CN102056178B - Interference coordination method among cells and a basestation - Google Patents

Interference coordination method among cells and a basestation Download PDF

Info

Publication number
CN102056178B
CN102056178B CN 201110009299 CN201110009299A CN102056178B CN 102056178 B CN102056178 B CN 102056178B CN 201110009299 CN201110009299 CN 201110009299 CN 201110009299 A CN201110009299 A CN 201110009299A CN 102056178 B CN102056178 B CN 102056178B
Authority
CN
China
Prior art keywords
prb
pusch
path loss
enb
loss compensation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110009299
Other languages
Chinese (zh)
Other versions
CN102056178A (en
Inventor
岳然
白杰
张连波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Haiyun Technology Co. Ltd.
Original Assignee
New Postcom Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New Postcom Equipment Co Ltd filed Critical New Postcom Equipment Co Ltd
Priority to CN 201110009299 priority Critical patent/CN102056178B/en
Publication of CN102056178A publication Critical patent/CN102056178A/en
Application granted granted Critical
Publication of CN102056178B publication Critical patent/CN102056178B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses an interference coordination method among cells and an evolved NodeB (eNB), belonging to the technical field of mobile communication. The technical scheme of the invention is as follows: a path loss compensation scaling factor k(i) is defined; k(i) is calculated handed down to user equipment (UE) by the eNB; and when calculating the transmitted power of an uplink traffic channel, the UE scales an original path loss compensation factor alpha according to the k(i), so that the update frequency of the actual path loss compensation factor is improved, thus the UE can respond to changes of edge cases of the cell and neighboring cells in time, thereby improving the system performance.

Description

A kind of disturbance coordination method of minizone and a kind of base station
Technical field
The present invention relates to the mobile communication technology field, particularly relate to a kind of disturbance coordination method and a kind of base station of minizone.
Background technology
Long Term Evolution (LTE, Long Term Evolution) system adopts flat network configuration.Fig. 1 is the LTE network structure.As shown in Figure 1, the universal mobile telecommunications system wireless access network of evolution (E-UTRAN, Evolved Universal Terrestrial Radio AccessNetwork) is made of base station (eNB, evolved NodeB), is interconnected by X2 interface between the eNB; (Evolved Packet Corenet work EPC) comprises gateway (S-GW, Serving Gateway) and Mobility Management Entity (MME, Mobility Management Entity) to Evolved Packet Core, and is mutual by S 1 interface and eNB.Wherein each eNB comprises a plurality of residential quarters.
In the LTE system based on OFDM (OFDM, Orthogonal Frequency DivisionMultiplexing), influence the main interference of systematic function from presence of intercell interference.Therefore Inter-Cell Interference Coordination (ICIC) technology is one of effective means that improves systematic function.The ICIC technology is by managing Radio Resource, the interference level of minizone is remained under the controlled state, especially in the cell boarder area, need do some special management to Radio Resource, to satisfy the lifting demand of LTE system cell edge customer quality of service.Inter-Cell Interference Coordination is a kind of many cell radio resources management function in essence, and it need consider to use state information and business load state information from the resource of a plurality of residential quarters simultaneously.
In the design of LTE system to uplink power control, also added the consideration to ICIC.The transmitted power P of reverse link traffic channel PUSCH(i) be expressed as:
P PUSCH(i)=min{P MAX,10log 10(M PUSCH(i))+P O_PUSCH(j)+α·PL+Δ TF(i)+f(i)} (1)
The implication of formula (1) is the transmitted power P of reverse link traffic channel PUSCH(i) get P MAXAnd 10log 10(M PUSCH(i))+P O_PUSCH(j)+α PL+ Δ TF(i)+f (i) in less value.Wherein, i represents subframe, and j represents type of data packet in the residential quarter, has three types in practice; P MAXBe maximum allowable power; M PUSCH(i) be reverse link traffic channel PUSCH transfer bandwidth, be expressed as the Resource Block number; P O_PUSCH(j) comprise residential quarter certain nominal power and UE certain nominal power excursion two parts; PL is descending path loss estimated value (following walking along the street is here decreased estimated value and is used as up path loss estimation); Δ TF(i) be power offset based on modulation coding mode (MSC, Modulation andCoding Scheme) and data type, can be so that UE dynamically adjusts corresponding transmit power spectral density according to selected MC S; F (i) has represented the closed loop adjustment member of power control, and eNB orders by the TPC in the physical downlink control channel PDCCH transmitting power of UE is adjusted, and can be divided into accumulation adjustment and absolute value and adjust dual mode.α is road loss compensation factor, and α ∈ { 0,0.4,0.5,0.6,0.7,0.8,0.9,1}.
Road loss compensation factor α is by eNB semi-static configuration in system message, in general, for the bigger residential quarter of radius, cover limited, when presence of intercell interference is not principal element simultaneously, the α value is 1, carry out full remuneration, residential quarter certain power fiducial value is got littler, makes to disturb to promote (IoT, Interference over Thermal) lower, guarantee that cell edge covers.More for number of users, when presence of intercell interference becomes principal element, the α value is less than 1, carries out the part compensation, residential quarter certain power fiducial value is got greatly, makes IoT higher, raising Cell Center User speed, the total throughput in raising residential quarter.
But in existing scheme, because road loss compensation factor α is semi-static configuration, regulating cycle is longer, can not be in time the change of this residential quarter and adjacent cell edge situation be responded.For example, this residential quarter/adjacent Cell Edge User number was less originally, thought that presence of intercell interference is less, and the α value arranges bigger; When this Cell Edge User increases, α value as can not in time adjust will increase the interference of adjacent residential quarter, causes systematic function to descend, and vice versa.
Although the problems referred to above can be improved by changing UE certain nominal power excursion, need high level (E-UTRAN) to connect reconfiguration message by RRC, carry the uplink power control dedicated signaling and indicate to UE, signaling consumption is bigger.In addition, for first biography (adopt Resource Allocation Formula, do not carry out dynamic dispatching) and the non-self-adapting re-transmission thereof of up non-self-adapting re-transmission and semi-continuous scheduling, when presence of intercell interference changed, it is more serious that α can not in time adjust the problem of bringing.
In sum, owing to influence the road loss compensation factor α of transmitted power of reverse link traffic channel by being semi-static configuration, can not upgrade in time, therefore can not make response to the change of this residential quarter and adjacent cell edge situation in time, cause systematic function to descend.
Summary of the invention
The invention provides a kind of disturbance coordination method of minizone, this method makes UE to make response to the change of this residential quarter and adjacent cell edge situation in time, has improved systematic function.
The present invention also provides a kind of base station eNB, and this eNB makes UE to make response to the change of this residential quarter and adjacent cell edge situation in time, has improved systematic function.
For achieving the above object, technical scheme of the present invention is achieved in that
The invention discloses a kind of disturbance coordination method of minizone, it is characterized in that, this method comprises:
Base station eNB is calculated path loss compensation contraction factor k (i), and k (i) is sent to user equipment (UE);
UE calculates the transmitted power P of reverse link traffic channel according to following formula PUSCH(i):
P PUSCH(i)=min{P MAX, 10log 10(M PUSCH(i))+P O_PUSCH(j)+(α+k (i)) PL+ Δ TF(i)+and f (i) } wherein, i represents subframe, j represents type of data packet in the residential quarter; P MAXBe maximum allowable power; M PUSCH(i) be reverse link traffic channel PUSCH transfer bandwidth; P O_PUSCH(j) comprise residential quarter certain nominal power and UE certain nominal power excursion two parts; PL is descending path loss estimated value; Δ TF(i) be power offset based on modulation coding mode and data type; F (i) represents the closed loop adjustment member of power control; α is road loss compensation factor, and k (i) is the path loss compensation contraction factor;
UE is according to the transmitted power P of the reverse link traffic channel that calculates PUSCH(i), send uplink business data at subframe i.
The present invention also provides a kind of base station eNB, it is characterized in that, this eNB comprises: computing module and issue module, wherein:
Computing module be used for to calculate path loss compensation contraction factor k (i), and k (i) sent to issues module;
Issue module, be used for k (i) is sent to user equipment (UE);
Wherein, after UE receives k (i), calculate the transmitted power P of reverse link traffic channel according to following formula PUSCH(i), and according to the P that calculates PUSCH(i), send uplink business data at subframe i:
P PUSCH(i)=min{P MAX, 10log 10(M PUSCH(i))+P O_PUSCH(j)+(α+k (i)) PL+ Δ TF(i)+and f (i) } wherein, i represents subframe, j represents type of data packet in the residential quarter; P MAXBe maximum allowable power; M PUSCH(i) be reverse link traffic channel PUSCH transfer bandwidth; P O_PUSCH(j) comprise residential quarter certain nominal power and UE certain nominal power excursion two parts; PL is descending path loss estimated value; Δ TF(i) be power offset based on modulation coding mode and data type; F (i) represents the closed loop adjustment member of power control; α is road loss compensation factor, and k (i) is the path loss compensation contraction factor.
By as seen above-mentioned, this definition path loss of the present invention compensation contraction factor k (i), calculate k (i) and be handed down to UE by eNB, UE is when calculating the transmitted power of reverse link traffic channel, former road loss compensation factor α is carried out the technical scheme of convergent-divergent according to k (i), improve the renewal frequency of actual road loss compensation factor, made UE to make response to the change of this residential quarter and adjacent cell edge situation in time, improved systematic function.
Description of drawings
Fig. 1 is the LTE network structure;
Fig. 2 is the flow chart of the disturbance coordination method of a kind of minizone in the embodiment of the invention;
Fig. 3 is a scene example schematic in the embodiment of the invention;
Fig. 4 is the composition structural representation of a kind of eNB in the embodiment of the invention.
Embodiment
In order to make the purpose, technical solutions and advantages of the present invention clearer, describe the present invention below in conjunction with the drawings and specific embodiments.
Fig. 2 is the flow chart of the disturbance coordination method of a kind of minizone in the embodiment of the invention.As shown in Figure 2, this method comprises:
Step 201, eNB calculates path loss compensation contraction factor k (i), and k (i) is sent to UE.
Step 202, UE calculates the transmitted power P of reverse link traffic channel according to formula (2) PUSCH(i).Formula (2) is as follows:
P PUSCH(i)=min{P MAX,10log 10(M PUSCH(i))+P O_PUSCH(j)+(α+k(i))·PL+Δ TF(i)+f(i)}
(2)
Wherein, i represents subframe, and j represents type of data packet in the residential quarter; PX is maximum allowable power; M PUSCH(i) be reverse link traffic channel PUSCH transfer bandwidth; P O_PUSCH(j) comprise residential quarter certain nominal power and UE certain nominal power excursion two parts; PL is descending path loss estimated value; Δ TF(i) be power offset based on modulation coding mode and data type; F (i) represents the closed loop adjustment member of power control; α is road loss compensation factor, and k (i) is the path loss compensation contraction factor, k (i) ∈ { a 1, a 2..., a m, and preferably, α+k (i) ∈ { 0,0.4,0.5,0.6,0.7,0.8,0.9,1}.
Formula (2) is with the difference of formula (1), has increased path loss compensation contraction factor k (i).
In addition, stipulate in the prior protocols: road loss compensation factor α ∈ { 0,0.4,0.5,0.6,0.7,0.8,0.9,1}, though increased path loss compensation contraction factor k (i) among the present invention, but still make α+k (i) ∈ { 0,0.4,0.5,0.6,0.7,0.8,0.9,1}, so the solution of the present invention can get a desired effect, and can not conflict with the prior protocols regulation.
Step 203, UE is according to the transmitted power P of the reverse link traffic channel that calculates PUSCH(i), send uplink business data at subframe i.
In method shown in Figure 2, redetermination path loss compensation contraction factor k (i), calculate k (i) and be handed down to UE by eNB, UE is when calculating the transmitted power of reverse link traffic channel, according to k (i) former road loss compensation factor α is carried out convergent-divergent, this technical scheme has improved the renewal frequency of actual road loss compensation factor, makes UE to make response to the change of this residential quarter and adjacent cell edge situation in time, has improved systematic function.
About determining of path loss compensation contraction factor k (i), provided following two kinds of schemes among the present invention:
First kind of scheme
ENB obtains path loss compensation contraction factor k (i) by the measurement result I (i) that receives interference power is compared with initial interference power I0, and specifically, eNB calculates path loss compensation contraction factor k (i) according to following formula (3):
k ( i ) = a 1 , I ( i ) - I 0 &GreaterEqual; &Delta; 1 > 0 ; a 2 , &Delta; 1 > I ( i ) - I 0 &GreaterEqual; &Delta; 2 &GreaterEqual; 0 ; . . . . . . a m , 0 < I 0 - I ( i ) &le; &Delta; m ; - - - ( 3 )
Wherein, I (i) represents to distribute to the current reception interference power measured value sum of each PRB of described UE among all Physical Resource Block PRB corresponding with subframe i; I 0Expression and the subframe i of original allocation ascending resource to UE 0Among all corresponding PRB, distribute to the initial reception interference power measured value sum of each PRB of described UE; Δ 1, Δ 2..., Δ mBe m the convergent-divergent judging threshold of presetting, in actual applications, can carry out different configurations according to different demands.
Here, I 0And the statistics of I (i) is carried out with PRB.ENB judges among each PRB that distributes to described UE among the PRB corresponding with subframe i, the interference variations degree greater than the PRB number of predetermined threshold value whether above predetermined number; If then eNB calculates path loss compensation contraction factor k (i), and k (i) is sent to UE.
For example, the number of all PRB of subframe i correspondence is 50, there are 10 PRB to distribute to current UE among these 50 PRB: then for each PRB among these 10 RPB, when its interference variations degree during greater than predetermined threshold value γ, think that this PRB interference variations is big, the PRB number that interference variations is big in these 10 PRB surpasses predetermined number n PRBThe time, think the adjustment that need carry out path loss compensation contraction factor k (i).I (i) can periodically add up, and in this example, calculates the current reception interference power measured value sum of described 10 PRB, namely obtains I (i), I 0Statistical value in first cycle during for configuration road loss compensation factor α.
The front mention α+k (i) ∈ 0,0.4,0.5,0.6,0.7,0.8,0.9,1}, then:
When α=0, k (i) ∈ { 0,0.4,0.5,0.6,0.7,0.8,0.9,1};
When α=0.4, k (i) ∈ { 0.4,0,0.1,0.2,0.3,0.4,0.5,0.6};
When α=0.5, k (i) ∈ 0.5 ,-0.1,0,0.1,0.2,0.3,0.4,0.5};
When α=0.6, k (i) ∈ 0.6 ,-0.2 ,-0.1,0,0.1,0.2,0.3,0.4};
When α=0.7, k (i) ∈ { 0.7 ,-0.3 ,-0.2 ,-0.1,0,0.1,0.2,0.3, };
When α=0.8, k (i) ∈ 0.8 ,-0.4 ,-0.3 ,-0.2 ,-0.1,0,0.1,0.2};
When α=0.9, k (i) ∈ 0.9 ,-0.5 ,-0.4 ,-0.3 ,-0.2 ,-0.1,0,0.1};
When α=1, k (i) ∈ 1 ,-0.6 ,-0.5 ,-0.4 ,-0.3 ,-0.2 ,-0.1,0}.
As seen, under certain specific value condition of α, the possible value of k (i) is 8, therefore available 3 bits (bit) are represented k (i), be m=8,8 kinds of values of these three bits are successively under the corresponding current α value state, and 8 kinds of arranging by certain order (for example arranging from small to large) of k (i) may values.For example, when α=1, if k (i) is 001, then α+k (i) specifically equals 1-0.6=0.4; Again for example, when α=0.6, if k (i) is 000, then α+k (i) specifically equals 0.6-0.6=0; By that analogy.
In short, in scheme one, k (i) has reflected that this residential quarter is subjected to the variation of annoyance level.
Fig. 3 is a scene example schematic in the embodiment of the invention.In above-mentioned scheme one, though considered the co-channel interference of base station to all adjacent residential quarters, but do not consider the special circumstances of user's particular location, for example, may have situation as shown in Figure 3: UE0 is the edge customer of residential quarter 0, the strong jamming residential quarter of UE0 is residential quarter 1, but 1 pair of residential quarter 0, residential quarter does not have co-channel interference, i.e. the high-power transmission of UE0 can not produce co-channel interference to residential quarter 1; There are newly-increased co-channel interference in residential quarter 3,4,5 pairs of residential quarters 0, these interference can be measured in the base station, according to scheme one, then might be by path loss compensation contraction factor k (i) to the α processing of demoting, think that namely the transmitted power that reduce UE0 comes the balance presence of intercell interference.But in fact, because UE0 and residential quarter 3,4,5 distance are far away, UE0 is in order to keep certain signal to noise ratio target, and promotes transmitted power, and the interference that produces is less to residential quarter 3,4,5 influence.In order to address this is that, provided following scheme two among the present invention.
Second kind of scheme
The high interference that has increased user's strong jamming residential quarter in this programme changes indication, namely considers the adjacent area interference variations, and by two weighted factor λ 1And λ 2Come the interference variations of this residential quarter of balance and the influence that adjacent area interference changes.
Specifically, eNB calculates path loss compensation contraction factor k (i) according to following formula:
Figure BDA0000044085500000071
k &prime; ( i ) = a 1 , I ( i ) - I 0 &GreaterEqual; &Delta; 1 > 0 ; a 2 , &Delta; 1 > I ( i ) - I 0 &GreaterEqual; &Delta; 2 &GreaterEqual; 0 ; . . . . . . a m , 0 < I 0 - I ( i ) &le; &Delta; m ; - - - ( 5 )
p ( i ) = b 1 , HII ( i ) - HII 0 &GreaterEqual; &Delta; &prime; 1 > 0 ; b 2 , &Delta; &prime; 1 > HII ( i ) - HII 0 &GreaterEqual; &Delta; &prime; 2 &GreaterEqual; 0 ; . . . . . . b m , 0 < HII 0 - HII ( i ) &le; &Delta; &prime; m ; - - - ( 6 )
λ 12=1;
Wherein, I 0Expression and the subframe i of original allocation ascending resource to UE 0Among all corresponding PRB, distribute to the initial reception interference power measured value sum of each PRB of described UE; I (i) represents to distribute to the current reception interference power measured value sum of each PRB of described UE among all Physical Resource Block PRB corresponding with subframe i; HII 0Add up during for described UE place cell initial, from the indicated high interference PRB number sum of high interference indication HII parameter of the strong jamming residential quarter of described UE; HII (i) is the current statistics in residential quarter, described UE place, from the indicated high interference PRB number sum of high interference indication HII parameter of the strong jamming residential quarter of described UE; Δ 1, Δ 2..., Δ mBe m the convergent-divergent judging threshold of presetting, Δ ' 1, Δ ' 2..., Δ ' mBe that m the high interference of presetting changes judging threshold, in actual applications, can carry out different configurations according to different demands.
If by calculating k (i)=0, think that then current the needs carry out convergent-divergent to α.
The strong jamming residential quarter of UE can be measured by the Reference Signal Received Power RSRP of UE and obtain HII 0High interference indication when initial, during by configuration α to the acquisition of suing for peace of the indicated high interference PRB number in described strong jamming residential quarter.
As seen, in scheme two, k (i) is that local area receives interference variations weighting and adjacent area interference variations weighting sum.
In above-mentioned scheme one and scheme two, the span of k (i) can be expanded by designing different thresholdings or weighted factor and increasing shared bit number.
In an embodiment of the present invention, eNB can be by taking the LCID territory that medium access control MAC layer is reserved, and media access control layer service data unit MAC SDU, and k (i) is sent to UE.In this case, can be as shown in table 1 with the value revision of the LCID among the DL-SCH:
Figure BDA0000044085500000091
Table 1
Namely increase the indication about the zoom factor k (i) of α in the LCID territory, and in MACSDU, specifically carried k (i).
In the solution of the present invention, if eNB does not need to change UE certain nominal power excursion, then do not send the RRC signaling; Equally, the UE that does not receive the RRC signaling thinks current P O_PUSCH(j) UE certain nominal power excursion in need not to change.
As seen, technical scheme of the present invention is by increasing the zoom factor k (i) of α, improved the renewal frequency of path loss compensation, solve the problem of the α configuration that can't be in time changes according to the variation of this residential quarter or adjacent Cell Edge User, and solved the signaling consumption big problem in order to guarantee that frequent transmission RRC uplink power control dedicated signaling that the UE target signal to noise ratio causes brings.
Provide the composition structure of a kind of eNB among the present invention based on above-described embodiment.
Fig. 4 is the composition structural representation of a kind of eNB in the embodiment of the invention.As shown in Figure 4, this eNB comprises: computing module 401 and issue module 402, wherein:
Computing module 401 be used for to calculate path loss compensation contraction factor k (i), and k (i) sent to issues module 402;
Issue module 402, be used for k (i) is sent to user equipment (UE);
Wherein, after UE receives k (i), calculate the transmitted power P of reverse link traffic channel according to following formula (2) PUSCH(i), and according to the P that calculates PUSCH(i), send uplink business data at subframe i:
P PUSCH(i)=min{P MAX,10log 10(M PUSCH(i))+P O_PUSCH(j)+(α+k(i))·PL+Δ TF(i)+f(i)}
(2)
Wherein, i represents subframe, and j represents type of data packet in the residential quarter; P MAXBe maximum allowable power; M PUSCH(i) be reverse link traffic channel PUSCH transfer bandwidth; P O_PUSCH(j) comprise residential quarter certain nominal power and UE certain nominal power excursion two parts; PL is descending path loss estimated value; Δ TF(i) be power offset based on modulation coding mode and data type; F (i) represents the closed loop adjustment member of power control; α is road loss compensation factor, and k (i) is the path loss compensation contraction factor.
In eNB shown in Figure 4, described computing module 401 is used for calculating path loss compensation contraction factor k (i) according to following formula (3):
k ( i ) = a 1 , I ( i ) - I 0 &GreaterEqual; &Delta; 1 > 0 ; a 2 , &Delta; 1 > I ( i ) - I 0 &GreaterEqual; &Delta; 2 &GreaterEqual; 0 ; . . . . . . a m , 0 < I 0 - I ( i ) &le; &Delta; m ; - - - ( 3 )
Wherein, I (i) represents to distribute to the current reception interference power measured value sum of each PRB of described UE among all Physical Resource Block PRB corresponding with subframe i; I 0Expression and the subframe i of original allocation ascending resource to UE 0Among all corresponding PRB, distribute to the initial reception interference power measured value sum of each PRB of described UE; Δ 1, Δ 2..., Δ mIt is the convergent-divergent judging threshold of presetting.
In eNB shown in Figure 4, described computing module 401 is used for calculating path loss compensation contraction factor k (i) according to following formula (4), (5), (6):
Figure BDA0000044085500000102
k &prime; ( i ) = a 1 , I ( i ) - I 0 &GreaterEqual; &Delta; 1 > 0 ; a 2 , &Delta; 1 > I ( i ) - I 0 &GreaterEqual; &Delta; 2 &GreaterEqual; 0 ; . . . . . . a m , 0 < I 0 - I ( i ) &le; &Delta; m ; - - - ( 5 )
p ( i ) = b 1 , HII ( i ) - HII 0 &GreaterEqual; &Delta; &prime; 1 > 0 ; b 2 , &Delta; &prime; 1 > HII ( i ) - HII 0 &GreaterEqual; &Delta; &prime; 2 &GreaterEqual; 0 ; . . . . . . b m , 0 < HII 0 - HII ( i ) &le; &Delta; &prime; m ; - - - ( 6 )
λ 12=1;
Wherein, I 0Expression and the subframe i of original allocation ascending resource to UE 0Among all corresponding PRB, distribute to the initial reception interference power measured value sum of each PRB of described UE; I (i) represents to distribute to the current reception interference power measured value sum of each PRB of described UE among all Physical Resource Block PRB corresponding with subframe i; HII 0Add up during for described UE place cell initial, from the indicated high interference PRB number sum of high interference indication HII parameter of the strong jamming residential quarter of described UE; HII (i) is the current statistics in residential quarter, described UE place, from the indicated high interference PRB number sum of high interference indication HII parameter of the strong jamming residential quarter of described UE; Δ 1, Δ 2..., Δ mBe m the convergent-divergent judging threshold of presetting, Δ ' 1, Δ ' 2..., Δ ' mBe that m the high interference of presetting changes judging threshold.
As shown in Figure 4, this eNB further comprises: judge module 403 is used for judging among each PRB that distributes to described UE of the PRB corresponding with subframe i whether the interference variations degree surpasses predetermined number greater than the PRB number of predetermined threshold value, if then send calculation command to computing module 401;
Described computing module 401 is used for calculating path loss compensation contraction factor k (i) after the calculation command that receives the judge module transmission.
In eNB shown in Figure 4, the described module 402 that issues is used for by taking the LCID territory that medium access control MAC layer is reserved, and media access control layer service data unit MAC SDU, and k (i) is sent to UE.
In sum, this definition path loss of the present invention compensation contraction factor k (i), calculate k (i) and be handed down to UE by eNB, UE is when calculating the transmitted power of reverse link traffic channel, former road loss compensation factor α is carried out the technical scheme of convergent-divergent according to k (i), improve the renewal frequency of actual road loss compensation factor, made UE to make response to the change of this residential quarter and adjacent cell edge situation in time, improved systematic function.
The above only is preferred embodiment of the present invention, and is in order to limit the present invention, within the spirit and principles in the present invention not all, any modification of making, is equal to replacement, improvement etc., all should be included within the scope of protection of the invention.

Claims (6)

1. the disturbance coordination method of a minizone is characterized in that, this method comprises:
Base station eNB is calculated path loss compensation contraction factor k (i), and k (i) is sent to user equipment (UE);
UE calculates the transmitted power P of reverse link traffic channel according to following formula PUSCH(i): P PUSCH(i)=min{P MAX, 10log 10(M PUSCH(i))+P O_PUSCH(j)+(α+k (i)) PL+ Δ TF(i)+and f (i) } wherein, i represents subframe, j represents type of data packet in the residential quarter; P MAXBe maximum allowable power; M PUSCH(i) be reverse link traffic channel PUSCH transfer bandwidth; P O_PUSCH(j) comprise residential quarter certain nominal power and UE certain nominal power excursion two parts; PL is descending path loss estimated value; Δ TF(i) be power offset based on modulation coding mode and data type; F (i) represents the closed loop adjustment member of power control; α is road loss compensation factor, and k (i) is the path loss compensation contraction factor;
UE is according to the transmitted power P of the reverse link traffic channel that calculates PUSCH(i), send uplink business data at subframe i;
Wherein, described eNB calculates path loss compensation contraction factor k (i) according to following formula:
Figure FDA00002712333400011
Wherein, I (i) represents to distribute to the current reception interference power measured value sum of each PRB of described UE among all Physical Resource Block PRB corresponding with subframe i; I 0Expression and the subframe i of original allocation ascending resource to UE 0Among all corresponding PRB, distribute to the initial reception interference power measured value sum of each PRB of described UE; Δ 1, Δ 2..., Δ mIt is the convergent-divergent judging threshold of presetting;
Perhaps, described eNB calculates path loss compensation contraction factor k (i) according to following formula:
Figure FDA00002712333400021
Figure FDA00002712333400022
λ 12=1;
Wherein, I 0Expression and the subframe i of original allocation ascending resource to UE 0Among all corresponding PRB, distribute to the initial reception interference power measured value sum of each PRB of described UE; I (i) represents to distribute to the current reception interference power measured value sum of each PRB of described UE among all Physical Resource Block PRB corresponding with subframe i; HII 0Add up during for described UE place cell initial, from the indicated high interference PRB number sum of high interference indication HII parameter of the strong jamming residential quarter of described UE; HII (i) is the current statistics in residential quarter, described UE place, from the indicated high interference PRB number sum of high interference indication HII parameter of the strong jamming residential quarter of described UE; Δ 1, Δ 2..., Δ mBe m the convergent-divergent judging threshold of presetting, Δ ' 1, Δ ' 2... .., Δ ' mBe that m the high interference of presetting changes judging threshold.
2. method according to claim 1 is characterized in that, calculates path loss compensation contraction factor k (i) at described eNB, and k (i) is sent to before the UE, and this method further comprises:
ENB judges among each PRB that distributes to described UE among the PRB corresponding with subframe i, the interference variations degree greater than the PRB number of predetermined threshold value whether above predetermined number;
If then carry out described eNB and calculate path loss compensation contraction factor k (i), and k (i) is sent to the step of UE.
3. method according to claim 1 and 2 is characterized in that, eNB sends to UE with k (i) and comprises:
ENB is by taking the LCID territory that medium access control MAC layer is reserved, and media access control layer service data unit MAC SDU, and k (i) is sent to UE.
4. a base station eNB is characterized in that, this eNB comprises: computing module and issue module, wherein:
Computing module be used for to calculate path loss compensation contraction factor k (i), and k (i) sent to issues module;
Issue module, be used for k (i) is sent to user equipment (UE);
Wherein, after UE receives k (i), calculate the transmitted power P of reverse link traffic channel according to following formula PUSCH(i), and according to the P that calculates PUSCH(i), send uplink business data at subframe i:
P PUSCH(i)=min{P MAX, 10log 10(M PUSCH(i))+P O_PUSCH(j)+(α+k (i)) PL+ Δ TF(i)+and f (i) } wherein, i represents subframe, j represents type of data packet in the residential quarter; P MAXBe maximum allowable power; M PUSCH(i) be reverse link traffic channel PUS CH transfer bandwidth; P O_PUSCH(j) comprise residential quarter certain nominal power and UE certain nominal power excursion two parts; PL is descending path loss estimated value; Δ TF(i) be power offset based on modulation coding mode and data type; F (i) represents the closed loop adjustment member of power control; α is road loss compensation factor, and k (i) is the path loss compensation contraction factor;
Described computing module is used for calculating path loss compensation contraction factor k (i) according to following formula:
Figure FDA00002712333400031
Wherein, I (i) represents to distribute to the current reception interference power measured value sum of each PRB of described UE among all Physical Resource Block PRB corresponding with subframe i; I 0Expression and the subframe i of original allocation ascending resource to UE 0Among all corresponding PRB, distribute to the initial reception interference power measured value sum of each PRB of described UE; Δ 1, Δ 2..., Δ mIt is the convergent-divergent judging threshold of presetting
Perhaps, described computing module is used for calculating path loss compensation contraction factor k (i) according to following formula:
Figure FDA00002712333400041
Figure FDA00002712333400042
Figure FDA00002712333400043
λ 12=1;
Wherein, I 0Expression and the subframe i of original allocation ascending resource to UE 0Among all corresponding PRB, distribute to the initial reception interference power measured value sum of each PRB of described UE; I (i) represents to distribute to the current reception interference power measured value sum of each PRB of described UE among all Physical Resource Block PRB corresponding with subframe i; HII 0Add up during for described UE place cell initial, from the indicated high interference PRB number sum of high interference indication HII parameter of the strong jamming residential quarter of described UE; HII (i) is the current statistics in residential quarter, described UE place, from the indicated high interference PRB number sum of high interference indication HII parameter of the strong jamming residential quarter of described UE; Δ 1, Δ 2..., Δ mBe m the convergent-divergent judging threshold of presetting, Δ ' 1, Δ ' 2..., Δ ' mBe that m the high interference of presetting changes judging threshold.
5. eNB according to claim 4, it is characterized in that, this eNB further comprises: judge module, be used for judging among each PRB that distributes to described UE of the PRB corresponding with subframe i, whether the interference variations degree surpasses predetermined number greater than the PRB number of predetermined threshold value, if then send calculation command to computing module;
Described computing module is used for calculating path loss compensation contraction factor k (i) after the calculation command that receives the judge module transmission.
6. according to claim 4 or 5 described eNB, it is characterized in that,
The described module that issues is used for by taking the LCID territory that medium access control MAC layer is reserved, and media access control layer service data unit MAC SDU, and k (i) is sent to UE.
CN 201110009299 2011-01-17 2011-01-17 Interference coordination method among cells and a basestation Active CN102056178B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110009299 CN102056178B (en) 2011-01-17 2011-01-17 Interference coordination method among cells and a basestation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110009299 CN102056178B (en) 2011-01-17 2011-01-17 Interference coordination method among cells and a basestation

Publications (2)

Publication Number Publication Date
CN102056178A CN102056178A (en) 2011-05-11
CN102056178B true CN102056178B (en) 2013-08-21

Family

ID=43959989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110009299 Active CN102056178B (en) 2011-01-17 2011-01-17 Interference coordination method among cells and a basestation

Country Status (1)

Country Link
CN (1) CN102056178B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102811478B (en) 2011-05-31 2016-03-30 华为技术有限公司 A kind of path loss compensation method and base station and subscriber equipment
CN102244923B (en) * 2011-07-25 2018-04-27 中兴通讯股份有限公司 A kind of Poewr control method of uplink signal, network side equipment and user equipment
EP2744277A4 (en) * 2011-08-12 2014-12-24 Fujitsu Ltd Uplink power control method and device
CN103298091B (en) * 2012-03-01 2018-08-24 中兴通讯股份有限公司 Uplink transmission power determines method and device
CN103596257B (en) * 2012-08-14 2018-04-27 电信科学技术研究院 A kind of method, system and device of uplink power control
CN103118424B (en) * 2013-01-24 2015-07-01 富春通信股份有限公司 Long term evolution (LTE) uplink power control method and control system based on interference consciousness
WO2014153745A1 (en) * 2013-03-27 2014-10-02 富士通株式会社 Transmit power determining method and apparatus and communications system
CN104080157B (en) * 2013-03-29 2017-09-22 普天信息技术研究院有限公司 The ascending power control method of colony terminal
RU2622039C1 (en) * 2013-07-29 2017-06-09 Фудзицу Лимитед Power control method, the ue and communication system
CN104661296B (en) * 2013-11-25 2019-06-11 株式会社Ntt都科摩 The device and method for determining the transmission power of user equipment
WO2016090548A1 (en) * 2014-12-09 2016-06-16 华为技术有限公司 Method for determining calibration weight coefficient and base station
CN106162851B (en) * 2015-03-27 2019-07-26 上海朗帛通信技术有限公司 A kind of communication means and device of multi-user's superposition
CN107567104B (en) * 2016-06-30 2022-11-04 中兴通讯股份有限公司 Semi-static scheduling method and base station
KR102244945B1 (en) * 2017-04-12 2021-04-28 광동 오포 모바일 텔레커뮤니케이션즈 코포레이션 리미티드 Uplink power control method, device and system
WO2019019186A1 (en) * 2017-07-28 2019-01-31 华为技术有限公司 Method and device for uplink power control
CN109873687B (en) * 2019-03-29 2022-01-11 深圳职业技术学院 Information processing method and system based on signal-to-noise ratio in Internet of things and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101272173A (en) * 2008-05-09 2008-09-24 中兴通讯股份有限公司 Road loss compensation factor setting method
CN101741437A (en) * 2008-11-19 2010-06-16 中国移动通信集团公司 Uplink power control method, system and equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7917164B2 (en) * 2007-01-09 2011-03-29 Alcatel-Lucent Usa Inc. Reverse link power control

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101272173A (en) * 2008-05-09 2008-09-24 中兴通讯股份有限公司 Road loss compensation factor setting method
CN101741437A (en) * 2008-11-19 2010-06-16 中国移动通信集团公司 Uplink power control method, system and equipment

Also Published As

Publication number Publication date
CN102056178A (en) 2011-05-11

Similar Documents

Publication Publication Date Title
CN102056178B (en) Interference coordination method among cells and a basestation
CN109861802B (en) System and method for adaptive transmission in wireless networks
CN103037488B (en) A kind of LTE ascending power control method and relevant device
US8126403B2 (en) Estimating and limiting inter-cell interference
US7647025B2 (en) Method for adaptively controlling and coordinating other cell interference
US8472886B2 (en) Mobile and base station transceiver apparatus for communicating
CN105453666A (en) Mobile terminal, first wireless network access point and methods performed therein
CN102905356B (en) Heterogeneous mobile communication network power control method
JPWO2011136083A1 (en) Wireless communication system, wireless base station, and communication control method
US20160066315A1 (en) Method and apparatus for management of protected resource in a heterogeneous network
WO2012081513A1 (en) Wireless communication system, base station, and control method thereof
EP2566079B1 (en) Method for coordinating at least one first transmission from a single-point transmitter to a single-point receiver and at least one second transmission from a multipoint transmitter or to a multipoint receiver in a radio communication system, and mobile station thereof
CN104333909B (en) Base stations in heterogeneous network selects and the dynamic time-domain resource distribution method based on load
EP2945444B1 (en) Wireless communication method and wireless communication device
KR20110085521A (en) Apparatus and method for controlling transmission power in wireless communication system
CN102065501A (en) Method and equipment for switching cells
CN104039000A (en) Power adjusting methods and base station
US20120094650A1 (en) Method of communication
AU2012370634B2 (en) Communication control device, communication control method, and communication control system
KR102027413B1 (en) Method and apparatus for resource allocation
EP2760237A1 (en) Network Node and Method to adjust user association in HetNets
JP2009284327A (en) Radio transceiver device
Lee et al. Dual layer small cell On/Off control for ultra-dense small cell networks
Zhao et al. Uplink power control for dual connectivity
CN102761949B (en) Power adjusting method and device, central node controller and access network node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170831

Address after: 100070, No. 188, building 25, No. eighteen, South Fourth Ring Road, Fengtai District, Beijing, 1, 101

Patentee after: Beijing Haiyun Technology Co. Ltd.

Address before: 510663, No. 3, color road, Science City, Guangzhou Development Zone, Guangdong

Patentee before: New Post Communication Equipment Co., Ltd.