CN101193406A - Uplink establishment method - Google Patents

Uplink establishment method Download PDF

Info

Publication number
CN101193406A
CN101193406A CNA200610161717XA CN200610161717A CN101193406A CN 101193406 A CN101193406 A CN 101193406A CN A200610161717X A CNA200610161717X A CN A200610161717XA CN 200610161717 A CN200610161717 A CN 200610161717A CN 101193406 A CN101193406 A CN 101193406A
Authority
CN
China
Prior art keywords
link
base station
station controller
configuration
described base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CNA200610161717XA
Other languages
Chinese (zh)
Inventor
黄萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CNA200610161717XA priority Critical patent/CN101193406A/en
Publication of CN101193406A publication Critical patent/CN101193406A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

The invention discloses a method for establishing a power up link, which comprises the following steps: S102, a base station uses a configuration which is connected with an E1 link to carry out negotiation link with a base station controller and sets time of reserved time length; and S104, a configuration which is connected with a second E1 link is used for negotiating with the base station controller to build a power up link if the base station fails to negotiate with the base station controller within the time limit, and the base station is used for collecting status information of the first E1 link and/or the second E1 link and reporting the status information to a corresponding management interface when the power up link is established. The invention not only ensures that a wireless telecommunication base station powers up and works steadily, but also calculates and reports the response information of the link status.

Description

Poweron link establishing method
Technical field
The present invention relates to the communications field, relate more specifically to a kind of Poweron link establishing method.
Background technology
The base station system of E1 transmission means generally includes: base station controller, several base stations and corresponding E1 transmission link.The link that powers on of base station is meant base station system at the beginning of powering on, and carries out initial negotiation to obtain the link of electrical information on corresponding necessity to base station controller.
Generally, use first and second E1 links to carry out the E1 clock synchronization of base station system.If there is fault in preceding two E1 communication, then the E1 of back also can't operate as normal.The link that powers on for the base station, normally select the configuration of article one E1 link to set up current source, if E1 link occurs fault article one, the base station system that will cause this link to connect can't power on, and the administrative staff that are positioned at base station controller can not understand real base station Reason For Deficiency.
Therefore, need first or second E1 link on increase the function that powers on, and require after the base station powers on success state with the E1 link to report corresponding administration interface to inquire about and solve fault for the attendant.
Summary of the invention
In view of the above problems, the present invention proposes a kind of Poweron link establishing method, under the situation that clock synchronization E1 breaks down therein, still can keep radio communication base station to power on and operate as normal.
According to the invention provides a kind of Poweron link establishing method, it is characterized in that, may further comprise the steps: S102, the base station use carries out link-attached configuration with article one E1 link and base station controller carries out link negotiation, sets the timing of scheduled duration simultaneously; And S104, if in timing, does not consult successfully with base station controller the base station, then use with second E1 link and carry out link-attached configuration and base station controller is held consultation, with the foundation link that powers on, wherein, after foundation powers on link, the state information about article one E1 link and/or second E1 link is collected in the base station, and reports corresponding administration interface.
In above-mentioned Poweron link establishing method, further may further comprise the steps: use the configuration that is connected with second E1 link with article one E1 link all not have to consult under the case of successful in the base station with base station controller, restart the base station, repeating step S102 and step S104.
In above-mentioned Poweron link establishing method, in timing, the base station use carries out link-attached configuration with article one E1 link and base station controller carries out link negotiation repeatedly up to consulting successfully.
In above-mentioned Poweron link establishing method, if in timing, does not consult successfully with base station controller the base station, further comprising the steps of: the link configuration of oneself is changed automatically so that carry out link-attached configuration and base station controller is held consultation in order to second E1 link in the base station.
By the present invention, therein under the situation that clock synchronization E1 breaks down, select other links to power on by base station system itself, can keep radio communication base station to power on and operate as normal, and the response message of Link State can be added up and reports, thereby improved the success rate that the base station powers on, and helped the unusual location and the alarm transmission of link.
Description of drawings
Fig. 1 is the flow chart according to Poweron link establishing method of the present invention;
Fig. 2 is the flow chart according to the specific embodiment of Poweron link establishing method of the present invention; And
Fig. 3 is the block diagram according to uplink establishment system of the present invention.
Embodiment
Below with reference to accompanying drawing, the specific embodiment of the present invention is described.
Fig. 1 shows according to Poweron link establishing method of the present invention; Fig. 2 shows the specific embodiment according to Poweron link establishing method of the present invention.
With reference to shown in Figure 1, illustrate according to Poweron link establishing method of the present invention.This Poweron link establishing method may further comprise the steps: S102, and the base station use carries out link-attached configuration with article one E1 link and base station controller carries out link negotiation, sets the timing of scheduled duration simultaneously; S104, if in timing, does not consult successfully with base station controller the base station, then uses with second E1 link and carry out link-attached configuration and base station controller is held consultation, with the foundation link that powers on.
This Poweron link establishing method further may further comprise the steps: after foundation powered on link, the state information about article one E1 link and/or second E1 link was collected in the base station, and reports corresponding administration interface.Alternatively, this Poweron link establishing method further may further comprise the steps: use the configuration that is connected with second E1 link with article one E1 link all not have to consult under the case of successful with base station controller in the base station, restart the base station, repeating step S102 and step S104.
Wherein, in timing, the base station use carries out link-attached configuration with article one E1 link and base station controller carries out link negotiation repeatedly up to consulting successfully.If in timing, does not consult successfully with base station controller the base station, further comprising the steps of: the link configuration of oneself is changed automatically so that carry out link-attached configuration and base station controller is held consultation in order to second E1 link in the base station.
Particularly, with reference to shown in Figure 2, the specific embodiment according to Poweron link establishing method of the present invention is described.
The initial period that powers in the base station, the base station acquiescence is initialized as the configuration that connects with article one E1 link with the link configuration of oneself, and carries out link negotiation with this configuration and base station controller, in this simultaneously, the timer of scheduled duration is set in base station oneself, waits for successes such as negotiation.
If timer then before, the link that powers on is set up, then the base station just can be according to normal flow process, by the link of setting up, obtains link configuration information and other necessary data that powers on veritably to base station controller and carries out the initial work of oneself.Finally, link setup is carried out with real link configuration in the base station, and beginning regular traffic flow process.
If use article one E1 link can't set up link, the base station can constantly attempt arriving up to the timer time.If within the timer duration, base station system all the time can't be by article one E1 link negotiation success, just the trial of article one E1 link is abandoned using in the base station, the link configuration of change oneself uses second E1 link to carry out link negotiation automatically.
Attempt having obtained success if use second E1 link to power on, the flow process that powers on of base station is the same with normal flow, and after normal operation, the state of contribution link (key is the state of article one E1 link) reports corresponding administration interface with it, offers the relevant base station attendant and positions and deal with problems.
All can't succeed if base station system has been attempted two E1 links, can restart automatically, attempt again.
With reference to shown in Figure 3, illustrate according to uplink establishment system of the present invention.This uplink establishment system, it comprises: first consulting device 302, be positioned at base station side, be used for using with article one E1 link and carry out link-attached configuration and base station controller carries out link negotiation, set the timing of scheduled duration simultaneously; Second consulting device 304 is positioned at base station side, if be used in timing, first consulting device is not consulted successfully with base station controller, then uses with second E1 link and carries out link-attached configuration and base station controller is held consultation, with the foundation link that powers on.
This uplink establishment system further comprises: the information reporting device, be positioned at base station side, and be used for after foundation powers on link, collect state information, and report corresponding administration interface about article one E1 link and/or second E1 link.This uplink establishment system may further include: the base station rebooting device, be used for using the configuration that is connected with second E1 link with article one E1 link all not have to consult under the case of successful with base station controller at first consulting device and second consulting device, restart the base station, make first consulting device carry out link-attached configuration and base station controller carries out link negotiation with article one E1 link, set the timing of scheduled duration simultaneously, and second consulting device, first consulting device in is not regularly consulted under the case of successful with base station controller, carry out link-attached configuration and base station controller is held consultation with second E1 link, with the foundation link that powers on.
Wherein, in timing, the use of first consulting device carries out link-attached configuration with article one E1 link and base station controller carries out link negotiation repeatedly up to consulting successfully.
Wherein, if in timing, first consulting device is not consulted successfully with base station controller, and then second consulting device also is used for: change the link configuration of oneself automatically so that carry out link-attached configuration and base station controller is held consultation in order to second E1 link.
By above description as can be known, main thought of the present invention is, the starting stage that powers in the base station, and still use the E1 link of acquiescence to be provided with, carry out the link negotiation on upper strata with article one E1 link.If the upper strata link negotiation can be set up, the link that it is good that foundation will be used in the base station obtains the needed necessary information that powers on.If within the predetermined time, upper-layer protocol is found to have no idea all the time to set up link, and article one E1 is abandoned using in the base station, changes the E1 link configuration of oneself, then uses second E1 link to carry out the trial of link setup.The link establishment success after base station system powers on, reports the unusual situation of article one E1 link by alarm, make base control obtain this message, is beneficial to locate unusually and solution and follow-up business and configuration information communication.
By the present invention, therein under the situation that clock synchronization E1 breaks down, select other links to power on by base station system itself, can keep radio communication base station to power on and operate as normal, and the response message of Link State can be added up and reports, thereby improved the success rate that the base station powers on, and helped the unusual location and the alarm transmission of link.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (4)

1. a Poweron link establishing method is characterized in that, may further comprise the steps:
S102, the base station use carries out link-attached configuration with article one E1 link and base station controller carries out link negotiation, sets the timing of scheduled duration simultaneously; And S104, if in described timing, does not consult successfully with described base station controller described base station, then use with second E1 link and carry out link-attached configuration and described base station controller is held consultation, and setting up the described link that powers on,
Wherein, after setting up the described link that powers on, the state information about described article one E1 link and/or described second E1 link is collected in described base station, and reports corresponding administration interface.
2. Poweron link establishing method according to claim 1 is characterized in that, further may further comprise the steps:
Use the configuration that is connected with described second E1 link with described article one E1 link all not have to consult under the case of successful with described base station controller in described base station, restart described base station, repeating said steps S102 and described step S104.
3. Poweron link establishing method according to claim 1 is characterized in that, in described timing, the use of described base station carries out link-attached configuration with article one E1 link and base station controller carries out link negotiation repeatedly up to consulting successfully.
4. Poweron link establishing method according to claim 1 is characterized in that, if in described timing, does not consult successfully with described base station controller described base station, further comprising the steps of:
The link configuration of oneself is changed automatically so that carry out link-attached configuration and described base station controller is held consultation in order to second E1 link in described base station.
CNA200610161717XA 2006-12-13 2006-12-13 Uplink establishment method Withdrawn CN101193406A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200610161717XA CN101193406A (en) 2006-12-13 2006-12-13 Uplink establishment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA200610161717XA CN101193406A (en) 2006-12-13 2006-12-13 Uplink establishment method

Publications (1)

Publication Number Publication Date
CN101193406A true CN101193406A (en) 2008-06-04

Family

ID=39488085

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200610161717XA Withdrawn CN101193406A (en) 2006-12-13 2006-12-13 Uplink establishment method

Country Status (1)

Country Link
CN (1) CN101193406A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11677862B1 (en) 2010-02-27 2023-06-13 Jenam Tech, Llc Methods, systems, and computer program products for sharing information for detecting an idle TCP connection

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11677862B1 (en) 2010-02-27 2023-06-13 Jenam Tech, Llc Methods, systems, and computer program products for sharing information for detecting an idle TCP connection

Similar Documents

Publication Publication Date Title
CN102104893B (en) Method, device and wireless access point equipment for realizing hot backup of wireless controller
MXPA03005348A (en) Wireless communication networks for providing remote monitoring of devices.
WO1998029962A3 (en) Method for repeater management
CN103338500A (en) Method, device and system for data transmission, network side equipment and terminal equipment
KR20110081724A (en) Method and apparatus of paging for high power saving reception mode m2m/mtc device communication in a mobile communication system
TW200644691A (en) Method of communication supporting media independent handover
GEP20105122B (en) Method and system for transferring information between network management entities of a wireless communication system
FI20000212A (en) Connection negotiation in a telecommunication system
TW200515757A (en) Resource negotiation in wireless communications networks and methods
WO2004062202A3 (en) Method and apparatus to establish communication
PL1704675T3 (en) Method and system for connecting user equipment to a communications network
CN105188022A (en) Wireless routing device and communication method
EP0920229A3 (en) Mobile communication termination controlling method and system
CN104602328A (en) Methods and equipment for configuring DRX (Discontinuous Reception) and monitoring control channel and system for configuring DRX
CN108093397A (en) A kind of report method and device of the ability information of terminal
CN102143604A (en) Method, system and device for recovering control and provisioning for wireless access point (CAPWAP) tunnel
CN106912043A (en) A kind of Wi Fi equipment, distribution method and system
CN101137161B (en) Poweron link establishing method and system
CN101193406A (en) Uplink establishment method
FR2862473B1 (en) METHOD FOR CONTROLLING COMMUNICATION SERVICE IN A TELECOMMUNICATION SYSTEM AND SWITCH THEREFOR
CN101193405A (en) Uplink establishment system
CN103152777B (en) Communicator and frequency band switching method
CN109831816A (en) A kind of method and system that NBIOT intelligent door lock power consumption is effectively reduced
CN101754208A (en) The hash key generation device and the method that are used for wireless communication system
CN101668321B (en) Control method, device and system for connecting network by multimode mobile terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C04 Withdrawal of patent application after publication (patent law 2001)
WW01 Invention patent application withdrawn after publication