CA3027547C - In situ combustion recovery process for mature hydrocarbon recovery operations - Google Patents

In situ combustion recovery process for mature hydrocarbon recovery operations Download PDF

Info

Publication number
CA3027547C
CA3027547C CA3027547A CA3027547A CA3027547C CA 3027547 C CA3027547 C CA 3027547C CA 3027547 A CA3027547 A CA 3027547A CA 3027547 A CA3027547 A CA 3027547A CA 3027547 C CA3027547 C CA 3027547C
Authority
CA
Canada
Prior art keywords
well
oxidizing gas
implementation
injection
combustion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CA3027547A
Other languages
French (fr)
Other versions
CA3027547A1 (en
Inventor
Jian Li
Kim Chiu
Cal Coulter
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suncor Energy Inc
Original Assignee
Suncor Energy Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suncor Energy Inc filed Critical Suncor Energy Inc
Priority to CA3027547A priority Critical patent/CA3027547C/en
Priority to CA3168169A priority patent/CA3168169A1/en
Publication of CA3027547A1 publication Critical patent/CA3027547A1/en
Application granted granted Critical
Publication of CA3027547C publication Critical patent/CA3027547C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/243Combustion in situ
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2406Steam assisted gravity drainage [SAGD]
    • E21B43/2408SAGD in combination with other methods

Abstract

A process for in situ combustion in a mature hydrocarbon recovery operation in an underground reservoir is disclosed. The mature hydrocarbon recovery operation includes well pairs and an interwell communication zone between the well pairs. The process includes injecting an oxidizing gas through at least one well to initiate combustion and promote mobilization of residual heavy hydrocarbons in the reservoir. The interwell communication zone may have a bitumen saturation of from about 0.20 to about 0.05. Alternatively, the oxidizing gas may be injected at an injection flux of about 0.3 to about 1.2 m3(ST)/m2.hour. The mature hydrocarbon recovery operation may be a Steam-Assisted Gravity Drainage (SAGD) operation.

Description

IN SITU COMBUSTION RECOVERY PROCESS FOR MATURE HYDROCARBON
RECOVERY OPERATIONS
FIELD OF THE TECHNOLOGY
[01] The present technology relates to a process for recovering bitumen/oil from an underground reservoir and more precisely to an in situ combustion recovery process for mature hydrocarbon recovery operations, such as in situ thermal operations.
BACKGROUND
[02] In situ steam based thermal extraction is one of the most extensively used techniques for recovering heavy hydrocarbons, such as heavy oils and bitumen, from underground reservoirs. For example, this technique has been successful in extracting bitumen from the Northern Alberta oil sands. Cyclic Steam Simulation (CSS) and Steam Assisted Gravity Drainage (SAGD) are two major processes that have been used for in situ thermal extraction. However, each of these processes has an economic limit and when this limit is reached; steam injection is terminated or scaled back. The economic limit of a SAGD
operation depends of course on several factors. One indicator that a SAGD
process is approaching its economic limit is often when the steam chambers which have developed in the reservoir have stopped increasing in volume. In the latter stage of a SADG
operation as it approaches or reaches its economic limit, the SAGD operation is generally referred to as being "mature". In the case of multiple SAGD well pairs adjacent to one another, which is often the case in the field, individual steam chambers developed above and around each well pair begin to coalesce with one another until one common steam chamber is formed.
Eventually an equilibrium is reached at which point the steam chamber generally stops growing, assuming a constant steam injection rate is maintained. The maturity of a SAGD
operation can also be indicated for example in terms of the steam-oil ratio (SOR). When the SOR is too high, the process becomes uneconomic. However, when a SAGD
operation has reached maturity, significant oil/bitumen still remains in the reservoir and the SAGD
chambers and it would be desirable to recover as much as possible of the remaining hydrocarbons.
[03] In situ combustion is another technique which can be used to extract oil/bitumen from underground reservoirs. In general, in situ combustion involves the injection of an oxidizing gas such as air into the reservoir to enable combustion of some of the reservoir hydrocarbons underground as fuel, thus heating and forcing the mobilized hydrocarbons to facilitate production. There are several known methods of in situ combustion using various injection and production wells patterns and orientations, oxidizing gas injection strategies and well constructions and designs. However, in various reservoir geologies and scenarios, in situ combustion has not been a proven method for bitumen recovery. Indeed, several in situ combustion field projects have been prematurely terminated, due to low fluid mobility in the reservoir and oxygen or combustion front rapid breakthrough from the producers among other challenges. Oxygen breakthrough has several challenges including hazards such as light hydrocarbon vapor/gas explosions at producers resulting in tubular damage, flue gas breakthrough at producers causing wellbore gas-liquid interference during production, and acid gas resulting in corrosion both in downhole equipment and surface facilities.
[04] Canadian patent No. 2,594,414 discloses a technology for recovering oil/bitumen using an air injection method into wells previously employed for a SAGD
operation.
Continuous air injection is conducted through an injection well while producers are maintained open in production mode throughout the process. This purportedly allows keeping the SAGD zones at constant pressure. The speed of combustion front in the formation is purportedly designed by the rate of air to be injected. However, continuous air injection is a technique which is difficult to apply to bitumen recovery, for instance because of the problem of air or oxygen early breakthrough observed in in situ combustion field applications. One reason for difficulties is due to significant heterogeneity in the reservoir, especially after SAGD operation, where hot spots and cold spots are observed.
Hot spots show a high mobility of gas/air due to lower oil/bitumen saturation and lower oil/bitumen viscosity, compared to cold spots. Fluid saturation and temperature distributions can vary from place to place at the mature stage of a SAGD operation, which creates heterogeneity to fluid mobility. Therefore, air or oxygen tend to flow through the area that is of the lowest flowing resistance, i.e. the highest directional permeability streaks or most depleted portions within the SAGD chamber. Another reason for difficulties is that within mature steam chamber, the air injector(s) will connect to producer(s) through some high permeability streaks that are of the lowest flow resistance to air or flue gas and become early oxygen/combustion breakthrough paths, if measures related to restriction of production are not taken.
[05] There is thus a need for a technology that overcomes at least some of the drawbacks of what is known in the field, such as the above-mentioned drawback that can result from premature oxygen/combustion breakthrough and/or low mobility of fluids, that increases the recovery of hydrocarbons from an underground reservoir at a mature stage of a SAGD
operation and/or that enables hydrocarbon recovery while reducing or maintaining a low steam-oil ratio.
SUMMARY
[06] The present technology responds to the above need by providing an in situ combustion recovery process for mature hydrocarbon recovery operations, such as in situ thermal operations.
[07] In a first aspect, there is provided a process for in situ combustion in a mature hydrocarbon recovery operation in an underground reservoir, the mature hydrocarbon recovery operation including well pairs and an interwell communication zone between the well pairs, the process including injecting an oxidizing gas through at least one well to initiate .. combustion and promote mobilization of residual heavy hydrocarbons in the reservoir, wherein the oxidizing gas is injected at an injection flux of about 0.3 to about 1.2 m3(ST)/m2.hour.
[08] In another aspect, there is provided a process for in situ combustion in a mature Steam-Assisted Gravity Drainage (SAGD) operation in an underground reservoir, the mature SAGD operation including well pairs and an interwell communication zone between the well pairs, the process including injecting an oxidizing gas through at least one well to initiate combustion and promote mobilization of residual heavy hydrocarbons in the reservoir, wherein the oxidizing gas is injected at an injection flux of about 0.3 to about 1.2 m3(ST)/m2.hour.
[09] In one implementation, the interwell communication zone has a bitumen saturation of from about 0.20 to about 0.05.
[010] In one implementation, the interwell communication zone has a porosity between about 0.30 to 0.35.
[011] In one implementation, the interwell communication zone has a temperature of at least about 150 C upon initial injection of the oxidizing gas.
[012] In one implementation, the interwell communication zone has a temperature of at least about 175 C upon initial injection of the oxidizing gas.
[013] In one implementation, the interwell communication zone has a temperature of at least about 200 C upon initial injection of the oxidizing gas.
[014] In one implementation, the oxidizing gas is oxygen, air, enriched air, a mixture steam/air or a mixture thereof.
[015] In one implementation, the oxidizing gas further includes additional components including methane or fuel gas or a combination thereof.
[016] In one implementation, the oxidizing gas further includes CO2, recovered flue gases from a previous combustion sequence, and/or N2.
[017] In one implementation, the oxidizing gas further includes water.
[018] In one implementation, the oxidizing gas is oxygen or air or a combination thereof.
[019] In one implementation, the oxidizing gas is air.
[020] In one implementation, each well pair includes a fluid injection well and a production well, the oxidizing gas being injected through the fluid injection well of one of the well pairs.
[021] In one implementation, the process includes operating the production well of the well pair including the injection well where the oxidizing gas is injected in shut-in or choked mode as long as the oxidizing gas is injected.
[022] In one implementation, the production well is operated in shut-in mode as long as the oxidizing gas is injected.
[023] In one implementation, the oxidizing gas is injected through a well which is on one end of the interwell communication zone.
[024] In one implementation, the oxidizing gas injection is injected through the injection well of an outside one of the well pairs.
[025] In another aspect, there is provided a process for in situ combustion in a mature Steam-Assisted Gravity Drainage (SAGD) operation in an underground reservoir, the mature SAGD operation comprising well pairs and an interwell communication zone between the well pairs, each well pair comprising a fluid injection well having a horizontal portion and a production well having a horizontal portion positioned below and aligned with the horizontal Date Recue/Date Received 2021-12-08 portion of the injection well, the process comprising injecting an oxidizing gas through at least one fluid injection well of one of the well pairs to initiate combustion and promote mobilization of residual heavy hydrocarbons in the reservoir, wherein the interwell communication zone has a bitumen saturation of from about 0.20 to about 0.05, and wherein the production well of the well pair comprising the injection well where the oxidizing gas is injected is operated in shut-in or choked mode while the oxidizing gas is injected.
[026] In a further aspect, there is provided a process for in situ combustion in a mature hydrocarbon recovery operation in an underground reservoir, the mature hydrocarbon recovery operation comprising well pairs and an interwell communication zone between the well pairs, each well pair comprising a fluid injection well having a horizontal portion and a production well having a horizontal portion positioned below and aligned with the horizontal portion of the injection well, the process comprising injecting an oxidizing gas through at least one fluid injection well of one of the well pairs to initiate combustion and promote mobilization of residual heavy hydrocarbons in the reservoir, wherein the interwell communication zone has a bitumen saturation of from about 0.20 to about 0.05, and wherein the production well of the well pair comprising the injection well where the oxidizing gas is injected is operated in shut-in or choked mode while the oxidizing gas is injected.
[027] In one implementation, the interwell communication zone has a porosity between about 0.30 to 0.35.
[028] In one implementation, the interwell communication zone has a temperature of at least about 150 C upon initial injection of the oxidizing gas.
[029] In one implementation, the interwell communication zone has a temperature of at least about 175 C upon initial injection of the oxidizing gas.
[030] In one implementation, the interwell communication zone has a temperature of at least about 200 C upon initial injection of the oxidizing gas.
[031] In one implementation, the oxidizing gas is oxygen, air, enriched air, a mixture steam/air or a mixture thereof.
[032] In one implementation, the oxidizing gas further includes additional components including methane or fuel gas or a combination thereof.
[033] In one implementation, the oxidizing gas further includes CO2, recovered flue gases from a previous combustion sequence, and/or N2.
Date Recue/Date Received 2021-12-08
[034] In one implementation, the oxidizing gas further includes water.
[035] In one implementation, the oxidizing gas is oxygen or air or a combination thereof.
[036] In one implementation, the oxidizing gas is air.
[037] In one implementation, the production well is operated in shut-in mode as long as the oxidizing gas is injected.
[038] In one implementation, the oxidizing gas is injected through a well which is on one end of the interwell communication zone.
[039] In one implementation, the oxidizing gas injection is injected through the injection well of an outside one of the well pairs.
[040] In another aspect, there is provided an in situ process for recovering heavy hydrocarbons from an underground reservoir, including:
a) providing an array of well pairs for gravity controlled recovery of heavy hydrocarbons, each well pair including a fluid injection well having a horizontal portion and a production well having a horizontal portion positioned below and aligned with the horizontal portion of the injection well;
b) operating the array of adjacent well pairs to produce hydrocarbons from the production wells and forming mobilized chambers within the reservoir extending from corresponding well pairs;
c) establishing fluid communication between the mobilized chambers of adjacent ones of the well pairs to create an interwell mobilized zone;
d) operating at least one well as an oxidizing gas injection well;
e) injecting oxidizing gas through the oxidizing gas injection well into a corresponding one of the mobilized chambers to form a combustion region at least partially sustained by residual hydrocarbons in the reservoir, the combustion region having a combustion front;
f) promoting displacement of the combustion front through the interwell communication zone to sweep the array of well pairs;
g) regulating the array of well pairs to pressurize the interwell communication zone;
h) terminating oxidizing gas injection;
Date Recue/Date Received 2021-05-14 i) regulating the array of well pairs to effectuate blowdown and produce a blowdown portion of the heavy hydrocarbons therefrom;
j) terminating blowdown; and k) repeating the sequence of steps d) to j).
[043] In one implementation, step d) includes converting a fluid injection well into the oxidizing gas injection well.
[044] In one implementation, the process includes operating the production well of the well pair including the oxidizing gas injection well in shut-in or choked mode while injecting the oxidizing gas through the oxidizing gas injection well.
[045] In one implementation, the production well of the well pair including the oxidizing gas injection well is operated in shut-in mode as long as the oxidizing gas is injected through the oxidizing gas injection well.
[046] In one implementation, step f) includes:
operating the well pairs downstream of the combustion front in production mode while the combustion front advances there-toward; and restricting each of the well pairs once the combustion front respectively reaches each of the well pairs.
[047] In one implementation, both the injection well and the production well of each well pair are operated in production mode while the combustion front advances there-toward.
[048] In one implementation, both the injection well and the production well of each well pair are operated in shut-in or choked mode once the combustion front respectively reaches each of the well pairs.
[049] In one implementation, the restricting of each of the well pairs is preformed upon = breakthrough of heat there-through.
[050] In one implementation, the restricting of each of the well pairs is performed upon breakthrough of combustion gas there-through.
[051] In one implementation, step g) includes operating the well pairs in shut-in or choke mode to achieve pressurization of the interwell communication zone.

[052] In one implementation, step i) includes operating at least one of the wells of the array of well pairs in production mode.
[053] In one implementation, step i) includes operating the production wells in production mode.
[054] In one implementation, step i) includes operating the fluid injection well and the production well of each of the well pairs of the array in production mode.
[055] In one implementation, the interwell communication zone extends along substantially the entire length of the horizontal portions of each of the well pairs.
[056] In one implementation, the underground reservoir is further provided with at least one infill well positioned in between two adjacent well pairs.
[057] In one implementation, step c) includes establishing fluid communication between the mobilized chambers and the at least one infill well thereby fluidly connecting the infill well with the interwell communication zone.
[058] In one implementation, step d) includes converting the infill well into the oxidizing gas injection well.
[059] In one implementation, step f) includes:
operating the at least one infill well downstream of the combustion front in production mode while the combustion front advances there-toward; and restricting each of the at least one infill well once the combustion front respectively reaches each of the at least one infill well.
[060] In one implementation, each of the at least one infill well is operated in shut-in or choked mode once the combustion front respectively reaches each of the at least one infill well.
[061] In one implementation, step g) includes operating each of the at least one infill well in shut-in or choke mode to help achieve pressurization of the interwell communication zone.
[062] In one implementation, step i) includes operating each of the at least one infill well in production mode.
[063] In one implementation, step k) includes selecting the same well as the oxidizing gas injection well for each sequence.

[064] In one implementation, step k) includes selecting a different well as the oxidizing gas injection well for a subsequent sequence.
[065] In one implementation, a single well is used as the oxidizing gas injection well.
[066] In one implementation, the oxidizing gas injection well is on one end of the interwell communication zone.
[067] In one implementation, the oxidizing gas injection well is the injection well of an outside one of the well pairs.
[068] In one implementation, the combustion front displaces from one end of the interwell communication zone over the array of well pairs to the opposed end of the interwell communication zone.
[069] In one implementation, the combustion front displaces across the array of well pairs in a direction perpendicular with respect to the well pairs.
[070] In another aspect, there is provided a cyclic in situ combustion process for a mature steam assisted gravity drainage (SAGD) operation in an underground reservoir, the mature SAGD operation including an array of well pairs generally parallel to each other and an interwell communication zone between the well pairs, each well pair including a fluid injection well having a horizontal portion and a production well having a horizontal portion positioned below and aligned with the horizontal portion of the injection well, the cyclic in situ combustion process including:
(i) operating at least one well as an oxidizing gas injection well;
(ii) injecting oxidizing gas through the oxidizing gas injection well into a corresponding one of the mobilized chambers to form a combustion region at least partially sustained by residual hydrocarbons in the reservoir, the combustion region having a combustion front;
(iii) promoting displacement of the combustion front through the interwell communication zone to sweep the array of well pairs;
(iv) pressurizing the interwell communication zone;
(v) terminating oxidizing gas injection;
(vi) producing a blowdown portion of the heavy hydrocarbons therefrom;

(vii) terminating blowdown; and (viii) repeating the sequence of steps (i) to (vii).
[071] In one implementation, step (i) includes converting a fluid injection well of one of the well pairs into the oxidizing gas injection well.
[072] In one implementation, the process includes operating the production well of the well pair including the oxidizing gas injection well in shut-in or choked mode while injecting the oxidizing gas through the oxidizing gas injection well.
[073] In one implementation, the production well of the well pair including the oxidizing gas injection well is operated in shut-in mode as long as the oxidizing gas is injected through the oxidizing gas injection well.
[074] In one implementation, step (iii) includes:
operating the well pairs downstream of the combustion front in production mode while the combustion front advances there-toward; and restricting each of the well pairs once the combustion front respectively reaches each of the well pairs.
[075] In one implementation, both the injection well and the production well of each well pair are operated in production mode while the combustion front advances there-toward.
[076] In one implementation, both the injection well and the production well of each well pair are operated in shut-in or choked mode once the combustion front respectively reaches each of the well pairs.
[077] In one implementation, the restricting of each of the well pairs is preformed upon breakthrough of heat there-through.
[078] In one implementation, the restricting of each of the well pairs is preformed upon breakthrough of combustion gas there-through.
[079] In one implementation, step (iv) includes operating the well pairs in shut-in or choke mode to achieve pressurization of the interwell communication zone.
[080] In one implementation, step (vi) includes operating at least one of the wells of the array of well pairs in production mode.

[081] In one implementation, step (vi) includes operating the production wells in production mode.
[082] In one implementation, step (vi) includes operating the fluid injection well and the production well of each of the well pairs of the array in production mode.
[083] In one implementation, the interwell communication zone extends along substantially the entire length of the horizontal portions of each of the well pairs.
[084] In one implementation, the process includes providing at least one infill well positioned in between two adjacent well pairs.
[085] In one implementation, the process includes establishing fluid communication between the mobilized chambers and the at least one infill well thereby fluidly connecting the infill well with the interwell communication zone.
[086] In one implementation, the process includes converting the infill well into the oxidizing gas injection well.
[087] In one implementation, step (iii) includes:
operating the at least one infill well downstream of the combustion front in production mode while the combustion front advances there-toward; and restricting each of the at least one infill well once the combustion front respectively reaches each of the at least one infill well.
[088] In one implementation, each of the at least one infill well is operated in shut-in or choked mode once the combustion front respectively reaches each of the at least one infill well.
[089] In one implementation, step (iv) includes operating each of the at least one infill well in shut-in or choke mode to help achieve pressurization of the interwell communication zone.
[090] In one implementation, step (vi) includes operating each of the at least one infill well in production mode.
[091] In one implementation, step (viii) includes selecting the same well as the oxidizing gas injection well for each sequence.

[092] In one implementation, step (viii) includes selecting a different well as the oxidizing gas injection well for a subsequent sequence.
[093] In one implementation, a single well is used as the oxidizing gas injection well.
[094] In one implementation, the oxidizing gas injection well is on one end of the interwell communication zone.
[095] In one implementation, the oxidizing gas injection well is the injection well of an outside one of the well pairs.
[096] In one implementation, the combustion front displaces from one end of the interwell communication zone over the array of well pairs to the opposed end of the interwell communication zone.
[097] In one implementation, the combustion front displaces across the array of well pairs in a direction perpendicular with respect to the well pairs.
[098] In one implementation, step (vi) is performed so as to establish fluid communication between the interwell communication zone and the at least one infill well.
[099] In a further aspect, there is provided an in situ process for recovering heavy hydrocarbons from a reservoir, an array of well pairs being located in the reservoir, wherein mobilized chambers in fluid communication with each other extend upward from respective well pairs and form an interwell communication zone, the process including:
injecting oxidizing gas through at least one well into a corresponding one of the mobilized chambers to form a combustion region at least partially sustained by residual hydrocarbons in the reservoir, the combustion region having a combustion front, wherein the combustion front is swept across the array of well pairs;
terminating oxidizing gas injection;
producing the heavy hydrocarbons from at least one of the wells of the array;
and restarting the process at the oxidizing gas injection step.
[0100] In another aspect, there is provided an in situ process for recovering heavy hydrocarbons from a reservoir, an array of well pairs being located in the reservoir, wherein mobilized chambers in fluid communication with each other extend upward from respective well pairs and form an interwell communication zone, the process including:

injecting oxidizing gas through at least one well into a corresponding one of the mobilized chambers to form a combustion region at least partially sustained by residual hydrocarbons in the reservoir, the combustion region having a combustion front, wherein the combustion front is swept across the array of well pairs;
serially restricting each of the well pairs once the combustion front respectively reaches each of the well pairs;
producing the heavy hydrocarbons from at least one of the wells of the array.
[0101] In one implementation, each well pair includes a fluid injection well having a horizontal portion and a production well having a horizontal portion positioned below and aligned with the horizontal portion of the injection well and wherein the oxidizing gas is injected in the fluid injection well of one of the well pairs.
[0102] In one implementation, the process includes operating the production well of the well pair including the oxidizing gas injection well in shut-in or choked mode while injecting the oxidizing gas through the oxidizing gas injection well.
[0103] In one implementation, the production well of the well pair including the oxidizing gas injection well is operated in shut-in mode as long as the oxidizing gas is injected through the oxidizing gas injection well.
[0104] In one implementation, the combustion front is swept across the array of well pairs by operating the well pairs downstream of the combustion front in production mode while the combustion front advances there-toward and each of the well pairs is restricted once the combustion front respectively reaches each of the well pairs.
[0105] In one implementation, both the injection well and the production well of each well pair are operated in production mode while the combustion front advances there-toward.
[0106] In one implementation, both the injection well and the production well of each well pair are operated in shut-in or choked mode once the combustion front respectively reaches each of the well pairs.
[0107] In one implementation, the restricting of each of the well pairs is preformed upon breakthrough of heat there-through.

[0108] In one implementation, the restricting of each of the well pairs is preformed upon breakthrough of combustion gas there-through.
[0109] In one implementation, the process includes pressurizing the interwell communication zone through injecting the oxidizing gas and operating the well pairs in shut-in or choke mode.
[0110] In one implementation, the production of the heavy hydrocarbons includes operating the production wells in production mode.
[0111] In one implementation, the production of the heavy hydrocarbons includes operating the fluid injection well and the production well of each of the well pairs of the array in production mode.
[0112] In one implementation, the interwell communication zone extends along substantially the entire length of the horizontal portions of each of the well pairs.
[0113] In one implementation, the process includes providing at least one infill well positioned in between two adjacent well pairs.
[0114] In one implementation, the process includes establishing fluid communication between the mobilized chambers and the at least one infill well thereby fluidly connecting the infill well with the interwell communication zone.
[0115] In one implementation, the process includes converting the infill well into the well where the oxidizing gas is injected.
[0116] In one implementation, the combustion front is swept across the array of well pairs by operating the at least one infill well downstream of the combustion front in production mode while the combustion front advances there-toward and restricting each of the at least one infill well once the combustion front respectively reaches each of the at least one infill well.
[0117] In one implementation, each of the at least one infill well is operated in shut-in or choked mode once the combustion front respectively reaches each of the at least one infill well.
[0118] In one implementation, each of the at least one infill well is operated in shut-in or choke mode to help achieve pressurization of the interwell communication zone.
[0119] In one implementation, the production of the heavy hydrocarbons includes operating each of the at least one infill well in production mode.

[0120] In one implementation, a single well is used as the well where the oxidizing gas is injected.
[0121] In one implementation, the well where the oxidizing gas is injected is on one end of the interwell communication zone.
[0122] In one implementation, the well where the oxidizing gas is injected is an injection well of an outside one of the well pairs.
[0123] In one implementation, the combustion front displaces from one end of the interwell communication zone over the array of well pairs to the opposed end of the interwell communication zone.
[0124] In one implementation, the combustion front displaces across the array of well pairs in a direction perpendicular with respect to the well pairs.
[0125] In one implementation, the production of the heavy hydrocarbons is performed so as to establish fluid communication between the interwell communication zone and the at least one infill well.
[0126] In one implementation, the interwell communication zone has a bitumen saturation of from about 0.20 to less than about 0.05.
[0127] In one implementation, the oxidizing gas injection well injects air at an injection flux of about 0.3 to about 1.2 m3(ST)/m2.hour.
[0128] In one implementation, the interwell communication zone has a porosity between about 0.30 to 0.35.
[0129] In one implementation, the interwell communication zone has a temperature of at least about 150 C upon initial injection of the oxidizing gas.
[0130] In one implementation, the interwell communication zone has a temperature of at least about 175 C upon initial injection of the oxidizing gas.
[0131] In one implementation, the interwell communication zone has a temperature of at least about 200 C upon initial injection of the oxidizing gas.
[0132] In one implementation, the oxidizing gas is oxygen, air, enriched air, a mixture steam/air or a mixture thereof.

[0133] In one implementation, the oxidizing gas further includes additional components including methane or fuel gas or a combination thereof. In another optional aspect, the oxidizing gas further includes CO2, recovered flue gases from a previous combustion sequence, and/or N2.
[0134] In one implementation, the oxidizing gas further includes water.
[0135] In one implementation, the oxidizing gas is oxygen or air or a combination thereof.
[0136] In one implementation, the oxidizing gas is air.
[0137] In another aspect, there is provided a process for in situ combustion in a mature Steam-Assisted Gravity Drainage (SAGD) operation in an underground reservoir, the mature SAGD operation including well pairs, at least one infill well positioned in between two adjacent well pairs and an interwell communication zone between the well pairs and the at least one infill well, wherein the process includes:
injecting an oxidizing gas through the at least one infill well to initiate combustion and promote mobilization of residual heavy hydrocarbons in the reservoir; and producing the heavy hydrocarbons from at least one of the wells.
[0138] In one implementation, a combustion region having a combustion front forms upon injecting the oxidizing gas through the at least one infill well, the combustion region being at least partially sustained by the residual hydrocarbons in the reservoir.
[0139] In one implementation, the mobilization of residual heavy hydrocarbons in the reservoir is achieved by displacement of the combustion front from the at least one infill well in direction of the adjacent well pairs and then through the interwell communication zone, followed by pressurization of the interwell communication zone.
[0140] In one implementation, the well pairs downstream of the combustion front are operated in production mode while the combustion front advances there-toward, and each of the well pairs is restricted once the combustion front respectively reaches each of the well pairs.
[0141] In one implementation, each well pair includes a fluid injection well and a production well, and both the injection well and the production well of each well pair are operated in production mode while the combustion front advances there-toward. In another optional aspect, both the injection well and the production well of each well pair are operated in shut-in or choked mode once the combustion front respectively reaches each of the well pairs.
[0142] In one implementation, the restricting of each of the well pairs is preformed upon breakthrough of heat there-through.
[0143] In one implementation, the restricting of each of the well pairs is performed upon breakthrough of combustion gas there-through.
[0144] In one implementation, pressurization is achieved by operating the well pairs in shut-in or choke mode.
[0145] In one implementation, the oxidizing gas is oxygen, air, enriched air, a mixture steam/air or a mixture thereof.
[0146] In one implementation, the oxidizing gas further includes additional components including methane or fuel gas or a combination thereof.
[0147] In one implementation, the oxidizing gas further includes CO2, recovered flue gases from a previous combustion sequence, and/or N2.
[0148] In one implementation, the oxidizing gas further includes water.
[0149] In one implementation, the oxidizing gas is oxygen or air or a combination thereof.
[0150] In one implementation, the oxidizing gas is air.
[0151] In a further aspect, there is provided a process for in situ combustion in a SAGD
operation in an underground reservoir, the SAGD operation including well pairs and mobilized chambers within the reservoir extending from corresponding well pairs, wherein after establishing fluid communication between the mobilized chambers to create an interwell communication zone, the process includes repeatedly executing the following sequence of steps:
initiating combustion by injecting an oxidizing gas through at least one well of the well pairs so as to promote mobilization of residual heavy hydrocarbons in the reservoir;
ceasing gas injection through the at least one well; and producing the heavy hydrocarbons from at least one of the wells.

[0152] In one implementation, each well pair includes a fluid injection well and a production well, and the fluid injection well of one of the well pair is used to inject the oxidizing gas.
[0153] In one implementation, a combustion region having a combustion front forms upon injecting the oxidizing gas, the combustion region being at least partially sustained by the residual hydrocarbons in the reservoir.
[0154] In one implementation, the mobilization of residual heavy hydrocarbons in the reservoir is achieved by displacement of the combustion front from the well where the oxidizing gas is injected through the interwell communication zone, followed by pressurization of the interwell communication zone.
[0155] In one implementation, the production well of the well pair including the oxidizing gas injection well is operated in shut-in or choked mode while injecting the oxidizing gas through the oxidizing gas injection well.
[0156] In one implementation, the production well of the well pair including the oxidizing gas injection well is operated in shut-in mode as long as the oxidizing gas is injected through the oxidizing gas injection well.
[0157] In one implementation, the well pairs downstream of the combustion front are operated in production mode while the combustion front advances there-toward, and each of the well pairs is restricted once the combustion front respectively reaches each of the well pairs.
[0158] In one implementation, both the injection well and the production well of each well pair are operated in production mode while the combustion front advances there-toward.
[0159] In one implementation, both the injection well and the production well of each well pair are operated in shut-in or choked mode once the combustion front respectively reaches each of the well pairs.
[0160] In one implementation, the restricting of each of the well pairs is preformed upon breakthrough of heat there-through.
[0161] In one implementation, the restricting of each of the well pairs is performed upon breakthrough of combustion gas there-through.
[0162] In one implementation, pressurization is achieved by operating the well pairs in shut-in or choke mode.

[0163] In one implementation, the oxidizing gas is oxygen, air, enriched air, a mixture steam/air or a mixture thereof.
[0164] In one implementation, the oxidizing gas further includes additional components including methane or fuel gas or a combination thereof.
[0165] In one implementation, the oxidizing gas further includes CO2, recovered flue gases from a previous combustion sequence, and/or N2.
[0166] In one implementation, the oxidizing gas further includes water.
[0167] In one implementation, the oxidizing gas is oxygen or air or a combination thereof.
[0168] In one implementation, the oxidizing gas is air.
[0169] In a further aspect, there is provided a process for in situ combustion in a SAGD
operation in an underground reservoir, the SAGD operation including well pairs and mobilized chambers within the reservoir extending from corresponding well pairs, wherein after establishing fluid communication between the mobilized chambers to create an interwell communication zone, the process includes:
initiating combustion by injecting an oxidizing gas through at least one well of the well pairs so as to promote mobilization of residual heavy hydrocarbons in the reservoir;
ceasing gas injection through the at least one well; and producing the heavy hydrocarbons from the at least one well.
[0169a] In a further aspect, there is provided a process for recovering bitumen from an underground reservoir provided with well pairs wherein each well pair includes an injection well above a production well, the process including:
a start-up phase including introducing a solvent via the injection well of at least one well pair to establish communication between the injection well and the production well of the at least one well pair;
a production phase including injecting a solvent to recover heavy hydrocarbons from the reservoir and form an interwell communication zone between the well pairs; and an in situ combustion phase including injecting an oxygen containing gas into the injection well or the production well of at least one well pair to initiate combustion and 19a promote mobilization of residual heavy hydrocarbons in the reservoir, and recovering mobilized residual hydrocarbons from the reservoir.
[0169b] In one implementation, the production phase is operated until the interwell communication zone reaches maturity.
[0169c] In one implementation, the process further includes supplying an external heat source to the oxygen containing gas to promote combustion.
[0169d] In one implementation, the external heat source includes a heater in the well through which the oxygen containing gas is injected.
[0169e] In one implementation, the heater includes a wall heater disposed in the well.
[0169f] In one implementation, in the start-up phase, the solvent is injected via the injection well.
[0169g] In one implementation, in the start-up phase, the solvent is circulated via the injection well.
[0169h] In one implementation, in the in situ combustion phase, the oxygen containing gas is injected via the injection well.
[0169i] In one implementation, the production phase includes injecting a mixture of steam and solvent into the reservoir to mobilize bitumen.
[0169j] In one implementation, the interwell communication zone has a bitumen saturation of from about 0.20 to about 0.05.
[0169k] In one implementation, the interwell communication zone has a porosity between about 0.30 to 0.35.
[01691] In one implementation, the interwell communication zone has a temperature of at least about 150 C upon initial injection of the oxidizing gas.
[0169m] In one implementation, the interwell communication zone has a temperature of at least about 175 C upon initial injection of the oxidizing gas.

19b [0169n] In one implementation, the interwell communication zone has a temperature of at least about 200 C upon initial injection of the oxidizing gas.
[01690] In one implementation, the oxidizing gas is oxygen, air, enriched air, a mixture steam/air or a mixture thereof.
[0169p] In one implementation, the oxidizing gas further includes additional components including methane or fuel gas or a combination thereof.
[0169q] In one implementation, the oxidizing gas further includes CO2, recovered flue gases from a previous combustion sequence, and/or N2.
[0169r] In one implementation, the oxidizing gas further includes water.
[0169s] In one implementation, the oxidizing gas is oxygen or air or a combination thereof.
[0169t] In one implementation, the oxidizing gas is air.
[0169u] In one implementation, the oxygen containing gas is injected via the injection well and the process includes operating the production well of the well pair including the injection well where the oxidizing gas is injected in shut-in or choked mode as long as the oxidizing gas is injected.
[0169v] In one implementation, the production well is operated in shut-in mode as long as the oxidizing gas is injected.
[0169w] In one implementation, both the injection well and the production well have a horizontal portion, the horizontal portion of the production well being positioned below and aligned with the horizontal portion of the injection well, allowing for gravity drainage recovery of the heavy hydrocarbons.
[0169x] In one implementation, the oxidizing gas is injected through a well which is on one end of the interwell communication zone.
[0169y] In one implementation, the initiation of combustion is followed by the formation of a combustion front which displaces from one end of the interwell communication zone over the array of well pairs to the opposed end of the interwell communication zone.

I 9c [01694 In one implementation, the combustion front displaces across the array of well pairs in a direction perpendicular with respect to the well pairs.
[01694 In a further aspect, there is provided a process for recovering bitumen from an underground reservoir provided with well pairs, each pair including an injection well and a production well, the process including:
a production phase including injecting a solvent to recover bitumen from the reservoir and forming an interwell communication zone between the well pairs;
and an in situ combustion phase including injecting an oxygen containing gas into the injection well of at least one well pair to initiate combustion in the interwell communication zone and promote mobilization of residual heavy hydrocarbons in the reservoir, wherein the injection well is provided with a heater to promote combustion.
[0169bl In one implementation, the heater includes a wall heater disposed in the injection well.
[01690 In one implementation, the production phase includes injecting a mixture of steam and solvent into the reservoir to mobilize bitumen.
[0169d1 In one implementation, the interwell communication zone has a bitumen saturation of from about 0.20 to about 0.05.
[0169e1 In one implementation, the interwell communication zone has a porosity between about 0.30 to 0.35.
.. [0169f] In one implementation, the interwell communication zone has a temperature of at least about 150 C upon initial injection of the oxidizing gas.
[0169gl In one implementation, the interwell communication zone has a temperature of at least about 175 C upon initial injection of the oxidizing gas.
[0169111 In one implementation, the interwell communication zone has a temperature of at least about 200 C upon initial injection of the oxidizing gas.
[0169i1 In one implementation, the oxidizing gas is oxygen, air, enriched air, a mixture steam/air or a mixture thereof.

19d [0169j'] In one implementation, the oxidizing gas further includes additional components including methane or fuel gas or a combination thereof.
[0169k'] In one implementation, the oxidizing gas further includes CO2, recovered flue gases from a previous combustion sequence, and/or N2.
[01691] In one implementation, the oxidizing gas further includes water.
[0169m'] In one implementation, the oxidizing gas is oxygen or air or a combination thereof.
[0169n] In one implementation, the oxidizing gas is air.
[016901 In one implementation, the process includes operating the production well of the well pair including the injection well where the oxidizing gas is injected in shut-in or choked mode as long as the oxidizing gas is injected.
[0169p] In one implementation, the production well is operated in shut-in mode as long as the oxidizing gas is injected.
[0169q] In one implementation, both the injection well and the production well have a horizontal portion, the horizontal portion of the production well being positioned below and aligned with the horizontal portion of the injection well, allowing for gravity drainage recovery of the heavy hydrocarbons.
[0169r] In one implementation, the oxidizing gas is injected through a well which is on one end of the interwell communication zone.
[0169s'] In one implementation, the initiation of combustion is followed by the formation of a combustion front which displaces from one end of the interwell communication zone over the array of well pairs to the opposed end of the interwell communication zone.
[01691] In one implementation, the combustion front displaces across the array of well pairs in a direction perpendicular with respect to the well pairs.
[0169u] In a further aspect, there is provided a process for in situ combustion in a mature hydrocarbon recovery operation in an underground reservoir, the mature hydrocarbon recovery operation including an array of well pairs where each well pair includes an 19e injection well above a production well, and an interwell communication zone between the well pairs, the process including:
injecting an oxidizing gas into the injection well of at least one well pair to initiate combustion and promote mobilization of residual heavy hydrocarbons in the reservoir; and producing the residual heavy hydrocarbons either through both the injection well and the production well of an adjacent well pair of the well pair including the injection well where the oxidizing gas is injected, or through one of the injection well or the production well of the adjacent well pair while the other well of the adjacent well pair is shut in.
[0169v] In one implementation, the residual heavy hydrocarbons are produced through both the injection well and the production well of the adjacent well pair.
[0169w1 In one implementation, the injection well is provided with a heater to promote combustion.
[01694 In one implementation, the heater includes a wall heater disposed in the injection well.
[0169y] In one implementation, the interwell communication zone has a bitumen saturation [01694 In one implementation, the interwell communication zone has a porosity between about 0.30 to 0.35.
[0169a1 In one implementation, the interwell communication zone has a temperature of at least about 150 C upon initial injection of the oxidizing gas.
[0169b1 In one implementation, the interwell communication zone has a temperature of at least about 175 C upon initial injection of the oxidizing gas.
[0169cl In one implementation, the interwell communication zone has a temperature of at least about 200 C upon initial injection of the oxidizing gas.
[0169cl] In one implementation, the oxidizing gas is oxygen, air, enriched air, a mixture steam/air or a mixture thereof.

, 19f [0169e"] In one implementation, the oxidizing gas further includes additional components including methane or fuel gas or a combination thereof.
[0169f'] In one implementation, the oxidizing gas further includes CO2, recovered flue gases from a previous combustion sequence, and/or N2.
[0169g1 In one implementation, the oxidizing gas further includes water.
[016911 In one implementation, the oxidizing gas is oxygen or air or a combination thereof.
[016911 In one implementation, the oxidizing gas is air.
[0169r] In one implementation, the process includes operating the production well of the well pair including the injection well where the oxidizing gas is injected in shut-in or choked mode as long as the oxidizing gas is injected.
[0169k1 In one implementation, the production well is operated in shut-in mode as long as the oxidizing gas is injected.
[016911 In one implementation, both the injection well and the production well have a horizontal portion, the horizontal portion of the production well being positioned below and aligned with the horizontal portion of the injection well, allowing for gravity drainage recovery of the heavy hydrocarbons.
[0169ml In one implementation, the oxidizing gas is injected through a well which is on one end of the interwell communication zone.
[0169n1 In one implementation, the initiation of combustion is followed by the formation of a combustion front which displaces from one end of the interwell communication zone over the array of well pairs to the opposed end of the interwell communication zone.
(016901 In one implementation, the combustion front displaces across the array of well pairs in a direction perpendicular with respect to the well pairs.
[0170] It should also be understood that many of the above implementations can be used in combination with one another.

19g BRIEF DESCRIPTION OF THE DRAWINGS
[0171] Figs 1a to lc are transverse front view schematics representing the formation stages of an interwell communication zone between mobilized chambers of adjacent SAGD
well pairs within an underground reservoir according to steps a) to c) of one implementation of the process.
[0172] Figs 2a to 2d are transverse front view schematics representing the in situ combustion sweep, pressure-up and blowdown phases in the interwell communication zone according to steps d) to h) of one implementation of the process.

[0173] Fig 32 to 3d are transverse front view schematics representing the in situ combustion sweep, pressure-up and blowdown phases in the interwell communication zone according to steps d) to h) of another implementation of the process.
[0174] Figs 4a, 4b and 4c are transverse front view schematics representing example configurations of arrays of four well pairs that can be used according to another implementation of the process.
[0175] Figs 5a to 5d are transverse front view schematics representing the in situ combustion sweep, pressure-up and blowdown phases in the interwell communication zone of the coalesced steam chambers of SAGD well pairs and an infill well provided in between the SAGD well pairs in an underground reservoir according to steps d) to h) of another implementation of the process.
[0176] Figs 6a to 6d are transverse front view schematics representing the in situ combustion sweep, pressure-up and blowdown phases in the interwell communication zone of the coalesced steam chambers of SAGD well pairs and an infill well in an underground reservoir according to steps d) to h) of another implementation of the process.
[0177] Figs 7a to 7d are transverse front view schematics representing the formation stages of an interwell communication zone between mobilized chambers of an array of SAGD well pairs and the addition of a plurality of infill wells and their fluid communication with the interwell communication zone in an underground reservoir according to another implementation of the process.
[0178] Figs 8a to 8d are top view schematics representing the formation stages of an interwell communication zone between mobilized chambers of an array of SAGD
well pairs and an in situ combustion sweep within the interwell communication zone in an underground reservoir according to one implementation of the process.
[0179] Fig 9 is a schematic section view of a laboratory experimental combustion tube showing the locations of core centerline, wall thermocouples and wall heaters.
[0180] Fig 10 is a simplified schematic of an experimental combustion tube set-up.
[0181] Fig 11 represents the core temperature profiles observed in the combustion tube of Fig 9 during the laboratory experimental combustion.

[0182] While the process will be described in conjunction with examples of implementations, one will understand that these examples are not intended to limit the scope of the technology to these implementations.
DETAILED DESCRIPTION
.. [0183] The present technology provides an in situ process for recovering heavy hydrocarbons from an underground reservoir. By heavy hydrocarbons, it is meant heavy crude oils or bitumen, i.e. petroleum or petroleum-like liquids or semisolids occurring naturally in porous and fractured media. Bitumen deposits are also called tar sand, oil sand, oil-impregnated rock, bituminous sand and the like. In the following detailed description, the terms heavy hydrocarbons, oil/bitumen and bitumen will be used interchangeably. In some implementations, the in situ combustion process is performed in a bitumen containing reservoir.
[0184] In the first step, the process provides an array of well pairs for gravity controlled recovery of heavy hydrocarbons. Each well pair includes a fluid injection well having a .. horizontal portion and a production well having a horizontal portion positioned below and aligned with the horizontal portion of the injection well. It should be understood that the horizontal portions of the injection and production wells can have varying inclinations along their trajectory depending on the reservoir characteristics and the in situ process used to recover the hydrocarbons from the reservoir. In one implementation, the well pairs have a configuration for performing a SAGD operation. It should also be noted that the well pairs can be configured and operated to perform a number of other in situ recovery processes during their lifetime whereby other mobilizing fluids are injected into the reservoir such as hot water, solvents, steam and mixtures thereof.
[0185] At least two well pairs are used in the process. However, for the purpose of .. illustrating the process, reference will be made to three well pairs as shown in Figs 1 to 3, four well pairs as shown in Fig 4, two well pairs and an infill well as shown in Figs 5 and 6, and 5 well pairs as shown in Figs 7 and 8.
[0186] Referring to Fig 1a, there is shown an underground reservoir 10 provided with three well pairs 12. Each well pair 12 includes a fluid injection well 20, 22, 24 having a horizontal portion and a production well 30, 32, 34 having a horizontal portion positioned below and aligned with the horizontal portion of the injection well. The horizontal portions of the injection and production wells are connected to vertical portions (not illustrated) which extend to the surface where they are used to inject fluids underground or recover the produced fluids for further processing.
[0187] In the second and third steps of the process, as illustrated in Fig lb as well as in Figs 7a and 8a, the array of adjacent well pairs 12 is operated to inject steam or another mobilizing fluid via the injection wells 20, 22, 24 and to produce hydrocarbons from the production wells 30, 32, 34, thereby forming mobilized chambers 14 within the reservoir extending from each well pair 12. Fluid communication is then established between the mobilized chambers 14 of adjacent well pairs 12 to create an interwell communication zone 16 which is shown in Fig lc and also in Figs 2a to 2d, 3a to 3c, 5a to 5d, 6a to 6c, 7b to 7d and 8b to 8d. In one implementation, the start-up phase includes injection or circulation of hot water, steam or solvent into the injection well such that fluid communication is established in between the injection well and production well. The processing is then ramped up as steam is injected into the bitumen baring formation through the fluid injection well 20, 22, 24 and production fluid including heated mobilized bitumen and condensate is recovered from the lower parallel-running horizontal production well 30, 32, 34 respectively. What has been called a mobilized steam chamber 14 is developed, upward and outward from each well pair. As steam flows toward the perimeter of the chamber 14, it encounters the lower temperature of the formation and condenses, causing heating and mobilization of the heavy hydrocarbons which drain downwardly with the condensate toward the production well. In this way heat is transferred to the bitumen, causing the bitumen to warm up to the point of mobilization or flow ability, preferably under gravity control. Eventually, both the bitumen and steam condensate are recovered from the formation through the production well 30, 32, 34 located below the steam injection well 20, 22, 24. As the heated and mobilized bitumen drains down, fresh bitumen becomes exposed at an extraction interface that is subsequently heated by the ongoing steam contact and its condensation. The continuous drainage of bitumen from the formation results in the steam filled bitumen depleted extraction chamber growing toward the top of the formation and then spreading sideways over time.
This chamber is called a SAGD steam chamber, a gravity drainage chamber or a mobilized chamber. In time, continuously injecting steam into the chambers leads to expanding the mobilized chambers to the point of establishing fluid communication between the mobilized chambers of adjacent well pairs and creates an interwell communication zone 16. In other words, the chambers 14 coalesce to form a larger chamber where the well pairs 12 are in fluid communication with each other. Referring to Fig 7b, the interwell communication zone 16 preferably includes the individual mobilized chambers 14 of the entire array of SAGD well pairs 12. In typical SAGD operation, the interwell communication zone can usually have a porosity of between about 0.30 to about 0.35. More regarding the interwell communication zone 16 will be described herein-below in reference to Figs 8a-8d. When SAGD
operation reaches the economic limit, usually when bitumen recovery factor is at least 50% of the original bitumen in place or SAGD recoverable reserve, steam injection is terminated. One can then say that the SAGD operation is mature. The temperature in the mature SAGD
chambers is generally around about 190 C to about 257 C, which is based on the SAGD
operating pressure from 1300kPa to 4500kPa. However, a temperature of at least above 150 C, and even more preferably above 200 C, is favourable for the next steps of the process including initiating in situ combustion in the mature SAGD chamber.
Furthermore, residual hydrocarbons are still present in and around the mobilized chambers after SAGD
operation, which will also favour combustion. In another optional aspect, the bitumen residual saturation in a mature SAGD chamber can be about 0.20 to less than about 0.05.
[0188] Referring to Figs 2a to 2d, there is shown the following steps of the process and more particularly those steps which allow recovering further oil/bitumen from the underground reservoir 10. As more particularly shown in Fig 2a, an oxidizing gas, e.g.
oxygen or air, preferably air for availability and economic reasons is injected through a well, preferably through one of the fluid injecting wells 20 into the mature interwell chamber 16.
Even though air is preferably injected in the process, it is also possible to inject other gases such as methane (e.g. pipelined methane), fuel gas (e.g. fuel gas from steam boiler), pure oxygen or enriched air (e.g. an oxygen concentration above 21%) as oxidizing gas and it is also possible to inject or co-inject additional gases at various steps of the process such as CO2 or N2, recovered flue gases from a previous combustion cycle, and the like. A mixture of water and air could also be used. Injection of a mixture steam/air is also possible. In this latter case, the mole ratio of air to steam in this mixture is preferably more than 2%.
[0189] In another optional aspect, the air injection rate is based on the value of air required and of the minimum air flux to sustain in situ combustion_ The minimum air flux is dependent upon the formation thickness, well length and well spacing. The injection rate is also dependent on the operating pressure and reservoir pressure. For example, for a typical SAGD well configuration and Athabasca bitumen formation, this rate can be estimated to be around 10,000 m3(ST)/day/well to 100,000 m3(ST)/day/well. In one implementation, the oxidizing gas injection flux can be about 3 to about 1.2 m3(ST)/m2.hour.
[0190] While in some implementations, one of the existing wells can be converted into the oxidizing gas injection well, it is also possible to provide an additional well, which can be vertical or horizontal, as the oxygen injection well. Due to the high temperature in the chamber and the presence of residual hydrocarbons, ignition occurs spontaneously and a combustion region forms around injecting well 20. It is worth noting that even though ignition is generally spontaneous, it would also be possible to initiate combustion through introduction of a source of ignition at the injection well. It is also possible to promote initial combustion by injecting a high oxygen content gas and then gradually scaling back oxygen content to the composition of air. At this step of initiating combustion, the producer well 30 below the converted oxidizing gas injection well 20 is shut in while all the other wells (injectors and producers) 22, 32, 24 and 34 are preferably left open in production mode. The combustion region is then allowed to propagate through the interwell communication zone 16 encouraged in the direction of adjacent well pairs of the array as a result of pressure differential between the air injector 20 and the open wells 22, 32, 24 and 34.
Injection of oxidizing gas is continued and when the first breakthrough of heat, combustion flue gases occurs at wells 22 and 32, or in response to another detected process parameter, these wells are restricted by choking or shutting in. For example, referring to Fig 2b, the well 22 is shut in upon arrival of the combustion front, while the downstream wells 24 and 34 are kept open to continue encouraging the combustion front to progress further along the interwell chamber 16. The timed restriction of the wells causes the advancing combustion front from prematurely breaking through and enables a continued advancement of the combustion across more of the interwell chamber. The combustion front is redirected toward the remaining open wells 24 and 34. In this way, the well pairs are operated such that each subsequent downstream well is choked or shut in upon arrival of the combustion front thus promoting the advancement of the combustion across and throughout the interwell region.
Once the oxygen/combustion front is close to the last well pair, wells 24 and 34 in Fig 2c for example, the restriction procedure is applied to these wells. Fig 2c shows all wells being shut in except for the air injection well. Continuing air injection causes the reservoir pressure to rise till a desired pressure value. Then, air injection is terminated and that well can also be shut in. The pressure-up shut-in time can be provided to allow prolonged heating of the interwell chamber. Even though Figs 2a to 2d only shows three well pairs, it should be understood that more well pairs could be present in the array and in the mature interwell chamber. The pressure-up phase could also be implemented sequentially until all the further wells are restricted.
[0191] In one implementation, the pressure-up phase is reached by restricting production by either choking or shutting in wells 22, 32, 24 and 34, after oxygen or combustion front has arrived to these producer wells, while air is being injected. This results in pressure rising both in the mature SAGD chamber and its surrounding reservoir, especially in the upswept .. area. Thus, combustion front is forced to penetrate from the mature SAGD
chamber into the adjacent portion of the reservoir which is upswept by steam and colder and which has a higher remaining oil/bitumen saturation. Therefore, more oxygen is consumed rather than flow breakthrough through the mature chamber that connected air injector 20 and wells 22, 32, 24 and 34. Thereby, more oil/bitumen is heated and eventually mobilized.
[0192] It is also worth mentioning that high energy can be released from the combustion or oxidation, and local combustion zone temperature can reach 300 C or more.
Flue gases (mainly containing nitrogen and carbon dioxide) are generated as a result of these high temperature oxidation or combustion reactions, which displace and mobilize residual oil/bitumen to form oil/bitumen banks between the well pairs. Also, flue gas occupies the void volume which is left by the steam condensate, so as to allow gravity drainage to continuously take place within the mature chamber, and incremental oil/bitumen is recovered.
[0193] Once the desired value of chamber pressure is reached, e.g. at a pressure below 4500 kPa, oxidizing gas or air injection is terminated. The next step of the process includes a blowdown/production phase. Fig 2d illustrates this phase of the process. In one implementation, the air injector 20 is shut in and eventually converted into a producer. Wells 30, 22, 32, 24, and 34 are also converted into producers in this period. It should be noted that depending on the reservoir conditions and oil/bitumen content as well as the economics of production, it can be preferred to open only the original production wells 30, 32 and 34 at the blowdown/production stage. In some implementations, the producers can be opened with little or no restriction, and the heated and mobilized oil/bitumen flows in the channels and is collected by the producers. The blowdown/production phase is continued until the oil/bitumen production rate falls off to a given limit, for example above 500 kPa bottom hole pressure of the production wells 30, 32 and 34. At the end of the blowdown/production phase, the oil/bitumen remaining in the mature chamber preferably ensures that ignition and combustion is obtained during the next oxidizing gas injection or pressure-up cycle.
[0194] Fig 2d shows that well 20, that is used as an oxidizing gas injection well during the injection cycle, can also be converted into a producer to collect flue gas and bitumen when blowdown/production phase is taken place. However, this well could also be simply shut in during blowdown/production phase and be re-used for injecting oxidizing gas or air in the next pressure-up phase.
[0195] In some implementations, the oxidizing injection pressure-up and blowdown/
production sequence is repeated cyclically, for instance until the oil/bitumen production rate falls off to a given economic limit or until the residual bitumen in the reservoir is insufficient to support the initiation or adequate sweep of combustion.
[0196] In another optional aspect, the flue gases and liquids (oil/bitumen) are produced through the producers at the end of a cycle.
[0197] Figs 2a to 2d illustrate one possible implementation of the process wherein a configuration of three well pairs is used, in which steam injector 20, that is the injector of the well pair of one far end of the array, is converted into oxidizing gas injector during the pressure-up phase. In this implementation, the in situ combustion sweep is able to advance across the entire distance of the interwell chamber, heating and mobilizing residual bitumen in a continuous sweep. However, many other configurations and operational variations could be used to implement the process. Some other possible configurations will be discussed hereinafter. However, the process is not limited to these specific examples.
[0198] In Figs 3a to 3d, for example, the steam injector of a well pair, in between two other well pairs, is converted into the oxidizing gas injector. Thus, air is injected through well 22 and combustion is initiated in the vicinity of this well (Fig 3a). Well 32 below well 22 is shut in and the combustion region is then allowed to propagate through the interwell communication zone 16 in the direction of adjacent well pairs as a result of pressure differential between the air injector 22 and the open wells 20, 30, 24 and 34. Thus, the combustion region moves in two opposite directions. Injection of oxidizing gas is continued and when the first breakthrough of heat/combustion occurs at wells 20 and 24, and 30 and 34, these wells are restricted by choking or shutting in (see Fig 3b). Air injection is continued and the reservoir's pressure is allowed to rise until the desired pressure value (Fig 3c). Then, air injection is terminated. The pressure-up phase is then followed by the blowdown phase wherein all wells 20, 22, 24, 30, 32, 34, or selected wells amongst those, can be opened and bitumen produced (see Fig 3d). The pressure-up/blowdown sequence is then repeated to recover further bitumen.
[0199] Figs 4a and 4b show two other possible configurations of the well pairs used to implement the process according to another implementation. In this case, four well pairs are represented.
[0200] In Fig 4a, the injector of the first well pair from the array is used as the air injector and all the other wells are used as producers. Combustion is initiated in the vicinity of the injector while the producer just below is shut in. All the other wells are opened and the combustion front is allowed to propagate in the direction of the second well pair. When the first breakthrough of heat, combustion and/or gas occurs at the second well pair, its wells are restricted. Oxidizing gas or air injection is continued and the reservoir's pressure is allowed to rise. The combustion front is redirected toward the remaining opened wells of the third and fourth well pairs. Once the combustion front is close to the third well pair, the restriction procedure is re-applied to its wells. Continuing oxidizing gas or air injection will allow the combustion front to finally propagate toward the fourth well pair wherein the wells are still opened. Once the combustion front reaches the fourth well pair, its wells are shut in, air injection is continued and the reservoir's pressure is allowed to rise till the desired pressure value. Oxidizing gas or air injection is then terminated and the blowdown phase is implemented wherein all wells, or selected wells, are opened and bitumen is produced there-from. The pressure-up/blowdown sequence is then repeated to recover further bitumen.
[0201] Fig 4b represents the case when air is injected through two different wells. For example, two steam injectors of SAGD well pairs can be converted to air injectors in some implementations of the process. In this example, air is injected in the steam injector of the first well pair of the array and in the steam injector of the third well pair.
The remaining wells are used as producers. In this configuration, combustion is initiated both in the vicinity of the first and third injectors while the producer below in their respective pair is shut in. The first combustion front moves from the first well pair in the direction of the second well pair where the wells are opened. The second combustion front moves from the third well pair in two directions, toward the second well pair and also toward the fourth well pair, the wells of both these pair wells being also opened. Before the combustion fronts reach the second and fourth well pairs, the producers at these pairs are shut in. Air injection is continued to .. pressure-up the chamber. Then, the blowdown phase is implemented by opening the wells and the oil/bitumen is produced.
[0202] It should also be noted that the process can be implemented by injecting oxidizing gas such as air through two injectors of adjacent well pairs (see Fig 4c). In this case, oxidizing gas such as air is injected in the steam injector of the second and third well pair of the array. The composition of the oxidizing gas injected through the two wells can be the same or different and can contain one or more of the above mentioned gases.
The remaining wells are used as producers. In this configuration, combustion is initiated both in the vicinity of the second and third injectors while the producer below in their respective pair is shut in. A first combustion front moves from the second well pair in the direction of the first well pair of the array where the wells are opened. A second combustion front moves from the third well pair in the direction of the fourth well pair of the array where the wells are also opened. Before the combustion fronts reach the first and fourth well pairs, the producers at these pairs are shut in. Air injection is continued to pressure-up the chamber. Then, the blowdown phase is implemented by opening the wells and the oil/bitumen is produced.
[0203] In another implementation, referring to Figs 5a to 5d, 6a to 6d and 7a to 7d, one or more infill wells can each be provided in between adjacent well pairs and can be involved in the in situ combustion process. Infill wells can be used to help recover stranded bitumen between SAGD well pairs. The infill wells can be provided by drilling a simple horizontal well between two existing well pairs in the bypassed zone of stranded or bypassed bitumen.
.. Remaining mobilized bitumen is collected through this infill well. The process can also be implemented in an underground reservoir further including one or more infill wells. One or more of the infill wells can then be used as a producer or it could be used as an air injector.
[0204] In Figs 5a to 5d, there is shown a two well pair configuration wherein an infill well 40 is present in between the two pairs. The infill well 40 is used as a producer, but it should be understood that it can also be initially used as an injection of steam, hot water and/or solvent to help mobilized the surrounding bitumen. In one aspect, combustion is initiated at well 20, while well 30 below is shut in. In one implementation, infill well 40 and wells 22 and 32 can be opened at this stage (Fig 5a). The combustion front then propagates through the interwell chamber in the direction of infill well 40 Injection of air is continued and before combustion front reaches the infill well 40, the latter is restricted by choking or shutting in (see Fig 5b).
The restriction of the infill well 40 causes the combustion front to be redirected toward the remaining opened wells 22 and 32. Once the combustion front is close to wells 22 and 32, the restriction procedure is re-applied to these wells. Continuing air injection causes the reservoir pressure to rise to a given pressure value (see Fig 5c). Then, air injection is terminated. The blowdown phase is then implemented by opening all of the wells or selected wells (see Fig 5d).
[0205] Figs 6a to 6d show another alternative wherein an infill well 40 is used as the air injector. In this case, the combustion region formed in the vicinity of the infill well 40 is allowed to move in the direction of both adjacent well pairs wherein wells 20, 30, 22, 32 are opened (see Figs 6a-6b). Injection of air is continued and before combustion front reaches wells 20, 30, 22, 32, these are restricted by choking or shutting in.
Oxidizing gas or air injection is continued and the reservoir's pressure is allowed to rise (see Fig 6c). Then, air injection is terminated. Then follows the blowdown phase wherein all wells or selected wells, are opened and bitumen is collected (Fig 6d).
[0206] Referring now to Figs 7c and 7d, the SAGO array of well pairs can be provided with at least one infill well in between each adjacent well pair. In one implementation, there is one infill well in between each adjacent well pair, but there can be multiple infill wells in one or more cases, depending on the size of the bypassed region, the distance in between adjacent well pairs as well as reservoir characteristics. In one aspect, conducting in situ combustion heats one or more bypassed regions in which the infill wells have not yet established fluid communication with the coalesced mobilized chamber, e.g.
infill wells 40' in Fig 7d.
[0207] Referring to Figs 8a to 8d, the development of the mobilized chambers 14 and the interwell communication zone 16 can occur in a variety of ways and the process can be implemented in accordance with mobilized chamber development. For instance, in one aspect, the in situ combustion process can be implemented once the interwell chamber 16 covers the majority or entirety of the area above the array of well pairs.
This implementation enables the combustion front to advance so as to remain generally parallel with the well pairs in a direction that is generally perpendicular with respect to the well pairs, as shown in Fig 8d. This promotes consistency and predictability in operation of the in situ combustion process. In another optional aspect, the combustion can be conducted while the interwell chamber has not yet completely covered the area above and between all well pairs, e.g. as shown in Fig 8b. In this case, the SAGD reservoir still includes some immobile bitumen regions 42 which are mainly located in between adjacent well pairs. As can be seen referring to Figs 8b and 8c, larger immobile bitumen regions 42a can eventually in time reduce to a smaller immobile bitumen region 42b and eventually this small region can be heated up resulting in sufficiently reducing the viscosity of bitumen and make the bitumen mobilized. In an optional aspect, the in situ combustion can be conducted while there are still various immobile bitumen regions 42 above and between the well pairs and the combustion sweeps help to heat, mobilize and reduce the size of these less mobile bitumen regions 42, compared to the SAGD chamber. In such cases, the combustion front follows a more tortuous path, which can have certain upsides.
[0208] As described above, the process includes cyclically conducting the in situ combustion sweep and blowdown recovery. In one aspect, each cycle uses the same well as the oxygen injection well and the combustion displacement pattern is generally similar with each cycle. This can present various advantages, for example reducing well conversion requirements and having consistent combustion patterns and development over multiple cycles. Alternatively, different cycles can use different wells as the oxygen injection well. In one such scenario, a well at one end of the array is used as the oxygen injection well for one cycle and a well at the opposite end of the array is used as the oxygen injection well for a subsequent cycle. The oxidizing gas or air injection can be alternated back and forth between two wells at either end of the array. The cycles can also use a central well as the oxygen injection well followed by outside end well in subsequent cycles. Such back-and-forth or alternating oxygen injection techniques can present advantages by promoting different combustion sweep patterns and directions to enhance bitumen mobilization, improve thorough bitumen recovery from more areas of the interwell chamber and investigate the combustion efficiency and productivity according to different combustion flows.
[0209] The above description and drawings are intended to help the understanding of some implementations of the process. It will be apparent to one skilled in the art that various modifications can be made to the process.

=
EXAMPLES
[0210] Combustion tests were performed on a bitumen core matrix to assess the suitability for air injection based on enhanced oil recovery process at low bitumen saturations in conditions that would be encountered in a steamed region after a SAGD
operation is mature.
The core materials were taken from the native reservoir of Suncor's Firebag SAGD
operation site, about 270 m to 310 m underground.
[0211] The Firebag reservoir bitumen-native core was packed in a combustion tube as illustrated in Fig 9. The core has been established residual oil saturation around only 8.0 A
to mimic the case of residual bitumen within a SAGD chamber after SAGD
operation.
[0212] This experiment was designed to investigate the feasibility of the process, by showing that, using air injection, combustion can be ignited automatically, combustion front can be sustained, and bitumen can be recovered from a mature SAGD chamber.
[0213] The overall burning characteristics using dry air injection of the native core-bitumen-brine premix at reservoir pressure of 1500 kPag and reservoir temperature of 190 C were assessed. The air and fuel requirements and other gas phase parameters were measured.
Produced gas compositions and produced oil and water properties were measured to provide benchmarks for monitoring the process and field operations.
[0214] On completion of the packing operation, the tube was sealed, insulated and inserted into the pressure jacket. Fig. 10 shows a simplified schematic of the combustion tube set-up. Table 1 gives the average properties of the composite core prior to the test and the fluid saturations at the start of air injection.

[0215] Table 1: Properties of initial core pack and at ignition Permeability (darcies) Not Measured Calculated Porosity (%) 38.9 Mass of Liquids Present (grams) Prior to Start After Inert Gas Flood of Inert Gas (Start of Air Injection) Flood Oil in Core 437.3 437.3 Water in Core 3868.2 1896.8 Oil in Lines 0.0 0.0 Water in Lines 456.0 50.0 Oil in Total System 437.3 437.3 Water in Total System 4324.2 1946.8 Core Saturations (Volume %) Oil 8.0 8.0*
Brine 68.9 33.8*
Gas 23.1 58.2*
" Core Saturations at the start of air injection are based on densities at 25 C and atmospheric pressure. They should fairly accurately represent the core saturations at the actual conditions of 190 C and 1500 kPag (218 psig). The gas saturation is by difference.
[0216] The experimental results indicate that the bitumen-native core can be ignited automatically at an initial temperature of 200 C, which is after steam injection. The combustion front advanced smoothly through the core. The temperature profiles are shown in Figure 11. The temperature response following the start of air injection indicated a good ignition, and shortly after the ignition, the wall heaters were set to adiabatic control with a temperature lag behind the centerline temperature. The combustion front progressed stably through the core pack.
[0217] The following is a summary of the conditions and results of the experiments:
Operating conditions:
- Core Porosity: 38.9 percent (calculated) - Core Permeability: Not measured - Pressure: 1500kPag (218 psig) - Pre-heat Temperature: 190 C

- Feed Gas: Normal air (21.14 mole percent oxygen, balance nitrogen) - Initial Injection Air Flux: 30.0 m3(ST)/m2h - Oil Saturation: 8.0 percent - The rest of fluid saturations are balanced with water and steam vapour.
Combustion parameters for the overall test:
- A maximum recorded peak temperature of 640 C
- An overall fuel requirement of 17.3 kg/m3 - An overall apparent atomic hydrogen to carbon ratio of 1.14.
[0218] The combustion process, occurring in this post-SAGD case, that followed the core ignition consumed 49.1% of the initial bitumen in place to mobilise 13.9% of the initial oil and effectively displaced almost all of the initial water. Residual bitumen remained in the unburned section of the core.
[0219] Table 2 shows the stabilized product gas compositions of the test results. The results show that combustion stabilization occurs following air injection into a mature SAGD chamber.
[0220] Table 2: Stable Product Gas Composition Component Mole % (2.45-7.15 hours)*
CO2 14.09 CO 4.61 02 0.13 N2 80.50 CH4 0.15 C2H4 0.03 C2H6 0.05 C3H6 0.07 C3H8 0.05 C4+ 0.13 H2S 0.15 H2 0.04 Stabilized time by the front is 0.65-8.92 hours

Claims (28)

34
1. A process for in situ combustion in a mature Steam-Assisted Gravity Drainage (SAGD) operation in an underground reservoir, the mature SAGD operation comprising well pairs and an interwell communication zone between the well pairs, each well pair comprising a fluid injection well having a horizontal portion and a production well having a horizontal portion positioned below and aligned with the horizontal portion of the injection well, the process comprising injecting an oxidizing gas through at least one fluid injection well of one of the well pairs to initiate combustion and promote mobilization of residual heavy hydrocarbons in the reservoir, wherein the interwell communication zone has a bitumen saturation of from about 0.20 to about 0.05, and wherein the production well of the well pair comprising the injection well where the oxidizing gas is injected is operated in shut-in or choked mode while the oxidizing gas is injected.
2. The process of claim 1, wherein the interwell communication zone has a porosity between about 0.30 to 0.35.
3. The process of claim 1 or 2, wherein the interwell communication zone has a temperature of at least about 150 C upon initial injection of the oxidizing gas.
4. The process of claim 3, wherein the interwell communication zone has a temperature of at least about 175 C upon initial injection of the oxidizing gas.
5. The process of claim 4, wherein the interwell communication zone has a temperature of at least about 200 C upon initial injection of the oxidizing gas.
6. The process of any one of claims 1 to 5, wherein the oxidizing gas is oxygen, air, enriched air, a mixture steam/air or a mixture thereof.
7. The process of any one of claims 1 to 6, wherein the oxidizing gas further comprises additional components including methane or fuel gas or a combination thereof.
8. The process of any one of claims 1 to 6, wherein the oxidizing gas further comprises CO2, recovered flue gases from a previous combustion sequence, and/or N2.
Date Recue/Date Received 2021-12-08
9. The process of any one of claims 1 to 8, wherein the oxidizing gas further comprises water.
10. The process of any one of claims 1 to 6, wherein the oxidizing gas is oxygen or air or a combination thereof.
11. The process of any one of claims 1 to 6, wherein the oxidizing gas is air.
12. The process of any one of claims 1 to 11, wherein the production well is operated in shut-in mode as long as the oxidizing gas is injected.
13. The process of any one of claims 1 to 14, wherein the oxidizing gas is injected through a well which is on one end of the interwell communication zone.
14. The process of claim 13, wherein the oxidizing gas injection is injected through the injection well of an outside one of the well pairs.
15. A process for in situ combustion in a mature hydrocarbon recovery operation in an underground reservoir, the mature hydrocarbon recovery operation comprising well pairs and an interwell communication zone between the well pairs, each well pair comprising a fluid injection well having a horizontal portion and a production well having a horizontal portion positioned below and aligned with the horizontal portion of the injection well, the process comprising injecting an oxidizing gas through at least one fluid injection well of one of the well pairs to initiate combustion and promote mobilization of residual heavy hydrocarbons in the reservoir, wherein the interwell communication zone has a bitumen saturation of from about 0.20 to about 0.05, and wherein the production well of the well pair comprising the injection well where the oxidizing gas is injected is operated in shut-in or choked mode while the oxidizing gas is injected.
16. The process of claim 15, wherein the interwell communication zone has a porosity between about 0.30 to 0.35.
17. The process of claim 15 or 16, wherein the interwell communication zone has a temperature of at least about 150 C upon initial injection of the oxidizing gas.
Date Recue/Date Received 2021-12-08
18. The process of claim 17, wherein the interwell communication zone has a temperature of at least about 175 C upon initial injection of the oxidizing gas.
19. The process of claim 18, wherein the interwell communication zone has a temperature of at least about 200 C upon initial injection of the oxidizing gas.
20. The process of any one of claims 15 to 19, wherein the oxidizing gas is oxygen, air, enriched air, a mixture steam/air or a mixture thereof.
21. The process of any one of claims 15 to 20, wherein the oxidizing gas further comprises additional components including methane or fuel gas or a combination thereof.
22. The process of any one of claims 15 to 20, wherein the oxidizing gas further comprises 002, recovered flue gases from a previous combustion sequence, and/or N2.
23. The process of any one of claims 15 to 22, wherein the oxidizing gas further comprises water.
24. The process of any one of claims 15 to 20, wherein the oxidizing gas is oxygen or air or a combination thereof.
25. The process of any one of claims 15 to 20, wherein the oxidizing gas is air.
26. The process of any one of claims 15 to 25, wherein the production well is operated in shut-in mode as long as the oxidizing gas is injected.
27. The process of any one of claims 15 to 26, wherein the oxidizing gas is injected through a well which is on one end of the interwell communication zone.
28. The process of claim 27, wherein the oxidizing gas injection is injected through the injection well of an outside one of the well pairs.
Date Recue/Date Received 2021-12-08
CA3027547A 2011-06-28 2011-06-28 In situ combustion recovery process for mature hydrocarbon recovery operations Active CA3027547C (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CA3027547A CA3027547C (en) 2011-06-28 2011-06-28 In situ combustion recovery process for mature hydrocarbon recovery operations
CA3168169A CA3168169A1 (en) 2011-06-28 2011-06-28 Process for recovering hydrocarbons including an in situ combustion phase

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CA3027547A CA3027547C (en) 2011-06-28 2011-06-28 In situ combustion recovery process for mature hydrocarbon recovery operations
CA2744640A CA2744640C (en) 2011-06-28 2011-06-28 Cyclic combustion recovery process for mature in situ operations
CA2971941A CA2971941C (en) 2011-06-28 2011-06-28 In situ combustion recovery process for mature hydrocarbon recovery operations

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CA2971941A Division CA2971941C (en) 2011-06-28 2011-06-28 In situ combustion recovery process for mature hydrocarbon recovery operations

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CA3168169A Division CA3168169A1 (en) 2011-06-28 2011-06-28 Process for recovering hydrocarbons including an in situ combustion phase

Publications (2)

Publication Number Publication Date
CA3027547A1 CA3027547A1 (en) 2012-12-28
CA3027547C true CA3027547C (en) 2022-09-27

Family

ID=47392174

Family Applications (5)

Application Number Title Priority Date Filing Date
CA3168169A Pending CA3168169A1 (en) 2011-06-28 2011-06-28 Process for recovering hydrocarbons including an in situ combustion phase
CA2744640A Active CA2744640C (en) 2011-06-28 2011-06-28 Cyclic combustion recovery process for mature in situ operations
CA3027547A Active CA3027547C (en) 2011-06-28 2011-06-28 In situ combustion recovery process for mature hydrocarbon recovery operations
CA2847742A Active CA2847742C (en) 2011-06-28 2011-06-28 In situ combustion recovery process for mature steam-assisted gravity drainage operations
CA2971941A Active CA2971941C (en) 2011-06-28 2011-06-28 In situ combustion recovery process for mature hydrocarbon recovery operations

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CA3168169A Pending CA3168169A1 (en) 2011-06-28 2011-06-28 Process for recovering hydrocarbons including an in situ combustion phase
CA2744640A Active CA2744640C (en) 2011-06-28 2011-06-28 Cyclic combustion recovery process for mature in situ operations

Family Applications After (2)

Application Number Title Priority Date Filing Date
CA2847742A Active CA2847742C (en) 2011-06-28 2011-06-28 In situ combustion recovery process for mature steam-assisted gravity drainage operations
CA2971941A Active CA2971941C (en) 2011-06-28 2011-06-28 In situ combustion recovery process for mature hydrocarbon recovery operations

Country Status (1)

Country Link
CA (5) CA3168169A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR112014009436A2 (en) 2011-10-21 2017-04-11 Nexen Energy Ulc oxygen-assisted gravity assisted steam drainage processes
CA2815737C (en) 2012-05-15 2020-05-05 Nexen Inc. Steam assisted gravity drainage with added oxygen geometry for impaired bitumen reservoirs
CA2972203C (en) 2017-06-29 2018-07-17 Exxonmobil Upstream Research Company Chasing solvent for enhanced recovery processes
CA2974712C (en) 2017-07-27 2018-09-25 Imperial Oil Resources Limited Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes
CA2978157C (en) 2017-08-31 2018-10-16 Exxonmobil Upstream Research Company Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation
CA2983541C (en) 2017-10-24 2019-01-22 Exxonmobil Upstream Research Company Systems and methods for dynamic liquid level monitoring and control

Also Published As

Publication number Publication date
CA2847742C (en) 2017-10-24
CA2744640A1 (en) 2012-12-28
CA2971941A1 (en) 2012-12-28
CA3168169A1 (en) 2012-12-28
CA2971941C (en) 2019-02-05
CA2744640C (en) 2014-11-18
CA2847742A1 (en) 2012-12-28
CA3027547A1 (en) 2012-12-28

Similar Documents

Publication Publication Date Title
US20210277757A1 (en) Pressure assisted oil recovery
US7516789B2 (en) Hydrocarbon recovery facilitated by in situ combustion utilizing horizontal well pairs
CA3027547C (en) In situ combustion recovery process for mature hydrocarbon recovery operations
CA2698454C (en) Improved in-situ combustion recovery process using single horizontal well to produce oil and combustion gases to surface
CA3006750C (en) In situ hydrocarbon recovery from pay zones between low permeability layers in a stratified reservoir region
CA2553297C (en) In situ process to recover heavy oil and bitumen
Miller et al. Proposed air injection recovery of cold-produced heavy oil reservoirs
WO2019136533A1 (en) Method and system for recovery of hydrocarbons from a subterranean formation
US20150034313A1 (en) In situ combustion with a mobile fluid zone
US11156072B2 (en) Well configuration for coinjection
Hallam et al. Pressure-up blowdown combustion: A channeled reservoir recovery process
Turta et al. In-situ combustion in the oil reservoirs underlain by bottom water. Review of the field and laboratory tests
US11668176B2 (en) Well configuration for coinjection
US20230147327A1 (en) Optimizing steam and solvent injection timing in oil production
CN207144914U (en) Thickened oil recovery system
Turta et al. Preliminary considerations on application of steamflooding in a toe-to-heel configuration
CA3088228A1 (en) In situ combustion in late life bitumen recovery wells

Legal Events

Date Code Title Description
EEER Examination request

Effective date: 20181214

EEER Examination request

Effective date: 20181214

EEER Examination request

Effective date: 20181214

EEER Examination request

Effective date: 20181214