WO2024037102A1 - The utility model relates to an integral prefabricated gutter installation adjusting device - Google Patents
The utility model relates to an integral prefabricated gutter installation adjusting device Download PDFInfo
- Publication number
- WO2024037102A1 WO2024037102A1 PCT/CN2023/097021 CN2023097021W WO2024037102A1 WO 2024037102 A1 WO2024037102 A1 WO 2024037102A1 CN 2023097021 W CN2023097021 W CN 2023097021W WO 2024037102 A1 WO2024037102 A1 WO 2024037102A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- adjusting device
- horizontal
- vertical
- integral prefabricated
- installation
- Prior art date
Links
- 238000009434 installation Methods 0.000 title claims abstract description 21
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000005273 aeration Methods 0.000 abstract 1
- 230000007246 mechanism Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 206010034719 Personality change Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000008094 contradictory effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/52—Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
- E03F3/046—Open sewage channels
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Definitions
- the invention belongs to the technical field of prefabricated ditch installation in engineering construction.
- prefabricated ditches are usually installed on both sides of municipal roads, national roads, provincial roads and ordinary roads for drainage.
- the number of ditches is huge and the line is long.
- traditional hoisting equipment such as truck crane or excavator is used to assist hoisting.
- the process requires the cooperation of multiple personnel, repeated adjustment, the installation speed is slow.
- the accuracy of the line and Angle of the ditch is difficult to control, resulting in uneven installation quality, the overall linearity after installation is not beautiful and other defects.
- the traditional gutter installation elevation, linear control are using the hanging line method, the technology is relatively backward, human influence will cause mistakes.
- the main purpose of the invention is to provide an integral prefabricated ditch installation adjustment device for the existing integral prefabricated ditch installation, which is heavy in weight, can only be installed by equipment, occupy the equipment for a long time, invest more personnel and lack of accuracy, so as to make the prefabricated ditch installation occupy the equipment for a short time, invest less personnel and make the precision more accurate.
- the invention provides an integral prefabricated gutter installation adjusting device, including a horizontal adjusting device, a vertical adjusting device and a laser horizontal centering device.
- the horizontal adjustment device comprises a bearing fixed on the support, a manual rotating handle placed on the outer side of the bearing, a movable horizontal bar arranged in the middle of the bearing, the inner side of the bearing is provided with a thread, the horizontal bar is provided with a thread on one side of the bearing, the horizontal bar through the pulley, the use of manual forward or reverse rotation of the handle, drive the bearing rotation,
- the bearing drives the horizontal rod to move around perpendicular to the direction of the prefabricated ditch through the thread.
- the vertical adjustment device comprises a vertical rod I, vertical rod II, arranged at the bottom of the bracket groove, arranged in the groove roller, arranged in the middle of the vertical rod foot type air pump, arranged on the air pump regulating mechanism, arranged in the vertical rod I, vertical rod II air pump connected pipe,
- the foot type air pump is inflated through an external simple inflation device, so that the vertical rod I and vertical rod II are raised at the same time.
- the regulating mechanism on the air pump is provided with a fine-tuning valve, open the valve to complete the air discharge, so that the vertical rod I, vertical rod II simultaneously reduce.
- the laser horizontal centering device comprises a laser emitter, a sliding sleeve ring arranged on a horizontal rod, and the sleeve ring is connected with the laser emitter, and the laser emitter emits visible infrared light.
- the horizontal adjusting device and the vertical adjusting device can be operated simultaneously.
- the device Compared with the existing technology, the device provides the following beneficial effects:
- the device does not need the continuous cooperation of hoisting equipment, and can greatly release the hoisting time of equipment and improve the utilization rate of hoisting equipment;
- the device requires less personnel to cooperate with the operation, 1 to 2 people can complete the installation and adjustment of the prefabricated ditch, and the rotating handle and foot type air pump is convenient and fast to inflate and deflate, and has the characteristics of strong operability;
- the invention provides a more accurate fine-tuning device for prefabricated ditch installation, which can be adjusted in both horizontal and vertical directions, and has the characteristics of high accuracy and full azimuth;
- the device has the advantages of simple structure, light weight and flexibility.
- the bottom of the device is equipped with a roller so that it can move easily and has good transferability;
- the laser horizontal alignment equipped with the device of the invention replaces the manual hanging line, so that the operator can easily observe the reference standard, ensure the installation quality, and have the characteristics of visualization.
- FIG. 1 is a schematic diagram of the overall structure of the invention
- connection may mean a fixed connection, a detachable connection, or a whole; Can be mechanical connection, can also be electrical connection; It may be directly connected or indirectly connected through an intermediary, or it may be a connection within two components or an interaction between two components, unless otherwise expressly specified.
- connection may mean a fixed connection, a detachable connection, or a whole; Can be mechanical connection, can also be electrical connection; It may be directly connected or indirectly connected through an intermediary, or it may be a connection within two components or an interaction between two components, unless otherwise expressly specified.
- an embodiment provided by the invention is an integral prefabricated gutter installation adjusting device, including a horizontal adjusting device 1, a vertical adjusting device 2 and a laser horizontal centering device 5.
- the horizontal adjusting device 1 comprises a bearing 11 fixed on the support, a manual rotating handle 12 placed on the outer side of the bearing, and a movable horizontal rod 9 arranged in the middle of the bearing.
- the vertical adjusting device 2 comprises a vertical rod I 6 as a support, vertical rod II 7, arranged at the bottom of the bracket groove, arranged in the groove roller 10, arranged in the middle of the vertical rod foot type air pump connected to the air pump on the adjusting mechanism 13.
- Bearing 11 is driven to rotate by rotating the handle 12 manually.
- Bearing 11 drives the horizontal rod 9 to move horizontally left and right perpendicular to the direction of the prefabricated ditch by threading.
- the horizontal rod 9 is connected with the prefabricated ditch by sling 4.
- the laser horizontal alignment device 5 is marked at the center point to be marked.
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Sewage (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention discloses an integral prefabricated gutter installation adjusting device, which comprises 1, horizontal adjusting device: 2, vertical adjusting device: 3, laser horizontal centering device. Step 1 includes: Rotate the horizontal adjustment handle, drive the horizontal rod to move parallel through the inner thread of the bearing, and connect the prefabricated ditch with a pull belt to adjust the horizontal movement of the prefabricated ditch. Step 2 includes: foot type air pressure pump lifting adjustment device, through the aeration and air discharge to raise and lower the vertical rod, adjust the vertical movement of the prefabricated ditch. Step 3 includes: Adjust the laser to the center line of the template by performing steps 1 and 2 to ensure accurate and rapid installation of the gutter. The invention has the advantages of simple operation, large reduction of equipment and manpower input, mature technology, safety, reliability and high efficiency.
Description
The invention belongs to the technical field of prefabricated ditch installation in engineering construction.
At present, prefabricated ditches are usually installed on both sides of municipal roads, national roads, provincial roads and ordinary roads for drainage. The number of ditches is huge and the line is long. Because of the overall prefabricated 2m section of ditches, the weight is heavy, traditional hoisting equipment such as truck crane or excavator is used to assist hoisting. The process requires the cooperation of multiple personnel, repeated adjustment, the installation speed is slow. In the hoisting and installation process, the accuracy of the line and Angle of the ditch is difficult to control, resulting in uneven installation quality, the overall linearity after installation is not beautiful and other defects. The traditional gutter installation elevation, linear control are using the hanging line method, the technology is relatively backward, human influence will cause mistakes.
The main purpose of the invention is to provide an integral prefabricated ditch installation adjustment device for the existing integral prefabricated ditch installation, which is heavy in weight, can only be installed by equipment, occupy the equipment for a long time, invest more personnel and lack of accuracy, so as to make the prefabricated ditch installation occupy the equipment for a short time, invest less personnel and make the precision more accurate.
For realizing the purpose of the invention, the invention provides an integral prefabricated gutter installation adjusting device, including a horizontal adjusting device, a vertical adjusting device and a laser horizontal centering device.
Preferably, the horizontal adjustment device comprises a bearing fixed on the support, a manual rotating handle placed on the outer side of the bearing, a movable horizontal bar arranged in the middle of the bearing, the inner side of the bearing is provided with a thread, the horizontal bar is provided with a thread on one side of the bearing, the horizontal bar through the pulley, the use of manual forward or reverse rotation of the handle, drive the bearing rotation, The bearing drives the horizontal rod to move around perpendicular to the direction of the prefabricated ditch through the thread.
Preferably, the vertical adjustment device comprises a vertical rod I, vertical rod II, arranged at the bottom of the bracket groove, arranged in the groove roller, arranged in the middle of the vertical rod foot type air pump, arranged on the air pump regulating mechanism, arranged in the vertical rod I, vertical rod Ⅱ air pump connected pipe, The foot type air pump is inflated through an external simple inflation device, so that the vertical rod I and vertical rod II are raised at the same time. The regulating mechanism on the air pump is provided with a fine-tuning valve, open the valve to complete the air discharge, so that the vertical rod I, vertical rod II simultaneously reduce.
Preferably, the laser horizontal centering device comprises a laser emitter, a sliding sleeve ring arranged on a horizontal rod, and the sleeve ring is connected with the laser emitter, and the laser emitter emits visible infrared light.
Preferably, the horizontal adjusting device and the vertical adjusting device can be operated simultaneously.
Compared with the existing technology, the device provides the following beneficial effects:
The device does not need the continuous cooperation of hoisting equipment, and can greatly release the hoisting time of equipment and improve the utilization rate of hoisting equipment;
The device requires less personnel to cooperate with the operation, 1 to 2 people can complete the installation and adjustment of the prefabricated ditch, and the rotating handle and foot type air pump is convenient and fast to inflate and deflate, and has the characteristics of strong operability;
The invention provides a more accurate fine-tuning device for prefabricated ditch installation, which can be adjusted in both horizontal and vertical directions, and has the characteristics of high accuracy and full azimuth;
The device has the advantages of simple structure, light weight and flexibility. The bottom of the device is equipped with a roller so that it can move easily and has good transferability;
The laser horizontal alignment equipped with the device of the invention replaces the manual hanging line, so that the operator can easily observe the reference standard, ensure the installation quality, and have the characteristics of visualization.
In order to more clearly illustrate the technical scheme in the embodiments of the invention or in the prior art, the following is a brief introduction of the drawings required to be used in the embodiments or in the description of the prior art. It is obvious that the drawings described below are only embodiments of the invention. For ordinary technicians in the field, without creative effort, Other drawings may be obtained from the structures shown in these drawings;
FIG. 1 is a schematic diagram of the overall structure of the invention;
In the figure: 1, horizontal adjusting device, 2, vertical adjusting device, 3, ditch preform, 4, sling, 5, laser horizontal centering device, 6, vertical rod I, 7, vertical rod II, 9 horizontal rod, 10 roller, 11, bearing, 12, rotating handle, 13, adjusting mechanism;
The realization of the purpose, functional characteristics and advantages of the invention will be further explained in combination with embodiments and with reference to the attached drawings.
The following is a clear and complete description of the technical scheme in the embodiment of the invention in combination with the drawings attached to the embodiment of the invention. Obviously, the described embodiment is only a part of the embodiment of the invention, but not the whole embodiment. Based on the embodiments of the invention, all other embodiments obtained by ordinary technicians in the field without creative labor are within the scope of protection of the invention.
It shall be stated that all directional indications (such as up, down, left, right, forward, backward...) in embodiments of the invention are indicated. It is only used to explain the relative position relationship and motion among the components in a certain attitude (as shown in the attached figure). If the specific attitude changes, the directional indication will change accordingly.
In the present invention, the terms "connection", "fixed" etc. shall be understood broadly, unless otherwise expressly specified and qualified. For example, "fixed" may mean a fixed connection, a detachable connection, or a whole; Can be mechanical connection, can also be electrical connection; It may be directly connected or indirectly connected through an intermediary, or it may be a connection within two components or an interaction between two components, unless otherwise expressly specified. For ordinary technicians in the field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
In addition, descriptions in the present invention that refer to "first", "second", etc., are used only for descriptive purposes and are not to be understood as indicating or implying their relative importance or as implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In addition, the technical schemes between embodiments may be combined with each other, but they must be based on the realization of common technical personnel in the field. When the combination of technical schemes is contradictory or impossible to be realized, it shall be considered that such combination of technical schemes does not exist and is not within the scope of protection required by the invention.
Referring to FIG. 1, an embodiment provided by the invention is an integral prefabricated gutter installation adjusting device, including a horizontal adjusting device 1, a vertical adjusting device 2 and a laser horizontal centering device 5.
Preferably, the horizontal adjusting device 1 comprises a bearing 11 fixed on the support, a manual rotating handle 12 placed on the outer side of the bearing, and a movable horizontal rod 9 arranged in the middle of the bearing.
Preferably, the vertical adjusting device 2 comprises a vertical rod I 6 as a support, vertical rod II 7, arranged at the bottom of the bracket groove, arranged in the groove roller 10, arranged in the middle of the vertical rod foot type air pump connected to the air pump on the adjusting mechanism 13. Bearing 11 is driven to rotate by rotating the handle 12 manually. Bearing 11 drives the horizontal rod 9 to move horizontally left and right perpendicular to the direction of the prefabricated ditch by threading. The horizontal rod 9 is connected with the prefabricated ditch by sling 4. Through the external simple charging device, artificial gas injection to the vertical adjustment device 2, so that the vertical rod I 6, vertical rod Ⅱ7 at the same time, driving the horizontal rod 9 rise, so as to achieve the prefabricated ditch 3 rise, control adjustment mechanism 13 in the valve vent, the vertical adjustment device 2 down, driving the horizontal rod 9 down, the process can be closed at any time, the valve, Final control precast ditch vertical accurate adjustment.
As further preferred in this embodiment, the laser horizontal alignment device 5 is marked at the center point to be marked.
The above is only the preferred embodiment of the invention, and does not therefore limit the scope of the patent of the invention. Under the premise of not deviating from the spirit and scope of the invention, there will be various changes and improvements in the invention. In general, under the idea of the invention, the equivalent structure transformation of the specification of the invention and the content of the attached drawings is made. Or directly/indirectly used in other relevant technical fields are included in the scope of patent protection of the invention.
Claims (4)
- The utility model relates to an integral prefabricated gutter installation adjusting device, which is characterized in that it comprises a horizontal adjusting device (1), a vertical adjusting device (2) and a laser horizontal centering device (5).
- According to an integral prefabricated ditch installation adjusting device described in claim 1, its characteristics lie in: the horizontal adjusting device (1) includes: can freely move a threaded horizontal rod, pulley bearing, rotating handle.
- According to an integral prefabricated ditch installation adjusting device described in claim 1, its characteristics are as follows: vertical adjusting device (2) includes: vertical rod with foot type air pump lifting, roller used to move the device, air valve used to adjust the air pump.
- According to an integral prefabricated gutter installation adjustment device described in claim 1, its characteristics are: laser level centering device (5) includes: it is easy to be identified by the naked eye infrared light, free from external light interference, to provide accurate instructions.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310364598.1 | 2023-04-07 | ||
CN202310364598.1A CN116641466A (en) | 2023-04-07 | 2023-04-07 | Integral prefabricated ditch installation adjusting device |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2024037102A1 true WO2024037102A1 (en) | 2024-02-22 |
Family
ID=87642380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2023/097021 WO2024037102A1 (en) | 2023-04-07 | 2023-05-30 | The utility model relates to an integral prefabricated gutter installation adjusting device |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN116641466A (en) |
WO (1) | WO2024037102A1 (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040163265A1 (en) * | 2003-02-21 | 2004-08-26 | Helms David B. | Alignment device |
JP2005138974A (en) * | 2003-11-07 | 2005-06-02 | Ken Oyama | U-shaped gutter lifting device |
CN106869168A (en) * | 2017-02-21 | 2017-06-20 | 中国铁道科学研究院铁道建筑研究所 | Pre-groove and pre-groove component |
CN110104557A (en) * | 2019-04-19 | 2019-08-09 | 中科院合肥技术创新工程院 | A kind of architectural prefab Hoisting Position positioning adjustment device |
CN209924079U (en) * | 2019-03-01 | 2020-01-10 | 中青建安建设集团有限公司 | Drainage ditch installation device |
CN112160770A (en) * | 2020-09-16 | 2021-01-01 | 中铁三局集团有限公司 | Tunnel reinforced concrete center ditch construction equipment and construction method thereof |
CN113005845A (en) * | 2021-01-29 | 2021-06-22 | 江门明浩电力工程监理有限公司 | Prefabricated ditch and drainage ditch and installation method thereof |
CN214007232U (en) * | 2020-12-21 | 2021-08-20 | 中铁十一局集团第三工程有限公司 | Ditch bottom elevation control frock |
CN216193760U (en) * | 2021-07-05 | 2022-04-05 | 中交二公局第三工程有限公司 | Prefabricated ditch adjusting device |
CN218027518U (en) * | 2022-07-18 | 2022-12-13 | 中国建筑土木建设有限公司 | Concrete ditch prefab erection equipment |
CN218373921U (en) * | 2022-08-02 | 2023-01-24 | 中国建筑第八工程局有限公司 | Z-shaped steel embedded part positioning auxiliary device |
-
2023
- 2023-04-07 CN CN202310364598.1A patent/CN116641466A/en active Pending
- 2023-05-30 WO PCT/CN2023/097021 patent/WO2024037102A1/en unknown
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040163265A1 (en) * | 2003-02-21 | 2004-08-26 | Helms David B. | Alignment device |
JP2005138974A (en) * | 2003-11-07 | 2005-06-02 | Ken Oyama | U-shaped gutter lifting device |
CN106869168A (en) * | 2017-02-21 | 2017-06-20 | 中国铁道科学研究院铁道建筑研究所 | Pre-groove and pre-groove component |
CN209924079U (en) * | 2019-03-01 | 2020-01-10 | 中青建安建设集团有限公司 | Drainage ditch installation device |
CN110104557A (en) * | 2019-04-19 | 2019-08-09 | 中科院合肥技术创新工程院 | A kind of architectural prefab Hoisting Position positioning adjustment device |
CN112160770A (en) * | 2020-09-16 | 2021-01-01 | 中铁三局集团有限公司 | Tunnel reinforced concrete center ditch construction equipment and construction method thereof |
CN214007232U (en) * | 2020-12-21 | 2021-08-20 | 中铁十一局集团第三工程有限公司 | Ditch bottom elevation control frock |
CN113005845A (en) * | 2021-01-29 | 2021-06-22 | 江门明浩电力工程监理有限公司 | Prefabricated ditch and drainage ditch and installation method thereof |
CN216193760U (en) * | 2021-07-05 | 2022-04-05 | 中交二公局第三工程有限公司 | Prefabricated ditch adjusting device |
CN218027518U (en) * | 2022-07-18 | 2022-12-13 | 中国建筑土木建设有限公司 | Concrete ditch prefab erection equipment |
CN218373921U (en) * | 2022-08-02 | 2023-01-24 | 中国建筑第八工程局有限公司 | Z-shaped steel embedded part positioning auxiliary device |
Also Published As
Publication number | Publication date |
---|---|
CN116641466A (en) | 2023-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206686381U (en) | 4G mobile communication mobile station apparatus | |
CN109785650A (en) | A kind of structurally stable Mobile traffic light convenient for observation | |
WO2023082748A1 (en) | Apparatus and method for vertically lifting and installing variable-diameter unbalanced-load device | |
CN112064662A (en) | Offshore wind power suction tube jacket installation method and device | |
CN106698208A (en) | Hoisting equipment and hoisting method for external transportation of super high-rise building | |
CN108167272B (en) | A kind of tractor hydraulic lifting system final inspection experimental rig | |
WO2024037102A1 (en) | The utility model relates to an integral prefabricated gutter installation adjusting device | |
CN112125245A (en) | Crane with loading frame | |
CN110103778A (en) | A kind of multi-platform apparatus for work control system | |
CN207062738U (en) | A kind of bridge of fast demountable | |
CN110134085A (en) | A kind of multi-platform apparatus for work control method | |
CN209542116U (en) | A kind of device of quick adjusting gyrocar performance test slope surface angle | |
CN209442543U (en) | Hanging device is used in a kind of construction of assembled architecture | |
CN207961154U (en) | A kind of tractor hydraulic lifting system final inspection experimental rig | |
CN208472681U (en) | Surface low road movable overhaul platform in a kind of power station | |
CN221396862U (en) | Hoisting platform for new energy power station construction | |
CN109708905A (en) | A kind of method and apparatus of quick adjusting gyrocar performance test slope surface angle | |
CN221070734U (en) | Virtual-real interactive tower crane monitoring system | |
CN214466560U (en) | Pipeline energy-saving non-excavation directional drilling machine | |
CN219384562U (en) | Remote control cable conveying equipment | |
CN220886773U (en) | Portal crane group for realizing horizontal rotation of large-scale component | |
CN110255388A (en) | A kind of Intelligent crane | |
CN216613816U (en) | Universal curtain wall and quick hoisting device for components thereof | |
CN220226148U (en) | Support frame for building engineering convenient to altitude mixture control | |
CN216737249U (en) | Gantry crane lifting ring type turnover device suitable for shipbuilding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23854008 Country of ref document: EP Kind code of ref document: A1 |