CN101969231B - Method for data synchronization after distributed application recovering parallelism of automatic power dispatching system - Google Patents

Method for data synchronization after distributed application recovering parallelism of automatic power dispatching system Download PDF

Info

Publication number
CN101969231B
CN101969231B CN 201010524910 CN201010524910A CN101969231B CN 101969231 B CN101969231 B CN 101969231B CN 201010524910 CN201010524910 CN 201010524910 CN 201010524910 A CN201010524910 A CN 201010524910A CN 101969231 B CN101969231 B CN 101969231B
Authority
CN
China
Prior art keywords
data
synchronization
module
information
operation information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010524910
Other languages
Chinese (zh)
Other versions
CN101969231A (en
Inventor
孙世明
张龙
孙大雁
彭晖
庄卫金
陈宁
季惠英
杨志宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Original Assignee
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jiangsu Electric Power Co Ltd, Nari Technology Co Ltd filed Critical State Grid Jiangsu Electric Power Co Ltd
Priority to CN 201010524910 priority Critical patent/CN101969231B/en
Publication of CN101969231A publication Critical patent/CN101969231A/en
Application granted granted Critical
Publication of CN101969231B publication Critical patent/CN101969231B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method for data synchronization after distributed application recovery parallelism of an automatic power dispatching system. The method is characterized by comprising the following steps of: 1) circularly detecting whether the local area system application is recovered to a parallel operating condition from a split operating condition by a system operating condition detection module, performing continuous detection if the condition is not met, and starting data synchronization modules after the condition is met; separating the data synchronization modules into a historic sampling data/ alarm recording synchronization module and a manual operating data synchronization module according to different types of data to be synchronized; 2) synchronizing the historic sampling/ alarm recording data stored in the system splitting period to a main system; and 3) synchronizing the operating data in the system splitting period to the main system according to different operating information types by adopting different synchronization methods. The method can effectively avoid the loss of the system application data in the splitting period after system splitting recovery.

Description

The electric power scheduling automatization system Distributed Application is recovered back method of data synchronization side by side
Technical field
The invention belongs to the electric power network technique field, the present invention relates to the electric power scheduling automatization system Distributed Application more precisely and recover back method of data synchronization side by side.
Background technology
In the Distributed Application dispatch automated system, under the normal condition, distribution application system links to each other through backbone network, and each is used through network remote and obtains the application function that the main system application service realizes the one's respective area.Occur obtaining the failure condition of main system application service as if the one's respective area, use unusual or distribution application system networking interruption like main system, then system is in subregion off-the-line running status.After system applies abnormal restoring or networking recovery; Then system will revert to paired running by subregion off-the-line running status; Be that the off-the-line area applications will realize the one's respective area function with the main system application service again; But this moment was because the operation of subregion off-the-line appearred in distribution application system; Can cause main system data imperfect; Be off-the-line district system service data disappearance during the off-the-line, several problems below main the existence:
1. the measurement historical data at off-the-line factory that system administers station lacks during the off-the-line.
2. the alarm history data at off-the-line factory that system administers station lack during the off-the-line.
During the off-the-line off-the-line system because the equipment that causes of manual operation and state quantity measurement, measuring value are inconsistent, manual operation record disappearance.
Summary of the invention
Technical problem to be solved by this invention provides the electric power scheduling automatization system Distributed Application and recovers back method of data synchronization side by side, can effectively avoid system splitting to recover losing of system applies data during the off-the-line of back.
For solving the problems of the technologies described above, the present invention provides the electric power scheduling automatization system Distributed Application to recover back method of data synchronization side by side, it is characterized in that may further comprise the steps:
1) whether system running state detecting module cycle detection one's respective area system applies reverts to the paired running state by the off-the-line running status, and condition does not satisfy then continuation and detects, and condition satisfies back log-on data synchronization module; Data simultaneous module as required data in synchronization type difference be divided into the history samples data alarm record synchronization module, manual operation data simultaneous module;
2) trigger at once behind the system restoration paired running history samples data alarm record synchronization module start; The history samples data alarm record synchronization module obtain history samples and the warning information data file of local cache, with stored historical sampling during the system splitting alarm record data synchronously to main system;
3) triggering the manual operation data simultaneous module behind the system restoration paired running at once starts; The manual operation data simultaneous module is obtained the operating data information of buffer memory during the off-the-line of one's respective area from the local storehouse in real time of off-the-line system, according to operation information type different mining with the operating data of different synchronization method during with system splitting synchronously to main system.Aforesaid electric power scheduling automatization system Distributed Application is recovered back method of data synchronization side by side; It is characterized in that: in said step 2) in; The history samples data after alarm record synchronization module obtains the history samples and warning information data file of local cache, data file is submitted to the document analysis module; The document analysis module is obtained the history samples data message and alarm recorded information during the off-the-line from data file, history samples data message of resolving the back acquisition and alarm recorded information are submitted to main system historical data service module; Main system historical data service module obtains to submit history samples data of preserving during the off-the-line and alarm record to commercial storehouse service module after the request; Commercial storehouse service module then is saved in these information in the database, so far accomplishes the work that off-the-line system history samples data and alarm record data during off-the-line are synchronized to main system.
Aforesaid electric power scheduling automatization system Distributed Application is recovered back method of data synchronization side by side, it is characterized in that: in said step 3), with operating data information submit operation information analysis module; The operation information analysis module then obtains the operation information formation through analysis, has comprised information such as action type, operating equipment in the operation information formation, with operation information formation submit operation information synchronization module; The operation information synchronization module is used the different synchronization method according to operation information type different mining.
Aforesaid electric power scheduling automatization system Distributed Application is recovered back method of data synchronization side by side, it is characterized in that: the operation information type comprises that equipment alarm suppresses operation information, measures and block operation information, the equipment operation information of listing.
Aforesaid electric power scheduling automatization system Distributed Application is recovered back method of data synchronization side by side; It is characterized in that: equipment alarm suppresses the operation method for synchronous and is: the state of corresponding device in the at first modification system; And with corresponding device state increase alarm holddown; Next revises the system operation information table, and the alarm that increases corresponding device in the operation information table suppresses operation note.
Aforesaid electric power scheduling automatization system Distributed Application is recovered back method of data synchronization side by side; It is characterized in that: measuring blockade operation method for synchronous is: the corresponding actual value that measures in the at first modification system; And with corresponding amount measured value state increase blockade blocked styate; Next revises the system lock information table, increases the corresponding blockade record that measures in the table that suppresses information.
Aforesaid electric power scheduling automatization system Distributed Application is recovered back method of data synchronization side by side; It is characterized in that: equipment list the operation method for synchronous be: at first obtain the type sign board attribute information in the sign board definition list; Based on equipment or the state quantity measurement after corresponding device is listed in the sign board attribute information modification system; Next revises system sign board information table, increases in the sign board information table corresponding equipment record of listing; After everyone operation information synchronization end, then manually-operated data simultaneous module finishes.
Adopt historical data and manual operation data during the synchronous off-the-line of different method of data synchronization after recovering side by side to the system applies off-the-line; Therefore can effectively avoid system splitting to recover losing of system applies data during the off-the-line of back; Thereby can be fast operand be made in historical data and manual work and be synchronized to main system according to completion behind the paired running recovered by off-the-line by the assurance system; Guarantee the integrality of historical data and the whole network real-time model data; Avoid during the off-the-line operation information of off-the-line district system to lose, ensure electric power netting safe running.
Description of drawings
Fig. 1 is a kind of electric power scheduling automatization system distribution application system allocation plan.
Fig. 2 is the flow chart of method of data synchronization behind the Distributed Application recovery paired running.
Embodiment
Below in conjunction with accompanying drawing the present invention is done further introduction in detail:
Whether system running state detecting module cycle detection one's respective area system applies reverts to the paired running state by the off-the-line running status, and condition does not satisfy then continuation and detects, and condition satisfies back log-on data synchronization module; Data simultaneous module as required data in synchronization type difference be divided into the history samples data alarm record synchronization module, manual operation data simultaneous module: trigger at once behind the system restoration paired running history samples data alarm record synchronization module start; The history samples data alarm record synchronization module obtain the history samples and the warning information data file of local cache, data file is submitted to the document analysis module; The document analysis module is obtained the history samples data message and alarm recorded information during the off-the-line from data file, history samples data message of resolving the back acquisition and alarm recorded information are submitted to main system historical data service module; Main system historical data service module obtains to submit history samples data of preserving during the off-the-line and alarm record to commercial storehouse service module after the request; Commercial storehouse service module then is saved in these information in the database, so far accomplishes the work that off-the-line system history samples data and alarm record data during off-the-line are synchronized to main system.Triggering the manual operation data simultaneous module behind the system restoration paired running at once starts; The manual operation data simultaneous module is obtained the operating data information of buffer memory during the off-the-line of one's respective area from the local storehouse in real time of off-the-line system, with operating data information submit operation information analysis module; The operation information analysis module then obtains the operation information formation through analysis, has comprised information such as action type, operating equipment in the operation information formation, with operation information formation submit operation information synchronization module; The operation information synchronization module is used the different synchronization method according to operation information type different mining, comprises that mainly equipment alarm suppresses to operate synchronously, measurement blockade operation is synchronous, equipment is listed, and operation is synchronous; It is following to carry out illustrated in detail to the method for synchronous of three kinds of dissimilar operations:
1. equipment alarm suppresses the operation method for synchronous
The state of corresponding device in the at first modification system, and with corresponding device state increase alarm holddown, next revises the system operation information table, the alarm that increases corresponding device in the operation information table suppresses operation note.
2. measure and block the operation method for synchronous
The corresponding actual value that measures in the at first modification system, and with corresponding amount measured value state increase blockade blocked styate, next revises the system lock information table, increases the blockade record of corresponding measurement in the table that suppresses information.
3. the equipment operation method for synchronous of listing
At first obtain the type sign board attribute information in the sign board definition list; According to equipment or the state quantity measurement after corresponding device is listed in the sign board attribute information modification system; Next revises system sign board information table, increases in the sign board information table corresponding equipment record of listing.
After everyone operation information synchronization end, then manual operation data simultaneous module finishes.
Accompanying drawing 1 is a kind of typical distributed application schedules automated system allocation plan; In the Distributed Application dispatch automated system; Under the normal condition; Distributed Application (be each zone, as regional A, area B among the figure ..., regional N) through backbone network link to each other (as the network A among the figure, network B ..., network N), use through network remote in each zone and obtain application function that the main system application service realizes the one's respective area.If this time domain A and main system networking are interrupted, system is in subregion off-the-line running status among the then regional A.To be cached to local file or in real time in the storehouse in the data of regional A off-the-line run duration, after network recovery between regional A and the main system is normal, paired running will recover in regional A system, will obtain the main system application service through network remote again at this moment.Zone A recovers behind the paired running at once, and the log-on data synchronization module writes down the history samples data during off-the-line, alarm record, manual operation synchronously to main system; Wherein the method for synchronous for history samples data and alarm record carries out synchronously for the data file of directly obtaining local cache;, carry out synchronously then through behind the off-the-line operation information that reads local banked cache in real time for manual operation synchronization of data method according to the different sample different synchronization method of action type.After accomplishing, zone A system data synchronization module will make the data of whole each area applications of distributed system after recovering side by side, reach in full accord in the generation off-the-line.The assurance system data is complete, and is available.
The foregoing description does not limit the present invention in any form, and all employings are equal to the technical scheme that form obtained of replacement or equivalent transformation, all drop within protection scope of the present invention.

Claims (7)

1. the electric power scheduling automatization system Distributed Application is recovered back method of data synchronization side by side, it is characterized in that may further comprise the steps:
1) whether system running state detecting module cycle detection one's respective area system applies reverts to the paired running state by the off-the-line running status, and condition does not satisfy then continuation and detects, and condition satisfies back log-on data synchronization module; Data simultaneous module as required data in synchronization type difference be divided into the history samples data alarm record synchronization module, manual operation data simultaneous module;
2) trigger at once behind the system restoration paired running history samples data alarm record synchronization module start; The history samples data alarm record synchronization module obtain history samples and the warning information data file of local cache, with stored historical sampling during the system splitting alarm record data synchronously to main system;
3) triggering the manual operation data simultaneous module behind the system restoration paired running at once starts; The manual operation data simultaneous module is obtained the operating data information of buffer memory during the off-the-line of one's respective area from the local storehouse in real time of off-the-line system, according to operation information type different mining with the operating data of different synchronization method during with system splitting synchronously to main system.
2. electric power scheduling automatization system Distributed Application according to claim 1 is recovered back method of data synchronization side by side; It is characterized in that: in said step 2) in; The history samples data after alarm record synchronization module obtains the history samples and warning information data file of local cache, data file is submitted to the document analysis module; The document analysis module is obtained the history samples data message and alarm recorded information during the off-the-line from data file, history samples data message of resolving the back acquisition and alarm recorded information are submitted to main system historical data service module; Main system historical data service module obtains to submit history samples data of preserving during the off-the-line and alarm record to commercial storehouse service module after the request; Commercial storehouse service module then is saved in these information in the database, so far accomplishes the work that off-the-line system history samples data and alarm record data during off-the-line are synchronized to main system.
3. electric power scheduling automatization system Distributed Application according to claim 1 is recovered back method of data synchronization side by side, it is characterized in that: in said step 3), with operating data information submit operation information analysis module; The operation information analysis module then obtains the operation information formation through analysis, has comprised information such as action type, operating equipment in the operation information formation, with operation information formation submit operation information synchronization module; The operation information synchronization module is used the different synchronization method according to operation information type different mining.
4. recover back method of data synchronization side by side according to claim 1 or 3 described electric power scheduling automatization system Distributed Application, it is characterized in that: the operation information type comprises that equipment alarm suppresses operation information, measures and block operation information, the equipment operation information of listing.
5. electric power scheduling automatization system Distributed Application according to claim 4 is recovered back method of data synchronization side by side; It is characterized in that: equipment alarm suppresses the operation method for synchronous and is: the state of corresponding device in the at first modification system; And with corresponding device state increase alarm holddown; Next revises the system operation information table, and the alarm that increases corresponding device in the operation information table suppresses operation note.
6. electric power scheduling automatization system Distributed Application according to claim 4 is recovered back method of data synchronization side by side; It is characterized in that: measuring blockade operation method for synchronous is: the corresponding actual value that measures in the at first modification system; And with corresponding amount measured value state increase blocked styate; Next revises the system lock information table, increases the corresponding blockade record that measures in the table that suppresses information.
7. recover back method of data synchronization side by side based on the described electric power scheduling automatization system Distributed Application of claim 4; It is characterized in that: equipment list the operation method for synchronous be: at first obtain the type sign board attribute information in the sign board definition list; Based on equipment or the state quantity measurement after corresponding device is listed in the sign board attribute information modification system; Next revises system sign board information table, increases in the sign board information table corresponding equipment record of listing; After everyone operation information synchronization end, then manually-operated data simultaneous module finishes.
CN 201010524910 2010-10-29 2010-10-29 Method for data synchronization after distributed application recovering parallelism of automatic power dispatching system Active CN101969231B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010524910 CN101969231B (en) 2010-10-29 2010-10-29 Method for data synchronization after distributed application recovering parallelism of automatic power dispatching system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010524910 CN101969231B (en) 2010-10-29 2010-10-29 Method for data synchronization after distributed application recovering parallelism of automatic power dispatching system

Publications (2)

Publication Number Publication Date
CN101969231A CN101969231A (en) 2011-02-09
CN101969231B true CN101969231B (en) 2012-08-15

Family

ID=43548346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010524910 Active CN101969231B (en) 2010-10-29 2010-10-29 Method for data synchronization after distributed application recovering parallelism of automatic power dispatching system

Country Status (1)

Country Link
CN (1) CN101969231B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102163877A (en) * 2011-03-09 2011-08-24 国电南瑞科技股份有限公司 Power grid model distribution maintaining and instantly synchronizing method based on segment identification
CN103778570A (en) * 2014-02-14 2014-05-07 国家电网公司 Method for recovering historical data during splitting period based on information interaction
CN109992628B (en) * 2019-04-15 2022-10-25 深圳市腾讯计算机系统有限公司 Data synchronization method, device, server and computer readable storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1801950A2 (en) * 2005-12-21 2007-06-27 Virtutility Limited Distributed generation control system and method
CN101636847A (en) * 2006-12-06 2010-01-27 太阳能安吉有限公司 Monitoring of distributed power harvesting systems using DC power sources

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02123845A (en) * 1988-11-02 1990-05-11 Nippon Hoso Kyokai <Nhk> Data communication system
JPH09305466A (en) * 1996-05-14 1997-11-28 Toshiba Corp Power distribution system supervisory and control unit

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1801950A2 (en) * 2005-12-21 2007-06-27 Virtutility Limited Distributed generation control system and method
CN101636847A (en) * 2006-12-06 2010-01-27 太阳能安吉有限公司 Monitoring of distributed power harvesting systems using DC power sources

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP平2-123845A 1990.05.11
JP特开平9-305466A 1997.11.28

Also Published As

Publication number Publication date
CN101969231A (en) 2011-02-09

Similar Documents

Publication Publication Date Title
CN110212645B (en) Power consumption information acquisition terminal power failure event reporting method and device
CN102355368B (en) Fault processing method of network equipment and system
CN105606957B (en) A kind of distribution network failure analysis method specially become based on fault detector and public affairs
CN102035202B (en) Network reconfiguration system
CN105093033A (en) Power grid multi-source information-based fault integrated analysis system and analysis method
CN105306272A (en) Method and system for collecting fault scene information of information system
CN105989427B (en) Equipment state trend analysis and early warning method based on data mining
CN101916224A (en) Test progress abnormality detection method and automatic test control device
CN107658982A (en) A kind of electrical power distribution integrated management system
CN103324128B (en) Primary equipment fault warning comprehensive compression method in power dispatching automation system
CN101969231B (en) Method for data synchronization after distributed application recovering parallelism of automatic power dispatching system
CN105512171A (en) Database synchronizing method and apparatus
CN110120983A (en) The method and system of SVN real-time synchronization backup is realized based on inotify and rsync automation installation and deployment
CN111830342B (en) Multi-system fusion intelligent substation relay protection dynamic fixed inspection method
CN102968360A (en) Storage system with N+1 redundancy function and method
CN1972287B (en) Communication protocol record analysis apparatus and its analysis method
CN107870663A (en) The information recording method and device of a kind of power module
CN104297680B (en) A kind of switch detection method and system
CN105139280A (en) Fault-trip statistical system and method of electrical power system
CN105373549B (en) Data migration method, equipment and back end server
CN112737863A (en) Intelligent measurement and control system capable of automatically correcting errors
CN101957867B (en) Data caching method in disconnection state of distributed application of power dispatching automation system
CN113471864A (en) Transformer substation secondary equipment field maintenance device and method
CN1905590B (en) Single chip information acquiring method
CN116737462A (en) Data processing method, system, device and medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: GUODIAN NANRUI SCIENCE + TECHNOLOGY CO. LTD.

Owner name: JIANGSU ELECTRIC POWER CO.

Free format text: FORMER OWNER: GUODIAN NANRUI SCIENCE + TECHNOLOGY CO. LTD.

Effective date: 20110221

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Sun Shiming

Inventor after: Zhang Long

Inventor after: Sun Dayan

Inventor after: Peng Hui

Inventor after: Zhuang Weijin

Inventor after: Chen Ning

Inventor after: Ji Huiying

Inventor after: Yang Zhihong

Inventor before: Sun Shiming

Inventor before: Peng Hui

Inventor before: Zhuang Weijin

Inventor before: Chen Ning

Inventor before: Ji Huiying

Inventor before: Yang Zhihong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SUN SHIMING PENG HUI ZHUANG WEIJIN CHEN NING JI HUIYING YANG ZHIHONG TO: SUN SHIMING ZHANG LONG SUN DAYAN PENG HUI ZHUANG WEIJIN CHEN NING JI HUIYING YANG ZHIHONG

Free format text: CORRECT: ADDRESS; FROM: 210061 NO. 20, GAOXIN ROAD, HIGH-TECH. DEVELOPMENT AREA, NANJING CITY, JIANGSU PROVINCE TO: 210024 NO. 215, SHANGHAI ROAD, NANJING CITY, JIANGSU PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20110221

Address after: 210024 Shanghai Road, Jiangsu, China, No. 215, No.

Applicant after: Jiangsu Electric Power Company

Co-applicant after: NARI Technology Development Co., Ltd.

Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Applicant before: NARI Technology Development Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant