CN101892833A - Pressure monitoring method for use in vertical well wall small-diameter open hole horizontal well drilling of oil-water wells - Google Patents
Pressure monitoring method for use in vertical well wall small-diameter open hole horizontal well drilling of oil-water wells Download PDFInfo
- Publication number
- CN101892833A CN101892833A CN2010102166978A CN201010216697A CN101892833A CN 101892833 A CN101892833 A CN 101892833A CN 2010102166978 A CN2010102166978 A CN 2010102166978A CN 201010216697 A CN201010216697 A CN 201010216697A CN 101892833 A CN101892833 A CN 101892833A
- Authority
- CN
- China
- Prior art keywords
- pressure
- cable
- oil
- open hole
- horizontal well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The invention relates to the technical field of oil extraction engineering and belongs to a pressure monitoring method for use in vertical well wall small-diameter open hole horizontal well drilling of oil-water wells. The invention solves the real-time pressure monitoring of a vertical well wall small-diameter open hole horizontal well drilling method on ground. The method mainly uses a ground test system 1, a cable 2 and a test connector 3, allows a drive pressure P in a piston cylinder 5 to be received at the position of the test connector 3 after pressure driving, and is mainly used in a method for vertical well wall small-diameter open hole horizontal well drilling of oil-water wells. The method has the advantages that: the structure is simple; the control is convenient; and the whole hydraulic drilling process is monitored in real time by monitoring the pressure change of the method for vertical well wall small-diameter open hole horizontal well drilling of oil-water wells.
Description
Technical field:
The present invention relates to the oil field technical field of oil production engineering, belong to a kind of pressure monitoring method of vertical well wall small-diameter open hole horizontal well drilling of oil-water wells.
Background technology:
At present sidetrack horizontal well is to utilize whipstock and window to mill awl, and is at design attitude that sleeve pipe is worn out and form window, gets out horizontal hole with the sidetracking drilling tool then.The operation situation was carried out real-time monitoring pressure when the SIDETRACKING TECHNOLOGY of horizontal well can't realize boring, and the present invention carries out real-time monitoring pressure by the down-hole pressure feedback to the open-hole horizontal well perforating job, has solved the problem that can't monitor open hole horizontal well drilling.
Summary of the invention:
The objective of the invention is in order to solve that existing horizontal well drilling technology can't be realized the open hole horizontal well drilling monitoring problem and the pressure monitoring method of a kind of vertical well wall small-diameter open hole horizontal well drilling of oil-water wells of designing.
Technical scheme of the present invention is by realizing with lower device: it is by ground test device, cable, and test splice is formed; Wherein testing arrangement is connected with cable, and the cable lower end is connected with test splice; Above-mentioned technology realizes by following steps:
A. at first with assigned address under the perforation tool lower going-into-well, grappling;
B. by ground test device test splice is lowered into the down-hole assigned address by cable then, docks with the downhole perforation instrument;
C. the operating pressure P at perforation tool nozzle place
jWith the pass of transmission pressure P in the piston rod be P=kP
j, during construction oil pipe is suppressed, can receive transmission pressure P in the piston rod by test splice place after the pressure transmission, and propagate by cable, finally, can realize operating pressure P thus to the perforation tool nozzle in the ground test device feedback
jReal-time monitoring, and can judge the waterpower drilling depth according to pressure-time curve.
Compared with the prior art the present invention has the following advantages: owing to take said method, can monitor in real time horizontal well drilling in the down-hole, improve the success rate of horizontal well drilling.
Description of drawings:
Fig. 1 is a general structure schematic diagram of the present invention;
Fig. 2 is an A part partial enlarged drawing of the present invention.
The specific embodiment:
The invention will be further described below in conjunction with accompanying drawing: it is by realizing with lower device: it is by ground test device 1, cable 2, and test splice 3 is formed; Wherein testing arrangement 1 is connected with cable 2, and cable 2 lower ends are connected with test splice 3; Above-mentioned technology realizes by following steps:
A. at first with assigned address under perforation tool 4 lower going-into-wells, grappling;
B. by ground test device 1 test splice 3 is lowered into the down-hole assigned address by cable 2 then, docks with downhole perforation instrument 4;
C. the operating pressure P at perforation tool 4 nozzle places
jWith the pass of transmission pressure P in the piston rod 5 be P=kP
j, during construction oil pipe is suppressed, can receive transmission pressure P in the piston rod 5 by test splice 3 places after the pressure transmission, and propagate by cable 2, finally, can realize operating pressure P thus to perforation tool 4 nozzles in ground test device 1 feedback
jReal-time monitoring, and can judge the waterpower drilling depth according to pressure-time curve.
Claims (1)
1. the pressure monitoring method of a vertical well wall small-diameter open hole horizontal well drilling of oil-water wells, it is by realizing with lower device: it is by ground test device (1), cable (2), test splice (3) is formed; Wherein testing arrangement (1) is connected with cable (2), and cable (2) lower end is connected with test splice (3); It is characterized in that: above-mentioned technology realizes by following steps:
A. at first with assigned address under perforation tool (4) lower going-into-well, grappling;
B. by ground test device (1) test splice (3) is lowered into the down-hole assigned address by cable (2) then, docks with downhole perforation instrument (4);
C. the operating pressure P at perforation tool (4) nozzle place
jWith the pass of transmission pressure P in the piston rod (5) be P=kP
jDuring construction oil pipe is suppressed, located to receive the interior transmission pressure P of piston rod (5), and propagate by cable (2) by test splice (3) after the pressure transmission, finally, can realize operating pressure P thus to perforation tool (4) nozzle in ground test device (1) feedback
jReal-time monitoring, and can judge the waterpower drilling depth according to pressure-time curve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102166978A CN101892833A (en) | 2010-07-02 | 2010-07-02 | Pressure monitoring method for use in vertical well wall small-diameter open hole horizontal well drilling of oil-water wells |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102166978A CN101892833A (en) | 2010-07-02 | 2010-07-02 | Pressure monitoring method for use in vertical well wall small-diameter open hole horizontal well drilling of oil-water wells |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101892833A true CN101892833A (en) | 2010-11-24 |
Family
ID=43102164
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102166978A Pending CN101892833A (en) | 2010-07-02 | 2010-07-02 | Pressure monitoring method for use in vertical well wall small-diameter open hole horizontal well drilling of oil-water wells |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101892833A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418517A (en) * | 2011-10-26 | 2012-04-18 | 中煤科工集团重庆研究院 | Method for comprehensively detecting drilling depth travel of fully hydraulic drilling machine for coal mine |
CN104929620A (en) * | 2014-03-21 | 2015-09-23 | 韩文峰 | Drilling-fluid on-line extreme pressure lubricity tester |
CN107023286A (en) * | 2011-07-08 | 2017-08-08 | 科诺科菲利浦公司 | Depth/orientation detection instrument and depth/orientation detection |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN88100528A (en) * | 1988-02-10 | 1988-08-10 | 华北石油管理局井下作业公司 | Bridge plug device releasing device and ash transporting cylinder |
US6189629B1 (en) * | 1998-08-28 | 2001-02-20 | Mcleod Roderick D. | Lateral jet drilling system |
CN101131068A (en) * | 2007-10-10 | 2008-02-27 | 大庆油田有限责任公司 | Yield increasing technique for fixed point deep penetration horizontal drilling in oil-water well oil layer |
CN101629474A (en) * | 2009-08-19 | 2010-01-20 | 大庆油田有限责任公司 | Ground-driven underground horizontal boring method for oil well |
CN101672159A (en) * | 2009-10-23 | 2010-03-17 | 大庆油田有限责任公司 | Vertical well wall small-bore bare hole horizontal well drilling method for oil-water well |
-
2010
- 2010-07-02 CN CN2010102166978A patent/CN101892833A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN88100528A (en) * | 1988-02-10 | 1988-08-10 | 华北石油管理局井下作业公司 | Bridge plug device releasing device and ash transporting cylinder |
US6189629B1 (en) * | 1998-08-28 | 2001-02-20 | Mcleod Roderick D. | Lateral jet drilling system |
CN101131068A (en) * | 2007-10-10 | 2008-02-27 | 大庆油田有限责任公司 | Yield increasing technique for fixed point deep penetration horizontal drilling in oil-water well oil layer |
CN101629474A (en) * | 2009-08-19 | 2010-01-20 | 大庆油田有限责任公司 | Ground-driven underground horizontal boring method for oil well |
CN101672159A (en) * | 2009-10-23 | 2010-03-17 | 大庆油田有限责任公司 | Vertical well wall small-bore bare hole horizontal well drilling method for oil-water well |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107023286A (en) * | 2011-07-08 | 2017-08-08 | 科诺科菲利浦公司 | Depth/orientation detection instrument and depth/orientation detection |
CN107023286B (en) * | 2011-07-08 | 2021-04-06 | 科诺科菲利浦公司 | Depth/orientation detection tool and depth/orientation detection method |
CN102418517A (en) * | 2011-10-26 | 2012-04-18 | 中煤科工集团重庆研究院 | Method for comprehensively detecting drilling depth travel of fully hydraulic drilling machine for coal mine |
CN102418517B (en) * | 2011-10-26 | 2014-02-26 | 中煤科工集团重庆研究院 | Method for comprehensively detecting drilling depth travel of fully hydraulic drilling machine for coal mine |
CN104929620A (en) * | 2014-03-21 | 2015-09-23 | 韩文峰 | Drilling-fluid on-line extreme pressure lubricity tester |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103016044B (en) | Comprehensive method of drilling, permeability increasing, repairing and gas-driven displacing of drill hole underground coal mine | |
CN111742110B (en) | Pressure testing of inflatable packer assembly | |
CN105649083B (en) | The clear stake device of the disposable rotary-cutting type of full-sleeve and its clear piling method | |
CN108729913B (en) | Controllable shock wave pre-cracking shale reservoir stratum method | |
CN105064919A (en) | Ultra-short-radius radial lateral drilling method for horizontal wells | |
CN111622728B (en) | Horizontal well perforation process for connecting perforation of cable tractor with hydraulic conveying perforation | |
CN102296950B (en) | Hydraulic shearing type sampling drilling tool | |
AU2006251059A1 (en) | Apparatus and method for driving casing or conductor pipe | |
CN2615322Y (en) | High-pressure jet-flow radial level drilling well system | |
CN109236185B (en) | Radial horizontal well drilling device and drilling method thereof | |
CN101382069A (en) | Continuous tube horizontal borehole process and device | |
CN202325239U (en) | Hydraulic jetting radial drilling device | |
CN104819858B (en) | Test device for evaluating reliability of downhole tool of horizontal well | |
CN104847263A (en) | Coal bed methane far-end butt joint horizontal well drilling method | |
CN104832092A (en) | Hydraulic jet sidetracking process | |
CN101629474B (en) | Ground-driven underground horizontal boring method for oil well | |
Aleksandrovich | Bottomhole formation zone completion through ultra deep multibranch channels: experimental research of a new technology | |
CN104594838B (en) | Radial drilling device for oil-water well downhole casing | |
CN203856456U (en) | Well testing pipe column | |
CN205387708U (en) | Clear stake device of disposable rotary -cut formula of a complete set of pipe | |
CN101892833A (en) | Pressure monitoring method for use in vertical well wall small-diameter open hole horizontal well drilling of oil-water wells | |
CN106285517B (en) | Oil-well rig establishes root system and method offline with double rat holes | |
CN110984878B (en) | Rope coring drilling device for urban deep-buried tunnel exploration hole | |
CN206957583U (en) | A kind of equipment of coal mine long range throughbore | |
CN205503007U (en) | Drilling system based on double -walled drilling rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20101124 |