CN102039918A - Railway early warning system and early warning method based on mobile communication - Google Patents

Railway early warning system and early warning method based on mobile communication Download PDF

Info

Publication number
CN102039918A
CN102039918A CN2009100242438A CN200910024243A CN102039918A CN 102039918 A CN102039918 A CN 102039918A CN 2009100242438 A CN2009100242438 A CN 2009100242438A CN 200910024243 A CN200910024243 A CN 200910024243A CN 102039918 A CN102039918 A CN 102039918A
Authority
CN
China
Prior art keywords
unit
main equipment
information
point
central processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN2009100242438A
Other languages
Chinese (zh)
Inventor
苏文科
王西君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI'AN XISHENG ELECTRONIC TECHNOLOGY Co Ltd
Original Assignee
XI'AN XISHENG ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XI'AN XISHENG ELECTRONIC TECHNOLOGY Co Ltd filed Critical XI'AN XISHENG ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN2009100242438A priority Critical patent/CN102039918A/en
Publication of CN102039918A publication Critical patent/CN102039918A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

The invention relates to a railway early warning system and an early warning method based on mobile communication. The railway early warning system comprises at least one main device and at least one slave device, wherein the main device is mounted on a locomotive head; the slave device is a portable mobile device; the main device comprises a power supply, a central processing unit, a keyboard, a display unit, an alarming unit and a point-to-point wireless communication unit, wherein the keyboard, the display unit, the alarming unit and the point-to-point wireless communication unit are respectively connected with the central processing unit; the slave device comprises a rechargeable battery, a central processing unit, a keyboard, a microphone, a display unit, a alarming unit and a point-to-point wireless communication unit, wherein the keyboard, the microphone, the display unit, the alarming unit and the point-to-point wireless communication unit are respectively connected with the central processing unit; and the point-to-point wireless communication unit of the main device and the point-to-point wireless communication unit of the slave device form a point-to-point wireless communication system. The invention solves the technical problem that the traditional railway early warning system only can be used for static fixed occasions. The invention can effectively prevent the occurrences of events, achieve random, automatic and fast early warning, and immediately stop or minimize the possible accidents.

Description

Railway forewarn system and method for early warning based on mobile communication
Technical field
The present invention relates to a kind of railway forewarn system and method for early warning based on mobile communication.
Background technology
Along with the China Railway develop rapidly, at present to generally raising speed more than 100 kilometer, the express locomotive F-Zero has reached more than 350 kilometer to locomotive running speed from more than 60 kilometer of original speed per hour.Yet great railway security accident but happens occasionally, existing railway security forewarn system all relatively concentrates on station or other fixed-sites, does not also have a kind of dynamic safe operation early warning linked system applicable to operating personnels such as tracking worker, railway public affairs system site operation team or other task groups.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of safe railway operation method for early warning and system, and it has solved the technical matters that existing railway forewarn system only can be used for static fixed-site.
Technical solution of the present invention is:
Railway forewarn system based on mobile communication, its difference is: it comprises at least one main equipment and at least one slave unit, wherein main equipment is installed on the locomotive head, slave unit is a portable mobile device, and described main equipment comprises power supply, central processing unit and the keyboard that is connected with central processing unit respectively, display unit, alarm unit and point to point wireless communication unit; Slave unit comprises rechargeable battery, central processing unit and the keyboard that is connected with central processing unit respectively, microphone, display unit, alarm unit and point to point wireless communication unit
The point to point wireless communication unit of main equipment and the point to point wireless communication unit of slave unit constitute point-to-point wireless telecommunication system.
Above-mentioned main equipment comprises the mobile communication unit that is connected with central processing unit; Described slave unit comprises the mobile communication unit that is connected with central processing unit.
Above-mentioned mobile communication unit is the GSM communication unit.
Above-mentioned main equipment comprises the GPS receiving element that is connected with central processing unit; Described slave unit comprises the GPS receiving element that is connected with central processing unit.
The central processing unit of above-mentioned main equipment links to each other with the locomotive brake control system, can implement forced brake to locomotive.
The central processing unit of above-mentioned slave unit links to each other with the ground linked system, can implement forced brake to locomotive.
Above-mentioned main equipment is built-in with the memory cell of MINI-SD card; Described slave unit is built-in with the memory cell of MINI-SD card.
The radio communication unit of above-mentioned main equipment and the radio communication unit of slave unit constitute the point-to-point wireless telecommunication system of 2.4G; Described central processing unit is the central processing unit based on ARM7; Described mobile communication unit is the GSM communication unit; Described alarm unit is loudspeaker.
A kind of safe railway operation method for early warning that is applied to the described railway forewarn system based on mobile communication of claim 1 is characterized in that, may further comprise the steps:
1] at each locomotive head a main equipment is installed, railway disposes at least one slave unit along the line;
2] master and slave equipment enters running state, and slave unit is selected suitable mode of operation;
3] slave unit sent and the corresponding early warning information of work at present pattern every the set time;
4] receive early warning information from slave unit after main equipment enters the signal coverage areas of slave unit, the central processing unit of main equipment is reported to the police according to the content of early warning information and is handled and send corresponding feedback information to slave unit;
5] slave unit is received the processing of reporting to the police behind the feedback information.
The mode of operation of above-mentioned slave unit comprises that track walker's pattern, deceleration blast mode, car-parking model or deceleration immediately pass through pattern;
Information is passed through in the corresponding track walker's of the comprising information of the early warning information of above-mentioned slave unit, the information of blowing a whistle of slowing down, parking information or deceleration immediately;
The warning that above-mentioned main equipment receives after the early warning information is handled as follows:
After receiving track walker's information, main equipment shows " blowing a whistle " information, and startup is blown a whistle;
When receiving the information of blowing a whistle of slowing down, main equipment shows " blowing a whistle, decelerate to XX kilometer/hour " information, and startup is blown a whistle;
When receiving parking information immediately, the main equipment control unit directly sends brake information to the locomotive brake control system;
Slow down by information when receiving, main equipment shows " decelerating to XX kilometer/hour " information.
Technique effect of the present invention is:
1, the present invention can effectively prevent the generation of incident, accomplish at any time, automatically, fast early warning, make the accident that may occur obtain at once preventing or reducing to minimum.
2, the present invention adopts wireless communication technology, and the antijamming capability of data, cryptographic capabilities, communication capacity are very strong.
3, the present invention has that cost is low, volume is little, reliability is high.
Description of drawings
Fig. 1 is a main equipment functional block diagram of the present invention;
Fig. 2 is a slave unit functional block diagram of the present invention.
The specific embodiment
System of the present invention comprises main equipment and slave unit.Main equipment is installed in the locomotive head, can see read-out clearly with the engineer and be advisable; Slave unit is carried (size, weight are equal to present general mobile phone) by the Ground Operation personnel.The Ground Operation personnel can be tracking worker, railway public affairs system site operation team or other task groups etc.After system puts into operation, master-slave equipment will be made corresponding processing according to different warnings (simultaneously with information), avoid the generation of disaster accident to the full extent.If enable the ground linked system, the locomotive that the ground linked system fully can emergency braking be sailed into is really accomplished early warning, control, and is perfectly safe.Present device adopts wireless network to communicate, and the wireless distances between main equipment and slave unit surpasses 300 meters, lays suitable words and can satisfy the distance (about 1000 meters) that locomotive stops.Display unit is 2.4 inches color LCD read-outs, and alarm unit is the alarming horn of 2W.
The staff installs slave unit (preferably at a distance of more than at least 2 kilometers) respectively the slave unit corresponding work mode is set at the two in early warning interval (being the set-point), open slave unit, makes its early warning in 24 hours.Slow down, blow a whistle or stop according to the order that receives slave unit after when locomotive arrives apart from more than 300 meter of set-point, receiving the signal that slave unit sends.If there is the workmen in the early warning interval, they hear warning, can withdraw the scene behind the sound of blowing a whistle, and wait locomotive to construct through early warning interval later again, advance just locomotive has been crossed can raise speed behind the early warning interval.Whole process is automatic, safety, and is very easy to use.Floor mounted is succinct, and equipment is gently little, and is easy to carry, and without manual intervention, all automatic early-warnings stop automatically behind the opening of device.
Slave unit (roadside equipment) working process is as follows:
At first, there is the device start switch slave unit inside, and only slave unit is just in running order when opening, and is in dormant state when not opening.
Secondly, slave unit has five kinds of mode of operations, specifically sets according to the field condition during the early warning:
1, tracking worker pattern: only blow a whistle;
2, deceleration blast mode: except that blowing a whistle, contain the value of geard-down speed: " decelerating to XX kilometer/hour ";
3, car-parking model immediately: contain distance value: " apart from 1000 meters of accident points " apart from accident point;
4, pattern is passed through in deceleration: the value that contains geard-down speed: " decelerating to XX kilometer/hour ";
5, Actuator Test Modes: only use during factory inspection.
At last, after mode of operation is selected, in case after entering mode of operation, slave unit just sends early warning information one time every 550mS, till closing or cutting off the power supply.
Main equipment (locomotive equipment) work is as follows:
At first, there is the device start switch main equipment inside, and only main equipment is just in running order when opening, and is in dormant state when not opening.
Secondly, enter mode of operation after, equipment enters the automatic reception state, is used to receive satisfactory 4 kinds of early warning information that slave unit sends, and makes corresponding warning according to early warning information and handle; If when respectively being provided with slave unit, need discern, in order to avoid wrong report by software at the two ends in early warning interval.Equally, because slave unit is in the transmission early warning information of not stopping, main equipment is only handled once after receiving early warning information.
Main equipment is specifically handled as follows according to the early warning of early warning information:
1, the early warning information of receiving is to find the tracking worker: show and blow a whistle, warn; This information of loopback simultaneously;
2, early warning information is a construction section: show and blow a whistle, decelerate to XX kilometer/hour, the information warning of loopback simultaneously;
3, a dangerous tip: show the place ahead danger, please stop immediately! The general distance of fault is 1000 meters.
4, deceleration area: show that the place ahead road conditions are bad, decelerate to XX kilometer/hour.

Claims (10)

1. railway forewarn system based on mobile communication, it is characterized in that: it comprises at least one main equipment and at least one slave unit, wherein main equipment is installed on the locomotive head, slave unit is a portable mobile device, and described main equipment comprises power supply, central processing unit and the keyboard that is connected with central processing unit respectively, display unit, alarm unit and point to point wireless communication unit;
Described slave unit comprises rechargeable battery, central processing unit and the keyboard that is connected with central processing unit respectively, microphone, display unit, alarm unit and point to point wireless communication unit;
The point to point wireless communication unit of described main equipment and the point to point wireless communication unit of slave unit constitute point-to-point wireless telecommunication system.
2. the railway forewarn system based on mobile communication according to claim 1 is characterized in that: described main equipment comprises the mobile communication unit that is connected with central processing unit; Described slave unit comprises the mobile communication unit that is connected with central processing unit.
3. the railway forewarn system based on mobile communication according to claim 2 is characterized in that: described mobile communication unit is the GSM communication unit.
4. according to claim 1 or 2 or 3 described railway forewarn systems based on mobile communication, it is characterized in that: described main equipment comprises the GPS receiving element that is connected with central processing unit; Described slave unit comprises the GPS receiving element that is connected with central processing unit.
5. the railway forewarn system based on mobile communication according to claim 4 is characterized in that: the central processing unit of described main equipment links to each other with the locomotive brake control system, can implement forced brake to locomotive.
6. the railway forewarn system based on mobile communication according to claim 5 is characterized in that: the central processing unit of described slave unit links to each other with the ground linked system, can implement forced brake to locomotive.
7. the railway forewarn system based on mobile communication according to claim 6, it is characterized in that: described main equipment is built-in with the memory cell of MINI-SD card; Described slave unit is built-in with the memory cell of MINI-SD card.
8. the railway forewarn system based on mobile communication according to claim 4 is characterized in that: the radio communication unit of described main equipment and the radio communication unit of slave unit constitute the point-to-point wireless telecommunication system of 2.4G; Described central processing unit is the central processing unit based on ARM7; Described mobile communication unit is the GSM communication unit; Described alarm unit is loudspeaker.
9. a safe railway operation method for early warning that is applied to the described railway forewarn system based on mobile communication of claim 1 is characterized in that, may further comprise the steps:
1] at each locomotive head a main equipment is installed, railway disposes at least one slave unit along the line;
2] master and slave equipment enters running state, and slave unit is selected suitable mode of operation;
3] slave unit sent and the corresponding early warning information of work at present pattern every the set time;
4] receive early warning information from slave unit after main equipment enters the signal coverage areas of slave unit, the central processing unit of main equipment is reported to the police according to the content of early warning information and is handled and send corresponding feedback information to slave unit;
5] slave unit is received the processing of reporting to the police behind the feedback information.
10. the railway method for early warning based on mobile communication according to claim 9 is characterized in that:
The mode of operation of described slave unit comprises that track walker's pattern, deceleration blast mode, car-parking model or deceleration immediately pass through pattern;
Information is passed through in the corresponding track walker's of the comprising information of the early warning information of described slave unit, the information of blowing a whistle of slowing down, parking information or deceleration immediately;
The warning that described main equipment receives after the early warning information is handled as follows:
After receiving track walker's information, main equipment shows " blowing a whistle " information, and startup is blown a whistle;
When receiving the information of blowing a whistle of slowing down, main equipment shows " blowing a whistle, decelerate to XX kilometer/hour " information, and startup is blown a whistle;
When receiving parking information immediately, the main equipment control unit directly sends brake information to the locomotive brake control system;
Slow down by information when receiving, main equipment shows " decelerating to XX kilometer/hour " information.
CN2009100242438A 2009-10-12 2009-10-12 Railway early warning system and early warning method based on mobile communication Withdrawn CN102039918A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100242438A CN102039918A (en) 2009-10-12 2009-10-12 Railway early warning system and early warning method based on mobile communication

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100242438A CN102039918A (en) 2009-10-12 2009-10-12 Railway early warning system and early warning method based on mobile communication

Publications (1)

Publication Number Publication Date
CN102039918A true CN102039918A (en) 2011-05-04

Family

ID=43906553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100242438A Withdrawn CN102039918A (en) 2009-10-12 2009-10-12 Railway early warning system and early warning method based on mobile communication

Country Status (1)

Country Link
CN (1) CN102039918A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104002835A (en) * 2014-06-05 2014-08-27 天津亨通利铁道工程机械配件有限公司 System and method for controlling driving safety of working condition locomotive
CN109080663A (en) * 2017-06-14 2018-12-25 中铁电气化局集团有限公司 Rail traffic control device and rail traffic guide system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104002835A (en) * 2014-06-05 2014-08-27 天津亨通利铁道工程机械配件有限公司 System and method for controlling driving safety of working condition locomotive
CN109080663A (en) * 2017-06-14 2018-12-25 中铁电气化局集团有限公司 Rail traffic control device and rail traffic guide system

Similar Documents

Publication Publication Date Title
CN101554878A (en) System for realizing remote monitoring of integrity of train and method
CN206984023U (en) Railway operation personnel safety guard's system
CN203025907U (en) Smart phone based vehicle collision or drop alarm system
CN105015563B (en) The reminding method and terminal of high speed railway vehicle mounted seismic emergency handling device information
CN103754241A (en) Earthquake emergency processing method and system for high speed railway
CN205177077U (en) Crane operation real -time monitoring system
CN106891916A (en) A kind of high speed railway vehicle mounted seismic emergency handling device detection system
CN101711035B (en) Mobile monitoring system
CN101022985A (en) A device for automatically detecting separation of a train formation
CN110351652A (en) A kind of small distribution room environmental state monitoring system
CN102039918A (en) Railway early warning system and early warning method based on mobile communication
CN201501411U (en) Locomotive shunting signal anti-overrunning system
CN110920679A (en) Railway protection construction equipment early warning alarm and recording method based on LTE-R
CN201525389U (en) Railway early-warning system based on mobile communication
CN103366509B (en) Highway traffic accident intelligent alarm system and method
CN217157436U (en) Construction area safety operation monitoring system
CN216450181U (en) Active prevention and control system for road-involved construction
CN109660974A (en) Intelligent escape evacuating system for power station
CN205280218U (en) Lamp house for subway tunnel with alarming function
CN210572573U (en) Electric power transmission environmental safety monitoring system
CN204010261U (en) Transformer station's No parking in front of this gate sound-light reminding device
CN203612015U (en) Railway level-crossing vehicle detection system based on electromagnetic transducer
CN102107670A (en) Trackside wireless alarm system
CN201703392U (en) Electronic speed limiting signal sign applicable to passenger special line
CN101533552A (en) Wireless anti-theft cable alarm

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C04 Withdrawal of patent application after publication (patent law 2001)
WW01 Invention patent application withdrawn after publication

Open date: 20110504