WO2023200701A1 - Avoiding prohibited sequences of materials processing at a crusher using predictive analytics - Google Patents
Avoiding prohibited sequences of materials processing at a crusher using predictive analytics Download PDFInfo
- Publication number
- WO2023200701A1 WO2023200701A1 PCT/US2023/018012 US2023018012W WO2023200701A1 WO 2023200701 A1 WO2023200701 A1 WO 2023200701A1 US 2023018012 W US2023018012 W US 2023018012W WO 2023200701 A1 WO2023200701 A1 WO 2023200701A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- machine
- processing
- machines
- predicted sequence
- sequence
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
Definitions
- the present disclosure relates generally to avoiding prohibited sequences of materials processing at a crusher, and more particularly, to avoiding prohibited sequences of materials processing at a crusher using predictive analytics.
- crushers may break large material (e.g., ore) particles into smaller ore particles using mechanical force for subsequent processing. Since the size reduction associated with any individual crusher may be limited, blasts may be designed to produce particle sizes that are as close as possible to the size required for processing. In some scenarios, mine sites may use more than one crusher in sequence (e.g., primary, secondary, tertiary, quaternary, etc. crushers) to break ore particles down to the required size.
- Crushers may have some limitations with respect to the material qualities they can handle. For example, a moisture level of the material, size of the material particles (e.g., fine versus coarse), pH of the material, etc. may negatively affect the processing performance of a crusher. In some cases, it may take several hours or even days to restore normal operations where a crusher breaks down after being fed a high concentration of material with certain material qualities (e.g., material that is too wet, sticky, hard, abrasive, large, or small).
- Monitoring the material that is input to a crusher is an important aspect of material processing as a number of the factors that affect the crusher’s ability to process the material cannot be adequately controlled through blast design. For example, blasting may be ineffective at removing moisture from ore located below a water table.
- Primary crushers may often be fed using mining haul trucks, which may tip their loads into the crusher using one or more dump pockets associated with the crushers.
- the sequence in which mining haul trucks tip different materials into the crusher may determine the overall material qualities of the material in the crusher. Where mining haul trucks can tip material in random sequences, the qualities of the material in the crusher may exceed the capabilities of the crusher from time-to-time causing it to break down. A sequence that is likely to cause a crusher to break down is called a “prohibited sequence.”
- these techniques may include sending trucks to a park-up location, diverting trucks to a stockpile, or holding trucks at an intersection to delay their arrival at the crusher.
- these techniques waste productive capacity as they may be limited with respect to scalability due to space limitations. For example, a park-up location cannot be used for sequencing once all of the parking spaces are occupied and diverting trucks to stockpiles may increase fuel consumption or increase material re-handling costs.
- U.S. Patent Application Publication No. 20210118066A1 published on April 22, 2021 (“the ’066 publication”), describes methods and systems for the batch delivery of material to a continuous material processor.
- the ’066 publication describes a method to direct the movement of haul trucks between a loading area and an ore crusher. The method predicts the state of the crusher at one or more future times based on the predicted number of haul trucks at the crusher as well as the level of the crushed material predicted to be in the surge bin at the future times. These predictions, in conjunction with the estimated idle times, may be used to direct the movement of the haul trucks to minimize the idle time and/or the time when the crusher will be in a no-material state.
- the ’066 publication does not disclose, for example, among other things, avoiding prohibited sequences of materials processing at a crusher using predictive analytics.
- a system may comprise at least one first machine operable to transport materials from at least one material source location to at least one material destination location, at least one second machine operable to process the materials at the at least one material destination location, and a control system.
- the control system may be configured to receive, from the at least one first machine, telemetry data indicative of operations of the at least one first machine and determine a predicted sequence of arrival of the at least one first machine at the at least one material destination location based on the telemetry data and determine a score for the predicted sequence of arrival.
- the control system may be further configured to determine a predicted sequence of processing of the materials at the at least one material destination location based on: material attribute data indicative of the materials transported by the at least one first machine, the predicted sequence of arrival, destination queue data indicative of a queue of first machines at the at least one material destination location, or the score for the predicted sequence of arrival.
- the control system may be configured to monitor whether the predicted sequence of processing violates at least one prohibited sequence of processing for the at least one second machine and send at least one command to at least one machine based on whether the predicted sequence of processing violates the at least one prohibited sequence of processing.
- a method may include receiving, from at least one first machine, telemetry data indicative of operations of the at least one first machine.
- the at least one first machine may be operable to transport materials from at least one material source location to at least one material destination location.
- the method may further include sending at least one command to at least one machine based on whether a predicted sequence of processing of materials by at least one second machine at the at least one material destination location violates at least one prohibited sequence of processing.
- the predicted sequence of processing may be based on at least one of: a predicted sequence of arrival of the at least one first machine at the at least one material destination location, material attribute data indicative of the materials transported by the at least one first machine, destination queue data indicative of a queue of first machines at the at least one material destination location, or a score for the predicted sequence of arrival.
- a control system for materials dumping during mining operations may be configured to receive, from at least one first machine, telemetry data indicative of operations of the at least one first machine.
- the at least one first machine may be operable to transport materials from at least one material source location to at least one material destination location.
- the control system may be further configured to determine a predicted sequence of arrival of the at least one first machine at the at least one material destination location based on the telemetry data and determine a score for the predicted sequence of arrival.
- the control system may be further configured to determine a predicted sequence of processing of the materials by at least one second machine at the at least one material destination location based on: material attribute data indicative of the materials transported by the at least one first machine, the predicted sequence of arrival, destination queue data indicative of a queue of first machines at the at least one material destination location, or the score for the predicted sequence of arrival.
- the control system may be further configured to monitor whether the predicted sequence of processing violates at least one prohibited sequence of processing for the at least one second machine and send at least one command to at least one machine based on whether the predicted sequence of processing violates the at least one prohibited sequence of processing.
- FIG. 1 is a schematic diagram of an exemplary environment including a physical environment with materials and machines and a related computing system for monitoring and/or controlling the machines, according to aspects of the disclosure.
- FIG. 2 is a schematic diagram of an example where the machinelearning engine of FIG. 1 receives data from machines and/or external data sources of FIG 1, according to aspects of the disclosure.
- FIG. 3 illustrates a flowchart depicting an exemplary method for avoiding prohibited sequences of materials processing at a crusher using predictive analytics, according to aspects of the disclosure.
- FIG. 1 is a schematic diagram of an exemplary environment including a physical environment 10 with materials and machines and a related computing system 11 for monitoring and/or controlling the machines, according to aspects of the disclosure.
- the physical environment 10 is shown as a mining location at which a number of machines 12-18 are used to dig, transport, and process source materials (e.g., ore).
- the computing system 20 is shown as including the machines 12-18, a control system 20 that monitors and controls the operations of the machines 12-18 to manage the characteristics of a material blend, and external data sources 28.
- the control system 20 receives and analyzes data from the machines 12-18, such as telemetry data and other sensor data, as well as data from the external data sources 28. For instance, in addition to sensor data from a particular machine 12-18, the control system 20 may receive detailed material attribute data from the external data sources 28.
- the physical environment 10 depicted in FIG. 1 schematically illustrates various operational mining scenarios for extracting materials from material source locations (e.g., mining blocks, stockpiles, or intermediate stockpiles) using excavators 12, and transporting the materials using mining haul trucks 14 to material destination locations, such as crushers 16, dump sites, and/or the like.
- FIG. 1 illustrates additional mining scenarios in which wheel loaders 18 may load material from a stockpile and dump the material directly into a crusher 16.
- a material destination location e.g., a stockpile
- a material destination location can act as an intermediate material source before the material is transported to a final material destination location (e.g., a crusher 16) at the mine site.
- Various operational scenarios may be implemented within the physical environment 10, including different material source or destination cardinalities, source material types, machine types, different blends at different crushers 16, etc.
- Additional or alternative operations performed at the site may include tunnel mining, blasting, and/or other mining or landscaping operations.
- the physical environment 10 is illustrated as a mining location in this example, the techniques described herein apply to other physical environments and geographic areas, such as paving sites, industrial sites, factory floors, building construction sites, road construction sites, quarries, and/or the like.
- features of the physical environment 10 may change over time, e.g., as the physical environment 10 changes from mining, digging, grading, and/or other machine-based actions and/or because of erosion or other natural changes. As noted above, FIG.
- FIG. 1 illustrates a variety of machines performing mining tasks, including excavators 12 digging materials at material source locations, trucks 14 and wheel loaders 18 performing hauling and dumping operations throughout the physical environment 10, and crushers 16 receiving and processing various blends of materials.
- the machines shown in FIG. 1 are illustrative, and various types of machines such as earth-moving machines (e.g., wheel loaders, dump trucks, backhoes, bulldozers, or material handlers), tankers for carrying water or fuel, over-the-road vehicles, work machines (e.g., pavers or compactors), and/or the like may be present in the physical environment 10.
- earth-moving machines e.g., wheel loaders, dump trucks, backhoes, bulldozers, or material handlers
- tankers for carrying water or fuel e.g., over-the-road vehicles
- work machines e.g., pavers or compactors
- different locations or types of physical environments may include different combinations of machines, and the techniques described
- machine refers to any type of mechanical apparatus that performs operations associated with a given industry, such as mining, construction, farming, transportation, oil and gas, manufacturing, or any other industry.
- machines including the excavators 12, trucks 14, crushers 16, and wheel loaders 18, and other machines may be referred to collectively as “machines 12-18.”
- the tasks, jobs, or operations performed in the physical environment 10 may be partially or completely autonomous.
- certain machines 12-18 may include automated components, internal rules engines 24 and/or machine-learning engines 22 to autonomously perform operations in response to conditions detected by the machines 12-18.
- machine operators or other personnel may also be present to control the machine operations in some examples.
- operators within the machines 12-18 may directly control the machines using on-board controls and/or remote operators at separate locations (e.g., workstations) may remotely control the machines 12-18 via wired and/or wireless communications systems.
- machines 12-18 may be controlled based on data from various data sources to perform operations activating any of the controls of the machines 12-18, and/or operations monitoring or overseeing the machines 12-18 or the physical environment 10 (e.g., to identify obstacles or machine malfunctions).
- the machines 12-18 may receive operating instructions from the control system 20 to extract, haul, and/or process materials, in order to manage the characteristics of a material blend.
- Certain machines 12-18 may be configured with or otherwise have access to sensing components and wired and/or wireless communications systems.
- accompanying sensing components and communications systems may be used by in-person and/or remote operators to control the machines 12-18.
- the machines 12-18 may include transceiver systems including antennas or other network components to facilitate wireless communication (e.g., via radio frequency (RF) signals, via a wireless network, such as a local area network (LAN) or a wide-area network (WAN)), or any other communications protocols.
- the machines 12-18 may be configured to communicate with a central hub, such as the control system 20, where the central hub is configured to receive communications from the machines 12-18 and transmit or re-route communications to other machines 12-18 or other external systems.
- the machines 12-18 may transmit individual communications to the central hub in real-time or near real-time.
- the machines 12-18 may record and store a group of multiple communications, and then transmit the group of communications to the central hub in a batch.
- the batching and periodic transmission of communications from the machines 12-18 may cause the control system 20 to receive data at different times and/or in different phases.
- the machines 12-18 may include communications systems configured to communicate directly with other machines 12-18 (e.g., via a distributed network). Hybrid networks and/or different communications networks and protocols may be alternatively used, and this disclosure is not dependent upon a single arrangement, technology or protocol.
- the machines 12-18 may also include, or be associated with, user devices, such as mobile phones, tablet devices, radios, headsets, and/or other similar electronic devices, configured to enable communication between the machines 12-18 (or an operator of the machines 12- 18) and remote systems or devices, or personnel at a remote location.
- user devices such as mobile phones, tablet devices, radios, headsets, and/or other similar electronic devices, configured to enable communication between the machines 12-18 (or an operator of the machines 12- 18) and remote systems or devices, or personnel at a remote location.
- operators at a mining site may use various user devices to monitor data described herein, to control the machines 12-18, to generate data used by the control system 20, and/or the like.
- the physical environment 10 may be associated with a computing system 11.
- the computing system 11 may include the control system 20 having hardware and/or software-based components for monitoring, controlling, and communicating with the machines 12-18 in the physical environment 10.
- the control system 20 may include one or more server devices (e.g., distributed across one or more data centers), processors, and/or memory.
- the memory of the control system 20 may store software-based components to perform various processes and techniques described herein of the control system 20, including a machine-learning engine 22, a rules engine 24, and a controller 26.
- a processor may include a central processing unit (CPU), a graphics processing unit (GPU), a microprocessor, a digital signal processor and/or other processing units or components. Additionally, or alternatively, the functionality described herein can be performed, at least in part, by one or more hardware logic components.
- illustrative types of hardware logic components include field- programmable gate arrays (FPGAs), application-specific integrated circuits (ASICs), application-specific standard products (ASSPs), system-on-a-chip systems (SOCs), complex programmable logic devices (CPLDs), etc.
- the processor may possess its own local memory, which also may store program modules, program data, and/or one or more operating systems.
- the processor may include one or more cores.
- Memory may be a non-transitory computer-readable medium that may include volatile and/or nonvolatile memory, removable and/or nonremovable media implemented in any method or technology for storage of information, such as computer-readable instructions, data structures, program modules, or other data.
- Such memory includes, but is not limited to, random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disc read-only memory (CD-ROM), digital versatile discs (DVD) or other optical storage, magnetic cassettes, magnetic tape, magnetic disk storage or other magnetic storage devices, redundant array of independent disks (RAID) storage systems, or any other medium which can be used to store the desired information and which can be accessed by a computing device (e.g., a user device, a server device, etc.).
- the memory may be implemented as computer-readable storage media (CRSM), which may be any available physical media accessible by the processor to execute instructions stored on the memory.
- the memory may have an operating system (OS) and/or a variety of suitable applications stored thereon.
- the OS when executed by the processor, may enable management of hardware and/or software resources of the controller 26.
- the controller 26 may control operations of the machine-learning engine 22 and/or the rules engine 24.
- the controller 26 may cause the machine-learning engine 22 to execute one or more trained machine-learned models based on the data received from the machines 12-18 and/or the external data sources 28, and may control the rules engine 115 to determine whether a sequence of materials to be processed is a prohibited sequence of materials (or an allowed or target sequence of materials).
- the control system 20 in the example of FIG. 1 may be implemented within an on-site workstation, such as an office, a building, a vehicle, and/or the like, where one or more remote operators may be situated.
- the workstation may include one or more offices in which a supervisor, a foreman, and/or different personnel are stationed.
- the workstation may act as a hub, for example, including the control system 20 and serving as a location from which the various machines 12-18 are controlled.
- the control system 20 may be configured to implement some or all of the processes and techniques described herein.
- FIG. 1 illustrates the control system 20 as associated with a workstation in the physical environment 10
- the workstation and/or control system 20 may be located off-site or in a different location in various examples.
- the control system 20 may be implemented as a remote computing system, a cloud-based computing system, or another computing system configured to communicate with the machines 12-18 via one or more networks.
- control system 20 may monitor and/or track the extraction, movement, and processing of materials performed by the various machines 12-18 within the physical environment 10. For instance, the control system 20 may track the attributes and/or arrival time of the incoming materials being transported to a crusher 16, where the blend of materials may be an aggregate of incoming material from multiple loads.
- a target material blend or prohibited material blends may be described using a collection of constraints (e.g. minimum and maximum thresholds defining a target range) for various material attributes over time or by mass.
- control system 20 may monitor movement of the machines 12-18 (e.g., based on location sensor data received from the machines 12-18, or other monitoring sensors/cameras in the physical environment 10), may track a material blend at a crusher 16, and may determine (or modify) operating instructions for the machines 12-18 to maintain the material blend within a target blend range.
- FIG. 1 schematically illustrates that the control system 20 receives data from the machines 12-18 within the physical environment 10 and/or the external data source(s) 28.
- the data that the control system 20 may receive and/or process may include telemetry data indicative of operations of the machines 12-18, material attribute data indicative of the materials transported by the machines 12-18, sensor data from sensors on the machines 12-18 and/or located throughout the physical environment 10, and/or the like, as described in more detail herein.
- other types of data may be used in combination with, or in place of, the data described herein.
- FIG. 2 is a schematic diagram of an example 30 where the machine-learning engine 22 of FIG. 1 receives data from the machines 12-18 and/or the external data sources 28 of FIG 1, according to aspects of the disclosure.
- the machine-learning engine 22 may receive telemetry data.
- the control system 20 may receive the telemetry data from the machines 12-18 and/or the external data sources 28 and may provide the telemetry data to the machine-learning engine 22.
- the machine-learning engine 22 may receive the telemetry data directly from the machines 12-18 and/or the external data sources 28.
- the telemetry data for a machine may include data indicative of (or representing) any operations performed by the machines 12-18.
- the telemetry data includes data describing any movements of the excavator 12 (e.g., forward and backward movements, rotational movements, etc.) and the movement and actions of the digging arm (e.g., extending, contracting, scooping, performing “a dipper” action to empty its bucket, etc.), and/or the like.
- the telemetry data may include data describing the locations and/or movements of the truck 14 (e.g., forward and reverse driving, driving speeds and directions, etc.), and the movements and actions of the dump body (e.g., extending pistons to tip the dump body, contracting the pistons to return the dump body to a flat position, opening or closing an automated tailgate, etc.), and/or the like.
- the telemetry data may include data describing the activation and deactivation of the crusher (e.g., time, duration, etc. of the crushing), whether the crusher 16 is performing to expectations (e.g., in terms of processing volume for a time period, output material particle size, etc.), and/or the like.
- the telemetry data may be received from a global positioning system (GPS) of the machines 12-18, from a sensor on the machines 12-18 (e.g., a sensor on an engine of the machines 12-18), a sensor at a mining site or along a path from one part of the mining site to another part of the mining site (e.g., radio frequency identification (RFID) transponders on the machine 12-18 may communicate with RFID receivers at the mining site to track movements of the machines 12-18), and/or the like.
- GPS global positioning system
- RFID radio frequency identification
- cameras, microphones, motion sensing devices, and other types of environmental sensors may be used to gather the telemetry data.
- cameras may be used to gather images of operations at a mining site and the control system 20 may process the images to track movements, locations, and/or operations of the machines 12-18.
- These examples of machines and associated telemetry data are illustrative, and the telemetry data received by the control system 20 may include any operational data, status data, or environmental data from the machines 12-18.
- the machine-learning engine 22 may process inputs using one or more models 36.
- the machine-learning engine 22 may process the telemetry data received at 32 by executing the one or more models 36.
- a model 36 may be trained on training data to process input data to identify certain characteristics in the input data and may output information based on the characteristics.
- the machine-learning engine 22 may execute a model 36 to determine a predicted sequence of arrival of various trucks 14 at a crusher 16 based on the telemetry data for the trucks 14.
- the control system 20 may provide the telemetry data to the machine-learning engine 22 to determine a predicted sequence of arrival of the trucks 14 at the crusher 16 (e.g., the machine-learning engine 22 may determine a first, second, third, etc. truck 14 to arrive at the crusher 16).
- the machinelearning engine 22 may receive the predicted sequence of arrival, material attribute data, and/or destination queue data (e.g., data related to a queue of trucks 14 at a crusher 16) as input data.
- the control system 20 may have stored the predicted sequence of arrival in memory and may access the predicted sequence of arrival in the memory to provide it to the machine-learning engine 22.
- the machine-learning engine 22 may receive the material attribute data and/or the destination queue data from sensors on the trucks 14 or at the mining site and/or from the external data sources 28.
- the material attribute data may be based on data from weight sensors and/or pressure sensors that determine a weight of a current load of material carried by the truck 14, from location sensors indicating a location of loading of the material (e.g., the external data sources 28 may provide data on the moisture, pH, etc. of the material based on the material source location), from a user device of an operator at a material source location (e.g., the operator may inspect the material as it is being loaded onto the truck 14 and may input material attribute data to the user device), and/or the like.
- weight sensors and/or pressure sensors that determine a weight of a current load of material carried by the truck 14, from location sensors indicating a location of loading of the material (e.g., the external data sources 28 may provide data on the moisture, pH, etc. of the material based on the material source location), from a user device of an operator at a material source location (e.g., the operator may inspect the material as it is being loaded onto the truck 14 and may input material attribute data to the user device), and/or
- the destination queue data may be based on GPS data from the trucks 14 in a queue at a crusher 16, sensors that count the number and/or positions of trucks 14 in the queue, input to a user device from an operator at the location of the queue (e.g., an operator may inspect the queue and may input data related to the number, identity, and/or order of trucks 14 in the queue), and/or the like.
- the machine-learning engine 22 may, at 34, process the inputs received at 40 in a manner similar to that described above.
- the machine-learning engine 22 may process the predicted sequence of arrival, the material attribute data, and/or the destination queue data by executing one or more models 36.
- the one or more models 36 may be trained to determine a predicted sequence of processing of materials at a crusher 16.
- the machine-learning engine 22 may use the predicted sequence of arrival and the destination queue data to determine an order in which the trucks 14 will likely dump their material into a crusher 16 and may then use the material attribute data to determine the predicted sequence of processing for the materials (e.g., to determine that materials with a certain moisture level from one truck 14 will likely be preceded or followed by materials with the same or a different moisture level). These and other operations are described in more detail with respect to FIG. 3.
- the model(s) executed by the machine-learning engine 22 may be generated and/or trained based on training data.
- the training data may be based on, e.g., historical data gathered from monitoring the physical environment 10 and/or similar environments (e.g., other mining sites). In some cases, training data is generated in environments via a variety of data acquisition means (e.g., video monitoring, machine sensors, separate site monitoring sensors, and/or manual monitoring by operators).
- Various machine learning techniques may be employed to train machine-learning models based on the training data.
- machine learning techniques may be employed to perform predictions of characteristics of material loads and/or machine activities, in physical environments 10 where less telemetry data is available to the control system 20, such as environments having fewer machine sensors, fewer site monitoring devices, no video monitoring/surveillance, no manual load monitoring/recording by operators, etc.
- the disclosed aspects of the control system 20 of the present disclosure may be used to help avoid prohibited sequences of materials (or facilitate allowed or target sequences of materials) processing at a crusher 16 using predictive analytics.
- certain aspects described herein may provide various advantages to mining operations including, e.g., the operations of a crusher 16. For example, by predicting that the crusher 16 is to process a prohibited sequence based on the predicted sequence of processing and taking actions to prevent the processing, certain aspects may reduce or eliminate breakdowns of the crusher 16, may reduce or eliminate excessive wear on the crusher 16, and/or the like. This reduces or eliminates an amount of downtime for the crusher 16 for maintenance, helps to maximize a useful life of the crusher 16 by preventing premature failure, conserves costs or labor resources related to performing repair more frequently than expected, and/or the like.
- certain aspects may make decisions to re-queue trucks 14 at the time of dumping. This may reduce or eliminate a need to use park-up locations or manual sequencing at a junction point prior to dumping, which may conserve fuel of the trucks 14 by reducing or eliminating a need for the trucks 14 to idle in route to a material destination location or to detour to a junction point for sequencing with other trucks 14. In addition, this may also facilitate continuous processing at the crusher 16 by reducing or eliminating queueing delays at the crusher 16, which may improve an efficiency of mining operations.
- certain aspects may preemptively control material source location assignments for trucks 14 based on the predictions described herein as one way of controlling the blend of materials arriving at the crusher 16.
- the control system 20 may monitor and predict the blend of materials to track variations or shifts in the composition of the blend over time and may assign a truck 14 to be loaded with materials from a certain material source location to re-balance the blend or to avoid having excessive unwanted qualities in the blend. This may reduce downtime of the crusher 16 due to breakdown or maintenance, may reduce an amount of time the truck 14 has to idle while waiting for an appropriate time to queue with other trucks 14 (as may be the case if the truck 14 is arbitrarily loaded with material from any material source location), and/or the like.
- FIG. 3 illustrates a flowchart depicting an exemplary method 100 for avoiding prohibited sequences of materials processing at a crusher 16 using predictive analytics, according to aspects of the disclosure.
- the method 100 illustrated in FIG. 3 may be implemented by the control system 20 (e.g., the controller 26 of the control system 20).
- the machine-learning engine 22 and/or the rules engine 24 may perform the method 100 (or certain steps of the method 100).
- the steps of the method 100 described herein may be embodied as machine readable and executable software instructions, software code, or executable computer programs stored in a memory and executed by a processor of the control system 20 (or the controller 26).
- the software instructions may be further embodied in one or more routines, subroutines, or modules and may utilize various auxiliary libraries and input/output functions to communicate with other equipment.
- the method 100 illustrated in FIG. 3 may also be associated with an operator interface (e.g., a human-machine interface, such as a graphical user interface (GUI)) through which an operator of a mining site may configure operations of the control system 20 (e.g., the manner in which the control system 20 performs various determinations and/or actions), may configure the machine-learning engine 22 (e.g., may tailor the models 36 to specific contexts), may configure the rules engine 24 with prohibited sequences, and/or the like.
- GUI graphical user interface
- the method 100 may be implemented by the control system 20 to provide for avoidance of prohibited sequences in materials processing.
- the control system 20 may predict the occurrence of a prohibited sequence in materials processing for tucks 14 that are in a queue to dump at a crusher 16 (or within a threshold distance of entering the queue) and may take corrective actions to prevent one or more of the trucks 14 from dumping at the crusher 16 and/or to reconfigure the queue so that the sequence of materials processing is not a prohibited sequence. This may prevent damage to the crusher 16 that might otherwise occur as a result of processing a prohibited sequence of materials and/or may conserve fuel or time that might otherwise be wasted through trying to organize trucks 14 to avoid prohibited sequences prior to the trucks 14 joining the queue.
- the method 100 may include receiving, from at least one first machine, telemetry data indicative of operations of the at least one first machine.
- the control system 20 may receive the telemetry data from the trucks 14 and may provide the telemetry data to the machine-learning engine 22, e.g., in a manner similar to that described above at 32 of FIG. 2.
- the control system 20 may receive the telemetry data based on requesting the telemetry data from the trucks 14, in a stream of data, according to a schedule, and/or the like.
- the control system 20 may receive the telemetry data for any trucks 14 within a threshold proximity of a dump site or a crusher 16 (e.g., as determined from a GPS system, a navigation system, a geo-fencing system, etc.). In some embodiments, the control system 20 may receive the telemetry data from one or more sensors associated with a truck 14 (e.g., sensors on an engine, on wheels, etc. of the truck 14) or associated with the physical environment 10 (e.g., sensors that can detect the presence or movement of the truck 14 in a certain location within the physical environment 10).
- sensors associated with a truck 14 e.g., sensors on an engine, on wheels, etc. of the truck 14
- the physical environment 10 e.g., sensors that can detect the presence or movement of the truck 14 in a certain location within the physical environment 10.
- the method 100 may include, at step 104, determining a predicted sequence of arrival of the at least one first machine at at least one material destination location based on the telemetry data.
- the control system 20 may determine a predicted sequence of arrival of the trucks 14 at at least one material destination location based on the telemetry data, e.g., in a manner similar to that described above at 34 and 38 of FIG. 2.
- the control system 20 may determine the predicted sequence of arrival for any trucks 14 within a threshold proximity of a dump site or a crusher 16.
- the control system 20 may execute (or cause the machine-learning engine 22 to execute) a model 36 to process the telemetry data.
- the model 36 may process GPS coordinates, navigation data (e.g., a planned route of a truck 14, traffic along the route, an expected arrival at a material destination location, etc.), speed data, and/or the like and may output a prediction of the arrival time of a truck 14 at the material destination location.
- the control system may perform similar determinations for multiple trucks 14 in the physical environment 10 transporting various materials (or materials with various attributes) from multiple material source locations to multiple material destination locations.
- the control system 20 may then predict an order in which various trucks 14 may arrive at the material destination location based on the predicted arrival times for the various trucks 14.
- control system 20 may generate (or may execute the model 36 to generate) an ordered list of the trucks 14 and the predicted arrival times, e.g., from earliest arrival time to latest arrival time at a material destination location. Trucks 14 with the same arrival time may be ordered alphanumerically by identifier for the trucks 14 or according to another criteria.
- the model 36 may output the predicted sequence of arrival to the control system 20, e.g., via the machine-learning engine 22.
- the machine-learning engine 22 may output a score for the predicted sequence of arrival.
- the score may indicate a likelihood or confidence level that the predicted sequence occurs (e.g., the more vehicles that are predicted to arrive at a material destination location at about the same time may result in a lower likelihood or confidence level).
- the control system 20 may use a probability calculation to determine the likely sequence of arrival times based on various inputs including machine learning models 36, predicted speeds, a site map of distances between physical locations, traffic patterns, delays, etc.
- the method 100 may include determining a predicted sequence of processing of materials transported by the at least one first machine based on the predicted sequence of arrival, destination queue data, and/or material attribute data indicative of the materials.
- the control system 20 may determine the predicted sequence of processing of materials at a crusher 16 after determining the predicted sequence of arrival for trucks 14 at the crusher 16, e.g., in a manner similar to that described above at 34 and 42 of FIG 2.
- the control system 20 may determine the predicted sequence of processing of the materials for any trucks 14 within a threshold proximity of the crusher 16.
- the control system 20 may execute (or cause the machine-learning engine 22 to execute) a model 36 to process the predicted sequence of arrival, destination queue data indicative of the queue of trucks 14 at a crusher 16, and/or materials attribute data indicative of the materials.
- the model 36 may process the destination queue data and the predicted sequence of arrival to determine a likely order (or multiple possible orders that may occur with a likelihood greater than a threshold) in which the trucks 14 are to dump material at a dump site or into a crusher 16. The model 36 may then correlate the material attribute data to each truck 14 to predict a sequence of attributes of the material dumped at the dump site or into the crusher 16.
- the model 36 may correlate the material attribute data to each truck 14 using location data that indicates a material source location for material loaded into each truck 14 and location data that associates material attributes to various material source locations.
- the control system 20 may predict the sequence of material processed by the crusher 16 over time based on predicting the manner in which the attributes of the blend of materials may change over time as the crusher 16 processes materials from different locations.
- the machine-learning engine 22 may output a score for the predicted sequence of processing.
- the score may indicate a likelihood or confidence level that the predicted sequence occurs (e.g., a lower likelihood or confidence level for a predicted sequence of arrival may result in a lower likelihood or confidence level for the predicted sequence of processing).
- the control system 20 may use a probability calculation to determine the likely sequence of processing based on various inputs including machine learning models 36, a predicted sequence of arrival, etc.
- the method 100 may include, at step 108, monitoring whether the predicted sequence of processing violates at least one prohibited sequence of processing for at least one second machine.
- the control system 20 may monitor whether the predicted sequence of material processing violates a prohibited sequence of material processing for a crusher 16 after determining the predicted sequence of processing.
- the control system 20 may monitor whether a predicted sequence of certain material attributes (e.g., moisture level) of material that the crusher 16 may process violates a prohibited sequence of material attributes.
- the control system 20 may continuously or periodically monitor whether the predicted sequence of processing violates the one or more prohibited sequences (e.g., may continuously monitor as the predictions at steps 104 and 106 are updated for new trucks 14 added to the queue or after trucks 14 have dumped their material).
- control system 20 may perform the monitoring just for trucks 14 that are in a queue of trucks 14 for a dump site or a crusher 16.
- control system 20 may perform the predictions described above to attempt to identify possible issues prior to queuing of the trucks 14 or as the trucks 14 are queueing and may monitor the predicted sequence of processing once the queue of trucks 14 forms and as the trucks 14 move to a dumping location from the queue.
- the control system 20 may provide the predicted sequence of processing to the rules engine 24 for processing.
- the rules engine 24 may be configured with one or more prohibited sequences of processing stored in memory and the rules engine 24 may compare the predicted sequence of processing to the one or more prohibited sequences to try to identify a match. Additionally, or alternatively, and as another example, the rules engine 24 may use a model 36 to determine a likelihood of whether the predicted sequence of processing violates any of the prohibited sequences and may determine that the predicted sequence of processing matches a prohibited sequence when the likelihood exceeds a threshold.
- the monitoring may include determining that a score for a predicted sequence of arrival or processing exceeds a threshold.
- the rules engine 24 may determine that a predicted sequence of processing is a prohibited sequence and may determine that the likelihood of the predicted sequence of processing occurring exceeds a threshold.
- the control system 20 may determine to perform one or more actions (described in more detail below in connection with step 110) to reduce the likelihood that the predicted prohibited sequence occurs or to try to increase a likelihood that an allowed sequence occurs.
- the method 100 may include sending at least one command to at least one machine based on whether the predicted sequence of processing violates the at least one prohibited sequence.
- the control system 20 may send the at least one command to one or more of the machines 12- 18 and/or may perform one or more actions other than sending commands.
- the control system 20 may send a command or perform another action immediately upon determining that the predicted sequence violates or does not violate a prohibited sequence, at a scheduled time (e.g., at a time a truck 14 is predicted to dump its material), based on input from an operator of the control system 20, and/or the like.
- the control system 20 may send a command to prevent a truck 14 from dumping at a material destination location or into a crusher 16.
- the control system 20 may send a command to a truck 14 to stop the dumper of the truck 14 from actuating when the truck 14 enters a dumping point from the queue, a command to cause the truck 14 to exit the dumping point without dumping the material, a command to cause the truck 14 wait at the exit of the dumping point for one or more other trucks 14 to enter the queue, a command to cause the truck 14 to rejoin the queue (e.g., after the one or more other trucks 14 carrying material with certain material attributes enter the queue), and/or the like.
- certain embodiments may prevent the dumping of material in a prohibited sequence and may utilize already available areas of a material destination location to help re-queue trucks 14. This may reduce or eliminate an amount of time that trucks 14 have to idle to queue trucks 14 for dumping and/or may reduce or eliminate a need for a mine site to have additional staging or idling areas.
- the control system 20 may send a command to cause a truck 14 to dump loaded material at a material destination location.
- the control system 20 may send a command to cause the truck 14 to enter a dump point at a material destination location, a command to actuate the dumper of the truck 14, to exit the material destination location (with or without waiting at the exit for an amount of time), and/or the like.
- control system 20 may send a command to the unloaded truck 14 to drive to a material source location for loading (e.g., after the control system 20 assigns the truck 14 to a loading location based on the predicted sequence of processing after the truck 14 dumps its material), a command to an excavator 12 at the material source locations to load the truck 14 with an amount of material when the truck 14 arrives at the material source location, and/or the like.
- certain embodiments may try to proactively manage a blend of material entering a queue at a material destination location, which may reduce or eliminate a need to re-queue trucks 14, reduce or eliminate damage that might otherwise occur to a crusher 16, conserve fuel and/or time that might otherwise be consumed re-queuing a truck 14, and/or the like.
- the control system 20 may send one or more other commands or perform other actions in some embodiments.
- the control system 20 may send a command to a front loader 18 to load material from a pile of dumped material at the material destination location into the crusher 16.
- the control system 20 may send a command to the crusher 16 to power on, a command to crush material that was dumped into the crusher 16, a command to power off, a command to stop crushing material when the control system 20 detects that a prohibited sequence of material may have been dumped into the crusher 16, and/or the like.
- the control system 20 may output an alarm or message to a user device of an operator controlling machines 12-18 or an operator in a control center for a mining site.
- control system 20 may send a command to stop or delay a truck 14’ s dumping, to change the probability of the arrival of the truck 14 at the crusher 16, and/or the like. Additionally, or alternatively, in this way, certain embodiments may use a probability model for determining the potential arrival sequence of a truck 14 based on various factors and may send commands to adjust upstream operations to change the probability of arrival or dumping in a desire sequence.
- the method 100 illustrated in FIG. 3 is described as including steps 102 through 110, the method 100 may not include all of these steps or may include additional or different steps.
- the method 100 may just include the operations at 106 through 110 based on the control system 20 determining a predicted sequence of processing for trucks 14 that are already queued.
- Certain embodiments described herein may use predictive analytics to reduce the probability of processing prohibited sequences on different time horizons.
- certain embodiments may manage probabilities: 1) by assigning or reassigning empty trucks 14 to loading machines (e.g., by assigning empty trucks 14 to loading machines to maintain the correct mix of material qualities being mined); 2) by assigning full trucks 14 to crushers 16 (e.g., assigning full trucks 14 to crushers 16 to minimize the probability of trucks 14 arriving in a prohibited sequence); 3) by holding trucks 14 in the loading machine or crusher 16 exit lane for a period of time; 4) by holding trucks 14 at a decision point for a period of time; and 5) by sequencing trucks 14 at the crusher 16 to avoid prohibited sequences.
- certain embodiments described herein may provide real-time (or near real-time) management of material being fed (or staged to be fed) to a crusher 16, which may reduce or eliminate the likelihood that the crusher 16 processes a prohibited sequence of material. This may reduce or eliminate breakdowns or maintenance time for the crusher 16, may help to maximize a useful life of the crusher 16, and/or the like.
- certain embodiments may provide for re-queuing of trucks 14 based on detecting a prohibited sequence at the time of dumping (e.g., rather than queuing the trucks 14 in a permitted sequence prior to dumping).
- This may reduce or eliminate an amount of time that trucks 14 have to idle while running in order to wait for other trucks 14 to queue before the truck joins the queue, which may conserve fuel of the trucks 14 and/or facilitate efficient use of the trucks 14. Additionally, or alternatively, this may reduce or eliminate a need for a mine site to have designated areas for the trucks 14 to idle while queuing occurs.
- a crusher 16 By queuing the trucks 14 as they arrive at a crusher 16 and then re-queueing the trucks 14 on an as-needed basis at the time of dumping, certain embodiments may provide for a more continuous provisioning of materials to the crusher 16, which may reduce or eliminate an idle time of the crusher 16. This may increase an efficiency of mining operations at a mining site.
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Operation Control Of Excavators (AREA)
- Disintegrating Or Milling (AREA)
Abstract
Description
Claims
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CA3247651A CA3247651C (en) | 2022-04-13 | 2023-04-10 | Avoiding prohibited sequences of materials processing at a crusher using predictive analytics |
| AU2023251738A AU2023251738B2 (en) | 2022-04-13 | 2023-04-10 | Avoiding prohibited sequences of materials processing at a crusher using predictive analytics |
| ZA2024/07839A ZA202407839B (en) | 2022-04-13 | 2024-10-16 | Avoiding prohibited sequences of materials processing at a crusher using predictive analytics |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US17/659,077 | 2022-04-13 | ||
| US17/659,077 US12572864B2 (en) | 2022-04-13 | 2022-04-13 | Avoiding prohibited sequences of materials processing at a crusher using predictive analytics |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2023200701A1 true WO2023200701A1 (en) | 2023-10-19 |
Family
ID=88308048
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2023/018012 Ceased WO2023200701A1 (en) | 2022-04-13 | 2023-04-10 | Avoiding prohibited sequences of materials processing at a crusher using predictive analytics |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US12572864B2 (en) |
| AU (1) | AU2023251738B2 (en) |
| WO (1) | WO2023200701A1 (en) |
| ZA (1) | ZA202407839B (en) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20080282583A1 (en) * | 2007-05-17 | 2008-11-20 | Koellner Walter G | Systems, Devices, and/or Methods Regarding Excavating |
| US20190128680A1 (en) * | 2011-08-24 | 2019-05-02 | Modular Mining Systems, Inc. | Driver guidance for guided maneuvering |
| US20200132882A1 (en) * | 2018-10-26 | 2020-04-30 | Tata Consultancy Services Limited | Method and system for online monitoring and optimization of mining and mineral processing operations |
| US20210117878A1 (en) * | 2019-10-16 | 2021-04-22 | Caterpillar Inc. | System and method for worksite project tracking |
| US20210118066A1 (en) * | 2019-10-21 | 2021-04-22 | Freeport-Mcmoran Inc. | Methods and systems for the batch delivery of material to a continuous material processor |
Family Cites Families (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2628054B2 (en) | 1987-12-25 | 1997-07-09 | 三菱マテリアル株式会社 | Crushing plant control system |
| US5961560A (en) * | 1996-12-19 | 1999-10-05 | Caterpillar Inc. | System and method for managing access of a fleet of mobile machines to a service resource |
| US6529812B1 (en) | 2001-08-28 | 2003-03-04 | Caterpillar Inc | Method and system for efficient processor usage |
| US6741921B2 (en) | 2001-10-05 | 2004-05-25 | Caterpillar Inc | Multi-stage truck assignment system and method |
| RU2337756C1 (en) * | 2007-01-31 | 2008-11-10 | Константин Евсеевич Белоцерковский | Method for controlling technological parameters of cone crusher |
| US20130214585A1 (en) * | 2010-07-09 | 2013-08-22 | Joy Mm Delaware, Inc. | Continuous-extraction mining system |
| US8583361B2 (en) | 2011-08-24 | 2013-11-12 | Modular Mining Systems, Inc. | Guided maneuvering of a mining vehicle to a target destination |
| EP2676732B1 (en) | 2012-06-20 | 2015-02-25 | Sandvik Intellectual Property AB | Method of feeding material to a horizontal shaft impact crusher, and a crushing device |
| US9714923B2 (en) * | 2015-05-08 | 2017-07-25 | Caterpillar Inc. | Topographic wear monitoring system for ground engaging tool |
| JP6498542B2 (en) * | 2015-06-17 | 2019-04-10 | 日立建機株式会社 | Control control system and in-vehicle terminal device |
| CA3002943A1 (en) * | 2017-06-05 | 2018-12-05 | Syncrude Canada Ltd. In Trust For The Owners Of The Syncrude Project, As Such Owners Exist Now And In The Future | Blending mined oil sand ores for bitumen extraction operations |
| US10852707B2 (en) | 2017-07-27 | 2020-12-01 | Caterpillar Inc. | Blend control truck assignment monitoring system and method |
| US12032350B2 (en) | 2020-04-13 | 2024-07-09 | Caterpillar Global Mining Llc | Multi-phase material blend monitoring and control |
| US20210325899A1 (en) | 2020-04-21 | 2021-10-21 | Caterpillar Inc. | Systems and methods for controlling a discharge rate of a hauling machine |
| US11631038B2 (en) | 2020-04-22 | 2023-04-18 | Caterpillar Inc. | System and method for multi-phase optimization of haul truck dispatch |
| WO2022035441A1 (en) * | 2020-08-14 | 2022-02-17 | Hitachi, Ltd. | Dynamic dispatching with robustness for large-scale heterogeneous mining fleet via deep reinforcement learning |
| CN112718224B (en) | 2021-01-17 | 2025-04-01 | 鹤庆北衙矿业有限公司 | Automatic unloading control method of multi-lane automatic unloading control device for large crusher |
| EP4305565A1 (en) * | 2021-03-12 | 2024-01-17 | Abb Schweiz Ag | Computer-implemented methods referring to an industrial process for manufacturing a product and system for performing said methods |
| US20230008357A1 (en) * | 2021-07-08 | 2023-01-12 | The Boston Consulting Group, Inc. | Overflow management configuration engine in a material processing system |
| US20230267390A1 (en) * | 2022-02-23 | 2023-08-24 | The Texas A&M University System | Systems and methods for optimizing the management of worksites |
-
2022
- 2022-04-13 US US17/659,077 patent/US12572864B2/en active Active
-
2023
- 2023-04-10 AU AU2023251738A patent/AU2023251738B2/en active Active
- 2023-04-10 WO PCT/US2023/018012 patent/WO2023200701A1/en not_active Ceased
-
2024
- 2024-10-16 ZA ZA2024/07839A patent/ZA202407839B/en unknown
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20080282583A1 (en) * | 2007-05-17 | 2008-11-20 | Koellner Walter G | Systems, Devices, and/or Methods Regarding Excavating |
| US20190128680A1 (en) * | 2011-08-24 | 2019-05-02 | Modular Mining Systems, Inc. | Driver guidance for guided maneuvering |
| US20200132882A1 (en) * | 2018-10-26 | 2020-04-30 | Tata Consultancy Services Limited | Method and system for online monitoring and optimization of mining and mineral processing operations |
| US20210117878A1 (en) * | 2019-10-16 | 2021-04-22 | Caterpillar Inc. | System and method for worksite project tracking |
| US20210118066A1 (en) * | 2019-10-21 | 2021-04-22 | Freeport-Mcmoran Inc. | Methods and systems for the batch delivery of material to a continuous material processor |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2023251738B2 (en) | 2025-10-16 |
| US12572864B2 (en) | 2026-03-10 |
| ZA202407839B (en) | 2026-01-28 |
| US20230334390A1 (en) | 2023-10-19 |
| AU2023251738A1 (en) | 2024-10-31 |
| CA3247651A1 (en) | 2023-10-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US12032350B2 (en) | Multi-phase material blend monitoring and control | |
| US20160342915A1 (en) | Autonomous Fleet Size Management | |
| US20240360647A1 (en) | Method and apparatus for coordinating loading of haul vehicles | |
| US20240362725A1 (en) | Methods and systems for the batch delivery of material to a continuous material processor | |
| CN118369628A (en) | Battery status based machine management | |
| US20160196749A1 (en) | Method for assisting hauling trucks at worksite | |
| AU2023251738B2 (en) | Avoiding prohibited sequences of materials processing at a crusher using predictive analytics | |
| CA3247651C (en) | Avoiding prohibited sequences of materials processing at a crusher using predictive analytics | |
| EP4303784B1 (en) | Balanced transport cycles in mass excavation operations | |
| EP4476667B1 (en) | Management systems for evaluation and automated control of workflows involving heavy-duty vehicles | |
| US20250043546A1 (en) | Material selection for a loading operation performed by a machine | |
| EP4383160B1 (en) | A method for handling state machines of production assets | |
| CN120634185B (en) | Intelligent mine auxiliary transportation comprehensive dispatching management and control method and system based on Internet of things | |
| US20240301658A1 (en) | System and method for coordinating operations of a fleet of machines and at least one processing plant | |
| AU2021221840A1 (en) | Method and apparatus for coordinating loading of haul vehicles | |
| AU2021221812A1 (en) | Methods and systems for mining |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23788796 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: AU2023251738 Country of ref document: AU |
|
| ENP | Entry into the national phase |
Ref document number: 2023251738 Country of ref document: AU Date of ref document: 20230410 Kind code of ref document: A |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 23788796 Country of ref document: EP Kind code of ref document: A1 |
