WO2023201700A1 - Power control for simultaneous pusch transmission in cell - Google Patents
Power control for simultaneous pusch transmission in cell Download PDFInfo
- Publication number
- WO2023201700A1 WO2023201700A1 PCT/CN2022/088452 CN2022088452W WO2023201700A1 WO 2023201700 A1 WO2023201700 A1 WO 2023201700A1 CN 2022088452 W CN2022088452 W CN 2022088452W WO 2023201700 A1 WO2023201700 A1 WO 2023201700A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- pusch transmission
- pusch
- cmax
- value
- coresetpoolindex
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
- H04W72/232—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal the control data signalling from the physical layer, e.g. DCI signalling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/04—Transmission power control [TPC]
- H04W52/30—Transmission power control [TPC] using constraints in the total amount of available transmission power
- H04W52/36—Transmission power control [TPC] using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
- H04W52/367—Power values between minimum and maximum limits, e.g. dynamic range
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0001—Arrangements for dividing the transmission path
- H04L5/0003—Two-dimensional division
- H04L5/0005—Time-frequency
- H04L5/0007—Time-frequency the frequencies being orthogonal, e.g. OFDM(A) or DMT
- H04L5/001—Time-frequency the frequencies being orthogonal, e.g. OFDM(A) or DMT the frequencies being arranged in component carriers
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0044—Allocation of payload; Allocation of data channels, e.g. PDSCH or PUSCH
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signalling, i.e. of overhead other than pilot signals
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0058—Allocation criteria
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0225—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal
- H04W52/0245—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal according to signal strength
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0225—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal
- H04W52/0248—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal dependent on the time of the day, e.g. according to expected transmission activity
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/04—Transmission power control [TPC]
- H04W52/30—Transmission power control [TPC] using constraints in the total amount of available transmission power
- H04W52/34—TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading
- H04W52/346—TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading distributing total power among users or channels
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/04—Transmission power control [TPC]
- H04W52/30—Transmission power control [TPC] using constraints in the total amount of available transmission power
- H04W52/36—Transmission power control [TPC] using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
- H04W52/365—Power headroom reporting
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1268—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
- H04W72/231—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal the control data signalling from the layers above the physical layer, e.g. RRC or MAC-CE signalling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/20—Manipulation of established connections
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0091—Signalling for the administration of the divided path, e.g. signalling of configuration information
- H04L5/0094—Indication of how sub-channels of the path are allocated
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/04—Transmission power control [TPC]
- H04W52/06—TPC algorithms
- H04W52/14—Separate analysis of uplink or downlink
- H04W52/146—Uplink power control
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/04—Transmission power control [TPC]
- H04W52/38—TPC being performed in particular situations
- H04W52/42—TPC being performed in particular situations in systems with time, space, frequency or polarisation diversity
Definitions
- the subject matter disclosed herein generally relates to wireless communications, and more particularly relates to methods and apparatuses for power control for simultaneous PUSCH transmission in a cell.
- New Radio NR
- VLSI Very Large Scale Integration
- RAM Random Access Memory
- ROM Read-Only Memory
- EPROM or Flash Memory Erasable Programmable Read-Only Memory
- CD-ROM Compact Disc Read-Only Memory
- LAN Local Area Network
- WAN Wide Area Network
- UE User Equipment
- eNB Evolved Node B
- gNB Next Generation Node B
- Uplink UL
- Downlink DL
- CPU Central Processing Unit
- GPU Graphics Processing Unit
- FPGA Field Programmable Gate Array
- OFDM Orthogonal Frequency Division Multiplexing
- RRC Radio Resource Control
- TX Receiver
- RX Physical Uplink Control Channel
- PUCCH Physical Uplink Control Channel
- Panel-selection based UL transmission was specified in NR Release 17 for a UE equipped with multiple panels which can be used for UL transmission.
- a UE may be equipped with multiple panels, while only one panel can be used for UL transmission at a time instant in NR Release 17 due to power limitation. It means that only one PUSCH transmission or one PUCCH resource or one SRS resource can be scheduled to be transmitted at a time instant in a carrier using one panel.
- Advanced UEs can benefit from higher UL coverage and average throughput with simultaneous UL multi-panel transmission. It means that multiple panels (e.g. two panels) can be used for UL transmission at a time instant for a carrier.
- PUSCH+PUSCH or PUCCH+PUCCH can be transmitted. It means that, if PUSCH transmission is transmitted by one panel of the two panels at a first given time instant, it is only allowed that another PUSCH transmission can be transmitted by the other panel of the two panels at the first give time instant of a carrier. Similarly, if PUCCH transmission is transmitted by one panel of the two panels at a second given time instant in a carrier, it is only allowed that another PUCCH transmission can be transmitted by the other panel of the two panels at the second give time instant.
- This disclosure targets the issue of power control for simultaneous UL multi-panel transmission.
- a UE comprises a transceiver; and a processor coupled to the transceiver, wherein the processor is configured to transmit, via the transceiver, a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; and receive, via the transceiver, at least one of the first PUSCH transmission and the second PUSCH transmission.
- the transmit power for each of the scheduled PUSCH transmission (s) is determined according to the one maximum output power value P CMAX, f, c , power control parameters associated with an indicated TCI state used for the scheduled PUSCH transmission and the DCI scheduling the PUSCH transmission.
- a first candidate transmit power P PUSCH, b, f, c, 0 for the first PUSCH transmission is determined according to the one maximum output power value P CMAX, f, c and power control parameters associated with a first indicated TCI state applied for the first PUSCH transmission
- a second candidate transmit power P PUSCH, b, f, c, 1 for the second PUSCH transmission is determined according to the one maximum output power value P CMAX, f, c and power control parameters associated with a second indicated TCI state applied for the second PUSCH transmission
- the method may further comprise transmitting the first PUSCH transmission with the transmit power for the first PUSCH transmission if the transmit power for the first PUSCH transmission is higher than a dropping threshold; and transmitting the second PUSCH transmission with the transmit power for the second PUSCH transmission if the transmit power for the second PUSCH transmission is higher than the dropping threshold.
- the priority of the first PUSCH transmission and the second PUSCH transmission is determined according to at least one of coresetPoolIndex value associated with each of the first PUSCH transmission and the second PUSCH transmission, a TB size of each of the first PUSCH transmission and the second PUSCH transmission, a start symbol index of each of the first PUSCH transmission and the second PUSCH transmission, an end symbol index of each of the first PUSCH transmission and the second PUSCH transmission, and a duration of each of the first PUSCH transmission and the second PUSCH transmission.
- the transmit power for the first PUSCH transmission is determined according to the first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI
- the transmit power for the second PUSCH transmission is determined according to the second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and
- the transmit power for the first PUSCH transmission is determined according to the first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH
- a first candidate transmit power P PUSCH, b, f, c, 0 for the first PUSCH transmission is determined according to the first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, power control parameters associated with a first indicated TCI state associated with the first
- the method may further comprise transmitting the first PUSCH transmission with the transmit power for the first PUSCH transmission if the transmit power for the first PUSCH transmission is higher than a dropping threshold; and transmitting the second PUSCH transmission with the transmit power for the second PUSCH transmission if the transmit power for the second PUSCH transmission is higher than the dropping threshold.
- the priority of the first PUSCH transmission and the second PUSCH transmission is determined according to at least one of coresetPoolIndex value associated with each of the first PUSCH transmission and the second PUSCH transmission, a TB size of each of the first PUSCH transmission and the second PUSCH transmission, a start symbol index of each of the first PUSCH transmission and the second PUSCH transmission, an end symbol index of each of the first PUSCH transmission and the second PUSCH transmission, and a duration of each of the first PUSCH transmission and the second PUSCH transmission.
- the processor is further configured to report, via the transceiver, a power headroom report (PHR) including two or three power headrooms (PHs) according to the configured one or multiple maximum output power values.
- PHR power headroom report
- PHs power headrooms
- the configuration configures one maximum output power value P CMAX, f, c , and a first PH and a second PH are included in the PHR
- the first PH is calculated based on the scheduled PUSCH transmission
- the second PH is calculated based on a reference PUSCH transmission with the power control parameters associated with a coresetPoolIndex value different from the coresetPoolIndex value associated with the scheduled PUSCH transmission
- the first PH is calculated based on the one maximum output power value P CMAX, f, c , power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI
- the second PH is calculated based on the one maximum output power value
- the first PH is calculated based on the one maximum output power value P CMAX, f, c , power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI
- the second PH is calculated based on the one maximum output power value P CMAX, f, c , power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission
- the third PH is calculated based on the one maximum output power value P CMAX, f, c , power control parameters associated with a first indicated TCI state associated with the
- the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission and a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and a first PH and a second PH are included in the PHR
- the first PH is calculated based on one of the first and the second maximum output power values associated with the scheduled PUSCH transmission, power control parameters associated with an indicated TCI state associated with the coresetPoolIndex value associated with the scheduled PUSCH transmission, and the DCI scheduling the PUSCH transmission
- a ninth implementation if the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and an additional maximum output power value P CMAX, f, c , which is smaller than P CMAX, f, c, 0 + P CMAX, f, c, 1 and larger than each of P CMAX, f, c, 0 and P CMAX, f, c, 1 , and a first PH and a second PH are included in the PHR, when one of the first PUSCH transmission and the second PUSCH transmission is scheduled in the one slot, the first PH is calculated based on one of the first and the second maximum output power values associated with the scheduled PUSCH transmission, power control parameters associated with an indicated TCI state associated with the coresetPoolIndex value associated with the scheduled PUSCH transmission, and the
- the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and an additional maximum output power value P CMAX, f, c , which is smaller than P CMAX, f, c, 0 + P CMAX, f, c, 1 and larger than each of P CMAX, f, c, 0 and P CMAX, f, c, 1 , and a first PH, a second PH and a third PH are included in the PHR, when the first PUSCH transmission and the second PUSCH transmission are scheduled to be overlapped in the one slot, the first PH is calculated based on the first maximum output power value P CMAX, f, c, 0 associated with the first coresetPoolIndex value, power control parameters associated with a first indicated T
- a method performed at a UE comprises receiving a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; and determining transmit power for each of the scheduled PUSCH transmission (s) according to the configured one or multiple maximum output power values.
- a base unit comprises a transceiver; and a processor coupled to the transceiver, wherein the processor is configured to transmit, via the transceiver, a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; and receive, via the transceiver, at least one of the first PUSCH transmission and the second PUSCH transmission.
- a method performed at a base unit comprises transmitting a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; and receiving at least one of the first PUSCH transmission and the second PUSCH transmission.
- Figure 1 is a schematic flow chart diagram illustrating an embodiment of a method
- Figure 2 is a schematic flow chart diagram illustrating an embodiment of another method.
- Figure 3 is a schematic block diagram illustrating apparatuses according to one embodiment.
- embodiments may be embodied as a system, apparatus, method, or program product. Accordingly, embodiments may take the form of an entirely hardware embodiment, an entirely software embodiment (including firmware, resident software, micro-code, etc. ) or an embodiment combining software and hardware aspects that may generally all be referred to herein as a “circuit” , “module” or “system” . Furthermore, embodiments may take the form of a program product embodied in one or more computer readable storage devices storing machine-readable code, computer readable code, and/or program code, referred to hereafter as “code” .
- code computer readable storage devices storing machine-readable code, computer readable code, and/or program code, referred to hereafter as “code” .
- the storage devices may be tangible, non-transitory, and/or non-transmission.
- the storage devices may not embody signals. In a certain embodiment, the storage devices only employ signals for accessing code.
- modules may be implemented as a hardware circuit comprising custom very-large-scale integration (VLSI) circuits or gate arrays, off-the-shelf semiconductors such as logic chips, transistors, or other discrete components.
- VLSI very-large-scale integration
- a module may also be implemented in programmable hardware devices such as field programmable gate arrays, programmable array logic, programmable logic devices or the like.
- Modules may also be implemented in code and/or software for execution by various types of processors.
- An identified module of code may, for instance, include one or more physical or logical blocks of executable code which may, for instance, be organized as an object, procedure, or function. Nevertheless, the executables of an identified module need not be physically located together, but, may include disparate instructions stored in different locations which, when joined logically together, include the module and achieve the stated purpose for the module.
- a module of code may contain a single instruction, or many instructions, and may even be distributed over several different code segments, among different programs, and across several memory devices.
- operational data may be identified and illustrated herein within modules and may be embodied in any suitable form and organized within any suitable type of data structure. This operational data may be collected as a single data set, or may be distributed over different locations including over different computer readable storage devices.
- the software portions are stored on one or more computer readable storage devices.
- the computer readable medium may be a computer readable storage medium.
- the computer readable storage medium may be a storage device storing code.
- the storage device may be, for example, but need not necessarily be, an electronic, magnetic, optical, electromagnetic, infrared, holographic, micromechanical, or semiconductor system, apparatus, or device, or any suitable combination of the foregoing.
- a storage device would include the following: an electrical connection having one or more wires, a portable computer diskette, a hard disk, random access memory (RAM) , read-only memory (ROM) , erasable programmable read-only memory (EPROM or Flash Memory) , portable compact disc read-only memory (CD-ROM) , an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
- a computer-readable storage medium may be any tangible medium that can contain or store a program for use by or in connection with an instruction execution system, apparatus, or device.
- Code for carrying out operations for embodiments may include any number of lines and may be written in any combination of one or more programming languages including an object-oriented programming language such as Python, Ruby, Java, Smalltalk, C++, or the like, and conventional procedural programming languages, such as the "C" programming language, or the like, and/or machine languages such as assembly languages.
- the code may be executed entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server.
- the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN) , or the connection may be made to an external computer (for example, through the Internet using an Internet Service Provider) .
- LAN local area network
- WAN wide area network
- Internet Service Provider an Internet Service Provider
- the code may also be stored in a storage device that can direct a computer, other programmable data processing apparatus, or other devices, to function in a particular manner, such that the instructions stored in the storage device produce an article of manufacture including instructions which implement the function specified in the schematic flowchart diagrams and/or schematic block diagrams block or blocks.
- the code may also be loaded onto a computer, other programmable data processing apparatus, or other devices, to cause a series of operational steps to be performed on the computer, other programmable apparatus or other devices to produce a computer implemented process such that the code executed on the computer or other programmable apparatus provides processes for implementing the functions specified in the flowchart and/or block diagram block or blocks.
- each block in the schematic flowchart diagrams and/or schematic block diagrams may represent a module, segment, or portion of code, which includes one or more executable instructions of the code for implementing the specified logical function (s) .
- Multi-TRP means that a serving cell can have multiple (e.g. two) TRPs.
- Multi-panel means that a UE can have multiple (e.g. two) panels.
- the UE may use one panel (e.g. panel#1) to transmit UL signal to one TRP (e.g. TRP#1) of the serving cell and use the other panel (e.g. panel#2) to transmit UL signal to another TRP (e.g. TRP#2) of the serving cell.
- one panel is associated with one TRP.
- panel#1 is associated with TRP#1
- panel#2 is associated with TRP#2. So, multi-panel multi-TRP scenario can be described as multi-panel/TRP.
- PUSCH transmission may be abbreviated as ‘PUSCH’
- PUCCH resource may be abbreviated as ‘PUCCH’ .
- each TRP may independently send DCI scheduling PUSCH or PUCCH to the same TRP.
- a UE may receive, from different (e.g. two) TRPs, multiple (e.g. two) DCIs scheduling multiple fully-overlapped or partial-overlapped or non-overlapped PUSCH or PUCCH transmissions in one slot.
- a RRC parameter coresetPoolIndex with value 0 or 1 is configured for a CORESET for TRP differential. For example, all CORESETs configured for TRP#1 is configured with coresetPoolIndex with value 0, and all the CORESETs configured for TRP#2 is configured with coresetPoolIndex with value 1.
- Multi-panel/TRP simultaneous UL transmission means the UE transmit UL signals from multiple panels (e.g. two panels) to multiple TRPs (e.g. two TRPs) simultaneously.
- Multi-DCI based multi-panel/TRP simultaneous UL transmission means that the UL signals (e.g. PUSCH) transmitted from multiple (e.g. two) panels to multiple TRPs (e.g. two TRPs) simultaneously are scheduled by multiple (e.g. two) DCIs.
- the UL signal (e.g. PUSCH) transmitted from panel#1 to TRP#1 is scheduled by one DCI associated with coresetPoolIndex with value 0 (e.g. from TRP#1)
- the UL signal (e.g. PUSCH) transmitted from panel#2 to TRP#2 is scheduled by another DCI associated with coresetPoolIndex with value 1 (e.g. from TRP#2) on the same symbol (s) .
- Two UL or joint TCI states associated with different coresetPoolIndex values are activated or indicated for UL signal transmitted from two panels to two TRPs for one BWP of a cell if unified TCI framework is configured, and are referred to as two indicated UL TCI states.
- UL TCI state is indicated when separate DL/UL TCI framework is configured, where the Tx beam for UL transmit and the Rx beam for DL reception are separately indicated by UL TCI state and DL TCI state, respectively.
- Each UL TCI state indicates a DL RS or an SRS for the UE to determine the TX spatial filter for UL transmission.
- a PL-RS is associated with the UL TCI state for the UE to calculate the DL channel path loss
- a set of power control parameters including P0, alpha and closed loop index for PUSCH is associated with each UL TCI state.
- Joint TCI state is indicated when joint DL/UL TCI framework is configured, where both Tx beam for UL transmission and Rx beam for DL reception are determined by the indicated joint TCI state.
- Each joint TCI state indicates a DL RS for the UE to determine the TX spatial filter for UL transmission, and the RX spatial filter for DL reception.
- a PL-RS is associated with the UL TCI state for the UE to calculate the DL channel path loss
- a set of power control parameters including P0, alpha and closed loop index for PUSCH is associated with each UL TCI state.
- Each PUSCH may be associated with one of the two indicated UL TCI states. For example, a first PUSCH scheduled by a first DCI associated with coresetPoolIndex value 0 is transmitted from panel#1 to TRP#1 associated with coresetPoolIndex value 0 by using the first indicated UL TCI state associated with coresetPoolIndex value 0 (i.e.
- the first indicated UL TCI state is applied to the first PUSCH)
- a second PUSCH scheduled by a second DCI associated with coresetPoolIndex value 1 is transmitted from panel#2 to TRP#2 by using the second indicated UL TCI state associated with coresetPoolIndex value 1 (i.e. the second indicated UL TCI state is applied to the second PUSCH) .
- two independent RF chains or transmit branches each including independent PAs and PLLs should be equipped for the UE. Therefore, two maximum output power values for a carrier f of a serving cell c, e.g. P CMAX, f, c, 0 and P CMAX, f, c, 1 , can be configured by the UE, where each of two maximum output power values corresponds to a configured maximum output power value associated with one panel.
- P CMAX, f, c, 0 corresponds to a configured maximum output power value associated with panel#1 (or associated with coresetPoolIndex value 0)
- P CMAX, f, c, 1 corresponds to a configured maximum output power value associated with panel#2 (or associated with coresetPoolIndex value 1)
- an additional maximum output power value e.g.
- P CMAX, f, c (where P CMAX, f, c ⁇ P CMAX, f, c, 0 +P CMAX, f, c, 1 ) , may be configured for a carrier to restrict the total output power of two panels in the carrier.
- Case 1 one maximum output power value P CMAX, f, c is configured for a UE for carrier f of a serving cell c.
- Case 2 two maximum output power values, e.g. P CMAX, f, c, 0 and P CMAX, f, c, 1 are configured for a UE for carrier f of a serving cell c, where each one of P CMAX, f, c, 0 and P CMAX, f, c, 1 is associated with a transmitter branch of a carrier and further associated with a UL panel, an indicated UL TCI state and a coresetPoolIndex value.
- P CMAX, f, c, 0 and P CMAX, f, c, 1 are configured for a UE for carrier f of a serving cell c, where each one of P CMAX, f, c, 0 and P CMAX, f, c, 1 is associated with a transmitter branch of a carrier and further associated with a UL panel, an indicated UL TCI state and a coresetPoolIndex value.
- P CMAX, f, c, 0 is the maximum output power value associated with a first transmitter branch, panel#1, coresetPoolIndex value 0 and a first indicated UL TCI state (associated with coresetPoolIndex value 0)
- P CMAX, f, c, 1 is the maximum output power value associated with a second transmitter branch, panel#2, coresetPoolIndex value 1 and a second indicated UL TCI state (associated with coresetPoolIndex value 1) .
- Case 3 three maximum output power values, e.g., P CMAX, f, c , P CMAX, f, c, 0 and P CMAX, f, c, 1 are configured for a UE for carrier f of a serving cell c, where P CMAX, f, c, 0 and P CMAX, f, c, 1 are the same as P CMAX, f, c, 0 and P CMAX, f, c, 1 described in Case 2, and P CMAX, f, c (where P CMAX, f, c ⁇ P CMAX, f, c, 0 +P CMAX, f, c, 1 , and P CMAX, f, c >P CMAX, f, c, 0 , and P CMAX, f, c >P CMAX, f, c, 1 ) corresponds to the maximum output power value of the carrier.
- the first to the third embodiments relate to determining the transmit power for each of the scheduled PUSCH (s) in one slot, respectively, in Cases 1, 2 and 3.
- a first embodiment relates to Case 1, i.e. one maximum output power value P CMAX, f, c is configured for a UE for carrier f of a serving cell c.
- the transmit power of each scheduled PUSCH transmission occasion i is determined by Equation 1.
- P CMAX, f, c (i) is the configured maximum output power value P CMAX, f, c for PUSCH transmission occasion i in the one slot.
- P O_PUSCH, b, f, c (j) , ⁇ b, f, c (j) , PL b, f, c (q d ) , ⁇ TF, b, f, c (i) , f b, f, c (i, l) ) to calculate P PUSCH, b, f, c (i, j, q d , l) are determined by the power control parameters associated with the indicated UL TCI state used for the PUSCH, and the scheduling DCI (i.e. the DCI scheduling the PUSCH) .
- P O_PUSCH, b, f, c (j) is the target receiving power at the gNB or TRP side of BWP b of carrier f of cell c.
- ⁇ b, f, c (j) is the pathloss compensation factor with 0 ⁇ b, f, c (j) ⁇ 1.
- PL b, f, c (q d ) is the DL channel pathloss estimated based on a DL RS with index q d .
- ⁇ TF, b, f, c (i) is the power adjustment according to the modulation of the scheduled PUSCH.
- f b, f, c (i, l) is the closed loop power adjustment for the scheduled PUSCH transmission occasion i in closed loop l indicated by the scheduling DCI.
- each indicated UL TCI state is associated with a P0 (i.e., P O_PUSCH, b, f, c (j) in Equation 1) , alpha (i.e., ⁇ b, f, c (j) in Equation 1) and l.
- P0 i.e., P O_PUSCH, b, f, c (j) in Equation 1
- alpha i.e., ⁇ b, f, c (j) in Equation 1
- l alpha
- a second candidate transmit power P PUSCH, b, f, c, 1 (i, j, q d , l) is determined for the second PUSCH (i.e.
- the UE further determines the actual transmit power for each of the first PUSCH and the second PUSCH according to the following procedure.
- Step 11 if P PUSCH, b, f, c, 0 (i, j, q d , l) +P PUSCH, b, f, c, 1 (i, j, q d , l) ⁇ P CMAX, f, c (i) , the UE transmits the first PUSCH with the first candidate transmit power of P PUSCH, b, f, c, 0 (i, j, q d , l) , and transmits the second PUSCH with the second candidate transmit power of P PUSCH, b, f, c, 1 (i, j, q d , l) .
- Step 12 if P PUSCH, b, f, c, 0 (i, j, q d , l) +P PUSCH, b, f, c, 1 (i, j, q d , l) >P CMAX, f, c (i) , one the following solutions 11, 12 and 13 can be considered:
- Solution 11 the UE directly allocates P CMAX, f, c (i) to each of the first PUSCH and the second PUSCH proportionally according to the required transmit powers by the first PUSCH and the second PUSCH, for example,
- P′ PUSCH, b, f, c, 0 (i, j, q d , l) is the actual transmit power for the first PUSCH
- P′ PUSCH, b, f, c, 1 (i, j, q d , l) is the actual transmit power for the second PUSCH.
- Solution 12 the UE allocates transmit power to the first PUSCH and the second PUSCH according to a priority.
- the UE first ensures the transmit power for the PUSCH with higher priority and then allocates the remaining power to the PUSCH with lower priority. For example, suppose the first PUSCH has a higher priority than the second PUSCH, then the UE allocates P PUSCH, b, f, c, 0 (i, j, q d , l) to the first PUSCH, and allocates (P CMAX, f, c (i) -P PUSCH, b, f, c, 0 (i, j, q d , l) ) to the second PUSCH.
- the UE allocates P PUSCH, b, f, c, 1 (i, j, q d , l) to the second PUSCH, and allocates (P CMAX, f, c (i) -P PUSCH, b, f, c, 1 (i, j, q d , l) ) to the first PUSCH.
- the priority can be determined by at least one of coresetPoolIndex value associated with each PUSCH, the TB size of each PUSCH, the start symbol index of each PUSCH, the end symbol index of each PUSCH, or the duration of each PUSCH. For example, any of criteria (11) to (15) can be used to determine which PUSCH has a higher priority:
- the PUSCH with larger TB size has higher priority than the PUSCH with smaller TB size
- the PUSCH with smaller start symbol index has higher priority than the PUSCH with larger start symbol index
- the PUSCH with smaller end symbol index has higher priority than the PUSCH with larger end symbol index
- the PUSCH with larger duration has higher priority than the PUSCH with smaller duration
- the priority of the PUSCHs is determined further by criterion (15) .
- Solution 13 the total power is allocated to the first PUSCH and the second PUSCH based on a RRC configured factor.
- the gNB configures a power allocation factor, bate (with the range of 0 ⁇ bate ⁇ 1) , used for the total power allocation for two overlapped PUSCHs scheduled to be transmitted in one slot.
- bate a power allocation factor
- bate*P CMAX, f, c (i) is allocated to the first PUSCH (i.e.
- a dropping threshold can be configured or specified to determine whether the PUSCH with lower priority is transmitted. It means that, when the transmit power determined for a PUSCH (e.g. PUSCH with lower priority) is less than the dropping threshold, the PUSCH shall be dropped (i.e. not transmitted) .
- a second embodiment relates to Case 2, i.e. two maximum output power values, e.g. P CMAX, f, c, 0 and P CMAX, f, c, 1 , are configured for a UE for carrier f of a serving cell c.
- P CMAX, f, c, 0 and P CMAX, f, c, 1 are associated with a first panel (e.g. panel#1) and a second panel (e.g. panel#2) used for simultaneous UL transmission.
- P CMAX, f, c, 0 is the maximum output power value for the first PUSCH (i.e.
- the UE shall determine the transmit power for each of the first PUSCH and the second PUSCH according to the coresetPoolIndex value associated therewith.
- Other parameters i.e.
- P O_PUSCH, b, f, c (j) , ⁇ b, f, c (j) , PL b, f, c (q d ) , ⁇ TF, b, f, c (i) , f b, f, c (i, l) to calculate P PUSCH, b, f, c, 0 (i, j, q d , l) ) are determined by the power control parameters associated with the indicated UL TCI state associated with coresetPoolIndex 0 used for the PUSCH, and the scheduling DCI.
- Other parameters i.e.
- P O_PUSCH, b, f, c (j) , ⁇ b, f, c (j) , PL b, f, c (q d ) , ⁇ TF, b, f, c (i) , f b, f, c (i, l) to calculate P PUSCH, b, f, c, 1 (i, j, q d , l) ) are determined by the power control parameters associated with the indicated UL TCI state associated with coresetPoolIndex 1 used for the PUSCH, and the scheduling DCI.
- a third embodiment relates to Case 3, i.e. three maximum output power values, e.g. P CMAX, f, c , P CMAX, f, c, 0 and P CMAX, f, c, 1 , are configured for a UE for carrier f of a serving cell c.
- P CMAX, f, c, 0 and P CMAX, f, c, 1 are the same as P CMAX, f, c, 0 and P CMAX, f, c, 1 described in the second embodiment. That is, P CMAX, f, c, 0 and P CMAX, f, c, 1 are associated with a first panel (e.g. panel#1) and a second panel (e.g. panel#2) used for simultaneous UL transmission.
- P CMAX, f, c, 0 is the maximum output power value for the first PUSCH (i.e.
- P CMAX, f, c is configured to restrict the total transmit power of the UE for carrier f of the serving cell c for simultaneous UL transmission. That is, P CMAX, f, c ⁇ P CMAX, f, c, 0 + P CMAX, f, c, 1 , and P CMAX, f, c > P CMAX, f, c, 0 , P CMAX, f, c > P CMAX, f, c, 1 are configured.
- the UE determines the transmit power for each PUSCH according to Equation 2 or Equation 3 based on the coresetPoolIndex value associated with the PUSCH.
- the UE shall determine the transmit power for each PUSCH according to the following procedure:
- Step 31 calculate P PUSCH, b, f, c, 0 (i, j, q d , l) for the first PUSCH according to Equation 2 and calculate P PUSCH, b, f, c, 1 (i, j, q d , l) for the second PUSCH according to or Equation 3.
- Step 32 compare P PUSCH, b, f, c, 0 (i, j, q d , ) +P PUSCH, b, f, c, 1 (i, j, q d , l) and P CMAX, f, c .
- Step 321 if P PUSCH, b, f, c, 0 (i, j, q d , l) +P PUSCH, b, f, c, 1 (i, j, q d , l) ⁇ P CMAX, b, f, c , the UE shall transmit the first PUSCH with the transmit power P PUSCH, b, f, c, 0 (i, j, q d , l) and transmit the second PUSCH with the transmit power P PUSCH, b, f, c, 1 (i, j, q d , l) .
- Step 322 if P PUSCH, b, f, c, 0 (i, j, q d , l) +P PUSCH, b, f, c, 1 (i, j, q d , l) >P CMAX, b, f, c , then one of the following four solutions can be considered to determine the transmit power for each PUSCH.
- Solution 31 the UE first allocates P CMAX, f, c (i) to each PUSCH proportionally according to the required transmit powers, for example,
- the actual transmit power for the first PUSCH is determined by
- the actual transmit power for the second PUSCH is determined by
- Solution 32 the UE first allocates P CMAX, f, c (i) to each PUSCH according to the configured maximum output power values for the first PUSCH and the second PUSCH, for example,
- the actual transmit power for the first PUSCH is determined by
- the actual transmit power for the second PUSCH is determined by
- Solution 33 the UE allocates transmit power for the first PUSCH and transmit power for the second PUSCH according to a priority.
- the UE first ensures the transmit power for the PUSCH with higher priority and then allocates the remaining power to the PUSCH with lower priority. For example, suppose the first PUSCH has a higher priority than the second PUSCH, then the UE allocates P PUSCH, b, f, c, 0 (i, j, q d , l) to the first PUSCH, and allocates (P CMAX, f, c (i) -P PUSCH, b, f, c, 0 (i, j, q d , l) ) to the second PUSCH.
- the UE allocates P PUSCH, b, f, c, 1 (i, j, q d , l) to the second PUSCH, and allocates (P CMAX, f, c (i) -P PUSCH, b, f, c, 1 (i, j, q d , l) ) to the first PUSCH.
- the priority can be determined by at least one of coresetPoolIndex value associated with each PUSCH, the TB size of each PUSCH, the start symbol index of each PUSCH, the end symbol index of each PUSCH, and the duration of each PUSCH. For example, any of criteria (31) to (35) can be used to determine which PUSCH has a higher priority:
- the PUSCH with larger TB size has higher priority than the PUSCH with smaller TB size
- the PUSCH with smaller start symbol index has higher priority than the PUSCH with larger start symbol index
- the PUSCH with smaller end symbol index has higher priority than the PUSCH with larger end symbol index
- the PUSCH with larger duration has higher priority than the PUSCH with smaller duration
- the priority of the PUSCHs is determined further by criterion (35) .
- Solution 34 the total power is allocated to the first PUSCH and the second PUSCH based on a RRC configured factor.
- the gNB configures a power allocation factor, bate (with the range of 0 ⁇ bate ⁇ 1) , used for the total power allocation for two overlapped PUSCHs scheduled to be transmitted in one slot.
- bate a power allocation factor
- bate*P CMAX, f, c (i) is allocated to the first PUSCH (i.e.
- a dropping threshold can be configured or specified to determine whether the PUSCH with lower priority is transmitted. It means that, when the transmit power determined for a PUSCH (e.g. PUSCH with lower priority) is less than the dropping threshold, the PUSCH shall be dropped (i.e. not transmitted) .
- the fourth embodiment to the sixth embodiment relate to calculating power headroom (PH) .
- Power headroom indicates the power availability for UL transmission.
- Type 1 PH reflects the PH assuming that PUSCH only transmits on a carrier and the PH is a measurement of the difference between the maximum output power value and the transmit power value that would have been used assuming that there would have been no upper limit on the transmit power.
- the PH can be transmitted from the UE to the gNB when the UE is scheduled to transmit on the UL-SCH. For example, when PUSCH (s) are scheduled to be transmitted from the UE, a PHR (power headroom report) including one or multiple PHs can be transmitted to the gNB.
- the gNB can configure the UE to report multiple PHs in a PHR in a cell according to UE capability report on whether multiple PHs (e.g., two PHs) can be configured in a cell.
- multiple PHs e.g., two PHs
- a fourth embodiment relates to calculating PHs in Case 1, i.e. one maximum output power value P CMAX, f, c is configured for a UE for carrier f of a serving cell c.
- two or three PHs can be configured to be reported in a PHR for a cell.
- a first PH is an actual PH based on the PUSCH transmission
- a second PH is a virtual PH based on a reference PUSCH transmission with the power control parameters associated with a coresetPoolIndex value different from the coresetPoolIndex value associated with the actual PUSCH transmission.
- a first actual PH i.e. PH type1, b, f, c, 0 (i, j, q d , l)
- the first actual PH i.e. PH type1, b, f, c, 0 (i, j, q d , l) ) is calculated according to Equation 4.
- P CMAX, f, c (i) is the configured maximum output power value P CMAX, f, c for PUSCH transmission occasion i in the one slot;
- the second actual PH (i.e. PH type1, b, f, c, 1 (i, j, q d , l) ) is calculated according to Equation 5.
- P CMAX, f, c (i) is the configured maximum output power value P CMAX, f, c for PUSCH transmission occasion i in the one slot;
- P CMAX, f, c (i) is the configured maximum output power value P CMAX, f, c for PUSCH transmission occasion i in the one slot;
- a fifth embodiment relates to calculating PHs in Case 2, i.e. two maximum output power values, e.g. P CMAX, f, c, 0 and P CMAX, f, c, 1 , are configured for a UE for carrier f of a serving cell c.
- the gNB can configure the UE to report two PHs (e.g. a first PH and a second PH) in a PHR for a cell according to UE capability report.
- two PHs e.g. a first PH and a second PH
- P CMAX, f, c, 0 (i) is the configured maximum output power value P CMAX, f, c, 0 for PUSCH transmission occasion i in the one slot;
- P CMAX, f, c, 1 (i) is the configured maximum output power value P CMAX, f, c, 1 for PUSCH transmission occasion i in the one slot;
- two PUSCHs e.g. two fully-overlapped or partially-overlapped or non-overlapped PUSCHs
- two actual PHs e.g. a first actual PH and a second actual PH
- a sixth embodiment relates to calculating PHs in Case 3, i.e. three maximum output power values, e.g. P CMAX, f, c , P CMAX, f, c, 0 and P CMAX, f, c, 1 , are configured for a UE for carrier f of a serving cell c.
- two or three PHs can be configured to be reported in a PHR for a cell according to UE capability report.
- two PUSCHs e.g. two fully-overlapped or partially-overlapped or non-overlapped PUSCHs
- two actual PHs e.g. a first actual PH and a second actual PH
- an additional PH can be calculated according to Equation 6.
- Figure 1 is a schematic flow chart diagram illustrating an embodiment of a method 100 according to the present application.
- the method 100 is performed by an apparatus, such as a remote unit (e.g. UE) .
- the method 100 may be performed by a processor executing program code, for example, a microcontroller, a microprocessor, a CPU, a GPU, an auxiliary processing unit, a FPGA, or the like.
- the method 100 is a method performed at a UE, comprising: 102 receiving a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; and 104 determining transmit power for each of the scheduled PUSCH transmission (s) according to the configured one or multiple maximum output power values.
- the transmit power for each of the scheduled PUSCH transmission (s) is determined according to the one maximum output power value P CMAX, f, c , power control parameters associated with an indicated TCI state used for the scheduled PUSCH transmission and the DCI scheduling the PUSCH transmission.
- a first candidate transmit power P PUSCH, b, f, c, 0 for the first PUSCH transmission is determined according to the one maximum output power value P CMAX, f, c and power control parameters associated with a first indicated TCI state applied for the first PUSCH transmission
- a second candidate transmit power P PUSCH, b, f, c, 1 for the second PUSCH transmission is determined according to the one maximum output power value P CMAX, f, c and power control parameters associated with a second indicated TCI state applied for the second PUSCH transmission
- the method may further comprise transmitting the first PUSCH transmission with the transmit power for the first PUSCH transmission if the transmit power for the first PUSCH transmission is higher than a dropping threshold; and transmitting the second PUSCH transmission with the transmit power for the second PUSCH transmission if the transmit power for the second PUSCH transmission is higher than the dropping threshold.
- the priority of the first PUSCH transmission and the second PUSCH transmission is determined according to at least one of coresetPoolIndex value associated with each of the first PUSCH transmission and the second PUSCH transmission, a TB size of each of the first PUSCH transmission and the second PUSCH transmission, a start symbol index of each of the first PUSCH transmission and the second PUSCH transmission, an end symbol index of each of the first PUSCH transmission and the second PUSCH transmission, and a duration of each of the first PUSCH transmission and the second PUSCH transmission.
- the transmit power for the first PUSCH transmission is determined according to the first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI
- the transmit power for the second PUSCH transmission is determined according to the second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and
- the transmit power for the first PUSCH transmission is determined according to the first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH
- a first candidate transmit power P PUSCH, b, f, c, 0 for the first PUSCH transmission is determined according to the first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, power control parameters associated with a first indicated TCI state associated with the first
- the method may further comprise transmitting the first PUSCH transmission with the transmit power for the first PUSCH transmission if the transmit power for the first PUSCH transmission is higher than a dropping threshold; and transmitting the second PUSCH transmission with the transmit power for the second PUSCH transmission if the transmit power for the second PUSCH transmission is higher than the dropping threshold.
- the priority of the first PUSCH transmission and the second PUSCH transmission is determined according to at least one of coresetPoolIndex value associated with each of the first PUSCH transmission and the second PUSCH transmission, a TB size of each of the first PUSCH transmission and the second PUSCH transmission, a start symbol index of each of the first PUSCH transmission and the second PUSCH transmission, an end symbol index of each of the first PUSCH transmission and the second PUSCH transmission, and a duration of each of the first PUSCH transmission and the second PUSCH transmission.
- the method 100 may further comprise 106 reporting a power headroom report (PHR) including two or three power headrooms (PHs) according to the configured one or multiple maximum output power values.
- PHR power headroom report
- the step 106 can be performed with or without the step 104.
- a method 100’ comprises step 102 and 106.
- the calculation of PHs can be implemented in the following sixth to the tenth implementations, no matter whether the step 104 is included in the method 100 or the step 104 is not included in the method 100’.
- the configuration configures one maximum output power value P CMAX, f, c , and a first PH and a second PH are included in the PHR
- the first PH is calculated based on the scheduled PUSCH transmission
- the second PH is calculated based on a reference PUSCH transmission with the power control parameters associated with a coresetPoolIndex value different from the coresetPoolIndex value associated with the scheduled PUSCH transmission
- the first PH is calculated based on the one maximum output power value P CMAX, f, c , power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI
- the second PH is calculated based on the one maximum output power value
- the first PH is calculated based on the one maximum output power value P CMAX, f, c , power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI
- the second PH is calculated based on the one maximum output power value P CMAX, f, c , power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission
- the third PH is calculated based on the one maximum output power value P CMAX, f, c , power control parameters associated with a first indicated TCI state associated with the
- the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission and a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and a first PH and a second PH are included in the PHR
- the first PH is calculated based on one of the first and the second maximum output power values associated with the scheduled PUSCH transmission, power control parameters associated with an indicated TCI state associated with the coresetPoolIndex value associated with the scheduled PUSCH transmission, and the DCI scheduling the PUSCH transmission
- a ninth implementation if the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and an additional maximum output power value P CMAX, f, c , which is smaller than P CMAX, f, c, 0 + P CMAX, f, c, 1 and larger than each of P CMAX, f, c, 0 and P CMAX, f, c, 1 , and a first PH and a second PH are included in the PHR, when one of the first PUSCH transmission and the second PUSCH transmission is scheduled in the one slot, the first PH is calculated based on one of the first and the second maximum output power values associated with the scheduled PUSCH transmission, power control parameters associated with an indicated TCI state associated with the coresetPoolIndex value associated with the scheduled PUSCH transmission, and the
- the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and an additional maximum output power value P CMAX, f, c , which is smaller than P CMAX, f, c, 0 + P CMAX, f, c, 1 and larger than each of P CMAX, f, c, 0 and P CMAX, f, c, 1 , and a first PH, a second PH and a third PH are included in the PHR, when the first PUSCH transmission and the second PUSCH transmission are scheduled to be overlapped in the one slot, the first PH is calculated based on the first maximum output power value P CMAX, f, c, 0 associated with the first coresetPoolIndex value, power control parameters associated with a first indicated T
- Figure 2 is a schematic flow chart diagram illustrating an embodiment of a method 200 according to the present application.
- the method 200 is performed by an apparatus, such as a base unit.
- the method 200 may be performed by a processor executing program code, for example, a microcontroller, a microprocessor, a CPU, a GPU, an auxiliary processing unit, a FPGA, or the like.
- the method 200 may comprise 202 transmitting a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; and 204 receiving at least one of the first PUSCH transmission and the second PUSCH transmission.
- the method may further comprise 206 receiving a power headroom report (PHR) including two or three power headrooms (PHs) determined according to the configured one or multiple maximum output power values.
- PHR power headroom report
- the step 206 can be performed with or without the step 204.
- a method 200’ comprises step 202 and 206.
- Figure 3 is a schematic block diagram illustrating apparatuses according to one embodiment.
- the UE i.e. the remote unit
- the UE includes a processor, a memory, and a transceiver.
- the processor implements a function, a process, and/or a method which are proposed in Figure 1.
- the UE comprises a transceiver; and a processor coupled to the transceiver, wherein the processor is configured to receive, via the transceiver, a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; and determine transmit power for each of the scheduled PUSCH transmission (s) according to the configured one or multiple maximum output power values.
- the first to the fifth implementations described with reference to method 100 also apply to the UE.
- the processor is further configured to report, via the transceiver, a power headroom report (PHR) including two or three power headrooms (PHs) according to the configured one or multiple maximum output power values. Similar to the description to step 106 of method 100, the processor may be configured to report the PHR without determining transmit power for each of the scheduled PUSCH transmission (s) .
- PHR power headroom report
- the calculation of PHs can be implemented in the above described sixth to tenth implementations, no matter whether the processor is configured to determine the transmit power for each of the scheduled PUSCH transmission (s) .
- the gNB (i.e. the base unit) includes a processor, a memory, and a transceiver.
- the processor implements a function, a process, and/or a method which are proposed in Figure 2.
- the base unit comprises a transceiver; and a processor coupled to the transceiver, wherein the processor is configured to transmit, via the transceiver, a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; and receive, via the transceiver, at least one of the first PUSCH transmission and the second PUSCH transmission.
- the processor may be further configured to receive a power headroom report (PHR) including two or three power headrooms (PHs) determined according to the configured one or multiple maximum output power values. Similar to the description to step 206, the processor may be configured to receive the PHR without receiving at least one of the first PUSCH transmission and the second PUSCH transmission.
- PHR power headroom report
- PHs power headrooms
- Layers of a radio interface protocol may be implemented by the processors.
- the memories are connected with the processors to store various pieces of information for driving the processors.
- the transceivers are connected with the processors to transmit and/or receive a radio signal. Needless to say, the transceiver may be implemented as a transmitter to transmit the radio signal and a receiver to receive the radio signal.
- the memories may be positioned inside or outside the processors and connected with the processors by various well-known means.
- each component or feature should be considered as an option unless otherwise expressly stated.
- Each component or feature may be implemented not to be associated with other components or features.
- the embodiment may be configured by associating some components and/or features. The order of the operations described in the embodiments may be changed. Some components or features of any embodiment may be included in another embodiment or replaced with the component and the feature corresponding to another embodiment. It is apparent that the claims that are not expressly cited in the claims are combined to form an embodiment or be included in a new claim.
- the embodiments may be implemented by hardware, firmware, software, or combinations thereof.
- the exemplary embodiment described herein may be implemented by using one or more application-specific integrated circuits (ASICs) , digital signal processors (DSPs) , digital signal processing devices (DSPDs) , programmable logic devices (PLDs) , field programmable gate arrays (FPGAs) , processors, controllers, micro-controllers, microprocessors, and the like.
- ASICs application-specific integrated circuits
- DSPs digital signal processors
- DSPDs digital signal processing devices
- PLDs programmable logic devices
- FPGAs field programmable gate arrays
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Description
Claims (15)
- A user equipment (UE) , comprising:a transceiver; anda processor coupled to the transceiver, wherein the processor is configured toreceive, via the transceiver, a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; anddetermine transmit power for each of the scheduled PUSCH transmission (s) according to the configured one or multiple maximum output power values.
- The UE of claim 1, wherein, if the configuration configures one maximum output power value P CMAX, f, c, and the first PUSCH transmission and the second PUSCH transmission are scheduled to be overlapped in the one slot, then, a first candidate transmit power P PUSCH, b, f, c, 0 for the first PUSCH transmission is determined according to the one maximum output power value P CMAX, f, c and power control parameters associated with a first indicated TCI state applied for the first PUSCH transmission, and a second candidate transmit power P PUSCH, b, f, c, 1 for the second PUSCH transmission is determined according to the one maximum output power value P CMAX, f, c and power control parameters associated with a second indicated TCI state applied for the second PUSCH transmission, andif P PUSCH, b, f, c, 0+P PUSCH, b, f, c, 1≤P CMAX, f, c, the transmit power for the first PUSCH transmission is the first candidate transmit power P PUSCH, v, f, c, 0, and the transmit power for the second PUSCH transmission is the second candidate transmit power P PUSCH, b, f, c, 1, andif P PUSCH, b, f, c, 0+P PUSCH, b, f, c, 1>P CMAX, f, c, the transmit power for the first PUSCH transmission and the transmit power for the second PUSCH transmission are determined according to one of the following manners 1 to 3:manner 1: the transmit power for the first PUSCH transmission is and the transmit power for the second PUSCH transmission ismanner 2: if the first PUSCH transmission has a higher priority than the second PUSCH transmission, the transmit power for the first PUSCH transmission is P PUSCH, b, f, c, 0 and the transmit power for the second PUSCH transmission is P CMAX, f, c-P PUSCH, b, f, c, 0; and if the second PUSCH transmission has a higher priority than the first PUSCH transmission, the transmit power for the second PUSCH transmission is P PUSCH, b, f, c, 1 and the transmit power for the first PUSCH transmission is P CMAX, f, c-P PUSCH, b, f, c, 1, andmanner 3: the transmit power for the first PUSCH transmission is bate*P CMAX, f, c and the transmit power for the second PUSCH transmission is (1-bate)*P CMAX, f, c, where, bate is a configured power allocation factor with the range of 0≤bate≤1.
- The UE of claim 2, wherein, the processor is further configured totransmit, via the transceiver, the first PUSCH transmission with the transmit power for the first PUSCH transmission if the transmit power for the first PUSCH transmission is higher than a dropping threshold; andtransmit, via the transceiver, the second PUSCH transmission with the transmit power for the second PUSCH transmission if the transmit power for the second PUSCH transmission is higher than the dropping threshold.
- The UE of claim 2, wherein, the priority of the first PUSCH transmission and the second PUSCH transmission is determined according to at least one ofcoresetPoolIndex value associated with each of the first PUSCH transmission and the second PUSCH transmission,a TB size of each of the first PUSCH transmission and the second PUSCH transmission,a start symbol index of each of the first PUSCH transmission and the second PUSCH transmission,an end symbol index of each of the first PUSCH transmission and the second PUSCH transmission, anda duration of each of the first PUSCH transmission and the second PUSCH transmission.
- The UE of claim 1, wherein, if the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission and a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and the first PUSCH transmission and the second PUSCH transmission are scheduled to be overlapped in the one slot, then,the transmit power for the first PUSCH transmission is determined according to the first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI, andthe transmit power for the second PUSCH transmission is determined according to the second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and the second DCI.
- The UE of claim 1, wherein, if the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and an additional maximum output power value P CMAX, f, c, which is smaller than P CMAX, f, c, 0+P CMAX, f, c, 1 and larger than each of P CMAX, f, c, 0 and P CMAX, f, c, 1, and the first PUSCH transmission and the second PUSCH transmission are scheduled to be non-overlapped in the one slot, then,the transmit power for the first PUSCH transmission is determined according to the first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI, andthe transmit power for the second PUSCH transmission is determined according to the second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and the second DCI.
- The UE of claim 1, wherein, if the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and an additional maximum output power value P CMAX, f, c, which is smaller than P CMAX, f, c, 0+P CMAX, f, c, 1 and larger than each of P CMAX, f, c, 0 and P CMAX, f, c, 1, and the first PUSCH transmission and the second PUSCH transmission are scheduled to be overlapped in the one slot, then, a first candidate transmit power P PUSCH, b, f, c, 0 for the first PUSCH transmission is determined according to the first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI, and a second candidate transmit power P PUSCH, b, f, c, 1 for the second PUSCH transmission is determined according to the second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and the second DCI,if P PUSCH, b, f, c, 0+P PUSCH, b, f, c, 1≤P CMAX, f, c, the transmit power for the first PUSCH transmission is the first candidate transmit power P PUSCH, b, f, c, 0, and the transmit power for the second PUSCH transmission is the second candidate transmit power P PUSCH, b, f, c, 1, andif P PUSCH, b, f, c, 0+P PUSCH, b, f, c, 1>P CMAX, f, c, the transmit power for the first PUSCH transmission and the transmit power for the second PUSCH transmission are determined according to one of the following manners 1 to 4,manner 1: the transmit power for the first PUSCH transmission is and the transmit power for the second PUSCH transmission ismanner 2: the transmit power for the first PUSCH transmission is and the transmit power for the second PUSCH transmission ismanner 3: if the first PUSCH transmission has a higher priority than the second PUSCH transmission, the transmit power for the first PUSCH transmission is P PUSCH, b, f, c, 0 and the transmit power for the second PUSCH transmission is P CMAX, f, c-P PUSCH, b, f, c, 0; and if the second PUSCH transmission has a higher priority than the first PUSCH transmission, the transmit power for the second PUSCH transmission is P PUSCH, b, f, c, 1 and the transmit power for the first PUSCH transmission is P CMAX, f, c-P PUSCH, b, f, c, 1, andmanner 4: the transmit power for the first PUSCH transmission is bate*P CMAX, f, c and the transmit power for the second PUSCH transmission is (1-bate) *P CMAX, f, c, where, bate is a configured power allocation factor with the range of 0≤bate≤1.
- The UE of claim 1, wherein, the processor is further configured toreport, via the transceiver, a power headroom report (PHR) including two or three power headrooms (PHs) according to the configured one or multiple maximum output power values.
- The UE of claim 8, if the configuration configures one maximum output power value P CMAX, f, c, and a first PH and a second PH are included in the PHR,when one of the first PUSCH transmission and the second PUSCH transmission is scheduled in the one slot, the first PH is calculated based on the scheduled PUSCH transmission, and the second PH is calculated based on a reference PUSCH transmission with the power control parameters associated with a coresetPoolIndex value different from the coresetPoolIndex value associated with the scheduled PUSCH transmission, andwhen the first PUSCH transmission and the second PUSCH transmission are scheduled to be non-overlapped in the one slot, the first PH is calculated based on the one maximum output power value P CMAX, f, c, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI, and the second PH is calculated based on the one maximum output power value P CMAX, f, c, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and the second DCI.
- The UE of claim 8, if the configuration configures one maximum output power value P CMAX, f, c, and a first PH, a second PH and a third PH are included in the PHR,when the first PUSCH transmission and the second PUSCH transmission are scheduled to be overlapped in the one slot, the first PH is calculated based on the one maximum output power value P CMAX, f, c, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI, the second PH is calculated based on the one maximum output power value P CMAX, f, c, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and the second DCI, the third PH is calculated based on the one maximum output power value P CMAX, f, c, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, the first DCI, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and the second DCI.
- The UE of claim 8, wherein, if the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission and a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and a first PH and a second PH are included in the PHR,when one of the first PUSCH transmission and the second PUSCH transmission is scheduled in the one slot, the first PH is calculated based on one of the first and the second maximum output power values associated with the scheduled PUSCH transmission, power control parameters associated with an indicated TCI state associated with the coresetPoolIndex value associated with the scheduled PUSCH transmission, and the DCI scheduling the PUSCH transmission, and the second PH is calculated based on the other of the first and the second maximum output power values assuming an allowed maximum power reduction MPR=0dB, an additional maximum power reduction A-MPR=0, P-MPR=0dB, an allowed operating band edge transmission power relaxation ΔTc=0dB, and default power control parameters associated with a coresetPoolIndex value different from the coresetPoolIndex value associated with the scheduled PUSCH transmission, andwhen the first PUSCH transmission and the second PUSCH transmission are scheduled to be non-overlapped in the one slot, the first PH is calculated based on the first maximum output power value P CMAX, f, c, 0 associated with the first coresetPoolIndex value, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI, and the second PH is calculated based on the second maximum output power value P CMAX, f, c, 1 associated with the second coresetPoolIndex value, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and the second DCI.
- The UE of claim 8, wherein, if the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and an additional maximum output power value P CMAX, f, c, which is smaller than P CMAX, f, c, 0+P CMAX, f, c, 1 and larger than each of P CMAX, f, c, 0 and P CMAX, f, c, 1, and a first PH and a second PH are included in the PHR,when one of the first PUSCH transmission and the second PUSCH transmission is scheduled in the one slot, the first PH is calculated based on one of the first and the second maximum output power values associated with the scheduled PUSCH transmission, power control parameters associated with an indicated TCI state associated with the coresetPoolIndex value associated with the scheduled PUSCH transmission, and the DCI scheduling the PUSCH transmission, and the second PH is calculated based on the other of the first and the second maximum output power values assuming an allowed maximum power reduction MPR=0dB, an additional maximum power reduction A-MPR=0, P-MPR=0dB, an allowed operating band edge transmission power relaxation ΔTc=0dB, and default power control parameters associated with a coresetPoolIndex value different from the coresetPoolIndex value associated with the scheduled PUSCH transmission, andwhen the first PUSCH transmission and the second PUSCH transmission are scheduled to be non-overlapped in the one slot, the first PH is calculated based on the first maximum output power value P CMAX, f, c, 0 associated with the first coresetPoolIndex value, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI, and the second PH is calculated based on the second maximum output power value P CMAX, f, c, 1 associated with the second coresetPoolIndex value, default power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and the second DCI.
- The UE of claim 8, wherein, if the configuration configures a first maximum output power value P CMAX, f, c, 0 associated with the first PUSCH transmission, a second maximum output power value P CMAX, f, c, 1 associated with the second PUSCH transmission, and an additional maximum output power value P CMAX, f, c, which is smaller than P CMAX, f, c, 0+P CMAX, f, c, 1 and larger than each of P CMAX, f, c, 0 and P CMAX, f, c, 1, and a first PH, a second PH and a third PH are included in the PHR,when the first PUSCH transmission and the second PUSCH transmission are scheduled to be overlapped in the one slot, the first PH is calculated based on the first maximum output power value P CMAX, f, c, 0 associated with the first coresetPoolIndex value, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, and the first DCI, the second PH is calculated based on the second maximum output power value P CMAX, f, c, 1 associated with the second coresetPoolIndex value, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and the second DCI, and the third PH is calculated based on the additional maximum output power value P CMAX, f, c, power control parameters associated with a first indicated TCI state associated with the first coresetPoolIndex value used for the first PUSCH transmission, the first DCI, power control parameters associated with a second indicated TCI state associated with the second coresetPoolIndex value used for the second PUSCH transmission, and the second DCI.
- A method performed at a user equipment (UE) , comprising:receiving a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; anddetermining transmit power for each of the scheduled PUSCH transmission (s) according to the configured one or multiple maximum output power values.
- A base unit, comprising:a transceiver; anda processor coupled to the transceiver, wherein the processor is configured totransmit, via the transceiver, a configuration to configure one or multiple maximum output power values for a serving cell (c) and at least one of a first DCI associated with a first coresetPoolIndex value and a second DCI associated with a second coresetPoolIndex value different from the first coresetPoolIndex value, in a BWP (b) of a carrier (f) of the serving cell (c) , the first DCI schedules a first PUSCH transmission associated with the first coresetPoolIndex value and the second DCI schedules a second PUSCH transmission associated with the second coresetPoolIndex value, the first PUSCH transmission and the second PUSCH transmission are in one slot; andreceive, via the transceiver, at least one of the first PUSCH transmission and the second PUSCH transmission.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/CN2022/088452 WO2023201700A1 (en) | 2022-04-22 | 2022-04-22 | Power control for simultaneous pusch transmission in cell |
| US18/841,136 US20250168783A1 (en) | 2022-04-22 | 2022-04-22 | Power control for simultaneous physical uplink shared channel (pusch) transmission in a cell |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/CN2022/088452 WO2023201700A1 (en) | 2022-04-22 | 2022-04-22 | Power control for simultaneous pusch transmission in cell |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2023201700A1 true WO2023201700A1 (en) | 2023-10-26 |
Family
ID=88418872
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2022/088452 Ceased WO2023201700A1 (en) | 2022-04-22 | 2022-04-22 | Power control for simultaneous pusch transmission in cell |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US20250168783A1 (en) |
| WO (1) | WO2023201700A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20240196343A1 (en) * | 2022-12-08 | 2024-06-13 | Intel Corporation | Mobile radio terminal device, communication device for configuring a mobile radio terminal device, and methods for configuring a mobile radio terminal device |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2021133121A1 (en) * | 2019-12-27 | 2021-07-01 | 삼성전자 주식회사 | Method and apparatus for repeatedly transmitting uplink data for network cooperative communication |
| WO2022000262A1 (en) * | 2020-06-30 | 2022-01-06 | Zte Corporation | Systems and methods for determining transmission information |
| CN114258131A (en) * | 2020-09-22 | 2022-03-29 | 中国移动通信有限公司研究院 | Transmission method, receiving method, terminal and base station of physical uplink shared channel |
-
2022
- 2022-04-22 WO PCT/CN2022/088452 patent/WO2023201700A1/en not_active Ceased
- 2022-04-22 US US18/841,136 patent/US20250168783A1/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2021133121A1 (en) * | 2019-12-27 | 2021-07-01 | 삼성전자 주식회사 | Method and apparatus for repeatedly transmitting uplink data for network cooperative communication |
| WO2022000262A1 (en) * | 2020-06-30 | 2022-01-06 | Zte Corporation | Systems and methods for determining transmission information |
| CN114258131A (en) * | 2020-09-22 | 2022-03-29 | 中国移动通信有限公司研究院 | Transmission method, receiving method, terminal and base station of physical uplink shared channel |
Non-Patent Citations (1)
| Title |
|---|
| ZTE: "Maintenance of multi-TRP enhancements", 3GPP DRAFT; R1-2100281, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. e-Meeting; 20210125 - 20210205, 19 January 2021 (2021-01-19), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , XP051970896 * |
Also Published As
| Publication number | Publication date |
|---|---|
| US20250168783A1 (en) | 2025-05-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2022067521A1 (en) | Joint tci states for dl and ul beam indication | |
| WO2020143018A1 (en) | Methods and apparatuses that enable panel-specific configuration and transmission | |
| US9723576B2 (en) | Method and device for reporting power headroom under carrier aggregation | |
| WO2023000300A1 (en) | Simultaneous unified tci state update for a group of cells | |
| WO2021258279A1 (en) | Default beam determination for ul signal transmission | |
| US20240179640A1 (en) | Enhanced power headroom report for multi-panel ue | |
| WO2023000302A1 (en) | Closed loop power control for pusch and pucch transmission in multi-trp | |
| US20240195479A1 (en) | Maximum permissible exposure (mpe) mitigation for multi-panel user equipment (ue) | |
| WO2023201700A1 (en) | Power control for simultaneous pusch transmission in cell | |
| US20240381266A1 (en) | Power control enhancement of pusch transmission with repetition | |
| WO2023108593A1 (en) | Power headroom report in unified tci framework | |
| WO2023004740A1 (en) | Group common tpc command for ul transmission in multi-trp | |
| US20250016693A1 (en) | Multiple p-mpr reporting for maximum permissible exposure | |
| US12289691B2 (en) | Power headroom report for additional SRS | |
| US12101724B2 (en) | Methods and apparatuses of power control for additional SRS | |
| WO2023130247A1 (en) | Multi-dci multi-trp based ul transmission in unified tci framework | |
| WO2023137648A1 (en) | Dynamic open loop power control parameter switching between embb and urllc in unified tci framework | |
| WO2023197295A1 (en) | Resource multiplexing for multi-dci based multi-panel simultaneous ul transmission | |
| US20260031860A1 (en) | Power control scheme for active ris based on network requirements and rrc connection states | |
| WO2023015463A1 (en) | Configuration and determination of power control parameters for ul transmission with unified tci framework | |
| WO2024060011A1 (en) | Power control for sdm based simultaneous multi-panel pusch transmission | |
| WO2021155572A1 (en) | Default spatial relation for srs resource transmission | |
| EP4278770A1 (en) | Inter-cell multi-trp operation | |
| WO2024073957A1 (en) | Power control for srs transmission used for non-codebook based ul transmission |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 22937936 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 18841136 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 29/01/2025) |
|
| WWP | Wipo information: published in national office |
Ref document number: 18841136 Country of ref document: US |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 22937936 Country of ref document: EP Kind code of ref document: A1 |









