CN101047609A - Working flow route control device - Google Patents
Working flow route control device Download PDFInfo
- Publication number
- CN101047609A CN101047609A CNA2007100089354A CN200710008935A CN101047609A CN 101047609 A CN101047609 A CN 101047609A CN A2007100089354 A CNA2007100089354 A CN A2007100089354A CN 200710008935 A CN200710008935 A CN 200710008935A CN 101047609 A CN101047609 A CN 101047609A
- Authority
- CN
- China
- Prior art keywords
- flow
- flow process
- routing
- rule
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A control device of operation flow rote consists of operation flow computer system and route control module. It is featured as setting operation flow computer of operation flow computer system at each operation position, connecting said operation flow computer directly to flow control server and short message machine server as well as flow databank server through internal local area network.
Description
Technical field
The present invention relates to a kind of Working flow route control device, belong to the workflow technology field.
Background technology
Workflow (Workflow) is exactly the computation model of workflow, is about to that the logic that organizes together before and after the work how in the workflow and rule are represented with appropriate model and to the calculation that plays tricks in fact in computer.The subject matter that workflow will solve is: for realizing certain business objective, between a plurality of participants, utilize computer, transmit document, information or task automatically by certain pre-defined rule.Workflow engine is the core of whole workflow platform, and it has controlled the circulation of whole service flow process.At present in the prior art several main workflow engines have appearred, BPEL for example, OSWorkflow, OpenWFE etc.
Routing table in the present most workflow engine all is that predefined is good, if in operation, found bottleneck, the problem of flow process, when need be optimized and recombinate, often need whole workflow platform is carried out a large amount of transformations, can't make things convenient for, carry out flexibly the adjustment of flow process route.
Summary of the invention
The objective of the invention is to provide a kind of Working flow route control device, this device helps the user for realizing certain business objective, between a plurality of participants, utilize computer, thereby transmit the adjustment that document, information or task are carried out the flow process route conveniently, flexibly automatically by certain pre-defined rule, improve work efficiency.
Working flow route control device of the present invention is made up of the workflow department of computer science routing module control two parts of unifying, wherein the workflow computer system includes: the workflow computer that is positioned at each working position, this workflow computer directly is connected with flow process Control Server, short message machine server, flow database server by internal lan, and the flow database server is connected with the flow data storage medium by optical fiber; Short message machine server directly is connected with mobile phone by telecommunications network; Wherein routing module control comprises: independent be provided with is connected and flow process Role Management module, flow operations administration module and the flow process routing management module of the single operating state of automatic control flow chart worker the independent note transmission administration module that is connected, also can sends reminding alarm information with short message machine server that is provided with the flow process Control Server.
Above-mentioned flow process Role Management module is meant that definition participates in the role of process action, and participates in personnel's distribution role separately of process action to all.
Described flow operations administration module, be meant be defined in user in the flow process circulation process the flow process standard operation that can use.
Described flow process routing management module is meant the routing rule that defines flow process, drives the circulation of flow process worker list.
Described note sends administration module, be meant that function such as can carry out that note is reminded, pressed to the treatment people of this worker's list when the worker singly arrives the idiographic flow node, the kind that note is reminded can be divided into the single arrival notice of worker, the single overtime prompting of worker, worker and singly press prompting etc.
Described flow process worker is single, has defined the packet of other job informations such as task, operating personnel in the workflow exactly.
The present invention has adopted the method for network route, and carried out deep research on its basis, it is applied in the workflow engine, the control method of process controller of the present invention and route, not only realized the automatic routing function of flow process on the workflow platform, the problem of losing list, leakage list, wrong list and the single delay of worker in the adjustment of carrying out route that can also be convenient, flexible and the solution production procedure.
Below by accompanying drawing, technical scheme of the present invention is described in further detail.
Description of drawings
Fig. 1 is the hardware structure diagram of Working flow route control device;
Fig. 2 is the functional block diagram of process controller and route control method thereof;
Fig. 3 is the schematic diagram of process controller and route control method thereof;
Fig. 4 is the process chart of process controller and route control method thereof;
Fig. 5 is process controller and route control method embodiment one flow process circulation routing rule thereof;
Fig. 6 is process controller and route control method embodiment two route control and treatment flow charts thereof
Embodiment
As shown in Figure 1, be the hardware structure diagram of Working flow route control device of the present invention, mainly comprise the flow nodes that flow process Control Server, flow database server, short message machine, flow data storage medium and the present invention are outer.
Flow nodes both can be that a action in certain production procedure also can be the cover system on certain production link, and the circulation between the flow nodes is all judged automatically by process controller, and controlled.
The flow process Control Server as the total control switch of production link automatic flow, can be collected the service data on each production link (flow nodes) automatically, analyzes automatically and automatically production task is circulated to next working link according to analysis result.The flow process Control Server is the carrier of route control method, wherein, mainly stored control datas such as flow process routing control table, flow rules control table, flow process role's control table, flow operations control table, and real-time analysis and route control have been carried out in the production procedure that is moving on the flow process by these data.
The flow database server is mainly collected and is stored the basic data in the production procedure process, and the concrete operation process data of flow process are stored.
The short message machine is mainly used to the short message prompt information of the task that sends to the concrete operations personnel in the production link, reminds operating personnel in time to carry out the operation of production link.
Said apparatus all intercoms mutually by Ethernet, also has the flow data storage medium in addition, mainly is the concrete storage medium of flow data, carries out the mutual of data by optical fiber and flow database server.
As shown in Figure 2, the functional block diagram for process controller of the present invention and route control method thereof mainly comprises: flow process Role Management, flow operations management, flow process routing management, note send four parts of management.
The flow process Role Management has defined the role who participates in process action, and participates in personnel's distribution role separately of process action to all, and carries out the management of User Status.The operation-roles of each node in the workflow, the configuration of the corresponding management of user and the management of User Status have mainly been defined in this module, as one of Rule of judgment of flow process circulation with the role.
Flow operations management, be defined in user in the flow process circulation process the flow process standard operation that can use.Comprise and build operations such as single, that commentaries on classics is sent, replied, accepts, returns, handles, presses, cancels, closes.
The flow process routing management, the routing rule of definition flow process drives the flow process circulation.Wherein also be divided into flow rules management and two submodules of flow process routing table management.Static routing rule, dynamic routing rule, artificial routing rule, this four rule-like of pressure tolerance rule have been managed in the flow rules management; The management of flow process routing table is the core of the automatic route of whole flow process, and it mainly is responsible for carrying out the circulation and the driving of procedure links as the combination of flow rules.
Note sends management, mainly function such as is responsible for can carrying out that note is reminded, pressed to the treatment people of this worker's list when the worker singly arrives the idiographic flow node; The kind that note is reminded can be divided into the single arrival notice of worker, the single overtime prompting of worker, worker and singly press types such as prompting.
As shown in Figure 3, be the schematic diagram of process controller of the present invention and route control method thereof, each working link on the figure in the corresponding workflow of each node, each working link all can only be operated by corresponding role's personnel.Circulation between the flow nodes all drives by routing table and rule list.Flow rules grid of reference Routing Protocol can be divided into: static routing rule, dynamic routing rule, artificial routing rule, pressure tolerance rule, these rules are provided with simultaneously and can form the combination routing table, by the flow nodes load and execution.
In flow nodes refinement figure, when flow process turns round that flow process is relevant routing table, rule and relevant role, operation deposit relevant register in, when but the loading of corresponding routing table, routing rule, role state executable operations is carried out in flow process running during to each flow nodes, the automatic route that the analysis by flow data and the matching relationship of dependency rule come realization flow.
When flow process circulates to some nodes, the executable operation of this node of inquiry earlier, and then table of query and routing, the routing rule of finding out the required loading of this node according to priority (loads the high rule of priority earlier, priority is identical then all to be needed to load, needs continue to load priority time high rule in routing table if the condition in the routing rule does not satisfy then), to the routing rule table, search corresponding routing rule then, at last circulate to destination node routing table schematic diagram such as following according to the condition of setting in the routing rule:
Route Distinguisher | The routing node name | Role name | The routing rule classification | The routing rule sign | The routing rule name | Priority |
1 | A | The role 1 | The static routing rule | Int1 | Static routing rule 1 | 5 |
2 | B | The | The dynamic routing rule | Int2 | | 5 |
3 | D | The | Artificial route rule | Int3 | | 5 |
Then | Then 1 | |||||
4 | B | The | Pressure tolerance rule | Int4 | | 4 |
The static routing rule is directly to send the routing mode of destination node when realizing trouble ticket dispatch by appointment flow process next node to.Static routing rule schematic diagram is as follows:
Rule ID | The routing rule name | Loading environment | The destination node name | Outside process identification |
1 | Static routing rule 1 | Combination condition 1 | B | 0 |
It is a plurality of that the dynamic routing rule is meant that destination node has, and adopts pro rate or the busy not busy routing mode of realizing the target flow nodes that distributes.
The pro rate route, the destination node that may distribute is provided with counter, according to the allocation proportion that presets initial value is set, select the flow nodes of Counter Value maximum earlier and send list, counter with this node subtracts one then, analogize in proper order, all become 0 up to all flow process counters, counting restarts in system.
Applicating example (is example with two target flow nodes):
Example 1: order group is single, and the ratio of flow process 1 and flow process 2 is 1: 1
Example 2: only send a flow process, the ratio of flow process 1 is 1, is equivalent to the static routing rule
Example 3: single according to 2: 1 minutes allotments of labor, the ratio of flow process 1 and flow process 2 is 2: 1
The busy not busy route of distributing is added up the busy not busy situation of the destination node that may distribute, and each to select " operating state---free time " maximum node to distribute the worker single.Dynamic routing rule schematic diagram is as follows:
Rule ID | The routing rule name | Distribute type | Loading environment | The destination node collection | Distribution principle | Outside process identification |
1 | Dynamic routing rule 1 | Ratio | Combination condition 1 | C | 20% | 0 |
D | 20% | 0 | ||||
E | 20% | 0 | ||||
G | 20% | 0 | ||||
G | 20% | 0 |
Artificial routing rule is meant the circulation that realizes worker's list by the single mode of manual group, and system can set the single destination node (a plurality of destination nodes can be arranged, support concurrent) of manual group, as the operation of cancelling the order must adopt the mode of artificial route to realize.Artificial routing rule schematic diagram is as follows:
Rule ID | The routing rule name | Loading environment | The destination node collection | Concurrent sign | Outside process identification |
1 | Artificial routing rule 1 | Combination condition 1 | C | 1 | 1 |
D | 1 | 1 | |||
E | 1 | 1 |
Annotate: whether concurrent sign is represented, be concurrent flow process when selecting a plurality of node.
Pressure tolerance rule adopts the Packet Filtering technology to realize the return to work filtering function of single or non-concern worker list of counterweight, the user can be absorbed in handle important, urgent task.The pressure tolerance is mainly judged according to time and number of times.
Time tolerance rule: the stand-by period of having only at certain worker's list has surpassed the thresholding that pre-sets, and just can distribute next destination node.
Number of times tolerance rule: in the continuous time of regulation,, just can distribute next destination node, simultaneously these a plurality of workers singly are merged into a worker and singly handle if the triggering times of certain type of worker's list surpasses the thresholding that pre-sets.
Pressure tolerates that regular schematic diagram is as follows:
Rule ID | The routing rule name | Loading environment | The destination node collection | The time threshold values | The number of times threshold values | Outside process identification |
1 | Pressure tolerance rule 1 | Combination condition 1 | | 5 | 1 | |
2 | | Combination condition 2 | D | 15 | 1 |
As shown in Figure 4, the process chart for process controller of the present invention and route control method thereof comprises the steps:
Step 1, user carry out task operating on workflow platform, trouble ticket dispatch is to some flow nodes of flow process;
As shown in Figure 5, be process controller of the present invention and route control method embodiment one flow process circulation routing rule thereof, system's collection network information from network management system or other system at first in the present embodiment, system finds to exist in the network some operation hidden danger by analyzing then, system produces early warning and gives the alarm, then analyze, the early warning of satisfying certain condition directly is distributed to personnel on the next node (as network optimization flow process by routing rule with the form of worker's list according to the route control unit in the flow process route control method, the early warning handling process) handles.Some early warning have loaded pressure tolerance rule and artificial routing rule simultaneously, and this early warning will be under the situation that satisfies the pressure tolerance so (for example: early warning frequency or early warning the back take place surpass preset time and also recover) reminds operating personnel to carry out that artificial to distribute the worker single.Also have some early warning to load the dynamic routing rule, this early warning will be sent list toward network optimization handling process and engineering construction handling process respectively automatically according to dynamic routing rule default in the rule so.Concrete treatment people obtains from the Role Management table according to different professional different device types.Finished a process in the present embodiment and realized the process of checking voluntarily, analyze, handling of network operation situation from collection network data, phase-split network data, loading flow process routing rule.
As shown in Figure 6, for process controller of the present invention and route control method embodiment two route control and treatment flow charts thereof, comprise the steps:
The trouble ticket dispatch of step 101, customer complaint is to some nodes of complaint handling flow process;
Present embodiment, realized one from network operation collection analysis, system locate automatically, system distributes process that the corresponding work personnel give concrete staff automatically according to routing rule.
It should be noted last that, above embodiment is only unrestricted in order to technical scheme of the present invention to be described, although the present invention is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement technical scheme of the present invention, and not break away from the spirit and scope of technical solution of the present invention.
Claims (3)
1, a kind of Working flow route control device, it is characterized in that: this control device is made up of the workflow department of computer science routing module control two parts of unifying, wherein the workflow computer system includes: the workflow computer that is positioned at each working position, this workflow computer directly is connected with flow process Control Server, short message machine server, flow database server by internal lan, and the flow database server is connected with the flow data storage medium by optical fiber; Short message machine server directly is connected with mobile phone by telecommunications network; Wherein routing module control comprises: independent be provided with is connected and flow process Role Management module, flow operations administration module and the flow process routing management module of the single operating state of automatic control flow chart worker the independent note transmission administration module that is connected, also can sends reminding alarm information with short message machine server that is provided with the flow process Control Server.
2, according to claims 1 described Working flow route control device, it is characterized in that: wherein flow process Role Management module is the role that definition participates in process action, and distribute separately role to the personnel that all participate in process actions, the flow operations administration module be defined in user in the flow process circulation process the flow process standard operation that can use, the routing rule of flow process routing management module definition flow process drives the circulation of flow process worker list.
3, according to claims 1 described Working flow route control device, it is characterized in that: wherein note sends administration module, by way of short messages the flow process operating personnel is carried out reminding alarm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007100089354A CN101047609A (en) | 2007-05-08 | 2007-05-08 | Working flow route control device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007100089354A CN101047609A (en) | 2007-05-08 | 2007-05-08 | Working flow route control device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101047609A true CN101047609A (en) | 2007-10-03 |
Family
ID=38771848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007100089354A Pending CN101047609A (en) | 2007-05-08 | 2007-05-08 | Working flow route control device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101047609A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008092344A1 (en) * | 2007-01-30 | 2008-08-07 | Huawei Technologies Co., Ltd. | A method and device for selecting the work flow route |
CN101626523B (en) * | 2008-07-10 | 2011-06-29 | 中国移动通信集团天津有限公司 | Method and device for scheduling circuit resources |
CN102496088A (en) * | 2011-12-14 | 2012-06-13 | 河北省电力公司通信中心 | Method for improving executive force of power communication overhaul core flow |
CN103532852A (en) * | 2013-10-11 | 2014-01-22 | 小米科技有限责任公司 | Routing scheduling method, routing scheduling device and network equipment |
CN103700026A (en) * | 2013-11-30 | 2014-04-02 | 北京科东电力控制系统有限责任公司 | Free node transfer processing method for intelligent power grid dispatching |
CN103903084A (en) * | 2012-12-28 | 2014-07-02 | 深圳市世纪凯旋科技有限公司 | Authentication method and system |
CN111178748A (en) * | 2019-12-26 | 2020-05-19 | 明阳智慧能源集团股份公司 | Method for automatically avoiding repeated work orders of early warning system of wind generating set |
CN111506698A (en) * | 2020-03-13 | 2020-08-07 | 浙江执御信息技术有限公司 | Intelligent process processing method based on sop |
-
2007
- 2007-05-08 CN CNA2007100089354A patent/CN101047609A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008092344A1 (en) * | 2007-01-30 | 2008-08-07 | Huawei Technologies Co., Ltd. | A method and device for selecting the work flow route |
CN101626523B (en) * | 2008-07-10 | 2011-06-29 | 中国移动通信集团天津有限公司 | Method and device for scheduling circuit resources |
CN102496088A (en) * | 2011-12-14 | 2012-06-13 | 河北省电力公司通信中心 | Method for improving executive force of power communication overhaul core flow |
CN103903084A (en) * | 2012-12-28 | 2014-07-02 | 深圳市世纪凯旋科技有限公司 | Authentication method and system |
CN103532852A (en) * | 2013-10-11 | 2014-01-22 | 小米科技有限责任公司 | Routing scheduling method, routing scheduling device and network equipment |
CN103700026A (en) * | 2013-11-30 | 2014-04-02 | 北京科东电力控制系统有限责任公司 | Free node transfer processing method for intelligent power grid dispatching |
CN111178748A (en) * | 2019-12-26 | 2020-05-19 | 明阳智慧能源集团股份公司 | Method for automatically avoiding repeated work orders of early warning system of wind generating set |
CN111506698A (en) * | 2020-03-13 | 2020-08-07 | 浙江执御信息技术有限公司 | Intelligent process processing method based on sop |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101047609A (en) | Working flow route control device | |
CN105354762B (en) | Power customer service work order identification and distribution system and method | |
CN108520316A (en) | A kind of data-optimized processing method of overload alarm | |
RU2009126605A (en) | METHOD AND DEVICE FOR ALLOCATING NETWORK RESOURCES IN A GROUP COMMUNICATION SYSTEM | |
EP2053786A3 (en) | Targeted resource allocation | |
CN101046811A (en) | Data integral service system and method | |
CN101196832A (en) | Resource proxy machine facing illumination variant equipment | |
CN101038640A (en) | Worksheets priority level administration method and system, and worksheets process method and system | |
CN109636321A (en) | Human Resource Management System based on synergetic office work platform | |
WO2021164265A1 (en) | Crowdsourcing task allocation method and apparatus, and electronic device and storage medium | |
CN111984718A (en) | Information management platform of government affair information system based on data sharing exchange | |
CN111858000A (en) | Task decomposition and monitoring management system | |
CN115392628A (en) | Emergency command and dispatch system for emergency | |
CN108280147A (en) | Data management method and device | |
WO2016137121A1 (en) | Integrated platform management system for cooperation between manufacturers | |
CN112581073B (en) | Method and system for managing collection operation maintenance labor intensity of robbery dispatch order | |
CN108694082A (en) | A kind of cross-domain operation stream scheduling method and system | |
CN1386233A (en) | Workflow system | |
CN113568931A (en) | Route analysis system and method for data access request | |
CN106599116B (en) | Cloud platform data integration management system and method | |
CN114066660A (en) | Insurance client resource development management system and management method | |
CN1266916C (en) | Telephone traffic statistical method based on rearward shift of task | |
CN101071489A (en) | Work flow management system and method for realizing work process automation | |
CN107070711A (en) | Operation management system and the processing method of O&M order | |
CN106126735A (en) | A kind of city management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20071003 |