CA1323561C - Method of achieving heated areal conformance in weak uncemented sands - Google Patents

Method of achieving heated areal conformance in weak uncemented sands

Info

Publication number
CA1323561C
CA1323561C CA000605500A CA605500A CA1323561C CA 1323561 C CA1323561 C CA 1323561C CA 000605500 A CA000605500 A CA 000605500A CA 605500 A CA605500 A CA 605500A CA 1323561 C CA1323561 C CA 1323561C
Authority
CA
Canada
Prior art keywords
well
injection
steam
production
rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CA000605500A
Other languages
French (fr)
Inventor
P. Richard Kry
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Imperial Oil Resources Ltd
Original Assignee
Esso Resources Canada Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Esso Resources Canada Ltd filed Critical Esso Resources Canada Ltd
Priority to CA000605500A priority Critical patent/CA1323561C/en
Application granted granted Critical
Publication of CA1323561C publication Critical patent/CA1323561C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2405Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection in association with fracturing or crevice forming processes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells

Abstract

A process is disclosed for achieving thermal communication and areal conformance in a weak uncemented tar sand formation between at least one injection well and at least one production well penetrating said formation, which comprises (1) steam stimulation of said at least one production well by injection of steam for a time and at a volume and pressure sufficient to drive steam into said oil-bearing formation in the vicinity of said well, (2) terminating injection of steam to said at least one production well and producing fluids from said at least one production well while maintaining back pressure on said well to prevent substantial revaporization of steam condensate forming part of said fluids, until the bituminous fluid production rate is below an economically acceptable value, (3) when the stress state favors horizontal fracturing, injecting a high viscosity fracturing fluid at said injection well at a rate and for a sufficient time to propagate horizontal fracturing from said injection well to said at least one production well, (4) immediately subsequently injecting steam through said injection well at a rate and at a pressure necessary to promote material failure in said formation and which will decrease to less than overburden pressure while still in a state of net overinjection and producing steam condensate and bitumen at said at least one production well for a time sufficient to establish fluid communication and heated areal conformance between said injection well and said at least one production well. A process is also disclosed for the production of bitumen from a weak tar sand formation which comprises the additional steps of (5) reducing the rate of injection of steam at said injection well below that of said rate of production of fluids from said production well until the proportion of bitumen in said fluids from said production well decreases below a predetermined level, and (6) increasing the rate of injection of steam at said injection well to increase the reservoir pressure at which the steam flood is occurring and condense vapours formed during step (5).

Description

1323~61 This invention relates to the recovery of highly viscous oil or bitumen from a subterranean formation of tar sands. More particularly it relates to a method of achieving effective thermal communication between injection and production wells in a formation and also achieving increased production of the highly viscous oil from tar sands formations of a weak uncemented type.

In many different areas of the world there are subterranean formations containing high viscosity immobile oil or bitumen which cannot be recovered by conventional methods, that is the tar-sand type of formation. Some tar sands are described as granular materials which are close to mechanical incompetence at in situ stress conditions. To produce the bitumen it is necessary to heat it. There are many methods proposed in the prior art for stimulating production from wells penetrating such formations as well as for establishing thermal communication between wells in such formations to enhance the production of the viscous oil or bitumen.

Canadian Patent 753.474 of Boberg relates to a process for thermal stimulation of a producing well. The production of oil from the well is interrupted, steam is injected into the formation in order to reverse the direction of flow in the formation surrounding the well for a time sufficient to drive the steam into the formation a certain distance. This is followed by backflowing and producing steam condensate and oil from the well while maintaining a back pressure on the well to prevent substantial revaporization of the condensate.
This cyclic process ~s commonly known as "cyclic steam stimulation" and is a well-known process. This "cyclic steam stimulation" is intended for tar sands or any other formation in which productivity can be enhanced by heating the bitumen or tar to be produced.

.:., - :

., -1323~61 U.S. Patent 3.280.909 of Closmann et al involves preheating and flooding a tarsand formation in order to recover oil therefrom. A zone of oil-bearing formation between any pair of an injection and production well or adjacent such wells is preheated in order to reduce the viscosity of the oil to be moved out of the zone between the two wells. First, a horizontal fracture is formed between injection and production wells to provide fluid flow communication. Then a hot fluid is injected down, preferably, both wells and through the fracture, or through one well at a time while the other well is shut in. This is followed by injection of a drive or displacement fluid into the injection well and the production of drive fluid and oil from the production well.

USP 4,130,163 of Bombardieri relates to the recovery of hydrocarbons from a viscous tar sand deposit utilizing at least two wells for injection and production. A heated fluid, as for example steam, is injected simultaneously down both wells until a substantial zone is heated in the formation into which the wells penetrate and communication is established between the wells. Then one well is shut in and hydrocarbons are produced from the other. When the producing rates decline below a predetermined level, steam is introduced under relatively low pressure at the shut-in well to continue production but to prevent steam breakthrough at the production well. This cycle can be repeated.

USP 4.299.284 of Brown et al involves a method wherein production wells are treated with sn aqueous fluid containing surfactants to reduce permeability of the formation. The production wells are treated with this diverter" fluid to promote sweep efficiency or horizontal conformance of the displacement process for oil recovery. As a result of the treatment, there is alleged to be a reduction in the tendency to develop an assymetrical sweep area and the displacement and recovery process are allegedly enhanced.

, ~ :
'. . ' : : :

1323~1 USP 4.637.461 of Hight discloses a method relating to modified inverted nine spot and thirteen spot well patterns where several wells extend at least partly through the formation in a horizontal direction. The method involves cyclic steam stimulation of production wells with a thermal fluid prior to being placed on production and then the thermal fluid is injected at the central injection well. Once breakthrough from the central injection well is reached at any of the infill production wells, these are converted into injection wells and injection continued at these interior wells of the pattern.

U.S. Patent 4.612.989 of Rakach et al relates to the recovery of oil from tar sands and involves at least one injection and one production well in fluid communication with each other. Steam is injected through the injection well at less than a fracturing rate but at a sufficient pressure to displace the heated oil to the production well. When breakthrough of steam occurs at the O
production well, the latter is shut in for a period of time. The injection of steam through the injection well is then increased to form a fracture and the injection well shut in and the production well opened to produce hydrocarbons. The steps can be repeated in a cyclic matter.

Canadian Patent 1.122.113 of Britton et al relates to a process for establishing a zone of increased heat and of increased fluid mobility between an injection well and a production well vertically penetrating an oil reservoir such as a tar sands reservoir. The method involves horizontal hydraulic fracturing between the wells, followed by injecting steam at a very high rate through the injection well while producing fluids at the production well, the steam being injected at a sufficient pressure and for sufficient time to maintain parting of the formation along the fracture system between the wells and effect channel flow of fluids through the parted fracture system between the wells and conduction heating of substantial reservoir volume. The method is alleged to achieve high thermal efficiency. Although the method is : .

: ' 1323~1 not specified as being restricted to certain types of tar sand formations, it appears that relatively thin reservoirs or shallow reservoirs having low permeability are of particular interest insofar as the claimed process is concerned. It is clear from this patent that the pressure of the steam injection at the injection well at high rates must be greater than or equal to the overburden stress in order to maintain parting of the fracture system as required.

Canadian Patent 1.004.593 of Wang et al relates to recovery of viscous oil from a tar sand formation in which a relatively water-impermeable zone overlies a water-permeable zone. Steam is injected into the permeable zone to establish a hot water-permeable channel between at least one production and one injection well, the steam being injected at the highest practical rates to give a tar mobility of at least 15 md/cp in as short a time as possible.
During this procedure the backpressure of the well from which fluids are produced is kept as low as practical to promote a high rate of steam advance through the permeable zone. The injection of steam is continued after fluid communication is established at about the same rate or slightly less and at the same time the production well is throttled back so that a hot, water-permeable channel is established and expanded to the maximum possible extent. Then the injection rate is cut back to the maintenance level of temperature and pressure with a high back pressure being maintained on the production wells. After maintenance of the pressure and temperature to provide the required flow viscosity of the bitumen, the pressure in the formation is reduced by increasing the production of fluids at the production well. These steps are then carried out in a cyclic manner for increased production of bituminous fluid.

All the foregoing processes are found to be unsatisfactory from the point of view of achieving fluid communication and promoting areal conformance between injection and production wells, as well as obtaining enhanced production of . ~ . :
:. .: .
. ~ . . . .

: ~ .
.~: :. :
:, - : ~

:

1323~
bituminous fluid from tar sand formations of a type with which the present invention is particularly concerned. In fact, processes such as that of Canadian Patent 1,122,113 of Britton as such are not effective or even operable in the tar sand formations of present concern. One reason is that the patented process depends on a type of formation wherein tensile parting by conventional fracturing methods is possible and the fracture so formed can be maintained.

The particular formations with which the present invention is found to be suitable are such as are found at Cold Lake Alberta, some in the Athabasca tar sands, in California, Venezuela, and the Soviet Union. Such formations are characterized as being nweak" formations which are subject to shear failure rather than tensile failure. Adequate fluid communication between wells in such formations cannot be achieved by conventional processes. The conditions that characterize "weak" formations can best be determined by field observations and laboratory testing.

Knowledge of the in situ stress state is essential to characterize whether or not the formation is weak. The vertical in situ stress can be estimated by integration of high quality density logs from the surface to the depth of interest and the minimum in situ stress may be determined by low rate, low volume, cyclic hydraullc fracturing as described by Gronseth, J.N. and Kry, P.R., (1983). (Instantaneous shut in pressure and its relationship to the minimum in situ stress. In Hydraulic Fracturing Stress Measurements, edited by M.D. Zoback and B.C. Haimson, National Academy Press, ~ashington, D.C.) The maximum in situ principal stress cannot easily or reliably be determined, but what data exists in Western Canada, for example as described in Kry, P.R.
and Gronseth, J.N., 1983. (In situ stresses and hydraulic fracturing in the Deep Basin. Journal of Canadian Petroleum Technology, Vol. 22, No. 6, pp.
31-35) suggests that the maximum horizontal stress exceeds the minimum stress by 20~ to 100~. In summary, the minimum in situ stress and whether it is vertical or horizontal can be reliably determined.

~3~3~1 The most important indicator of whether the formation is weak is the observation of injection at pressures less than the in situ stress and at rates that exceed those expected from the undisturbed formation injectivity.
Undisturbed formation injectivity is the limit of the ratio between injection rate and the excess pressure above reservoir pressure which enables the injection to take place as the excess pressure tends to zero. (At zero excess pressure there is of course zero injection rate). In strong, cemented formations, injectivity that exceeds undisturbed formation injectivity indicates tensile parting, that is hydraulic fracturing. This is also the art taught as central to Canadian Patent 1,122,113 where the formation is floated by having the injection pressure exceed the minimum in situ stress which is the weight of the overburden in the applications that are taught. Tensile parting occurs only if the minimum in situ stress is exceeded by the injection pressure. In a weak formation, a low rate stress test shows that undisturbed formation injectivity is exceeded in oil sands for almost the lowest rates at which injection can be conducted, e.g. several liters per minute. At Cold Lake, for example, subsequent injection at several cubic meters per minute occurred at pressures up to 2 MPa less than the minimum in situ stress. In this situation, formation disturbance occurs leading to the increased injectivity. This cannot occur due to tensile parting but rather is due to material failure. The material undergoes localized shear failure due to differences in the in situ stressses and the elevation of the pore pressure to values within a few MPa of the minimum in situ stress. The material failure increases porosity in the uncemented granular reservoir material, and increased injectivity results: injection occurs at pressures less than the in situ stress at rates that exceed those expected from the undisturbed formation injectivity.

Local shear failure is the expression of material failure for an uncemented granular material. Material failure occurs when the state of stress exerted on a part of the material approaches the failure envelope for the material.
It is accompanied by dilation of the material, that is, increases in porosity and corresponding increases in permeability. (Lambe, T.~., and ~hitman, R.V., 1969. Soil Mechanics. John ~iley and Sons, Inc., New York, ISBN 0471 S1192-7.) It is the increase in permeability that gives rise to improved in;ec~ivity.

. .

- : ~ . . :

1~23~61 Laboratory tests on the mechanical strength of reservoir material can show whether or not it is a sufficiently weak material for the existing in situ stress state, so that material failure will occur before tensile parting occurs. In such tests as described by Dussealt, M.B. and Morgenstern, N.R., 1978. (Shear strength of Athabasca Oil Sands. Canadian Geotechnical Journal, Vol. 15, pp 216,238); Agar, J.G., 1984. (Geotechnical behaviour of oil sands at elevated temperatures and pressures. Ph.D. Thesis, Department of Civil Engineering, University of Alberta, Edmonton, Canada); Agar, J.G., Morgenstern, N.R. and Scott, J.D., 1983. (Geotechnical Testing of Alberta Oil Sands at Elevated Temperatures and Pressures. Proceedings 24th U.S. Symposium on Rock Mechanics, June 1983, pp 795-806.); Head, R.H., 1980. (Manual of Soil Laboratory testing. Pentech Press, London.), a sample of reservoir material usually recovered as core is subjected to confining stresses and pore pressure. These are changed in prescribed manners corresponding to various stress paths until failure is observed. By altering the stress paths and using a number of samples, the envelope of stress conditions for which material failure occurs can be defined. By comparison of this envelope with the in situ stress state and its variations due to pore pressure increases during the injection, conclusions as to whether or not material failure will occur can be made.

A minor observation that helps identify formations that might be sufficiently weak is that uncemented sands have grains that can more easily move relative to each other as will occur during material failure. Cemented sands have intergranular bonds that must be broken before such movement can easily occur. Depending on the degree of cementation this can make cemented sands considerably stronger, such that tensile parting will occur before material failure. Not all uncemented granual materials have the same failure envelope. An example illustrating this is the locked grain structure observed by Dussealt, M.B. and Morgenstern, N.R., 1979. (Locked sands. Quarterly Journal of Engineering Geology, Vol. 12, pp 117-131.) ' ' "' ~ ' '.~'~' ~:

~323~1 In the formation at Cold Lake, the injection of low viscosity fluid (water), at pressures lower than the in situ stress state and rates higher than those expected from the undisturbed formation injectivity has been observed.
Injection does start out above the minimum in situ stress but as that initial fluid pressurizes some of the pore volume, that pore volume can fail, increase in permeability, accept fluid and grow. The material failure zone grows but at the pressure required for material failure, rather than the pressure to maintain tensile parting.

Observations at Cold Lake have shown that when material failure occurs in a virgin reservoir, the propagation of the failure proceeds in a single preferential direction close to the orientation of the maximum in situ stress. The width of the failed zone is set by the size of the initial hydraulic fracture. The shape of the failed portion of the reservoir after steam injection is like a cigar - long and narrow. Such regions are unsuitable for communica~ion except between wells lying along the narrow cigar shape. Even then, unless the channel is sufficiently large, the communication path is not suitable for sufficient recovery of bitumen. The present invention combines conventional technology for hydraulic fracturing in the presence of the correct in situ stress state with an appropriate steam injection strategy to Dvercome limitations of typical operations and achieve desirable thermal communication and areal conformance.

Thus, the present invention was developed as a method applicable to theaforementioned type of formation for enhanced recovery of viscous oil from such tar sand formations.

The present invention provides a process for achieving thermal communication and areal conformance in a weak uncemented tar sand formation between at least one injection well and one production well penetrating said formation, which comprises (1) steam stimulation of said at least one production well by injection of steam for a time and at a volume and pressure sufficient to drive steam into said oil-bearing formation in the vicinity of said well, .
- . : .

~ ' 1323~61 (2) terminating injection of steam to said at least one production well and producing fluids from said at least one production well while maintaining back pressure on said well to prevent substantial revaporization of steam condensate forming part of said fluids, until the bituminous fluid production rate is below an economically acceptable value, (3) when the stress state favors horizontal fracturing, injecting a high viscosity fracturing fluid at said injection well at a rate and for a sufficient time to propagate horizontal fracturing from said injection well to said at least one production well, (4) immediately subsequently injecting steam through said injection well at a rate and at a pressure necessary to promote material failure in said formation and which will decrease to less than overburden pressure while still in a state of net overinjection and producing steam condensate and bitumen at said at least one production well for a time sufficient to establish fluid communication and heated areal conformance between said injection well and said at least one production well.

In a preferred embodiment the foregoing process also includes the additional steps of (5) reducing the rate of injection of steam at said injection well below that of said rate of production of fluids from said production well until the proportion of bitumen in said fluids from said production well decreases below a predetermined level, and (6) increasing the rate of injection of steam at said injection well to increase the rate of production of bitumen in the fluids produced from said production well. In the foregoing process steps (1) and (2) may be carried out on a cyclic basis and also steps (5) and (6) may be repeated sequentially on a cyclic basis.

In the drawings:
Figure la is schematic representation in plan view of an inverted seven spot well pattern during steps (1) and (2) of the foregoing process at the level where steam is in;ected in the formation.

~32356~

Figure lb is a sectional schematic view taken along the lines A-A' of figure la.
Figure 2a is a schematic plan view of the inverted seven spot well pattern at the level of injection at the end of step t3) of the process according to the invention.
Figure 2b is a sectional schematic view along the lines A--A' of Figure 2a.
Figure 3a is a schematic plan view of the inverted seven spot well pattern at the level of injection during step (4) of the process according to the invention.
Figure 3b is a schematic sectional view along the line A--A' of Figure 3a.
Figure 4a is a diagrammatic representation in plan view of the seven spot well pattern during step (5) of the process according to the invention at the level where steam is injected into the formation.
Figure 4b is a cross-sectional representation along the lines A--A' of Figure 4a.
Figure Sa is a diagrammatic representation in plan view of the inverted seven spot well pattern during step (6) of the aforementioned process according to the invention at the level where the steam is injected into the formation.
Figure 5b is a sectional diagrammatic view along the level A--A' in Figure Sa.
Figure 6 is a schematic representation of the relative locations of the wells at an experimental pad at Cold Lake Alberta wherein the method according to the invention was carried out as described in the Example herein.
Figure 7 is a graph showing the injection pressure of steam vs. time in days from the time of hydraulic fracturing of the formation for the method of the invention as carried out and described in the Esample herein.
Figure 8 is a graph showing cumulative volumes of steam injected and fluid and oil produced from the time of hydraulic fracturing of the formation for the method according to the invention as described in the Example herein.
Figure 9 is a schematic diagram showing the results from simulation studies of the hydraulic fracture treatment and the first 30 days of steam injection to the central well in the method of the invention as carried out and described in the Esample herein.

' ,, ~
~:

1~23~
Figure 10 is a graph showing bottomhole and wellhead temperatures as well production rates of fluids for well 26 in Fig. 6 for the method of the invention as carried out and described in the Example herein.

The process according to the present invention is applicable to any pattern of injection and production wells with a minimum of one injection well and at least one production well spaced therefrom but preferably with at least two spaced production wells not colinear with the injection well. However, the process is particularly suited to the use of an inverted pattern such as a seven spot well pattern, which type of pattern is well-known to those skilled in the art and involves a central injection well surrounded by six production wells in the form of a hexagon.

The field in which the wells are drilled comprises an oil bearing reservoir bounded above and below by impermeable formations. The injection and production wells are provided in this field and all penetrate into the reservoir. They are drilled by conventional drilling methods using drill bits on a tool string which is removed after the hole is drilled to its final depth to allow the installation of casing which is cemented in place. The casing and cement are conventional for thermal recovery operations and each well is provided with production tubing which places the wells in fluid communication with the well heads in conventional manner. Each well head is provided with suitable inlet and outlet connections, again in conventional manner. The production wells and the injection wells are sealed at the lower end by the cementing operation and use of conventional well cementing equipment.
Communication of each well with the surrounding reservoir is achieved by the use of a perforating gun which gun creates holes in the casing when detonated at the desired depth in the well, or one can use a method of notching wherein a nozzle which e~ects a fine stream of fluid containing particulates is used which wears the casing away as it is rotated. Both of these are conventional, but the former method is more economical. The wells may be substantially perpendicular to the planar surface of the terrain or they may be ~deviated~

'.
' ~ ,.

or "directionally~ drilled as is well-known in the art so that the surface area over which the wells are distributed is relatively small compared to the area over which the wells penetrate at the level of communication with the reservoir.

The first two stages of the process according to the present invention are preferably carried out in a cyclic manner and in themselves are conventional steps known as "cyclic steam stimulation~. The purpose of this initial stage in the process is to establish a heated portion of the reservoir in the vicinity of each production well to lower the viscosity of the oil. Since material failure will occur in a weak formation during this injection in the vicinity of each of the production wells, reservoir dilation will occur improving productivity of the wells. The expanded reservoir volume around each of the producers will then also alter the stress state in the vicinity of the central well to favour horizontal fracture over vertical fracture prior to injection of highly viscous fracturing fluid at the injection well. First of all, steam is injected into each production well and a total of about 5,000 to 15,000 cubic meters of steam is injected at each production or offset well at a pressure sufficient to drive the steam into the formation and heat the formation. This is generally carried out over a period of one or two months or so depending on the particular formation and the well characteristics.
Suitable pressures of steam will depend on the depth and type of formation.
The rate of injection of the steam is suitably over a period of a month or two at a rate between 100 and 300 m3/d. Steam must be injected to heat a sufficiently large reservoir volume. Numerical studies and empirical observations for the formation at Cold Lake Alberta have shown the total volumes suitable to be as aforementioned.

~hen the predetermined volume of steam injection is achieved, steaming is terminated and the production of condensate and bituminous fluid is begun from these wells while maintainin8 a back pressure on each of the wells to prevent ' " ' , ':
. ~ ,,' ~ ' ` ,.` ~

1323~
substantial revaporization of condensate within the formation or within the wellbore. The production of fluids is continued until the bituminous fluid stops flowing, that is, when it becomes too cold to continue the flow. Then, steam is again injected at each of the production or offset wells and the process repeated. The number of cycles will depend on how much heating is required around each production well and generally for the purposes of the present invention will comprise one to three cycles, whereas cyclic steam stimulation in conventional processes usually involves of the order of eight to fifteen cycles. The next step in the process can only proceed when a determination of the stress pattern at the central injection well indicates that horizontal rather than vertical fracturing is favoured and this test can be carried out by the test described in KrY et al to which reference has previously been made.

Figures la and lb show by diagrammatic representation the heated areas 10 around production wells 1, 2, 3, 4, 5 and 6 surrounding injection well 7.
Areas 11 in these figures show where material failure has occurred by virtue of the injection of steam and increase of pore pressure around the production wells 1-6.

In the overall process according to the invention it is desired to affect the stress characteristics of the formation to promote horizontal fracturing between the injection well and each production well as this allows communication between a mulitiplicity of wells whereas vertical fracturing, if favoured, can only result in limited well connectivity.

The next stage in the process according to the invention is the injection of a high viscosity fracturing fluid through the central injection well when the stress characteristics of the reservoir favour horizontal fracturing over vertical fracturing. It has been found that the fracturing fluid to be used at the time of entry into the formation through the injection well should have a fluid loss coefficient of less than about 10 4 m s 1/2 and an effective , ~

:

132~
viscosity at a shear rate of S00 s 1 of greater than 0.1 Pa s. These characteristics are most economically achieved by the use of a cross-linked guar gum as the fracturing fluid as for example MITEY-GEL LT-1300*
(Halliburton) or YFG* (Dowell) with Jlll* thickener which is a well-known such fluid. These characteristics can be achieved with several fracturing fluids from many different service companies. The characteristics are achieved quite economically with water based fracturing fluids that are prepared by adding guar gum to water to form a base gel with a moderate nonlinear viscosity. The high viscosity properties are created with special proprietary chemical formulations from hydraulic fracturing service companies that utilize metallic ions such as titanium to act as complexing agents which cross link the guar gum structure in the fluid and significantly increase its viscosity. Fluid loss control is often also accomplished by addition of fine mesh size sand (such as 100 mesh) added in low concentration to the fracturing fluid. In conventional operations, which are quite satisfactory for the present invention, the fracturing fluid is mixed to specifications by a service company at the well site.

The fracturing fluid is preferably injected at the injection well at a rate of about 5 to about 20 cubic meters per minute. It is found that rates lower than about 5 cubic meters per minute are not particularly effective and higher rates than about 20 cubic meters per minute can cause safety problems. The injection of the fracturing fluid is carried out for a sufficient time to propagate horizontal tensile fracturing between the injection well and each production well or until such time as the fracturing fluid reaches the production wells. In theory, the production wells can be monitored for an increase in pressure which indicates the arrival of the fracturing fluid in the formation at those wells. Alternately, this can be estimated from calculations using a fracturing simulator (such as TAaFRAC* a commercial *Trade Mark :.

:~ :

132'~61 product from SIMTECH Consulting). Fracturing simulators use the input conditions for the fracturing treatment such as the stress state, the injection volumes and rates, the mechanical properties of the reservoir and the fluid properties of the injected hydraulic fluid to then numerically solve the governing equations for the propagation of a tensile parting fracture with fluid leaking from the faces into the pore system and out of the fracture.
Such a simulator gives a prediction of fracture size as a function of volume injected. Often assumptions need to be made as to the shape of the perimeter of the hydraulic fracture, but for horizontal fractures a circular shape assumption may be quite reasonable. To generate a fracture with a 100 m radius typically requires the injection of 500 to 1500 m .

Figures 2a and 2b show in diagrammatic representation the situation at the level of the injection of the fracturing fluid at the end of this stage of the process wherein the fracturing fluid has propagated a tensile parting fracture to each of the production wells. In Figures 2a and 2b, the previously heated volumes surrounding the production wells are indicated at 10 while 12 indicates where fracturing fluid is present. During this stage of the operation the production wells are shut in to prevent any uncontrolled flow of fluid to the surface while the hydraulic fracture treatment is being conducted. This is not considered to be a likely event, but the consequences could be a severe disruption of the hydraulic fracturing treatment during its execution.

The next stage in the process is that injection of the fracturing fluid at the in;ection well is halted and injection of steam therethrough is begun at a higher rate than is normally used for cyclic steam stimulation of wells. The rate of in;ection of the steam is, according to the invention, preferably greater than about 300 m3/d and at a pressure which decreases to less than the overburden pressure as the material failure begins to dominate over , ~

.
' .

1 3 2 ~
tensile parting promoted during the hydraulic fracturing phase.
Simultaneously, steam condensate and bitumen are produced from the production wells at maximum rate. The rate of injection of the steam through the injection well is limited mainly by safety factors and will probably not exceed about 1,000 m3/d. A typical figure for this stage of the process is about 500 m3/d of steam. This injection with simultaneous production at a high rate of water condensate and bituminous fluid from the production wells is continued until the reservoir between the injection well and each production well has a significantly heated portion. This can be determined by calculations with a numerical simulator similar in principle to the fracturing simulator or more directly, observations of flowing temperatures can be made at the production wells to determine when heat first arrives and hence determine the length of time subsequent to that first arrival that hot fluids must continue to flow in order to generate a sufficiently large heated portion of the reservoir. If insufficient heating of the pathway between injector and producer occurs, then through the narrowest part of that pathway subsequent flow of bitumen may be cooled by conduction heat losses from the narrow portion resulting in increased bitumen viscosity and plugging of the pathway.
The initial heat arrival time will depend on the specific injection rates and how well material failure was suppressed during the hydraulic fracturing phase and on the extent of material failure above and below the initial fracture.
The sooner that hot fluids arrive, the thinner is the material failure zone and the longer must be the subsequent flow of hot fluids to sufficiently heat the reservoir between injector and producer. In the experience at Cold Lake, hot fluids began to reach the producers after about 100 days of injection (total volume 43,000 m injected and 5,000 m3 of total fluids produced per injector). High rate in3ection (>300 m3td) was continued for an additional 100 days to ensure thermal communication. In other words, the steam injection at high rates is continued until there is thermal communication between the injection and each production well and significant areal conformance has been achieved. In practical terms the injection of steam at relatively high rates : :. . :.. : ..

- .:: -:

~ -' ~ ; "

:

is continued with the total fluids produced at the production wells equalling the fluids injected at the injection well until the water to bitumen ratio from the production wells is excessive. At the end of this stage thermal conformance of a heated area has been achieved over a significant portion of the reservoir as shown in Figures 3a and 3b, the previously heated volumes being shown at 10, the area or volume permeated by the fracturing fluid being shown by 12 and the volume heated by steam injection being shown at 13.

As preferred steps according to the invention in order to achieve increased production of bituminous fluids from the production wells, the next stage is that the rate of injection of steam at the injector well is reduced to a rate below the production rate from the offset wells and the pressure is reduced.
Thus, the heated water in the formation vaporizes and promotes exchange of water and bitumen and hence flow of the latter. In fact, one can even cut off the injection of steam at well 7 completely until one has reached the preferred operating pressure. The production wells are operated within safety constraints at maximum rate of fluid handling capability. The bitumen will continue to flow and be produced at the production wells until such time as there is a general cooling in the formation which adversely affects the production rate. ~hen this step of the process is terminated will depend strictly on economics but in general will be when the bitumen rate decreases below that expected during high injection rate flooding. The injection rate of steam at the injection well 7 is then increased to a rate higher than the maximum production rate and higher than at least 300 m3/d in order to reheat the formation with concurrent maximum production rates at the production wells. During the stage when the rate of steam injection is decreased and the flow of bitumen increased from the production wells, it has been found in formation at Cold Lake, Alberta that the volume ratio of water condensate to bitumen is about 3. Figures 4a and 4b show the condition of the reservoir during the low pressure injection of steam stage of the process including liquid (14) and vapour (15) zones superimposed on the zone (13) heated during . :
. .. : ' '"
, , ~ 323~
the prior high rate steam injection phase. Figures 5a and 5b show the condition of the reservoir when high steam injection rates are resumed to increase pressures and temperatures in the reservoir at 16.

The last two stages in the process can be repeated sequentially for as many cycles as required and as long as bitumen is being economically produced from the reservoir via the production wells.

EXAMPLE

The following specific example of the method carried out at a formation at Cold Lake, Alberta illustrates the process according to the present invention. Figure 6 illustrates the relative locations of the wells. To conduct the experiment 7 wells were reserved from the corner of a 30 well pad. The wells were drilled with an interwell distance of 105 m and the 7 wells reserved formed an inverted seven spot. The wells were all drilled to the base of the oil sand (500 m), however the quality of the lower part of the reservoir was considered to be marginal and thus the seven spot wells were perforated near the middle of the reservoir. The top of the formation was at 460 m depth.

The six surrounding wells were carried through a first cycle of cyclic steam stimulation. On average, 6500 m3 of steam was injected to each well and production carried out over about a 5 month period. Each well on average produced 3500 m3 of fluid including about 1400 m3 of bitumen. During this time the stress state was monitored in the central well and it was observed that by the end of the first cycle production, the minimum in situ stress had decreased below the weight of the overburden. This means that vertical fracturing would be favoured. To again change the stress state to favour horizontal fracturing required the injection of more fluid to the producers.
It was thus necessary to undertake a second cycle of steam stimulation in the six surrounding wells. This was accomplished with an average injection ;: :
:
. - , :' . , .

: : : ;. :., .

1323~6~
of 6200 m of steam which was varied between the wells to provide an approximate balance with the net fluid injection over the life of the wells to that date.

The stress state was assessed at the end of the second cycle of steam injection and found to favour horizontal fracturing. The initial weight of the overburden at the depths of the perforations was 9.9 MPa while the minimum horizontal in situ stress was determined to be 11.5 MPa. The pore pressure was at 10.3 MPa due to the second cycle of steam injection to the surrounding 6 wells suggesting that the vertical stress was somewhat elevated compared to initial conditions by the injection to the surrounding producers. ~ith these conditions the hydraulic fracture treatment was conducted using a guar gum aqueous based crosslinked gel that during the fracture treatment had an effective viscosity at a shear rate of 500 s 1 of 0.1 Pa s and a fluid loss coefficient of 1.4 x 10 4 m s 1/ . 750 m3 of fluid were injected at a bottom hole pressure of 12.9 MPa and fluid injection rate of 8 m3/min.
Steam injection was begun within 40 min of completion of the injection at a bottom hole injection pressure of 11.5 MPa.

For the first 30 days the injection rate averaged 550 m /d at an injection pressure of 11.7 MPa. Net overinjection was still occurring to the pattern with more than twice as much condensed volume of steam injected as the total volume of fluid produced. The rate was decreased to average 370 m3/d after 30 days of injection while the injection pressure dropped to 11.2 MPa. ~ith no reduction in net injection rate after lO0 days the injection pressure had decreased below lO MPa and by 200 days it had decreased to near 8 MPa. From 30 to 200 days there was essentially balance between the condensed volume of steam injected and the volume of produced fluids. These results are shown in Figures 7 and 8 which show the injection pressure history and the cumulative volumes injected and produced from the pattern from the time of the hydraulic fracture. The continuous support of flow from the producing wells demonstrated that communication had been achieved between the central well and each of the surrounding producers.

.

:' 1~23~

It was during this time interval that it was observed that the well to the northeast of the pattern (24 in Fig. 6) was being strongly influenced by the injection to the central well. Observation of a pressure response in the closest well (23) in the pattern during the hydraulic fracture treatment indicted some assymetry in that direction, suggesting that material failure was playing some role during the hydraulic fracture treatment: that ~t was not completely suppressed in favour of tensile parting. Consequently, that well (24) was included in the pattern and operated as the bounding well to the pattern in that direction. The intermediate well (23) was only intermittently operated and served essentially as an observation well.

In this case, the steaming to the surrounding wells changed the stress state significantly from the ~irgin condition. It is this change in stress state that required such high pressures to initiate the material failure process.
The pore pressure must be very close to the in situ stress values since all three stress components are close to each other. In virgin reservoirs where higher differences between stress components can exist, pore pressures significantly less than the minimum in situ stress value can result in material failure. These results are clear from consideration of the equation for the failure pressure with the assumption of a Mohr-Coulomb failure envelope with typical friction angle of ~ - 35 .

Pr = 2 tah+ av- (ah- a~ in] (1) ~here ~ is the vertical in situ stress (minimum principal assumed) andc~h is the marimum horizontal in situ stress (maximum principal stress). ~hen the 6tresses approach equality, the failure pressure approaches their value. ~hen there i8 a contrast of 2 MPa between the minimum and maximum, Equation l shows the failure pressure is 0.~ ~Pa less than the minimum in situ stress. As overinjection continues, the size of the zone of failure must increase.

~ ' ' '' .

1323~
Eventually the size of this zone becomes sufficiently large that the shear support of the overburden which gives rise to the increase in vertical stress can no longer support the area of pressurized reservoir and the contrast between the vertical stress and horizontal stress must increase, reducing the failure pressure while the reservoir stays in a state of net overinjection.

Simulation of the hydraulic fracture treatment indicated a radius for thé
fracture of slightly less than the well spacing (17 in Figure 9). Simulation of the first 30 days of steam injection to the central well with a simulator accounting for material failure (Settari, A., 1988. Modeling of Fracture and Deformation Processes in Oil Sands: Paper presented at the 4th UNITAR/UNDP
Conference, Edmonton, Alberta. Settari, A., Kry, P.R., Yee, C.T., 1989.
Coupling of Fluid Flow and Soil Behaviour to model injection into uncemented oil sands. Journal of Canadian Petroleum Technology, Vol. 28, No. 11, pp 81-92.) suggested that heat should be distributed out to about 85 m radius (18 in Figure 9). These results are shown in Pigure 9.

Thermal communication occurred about 100 days after the hydraulic fracture treatment. The time of arrival of thermal communication is defined as the time at which half the ultimate thermal response has been observed. This is shown in Figure 10 which is a particularly clear example. The bottomhole temperature was estimated from the well head temperature and the production rates using an approYimate relationship for wellbore heat losses. As shown in Figure 10 for well 26 in Figure 6, the estimated bottom hole temperature decreases from the day of the hydraulic fracture treatment as the reservoir near the producer c0018 due to production. After about 60 days for this well, the temperature reaches its minimum value and begins to increase to the maximum value estimated after about 140 days. It reaches the half way point in the transition at about day 100. Similar timing was observed for the other producers.
-.
: .

1~23~

The high rate injection continued for another 100 days after this thermal communication time. At that point the central injector was shut in for 40 days while production continued and the pressure fell to near 3 MPa.
Subsequently low rate injection was restarted to the central well. Production continued for about 400 days until a repressurization cycle was started. This latter interval is also shown in Figures 7 and 8 which are the injection pressure history and the cumulative volumes injected and produced after the hydraulic fracture. To the point of repressurization including the cyclic steam stimulation cycles, 185,000 m3 of steam have been injected and 178,000 m of fluids have been produced, including, 40,000 m of bitumen.

: . : : ."

:

~:

. ~ ; ~- '

Claims (12)

1. A process for achieving thermal communication and areal conformance in a weak uncemented tar sand formation between at least one injection well and at least one production well penetrating said formation, which comprises (1) steam stimulation of said at least one production well by injection of steam for a time and at a volume and pressure sufficient to drive steam into said oil-bearing formation in the vicinity of said well, (2) terminating injection of steam to said at least one production well and producing fluids from said at least one production well while maintaining back pressure on said well to prevent substantial revaporization of steam condensate forming part of said fluids, until the bituminous fluid production rate is below an economically acceptable value, (3) when the stress state favors horizontal fracturing, injecting a high viscosity fracturing fluid at said injection well at a rate and for a sufficient time to propagate horizontal fracturing from said injection well to said at least one production well, (4) immediately subsequently injecting steam through said injection well at a rate and at a pressure necessary to promote material failure in said formation and which will decrease to less than overburden pressure while still in a state of net overinjection and producing steam condensate and bitumen at said at least one production well for a time sufficient to establish fluid communication and heated areal conformance between said injection well and said at least one production well.
2. The process of claim 1 wherein in step (3) the high viscosity fracturing fluid is injected at a rate of about 5 to about 20 m3/min., said fracturing fluid at the time of entry into said formation having a fluid loss coefficient of less than 10-4m s-1/2 and an effective viscosity at a shear rate of 500 s-1 of greater than 0.1 Pa s.
3. The process of claim 2 wherein in step (4) the steam is injected at a rate greater than about 300 m3/d.
4. The process of claim 1 wherein steps (1) and (2) are repeated for two or three cycles.
5. A process for the production of bitumen from a weak tar sand formation which comprises the process of claim 1 with the additional steps of (5) reducing the rate of injection of steam at said injection well below that of said rate of production of fluids from said production well until the proportion of bitumen in said fluids from said production well decreases below a predetermined level, (6) increasing the rate of injection of steam at said injection well to increase the reservoir pressure at which the steam flood is occurring and condense vapours formed during step (5).
6. The process of claim 5 wherein steps (5) and (6) are repeated sequentially.
7. The process of claim 1 or claim 5 wherein at least one injection well and at least two production wells not colinear with the injection well are used.
8. The process of claim 1 or 5 wherein the injection and production wells form an inverted seven-spot pattern.
9. The process of claim 1 or 5 wherein step (1) is carried out until a total of about 5,000 to 15,000 m3 water equivalent of steam has been injected at each production well.
10. The process of claim 1 or 5 wherein step (3) is carried out using a total injection of fracturing fluid of about 500 to 1,500 m3 with a well spacing of about 100 m.
11. The process of claim 1 or 5 wherein step (4) is carried out over a period of about three to six months with a well spacing of about 100 m.
12. The process of claim 1, 3 or 5 wherein in step (4) the rate of injection of steam is about 500 m3/d for about 30 d with a well spacing of 100 m.
CA000605500A 1989-07-12 1989-07-12 Method of achieving heated areal conformance in weak uncemented sands Expired - Lifetime CA1323561C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CA000605500A CA1323561C (en) 1989-07-12 1989-07-12 Method of achieving heated areal conformance in weak uncemented sands

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA000605500A CA1323561C (en) 1989-07-12 1989-07-12 Method of achieving heated areal conformance in weak uncemented sands

Publications (1)

Publication Number Publication Date
CA1323561C true CA1323561C (en) 1993-10-26

Family

ID=4140339

Family Applications (1)

Application Number Title Priority Date Filing Date
CA000605500A Expired - Lifetime CA1323561C (en) 1989-07-12 1989-07-12 Method of achieving heated areal conformance in weak uncemented sands

Country Status (1)

Country Link
CA (1) CA1323561C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011029173A1 (en) * 2009-09-11 2011-03-17 Excelsior Energy Limited System and method for enhanced oil recovery from combustion overhead gravity drainage processes
CN103867175A (en) * 2014-02-27 2014-06-18 中国石油天然气股份有限公司 Steam-driving well network structure and steam-driving developing method thereof
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011029173A1 (en) * 2009-09-11 2011-03-17 Excelsior Energy Limited System and method for enhanced oil recovery from combustion overhead gravity drainage processes
CN103867175A (en) * 2014-02-27 2014-06-18 中国石油天然气股份有限公司 Steam-driving well network structure and steam-driving developing method thereof
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10385258B2 (en) 2015-04-09 2019-08-20 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10385257B2 (en) 2015-04-09 2019-08-20 Highands Natural Resources, PLC Gas diverter for well and reservoir stimulation
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation

Similar Documents

Publication Publication Date Title
US4265310A (en) Fracture preheat oil recovery process
US5036918A (en) Method for improving sustained solids-free production from heavy oil reservoirs
US4635720A (en) Heavy oil recovery process using intermittent steamflooding
US4116275A (en) Recovery of hydrocarbons by in situ thermal extraction
US5547023A (en) Sand control well completion methods for poorly consolidated formations
US4344485A (en) Method for continuously producing viscous hydrocarbons by gravity drainage while injecting heated fluids
US5085276A (en) Production of oil from low permeability formations by sequential steam fracturing
US3500913A (en) Method of recovering liquefiable components from a subterranean earth formation
US3682246A (en) Fracturing to interconnect wells
US4633948A (en) Steam drive from fractured horizontal wells
Soliman et al. Fracturing horizontal wells in gas reservoirs
US3455392A (en) Thermoaugmentation of oil production from subterranean reservoirs
US4612989A (en) Combined replacement drive process for oil recovery
CN101835953B (en) Well construction using small laterals
US5036917A (en) Method for providing solids-free production from heavy oil reservoirs
US3960214A (en) Recovery of bitumen by steam injection
US4109722A (en) Thermal oil recovery method
Palmer et al. Completions and stimulations for coalbed methane wells
CA1323561C (en) Method of achieving heated areal conformance in weak uncemented sands
CA1303974C (en) Method of producing viscous oil from subterranean formations
US5042581A (en) Method for improving steam stimulation in heavy oil reservoirs
CA1310581C (en) Method of improving the areal sweep efficiency of a steam flood oil recovery process
US4279301A (en) Method for improving the effective permeability of formations
Baumgartner et al. Fracture Stimulation of a Horizontal Well in a Deep, Tight Gas Reservoir: A Case History from Offshore The Netherlands
CA1246997A (en) Determining steam distribution

Legal Events

Date Code Title Description
MKEX Expiry