ZA202103082B - Systems and methodology for construction management and equipment positioning via building information modeling - Google Patents
Systems and methodology for construction management and equipment positioning via building information modelingInfo
- Publication number
- ZA202103082B ZA202103082B ZA2021/03082A ZA202103082A ZA202103082B ZA 202103082 B ZA202103082 B ZA 202103082B ZA 2021/03082 A ZA2021/03082 A ZA 2021/03082A ZA 202103082 A ZA202103082 A ZA 202103082A ZA 202103082 B ZA202103082 B ZA 202103082B
- Authority
- ZA
- South Africa
- Prior art keywords
- methodology
- systems
- building information
- construction management
- information modeling
- Prior art date
Links
- 238000009430 construction management Methods 0.000 title 1
- 238000000034 method Methods 0.000 title 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K19/00—Record carriers for use with machines and with at least a part designed to carry digital markings
- G06K19/06—Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code
- G06K19/067—Record carriers with conductive marks, printed circuits or semiconductor circuit elements, e.g. credit or identity cards also with resonating or responding marks without active components
- G06K19/07—Record carriers with conductive marks, printed circuits or semiconductor circuit elements, e.g. credit or identity cards also with resonating or responding marks without active components with integrated circuit chips
- G06K19/0723—Record carriers with conductive marks, printed circuits or semiconductor circuit elements, e.g. credit or identity cards also with resonating or responding marks without active components with integrated circuit chips the record carrier comprising an arrangement for non-contact communication, e.g. wireless communication circuits on transponder cards, non-contact smart cards or RFIDs
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B5/00—Near-field transmission systems, e.g. inductive or capacitive transmission systems
- H04B5/70—Near-field transmission systems, e.g. inductive or capacitive transmission systems specially adapted for specific purposes
- H04B5/77—Near-field transmission systems, e.g. inductive or capacitive transmission systems specially adapted for specific purposes for interrogation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Geometry (AREA)
- Business, Economics & Management (AREA)
- Computer Hardware Design (AREA)
- Architecture (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Evolutionary Computation (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Optimization (AREA)
- Game Theory and Decision Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Health & Medical Sciences (AREA)
- Electromagnetism (AREA)
- Educational Administration (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Joining Of Building Structures In Genera (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/186,247 US10689841B2 (en) | 2018-11-09 | 2018-11-09 | Construction anchoring system, apparatus and methodology |
US201962794905P | 2019-01-21 | 2019-01-21 | |
US201962841217P | 2019-04-30 | 2019-04-30 | |
PCT/US2019/060653 WO2020097589A1 (fr) | 2018-11-09 | 2019-11-09 | Système et méthodologie de gestion de construction et de positionnement d'équipement au moyen d'une modélisation d'informations de construction |
Publications (1)
Publication Number | Publication Date |
---|---|
ZA202103082B true ZA202103082B (en) | 2022-12-21 |
Family
ID=70611205
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ZA2021/03082A ZA202103082B (en) | 2018-11-09 | 2021-05-07 | Systems and methodology for construction management and equipment positioning via building information modeling |
Country Status (11)
Country | Link |
---|---|
EP (1) | EP3861498A4 (fr) |
JP (1) | JP2022506961A (fr) |
KR (1) | KR20210090668A (fr) |
CN (1) | CN113261018A (fr) |
AU (2) | AU2019376170B2 (fr) |
BR (1) | BR112021009060A2 (fr) |
CA (1) | CA3119327A1 (fr) |
IL (1) | IL283001A (fr) |
MX (1) | MX2021005305A (fr) |
WO (1) | WO2020097589A1 (fr) |
ZA (1) | ZA202103082B (fr) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7489279B2 (ja) | 2020-09-24 | 2024-05-23 | センクシア株式会社 | アンカーフレーム及び架台の施工管理システム |
RU2769083C1 (ru) * | 2021-03-11 | 2022-03-28 | Денис Олегович Кузнецов | Аппаратно-программный комплекс для контроля процессов строительства и сбора конструкций с использованием BIM технологии |
CN113428785A (zh) * | 2021-06-22 | 2021-09-24 | 筑友智造建设科技集团有限公司 | 施工现场构件的吊装定位方法、装置、设备及存储介质 |
CN114109039B (zh) * | 2021-12-10 | 2023-03-17 | 广东天凛高新科技有限公司 | 一种基于nfc无源控制的模具紧固装置及模具紧固方法 |
CN117939086B (zh) * | 2024-03-19 | 2024-06-04 | 中通服建设有限公司 | 一种数字建筑的智慧监控平台及方法 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS423091Y1 (fr) * | 1964-03-17 | 1967-02-23 | ||
JPH0340982Y2 (fr) * | 1985-12-19 | 1991-08-28 | ||
JPH0414662Y2 (fr) * | 1987-04-06 | 1992-04-02 | ||
US6302310B1 (en) | 1998-11-13 | 2001-10-16 | Frederick W. Lamb | Staple or nail gun assembly, cap feeding device for staple or nail gun, and cap assembly |
JP2001269916A (ja) * | 2000-03-23 | 2001-10-02 | Flex Syst:Kk | コンクリート埋込アンカーおよびそれを用いたコンクリート成形品の製造方法 |
WO2005060421A2 (fr) * | 2003-12-05 | 2005-07-07 | Building Construction Solutions, Inc. | Element flottant d'ancrage dans du beton |
US7103984B2 (en) * | 2004-02-26 | 2006-09-12 | Kastberg David J | Anchor bolt and setting template |
EP2545478A4 (fr) * | 2010-03-09 | 2014-12-31 | Autodesk Inc | Systèmes et procédés pour la gestion et les opérations d'un chantier de construction avec modélisation des données d'un bâtiment |
JP5746378B2 (ja) | 2011-02-05 | 2015-07-08 | アップル インコーポレイテッド | 移動体ロケーション判定のための方法及び装置 |
CA2988406C (fr) | 2011-03-18 | 2020-08-25 | Thomas M. Espinosa | Ensemble d'accouplement pour ancrage a beton et support de tige d'ancrage |
US9817839B2 (en) * | 2011-11-29 | 2017-11-14 | Trimble Inc. | Managing information at a construction site |
US9539164B2 (en) | 2012-03-20 | 2017-01-10 | Xerox Corporation | System for indoor guidance with mobility assistance |
FR2989196B1 (fr) * | 2012-04-05 | 2015-01-30 | Vinci Construction Grands Projets | Procede de generation d'une interface interactive d'affichage de donnees. |
WO2016011259A1 (fr) * | 2014-07-16 | 2016-01-21 | SR Systems, LLC | Boulon d'ancrage anti-torsion |
EP3054404A1 (fr) * | 2015-02-04 | 2016-08-10 | Hexagon Technology Center GmbH | Modélisation d'informations de travail |
CA3006164A1 (fr) * | 2015-12-01 | 2017-06-08 | Vinci Construction | Procede et systeme d'aide a l'installation d'elements dans un travail de construction |
US11250176B2 (en) * | 2017-05-05 | 2022-02-15 | Nucor Corporation | System for on-site tracking, managing, planning and staging construction projects |
-
2019
- 2019-11-09 KR KR1020217017603A patent/KR20210090668A/ko unknown
- 2019-11-09 WO PCT/US2019/060653 patent/WO2020097589A1/fr unknown
- 2019-11-09 CA CA3119327A patent/CA3119327A1/fr active Pending
- 2019-11-09 JP JP2021525125A patent/JP2022506961A/ja active Pending
- 2019-11-09 AU AU2019376170A patent/AU2019376170B2/en active Active
- 2019-11-09 CN CN201980084867.0A patent/CN113261018A/zh active Pending
- 2019-11-09 EP EP19883168.7A patent/EP3861498A4/fr active Pending
- 2019-11-09 BR BR112021009060-6A patent/BR112021009060A2/pt unknown
- 2019-11-09 MX MX2021005305A patent/MX2021005305A/es unknown
-
2021
- 2021-05-06 IL IL283001A patent/IL283001A/en unknown
- 2021-05-07 ZA ZA2021/03082A patent/ZA202103082B/en unknown
-
2024
- 2024-08-09 AU AU2024205658A patent/AU2024205658A1/en active Pending
Also Published As
Publication number | Publication date |
---|---|
BR112021009060A2 (pt) | 2021-08-10 |
AU2019376170A1 (en) | 2021-05-27 |
IL283001A (en) | 2021-06-30 |
CN113261018A (zh) | 2021-08-13 |
AU2024205658A1 (en) | 2024-08-29 |
AU2019376170B2 (en) | 2024-05-09 |
EP3861498A4 (fr) | 2022-10-19 |
EP3861498A1 (fr) | 2021-08-11 |
WO2020097589A1 (fr) | 2020-05-14 |
MX2021005305A (es) | 2021-08-16 |
JP2022506961A (ja) | 2022-01-17 |
KR20210090668A (ko) | 2021-07-20 |
CA3119327A1 (fr) | 2020-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ZA202103082B (en) | Systems and methodology for construction management and equipment positioning via building information modeling | |
SG11202102436RA (en) | Systems and methods for managing information about building resources | |
SG11202104327XA (en) | Systems and methods for inventory management and optimization | |
EP3664370A4 (fr) | Procédé de gestion d'informations de fonction de réseau et dispositif associé | |
IL269697A (en) | Automatic system for planning plaster walls and method | |
DK3430485T3 (da) | Fremgangsmåder og system til at styre et bevægeligt objekt | |
DK3773798T3 (da) | Tidsstyring til tidsafhængige tidsstyringssystemer, fremgangsmåder og enheder | |
EP3786863A4 (fr) | Système de gestion de construction et procédé de gestion de construction | |
SG11202104254UA (en) | Methods and systems for interactive data management | |
GB2578316B (en) | A building management system and method | |
EP3695372A4 (fr) | Système et procédé de gestion d'actifs | |
SG11202003580XA (en) | System and method for data management | |
EP3823879C0 (fr) | Système et procédé de construction et de gestion de composition de train | |
IL263820B (en) | Ticketing management system and program | |
SG11202011013XA (en) | Payment management system and payment management method | |
DK3703331T3 (da) | Systemer og fremgangsmåder til netværksstyring | |
GB2589740C (en) | Environmental information management system | |
GB201813712D0 (en) | Systems and methods for providing traffic information | |
GB201704710D0 (en) | A data management system and method | |
SG11202100717SA (en) | Parallel blockchain-based information management and operation system | |
GB202008525D0 (en) | Learning management systems and methods therefor | |
SG11202101549PA (en) | Management system and data center | |
GB201813160D0 (en) | A property services management system and method of providing property services | |
GB201720580D0 (en) | A data management system and method | |
EP3764312A4 (fr) | Système et procédé de gestion d'informations de construction |