WO2024038583A1 - エレベーターのケーブル吊手装置 - Google Patents

エレベーターのケーブル吊手装置 Download PDF

Info

Publication number
WO2024038583A1
WO2024038583A1 PCT/JP2022/031380 JP2022031380W WO2024038583A1 WO 2024038583 A1 WO2024038583 A1 WO 2024038583A1 JP 2022031380 W JP2022031380 W JP 2022031380W WO 2024038583 A1 WO2024038583 A1 WO 2024038583A1
Authority
WO
WIPO (PCT)
Prior art keywords
bracket
cable
holding plate
plate
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2022/031380
Other languages
English (en)
French (fr)
Inventor
裕太郎 上條
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Solutions Corp filed Critical Mitsubishi Electric Building Solutions Corp
Priority to JP2024541376A priority Critical patent/JP7706664B2/ja
Priority to PCT/JP2022/031380 priority patent/WO2024038583A1/ja
Publication of WO2024038583A1 publication Critical patent/WO2024038583A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00—Other common features of elevators
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00—Other common features of elevators
    • B66B7/06—Arrangements of ropes or cables

Definitions

  • the present disclosure relates to an elevator cable hanging device.
  • an elevator cable hanging device that includes a bracket and a holding plate is known.
  • the bracket is fixed to the guide rail via a rail clip.
  • the holding plate is attached to the bracket via bolts, with the cable being sandwiched between the bracket and the holding plate.
  • the cable is held by the elevator cable hanging device by being sandwiched between the bracket and the holding plate (for example, see Patent Document 1).
  • a second cable which is a newly installed cable
  • the first cable which is the existing cable
  • both the first cable and the second cable cannot be sandwiched between the bracket and the holding plate. Therefore, in this case, prepare a new bracket and a new holding plate that can hold both the first cable and the second cable, and replace the existing bracket and the existing holding plate with the new bracket and the new holding plate. must be replaced. As a result, there was a problem in that the work efficiency for installing the second cable was poor.
  • the present disclosure has been made in order to solve the above-mentioned problems, and its purpose is to provide a cable hanging device for an elevator that can improve work efficiency for installing the second cable. be.
  • a cable hanging device for an elevator includes a first bracket fixed to a guide rail, a first presser plate attached to the first bracket, a second bracket detachably attached to the first bracket, and a first bracket fixed to a guide rail.
  • a second holding plate attached to the second bracket the first holding plate is attached to the first bracket with the first cable sandwiched between the first bracket and the first holding plate, and the second holding plate is attached to the first bracket;
  • the second holding plate is attached to the second bracket with the second cable being sandwiched between the bracket and the second holding plate.
  • the elevator cable hanging device According to the elevator cable hanging device according to the present disclosure, it is possible to improve the work efficiency for installing the second cable.
  • FIG. 2 is a front view showing the elevator cable hanging device according to the first embodiment.
  • FIG. 2 is a plan view showing the cable hanging device of the elevator shown in FIG. 1;
  • FIG. 2 is a side view showing the cable hanging device of the elevator shown in FIG. 1;
  • FIG. 2 is a front view showing the first bracket of FIG. 1;
  • FIG. 5 is a side view showing the first bracket of FIG. 4;
  • FIG. 2 is a front view showing the second bracket of FIG. 1;
  • FIG. 7 is a side view showing the second bracket of FIG. 6;
  • FIG. 1 is a front view showing a cable hanging device for an elevator according to a first embodiment.
  • FIG. 2 is a plan view showing the cable hanging device of the elevator shown in FIG. 1.
  • 3 is a side view showing the cable hanging device of the elevator of FIG. 1.
  • the elevator cable hanging device according to the first embodiment includes a bracket base 1, four rail clips 2, a first bracket 3, two first bracket bolts 4, and a first holding plate 5. , and four first holding plate bolts 6.
  • the elevator cable hanging device according to the first embodiment also includes a second bracket 7, two second bracket bolts 8, a second holding plate 9, and four second holding plate bolts 10. It is equipped with.
  • the bracket base 1 is fixed to the guide rail 11 via four rail clips 2.
  • Examples of the guide rail 11 include an elevator car guide rail and a counterweight guide rail.
  • the bracket base 1 protrudes from the guide rail 11 in the width direction D of the guide rail 11.
  • the first bracket 3 is fixed to the bracket base 1 via two first bracket bolts 4.
  • the first bracket 3 protrudes from the bracket base 1 in the width direction D of the guide rail 11 and in the direction away from the guide rail 11.
  • the first bracket 3 and the first holding plate 5 are arranged to face each other.
  • the direction in which the first bracket 3 and the first holding plate 5 face each other is a direction perpendicular to the width direction D of the guide rail 11 when viewed from above.
  • the first cable 12 is an existing cable that has been held in the cable hanging device of the elevator before the elevator was renewed.
  • the two first cables 12 are sandwiched between the first bracket 3 and the first holding plate 5 in a state where the two first cables 12 are stacked on top of each other.
  • the direction in which the two first cables 12 are stacked on each other coincides with the direction in which the first bracket 3 and the first holding plate 5 face each other.
  • the first holding plate 5 is connected to the first holding plate 5 via the four first holding plate bolts 6. It is attached to the first bracket 3. By attaching the first holding plate 5 to the first bracket 3, the two first cables 12 are held by the elevator hanging device.
  • the second bracket 7 is removably attached to the first bracket 3 via two second bracket bolts 8.
  • the second bracket 7 protrudes from the first bracket 3 in the width direction D of the guide rail 11 and in the direction away from the guide rail 11.
  • the second bracket 7 and the second presser plate 9 are arranged to face each other.
  • the direction in which the second bracket 7 and the second presser plate 9 face each other is a direction perpendicular to the width direction D of the guide rail 11 when viewed from above. That is, the direction in which the second bracket 7 and the second holding plate 9 face each other matches the direction in which the first bracket 3 and the first holding plate 5 face each other.
  • the second cable 13 is a newly installed cable that is newly added to the elevator when the elevator is renovated and is held by the cable hanging device of the elevator.
  • the two second cables 13 are sandwiched between the second bracket 7 and the second pressing plate 9 in a state where the two second cables 13 are stacked on top of each other.
  • the direction in which the two second cables 13 are stacked on each other coincides with the direction in which the second bracket 7 and the second press plate 9 face each other.
  • the second holding plate 9 is connected to the second holding plate 9 via the four second holding plate bolts 10. It is attached to the second bracket 7. By attaching the second press plate 9 to the second bracket 7, the two second cables 13 are held by the elevator hanging device.
  • FIG. 4 is a front view showing the first bracket 3 of FIG. 1.
  • FIG. 5 is a side view showing the first bracket 3 of FIG. 4.
  • the first bracket 3 is formed into a plate shape.
  • Two first through holes 301 , four second through holes 302 , and two third through holes 303 are formed in the first bracket 3 .
  • the two first through holes 301 penetrate the first bracket 3 in the thickness direction of the first bracket 3.
  • Two first bracket bolts 4 are inserted into each of the two first through holes 301, one each.
  • Two through holes are formed in the bracket base 1.
  • the two through holes of the bracket base 1 correspond to each of the two first through holes 301.
  • the first bracket bolt 4 is inserted into the first through hole 301 and the through hole of the bracket base 1 with the first through hole 301 and the through hole of the bracket base 1 overlapping each other.
  • the first bracket 3 is fixed to the bracket base 1 by attaching the nut 14 to the inserted first bracket bolt 4. By fixing the first bracket 3 to the bracket base 1, the first bracket 3 is fixed to the guide rail 11.
  • the surface of the bracket base 1 facing the guide rail 11 is the front surface of the bracket base 1
  • the surface opposite to the guide rail 11 is the back surface of the bracket base 1.
  • the first bracket 3 is in surface contact with the surface of the bracket base 1.
  • the surface facing the bracket base 1 is the back surface of the first bracket 3
  • the surface opposite to the bracket base 1 is the front surface of the first bracket 3.
  • the back surface of the first bracket 3 is in surface contact with the surface of the bracket base 1.
  • the four second through holes 302 penetrate the first bracket 3 in the thickness direction of the first bracket 3.
  • Four first holding plate bolts 6 are inserted into each of the four second through holes 302, one each.
  • the four through holes of the first holding plate 5 correspond to the four second through holes 302 one by one.
  • the first holding plate bolt 6 is inserted into the second through hole 302 and the through hole of the first holding plate 5 with the second through hole 302 and the through hole of the first holding plate 5 overlapping each other.
  • the four nuts 15 are fixed to the back surface of the first bracket 3.
  • the four nuts 15 correspond to each of the four second through holes 302.
  • the screw hole of the nut 15 is arranged to overlap the second through hole 302.
  • the first presser plate 5 is attached to the first bracket 3 by attaching the inserted first presser plate bolt 6 to the nut 15 .
  • the two third through holes 303 penetrate the first bracket 3 in the thickness direction of the first bracket 3.
  • Two second bracket bolts 8 are inserted into each of the two third through holes 303, one each.
  • FIG. 6 is a front view showing the second bracket 7 of FIG. 1.
  • FIG. 7 is a side view showing the second bracket 7 of FIG. 6.
  • the second bracket 7 has a first plate part 701 and a second plate part 702. Each of the first plate section 701 and the second plate section 702 is formed into a plate shape.
  • the first plate part 701 and the second plate part 702 are integrally formed with each other.
  • the thickness direction of the first plate portion 701 and the thickness direction of the second plate portion 702 coincide with each other.
  • the first plate part 701 and the second plate part 702 are arranged offset from each other in the thickness direction of the first plate part 701.
  • the deviation between the position of the first plate part 701 and the position of the second plate part 702 in the thickness direction of the first plate part 701 matches the thickness dimension of the first bracket 3.
  • the first plate portion 701 is stacked on the back surface of the first bracket 3.
  • the surface facing the first bracket 3 is the front surface of the first plate part 701
  • the surface opposite to the first bracket 3 is the back surface of the first plate part 701.
  • the surface of the first plate portion 701 is in surface contact with the back surface of the first bracket 3.
  • the surface facing the same direction as the front surface of the first plate part 701 is the front surface of the second plate part 702
  • the surface facing the same direction as the back surface of the first plate part 701 is the surface facing the same direction as the front surface of the first plate part 701. This is the back surface of the second plate portion 702.
  • Two first through holes 703 are formed in the first plate portion 701.
  • the two first through holes 703 penetrate the first plate portion 701 in the thickness direction of the first plate portion 701.
  • the two first through holes 703 correspond to the two third through holes 303 one by one.
  • the second bracket bolt 8 is inserted into the third through hole 303 and the first through hole 703 with the third through hole 303 and the first through hole 703 overlapping each other.
  • the second bracket 7 is removably attached to the first bracket 3.
  • Four second through holes 704 are formed in the second plate portion 702.
  • the four second through holes 704 penetrate the second plate part 702 in the thickness direction of the second plate part 702.
  • Four second pressing plate bolts 10 are inserted into each of the four second through holes 704, one each.
  • the second pressing plate 9 has four through holes (not shown) formed therein.
  • the four through holes of the second pressing plate 9 correspond to each of the four second through holes 704.
  • the second press plate bolt 10 is inserted into the second through hole 704 and the through hole of the second press plate 9, with the second through hole 704 and the through hole of the second press plate 9 overlapping each other.
  • the four nuts 17 are fixed to the back surface of the second plate portion 702.
  • the four nuts 17 correspond to each of the four second through holes 704.
  • the screw hole of the nut 17 is arranged to overlap the second through hole 704.
  • the second press plate 9 is attached to the second bracket 7 by attaching the inserted second press plate bolt 10 to the nut 17.
  • the second bracket 7 is attached to the first bracket 3 via the two second bracket bolts 8.
  • the second holding plate 9 is attached to the second bracket 7 via the four second holding plate bolts 10. Attach to. Thereby, the second cable 13 is held by the cable hanging device of the elevator.
  • the elevator cable hanging device includes the first bracket 3, the first holding plate 5, the second bracket 7, and the second holding plate 9. .
  • the first bracket 3 is fixed to the guide rail 11.
  • the first holding plate 5 is attached to the first bracket 3 with the first cable 12 being sandwiched between the first bracket 3 and the first holding plate 5.
  • the second bracket 7 is removably attached to the first bracket 3.
  • the second holding plate 9 is attached to the second bracket 7 with the second cable 13 being sandwiched between the second bracket 7 and the second holding plate 9.
  • the second bracket 7 is removably installed on the first bracket 3 while the first holding plate 5 is attached to the first bracket 3. According to this configuration, the cable hanging device of the elevator can hold the second cable 13 while the cable hanging device of the elevator holds the first cable 12 . Thereby, the work efficiency for providing the second cable 13 can be improved.
  • the configuration in which the two first cables 12 are sandwiched between the first bracket 3 and the first holding plate 5 has been described.
  • one first cable 12 may be sandwiched between the first bracket 3 and the first holding plate 5, or three or more first cables 12 may be sandwiched between the first bracket 3 and the first holding plate 5. 1 and the holding plate 5 may be used.
  • the first bracket 3 is fixed to the guide rail 11 by fixing the first bracket 3 to the bracket base 1 via the first bracket bolt 4.
  • the configuration that will be used has been explained.
  • the first bracket 3 may be formed integrally with the bracket base 1.
  • the first bracket 3 is fixed to the guide rail 11 by fixing the bracket base 1 to the guide rail 11.
  • the second bracket 7 is removably attached to the first bracket 3 via the second bracket bolt 8.
  • the second bracket 7 may be configured to be detachably attached to the first bracket 3 via the first holding plate bolt 6. That is, the first holding plate 5 and the second bracket 7 may be removably attached to the first bracket 3 via the first holding plate bolts 6.
  • the first presser plate 5 is attached to the first bracket 3 via a clip (not shown). Pushed in.
  • the first holding plate 5 and the second bracket 7 are attached to the first holding plate 3 via the first holding plate bolt 6. It can be removably installed.
  • the present invention is not limited to the cable suspension device for an elevator according to the first embodiment described above.
  • Various modifications and conversions can be made to the elevator cable hanging device according to the first embodiment described above without departing from the scope of the claims.

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

第2ケーブルを設けるための作業効率を向上させることができるエレベーターのケーブル吊手装置を得る。このエレベーターのケーブル吊手装置は、ガイドレールに固定される第1ブラケットと、第1ブラケットに取り付けられる第1押さえ板と、第1ブラケットに着脱可能に設けられる第2ブラケットと、第2ブラケットに取り付けられる第2押さえ板と、を備え、第1ブラケットと第1押さえ板との間に第1ケーブルが挟まれた状態で、第1押さえ板が第1ブラケットに取り付けられ、第2ブラケットと第2押さえ板との間に第2ケーブルが挟まれた状態で、第2押さえ板が第2ブラケットに取り付けられる。

Description

エレベーターのケーブル吊手装置
 本開示は、エレベーターのケーブル吊手装置に関する。
 従来、ブラケットと、押さえ板と、を備えているエレベーターのケーブル吊手装置が知られている。ブラケットは、レールクリップを介してガイドレールに固定されている。ブラケットと押さえ板との間にケーブルが挟まれた状態で、押さえ板がボルトを介してブラケットに取り付けられている。ブラケットと押さえ板との間にケーブルが挟まれることによって、ケーブルがエレベーターケーブル吊手装置に保持されている(例えば、特許文献1参照)。
実公昭56-51772号公報
 エレベーターがリニューアルされることによって、既設のケーブルである第1ケーブルに加えて、新設のケーブルである第2ケーブルが新たに設けられる場合がある。しかしながら、特許文献1に記載の構成では、ブラケットと押さえ板との間に第1ケーブルおよび第2ケーブルの両方を挟むことができない。したがって、この場合には、第1ケーブルおよび第2ケーブルの両方を挟むことができる新設のブラケットおよび新設の押さえ板を用意し、既設のブラケットおよび既設の押さえ板を新設のブラケットおよび新設の押さえ板に交換しなければならない。これにより、第2ケーブルを設けるための作業効率が悪いという問題点があった。
 本開示は、上述のような課題を解決するためになされたものであり、その目的は、第2ケーブルを設けるための作業効率を向上させることができるエレベーターのケーブル吊手装置を提供するものである。
 本開示に係るエレベーターのケーブル吊手装置は、ガイドレールに固定される第1ブラケットと、第1ブラケットに取り付けられる第1押さえ板と、第1ブラケットに着脱可能に設けられる第2ブラケットと、第2ブラケットに取り付けられる第2押さえ板と、を備え、第1ブラケットと第1押さえ板との間に第1ケーブルが挟まれた状態で、第1押さえ板が第1ブラケットに取り付けられ、第2ブラケットと第2押さえ板との間に第2ケーブルが挟まれた状態で、第2押さえ板が第2ブラケットに取り付けられる。
 本開示に係るエレベーターのケーブル吊手装置によれば、第2ケーブルを設けるための作業効率を向上させることができる。
実施の形態1に係るエレベーターのケーブル吊手装置を示す正面図である。 図1のエレベーターのケーブル吊手装置を示す平面図である。 図1のエレベーターのケーブル吊手装置を示す側面図である。 図1の第1ブラケットを示す正面図である。 図4の第1ブラケットを示す側面図である。 図1の第2ブラケットを示す正面図である。 図6の第2ブラケットを示す側面図である。
 実施の形態1.
 図1は、実施の形態1に係るエレベーターのケーブル吊手装置を示す正面図である。図2は、図1のエレベーターのケーブル吊手装置を示す平面図である。図3は、図1のエレベーターのケーブル吊手装置を示す側面図である。実施の形態1に係るエレベーターのケーブル吊手装置は、ブラケット基部1と、4個のレールクリップ2と、第1ブラケット3と、2個の第1ブラケット用ボルト4と、第1押さえ板5と、4個の第1押さえ板用ボルト6と、を備えている。また、実施の形態1に係るエレベーターのケーブル吊手装置は、第2ブラケット7と、2個の第2ブラケット用ボルト8と、第2押さえ板9と、4個の第2押さえ板用ボルト10と、を備えている。
 ブラケット基部1は、4個のレールクリップ2を介して、ガイドレール11に固定されている。ガイドレール11としては、例えば、エレベーターかご用ガイドレール、つり合いおもり用ガイドレールが挙げられる。ブラケット基部1は、ガイドレール11からガイドレール11の幅方向Dに突出している。
 第1ブラケット3は、2個の第1ブラケット用ボルト4を介して、ブラケット基部1に固定されている。第1ブラケット3は、ガイドレール11の幅方向Dであってガイドレール11から離れる方向にブラケット基部1から突出している。
 第1ブラケット3および第1押さえ板5は、互いに対向するように配置されている。第1ブラケット3および第1押さえ板5が互いに対向する方向は、上方から見た場合に、ガイドレール11の幅方向Dに直交する方向である。
 第1ブラケット3と第1押さえ板5との間に2本の第1ケーブル12が挟まれている。第1ケーブル12は、エレベーターがリニューアルされる前からエレベーターのケーブル吊手装置に保持されている既設のケーブルである。
 2本の第1ケーブル12が互いに重ねられた状態で、2本の第1ケーブル12が第1ブラケット3と第1押さえ板5との間に挟まれている。2本の第1ケーブル12が互いに重ねられた方向は、第1ブラケット3および第1押さえ板5が互いに対向する方向と一致する。
 第1ブラケット3と第1押さえ板5との間に2本の第1ケーブル12が挟まれている状態で、第1押さえ板5は、4個の第1押さえ板用ボルト6を介して、第1ブラケット3に取り付けられている。第1押さえ板5が第1ブラケット3に取り付けられることによって、2本の第1ケーブル12がエレベーターの吊手装置に保持される。
 第2ブラケット7は、2個の第2ブラケット用ボルト8を介して、第1ブラケット3に着脱可能に設けられている。第2ブラケット7は、ガイドレール11の幅方向Dであってガイドレール11から離れる方向に第1ブラケット3から突出している。
 第2ブラケット7および第2押さえ板9は、互いに対向するように配置されている。第2ブラケット7および第2押さえ板9が互いに対向する方向は、上方から見た場合に、ガイドレール11の幅方向Dに直交する方向である。すなわち、第2ブラケット7および第2押さえ板9が互いに対向する方向は、第1ブラケット3および第1押さえ板5が互いに対向する方向と一致する。
 第2ブラケット7と第2押さえ板9との間に2本の第2ケーブル13が挟まれている。第2ケーブル13は、エレベーターがリニューアルされる際にエレベーターに新たに追加されて、エレベーターのケーブル吊手装置に保持される新設のケーブルである。
 2本の第2ケーブル13が互いに重ねられた状態で、2本の第2ケーブル13が第2ブラケット7と第2押さえ板9との間に挟まれている。2本の第2ケーブル13が互いに重ねられた方向は、第2ブラケット7および第2押さえ板9が互いに対向する方向と一致する。
 第2ブラケット7と第2押さえ板9との間に2本の第2ケーブル13が挟まれている状態で、第2押さえ板9は、4個の第2押さえ板用ボルト10を介して、第2ブラケット7に取り付けられている。第2押さえ板9が第2ブラケット7に取り付けられることによって、2本の第2ケーブル13がエレベーターの吊手装置に保持される。
 図4は、図1の第1ブラケット3を示す正面図である。図5は、図4の第1ブラケット3を示す側面図である。第1ブラケット3は、板形状に形成されている。第1ブラケット3には、2個の第1貫通孔301と、4個の第2貫通孔302と、2個の第3貫通孔303と、が形成されている。
 2個の第1貫通孔301は、第1ブラケット3の板厚方向に第1ブラケット3を貫通している。2個の第1貫通孔301のそれぞれには、2個の第1ブラケット用ボルト4が1個ずつ挿入される。
 ブラケット基部1には、図示しない2個の貫通孔が形成されている。ブラケット基部1の2個の貫通孔は、2個の第1貫通孔301に1個ずつ対応している。
 第1貫通孔301とブラケット基部1の貫通孔とが互いに重なった状態で第1貫通孔301およびブラケット基部1の貫通孔に第1ブラケット用ボルト4が挿入される。挿入された第1ブラケット用ボルト4にナット14が取り付けられることによって、第1ブラケット3がブラケット基部1に固定される。第1ブラケット3がブラケット基部1に固定されることによって、第1ブラケット3がガイドレール11に固定される。
 ブラケット基部1の板厚方向において、ブラケット基部1がガイドレール11に対向する面をブラケット基部1の表面とし、ガイドレール11とは反対側の面をブラケット基部1の裏面とする。第1ブラケット3は、ブラケット基部1の表面に面接触している。
 第1ブラケット3の板厚方向において、ブラケット基部1に対向する面を第1ブラケット3の裏面とし、ブラケット基部1とは反対側の面を第1ブラケット3の表面とする。第1ブラケット3の裏面がブラケット基部1の表面に面接触している。
 4個の第2貫通孔302は、第1ブラケット3の板厚方向に第1ブラケット3を貫通している。4個の第2貫通孔302のそれぞれには、4個の第1押さえ板用ボルト6が1個ずつ挿入される。
 第1押さえ板5には、図示しない4個の貫通孔が形成されている。第1押さえ板5の4個の貫通孔は、4個の第2貫通孔302に1個ずつ対応している。
 第2貫通孔302と第1押さえ板5の貫通孔とが互いに重なった状態で第2貫通孔302および第1押さえ板5の貫通孔に第1押さえ板用ボルト6が挿入される。
 第1ブラケット3の裏面には、4個のナット15が固定されている。4個のナット15は、4個の第2貫通孔302に1個ずつ対応している。ナット15のねじ穴は、第2貫通孔302に重なるように配置されている。挿入された第1押さえ板用ボルト6がナット15に取り付けられることによって、第1押さえ板5が第1ブラケット3に取り付けられている。
 2個の第3貫通孔303は、第1ブラケット3の板厚方向に第1ブラケット3を貫通している。2個の第3貫通孔303のそれぞれには、2個の第2ブラケット用ボルト8が1個ずつ挿入される。
 図6は、図1の第2ブラケット7を示す正面図である。図7は、図6の第2ブラケット7を示す側面図である。第2ブラケット7は、第1板部701と、第2板部702と、を有している。第1板部701および第2板部702のそれぞれは、板形状に形成されている。
 第1板部701および第2板部702は、互いに一体に形成されている。第1板部701の板厚方向と第2板部702の板厚方向は、互いに一致する。第1板部701および第2板部702は、第1板部701の板厚方向に互いにずれて配置されている。
 第1板部701の板厚方向における第1板部701の位置と第2板部702の位置との間のずれ寸法は、第1ブラケット3の板厚寸法と一致する。
 第1板部701は、第1ブラケット3の裏面に重ねられている。第1板部701の板厚方向において、第1ブラケット3に対向する面を第1板部701の表面とし、第1ブラケット3とは反対側の面を第1板部701の裏面とする。第1板部701の表面が第1ブラケット3の裏面に面接触している。
 第2板部702の板厚方向において、第1板部701の表面と同一の方向を向く面を第2板部702の表面とし、第1板部701の裏面と同じ方向を向く面を第2板部702の裏面とする。第1板部701の表面が第1ブラケット3の裏面に面接触している場合に、第1ブラケット3の表面と第2板部702の表面とが互いに面一となる。
 第1板部701には、2個の第1貫通孔703が形成されている。2個の第1貫通孔703は、第1板部701の板厚方向に第1板部701を貫通している。2個の第1貫通孔703は、2個の第3貫通孔303に1個ずつ対応している。
 第3貫通孔303と第1貫通孔703とが互いに重なった状態で第3貫通孔303および第1貫通孔703に第2ブラケット用ボルト8が挿入される。挿入された第2ブラケット用ボルト8にナット16が取り付けられることによって、第2ブラケット7が第1ブラケット3に着脱可能に設けられている。
 第2板部702には、4個の第2貫通孔704が形成されている。4個の第2貫通孔704は、第2板部702の板厚方向に第2板部702を貫通している。4個の第2貫通孔704のそれぞれには、4個の第2押さえ板用ボルト10が1個ずつ挿入される。
 第2押さえ板9には、図示しない4個の貫通孔が形成されている。第2押さえ板9の4個の貫通孔は、4個の第2貫通孔704に1個ずつ対応している。
 第2貫通孔704と第2押さえ板9の貫通孔とが互いに重なった状態で第2貫通孔704および第2押さえ板9の貫通孔に第2押さえ板用ボルト10が挿入される。
 第2板部702の裏面には、4個のナット17が固定されている。4個のナット17は、4個の第2貫通孔704に1個ずつ対応している。ナット17のねじ穴は、第2貫通孔704に重なるように配置されている。挿入された第2押さえ板用ボルト10がナット17に取り付けられることによって、第2押さえ板9が第2ブラケット7に取り付けられている。
 次に、エレベーターがリニューアルされる際に第2ケーブル13をエレベーターのケーブル吊手装置に保持させる手順について説明する。
 第1押さえ板5が第1ブラケット3に取り付けられている状態で、2個の第2ブラケット用ボルト8を介して第2ブラケット7を第1ブラケット3に取り付ける。
 その後、第2ブラケット7と第2押さえ板9との間に第2ケーブル13が挟まれた状態で、4個の第2押さえ板用ボルト10を介して第2押さえ板9を第2ブラケット7に取り付ける。これにより、エレベーターのケーブル吊手装置に第2ケーブル13が保持される。
 以上により、第2ケーブル13をエレベーターのケーブル吊手装置に保持させる手順が終了する。
 以上説明したように、実施の形態1に係るエレベーターのケーブル吊手装置は、第1ブラケット3と、第1押さえ板5と、第2ブラケット7と、第2押さえ板9と、を備えている。第1ブラケット3は、ガイドレール11に固定される。第1ブラケット3と第1押さえ板5との間に第1ケーブル12が挟まれた状態で、第1押さえ板5が第1ブラケット3に取り付けられる。第2ブラケット7は、第1ブラケット3に着脱可能に設けられる。第2ブラケット7と第2押さえ板9との間に第2ケーブル13が挟まれた状態で、第2押さえ板9が第2ブラケット7に取り付けられる。この構成によれば、第2ケーブル13が新たに設けられる場合に、第1ブラケット3および第1押さえ板5をガイドレール11から取り外すことなく、エレベーターのケーブル吊手装置が第2ケーブル13を保持することができる。これにより、第2ケーブル13を設けるための作業効率を向上させることができる。
 また、実施の形態1に係るエレベーターのケーブル吊手装置では、第1押さえ板5が第1ブラケット3に取り付けられている状態で、第2ブラケット7が第1ブラケット3に着脱可能に設けられる。この構成によれば、エレベーターのケーブル吊手装置が第1ケーブル12を保持している状態で、エレベーターのケーブル吊手装置に第2ケーブル13を保持させることができる。これにより、第2ケーブル13を設けるための作業効率を向上させることができる。
 なお、実施の形態1に係るエレベーターのケーブル吊手装置では、2本の第1ケーブル12が第1ブラケット3と第1押さえ板5との間に挟まれる構成について説明した。しかしながら、1本の第1ケーブル12が第1ブラケット3と第1押さえ板5との間に挟まれる構成であってもよく、また、3本以上の第1ケーブル12が第1ブラケット3と第1押さえ板5との間に挟まれる構成であってもよい。
 また、実施の形態1に係るエレベーターのケーブル吊手装置では、2本の第2ケーブル13が第2ブラケット7と第2押さえ板9との間に挟まれる構成について説明した。しかしながら、1本の第2ケーブル13が第2ブラケット7と第2押さえ板9との間に挟まれる構成であってもよく、また、3本以上の第2ケーブル13が第2ブラケット7と第2押さえ板9との間に挟まれる構成であってもよい。
 また、実施の形態1に係るエレベーターのケーブル吊手装置では、第1ブラケット3が第1ブラケット用ボルト4を介してブラケット基部1に固定されることによって、第1ブラケット3がガイドレール11に固定される構成について説明した。しかしながら、第1ブラケット3がブラケット基部1に一体に形成された構成であってもよい。この場合に、ブラケット基部1がガイドレール11に固定されることによって、第1ブラケット3がガイドレール11に固定される。
 また、実施の形態1に係るエレベーターのケーブル吊手装置では、第2ブラケット用ボルト8を介して第2ブラケット7が第1ブラケット3に着脱可能に設けられる構成について説明した。しかしながら、第1押さえ板用ボルト6を介して第2ブラケット7が第1ブラケット3に着脱可能に設けられる構成であってもよい。すなわち、第1押さえ板用ボルト6を介して、第1押さえ板5および第2ブラケット7が第1ブラケット3に着脱可能に設けられる構成であってもよい。この場合には、第1押さえ板用ボルト6による第1ブラケット3に対する第1押さえ板5の取り付けが解除される前に、図示しないクリップを介して、第1押さえ板5が第1ブラケット3に押し込まれる。これにより、第1押さえ板用ボルト6による第1ブラケット3に対する第1押さえ板5の取り付けが解除された後であっても、第1ケーブル12が第1ブラケット3と第1押さえ板5とに挟まれた状態が維持される。その結果、第1ケーブル12がエレベーターのケーブル吊手装置に保持された状態を維持しながら、第1押さえ板用ボルト6を介して、第1押さえ板5および第2ブラケット7を第1ブラケット3に着脱可能に設けることができる。
 以上、好ましい実施の形態1に係るエレベーターのケーブル吊手装置について説明したが、上述した実施の形態1に係るエレベーターのケーブル吊手装置に制限されることはない。特許請求の範囲に記載された範囲を逸脱することなく、上述した実施の形態1に係るエレベーターのケーブル吊手装置に種々の変形および変換を加えることができる。
 1 ブラケット基部、2 レールクリップ、3 第1ブラケット、4 第1ブラケット用ボルト、5 第1押さえ板、6 第1押さえ板用ボルト、7 第2ブラケット、8 第2ブラケット用ボルト、9 第2押さえ板、10 第2押さえ板用ボルト、11 ガイドレール、12 第1ケーブル、13 第2ケーブル、14 ナット、15 ナット、16 ナット、17 ナット、301 第1貫通孔、302 第2貫通孔、303 第3貫通孔、701 第1板部、702 第2板部、703 第1貫通孔、704 第2貫通孔。

Claims (2)

  1.  ガイドレールに固定される第1ブラケットと、
     前記第1ブラケットに取り付けられる第1押さえ板と、
     前記第1ブラケットに着脱可能に設けられる第2ブラケットと、
     前記第2ブラケットに取り付けられる第2押さえ板と、
     を備え、
     前記第1ブラケットと前記第1押さえ板との間に第1ケーブルが挟まれた状態で、前記第1押さえ板が前記第1ブラケットに取り付けられ、
     前記第2ブラケットと前記第2押さえ板との間に第2ケーブルが挟まれた状態で、前記第2押さえ板が前記第2ブラケットに取り付けられるエレベーターのケーブル吊手装置。
  2.  前記第1押さえ板が前記第1ブラケットに取り付けられている状態で、前記第2ブラケットが前記第2ブラケットに着脱可能に設けられる請求項1に記載のエレベーターのケーブル吊手装置。
PCT/JP2022/031380 2022-08-19 2022-08-19 エレベーターのケーブル吊手装置 Ceased WO2024038583A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2024541376A JP7706664B2 (ja) 2022-08-19 2022-08-19 エレベーターのケーブル吊手装置
PCT/JP2022/031380 WO2024038583A1 (ja) 2022-08-19 2022-08-19 エレベーターのケーブル吊手装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/031380 WO2024038583A1 (ja) 2022-08-19 2022-08-19 エレベーターのケーブル吊手装置

Publications (1)

Publication Number Publication Date
WO2024038583A1 true WO2024038583A1 (ja) 2024-02-22

Family

ID=89941733

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/031380 Ceased WO2024038583A1 (ja) 2022-08-19 2022-08-19 エレベーターのケーブル吊手装置

Country Status (2)

Country Link
JP (1) JP7706664B2 (ja)
WO (1) WO2024038583A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS581063U (ja) * 1981-06-23 1983-01-06 三菱電機株式会社 エレベ−タの移動ケ−ブル装置
JPH09188487A (ja) * 1996-01-08 1997-07-22 Hitachi Building Syst Co Ltd エレベータの昇降路内器具取付装置
JP2009040589A (ja) * 2007-08-10 2009-02-26 Toshiba Elevator Co Ltd エレベータシステム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS581063U (ja) * 1981-06-23 1983-01-06 三菱電機株式会社 エレベ−タの移動ケ−ブル装置
JPH09188487A (ja) * 1996-01-08 1997-07-22 Hitachi Building Syst Co Ltd エレベータの昇降路内器具取付装置
JP2009040589A (ja) * 2007-08-10 2009-02-26 Toshiba Elevator Co Ltd エレベータシステム

Also Published As

Publication number Publication date
JP7706664B2 (ja) 2025-07-11
JPWO2024038583A1 (ja) 2024-02-22

Similar Documents

Publication Publication Date Title
JP2018070317A (ja) エレベータのガイドレール支持構造及びレールクリップ
US2614785A (en) Mounting for recessed lighting fixtures
JP7706664B2 (ja) エレベーターのケーブル吊手装置
CN223250608U (zh) 一种双层卡爪
CN209184537U (zh) 光伏组件安装夹具及屋顶结构
CN206036398U (zh) 线缆支架
CN221853852U (zh) 一种高精度电梯导轨用连接件
JP4611184B2 (ja) 壁パネルの取付工法及び取付装置
CN220845012U (zh) 电梯系统
CN107322503A (zh) 组合夹具
JP4233921B2 (ja) 金型固定装置
CN215357304U (zh) 一种用于圆柱零件端面钻孔的夹具工装
CN210838841U (zh) 一种弱电走线用夹具
CN112077765B (zh) 一种夹具结构、挂具及输送装置
JPH08133626A (ja) エレベータのガイドシュー取替治具
CN220475933U (zh) 一种多合音喇叭
CN209245996U (zh) 一种led灯板安装机构
JP6400785B1 (ja) ジャッキアップ治具、エレベータの乗りかご、および防振部材の交換方法
CN108423517B (zh) 电梯的导轨的对芯装置及电梯的导轨的对芯方法
CN116365815B (zh) 一种永磁电机维修冶具
CN218157253U (zh) 一种平推对夹液压夹具
JP3827287B2 (ja) リニアガイド取付けジグ
CN214998838U (zh) 一种用于安装直线模组的型材
CN112496810A (zh) 一种电池壳的固定工装
CN216955456U (zh) 一种长规格镶嵌式钳口装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22955755

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2024541376

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 22955755

Country of ref document: EP

Kind code of ref document: A1