CN101835247A - Method for energy conservation and activation of base station, network device, active device and network system - Google Patents

Method for energy conservation and activation of base station, network device, active device and network system Download PDF

Info

Publication number
CN101835247A
CN101835247A CN200910128412A CN200910128412A CN101835247A CN 101835247 A CN101835247 A CN 101835247A CN 200910128412 A CN200910128412 A CN 200910128412A CN 200910128412 A CN200910128412 A CN 200910128412A CN 101835247 A CN101835247 A CN 101835247A
Authority
CN
China
Prior art keywords
base station
carrier frequency
district
sub
tracing area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910128412A
Other languages
Chinese (zh)
Inventor
王学龙
牛卫国
张宏卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201210164437.XA priority Critical patent/CN102821445B/en
Priority to CN200910128412A priority patent/CN101835247A/en
Priority to PCT/CN2010/071016 priority patent/WO2010102581A1/en
Publication of CN101835247A publication Critical patent/CN101835247A/en
Priority to ZA2011/07493A priority patent/ZA201107493B/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0203Power saving arrangements in the radio access network or backbone network of wireless communication networks
    • H04W52/0206Power saving arrangements in the radio access network or backbone network of wireless communication networks in access points, e.g. base stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Abstract

The embodiment of the invention provides a method for energy conservation and activation of a base station, a network device, an active device and a network system. The method for energy conservation of the base station comprises the following steps: if carrier frequency, a cell, a base station or a tracking region meets the condition of moving to an energy conservation mode, determining the target energy conservation mode of the carrier frequency, the cell, the base station or the tracking region, and moving the carrier frequency, the cell, the base station or the tracking region to the target energy conservation mode. According to the embodiment of the invention, the carrier frequency, the cell, the base station or the tracking region can be switched to the target energy conservation mode according to the working condition of the carrier frequency, the cell, the base station or the tracking region, thereby carrying out energy conservation treatment on the base station according to actual working situation, so as to reduce energy consumption of the base station, reduce operation cost for operators and promoting environmental protection.

Description

The method of base station energy-saving and activation, network equipment, active device and network system
Technical field
The present invention relates to the mobile communication technology field, relate in particular to method and network equipment, active device and the network system of a kind of base station energy-saving and activation.
Background technology
At present, the carrier frequency in the cordless communication network in the sub-district will be opened after deployment puts into effect always, be positioned at traffic carrying capacity on this carrier frequency or number of users more after a little while, have the wasting phenomenon of power consumption, increase operation cost.In addition, traffic carrying capacity on all carrier frequency in the sub-district or user see the phenomenon that also has the power consumption waste from the angle of whole sub-district more after a little while, and in like manner, traffic carrying capacity in all sub-districts of a base station or number of users more also can cause the waste in the power consumption.
Summary of the invention
In view of this, the purpose of the embodiment of the invention is to provide the method and the network equipment of a kind of base station energy-saving and activation, can reduce the energy resource consumption of base station operation, thereby reduce operating cost of operator.
For achieving the above object, the embodiment of the invention provides a kind of method of base station energy-saving, comprising:
If carrier frequency or sub-district or base station or tracing area satisfy the condition of moving to energy saver mode,
Determine the target energy saver mode of described carrier frequency or sub-district or base station or tracing area,
Described target energy saver mode is moved in carrier frequency or sub-district or base station or tracing area.
The embodiment of the invention also provides a kind of Activiation method of base station, comprises, judges that whether carrier frequency or sub-district or base station or tracing area satisfy the condition that activates, if satisfy, then carrier frequency or sub-district or base station or tracing area is activated.
In addition, the embodiment of the invention also provides a kind of network equipment, comprising:
Judging unit is used to judge whether carrier frequency or sub-district or base station or tracing area satisfy the condition of moving to energy saver mode;
The energy saver mode determining unit is used for the target energy saver mode that definite described carrier frequency or sub-district or base station or tracing area are moved to;
Migration units is used for described target energy saver mode is moved in described carrier frequency or sub-district or base station or tracing area.
In addition, the embodiment of the invention also provides a kind of active device, comprising:
Judging unit is used to judge whether carrier frequency or sub-district or base station or tracing area satisfy the condition that activates;
Activate the unit, be used for when described judgment unit judges result when being, carrier frequency or sub-district or base station or tracing area are activated.
In addition, the embodiment of the invention also provides a kind of network system, comprises the above-mentioned network equipment and active device.
By above-mentioned disclosed technical scheme as can be known, in embodiments of the present invention, operating state according to carrier frequency switches to carrier frequency on the target energy saver mode, thereby can be according to the real work situation, carrier frequency in the sub-district is carried out energy-efficient treatment, thereby reduce the energy resource consumption of sub-district, lower operating cost of operator, promote environmental protection.
Description of drawings
Fig. 1 is the schematic diagram of the base station energy-saving method that provides of the embodiment of the invention one;
Fig. 2 is the schematic diagram that utilizes OAM that the property value of cell carrier frequencies is configured in the embodiment of the invention one;
Fig. 3 is the flow chart of the same judgement that covers in the embodiment of the invention one;
Fig. 4 is that the target energy saver mode that in the embodiment of the invention one carrier frequency is switched to is notified in abutting connection with the schematic diagram of economize on electricity;
Fig. 5 utilizes X2 interface to switch the schematic diagram of activation in the embodiment of the invention one;
Fig. 6 utilizes the S1 interface to switch the schematic diagram of activation in the embodiment of the invention one;
Fig. 7 is the schematic diagram of a kind of network equipment of providing in the embodiment of the invention two;
Fig. 8 is the schematic diagram of the active device that provides of the embodiment of the invention three;
Fig. 9 is the schematic diagram of the network system that provides of the embodiment of the invention four.
Embodiment
Below in conjunction with accompanying drawing the embodiment of the invention is described in detail.
Embodiment one
Present embodiment provides a kind of sub-district method for saving energy, referring to Fig. 1, realizes that the method for the embodiment of the invention comprises the steps:
Step S101:, judge whether carrier frequency satisfies the trigger condition of moving to the target energy saver mode, if satisfy execution in step S102 according to the state of carrier frequency.
In the present embodiment, at first need carrier frequency is defined several mode of operations the working method of the corresponding a kind of carrier frequency of each mode of operation, wherein, except carrier frequency did not carry out any energy-conservation mode of operation, other mode of operation can be called the energy conservation pattern, hereinafter to be referred as energy saver mode.Be operated in the carrier frequency degree of power conservation difference on the different energy saver modes.
For example, can be defined as follows several mode of operations for carrier frequency:
Mode of operation 0: the carrier frequency that is in this mode of operation does not carry out energy-conservation;
Mode of operation 1: comprise that specific transactions is limited and the specific user is limited, the carrier frequency that is in this mode of operation will only can provide specific transactions, or only provide service to the specific user in order to save resource consumption.Specific transactions is limited can be to limit the concrete service access of certain class, as limiting VOIP (Voice over Internet Protocol, the networking telephone) business, high-speed data service access etc.; Also can be that specific transactions only is provided, as VOIP business etc. only is provided.The specific user is limited can be that the restriction specific user inserts, as user's access of restriction low priority; Also can be only to provide service, as only providing service to Gold Subscriber to the specific user;
Mode of operation 2: carrier frequency is closed, and the carrier frequency that is in this mode of operation is fully closed, without any energy resource consumption.
Need to prove, in actual applications, definition can not only be confined to three kinds of mode of operations of above-mentioned understanding to the mode of operation of carrier frequency, and is also different to the concrete definition of mode of operation simultaneously, and the concrete definition of above-mentioned mode of operation is not constituted restriction to the embodiment of the invention.
Here, for convenience of description, the energy saver mode that will move to is called the target energy saver mode.
The trigger condition of moving to the target energy saver mode can be followed one of following several principles or combination in any:
1) Event triggered principle.This principle is meant by predefined incident and triggers closing of carrier frequency when satisfying condition.For example, based on the Event triggered of load information, when the load on the carrier frequency is less than or equal to preset first threshold, then triggers this carrier frequency and move on the target energy saver mode.Load can be PRB (Physical Resource Block, the Physical Resource Block) resources occupation rate in the certain hour, activated state user's number, Idle state user's number etc.Idle state user's number can pass through the measurement period tracking area, and (TrackingArea, TA) the user UE number that upgrades is estimated.It is pre-configured that first threshold value of these incidents can be passed through OAM (Operation and Maintenance, Operation ﹠ Maintenance System).The value of first threshold value is determined according to carrier policy and network planning data, is not done qualification in the embodiment of the invention.As first thresholding is 0 o'clock, then is illustrated in when not having load fully on the carrier frequency, just triggers carrier frequency and moves on the target energy saver mode.If triggering thresholding is not 0 o'clock, starting before carrier frequency moves to the target energy saver mode, also to consider abutting subdistrict or with the loading condition of other carrier frequency in the sub-district.After avoiding sub-district/base station to close, cause that the overweight situation of abutting subdistrict/base station load occurs.
2) the professional principle that triggers.This criterion is meant uses the user UE number of certain class business to be less than or equal to certain predefined load-threshold value within a certain period of time on the carrier frequency, hereinafter referred to as second threshold value.As, when not having LTE professional on the carrier frequency in the sub-district of a LTE (Long Term Evolution, Long Term Evolution) system, then trigger this carrier frequency is moved on the target energy saver mode.
3) periodic triggers principle.This criterion is meant that triggering cell was moved on the target energy saver mode when time arrived Preset Time.Can be in the network planning stage, according to the cycle of traffic model initial configuration triggering.Also can be in the network operation stage, according to the every performance index and the actual traffic measurement data of network, dynamic-configuration triggers the cycle.
Step S102: determine whether above-mentioned carrier frequency can move on the target pattern, if can, execution in step S103 then.
Wherein, determining whether carrier frequency can move on the target pattern can specifically comprise following several method:
Method 1: static configuration method.In the network design stage, when doing plot planning, determine according to the geographical location information of planning sub-district and the coverage information in this geographical position whether this carrier frequency can move on the target energy saver mode.For example, if in the carrier frequency coverage of certain sub-district, have other sub-district to provide alien frequencies or different system to cover simultaneously, then definite this carrier frequency can be moved on the target energy saver mode.But need avoid all being moved on the energy saver mode of closing fully of all sub-districts in this geographical position.
In actual applications, can safeguard a property value to this carrier frequency in advance, can be called transportable property value, this property value represents whether this carrier frequency can be moved on the energy saver mode.For example, can in the base station of respective cell, dispose this property value, and utilize OAM to be configured, particularly, as shown in Figure 2, comprise:
Step S201:OAM 202 utilizes the property value of the carrier frequency in each sub-district in configuration management (CM, Configuration Management) the message arrangement base station of interface of 201 of OAM202 and base stations.
Step S202: base station 201 utilizes the configuration management message of the interface of 201 of OAM 202 and base stations to send the configuration response message to OAM 202.
Method 2: dynamic decision method.In the network operation process, according to the running status of network, the information such as measurement report of the load information of carrier frequency and user UE judge whether carrier frequency can move on the target energy saver mode.
In practice, the executive agent of above-mentioned judgement action can be OAM or sub-district, carrier frequency place relevant base station.Similarly, also can safeguard a property value to this carrier frequency in this method, this property value represents whether this carrier frequency can be moved on the energy saver mode.Also need to avoid all being moved on the energy saver mode of closing fully of all sub-districts in this geographical position.Might as well be the specific implementation that example describes this dynamic decision method in detail below this carrier frequency is safeguarded above-mentioned property value.Wherein, the span of above-mentioned property value can be defined as and comprise very and false, and corresponding respectively carrier frequency can be moved on the energy saver mode and cannot be moved on the energy saver mode.
Above-mentioned dynamic decision method can comprise: same coverage criterion.Whether the decision condition of this criterion is to have other sub-district or base station that the covering of different frequency/different system is provided simultaneously in the scope that covers of cell carrier frequencies.
Should can be one of following or combination in any with the specific implementation method that covers principle:
A) user UE measures the adjacent area, if in one section timing statistics, have at least a signal quality of adjacent cells to reach certain threshold value in all adjacent areas that user UE reports, for example more than or equal to the 3rd threshold value, exist other sub-district or base station that the covering of different frequency/different system is provided simultaneously in the scope that then shows cell carrier frequencies and covered, this moment, the base station reported this information to give OAM, and the attribute with this carrier frequency after OAM confirms is changed to very; Perhaps base station oneself is revised the attribute of this carrier frequency and is notified OAM.
B), adding that sub-district geography information and coverage information comprehensively judge based on existing different frequency/different system adjacent area in the Neighboring Cell List in the sub-district.As shown in Figure 3, for providing with the judgment condition that covers by a sub-district A to sub-district B is R>r, and R>=d+r, wherein R is the radius of sub-district A, r is the radius of sub-district B, after satisfying above-mentioned condition, can think that sub-district B satisfies with the requirement that covers, the property value whether this carrier frequency of expression that can sub-district B can be moved on the energy saver mode is set to "Yes".
Step S103: carrier frequency is moved on the target energy saver mode.
Step S104: the target energy saver mode that carrier frequency is moved to is notified to terminal.
Wherein, the work at present state of carrier frequency in the broadcast cell in system broadcast message perhaps passes through the change of beep-page message informing user terminal UE working state of system.
After carrier frequency is moved on the target energy saver mode, can also notify the current state information of sub-district, adjacent node above-mentioned carrier frequency place.
Wherein adjacent node comprises adjoining base station, all MME (Mobility Management Entity, mobile management entity) in the pool (pond), OAM.A resource pool forming by a plurality of MME of pool wherein.
As shown in Figure 4, the specific implementation of above-mentioned notice adjacent node can comprise:
Step S401: sub-district, the carrier frequency place relevant base station 401 of moving on the energy saver mode sends base station configuration updating information to adjacent nodes such as adjoining base station, MME or OAM 402, notice adjacent node 402, the mode of operation after carrier frequency switches in this sub-district.
In the practical application, message name may be different, can use as long as can finish the message of identical or similar functions.Carry carrier frequency in the message and move to indication on the target energy saver mode, or carry the cause value of this switching.Can also carry the cell ID at this carrier frequency place in the message, as E-CGI (E-UTRAN Cell Global Identifier, the cellular global identity of evolution), CGI (Cell Global Identifier, cellular global identity) or PCI information such as (Physical Cell Identity, Physical Cell Identifier).Go back the current ability information of portability sub-district in the message, this ability information includes but not limited to: the sub-district is to the enabling capabilities of business and the sub-district enabling capabilities to function, and the sub-district can comprise the ability of making of function: whether support to resemble MANET function and radio resource management functions such as automatic adjacent section management, mobility optimization, interference coordination, load balancing.These cells are option.
Step S402: adjacent node 402 is preserved the response configuration information, and handles accordingly.Above-mentioned respective handling comprises: upgrade NRT (Neighbor Relation Table, neighborhood region correlation chart) state of sub-district in the table, and writing down concrete state information and cell capacity information, this ability information includes but not limited to that the sub-district is to the enabling capabilities of business and the sub-district enabling capabilities to function.If the work at present pattern of all carrier frequency of sub-district is for closing fully, then adjacent node can also be deleted this sub-district.MME is according to buttoned-up sub-district and state thereof in the Notification Record TA.If all carrier frequency of all sub-districts all enter the mode of operation of closing fully in the TA, then follow-uply in this TA, do not initiate paging.
Step S403: adjacent node 402 sends the base station configuration updating response message to the base station 401 of sub-district, the carrier frequency place correspondence of moving to the target energy saver mode.This step is optional, and can exchange execution sequence with step S402.
After carrier frequency is moved to the target energy saver mode, also can discharge respective resources or interface according to the definition of this target energy saver mode.
In addition, can also comprise the process that cell carrier frequencies is activated in the method that the embodiment of the invention provides.Wherein activate and comprise moving to not having energy-conservation mode of operation, also can comprise and moving to than on the slightly little energy saver mode of the degree of power conservation of current energy saver mode from energy saver mode.
Above-mentioned activation can comprise following several method:
Method 1: the Idle state user activates the carrier frequency of sub-district.Specific implementation comprises:
Realize 1): the Idle state user initiatively initiates service request, in the activation of stage triggering cell carrier frequency that connects.Or
Realize 2): the Idle state user receives the beep-page message that network side sends, when sending page response, the activation of triggering cell/base station.
Method 2: switching command activates.The activation of cell carrier frequencies is carried out in sub-district, carrier frequency place when receiving the handoff request order.Can comprise in concrete the application that the switching activation of X2 interface and the switching of S1 interface activate.
Fig. 5 shows and utilizes X2 interface to switch the schematic diagram of activation.X2 interface is the interface that is connected between base station and the base station in E-UTRAN (Evolved Universal Mobile Telecommunications System Territorial Radio Access Network, the universal mobile telecommunications system land radio access web of the evolution) network configuration.As shown in the figure, comprise the steps:
Step S501: the carrier frequency activation command is received in base station 501.
Step S502: if the X2 interface transmission link discharges, then rebulid the transmission link of X2 interface, i.e. SCTP (Stream Control Transmission Protocol, SCTP) coupling connection to adjoining base station 502.
Step S503: base station 501 sends X2 to adjoining base station 502 and sets up message, carries cell carrier frequencies in the message and activates the notice indication, or notify the activation of adjoining base station sub-district by specific messages.
Step S504: adjoining base station 502 sends to base station 501 and activates push-notification-answer message.
Fig. 6 shows and utilizes the S1 interface to switch the schematic diagram of activation.The S1 interface is the interface that connects between base station and MME or SAE (SystemArchitecture Evolution, the System Architecture Evolution) gateway in the E-UTRAN network configuration.As shown in the figure, comprise the steps:
Step S601: the cell carrier frequencies activation command is received in base station 601.
Step S602:, then rebulid the transmission link of S1 interface, i.e. SCTP association to MME 602 if S 1 interface transmission link discharges.
Step S603: base station 601 sends S1 to MME 602 and sets up message, carries cell carrier frequencies in the message and activates the notice indication.Or the activation by specific messages notice adjoining base station sub-district.
Step S604:MME 602 sends to base station 601 and activates push-notification-answer.
Method 3: network side activates.Network others node such as adjoining base station, MME, OAM triggers the activation by explicit signaling.
Method 4: Event triggered activates.After the traffic carrying capacity in the coverage of sub-district, carrier frequency place or load acquire a certain degree (or thresholding), for example, greater than the 4th predetermined threshold value, the activation process of system triggers cell carrier frequencies.
Method 5: regularly activate.Predefined activationary time arrives, and then activates carrier frequency.
After carrier frequency in the sub-district carried out activation manipulation, adjacent node or OAM can also be notified in the sub-district.
More than in description process to technical scheme, directly the implementation mode switch to as if the sub-district in carrier frequency, those skilled in the art should be understood that, in actual applications, also can carry out whole change action to the carrier frequency in the whole sub-district, can for example can comprise the several mode of operations of little area definition this moment:
Mode of operation 0: normal operating conditions.The sub-district that is in this state is not carried out energy-conservation.
Mode of operation 1: specific transactions is limited or the specific user is limited.The sub-district that is in this state will only can provide specific transactions, or only provide service to the specific user in order to save resource consumption.Specific transactions is limited can be to limit the concrete service access of certain class, as limiting VOIP business, high-speed data service access etc.; Also can be that specific transactions only is provided, as VOIP business etc. only is provided.The specific user is limited can be that the restriction specific user inserts, as user's access of restriction low priority; Also can be only to provide service, as only providing service to Gold Subscriber to the specific user.
Mode of operation 2: be in the sub-district of this state, the transmission cycle of descending synchronous signal channel and broadcast channel is extended.In each intermittent phase that sends the cycle, will stop to send common down channel, reach energy-conservation purpose.
Mode of operation 3: down channel is limited.The sub-district that is in this state is in order to save energy, close descending channel, the up accepting state that still keeps of sub-district, descending all dedicated channels of closing of sub-district, cell downlink only keeps sending SCH (Synchronization Channel, synchronizing channel) and BCH (Broadcast Channel, broadcast channel), that is to say that the sub-district is at the descending host system message block that still sends synchronizing channel and system.
Mode of operation 4: particular channel is limited, and the carrier frequency that is in this mode of operation can only be closed downstream data channel reservation Common Control Channel, perhaps closes the up-downgoing data channel and keeps down control channel and uplink random access channel.Under this pattern, each channel is separately to consider.
Mode of operation 5: be in the sub-district/base station of this state, except that the attribute with mode of operation 3, the X2/S1 interface link of sub-district also is in closed condition.
Mode of operation 6: the sub-district is closed.The sub-district that is in this state will be fully closed, without any energy loss.
Mode of operation 7: carrier frequency is closed.Be in the multicarrier system of this state,, one or several subcarrier frequency closed, run on main carrier frequency and other subcarrier frequencies as LTE Advance (LTE-A) system; Perhaps all subcarrier frequencies are closed, run on the main carrier frequency.Be in the multi-carrier frequency cell of this state, as the sub-district of TD-SCDMA system, just one or several carrier frequency is closed, and runs on main carrier frequency and other subcarrier frequencies; Perhaps all subcarrier frequencies are closed, run on the main carrier frequency.
From the definition of above-mentioned mode of operation, the definition of the mode of operation of sub-district is associated with the mode of operation definition of its interior carrier frequency as can be seen, for example, when all carrier frequency all were in the mode of operation of closing fully in the sub-district, the work at present pattern of sub-district should respective cell be closed.
Those skilled in the art should be understood that switches and can finish by the mode of operation of wherein corresponding carrier frequency is switched the mode of operation of sub-district.
In like manner, for also can pre-defined several mode of operations by the base station of a plurality of sub-districts correspondence, these mode of operations interrelate with the mode of operation of its corresponding district again.Therefore, the mode of operation of base station being switched also can be by finishing the switching of carrier frequency mode of operation.
In the E-UTRAN network, introduced the notion of tracing area (TA, Tracking Area).In a cordless communication network, a tracing area (TA, Tracking Area) is by a Tracking Area Code (Tracking Area Code, TAC) unique identification.A tracing area (TA, Tracking Area) can comprise one to a plurality of sub-districts.Different districts in base station can belong to different tracing areas (TA, Tracking Area).But, in the practical application, generally one or more base station of doing are divided into a tracing area (TA, Tracking Area) for convenient management.Also can define several mode of operations for tracing area like this, get in touch, so also can finish by switching to the mode of operation of carrier frequency to the switching of the mode of operation of tracing area and exist between the mode of operation of these mode of operations and base station.
In addition,, improve the availability of frequency spectrum, in the LTE-A mobile communication system, proposed the notion of carrier aggregation (Carrier Aggregation) in order to realize higher peak rate.The basic principle of carrier aggregation (Carrier Aggregation) is in the LTE-A mobile communication system a plurality of carrier waves to be carried out polymerization to realize the transmission bandwidth greater than 20MHZ.Carrier aggregation (Carrier Aggregation) is divided into two kinds of situations, and a kind of is that a plurality of LTE carrier aggregation become a single LTE-A carrier wave, is called the polymerization of intercarrier.LTE carrier aggregation as 5 20MHZ is a LTE-A carrier wave with 100MHZ bandwidth.Another kind is the polymerization between a plurality of frequency spectrum sheets (Spectrum Aggregation), is called spectrum aggregating (Spectrum Aggregation).This shows, also can utilize carrier aggregation to carry out the definition of mode of operation, and the handoff procedure of carrier aggregation mode of operation also can be finished by the mode of operation of wherein carrier wave is switched.
Particularly, when all carrier frequency in the sub-district satisfy when moving to the condition of energy saver mode, trigger on the target energy saver mode that described sub-district switches to the sub-district.
When the condition of moving to energy saver mode is all satisfied in all sub-districts in the base station, trigger on the target energy saver mode of moving to the base station in described base station.
When the condition of moving to energy saver mode is all satisfied in all base stations in the tracing area, trigger described tracing area and move on the target energy saver mode.
In sum, in the embodiment of the invention, carrier frequency is moved on the target energy saver mode according to the operating state of carrier frequency, thereby can the carrier frequency in the sub-district be carried out energy-efficient treatment according to the real work situation, thereby reduce the energy resource consumption of sub-district, lower operating cost of operator, promote environmental protection.
Embodiment two
As shown in Figure 7, present embodiment provides a kind of network equipment, and this network equipment 700 comprises:
Judging unit 701 is used to judge whether carrier frequency or sub-district or base station or tracing area satisfy the condition of moving to energy saver mode;
Energy saver mode determining unit 702 is used for the target energy saver mode that definite described carrier frequency or sub-district or base station or tracing area are moved to;
Migration units 703 is used for described target energy saver mode is moved in described carrier frequency or sub-district or base station or tracing area.
In addition, the network equipment that present embodiment provides can also comprise professional switch unit 704, be used for before carrier frequency or sub-district or base station or tracing area are switched to energy saver mode, the business that will be positioned on this carrier frequency or sub-district or base station or the tracing area switches on other carrier frequency or sub-district or base station or the tracing area.
In addition, this network equipment 700 can also comprise notification unit 705, is used for after carrier frequency or sub-district or base station or tracing area are moved to the target energy saver mode, and the target energy saver mode that described carrier frequency or sub-district or base station or tracing area are moved to is notified to terminal.
The network equipment in the present embodiment can be base station, network management system or MME.
In sum, in the embodiment of the invention, carrier frequency is moved on the target energy saver mode according to the operating state of carrier frequency, thereby can the carrier frequency in the sub-district be carried out energy-efficient treatment according to the real work situation, thereby reduce the energy resource consumption of sub-district, lower operating cost of operator, promote environmental protection.
Embodiment three
Present embodiment is corresponding to provide a kind of active device, and as shown in Figure 8, this active device 800 can comprise:
Judging unit 801 is used to judge whether carrier frequency or sub-district or base station or tracing area satisfy the condition that activates;
Activate unit 802, be used for when judging unit 801 judged results when being, carrier frequency or sub-district or base station or tracing area are activated.
Wherein judging unit 801 can adopt following method when judging whether to satisfy activation condition:
Method 1: the Idle state user activates the carrier frequency of sub-district.Specific implementation comprises:
Realize 1): the Idle state user initiatively initiates service request, in the activation of stage triggering cell carrier frequency that connects.Or
Realize 2): the Idle state user receives the beep-page message that network side sends, when sending page response, the activation of triggering cell/base station.
Method 2: switching command activates.The activation of cell carrier frequencies is carried out in sub-district, carrier frequency place when receiving the handoff request order.Can comprise in concrete the application that the switching activation of X2 interface and the switching of S1 interface activate.
Method 3: network side activates.Network others node such as adjoining base station, MME, OAM triggers the activation by explicit signaling.
Method 4: Event triggered activates.After the traffic carrying capacity in the coverage of sub-district, carrier frequency place or load acquire a certain degree (or thresholding), for example, greater than the 4th predetermined threshold value, the activation process of system triggers cell carrier frequencies.
Method 5: regularly activate.Predefined activationary time arrives, and then activates carrier frequency.
The carrier frequency that satisfies condition or sub-district or base station or tracing area can be activated according to virtual condition according to the embodiment of the invention.
Embodiment four
The embodiment of the invention four provides a kind of network system, and as shown in Figure 9, this network system 900 comprises: the network equipment 901 and active device 902;
Wherein the network equipment 901 can comprise:
Judging unit 9011 is used to judge whether carrier frequency or sub-district or base station or tracing area satisfy the condition of moving to energy saver mode;
Energy saver mode determining unit 9012 is used for determining the target energy saver mode of described carrier frequency or sub-district or base station or tracing area;
Migration units 9013 is used for described target energy saver mode is moved in described carrier frequency or sub-district or base station or tracing area.
In addition, the described network equipment 901 can also comprise: professional switch unit 9014, be used for before carrier frequency or sub-district or base station or tracing area are switched to energy saver mode, the business that will be positioned on this carrier frequency or sub-district or base station or the tracing area switches on other carrier frequency or sub-district or base station or the tracing area.
In addition, the described network equipment 901 can also comprise: comprise notification unit 9015, be used for after carrier frequency or sub-district or base station or tracing area are moved to the target energy saver mode, the target energy saver mode that described carrier frequency or sub-district or base station or tracing area are moved to is notified to terminal.
Described active device 902 can comprise:
Judging unit 9021 is used to judge whether carrier frequency or sub-district or base station or tracing area satisfy the condition that activates;
Activate unit 9022, be used for when judging unit 9021 judged results when being, carrier frequency or sub-district or base station or tracing area are activated.
The network system that present embodiment provides can be according to the actual working state of carrier frequency or sub-district or base station or tracing area, to carrier frequency or sub-district or base station or tracing area carries out energy-conservation or activate and handle.
The above only is a preferred implementation of the present invention; should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the principle of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (29)

1. the method for a base station energy-saving is characterized in that, comprising:
If carrier frequency or sub-district or base station or tracing area satisfy the condition of moving to energy saver mode,
Determine the target energy saver mode of described carrier frequency or sub-district or base station or tracing area,
Described target energy saver mode is moved in described carrier frequency or sub-district or base station or tracing area.
2. method according to claim 1, it is characterized in that, described method also comprises: before described carrier frequency or sub-district or base station or tracing area were moved to energy saver mode, the business that will be positioned on this carrier frequency or sub-district or base station or the tracing area switched on other carrier frequency or sub-district or base station or the tracing area.
3. method according to claim 1, it is characterized in that, described method also comprises: after described carrier frequency or sub-district or base station or tracing area were moved to the target energy saver mode, the target energy saver mode that described carrier frequency or sub-district or base station or tracing area are moved to was notified to terminal.
4. method according to claim 3 is characterized in that, the step of described notice terminal comprises: broadcast the target energy saver mode of moving in broadcast, or notify terminal by signaling message with the target energy saver mode of moving to.
5. method according to claim 1 is characterized in that, described trigger condition of moving to energy saver mode comprises: Event triggered, and/or professional triggering the, and/or periodic triggers.
6. method according to claim 5 is characterized in that, described trigger conditions comprises: the load of described carrier frequency or sub-district or base station or tracing area is less than or equal to default threshold value.
7. method according to claim 1 is characterized in that, described triggering mode of moving to energy saver mode comprises:
Base station triggers, or the triggering of mobile management node, or Operation ﹠ Maintenance System triggers.
8. according to any described method in the claim 1 to 7, it is characterized in that described target energy saver mode comprises:
The carrier frequency of energy saver mode or sub-district or base station or tracing area are supported at least one class business, and limit other business, or;
The carrier frequency of energy saver mode or sub-district or base station or tracing area provide service for the specific user, and limit other users and insert, or;
Base station limits one class of energy saver mode or the transmission of a few class down channels, and receive a class or a few class or all transmission of up channel.
9. according to any described method in the claim 1 to 7, it is characterized in that described target energy saver mode comprises:
X2 interface and/or S1 interface are closed in the energy saver mode base station.
10. according to any described method in the claim 1 to 7, it is characterized in that described target energy saver mode can be:
The energy saver mode base station is closed the carrier frequency of one or several carrier frequency and is closed.
11. method according to claim 10 is characterized in that, described carrier frequency comprises the main carrier frequency or the subcarrier frequency of multicarrier system or multi-carrier frequency cell.
12., it is characterized in that described method also comprises: before moving to the target energy saver mode, judge whether carrier frequency or sub-district or base station or tracing area can move to the target energy saver mode according to any described method in the claim 1 to 7.
13. method according to claim 12 is characterized in that, describedly judges whether carrier frequency or sub-district or base station or tracing area can move to specifically comprising of target energy saver mode:
According to the transportable property value of pre-configured carrier frequency or sub-district or base station or tracing area, judge whether carrier frequency or sub-district or base station or tracing area can move to the target energy saver mode.
14. method according to claim 13 is characterized in that, described method also comprises:
Operation ﹠ Maintenance System disposes the transportable property value of described carrier frequency according to the geographical position coverage information of carrier frequency or sub-district or base station or tracing area.
15. method according to claim 14 is characterized in that, described method also comprises:
Terminal is measured the signal of the neighbor cell of carrier frequency or sub-district or base station or tracing area, whether the neighbor cell signal intensity of measuring according to terminal disposes the transportable property value of described carrier frequency or sub-district or base station or tracing area greater than the 3rd default threshold value.
16., it is characterized in that described method also comprises according to any described method in the claim 1 to 7:
After described carrier frequency or sub-district or base station or tracing area are moved to described target energy saver mode, send the current power save mode information of sub-district, described carrier frequency place to adjacent node.
17. method according to claim 16, it is characterized in that, the described current state information that sends to adjacent node comprises: carrier frequency or sub-district or base station or tracing area are moved to the indication on the target energy saver mode, and/or the cause value of migration and/or the sign of carrier frequency or sub-district or base station or tracing area, and/or the current ability information of described carrier frequency or sub-district or base station or tracing area.
18. method according to claim 17 is characterized in that, described method also comprises:
Adjacent node upgrades the current state information of described sub-district behind the current state information that receives the transmission of sub-district, described carrier frequency place, and/or ability information.
19. the Activiation method of a base station is characterized in that, comprises, judges that whether carrier frequency or sub-district or base station or tracing area satisfy the condition that activates, if satisfy, then carrier frequency or sub-district or base station or tracing area is activated.
20. method according to claim 19 is characterized in that, the condition of described activation comprises: the user is initiatively to carrier frequency or sub-district or base station or tracing area initiation business request information, perhaps;
The user receives the beep-page message of carrier frequency or sub-district or base station or tracing area transmission, and the user is to described carrier frequency or sub-district or base station or tracing area transmission page-response message, perhaps;
Described carrier frequency or sub-district or base station or tracing area receive the handoff request command messages.
21. method according to claim 19 is characterized in that, the condition of described activation comprises:
Adjacent node triggers described carrier frequency or sub-district or base station by explicit signaling or tracing area activates or Event triggered activates, or regularly activates.
22. method according to claim 21 is characterized in that, described adjacent node comprises: base station, or mobile management node, or Operation ﹠ Maintenance System.
23. method according to claim 21, described Event triggered activate and comprise:
When the load of described overlay area of moving to carrier frequency on the target energy saver mode or sub-district or base station or tracing area more than or equal to the 4th predetermined threshold value.
24. method according to claim 19 is characterized in that, described method also comprises:
After carrier frequency or sub-district or base station or tracing area are activated, the message of notifying described carrier frequency or sub-district or base station or tracing area to activate to Operation ﹠ Maintenance System or adjacent node or mobile management node.
25. a network equipment is characterized in that, comprising:
Judging unit is used to judge whether carrier frequency or sub-district or base station or tracing area satisfy the condition of moving to energy saver mode;
The energy saver mode determining unit is used for determining the target energy saver mode of described carrier frequency or sub-district or base station or tracing area;
Migration units is used for described target energy saver mode is moved in described carrier frequency or sub-district or base station or tracing area.
26. the network equipment according to claim 25 is characterized in that, the described network equipment also comprises:
Professional switch unit is used for before carrier frequency or sub-district or base station or tracing area are switched to energy saver mode, and the business that will be positioned on this carrier frequency or sub-district or base station or the tracing area switches on other carrier frequency or sub-district or base station or the tracing area.
27. the network equipment according to claim 25 is characterized in that, the described network equipment also comprises:
Notification unit is used for after carrier frequency or sub-district or base station or tracing area are moved to the target energy saver mode, and the target energy saver mode that described carrier frequency or sub-district or base station or tracing area are moved to is notified to terminal.
28. an active device is characterized in that, comprising:
Judging unit is used to judge whether carrier frequency or sub-district or base station or tracing area satisfy the condition that activates;
Activate the unit, be used for when described judgment unit judges result when being, carrier frequency or sub-district or base station or tracing area are activated.
29. a network system is characterized in that, comprising: as any described network equipment in the claim 25 to 27 with as the active device in the claim 28.
CN200910128412A 2009-03-12 2009-03-12 Method for energy conservation and activation of base station, network device, active device and network system Pending CN101835247A (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201210164437.XA CN102821445B (en) 2009-03-12 2009-03-12 The method and apparatus of base station energy-saving
CN200910128412A CN101835247A (en) 2009-03-12 2009-03-12 Method for energy conservation and activation of base station, network device, active device and network system
PCT/CN2010/071016 WO2010102581A1 (en) 2009-03-12 2010-03-12 Method, equipment and network system for base station energy-saving and activation
ZA2011/07493A ZA201107493B (en) 2009-03-12 2011-10-12 Method, equipment and network system for base station energy-saving and activation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910128412A CN101835247A (en) 2009-03-12 2009-03-12 Method for energy conservation and activation of base station, network device, active device and network system

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN2012101718462A Division CN102685862A (en) 2009-03-12 2009-03-12 Power saving activation method and device
CN201210164437.XA Division CN102821445B (en) 2009-03-12 2009-03-12 The method and apparatus of base station energy-saving

Publications (1)

Publication Number Publication Date
CN101835247A true CN101835247A (en) 2010-09-15

Family

ID=42719128

Family Applications (2)

Application Number Title Priority Date Filing Date
CN200910128412A Pending CN101835247A (en) 2009-03-12 2009-03-12 Method for energy conservation and activation of base station, network device, active device and network system
CN201210164437.XA Active CN102821445B (en) 2009-03-12 2009-03-12 The method and apparatus of base station energy-saving

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201210164437.XA Active CN102821445B (en) 2009-03-12 2009-03-12 The method and apparatus of base station energy-saving

Country Status (3)

Country Link
CN (2) CN101835247A (en)
WO (1) WO2010102581A1 (en)
ZA (1) ZA201107493B (en)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011140941A1 (en) * 2010-05-12 2011-11-17 电信科学技术研究院 Method and device for implementing energy saving control between cells
CN102300295A (en) * 2011-08-11 2011-12-28 新邮通信设备有限公司 Method for realizing energy conservation of base station
CN102396257A (en) * 2011-05-16 2012-03-28 华为技术有限公司 Method, system and device of energy saving for base stations
CN102457947A (en) * 2010-10-19 2012-05-16 中国移动通信集团公司 Network energy saving system and method and relevant device
CN102595478A (en) * 2011-01-14 2012-07-18 华为技术有限公司 Cell energy-saving information processing method, network side equipment and user equipment
CN102595564A (en) * 2011-01-06 2012-07-18 中兴通讯股份有限公司 Cell energy-saving method, NodeB and long term evolution system
CN102612061A (en) * 2011-01-19 2012-07-25 中兴通讯股份有限公司 Energy saving recovery method and system based on S1 interface
WO2012097500A1 (en) * 2011-01-18 2012-07-26 Huawei Technologies Co., Ltd. A method for reducing energy consumption in a base station of a wireless network
WO2012127325A3 (en) * 2011-03-21 2012-11-22 Alcatel Lucent Method for energy saving in mobile communication system
WO2012155586A1 (en) * 2011-07-07 2012-11-22 中兴通讯股份有限公司 Method and system for selecting energy-saving cell
CN102843724A (en) * 2012-07-30 2012-12-26 东南大学 Energy conservation method in mobile communication system carrier aggregation scene
CN103024880A (en) * 2011-09-28 2013-04-03 普天信息技术研究院有限公司 Energy saving method and system of cell
CN103118371A (en) * 2011-11-17 2013-05-22 中兴通讯股份有限公司 Carrier frequency control method and device
CN103262614A (en) * 2010-10-22 2013-08-21 诺基亚西门子通信公司 Method of optimizing data exchange in communications network
US8731601B2 (en) 2009-10-19 2014-05-20 Huawei Technologies Co., Ltd. Energy saving management method for base station, apparatus and system
CN103814608A (en) * 2011-04-29 2014-05-21 英特尔公司 Techniques to manage energy savings for interoperable radio access technology networks
CN103947237A (en) * 2011-09-19 2014-07-23 北京大学 System and method for communication in a cellular network
CN104113901A (en) * 2010-10-19 2014-10-22 中国移动通信集团公司 Network energy saving system and method and related devices
CN104145489A (en) * 2012-01-27 2014-11-12 英特尔公司 Techniques for improved energy-savings management
CN104244321A (en) * 2014-09-19 2014-12-24 京信通信系统(中国)有限公司 Cell energy saving and awakening method and device
CN104782191A (en) * 2012-11-13 2015-07-15 三星电子株式会社 Method and apparatus for controlling operation state of base station in wireless communication system
CN104955088A (en) * 2014-03-27 2015-09-30 中兴通讯股份有限公司 Cell activating method and device
WO2016082539A1 (en) * 2014-11-28 2016-06-02 中兴通讯股份有限公司 Base station control method and base station
CN108243473A (en) * 2016-12-27 2018-07-03 大唐移动通信设备有限公司 The cell progress control method and device of a kind of dual carrier equipment
CN108990073A (en) * 2017-06-02 2018-12-11 中兴通讯股份有限公司 Overlapping control method, device and the base station of wireless area
CN109121158A (en) * 2017-06-22 2019-01-01 中国移动通信有限公司研究院 A kind of power-economizing method based on cell cooperative, device and storage medium
CN109769278A (en) * 2012-09-28 2019-05-17 三菱电机株式会社 Mobile communication system
CN109951789A (en) * 2017-12-19 2019-06-28 北京松果电子有限公司 Issue method, apparatus, storage medium and the equipment of location information
CN111417180A (en) * 2020-03-25 2020-07-14 沈欣颖 Network scheduling method and device for energy-saving management of cooperative base station
WO2024031967A1 (en) * 2022-08-08 2024-02-15 中兴通讯股份有限公司 Base station energy-saving method, electronic device and storage medium

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103179591B (en) * 2011-12-23 2017-12-05 中兴通讯股份有限公司 Intelligent power source management method and system in TD LTE systems
WO2015096166A1 (en) * 2013-12-28 2015-07-02 华为技术有限公司 Signal sending method, signal detection method and relevant device and system
CN104618956B (en) * 2015-01-12 2018-05-01 中国联合网络通信集团有限公司 A kind of method and device for controlling cell
CN110475318B (en) * 2018-05-10 2021-07-27 维沃移动通信有限公司 Base station energy-saving mode conversion method and network side equipment
CN112243285B (en) * 2019-07-16 2023-04-14 中国移动通信集团重庆有限公司 Base station energy saving method and device
CN112291806B (en) * 2020-11-03 2023-03-14 比科奇微电子(杭州)有限公司 Service migration method and device
CN113705707B (en) * 2021-09-02 2023-06-30 中国联合网络通信集团有限公司 Method and device for determining power saving state of base station cell and electronic equipment
WO2023044805A1 (en) * 2021-09-24 2023-03-30 北京小米移动软件有限公司 Method and apparatus for determining cell configuration

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4032257B2 (en) * 2004-06-28 2008-01-16 日本電気株式会社 Power saving method in wireless LAN, base station, terminal station, wireless LAN system
CN1893717A (en) * 2005-07-01 2007-01-10 华为技术有限公司 Method for setting sleep mode in mobile wide-band wire-less accessing system
KR100801649B1 (en) * 2006-10-12 2008-02-05 삼성전자주식회사 Standby mode power saving method for mobile terminal
CN100584063C (en) * 2007-06-22 2010-01-20 清华大学 An energy-saving method applied in GSM base station
CN101179814A (en) * 2007-11-28 2008-05-14 上海华为技术有限公司 Energy-saving method and apparatus for base station
CN101291510B (en) * 2008-06-03 2012-07-04 中兴通讯股份有限公司 Intelligent power-off method for carrier frequency

Cited By (46)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9485741B2 (en) 2009-10-19 2016-11-01 Huawei Technologies Co., Ltd. Energy saving management method for base station, apparatus and system
US8731601B2 (en) 2009-10-19 2014-05-20 Huawei Technologies Co., Ltd. Energy saving management method for base station, apparatus and system
WO2011140941A1 (en) * 2010-05-12 2011-11-17 电信科学技术研究院 Method and device for implementing energy saving control between cells
CN102457947B (en) * 2010-10-19 2016-03-30 中国移动通信集团公司 Network energy-saving system, network energy-saving method and relevant apparatus
CN102457947A (en) * 2010-10-19 2012-05-16 中国移动通信集团公司 Network energy saving system and method and relevant device
CN104113901B (en) * 2010-10-19 2017-11-03 中国移动通信集团公司 Network energy-saving system, network energy-saving method and relevant apparatus
CN104113901A (en) * 2010-10-19 2014-10-22 中国移动通信集团公司 Network energy saving system and method and related devices
CN103262614A (en) * 2010-10-22 2013-08-21 诺基亚西门子通信公司 Method of optimizing data exchange in communications network
CN102595564B (en) * 2011-01-06 2016-08-24 中兴通讯股份有限公司 Cell energy-saving method, base station and long evolving system
CN102595564A (en) * 2011-01-06 2012-07-18 中兴通讯股份有限公司 Cell energy-saving method, NodeB and long term evolution system
CN102595478A (en) * 2011-01-14 2012-07-18 华为技术有限公司 Cell energy-saving information processing method, network side equipment and user equipment
WO2012097500A1 (en) * 2011-01-18 2012-07-26 Huawei Technologies Co., Ltd. A method for reducing energy consumption in a base station of a wireless network
CN102612061A (en) * 2011-01-19 2012-07-25 中兴通讯股份有限公司 Energy saving recovery method and system based on S1 interface
WO2012097700A1 (en) * 2011-01-19 2012-07-26 中兴通讯股份有限公司 S1 interface-based method and system for resuming from power saving mode
CN102612061B (en) * 2011-01-19 2014-12-10 中兴通讯股份有限公司 Energy saving recovery method and system based on S1 interface
WO2012127325A3 (en) * 2011-03-21 2012-11-22 Alcatel Lucent Method for energy saving in mobile communication system
US9398528B2 (en) 2011-03-21 2016-07-19 Alcatel Lucent Method for energy saving in a mobile communication system
TWI596966B (en) * 2011-03-21 2017-08-21 Alcatel Lucent Energy-saving method in mobile communication system
CN103814608A (en) * 2011-04-29 2014-05-21 英特尔公司 Techniques to manage energy savings for interoperable radio access technology networks
CN102396257A (en) * 2011-05-16 2012-03-28 华为技术有限公司 Method, system and device of energy saving for base stations
WO2012155586A1 (en) * 2011-07-07 2012-11-22 中兴通讯股份有限公司 Method and system for selecting energy-saving cell
CN102300295A (en) * 2011-08-11 2011-12-28 新邮通信设备有限公司 Method for realizing energy conservation of base station
CN102300295B (en) * 2011-08-11 2014-02-19 新邮通信设备有限公司 Method for realizing energy conservation of base station
CN103947237B (en) * 2011-09-19 2017-12-15 北京大学 Communication system and method in cellular network
CN103947237A (en) * 2011-09-19 2014-07-23 北京大学 System and method for communication in a cellular network
CN103024880A (en) * 2011-09-28 2013-04-03 普天信息技术研究院有限公司 Energy saving method and system of cell
CN103118371A (en) * 2011-11-17 2013-05-22 中兴通讯股份有限公司 Carrier frequency control method and device
CN104145489B (en) * 2012-01-27 2018-08-17 英特尔公司 Technology for improved administration of energy conservation
US10085207B2 (en) 2012-01-27 2018-09-25 Intel Corporation Techniques for improved energy-savings management
CN104145489A (en) * 2012-01-27 2014-11-12 英特尔公司 Techniques for improved energy-savings management
CN102843724A (en) * 2012-07-30 2012-12-26 东南大学 Energy conservation method in mobile communication system carrier aggregation scene
CN102843724B (en) * 2012-07-30 2015-06-03 东南大学 Energy conservation method in mobile communication system carrier aggregation scene
CN109769278A (en) * 2012-09-28 2019-05-17 三菱电机株式会社 Mobile communication system
CN104782191A (en) * 2012-11-13 2015-07-15 三星电子株式会社 Method and apparatus for controlling operation state of base station in wireless communication system
CN104782191B (en) * 2012-11-13 2020-03-27 三星电子株式会社 Method and apparatus for controlling operation state of base station in wireless communication system
CN104955088B (en) * 2014-03-27 2020-02-14 中兴通讯股份有限公司 Cell activation method and device
CN104955088A (en) * 2014-03-27 2015-09-30 中兴通讯股份有限公司 Cell activating method and device
CN104244321A (en) * 2014-09-19 2014-12-24 京信通信系统(中国)有限公司 Cell energy saving and awakening method and device
WO2016082539A1 (en) * 2014-11-28 2016-06-02 中兴通讯股份有限公司 Base station control method and base station
CN108243473A (en) * 2016-12-27 2018-07-03 大唐移动通信设备有限公司 The cell progress control method and device of a kind of dual carrier equipment
CN108990073A (en) * 2017-06-02 2018-12-11 中兴通讯股份有限公司 Overlapping control method, device and the base station of wireless area
CN109121158A (en) * 2017-06-22 2019-01-01 中国移动通信有限公司研究院 A kind of power-economizing method based on cell cooperative, device and storage medium
CN109951789A (en) * 2017-12-19 2019-06-28 北京松果电子有限公司 Issue method, apparatus, storage medium and the equipment of location information
CN111417180A (en) * 2020-03-25 2020-07-14 沈欣颖 Network scheduling method and device for energy-saving management of cooperative base station
CN111417180B (en) * 2020-03-25 2023-06-16 沈欣颖 Network scheduling method and device for energy-saving management of cooperative base station
WO2024031967A1 (en) * 2022-08-08 2024-02-15 中兴通讯股份有限公司 Base station energy-saving method, electronic device and storage medium

Also Published As

Publication number Publication date
WO2010102581A1 (en) 2010-09-16
CN102821445B (en) 2016-03-30
CN102821445A (en) 2012-12-12
ZA201107493B (en) 2012-08-29

Similar Documents

Publication Publication Date Title
CN102821445B (en) The method and apparatus of base station energy-saving
JP6364410B2 (en) Small cell discovery method and apparatus
CN101971662B (en) Method and device for configuring measurement time slots for mobile terminals in a tdd system
CN101242636B (en) Method and system for configuring single-frequency network area
CN102065461B (en) Home base station information configuring and processing method and device
CN105208593A (en) Management method of auxiliary service district on non-authorized frequency spectrum, system and base station
CN102469557A (en) Method for accessing base station, base station and user equipment
CN102137430A (en) Method and device for reporting multimedia broadcast multicast service (MBMS) status
CN104168624A (en) Wireless network access control method, device and system
CN101772099A (en) Cell switching method and system, and access devices
CN102625320A (en) Femtocell network energy saving method
JP6414208B2 (en) Base station, radio communication system, communication method
CN101521870A (en) Method for supporting movement of UE between macro cells and HNB cells
WO2013026319A1 (en) Cell measurement method, information processing method, terminal, base station and network system
CN103167423A (en) Cell switching method, device and system for monitoring user terminal in clustered system
CN103188754A (en) Method, node and system for selecting target area
CN102685862A (en) Power saving activation method and device
CN102238659A (en) Base station switching processing method and base station equipment
WO2012152229A1 (en) Method, device and system for configuring wireless network
CN105992168A (en) Cell selection method and automatic neighbor cell relation configuration method and equipment
CN103686834A (en) Measurement reporting method and equipment
CN104618995A (en) Symbol turn-off processing method and equipment
CN102244877A (en) Method and device for updating neighbouring cell relationship list
WO2012155597A1 (en) Discontinuous reception method and equipment in mobility management
CN102857969A (en) Congestion control method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100915