WO2024216666A1 - 一种光伏基础桩用筏板支模模具及其筏板 - Google Patents
一种光伏基础桩用筏板支模模具及其筏板 Download PDFInfo
- Publication number
- WO2024216666A1 WO2024216666A1 PCT/CN2023/091205 CN2023091205W WO2024216666A1 WO 2024216666 A1 WO2024216666 A1 WO 2024216666A1 CN 2023091205 W CN2023091205 W CN 2023091205W WO 2024216666 A1 WO2024216666 A1 WO 2024216666A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- raft
- mold
- formwork
- pouring
- photovoltaic foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
- E02D27/013—Shuttering specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
- E02D27/08—Reinforcements for flat foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Definitions
- the invention relates to the technical field of photovoltaic foundation piles, and in particular to a raft formwork mould for photovoltaic foundation piles and a raft plate thereof.
- the object of the present invention is to provide a raft formwork mould for photovoltaic foundation piles and a raft formwork thereof.
- a raft formwork mold for photovoltaic foundation piles and a raft thereof comprising a formwork assembly, including a formwork member, and a mold separation and assembly member located on the formwork member; and a raft assembly, including a raft member cast by the formwork member, and a reinforcement member cast by the raft member.
- the formwork component includes a plurality of single mold plates, and the two sides of the plurality of single mold plates are at an angle of 60 degrees; a closing module is provided at the outer side of the end of the plurality of single mold plates, and a guide surface I is provided on the closing module; the mold separation and combination component includes a combined upper plate, and a plurality of closing mold drive plates are provided at the outer side of the combined upper plate, and a guide surface II is provided on the lower side of the closing mold drive plate.
- the single mold plate is also provided with a sub-module, and the sub-module is provided with a guide surface III;
- the outer side of the upper plate is located on both sides of the mold closing drive plate and is also provided with a mold splitting drive plate.
- the mold closing and splitting parts also include a guide rod located on the mold splitting drive plate.
- One end of the guide rod is provided with a special-shaped pressure block, and the other end of the guide rod passes through the mold splitting drive plate and is provided with a limit ring.
- a spring is provided on the outer side of the guide rod; a guide surface IIII is provided on the lower side of the special-shaped pressure block.
- a standby demoulding column is further provided on the upper side of the angle between the two sides of the single mould plate.
- a hanging ring is also provided on the combined upper plate.
- the raft member includes a raft body, and the raft body is in the shape of an equilateral triangle.
- first pouring holes are reserved at three 60-degree angles on the raft body; and a second pouring hole is reserved at the center of the raft body.
- a plurality of third pouring holes are reserved on the raft body, the third pouring holes are located at the center of the connecting line between the first pouring hole and the second pouring hole, and the third pouring holes are inclined downward at an angle of 45 degrees; the diameters of the first pouring hole and the second pouring hole are equal.
- the raft member also includes a steel cage arranged in the first pouring hole and the second pouring hole, and the diameter of the steel cage is smaller than the diameter of the first pouring hole.
- the reinforcement member includes a first screw pile, and the first screw pile is formed after pouring concrete into the second pouring hole; the reinforcement member also includes a second screw pile and a third screw pile, the second screw pile is formed after pouring concrete into the first pouring hole, and the third screw pile is formed after pouring concrete into the third pouring hole.
- a suitable area is selected according to the on-site environment to level the foundation, the supporting formwork is placed on the leveled foundation, connected in sequence to form a triangle, the mold separation and assembly is moved by a crane, the mold separation and assembly is placed from top to bottom on the triangle formed by the supporting formwork, the supporting formwork is limited by the mold separation and assembly, and concrete is poured after the steel bar skeleton is built to form a raft plate; after the raft plate is solidified, the mold separation and assembly is moved upward by a crane, and the mold separation and assembly moves upward so that the supporting formwork is decomposed, thereby
- the formwork removal work is completed quickly to obtain the raft slab parts, which greatly improves the construction speed; after the formwork removal work is completed, the strength of the raft slab parts is reinforced by reinforcement parts.
- FIG. 1 is a schematic diagram of the overall structure of a raft formwork mold and a raft for photovoltaic foundation piles according to the present invention.
- FIG. 2 is a schematic diagram of a raft formwork mold for photovoltaic foundation piles and a raft decomposition structure thereof according to the present invention.
- FIG3 is a schematic diagram of the formwork structure of the raft formwork mold for photovoltaic foundation piles and the formwork components described in the raft of the present invention.
- FIG. 4 is a schematic diagram of the structure of the mold assembly and separation parts of the raft formwork mold for photovoltaic foundation piles and the raft formwork described in the present invention.
- FIG. 5 is a schematic diagram of the structure of the raft assembly described in the raft formwork mold and the raft for photovoltaic foundation piles of the present invention.
- one embodiment or “embodiment” as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention.
- the term “in one embodiment” that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
- a raft formwork mold for photovoltaic foundation piles and a raft thereof include a formwork assembly 100 including a formwork member 101 and a mold separation and assembly member 102 located on the formwork member 101; and a raft assembly 200 including a raft member 201 cast by the formwork member 101, and a reinforcement member 202 cast by the raft member 201;
- a suitable area is selected according to the on-site environment to level the foundation, and the supporting formwork 101 is placed on the leveled foundation, connected in sequence to form a triangle, and the mold separation and assembly 102 is moved by a crane, and the mold separation and assembly 102 is placed from top to bottom on the triangle formed by the supporting formwork 101, and the supporting formwork 101 is limited by the mold separation and assembly 102, and concrete is poured after the steel frame is built to form the raft slab 201;
- the mold separation and assembly part 102 is moved upward by a crane.
- the mold separation and assembly part 102 moves upward so that the supporting mold part 101 is decomposed, thereby quickly completing the demoulding work and obtaining the raft slab 201.
- the raft plate member 201 is reinforced by the reinforcement member 202 .
- the mold support member 101 includes a plurality of single mold plates 101a, and the two sides of the plurality of single mold plates 101a are at an angle of 60 degrees; a closing module 101a-1 is provided on the outer side of the end of the plurality of single mold plates 101a, and a guide surface I is provided on the closing module 101a-1; the mold separation and combination member 102 includes a combined upper plate 102a, and a plurality of mold clamping driving plates 102a-1 are provided on the outer side of the combined upper plate 102a, and a guide surface II is provided on the lower side of the mold clamping driving plate 102a-1;
- three single mold plates 101a are combined with each other to form a supporting mold part 101, and the adjacent single mold plates 101a can be pressed against and fixed to each other by pressing the guide surface I on the adjacent closing modules 101a-1.
- the combined upper plate 102a moves downward to drive the closing mold driving plate 102a-1 to move downward.
- the downward movement of the closing mold driving plate 102a-1 can make the adjacent single mold plates 101a pressed against and fixed to each other.
- a sub-module 101a-2 is further provided on the single mold plate 101a, and a guide surface III is provided on the sub-module 101a-2;
- a sub-mold driving plate 102a-2 is further provided on both sides of the mold closing driving plate 102a-1 on the outer side of the combined upper plate 102a, and the mold closing and closing part 102 further includes a guide rod 102b located on the sub-mold driving plate 102a-2, one end of the guide rod 102b is provided with a special-shaped pressing block 102b-1, and the other end of the guide rod 102b is provided with a limit ring 102b-2 after passing through the sub-mold driving plate 102a-2, and a spring 102b-3 is provided on the outer side of the guide rod 102b;
- a guide surface IIII is provided on the lower side of the special-shaped pressing block 102b-1;
- the combined upper plate 102a moves downward, it also drives the mold separation driving plate 102a-2 to move downward.
- the mold separation driving plate 102a-2 moves downward and drives the guide surface IIII on the lower side of the special-shaped pressing block 102b-1 to abut against the mold separation module.
- the special-shaped pressure block 102b-1 drives the guide rod 102b to move, and the spring 102b-3 is compressed. When it descends to the second half, the guide surface IIII and the guide surface III are no longer in contact.
- the special-shaped pressure block 102b-1 moves under the action of the spring 102b-3 so that the special-shaped pressure block 102b-1 and the notch on the sub-module 101a-2 are just engaged; when the mold is removed, the combined upper plate 102a can move upward so that the special-shaped pressure block 102b-1 drives the sub-module 101a-2 to move, thereby separating the single mold plate 101a and the raft plate part 201.
- a mold removal column 101a-3 is provided on the upper side of the angle between the two sides of the single mold plate 101a;
- the single mould plate 101a and the raft plate member 201 can be separated by hammering the demoulding columns 101a-3 outwards.
- a lifting ring 102a-3 is provided on the combined upper plate 102a;
- the lifting ring 102a-3 can facilitate the staff to lift the combined upper plate 102a.
- the combined upper plate 102a When the mold is removed, the combined upper plate 102a can be moved upward by hanging the lifting ring 102a-3 on the crane. The upward movement of the combined upper plate 102a allows the special-shaped pressing block 102b-1 to drive the sub-module 101a-2. The movement of the sub-module 101a-2 separates the single mold plate 101a and the raft plate part 201, thereby obtaining a complete raft plate part 201.
- the embodiment is different from the first embodiment in that: the raft member 201 includes a raft body 201a, and the raft body 201a is in the shape of an equilateral triangle; first pouring holes 201a-1 are reserved at positions near three 60-degree angles on the raft body 201a; and a second pouring hole 201a-2 is reserved at the center of the raft body 201a;
- the raft body 201a can be formed by pouring concrete after building a steel skeleton, and the first pouring hole 201a-1 and the second pouring hole 201a-2 can be formed by vertically placing thick steel pipes of equal diameter to block the concrete.
- a plurality of third pouring holes 201a-3 are reserved on the raft body 201a.
- the third pouring holes 201a-3 are located at the center of the connecting line between the first pouring hole 201a-1 and the second pouring hole 201a-2.
- the third pouring holes 201a-3 are arranged downward at an angle of 45 degrees.
- the diameters of 201a-2 are equal;
- the third pouring hole 201a-3 can be formed by obliquely placing thin steel pipes of equal diameter to block the concrete.
- Operation process build a steel frame in the formwork 101, put several thick steel pipes of equal diameter into the first pouring hole 201a-1 and the second pouring hole 201a-2 in the formwork 101 in turn, and then place thin steel pipes of equal diameter obliquely at the third pouring hole 201a-3 in the formwork 101, pour concrete, and wait for the concrete to solidify before the raft slab 201 is formed.
- the raft member 201 further includes a steel cage 201b disposed in the first pouring hole 201a - 1 and the second pouring hole 201a - 2 , and the diameter of the steel cage 201b is smaller than the diameter of the first pouring hole 201a - 1 ;
- the steel cage 201b vertically penetrates the first pouring hole 201a-1 and the second pouring hole 201a-2 and is placed in a large spiral pile hole driven by a large-diameter spiral pile driver.
- the reinforcement member 202 includes a first screw pile 202a, which is formed by pouring concrete; the reinforcement member 202 also includes a second screw pile 202b and a third screw pile 202b-1, which are both formed by pouring concrete;
- the large spiral pile hole drilled by pouring concrete through the second pouring hole 201a-2 can obtain the first spiral pile 202a
- the large spiral pile hole drilled by pouring concrete through the first pouring hole 201a-1 can obtain the second spiral pile 202b
- the small spiral pile hole drilled by pouring concrete through the third pouring hole 201a-3 can obtain the third spiral pile 202b-1.
- Operation process First, use a large-diameter spiral pile driver to align with the first pouring hole 201a-1 and the second pouring hole 201a-2 to drive a large spiral pile hole, and then use a small-diameter spiral pile driver to align with the third pouring hole 201a-3 to drive a small spiral pile hole;
- the steel cage 201b is vertically passed through the first pouring hole 201a-1 and the second pouring hole 201a-2 and then placed in the large spiral pile hole. Concrete is poured into the large spiral pile hole and the small spiral pile hole through a straight pipe until they are filled. After the concrete solidifies, the first spiral pile 202a and the crossed second spiral pile 202b and the third spiral pile 202b-1 are obtained, which greatly improves the pull-out resistance of the raft slab 201.
- any “device plus function” clause is intended to cover the structure described herein that performs the function, and is not only structurally equivalent but also equivalent structure.
- substitutions, modifications, changes and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the invention is not limited to a specific embodiment, but extends to several modifications still falling within the scope of the appended claims.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
- Moulds, Cores, Or Mandrels (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明涉及光伏基础桩的技术领域,尤其是一种光伏基础桩用筏板支模模具及其筏板,包括,支模组件,包括支模件,位于所述支模件上的模具分合件;以及,筏板组件,包括通过所述支模件浇筑成型的筏板件,以及通过所述筏板件浇筑成型的加固件。本发明使用吊机移动模具分合件,将模具分合件从上向下放置在支模件组成的三角形上,通过模具分合件对支模件进行限位,搭建钢筋骨架后灌注混凝土从而形成筏板件;待筏板件凝固后,使用吊机向上移动模具分合件,模具分合件向上移动使得支模件被分解,从而快速完成拆模工作,得到筏板件,大大提高了施工速度;拆模工作完成后通过加固件对筏板件进行强度加固。
Description
本发明涉及光伏基础桩的技术领域,尤其涉及一种光伏基础桩用筏板支模模具及其筏板。
目前国内外光伏地面电站建设地点多在荒漠、戈壁,以及一些条件相对较好的屋顶、山地、渔塘、滩涂等地方,而坡度起伏较大、植被较高的山地,地质条件较差的滩涂,水位深、跨度大的渔塘,以及一些大型污水处理厂等地方,由于受限于传统支架安装方式的要求而不能被充分利用。
而现有的光伏基础桩在构造筏板时往往模具搭建拆除较为麻烦,影响工作人员的施工进度,同时搭建的筏板未经过加固往往寿命较短。
发明内容
本部分的目的在于概述本发明的实施例的一些方面以及简要介绍一些较佳实施例。在本部分以及本申请的说明书摘要和发明名称中可能会做些简化或省略以避免使本部分、说明书摘要和发明名称的目的模糊,而这种简化或省略不能用于限制本发明的范围。
鉴于上述现有光伏基础桩用筏板支模模具及其筏板存在的问题,提出了本发明。
因此,本发明目的是提供一种光伏基础桩用筏板支模模具及其筏板。
为解决上述技术问题,本发明提供如下技术方案:一种光伏基础桩用筏板支模模具及其筏板,包括,支模组件,包括支模件,位于所述支模件上的模具分合件;以及,筏板组件,包括通过所述支模件浇筑成型的筏板件,以及通过所述筏板件浇筑成型的加固件。
作为本发明所述光伏基础桩用筏板支模模具及其筏板的一种优选方案,其中:所述支模件包括若干个单模具板,若干个所述单模具板的两条边均呈60度夹角;若干个所述单模具板末端的外侧设有合模块,所述合模块上设有导向面I;所述模具分合件包括组合上板,所述组合上板的外侧设有若干个合模驱动板,所述合模驱动板的下侧设有导向面II。
作为本发明所述光伏基础桩用筏板支模模具及其筏板的一种优选方案,其中:所述单模具板上还设有分模块,所述分模块上设有导向面III;所述组合
上板的外侧位于合模驱动板的两侧还设有分模驱动板,所述模具分合件还包括位于所述分模驱动板上的导向杆,所述导向杆的一端设有异形压块,所述导向杆的另一端贯穿分模驱动板后设有限位环,所述导向杆的外侧设有弹簧;所述异形压块的下侧设有导向面IIII。
作为本发明所述光伏基础桩用筏板支模模具及其筏板的一种优选方案,其中:所述单模具板上位于两条边夹角的上侧还设有备拆模柱。
作为本发明所述光伏基础桩用筏板支模模具及其筏板的一种优选方案,其中:所述组合上板上还设有吊环。
作为本发明所述光伏基础桩用筏板支模模具及其筏板的一种优选方案,其中:所述筏板件包括筏板本体,所述筏板本体为等边三角形形状。
作为本发明所述光伏基础桩用筏板支模模具及其筏板的一种优选方案,其中:所述筏板本体上靠近三个60度角的位置均预留有第一浇灌孔;所述筏板本体的中心位置预留有第二浇灌孔。
作为本发明所述光伏基础桩用筏板支模模具及其筏板的一种优选方案,其中:所述筏板本体上还预留有若干个第三浇灌孔,所述第三浇灌孔位于第一浇灌孔和第二浇灌孔连接线的中心位置,所述第三浇灌孔呈45度角倾斜向下设置;所述第一浇灌孔和第二浇灌孔的直径相等。
作为本发明所述光伏基础桩用筏板支模模具及其筏板的一种优选方案,其中:所述筏板件还包括设置于第一浇灌孔和第二浇灌孔内的钢筋笼,所述钢筋笼的直径小于第一浇灌孔直径。
作为本发明所述光伏基础桩用筏板支模模具及其筏板的一种优选方案,其中:所述加固件包括第一螺旋桩,所述第一螺旋桩通过混凝土灌注第二浇灌孔后成型;所述加固件还包括第二螺旋桩和第三螺旋桩,所述第二螺旋桩通过混凝土灌注第一浇灌孔后成型,所述第三螺旋桩通过混凝土灌注后第三浇灌孔成型。
本发明的有益效果:根据现场环境选定适合的区域进行地基整平,将支模件放置在整平的地基上,依次相连组合成三角形,使用吊机移动模具分合件,将模具分合件从上向下放置在支模件组成的三角形上,通过模具分合件对支模件进行限位,搭建钢筋骨架后灌注混凝土从而形成筏板件;待筏板件凝固后,使用吊机向上移动模具分合件,模具分合件向上移动使得支模件被分解,从而
快速完成拆模工作,得到筏板件,大大提高了施工速度;拆模工作完成后通过加固件对筏板件进行强度加固。
为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。其中:
图1为本发明光伏基础桩用筏板支模模具及其筏板的整体结构示意图。
图2为本发明光伏基础桩用筏板支模模具及其筏板分解结构示意图。
图3为本发明光伏基础桩用筏板支模模具及其筏板所述的支模件结构示意图。
图4为本发明光伏基础桩用筏板支模模具及其筏板所述的模具分合件结构示意图。
图5为本发明光伏基础桩用筏板支模模具及其筏板所述的筏板组件结构示意图。
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合说明书附图对本发明的具体实施方式做详细的说明。
在下面的描述中阐述了很多具体细节以便于充分理解本发明,但是本发明还可以采用其他不同于在此描述的其它方式来实施,本领域技术人员可以在不违背本发明内涵的情况下做类似推广,因此本发明不受下面公开的具体实施例的限制。
其次,此处所称的“一个实施例”或“实施例”是指可包含于本发明至少一个实现方式中的特定特征、结构或特性。在本说明书中不同地方出现的“在一个实施例中”并非均指同一个实施例,也不是单独的或选择性的与其他实施例互相排斥的实施例。
再其次,本发明结合示意图进行详细描述,在详述本发明实施例时,为便于说明,表示器件结构的剖面图会不依一般比例作局部放大,而且所述示意图只是示例,其在此不应限制本发明保护的范围。此外,在实际制作中应包含长度、宽度及深度的三维空间尺寸。
实施例1
参照图1,提供了一种光伏基础桩用筏板支模模具及其筏板的整体结构示意图,如图1-4,一种光伏基础桩用筏板支模模具及其筏板,包括,支模组件100,包括支模件101,位于支模件101上的模具分合件102;以及,筏板组件200,包括通过支模件101浇筑成型的筏板件201,以及通过筏板件201浇筑成型的加固件202;
其中,根据现场环境选定适合的区域进行地基整平,将支模件101放置在整平的地基上,依次相连组合成三角形,使用吊机移动模具分合件102,将模具分合件102从上向下放置在支模件101组成的三角形上,通过模具分合件102对支模件101进行限位,搭建钢筋骨架后灌注混凝土从而形成筏板件201;
待筏板件201凝固后,使用吊机向上移动模具分合件102,模具分合件102向上移动使得支模件101被分解,从而快速完成拆模工作,得到筏板件201;
拆模工作完成后通过加固件202对筏板件201进行强度加固。
进一步的,支模件101包括若干个单模具板101a,若干个单模具板101a的两条边均呈60度夹角;若干个单模具板101a末端的外侧设有合模块101a-1,合模块101a-1上设有导向面I;模具分合件102包括组合上板102a,组合上板102a的外侧设有若干个合模驱动板102a-1,合模驱动板102a-1的下侧设有导向面II;
其中,将三个单模具板101a相互组合能够形成支模件101,通过压迫相邻近合模块101a-1上的导向面I能使得相邻的单模具板101a相互抵持固定,组合上板102a向下移动带动合模驱动板102a-1向下移动,合模驱动板102a-1向下移动可使得相邻的单模具板101a相互抵持固定。
进一步的,单模具板101a上还设有分模块101a-2,分模块101a-2上设有导向面III;组合上板102a的外侧位于合模驱动板102a-1的两侧还设有分模驱动板102a-2,模具分合件102还包括位于分模驱动板102a-2上的导向杆102b,导向杆102b的一端设有异形压块102b-1,导向杆102b的另一端贯穿分模驱动板102a-2后设有限位环102b-2,导向杆102b的外侧设有弹簧102b-3;异形压块102b-1的下侧设有导向面IIII;
其中,当组合上板102a向下移动时,还带动分模驱动板102a-2向下移动,分模驱动板102a-2向下移动带动异形压块102b-1下侧的导向面IIII抵在分模块
101a-2上的导向面III上,异形压块102b-1带动导向杆102b移动,弹簧102b-3被压缩,当下降到后半段时,导向面IIII和导向面III不再接触,此时异形压块102b-1在弹簧102b-3的作用利下移动从而使得异形压块102b-1和分模块101a-2上的缺口恰好卡合;当模具拆除时,组合上板102a向上可使得异形压块102b-1带动分模块101a-2移动,从而使得单模具板101a和筏板件201分离。
进一步的,单模具板101a上位于两条边夹角的上侧还设有备拆模柱101a-3;
其中,通过向外锤击备拆模柱101a-3可使得单模具板101a和筏板件201分离。
进一步的,组合上板102a上还设有吊环102a-3;
其中,通过吊环102a-3能够方便工作人员吊起组合上板102a。
操作过程:模具固定时,通过吊机悬挂吊环102a-3可使得组合上板102a向下移动,组合上板102a向下移动带动合模驱动板102a-1向下移动,合模驱动板102a-1向下移动可使得相邻的单模具板101a相互抵持固定,当单模具板101a相互抵持固定可组成完整的支模件101,通过在支模件101内完成钢筋搭建和混凝土灌注,待混凝土凝固可形成筏板件201;
模具拆除时,通过吊机悬挂吊环102a-3可使得组合上板102a向上移动,组合上板102a向上移动使得异形压块102b-1带动分模块101a-2,分模块101a-2移动使得单模具板101a和筏板件201分离,从而得到完整的筏板件201。
实施例2
参照图1-5,该实施例不同于第一个实施例的是:筏板件201包括筏板本体201a,筏板本体201a为等边三角形形状;筏板本体201a上靠近三个60度角的位置均预留有第一浇灌孔201a-1;筏板本体201a的中心位置预留有第二浇灌孔201a-2;
其中,筏板本体201a可通过搭建钢筋骨架后灌注混凝土成型,第一浇灌孔201a-1和第二浇灌孔201a-2均可通过垂直放置等直径粗钢管阻挡混凝土后成型。
进一步的,筏板本体201a上还预留有若干个第三浇灌孔201a-3,第三浇灌孔201a-3位于第一浇灌孔201a-1和第二浇灌孔201a-2连接线的中心位置,第三浇灌孔201a-3呈45度角倾斜向下设置;第一浇灌孔201a-1和第二浇灌孔
201a-2的直径相等;
其中,第三浇灌孔201a-3可通过倾斜放置等直径细钢管阻挡混凝土后成型。
其余结构均与实施例1相同。
操作过程:在支模件101内的搭建钢筋骨架,将若干个等直径粗钢管依次放入支模件101内第一浇灌孔201a-1和第二浇灌孔201a-2的位置,再将等直径细钢管倾斜放置于支模件101内第三浇灌孔201a-3的位置,灌注混凝土后,待混凝土凝固后筏板件201成型。
实施例3
参照图1-5,该实施例不同于以上实施例的是:筏板件201还包括设置于第一浇灌孔201a-1和第二浇灌孔201a-2内的钢筋笼201b,钢筋笼201b的直径小于第一浇灌孔201a-1直径;
其中,钢筋笼201b垂直贯穿第一浇灌孔201a-1和第二浇灌孔201a-2后放置于大口径螺旋打桩机打出的大螺旋桩孔内。
进一步的,加固件202包括第一螺旋桩202a,第一螺旋桩202a通过混凝土灌注成型;加固件202还包括第二螺旋桩202b和第三螺旋桩202b-1,第二螺旋桩202b和第三螺旋桩202b-1均通过混凝土灌注后成型;
其中,混凝土灌注通过第二浇灌孔201a-2打出的大螺旋桩孔能够得到第一螺旋桩202a,混凝土灌注通过第一浇灌孔201a-1打出的大螺旋桩孔能够得到第二螺旋桩202b,混凝土灌注通过第三浇灌孔201a-3打出的小螺旋桩孔能够得到第三螺旋桩202b-1。
其余结构均与实施例2相同。
操作过程:首先,使用大口径螺旋打桩机对准第一浇灌孔201a-1和第二浇灌孔201a-2后打出大螺旋桩孔,再使用小口径螺旋打桩机对准第三浇灌孔201a-3后打出小螺旋桩孔;
其次,将钢筋笼201b垂直贯穿第一浇灌孔201a-1和第二浇灌孔201a-2后放置于大螺旋桩孔内,通过直管将混凝土灌入大螺旋桩孔和小螺旋桩孔内直至填满,待混凝土凝固后得到第一螺旋桩202a以及交叉的第二螺旋桩202b与第三螺旋桩202b-1,大大提高了筏板件201的抗拔性能。
重要的是,应注意,在多个不同示例性实施方案中示出的本申请的构造和
布置仅是例示性的。尽管在此公开内容中仅详细描述了几个实施方案,但参阅此公开内容的人员应容易理解,在实质上不偏离该申请中所描述的主题的新颖教导和优点的前提下,许多改型是可能的(例如,各种元件的尺寸、尺度、结构、形状和比例、以及参数值(例如,温度、压力等)、安装布置、材料的使用、颜色、定向的变化等)。例如,示出为整体成形的元件可以由多个部分或元件构成,元件的位置可被倒置或以其它方式改变,并且分立元件的性质或数目或位置可被更改或改变。因此,所有这样的改型旨在被包含在本发明的范围内。可以根据替代的实施方案改变或重新排序任何过程或方法步骤的次序或顺序。在权利要求中,任何“装置加功能”的条款都旨在覆盖在本文中所描述的执行所述功能的结构,且不仅是结构等同而且还是等同结构。在不背离本发明的范围的前提下,可以在示例性实施方案的设计、运行状况和布置中做出其他替换、改型、改变和省略。因此,本发明不限制于特定的实施方案,而是扩展至仍落在所附的权利要求书的范围内的多种改型。
此外,为了提供示例性实施方案的简练描述,可以不描述实际实施方案的所有特征(即,与当前考虑的执行本发明的最佳模式不相关的那些特征,或于实现本发明不相关的那些特征)。
应理解的是,在任何实际实施方式的开发过程中,如在任何工程或设计项目中,可做出大量的具体实施方式决定。这样的开发努力可能是复杂的且耗时的,但对于那些得益于此公开内容的普通技术人员来说,不需要过多实验,所述开发努力将是一个设计、制造和生产的常规工作。
应说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的精神和范围,其均应涵盖在本发明的权利要求范围当中。
Claims (10)
- 一种光伏基础桩用筏板支模模具及其筏板,其特征在于:包括,支模组件(100),包括支模件(101),位于所述支模件(101)上的模具分合件(102);以及,筏板组件(200),包括通过所述支模件(101)浇筑成型的筏板件(201),以及通过所述筏板件(201)浇筑成型的加固件(202)。
- 如权利要求1所述的光伏基础桩用筏板支模模具及其筏板,其特征在于:所述支模件(101)包括若干个单模具板(101a),若干个所述单模具板(101a)的两条边均呈60度夹角;若干个所述单模具板(101a)末端的外侧设有合模块(101a-1),所述合模块(101a-1)上设有导向面I;所述模具分合件(102)包括组合上板(102a),所述组合上板(102a)的外侧设有若干个合模驱动板(102a-1),所述合模驱动板(102a-1)的下侧设有导向面II。
- 如权利要求2所述的光伏基础桩用筏板支模模具及其筏板,其特征在于:所述单模具板(101a)上还设有分模块(101a-2),所述分模块(101a-2)上设有导向面III;所述组合上板(102a)的外侧位于合模驱动板(102a-1)的两侧还设有分模驱动板(102a-2),所述模具分合件(102)还包括位于所述分模驱动板(102a-2)上的导向杆(102b),所述导向杆(102b)的一端设有异形压块(102b-1),所述导向杆(102b)的另一端贯穿分模驱动板(102a-2)后设有限位环(102b-2),所述导向杆(102b)的外侧设有弹簧(102b-3);所述异形压块(102b-1)的下侧设有导向面IIII。
- 如权利要求3所述的光伏基础桩用筏板支模模具及其筏板,其特征在于:所述单模具板(101a)上位于两条边夹角的上侧还设有备拆模柱(101a-3)。
- 如权利要求4所述的光伏基础桩用筏板支模模具及其筏板,其特征在于:所述组合上板(102a)上还设有吊环(102a-3)。
- 如权利要求5所述的光伏基础桩用筏板支模模具及其筏板,其特征在于:所述筏板件(201)包括筏板本体(201a),所述筏板本体(201a)为等边三角形形状。
- 如权利要求6所述的光伏基础桩用筏板支模模具及其筏板,其特征在于: 所述筏板本体(201a)上靠近三个60度角的位置均预留有第一浇灌孔(201a-1);所述筏板本体(201a)的中心位置预留有第二浇灌孔(201a-2)。
- 如权利要求7所述的光伏基础桩用筏板支模模具及其筏板,其特征在于:所述筏板本体(201a)上还预留有若干个第三浇灌孔(201a-3),所述第三浇灌孔(201a-3)位于第一浇灌孔(201a-1)和第二浇灌孔(201a-2)连接线的中心位置,所述第三浇灌孔(201a-3)呈45度角倾斜向下设置;所述第一浇灌孔(201a-1)和第二浇灌孔(201a-2)的直径相等。
- 如权利要求1或8所述的光伏基础桩用筏板支模模具及其筏板,其特征在于:所述筏板件(201)还包括设置于第一浇灌孔(201a-1)和第二浇灌孔(201a-2)内的钢筋笼(201b),所述钢筋笼(201b)的直径小于第一浇灌孔(201a-1)直径。
- 如权利要求9所述的光伏基础桩用筏板支模模具及其筏板,其特征在于:所述加固件(202)包括第一螺旋桩(202a),所述第一螺旋桩(202a)通过混凝土灌注成型;所述加固件(202)还包括第二螺旋桩(202b)和第三螺旋桩(202b-1),第二螺旋桩(202b)和第三螺旋桩(202b-1)均通过混凝土灌注后成型。
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310430616.1A CN116695763A (zh) | 2023-04-21 | 2023-04-21 | 一种光伏基础桩用筏板支模模具及其筏板 |
| CN202310430616.1 | 2023-04-21 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2024216666A1 true WO2024216666A1 (zh) | 2024-10-24 |
Family
ID=87830079
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2023/091205 Ceased WO2024216666A1 (zh) | 2023-04-21 | 2023-04-27 | 一种光伏基础桩用筏板支模模具及其筏板 |
Country Status (4)
| Country | Link |
|---|---|
| CN (1) | CN116695763A (zh) |
| BE (1) | BE1031173B1 (zh) |
| NL (1) | NL2035419B1 (zh) |
| WO (1) | WO2024216666A1 (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119195201A (zh) * | 2024-10-28 | 2024-12-27 | 中国电建集团贵州电力设计研究院有限公司 | 一种柔性光伏支架的新型抗倾斜桩基结构 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1116829A2 (en) * | 2000-01-17 | 2001-07-18 | Abbey Pynford Holdings plc | Foundation raft |
| CN105839657A (zh) * | 2016-04-20 | 2016-08-10 | 叶香雄 | 筏板基础 |
| CN110206305A (zh) * | 2019-05-18 | 2019-09-06 | 陕西建工第五建设集团有限公司 | 一种钢筋笼与钢模板整体直锚定位结构 |
| CN111321750A (zh) * | 2020-03-16 | 2020-06-23 | 中国十七冶集团有限公司 | 一种倾斜不平整基层免垫层筏板独立基础工具式砼胎模 |
| CN112096054A (zh) * | 2020-08-27 | 2020-12-18 | 中国二十冶集团有限公司 | 建筑底板内大深电梯井和集水井简便支模及整体浇筑方法 |
| WO2021043778A1 (en) * | 2019-09-02 | 2021-03-11 | Glavloc Build Systems Limited | A building raft foundation system |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS58168725A (ja) * | 1982-03-27 | 1983-10-05 | Ryusuke Nojima | 住宅コンクリ−ト基礎型枠装置 |
| MX2017002173A (es) * | 2014-08-20 | 2017-05-22 | Iconkrete 2012 S L | Sistema de cimentacion superficial hormigon prefabricado para plantas fotovoltaicas y termosolares y procedimiento de ejecucion del mismo. |
| KR20190130414A (ko) * | 2018-05-14 | 2019-11-22 | 주식회사 이스온 | 태양광 발전 모듈 지지장치 및 그 시공방법 |
-
2023
- 2023-04-21 CN CN202310430616.1A patent/CN116695763A/zh not_active Withdrawn
- 2023-04-27 WO PCT/CN2023/091205 patent/WO2024216666A1/zh not_active Ceased
- 2023-07-13 BE BE20230054A patent/BE1031173B1/de not_active IP Right Cessation
- 2023-07-18 NL NL2035419A patent/NL2035419B1/en active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1116829A2 (en) * | 2000-01-17 | 2001-07-18 | Abbey Pynford Holdings plc | Foundation raft |
| CN105839657A (zh) * | 2016-04-20 | 2016-08-10 | 叶香雄 | 筏板基础 |
| CN110206305A (zh) * | 2019-05-18 | 2019-09-06 | 陕西建工第五建设集团有限公司 | 一种钢筋笼与钢模板整体直锚定位结构 |
| WO2021043778A1 (en) * | 2019-09-02 | 2021-03-11 | Glavloc Build Systems Limited | A building raft foundation system |
| CN111321750A (zh) * | 2020-03-16 | 2020-06-23 | 中国十七冶集团有限公司 | 一种倾斜不平整基层免垫层筏板独立基础工具式砼胎模 |
| CN112096054A (zh) * | 2020-08-27 | 2020-12-18 | 中国二十冶集团有限公司 | 建筑底板内大深电梯井和集水井简便支模及整体浇筑方法 |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119195201A (zh) * | 2024-10-28 | 2024-12-27 | 中国电建集团贵州电力设计研究院有限公司 | 一种柔性光伏支架的新型抗倾斜桩基结构 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN116695763A (zh) | 2023-09-05 |
| NL2035419B1 (en) | 2024-10-28 |
| BE1031173B1 (de) | 2024-07-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108580758B (zh) | 一种双层钢筋网片加工装置 | |
| CN109555027B (zh) | 一种节段梁混凝土浇筑系统及其施工方法 | |
| CN103452350B (zh) | 装配式电子厂房及其施工方法 | |
| CN211057776U (zh) | 预制混凝土桩 | |
| CN116695763A (zh) | 一种光伏基础桩用筏板支模模具及其筏板 | |
| CN212743356U (zh) | 一种逆作法吊模系统 | |
| CN103911990B (zh) | 一种带有护壁的水下浇筑式管柱及其施工方法 | |
| CN105216095B (zh) | 一种混凝土预制砌块多模腔成型机 | |
| CN219081001U (zh) | 一种用于集水坑支模的可周转支撑架 | |
| CN214419109U (zh) | 一种先张法t形梁张拉台座 | |
| CN215859053U (zh) | 一种独立支撑后浇带楼板模板支撑结构 | |
| CN203782715U (zh) | 一种空心管柱水下浇筑自浮式内模系统 | |
| CN211057781U (zh) | 预制混凝土桩接头 | |
| CN116537201A (zh) | 超深大断面沉井水下混凝土封底装置及施工方法 | |
| CN115897497A (zh) | 一种陡崖地形渡槽支架 | |
| CN105544548B (zh) | 一种空心管柱水下浇筑施工方法 | |
| CN109235709B (zh) | 一种建筑全现浇外墙结构 | |
| KR20100001241A (ko) | 해상에서의 부유식 구조물 제작장치 및 방법 | |
| CN224116383U (zh) | 一种预应力方桩模具快速更换结构 | |
| CN221399013U (zh) | 一种基坑边坡支架装置 | |
| CN205445133U (zh) | 装配式围墙用组合式抗风柱结构 | |
| CN218522366U (zh) | 一种承重2000t酒罐检修沟 | |
| CN223647231U (zh) | 框架柱钢管榫卯套接高性能材料灌浆连接结构及建筑 | |
| CN211735542U (zh) | 一种坑中坑桩反力芯模施工装置 | |
| CN222686293U (zh) | 一种水泥库钢筋混凝土减压锥支架 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23933542 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 23933542 Country of ref document: EP Kind code of ref document: A1 |