty is high and easily make mistakes.Therefore the numerical evaluation of processing of arch dam computer graphical and arch dam pour just seems very meaningful with the research work that three-dimensional picture shows and output combines.
Summary of the invention
Technical matters to be solved by this invention is: propose a kind of arch dam pour automatic map delivery device and go out drawing method, solve and adopt artificial the drawing to cause the problem that workload is big, difficulty is high, easily make mistakes in the conventional art.
The present invention solves the problems of the technologies described above the technical scheme that is adopted: arch dam pour automatic map delivery device comprises that database module, three-dimensional data processing module, two dimension go out module, information labeling module; Described database module, three-dimensional data processing module, two dimension go out module and are connected successively with the information labeling module; Described database module is used to provide arch dam modeling related data information; The arch dam modeling related data information that described three-dimensional data processing module provides according to database module is set up the whole three-dimensional model of arch dam, and extracts pour three-dimensional structure information according to default pour position from block mold; Described two dimension goes out module the three-dimensional structure information output of the pour that extracts is generated two-dimentional drawing; Described information labeling module marks with essential information the two-dimentional drawing that generates and adds up.
Arch dam pour automatic map delivery method may further comprise the steps:
A. make up the master database that comprises arch dam modeling related data information;
B. set up the whole three-dimensional model of arch dam;
C. import the pour information that to publish picture, from the whole three-dimensional model of arch dam, extract pour three-dimensional structure information;
D. with the pour three-dimensional structure information output of obtaining, go out module by two dimension and generate two-dimentional drawing;
E. the two-dimentional drawing that generates is marked and the essential information statistics, and be illustrated on the drawing.
Among the step a, described arch dam modeling related data information comprises arch dam bodily form data, transverse joint data and grout groove data.
Among the step a, described arch dam modeling related data information adopts the storage of EXCEL table.
Among the step c, described pour three-dimensional structure information comprises pour dimensional data, upstream and downstream sealing data and grout groove data.
Among the step c, the pour information that described need are published picture comprises elevation at the bottom of pour place monolith numbering, pour crest level and the pour.
Among the step e, the content that the two-dimentional drawing that generates is marked comprises: monolith numbering, elevation and reference mark numbering.
Among the step e, the essential information statistics comprises that reference mark coordinate statistics generates with relevant form.
Among the step b, adopt CATIA software to set up the whole three-dimensional model of arch dam.
Among the step e, the content that the two-dimentional drawing that generates marks is upgraded synchronously automatically with the change of pour three-dimensional structure information.
The invention has the beneficial effects as follows: realized arch dam pour automatic map delivery, accelerated design schedule, reduced design cost, and reduced error rate, enhanced productivity.
Description of drawings
Fig. 1 is an arch dam pour automatic map delivery apparatus structure block diagram of the present invention;
Fig. 2 is an arch dam pour automatic map delivery method flow diagram of the present invention.
Embodiment
The invention will be further described below in conjunction with drawings and Examples.
The present invention is directed to and adopt artificial the drawing to cause the defective that workload is big, difficulty is high, easily make mistakes in the conventional art, propose a kind of arch dam pour automatic map delivery device and gone out drawing method, realized arch dam pour automatic map delivery, accelerate design schedule, reduce design cost, and the minimizing error rate is enhanced productivity.
As shown in Figure 1, arch dam pour automatic map delivery device comprises that database module, three-dimensional data processing module, two dimension go out module, information labeling module; Described database module, three-dimensional data processing module, two dimension go out module and are connected successively with the information labeling module.
Described database module is used to provide arch dam modeling related data information; The arch dam modeling related data information that described three-dimensional data processing module provides according to database module is set up the whole three-dimensional model of arch dam, and extracts pour three-dimensional structure information according to default pour position from block mold; Described two dimension goes out module the three-dimensional structure information output of the pour that extracts is generated two-dimentional drawing; Described information labeling module marks with essential information the two-dimentional drawing that generates and adds up.
Fig. 2 has provided the arch dam pour automatic map delivery method flow among the present invention, on concrete enforcement, may further comprise the steps: make up database 1.: promptly make up the master database that comprises arch dam modeling related data information; 2. set up arch dam model: promptly set up the whole three-dimensional model of arch dam; 3. import pour information: i.e. the pour information that input need be published picture; 4. extract pour three-dimensional structure information: promptly from the whole three-dimensional model of arch dam, extract pour three-dimensional structure information; 5. export three-dimensional structure information: the pour three-dimensional structure information output that is about to obtain; 6. generate two-dimentional drawing: promptly go out module and generate two-dimentional drawing by two dimension; 7. to two-dimentional drawings marked: promptly the two-dimentional drawing that generates is marked and the essential information statistics, and be illustrated on the drawing.
Embodiment:
1. make up a master database,, comprise arch dam bodily form data in this master database for the follow-up whole three-dimensional model of arch dam of setting up provides the data support, transverse joint data and grout groove data, statistics can be with the form storage of these data with the EXCEL table for convenience;
2. based on the data message in the step 1, set up the whole three-dimensional model (can adopt CATIA software to come modeling) of arch dam, and as required, the pour information that input need be published picture comprises pour place monolith numbering, elevation at the bottom of pour crest level and the pour;
3. the pour information according to input in the step 2 extracts pour three-dimensional structure information from the whole three-dimensional model of arch dam, comprises pour dimensional data, upstream and downstream sealing data and grout groove data;
4. with the pour three-dimensional structure information output of obtaining, go out module by two dimension and generate two-dimentional drawing, X-Y scheme lateral lattice are determined according to water power industry drafting standard;
5. the two-dimentional drawing that generates is marked with essential information and add up, and be illustrated on the drawing, wherein Biao Zhu content comprises monolith numbering, elevation and reference mark numbering, the essential information statistics comprises reference mark coordinate statistics, and the relevant form (being reference mark coordinate statistical form) of generation, the content and the reference mark coordinate statistical representation of these marks are intended on the drawing, promptly form perfect pour structural drawing.
Behind pour three-dimensional structure information-change, the content that the information labeling module marks the two-dimentional drawing that generates (monolith numbering, elevation and reference mark numbering) is also upgraded synchronously automatically.

Claims (10)

1. arch dam pour automatic map delivery device is characterized in that: comprise that database module, three-dimensional data processing module, two dimension go out module, information labeling module; Described database module, three-dimensional data processing module, two dimension go out module and are connected successively with the information labeling module; Described database module is used to provide arch dam modeling related data information; The arch dam modeling related data information that described three-dimensional data processing module provides according to database module is set up the whole three-dimensional model of arch dam, and extracts pour three-dimensional structure information according to default pour position from block mold; Described two dimension goes out module the three-dimensional structure information output of the pour that extracts is generated two-dimentional drawing; Described information labeling module marks with essential information the two-dimentional drawing that generates and adds up.
2. arch dam pour automatic map delivery method is characterized in that: may further comprise the steps:
A. make up the master database that comprises arch dam modeling related data information;
B. set up the whole three-dimensional model of arch dam;
C. import the pour information that to publish picture, from the whole three-dimensional model of arch dam, extract pour three-dimensional structure information;
D. with the pour three-dimensional structure information output of obtaining, go out module by two dimension and generate two-dimentional drawing;
E. the two-dimentional drawing that generates is marked and the essential information statistics, and be illustrated on the drawing.
3. arch dam pour automatic map delivery method as claimed in claim 2 is characterized in that: among the step a, described arch dam modeling related data information comprises arch dam bodily form data, transverse joint data and grout groove data.
4. as claim 2 or 3 described arch dam pour automatic map delivery methods, it is characterized in that: among the step a, described arch dam modeling related data information adopts the storage of EXCEL table.
5. as claim 2 or 3 described arch dam pour automatic map delivery methods, it is characterized in that: among the step c, described pour three-dimensional structure information comprises pour dimensional data, upstream and downstream sealing data and grout groove data.
6. as claim 2 or 3 described arch dam pour automatic map delivery methods, it is characterized in that: among the step c, the pour information that described need are published picture comprises elevation at the bottom of pour place monolith numbering, pour crest level and the pour.
7. as claim 2 or 3 described arch dam pour automatic map delivery methods, it is characterized in that: among the step e, the content that the two-dimentional drawing that generates is marked comprises: monolith numbering, elevation and reference mark numbering.
8. arch dam pour automatic map delivery method as claimed in claim 7 is characterized in that: among the step e, the essential information statistics comprises that reference mark coordinate statistics generates with relevant form.
9. as claim 2 or 3 described arch dam pour automatic map delivery methods, it is characterized in that: among the step b, adopt CATIA software to set up the whole three-dimensional model of arch dam.
10. as claim 2 or 3 described arch dam pour automatic map delivery methods, it is characterized in that: among the step e, the content that the two-dimentional drawing that generates marks is upgraded synchronously automatically with the change of pour three-dimensional structure information.
CN 201110005919 2011-01-13 2011-01-13 Automatic arch dam pouring block plotting device and plotting method Pending CN102073768A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110005919 CN102073768A (en) 2011-01-13 2011-01-13 Automatic arch dam pouring block plotting device and plotting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110005919 CN102073768A (en) 2011-01-13 2011-01-13 Automatic arch dam pouring block plotting device and plotting method

Publications (1)

Publication Number Publication Date
CN102073768A true CN102073768A (en) 2011-05-25

Family

ID=44032306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110005919 Pending CN102073768A (en) 2011-01-13 2011-01-13 Automatic arch dam pouring block plotting device and plotting method

Country Status (1)

Country Link
CN (1) CN102073768A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103853868A (en) * 2013-07-10 2014-06-11 成都希盟泰克科技发展有限公司 Drawing method for isoheight two-dimensional engineering drawing based on CATIA (Computer-graphics Aided Three-dimensional Interactive Application)
CN107480374A (en) * 2017-08-14 2017-12-15 中国铁道科学研究院铁道建筑研究所 A kind of bridge BIM model creation methods based on CATIA
CN110284465A (en) * 2019-06-28 2019-09-27 中国电建集团成都勘测设计研究院有限公司 Arch dam pour construction control method
CN110781535A (en) * 2018-07-27 2020-02-11 西安海平方网络科技有限公司 Model plotting method and device, computer equipment and readable storage medium
CN111899342A (en) * 2020-06-29 2020-11-06 中铁第一勘察设计院集团有限公司 Graph establishing method and device based on central database
CN113165420A (en) * 2018-11-29 2021-07-23 李成培 Shaped object in three-dimensional transparent space and manufacturing method thereof
CN116842915A (en) * 2023-07-04 2023-10-03 中国电建集团西北勘测设计研究院有限公司 CATIAV 6-based batch labeling method for hydraulic and hydroelectric engineering drawings
CN116842915B (en) * 2023-07-04 2024-05-10 中国电建集团西北勘测设计研究院有限公司 Water conservancy and hydropower engineering drawing batch labeling method based on CATIA V6

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1858803A (en) * 2006-04-04 2006-11-08 天津大学 Three dimension uniform model construction method of water conservancy hydropower engineering geological information
CN101727677A (en) * 2008-10-20 2010-06-09 车德福 Method for mutual conversion between two-dimensional view and three--dimensional view in mine model
CN101762265A (en) * 2008-10-27 2010-06-30 任凌云 Method of interconversion between two-dimensional drawing and three-dimensional model in mine model

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1858803A (en) * 2006-04-04 2006-11-08 天津大学 Three dimension uniform model construction method of water conservancy hydropower engineering geological information
CN101727677A (en) * 2008-10-20 2010-06-09 车德福 Method for mutual conversion between two-dimensional view and three--dimensional view in mine model
CN101762265A (en) * 2008-10-27 2010-06-30 任凌云 Method of interconversion between two-dimensional drawing and three-dimensional model in mine model

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103853868A (en) * 2013-07-10 2014-06-11 成都希盟泰克科技发展有限公司 Drawing method for isoheight two-dimensional engineering drawing based on CATIA (Computer-graphics Aided Three-dimensional Interactive Application)
CN103853868B (en) * 2013-07-10 2016-10-26 成都希盟泰克科技发展有限公司 Equal pitch contour two-dimensional engineering graphic based on CATIA goes out drawing method
CN107480374A (en) * 2017-08-14 2017-12-15 中国铁道科学研究院铁道建筑研究所 A kind of bridge BIM model creation methods based on CATIA
CN107480374B (en) * 2017-08-14 2020-06-02 中国铁道科学研究院铁道建筑研究所 Bridge BIM model creation method based on CATIA
CN110781535A (en) * 2018-07-27 2020-02-11 西安海平方网络科技有限公司 Model plotting method and device, computer equipment and readable storage medium
CN113165420A (en) * 2018-11-29 2021-07-23 李成培 Shaped object in three-dimensional transparent space and manufacturing method thereof
CN110284465A (en) * 2019-06-28 2019-09-27 中国电建集团成都勘测设计研究院有限公司 Arch dam pour construction control method
CN111899342A (en) * 2020-06-29 2020-11-06 中铁第一勘察设计院集团有限公司 Graph establishing method and device based on central database
CN116842915A (en) * 2023-07-04 2023-10-03 中国电建集团西北勘测设计研究院有限公司 CATIAV 6-based batch labeling method for hydraulic and hydroelectric engineering drawings
CN116842915B (en) * 2023-07-04 2024-05-10 中国电建集团西北勘测设计研究院有限公司 Water conservancy and hydropower engineering drawing batch labeling method based on CATIA V6

Similar Documents

Publication Publication Date Title
CN110580376B (en) Revit and Dynamo-based pile foundation model creation method
CN109784004B (en) BIM technology-based special-shaped metal roof installation construction method
CN102073768A (en) Automatic arch dam pouring block plotting device and plotting method
CN104252558B (en) A kind of non-standard construction fender member digital control processing preprocess method based on BIM platform
CN107194074B (en) Method for establishing parametric model of toe board of panel dam by using CATIA three-dimensional software
CN106777779B (en) Railway culvert design method based on BIM
CN106202831A (en) A kind of pipeline layout optimization method based on BIM
CN104537191A (en) Drawing method for three-dimensional rebar model schematic diagram
CN108536973A (en) The construction drawing detailing method of curved surface steel box bridge
CN104408240A (en) Data conversion and extraction method for model based definition (MBD)
CN105608274A (en) Tribon M3 ship design software based quick lofting method for molded line of anchor platform
CN110188423A (en) A kind of linear engineering structure fast B IM modeling method based on FEM meshing
CN109918760A (en) Reinforcing bar modeling method based on Revit interoperability
CN110489890A (en) Steel bifurcated structure automatic map delivery method
CN108647450A (en) A kind of pre-buried big foundation bolt construction method based on BIM technology
CN110990933A (en) Modeling method for shield tunnel
CN105956278A (en) Detailed design method of mechanical and electrical engineering pipeline system based on Autodesk Revit
CN113626911A (en) Concrete 3D printing path optimization method based on first principal stress vector distribution
CN106837375A (en) A kind of method for automatic modeling of shield tunnel concrete pipe sheet tectonic model
CN103631996A (en) Product structure and process parallel design method based on model maturity
CN110990923A (en) Rapid engineering calculation method, system and medium for hyperbolic arch dam of water conservancy and hydropower engineering
CN102147825A (en) Method for rapidly making drawing of beam structural part and optimizing drawing
CN103761769A (en) Method for engraving three-dimensional landform
CN102722621A (en) Method for visualizing computed result of finite element method
CN104281727A (en) Method for designing tire die on basis of Excel and CAD (computer aided design) platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110525