WO2023187652A1 - A configuration based on configured grant uplink control information - Google Patents
A configuration based on configured grant uplink control information Download PDFInfo
- Publication number
- WO2023187652A1 WO2023187652A1 PCT/IB2023/053089 IB2023053089W WO2023187652A1 WO 2023187652 A1 WO2023187652 A1 WO 2023187652A1 IB 2023053089 W IB2023053089 W IB 2023053089W WO 2023187652 A1 WO2023187652 A1 WO 2023187652A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- transmission
- combination
- duration
- packet
- adu
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/21—Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
Definitions
- the subject matter disclosed herein relates generally to wireless communications and more particularly relates to a configuration based on configured grant (“CG”) uplink control information (“UCI”) (“CG-UCI”).
- CG configured grant
- UCI uplink control information
- a channel occupancy time may be used.
- the COT may be configured in a number of ways.
- One embodiment of a method includes initiating, at a user equipment (“UE”), a COT by transmitting a first configured grant uplink (“UL”) transmission.
- the method includes including a first CG-UCI in the first configured grant UL transmission.
- the first CG-UCI indicates a first offset, a first duration, or a combination thereof.
- the method includes determining a first downlink (“DL”) transmission starting time based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is sent.
- DL downlink
- the method includes determining whether a delay budget for an UL application data unit (“ADU”), packet, or a combination thereof is less than a threshold value, and based on whether the delay budget for the UL ADU, packet, or the combination thereof being less than the threshold value. In some embodiments, the method includes determining a second DL transmission starting time, a second duration or a combination thereof based on: whether the delay budget for the UL ADU, packet, or the combination thereof is less than the threshold value; the first offset, the first duration, an untransmitted portion of the UL ADU, packet, or the combination thereof; or a combination thereof.
- ADU application data unit
- the second DL transmission starting time is different than the first DL transmission starting time, the second duration is different than the first duration, or a combination thereof; the UE does not expect to receive a DL transmission in the COT prior to the second DL transmission starting time; and the UE does not expect to receive the DL transmission in the COT for a duration larger than the second duration.
- One apparatus for a configuration based on CG-UCI includes a user equipment.
- the apparatus includes a processor that: initiates a COT by transmitting a first configured grant UL transmission; includes a first CG-UCI in the first configured grant UL transmission, wherein the first CG-UCI indicates a first offset, a first duration, or a combination thereof; determines a first DL transmission starting time based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is sent; determines whether a delay budget for an UU ADU, packet, or a combination thereof is less than a threshold value, and based on whether the delay budget for the UU ADU, packet, or the combination thereof being less than the threshold value; and determines a second DU transmission starting time, a second duration or a combination thereof based on: whether the delay budget for the UU ADU, packet, or the combination thereof is less than the threshold value; the first offset, the first duration, an un
- the second DU transmission starting time is different than the first DU transmission starting time, the second duration is different than the first duration, or a combination thereof; the UE does not expect to receive a DE transmission in the COT prior to the second DL transmission starting time; and the UE does not expect to receive the DL transmission in the COT for a duration larger than the second duration.
- Figure 1 is a schematic block diagram illustrating one embodiment of a wireless communication system for a configuration based on CG-UCI
- Figure 2 is a schematic block diagram illustrating one embodiment of an apparatus that may be used for a configuration based on CG-UCI;
- Figure 3 is a schematic block diagram illustrating one embodiment of an apparatus that may be used for a configuration based on CG-UCI;
- Figure 4 is a timing diagram illustrating one embodiment of a fixed frame period structure
- Figure 5 is a timing diagram illustrating CG-UCI indicating two sets of offset and/or duration for sharing a UE-COT, wherein a first offset and/or a first duration is applicable to DL transmissions with a delay budget greater than a threshold value, and a second offset and/or a second duration is applicable to DL transmissions with a delay budget less than or equal to the threshold value;
- Figure 6 is a timing diagram illustrating a second CG-UCI that indicates a second offset and/or a second duration if the UE determines that an UL ADU and/or packet exceeds its delay budget;
- Figure 7 is a flow chart diagram illustrating one embodiment of a method for a configuration based on CG-UCI.
- embodiments may be embodied as a system, apparatus, method, or program product. Accordingly, embodiments may take the form of an entirely hardware embodiment, an entirely software embodiment (including firmware, resident software, micro-code, etc.) or an embodiment combining software and hardware aspects that may all generally be referred to herein as a “circuit,” “module” or “system.” Furthermore, embodiments may take the form of a program product embodied in one or more computer readable storage devices storing machine readable code, computer readable code, and/or program code, referred hereafter as code. The storage devices may be tangible, non-transitory, and/or non-transmission. The storage devices may not embody signals. In a certain embodiment, the storage devices only employ signals for accessing code.
- modules may be implemented as a hardware circuit comprising custom very-large-scale integration (“VLSI”) circuits or gate arrays, off-the-shelf semiconductors such as logic chips, transistors, or other discrete components.
- VLSI very-large-scale integration
- a module may also be implemented in programmable hardware devices such as field programmable gate arrays, programmable array logic, programmable logic devices or the like.
- Modules may also be implemented in code and/or software for execution by various types of processors.
- An identified module of code may, for instance, include one or more physical or logical blocks of executable code which may, for instance, be organized as an object, procedure, or function. Nevertheless, the executables of an identified module need not be physically located together, but may include disparate instructions stored in different locations which, when joined logically together, include the module and achieve the stated purpose for the module.
- a module of code may be a single instruction, or many instructions, and may even be distributed over several different code segments, among different programs, and across several memory devices.
- operational data may be identified and illustrated herein within modules, and may be embodied in any suitable form and organized within any suitable type of data structure. The operational data may be collected as a single data set, or may be distributed over different locations including over different computer readable storage devices.
- the software portions are stored on one or more computer readable storage devices.
- the computer readable medium may be a computer readable storage medium.
- the computer readable storage medium may be a storage device storing the code.
- the storage device may be, for example, but not limited to, an electronic, magnetic, optical, electromagnetic, infrared, holographic, micromechanical, or semiconductor system, apparatus, or device, or any suitable combination of the foregoing.
- a storage device More specific examples (a non-exhaustive list) of the storage device would include the following: an electrical connection having one or more wires, a portable computer diskette, a hard disk, a random access memory (“RAM”), a read-only memory (“ROM”), an erasable programmable read-only memory (“EPROM” or Flash memory), a portable compact disc readonly memory (“CD-ROM”), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
- a computer readable storage medium may be any tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device.
- Code for carrying out operations for embodiments may be any number of lines and may be written in any combination of one or more programming languages including an object oriented programming language such as Python, Ruby, Java, Smalltalk, C++, or the like, and conventional procedural programming languages, such as the "C" programming language, or the like, and/or machine languages such as assembly languages.
- the code may execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server.
- the remote computer may be connected to the user's computer through any type of network, including a local area network (“LAN”) or a wide area network (“WAN”), or the connection may be made to an external computer (for example, through the Internet using an Internet Service Provider).
- LAN local area network
- WAN wide area network
- Internet Service Provider an Internet Service Provider
- the code may also be stored in a storage device that can direct a computer, other programmable data processing apparatus, or other devices to function in a particular manner, such that the instructions stored in the storage device produce an article of manufacture including instructions which implement the function/act specified in the schematic flowchart diagrams and/or schematic block diagrams block or blocks.
- the code may also be loaded onto a computer, other programmable data processing apparatus, or other devices to cause a series of operational steps to be performed on the computer, other programmable apparatus or other devices to produce a computer implemented process such that the code which execute on the computer or other programmable apparatus provide processes for implementing the functions/acts specified in the flowchart and/or block diagram block or blocks.
- the schematic flowchart diagrams and/or schematic block diagrams in the Figures illustrate the architecture, functionality, and operation of possible implementations of apparatuses, systems, methods and program products according to various embodiments.
- each block in the schematic flowchart diagrams and/or schematic block diagrams may represent a module, segment, or portion of code, which includes one or more executable instructions of the code for implementing the specified logical function(s).
- Figure 1 depicts an embodiment of a wireless communication system 100 for a configuration based on CG-UCI.
- the wireless communication system 100 includes remote units 102 and network units 104. Even though a specific number of remote units 102 and network units 104 are depicted in Figure 1, one of skill in the art will recognize that any number of remote units 102 and network units 104 may be included in the wireless communication system 100.
- the remote units 102 may include computing devices, such as desktop computers, laptop computers, personal digital assistants (“PDAs”), tablet computers, smart phones, smart televisions (e.g., televisions connected to the Internet), set-top boxes, game consoles, security systems (including security cameras), vehicle on-board computers, network devices (e.g., routers, switches, modems), aerial vehicles, drones, or the like.
- the remote units 102 include wearable devices, such as smart watches, fitness bands, optical head-mounted displays, or the like.
- the remote units 102 may be referred to as subscriber units, mobiles, mobile stations, users, terminals, mobile terminals, fixed terminals, subscriber stations, UE, user terminals, a device, or by other terminology used in the art.
- the remote units 102 may communicate directly with one or more of the network units 104 via UL communication signals. In certain embodiments, the remote units 102 may communicate directly with other remote units 102 via sidelink communication.
- the network units 104 may be distributed over a geographic region.
- a network unit 104 may also be referred to and/or may include one or more of an access point, an access terminal, a base, a base station, a location server, a core network (“CN”), a radio network entity, a Node-B, an evolved node-B (“eNB”), a 5G node-B (“gNB”), a Home Node-B, a relay node, a device, a core network, an aerial server, a radio access node, an access point (“AP”), new radio (“NR”), a network entity, an access and mobility management function (“AMF”), a unified data management (“UDM”), a unified data repository (“UDR”), a UDM/UDR, a policy control function (“PCF”), a radio access network (“RAN”), a network slice selection function (“NSSF”), an operations, administration, and management (“0AM”), a session management function (“SMF”)
- RAN radio access
- the network units 104 are generally part of a radio access network that includes one or more controllers communicably coupled to one or more corresponding network units 104.
- the radio access network is generally communicably coupled to one or more core networks, which may be coupled to other networks, like the Internet and public switched telephone networks, among other networks. These and other elements of radio access and core networks are not illustrated but are well known generally by those having ordinary skill in the art.
- the wireless communication system 100 is compliant with NR protocols standardized in 3GPP, wherein the network unit 104 transmits using an orthogonal frequency division multiplexing (“OFDM”) modulation scheme on the DL and the remote units 102 transmit on the UL using a single-carrier frequency division multiple access (“SC-FDMA”) scheme or an OFDM scheme. More generally, however, the wireless communication system 100 may implement some other open or proprietary communication protocol, for example, WiMAX, institute of electrical and electronics engineers (“IEEE”) 802.
- WiMAX WiMAX
- IEEE institute of electrical and electronics engineers
- GSM global system for mobile communications
- GPRS general packet radio service
- UMTS universal mobile telecommunications system
- LTE long term evolution
- CDMA2000 code division multiple access 2000
- Bluetooth® ZigBee
- Sigfox among other protocols.
- the present disclosure is not intended to be limited to the implementation of any particular wireless communication system architecture or protocol.
- the network units 104 may serve a number of remote units 102 within a serving area, for example, a cell or a cell sector via a wireless communication link.
- the network units 104 transmit DL communication signals to serve the remote units 102 in the time, frequency, and/or spatial domain.
- a remote unit 102 may initiate, at a UE, a COT by transmitting a first configured grant UL transmission.
- the remote unit 102 may include a first CG-UCI in the first configured grant UL transmission.
- the first CG-UCI indicates a first offset, a first duration, or a combination thereof.
- the remote unit 102 may determine a first DL transmission starting time based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is sent.
- the remote unit 102 may determine whether a delay budget for an UL ADU, packet, or a combination thereof is less than a threshold value, and based on whether the delay budget for the UL ADU, packet, or the combination thereof being less than the threshold value. In some embodiments, the remote unit 102 may determine a second DL transmission starting time, a second duration or a combination thereof based on: whether the delay budget for the UL ADU, packet, or the combination thereof is less than the threshold value; the first offset, the first duration, an untransmitted (e.g., not yet transmitted) portion of the UL ADU, packet, or the combination thereof; or a combination thereof.
- the second DL transmission starting time is different than the first DL transmission starting time, the second duration is different than the first duration, or a combination thereof; the UE does not expect to receive a DL transmission in the COT prior to the second DL transmission starting time; and the UE does not expect to receive the DL transmission in the COT for a duration larger than the second duration.
- the remote unit 102 may be used for a configuration based on CG-UCI.
- Eigure 2 depicts one embodiment of an apparatus 200 that may be used for a configuration based on CG-UCI.
- the apparatus 200 includes one embodiment of the remote unit 102.
- the remote unit 102 may include a processor 202, a memory 204, an input device 206, a display 208, a transmitter 210, and a receiver 212.
- the input device 206 and the display 208 are combined into a single device, such as a touchscreen.
- the remote unit 102 may not include any input device 206 and/or display 208.
- the remote unit 102 may include one or more of the processor 202, the memory 204, the transmitter 210, and the receiver 212, and may not include the input device 206 and/or the display 208.
- the processor 202 may include any known controller capable of executing computer-readable instructions and/or capable of performing logical operations.
- the processor 202 may be a microcontroller, a microprocessor, a central processing unit (“CPU”), a graphics processing unit (“GPU”), an auxiliary processing unit, a field programmable gate array (“FPGA”), or similar programmable controller.
- the processor 202 executes instructions stored in the memory 204 to perform the methods and routines described herein.
- the processor 202 is communicatively coupled to the memory 204, the input device 206, the display 208, the transmitter 210, and the receiver 212.
- the memory 204 in one embodiment, is a computer readable storage medium.
- the memory 204 includes volatile computer storage media.
- the memory 204 may include a RAM, including dynamic RAM (“DRAM”), synchronous dynamic RAM (“SDRAM”), and/or static RAM (“SRAM”).
- the memory 204 includes non-volatile computer storage media.
- the memory 204 may include a hard disk drive, a flash memory, or any other suitable non-volatile computer storage device.
- the memory 204 includes both volatile and non-volatile computer storage media.
- the memory 204 also stores program code and related data, such as an operating system or other controller algorithms operating on the remote unit 102.
- the input device 206 may include any known computer input device including a touch panel, a button, a keyboard, a stylus, a microphone, or the like.
- the input device 206 may be integrated with the display 208, for example, as a touchscreen or similar touch-sensitive display.
- the input device 206 includes a touchscreen such that text may be input using a virtual keyboard displayed on the touchscreen and/or by handwriting on the touchscreen.
- the input device 206 includes two or more different devices, such as a keyboard and a touch panel.
- the display 208 may include any known electronically controllable display or display device.
- the display 208 may be designed to output visual, audible, and/or haptic signals.
- the display 208 includes an electronic display capable of outputting visual data to a user.
- the display 208 may include, but is not limited to, a liquid crystal display (“UCD”), a light emitting diode (“FED”) display, an organic light emitting diode (“OEED”) display, a projector, or similar display device capable of outputting images, text, or the like to a user.
- UCD liquid crystal display
- FED light emitting diode
- OEED organic light emitting diode
- the display 208 may include a wearable display such as a smart watch, smart glasses, a heads-up display, or the like. Further, the display 208 may be a component of a smart phone, a personal digital assistant, a television, a table computer, a notebook (laptop) computer, a personal computer, a vehicle dashboard, or the like.
- the display 208 includes one or more speakers for producing sound.
- the display 208 may produce an audible alert or notification (e.g., a beep or chime).
- the display 208 includes one or more haptic devices for producing vibrations, motion, or other haptic feedback.
- all or portions of the display 208 may be integrated with the input device 206.
- the input device 206 and display 208 may form a touchscreen or similar touch-sensitive display.
- the display 208 may be located near the input device 206.
- the processor 202 initiates a COT by transmitting a first configured grant UL transmission; includes a first CG-UCI in the first configured grant UL transmission, wherein the first CG-UCI indicates a first offset, a first duration, or a combination thereof; determines a first DL transmission starting time based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is sent; determines whether a delay budget for an UU ADU, packet, or a combination thereof is less than a threshold value, and based on whether the delay budget for the UU ADU, packet, or the combination thereof being less than the threshold value; and determines a second DU transmission starting time, a second duration or a combination thereof based on: whether the delay budget for the UU ADU, packet, or the combination thereof is less than the threshold value; the first offset, the first duration, an untransmitted portion of the UU ADU, packet, or the combination thereof; or a combination thereof.
- the second DU transmission starting time is different than the first DU transmission starting time, the second duration is different than the first duration, or a combination thereof; the UE does not expect to receive a DE transmission in the COT prior to the second DL transmission starting time; and the UE does not expect to receive the DL transmission in the COT for a duration larger than the second duration.
- the remote unit 102 may have any suitable number of transmitters 210 and receivers 212.
- the transmitter 210 and the receiver 212 may be any suitable type of transmitters and receivers.
- the transmitter 210 and the receiver 212 may be part of a transceiver.
- Figure 3 depicts one embodiment of an apparatus 300 that may be used for a configuration based on CG-UCI.
- the apparatus 300 includes one embodiment of the network unit 104.
- the network unit 104 may include a processor 302, a memory 304, an input device 306, a display 308, a transmitter 310, and a receiver 312.
- the processor 302, the memory 304, the input device 306, the display 308, the transmitter 310, and the receiver 312 may be substantially similar to the processor 202, the memory 204, the input device 206, the display 208, the transmitter 210, and the receiver 212 of the remote unit 102, respectively.
- a service-oriented design may have extended reality (“XR”) traffic characteristics (e.g., a) variable packet arrival rate: packets coming at 30-120 frames per second with some jitter, b) packets having variable and large packet size, c) bidirectional prediction image (“B”) and/or predicted image (“P”) (“B/P”) -frames being dependent on intracoded (“I”)-frames, d) presence of multiple traffic and/or data flows such as pose and video scene in uplink) can enable more efficient (e.g., in terms of satisfying XR service requirements for a greater number of UEs, or in terms of UE power saving) for XR service delivery.
- XR extended reality
- traffic characteristics e.g., a) variable packet arrival rate: packets coming at 30-120 frames per second with some jitter, b) packets having variable and large packet size, c) bidirectional prediction image (“B”) and/or predicted image (“P”) (“B/P”) -frames being dependent on intracoded (“I”)-frame
- a latency requirement for XR traffic at a radio access network (“RAN”) side is modelled as packet delay budget (“PDB”).
- PDB packet delay budget
- the PDB is a limited time budget for a packet to be transmitted over the air from a gNB to a UE.
- a delay budget can be also defined for an ADU, referred to as (“ADB”).
- a gNB may take this knowledge into account in scheduling transmissions. Described herein are mechanisms to take advantage of such delay budget awareness in an unlicensed spectrum.
- downlink and uplink transmissions are allowed after a node such as a gNB or a UE has acquired a shared channel by a successful clear channel assessment, following a listen- before-talk (“LBT”) procedure.
- LBT listen- before-talk
- Procedures for gNBs and UEs acquiring a COT may be used for both dynamic and semi-static channel access mechanisms.
- a UE initiates a COT via a configured grant physical uplink shared channel (“PUSCH”) transmission (e.g., UL pose)
- PUSCH physical uplink shared channel
- the gNB can share the COT starting from an offset with respect to a time at which UCI containing 'COT sharing information' (e.g., referred to as CG-UCI) is detected for a duration.
- the offset and the duration are indicated via the 'COT sharing information'.
- CG-UCI enhancements may be used to schedule ADUs and/or packets that are reaching their delay budget within a COT acquired by a UE: 1) CG-UCI contains at least two 'COT sharing information' fields or a field indicating at least two 'COT sharing information' lists (e.g., a row of a table for COT sharing combinations where each row can provide at least two 'COT sharing information'), wherein a first 'COT sharing information' field indicates a first offset and duration, and a second 'COT sharing information' field indicates a second offset and duration, and the second offset is smaller than the first offset and/or the second duration is larger than the first duration - the gNB may schedule a transport block of a DL packet and/or ADU that is reaching its delay budget from the second offset in the COT and/or for the second duration; 2) CG-UCI indicates a set of offsets and durations (e.g., a row from a configured radio resource
- devices and/or network nodes such as gNBs operate in an unlicensed spectrum may be required to perform listen-before-talk (“LBT”) (e.g., also referred to as channel sensing) prior to being able to transmit in an unlicensed spectrum. If the device and/or network node performing LBT does not detect the presence of other signals in the channel, the medium and/or channel is considered for transmission.
- LBT listen-before-talk
- FIG. 4 is a timing diagram illustrating one embodiment of a fixed frame period structure 400.
- the fixed frame period structure 400 includes a COT 402 and idle 404 period that together extend for a fixed frame period 406.
- a UE can perform channel sensing and access a channel if it senses the channel to be idle.
- UE initiated channel occupancy (“CO”) may be useful especially in low-latency applications, wherein having UL data to be sent in configured grant resources is allowed to initiate a CO.
- CG-UCI indicates an offset and/or duration which leads to a consistent DL starting position and duration for a DL transmission within a COT. So, different DL packets are not differentiated with respect to an earliest possible starting time instance within a UE-COT (e.g., based on packet delay budget).
- HARQ-ACK related information and/or channel sharing related information may be indicated by the UE to the network via CG-UCI (see Table 1).
- the UE is configured with higher layer parameter cg-RetransmissionTimer (e.g., to enable autonomous retransmissions of a configured PUSCH transmission in configured grant resources based on expiration of the CG-retransmission timer)
- the UE multiplexes CG-UCI in the CG-PUSCH transmission (see Tables 2 and 3).
- a channel access priority class is indicated in the CG-UCI instead or along with offset and duration.
- the CG-UCI in a COT may indicate two sets of (e.g., offset, duration, and channel access priority class), wherein depending on a delay budget for a packet/ADU, the gNB shares the COT: e.g., for a small delay budget, the gNB uses a smaller offset, a longer duration, a higher channel access priority, or a combination of thereof, and for a large delay budget, the gNB uses a larger offset, a shorter duration, a lower channel access priority, or a combination of thereof.
- XR is an umbrella term for different types of realities including: 1) virtual reality (“VR”) is a rendered version of a delivered visual and audio scene - the rendering is designed to mimic the visual and audio sensory stimuli of the real world as naturally as possible to an observer or user as they move within the limits defined by the application - virtual reality usually, but not necessarily, requires a user to wear a head mounted display (“HMD”) to completely replace the user's field of view with a simulated visual component, and to wear headphones, to provide the user with the accompanying audio - some form of head and motion tracking of the user in VR is usually also necessary to allow the simulated visual and audio components to be updated in order to ensure that, from the user's perspective, items and sound sources remain consistent with the user's movements - additional means to interact with the virtual reality simulation may be provided but are not strictly necessary; 2) augmented reality (“AR”) is when a user is provided with additional information or artificially generated items or content overlaid upon their current environment - such additional information or content will usually be visual
- VR virtual reality
- AR
- XR refers to all real -and- virtual combined environments and human-machine interactions generated by computer technology and wearables. It includes representative forms such as AR, MR, and VR and the areas interpolated among them. The levels of virtuality range from partially sensory inputs to fully immersive VR. A key aspect of XR is the extension of human experiences especially relating to the senses of existence (e.g., represented by VR) and the acquisition of cognition (e.g., represented by AR).”
- a latency requirement of XR traffic at an RAN side is modelled as packet delay budget (“PDB”).
- PDB is a limited time budget for a packet to be transmitted over the air from a gNB to a UE.
- a delay of a packet incurred in air interface is measured from a time that the packet arrives at the gNB to the time that it is successfully transferred to a UE. If the delay is larger than a given PDB for the packet, then the packet is said to violate PDB, otherwise the packet is said to be successfully delivered.
- PDB may vary for different applications and traffic types, which can be 10-20 ms depending on an application. Applications can have a certain delay requirement on an ADU, that may not be adequately translated into packet delay budget requirements.
- ADB ADU delay budget
- 5G fifth generation
- many of the XR and CG use cases are characterized by quasi-periodic traffic (e.g., with possible jitter) with high data rate in DL (e.g., video steam) combined with the frequent UL (e.g., pose and/or control update) and/or UL video stream.
- DL e.g., video steam
- UL e.g., pose and/or control update
- Both DL and UL traffic are also characterized by relatively strict PDB.
- the set of anticipated XR and CG services has a certain variety and characteristics of the data streams (e.g., video) may change “on-the-fly”, while the services are running over NR.
- QoS quality of service
- framelevel QoS e.g., framelevel QoS
- ADU-based QoS e.g., framelevel QoS
- XR specific QoS e.g., XR specific QoS and so forth
- QoS quality of service
- XR application awareness by UE and gNB may improve user experience, improve an NR system capacity in supporting XR services, and reduce the UE power consumption.
- An ADU may be the smallest unit of data that can be processed independently by an application (e.g., such as processing for handling out-of-order traffic data).
- synchronized sharing there may be over-the-air synchronization as a mechanism (e.g., referred to as synchronized sharing) to provide more reliable communications for ultrareliable low-latency communication (“URLLC”) applications in co-sited deployments using unlicensed spectrum.
- URLLC ultrareliable low-latency communication
- NR-U NR unlicensed
- CoMP coordinated multipoint
- CoMP schedulers can adapt dynamically between the extremes of maximum spectral efficiency and maximum reliability from one scheduling period to the next, depending on the specific QoS requirements of the applications with data in transmission buffers.
- One NR-U network may be used to serve diverse applications such as mission-critical sensing and control, video surveillance, augmented or virtual reality (e.g., XR) and voice, each of which have different requirements for throughput, latency, j itter and packet loss or reliability.
- XR augmented or virtual reality
- voice each of which have different requirements for throughput, latency, j itter and packet loss or reliability.
- specific mechanisms for CG-UCI enhancements are described herein considering a remaining delay budget for DL and/or UL traffic and can work with an over-the-air synchronization mechanism.
- delay across different protocol stack layers from an XR server to a RAN may be labeled to improve scheduling packets that approach their latency limits.
- the packet could be dropped at any particular layer or the priority of the packet could be re-adjusted (e.g., deprioritized).
- a gNB informs a UE about a delay budget for DE transmissions.
- a symbol, a slot, a subslot, and/or a transmission time interval may be a time unit with a particular duration (e.g., symbol may be a fraction and/or percentage of an orthogonal frequency division multiplexing (“OFDM”) symbol length associated with a particular subcarrier spacing (“SCS”)).
- an UL transmission e.g., UL transmission burst
- sharing a COT implies that the device or node with which the COT is shared can forego an indicated or configured channel access category and/or type and instead apply and/or perform a channel access according to a category and/or type whose characteristic includes a generally shorter sensing period, an increased likelihood for the channel sensing to result in being able to transmit, or no required sensing period prior to transmission in the shared COT.
- CG-UCI enhancements there may be CG-UCI enhancements.
- a UE initiates a UE-COT by transmitting a configured grant UL transmission; 2) the UE includes a CG-UCI in the configured grant UL transmission in which a) the CG-UCI indicates at least a first offset and/or first duration, and a second offset and/or a second duration, b) wherein the second offset is less than or equal to the first offset, and/or the second duration is greater than or equal to the first duration; 3) wherein the gNB can transmit a first DL transmission (e.g., to the UE) in the CO: a) after the second offset from the time and/or slot the CG-UCI is detected for at most the second duration, if a remaining delay budget for the 1 st DL transmission is less than or equal to a threshold value (or a priority of the DL transmission is greater than a threshold value), b) otherwise, after the first offset from the time and/or slot the CG
- the threshold value is: 1) signaled in the CG-UCI from a set of possible (e.g., configured) threshold levels - the UE may have UL data in the buffer for an UL ADU that might also approach its delay limit, so the UE can signal the threshold to balance between delay budget in UL and DL; 2) defined in a specification; 3) signaled by higher layers (e.g., RRC or medium access control (“MAC”) control element (“CE”) (“MAC-CE”) indication); 4) determined by an application layer; 5) determined based on a frame-per-second rate associated with the DL ADU and/or packet; 6) determined based on a DL and/or UL ADU payload size; and/or 7) determined based on a radio configuration of at least one of SCS, modulation and coding scheme (“MCS”), a number of transmission layers, and/or available physical resource blocks (“PRBs”) over the CO.
- MCS modulation and coding scheme
- PRBs physical resource blocks
- the UE is expected to mute for a period of time after/before the 1st offset and/or a 2nd offset, wherein the period of time is: 1) fixed in a specification (e.g., can be SCS dependent); 2) configured by RRC; 3) indicated by downlink control information (“DCI”) or MAC-CE; and/or 4) determined based on the threshold value.
- the second offset and/or second duration leads to a longer CO opportunity than the first offset and/or first duration.
- the UE is not expected to receive a physical downlink shared channel (“PDSCH”) with a remaining delay budget that is more than the threshold value before the first offset.
- PDSCH physical downlink shared channel
- the UE is not expected to receive a PDSCH before the 1 st offset if the remaining delay budget (or priority) can be accommodated in DL starting point and duration associated with the first offset and duration within the same UE initiated COT.
- the DL transmission is not expected to be received prior to the first offset.
- FIG. 5 is a timing diagram 500 illustrating CG-UCI indicating two sets of offset and/or duration for sharing a UE-COT, wherein a first offset and/or a first duration is applicable to DL transmissions with a delay budget greater than a threshold value, and a second offset and/or a second duration is applicable to DL transmissions with a delay budget less than or equal to the threshold value.
- the timing diagram 500 illustrates a first COT 502 and a second COT 504. During the second COT 504, there is a CG-PUSCH 506, and a UE mute time 508. Further, there is a first duration 510 from a first DL starting point 512, and a second duration 514 from a second DL starting point 516.
- the UE initiates a UE- COT by transmitting a configured grant UL transmission; 2) the UE includes a CG-UCI in the configured grant UL transmission (e.g., the CG-UCI indicates a first offset and/or a first duration); 3) for a first DL transmission, the gNB determines a second offset and/or a second duration based on the first offset and/or the first duration and the remaining delay budget for the first DL transmission; 4) for a second DL transmission, the gNB determines a third offset and/or a third duration based on the first offset and/or the first duration and the remaining delay budget for the second DL transmission; 5) the gNB transmits the first DL transmission (e.g., to the UE) in the COT after the second offset from the time and/or slot the CG-UCI is detected; 6) the gNB transmits the second DL transmission (e.g., to
- the third offset and/or the third duration is not determined and/or not applicable. Moreover, if the UE has received such indication, the offset and/or the duration in the CG-UCI is not applicable or CG- UCI is not included in the configured grant UL transmission. Further, at least if such indication is acknowledged by the UE (e.g., in a prior COT) where the UE has been scheduled for a PDSCH transmission wherein the DCI indicates information regarding the remaining delay budget of a DL ADU and/or packet. If the PDSCH transmission is acknowledged, then, in the UE-COT, the CG- UCI is not applicable or CG-UCI is not included in the configured grant UL transmission.
- the indication may be provided via a group-common DCI with multiple fields, wherein each field indicates information of remaining delay budget for a DL ADU and/or packet for a UE or a group of UEs.
- a first device initiates a COT and subsequently transmits a first transmission within the initiated CO; 2) the first transmission of the first device includes control information; 3) the control information indicates at least a first offset and/or a first duration, and a second offset and/or a second duration; 4) the second offset is less than or equal to the first offset, and/or the second duration is greater than the first duration; 5) a second device transmits a second transmission (e.g., to the first device) in the CO, a) after the second offset from the time and/or slot in which the control information is detected for at most the second duration if a remaining delay budget for the second transmission is less than or equal to a threshold value (or a priority of the second transmission is greater than a threshold value), b) otherwise, after the first offset from the time and/or slot in which the control information is detected for at most the first duration.
- a threshold value or a priority of the second transmission is greater than a threshold value
- the first device may be a UE, a gNB, a repeater, and/or a smart device; and/or 2) the second device may be a UE, a gNB, a repeater, and/or a smart device.
- the first transmission by the first device may be: 1) a downlink transmission, such as dynamically indicated by a DCI, especially if the first device is a gNB; 2) a downlink transmission, such as indicated by an semi-persistent scheduling (“SPS”) configuration and/or SPS activation command by RRC and/or DCI, especially if the first device is a gNB; 3) an uplink transmission, such as dynamically indicated by a DCI, especially if the first device is a UE; 4) an uplink transmission, such as indicated by a CG configuration and/or CG activation command by RRC and/or DCI, especially if the first device is a UE; and/or 5) a sidelink transmission, such as indicated by sidelink control information (“SCI”), especially if the first device is a UE.
- SPS semi-persistent scheduling
- control information may be part of or indicated by: 1) a DCI message, especially if the first transmission is a downlink transmission; 2) a UCI message, especially if the first transmission is an uplink transmission; 3) a CG-UCI message if the first transmission is an uplink CG transmission; and/or 4) an SCI message, especially if the first transmission is a sidelink transmission.
- the second transmission by the second device may be: 1) a downlink transmission, such as dynamically indicated by a DCI, especially if the second device is a gNB; 2) a downlink transmission, such as indicated by an SPS configuration/activation by RRC and/or DCI, especially if the second device is a gNB; 3) an uplink transmission, such as dynamically indicated by a DCI, especially if the second device is a UE; 4) an uplink transmission, such as indicated by a CG configuration/activation by RRC and/or DCI, especially if the second device is a UE; and/or 5) a sidelink transmission, such as indicated by an SCI, especially if the second device is a UE.
- a first device initiates a COT and subsequently transmits a first transmission within the initiated CO; 2) the first transmission of the first device includes control information, wherein the control information indicates a first offset and/or a first duration; 3) for a second transmission, a second device determines a second offset and/or a second duration based on the first offset and/or the first duration, and the remaining delay budget for the second transmission; 4) for a third transmission, the second device determines a third offset and/or a third duration based on the first offset and/or the first duration, and the remaining delay budget for the third transmission; 5) the second device transmits the second transmission (e.g., to the first device) in the COT after the second offset from the time and/or slot in which the control information is detected; 6) the second device transmits the third transmission (e.g., to the first device) in the COT after the third offset from the time and/or slot in which the control information is detected;
- the first device may be a UE, a gNB, a repeater, a smart device; and/or 2) the second device may be a UE, a gNB, a repeater, a smart device.
- the first transmission by the first device may be: 1) a downlink transmission, such as dynamically indicated by a DCI, especially if the first device is a gNB; 2) a downlink transmission, such as indicated by an SPS configuration/activation by RRC and/or DCI, especially if the first device is a gNB; 3) an uplink transmission, such as dynamically indicated by a DCI, especially if the first device is a UE; 4) an uplink transmission, such as indicated by a CG configuration/activation by RRC and/or DCI, especially if the first device is a UE; and/or 5) a sidelink transmission, such as indicated by an SCI, especially if the first device is a UE.
- control information may be part of or indicated by: 1) a DCI message, especially if the first transmission is a downlink transmission; 2) a UCI message, especially if the first transmission is an uplink transmission; 3) a CG-UCI message if the first transmission is an uplink CG transmission; and/or 4) an SCI message, especially if the first transmission is a sidelink transmission.
- the second transmission by the second device, and the third transmission by the second device each may be: 1) a downlink transmission, such as dynamically indicated by a DCI, especially if the second device is a gNB; 2) a downlink transmission, such as indicated by an SPS configuration/activation by RRC and/or DCI, especially if the second device is a gNB; 3) an uplink transmission, such as dynamically indicated by a DCI, especially if the second device is a UE; 4) an uplink transmission, such as indicated by a CG configuration/activation by RRC and/or DCI, especially if the second device is a UE; and/or 5) a sidelink transmission, such as indicated by an SCI, especially if the second device is a UE.
- the UE initiates a UE- COT by transmitting a first configured grant UL transmission; 2) the UE includes a first CG-UCI in the first configured grant UL transmission in which the first CG-UCI indicates a first offset and/or a first duration, and the gNB can share the COT starting from the first offset with respect to the time the CG-UCI is detected (e.g., referred to as first DL starting point) for the first duration; and/or 3) the UE determines that a delay budget for an UL ADU and/or packet is exceeded, in response to such determination: a) the UE drops the remainder of the UL ADU and/or UL packet transmission, and b) the UE performs one or both of the following: in an upcoming (e.g., second) CG-UCI, the UE indicates to gNB a second offset and/or a second duration resulting in a second DL starting point,
- FIG. 6 is a timing diagram 600 illustrating a second CG-UCI that indicates a second offset and/or a second duration if the UE determines that an UL ADU and/or packet exceeds its delay budget.
- the timing diagram 600 illustrates a first CG-PUSCH 602, and a second CG- PUSCH 604. Further, there is a first duration 606 from a first DL starting point 608, and a second duration 610 from a second DL starting point 612.
- a CG-UCI at least includes two sub-fields: a) a 1st sub-field indicates if a delay budget is exceeded, b) if the 1st sub-field indicates a delay budget is exceeded, the 2nd sub-field indicates an ADU- identifier (“ID”), packet-ID, and/or hybrid automatic repeat request (“HARQ”)-ID associated with the ADU and/or packet for which the delay budget is exceeded, c) if the 1st sub-field indicates a delay budget is not exceeded, cl) the 2nd sub-field is not included in the CG-UCI, c2) the 2nd subfield is included in the CG-UCI, and a pre-determined value is indicated in the 2nd sub-field, c3) the 2nd sub-field indicates a remaining delay budget or c4) the gNB ignores the value of the 2nd sub-field; 2) a CG-UCI (e.g.,
- the UE initiates a UE-COT by transmitting a configured grant UL transmission; 2) the UE includes a CG-UCI in the configured grant UL transmission in which the CG-UCI indicates an offset and/or a duration the gNB can share the COT starting from the offset with respect to the time the CG-UCI is detected (e.g., referred to as the DL starting point) for the duration; and/or 3) the gNB determines that a delay budget for a DL ADU and/or packet or an UL ADU and/or packet is exceeded or going to be exceeded.
- one or more of the following is performed: 1) the gNB starts a DL transmission earlier than the indicated starting offset in the CG-UCI - the duration of the DL transmission can exceed the duration indicated in the CG-UCI; and/or 2) the UE cancels one or more of upcoming poses associated with the ADU and/or packet.
- an ADU (e.g., DL ADU) is no longer useful, a corresponding pose may not be useful and/or the UE may skip transmitting every other UL poses or down-samples the UL poses according to a down-sampling pattern, wherein the down-sampling pattern may depend on the frame per second (“FPS”) of the XR DL traffic or other application parameters (e.g., pose delta/change with respect to a previous/reference pose).
- FPS frame per second
- the gNB indicates to the UE the number of upcoming UL poses to be canceled; 2) the gNB can indicate a pose cancellation or down-sampling command to the UE (the command may include a threshold for a pose difference with respect to a previous/reference pose, wherein if the pose is not that different (based on the threshold, and a defined measure for calculating the difference) form the previous/reference pose, the pose will not be transmitted), wherein the command can be sent in another component carrier which is different than the component carrier in which the pose is intended to be transmitted; 3) the UE may be configured with one or more time instances and/or offsets from the beginning of the COT or determined based on (e.g., duration and/or location) of one or more configured grant resources, the UE may mute for a certain time prior/after each of the one or more time instances and/or offsets to allow gNB to grab the channel and/or share the CO in case
- the UE indicates the set of UL poses to be canceled or a parameter of the set of UL poses (e.g., number of cancelled UL poses and the first or the last cancelled UL pose index).
- the indication can be a SLIV-like indication, where a starting symbol and length for time domain resource allocation is indicated, wherein the UL poses lying in the time-domain resources from the indicated starting symbol for a duration of the indicated length are cancelled.
- a first device initiates a COT and subsequently transmits a first transmission within the initiated CO; 2) the first transmission of the first device includes a first control information to a second device; 3) the first control information indicates at least a first offset and/or duration resulting in a first transmission starting point, wherein the second device can start transmitting (e.g., to the first device) from the first transmission starting point for a maximum duration of the first duration; 4) the first device determines that a delay budget for an ADU and/or packet in its buffer is exceeded, in response to such determination: a) the first device drops the remainder of the ADU and/or packet transmission, and b) the first device performs one or both of the following: bl) in a second control information, the first device indicates to the second device a second offset and/or duration resulting in a 2nd transmission starting point, wherein the 1st transmission starting point and the 2nd transmission starting point are different and/or the 1st
- the first device may be a UE, a gNB, a repeater, a smart device; and/or 2) the second device may be a UE, a gNB, a repeater, a smart device.
- the first transmission by the first device may be: 1) a downlink transmission, such as dynamically indicated by a DCI, especially if the first device is a gNB; 2) a downlink transmission, such as indicated by an SPS (semi-persistent scheduling) configuration and/or SPS activation command by RRC and/or DCI, especially if the first device is a gNB; 3) an uplink transmission, such as dynamically indicated by a DCI, especially if the first device is a UE; 4) an uplink transmission, such as indicated by a CG configuration and/or CG activation command by RRC and/or DCI, especially if the first device is a UE; and/or 5) a sidelink transmission, such as indicated by an SCI, especially if the first device is a UE.
- a downlink transmission such as dynamically indicated by a DCI, especially if the first device is a gNB
- SPS sin-persistent scheduling
- RRC and/or DCI especially
- the first and the second control information may be part of or indicated by: 1) a DCI message, especially if the first transmission is a downlink transmission; 2) a UCI message, especially if the first transmission is an uplink transmission; 3) a CG-UCI message if the first transmission is an uplink CG transmission; and/or 4) an SCI message, especially if the first transmission is a sidelink transmission.
- the second transmission by the second device may be: 1) a downlink transmission, such as dynamically indicated by a DCI, especially if the second device is a gNB; 2) a downlink transmission, such as indicated by an SPS configuration/activation by RRC and/or DCI, especially if the second device is a gNB; 3) an uplink transmission, such as dynamically indicated by a DCI, especially if the second device is a UE; 4) an uplink transmission, such as indicated by a CG configuration/activation by RRC and/or DCI, especially if the second device is a UE; and/or 5) a sidelink transmission, such as indicated by an SCI, especially if the second device is a UE.
- a first device initiates a COT and subsequently transmits a first transmission within the initiated CO; 2) the first transmission of the first device includes control information, a) the control information indicates a 1st offset and/or a 1st duration corresponding to a first transmission starting point allowing a second device to transmit in the initiated CO after the 1st transmission starting point and for a maximum duration of the first duration; 3) the second device determines that a delay budget for an ADU and/or packet is exceeded or going to be exceeded, a) in response to such determination, one or more of the following is performed: al) the second device starts a second transmission earlier than the first transmission starting point - the duration of the second transmission can exceed the first duration, a2) the first device cancels one or more of upcoming transmissions associated with the ADU and/or packet; 4) the second device transmits a second transmission (e.g., to the first device) in the COT after a 2nd offset from the time/
- the first device may be a UE, a gNB, a repeater, a smart device; and/or 2) the second device may be a UE, a gNB, a repeater, a smart device.
- the first transmission by the first device may be: 1) a downlink transmission, such as dynamically indicated by a DCI, especially if the first device is a gNB; 2) a downlink transmission, such as indicated by an SPS configuration/activation by RRC and/or DCI, especially if the first device is a gNB; 3) an uplink transmission, such as dynamically indicated by a DCI, especially if the first device is a UE; 4) an uplink transmission, such as indicated by a CG configuration/activation by RRC and/or DCI, especially if the first device is a UE; and/or 5) a sidelink transmission, such as indicated by an SCI, especially if the first device is a UE.
- control information may be part of or indicated by: 1) a DCI message, especially if the first transmission is a downlink transmission; 2) a UCI message, especially if the first transmission is an uplink transmission; 3) a CG-UCI message if the first transmission is an uplink CG transmission; and/or 4) an SCI message, especially if the first transmission is a sidelink transmission.
- the second transmission by the second device, and the third transmission by the second device each may be: 1) a downlink transmission, such as dynamically indicated by a DCI, especially if the second device is a gNB; 2) a downlink transmission, such as indicated by an SPS configuration/activation by RRC and/or DCI, especially if the second device is a gNB; 3) an uplink transmission, such as dynamically indicated by a DCI, especially if the second device is a UE; 4) an uplink transmission, such as indicated by a CG configuration/activation by RRC and/or DCI, especially if the second device is a UE; and/or 5) a sidelink transmission, such as indicated by an SCI, especially if the second device is a UE.
- an offset and/or duration may be reported in some embodiments in terms of symbols and/or in terms of slots.
- Figure 7 is a flow chart diagram illustrating one embodiment of a method 700 for a configuration based on CG-UCI.
- the method 700 is performed by an apparatus, such as the remote unit 102.
- the method 700 may be performed by a processor executing program code, for example, a microcontroller, a microprocessor, a CPU, a GPU, an auxiliary processing unit, a FPGA, or the like.
- the method 700 includes initiating 702, at a UE, a COT by transmitting a first configured grant UL transmission.
- the method 700 includes including 704 a first CG-UCI in the first configured grant UL transmission.
- the first CG- UCI indicates a first offset, a first duration, or a combination thereof.
- the method 700 includes determining 706 a first DL transmission starting time based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is sent.
- the method 700 includes determining 708 whether a delay budget for an UL ADU, packet, or a combination thereof is less than a threshold value, and based on whether the delay budget for the UL ADU, packet, or the combination thereof being less than the threshold value. In some embodiments, the method 700 includes determining 710 a second DL transmission starting time, a second duration or a combination thereof based on: whether the delay budget for the UL ADU, packet, or the combination thereof is less than the threshold value; the first offset, the first duration, an un-transmitted portion of the UL ADU, packet, or the combination thereof; or a combination thereof.
- the second DL transmission starting time is different than the first DL transmission starting time, the second duration is different than the first duration, or a combination thereof; the UE does not expect to receive a DL transmission in the COT prior to the second DL transmission starting time; and the UE does not expect to receive the DL transmission in the COT for a duration larger than the second duration.
- a second CG-UCI is included in a second configured grant UL transmission, and the second CG-UCI indicates a second offset, the second duration, or a combination thereof.
- the second CG-UCI is at least a certain time after the first CG-CUI.
- the second DE transmission starting time is at least a certain time earlier than the first DL transmission starting time.
- the second duration is at least a certain time greater than the first duration.
- the threshold value is configured by higher layer signaling.
- the delay budget for the UL ADU, packet, or the combination thereof is exceeded.
- the method 700 further comprises dropping the remainder of the UL ADU, packet, or the combination thereof transmission.
- the second DL transmission starting time is at or later than a time at which the remainder of the UL ADU, packet, or the combination thereof transmission is dropped.
- the method 700 further comprises indicating to a network device that the delay budget is exceeded, that the remainder of the UL ADU, packet, or the combination thereof transmission is to be dropped, or a combination thereof.
- the second DL transmission starting time, the second duration, or a combination thereof is further determined based on a time at which a remainder of a transmission of the UL ADU, packet, or the combination thereof is dropped.
- the method 700 further comprises determining a set of UL extended reality (XR) poses to be canceled based on a delay budget for a DL ADU, packet, or a combination thereof, an UL ADU, packet, or a combination thereof, or a combination thereof being exceeded.
- XR extended reality
- the method 700 further comprises indicating the set of UL XR poses to a network device.
- the method further comprises receiving an indication that the delay budget for a DL ADU, packet, or a combination thereof is exceeded or to be exceeded within a certain time, wherein, in response to the indication, the method further comprises determining a set of UL extended reality (XR) poses to be canceled, muted, or a combination thereof.
- XR UL extended reality
- an apparatus comprises a UE.
- the apparatus further comprises: a processor that: initiates a COT by transmitting a first configured grant UL transmission; includes a first CG-UCI in the first configured grant UL transmission, wherein the first CG-UCI indicates a first offset, a first duration, or a combination thereof; determines a first DL transmission starting time based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is sent; determines whether a delay budget for an UL ADU, packet, or a combination thereof is less than a threshold value, and based on whether the delay budget for the UL ADU, packet, or the combination thereof being less than the threshold value; and determines a second DL transmission starting time, a second duration or a combination thereof based on: whether the delay budget for the UL ADU, packet, or the combination thereof is less than the threshold value; the first offset, the first duration, an un-transmitted portion of the UL ADU,
- a second CG-UCI is included in a second configured grant UL transmission, and the second CG-UCI indicates a second offset, the second duration, or a combination thereof.
- the second CG-UCI is at least a certain time after the first CG-CUI.
- the second DL transmission starting time is at least a certain time earlier than the first DL transmission starting time.
- the second duration is at least a certain time greater than the first duration.
- the threshold value is configured by higher layer signaling.
- the delay budget for the UL ADU, packet, or the combination thereof is exceeded.
- the processor drops the remainder of the UL ADU, packet, or the combination thereof transmission.
- the second DL transmission starting time is at or later than a time at which the remainder of the UL ADU, packet, or the combination thereof transmission is dropped.
- the processor indicates to a network device that the delay budget is exceeded, that the remainder of the UL ADU, packet, or the combination thereof transmission is to be dropped, or a combination thereof.
- the second DL transmission starting time, the second duration, or a combination thereof is further determined based on a time at which a remainder of a transmission of the UL ADU, packet, or the combination thereof is dropped.
- the processor determines a set of UL extended reality (XR) poses to be canceled based on a delay budget for a DL ADU, packet, or a combination thereof, an UL ADU, packet, or a combination thereof, or a combination thereof being exceeded.
- XR extended reality
- the processor indicates the set of UL XR poses to a network device.
- the apparatus further comprises a receiver that receives an indication that the delay budget for a DL ADU, packet, or a combination thereof is exceeded or to be exceeded within a certain time, wherein, in response to the indication, the processor determines a set of UL extended reality (XR) poses to be canceled, muted, or a combination thereof.
- XR extended reality
- a method at a UE comprises: initiating a COT by transmitting a first configured grant UL transmission; including a first CG-UCI in the first configured grant UL transmission, wherein the first CG-UCI indicates a first offset, a first duration, or a combination thereof; determining a first DL transmission starting time based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is sent; determining whether a delay budget for an UL ADU, packet, or a combination thereof is less than a threshold value, and based on whether the delay budget for the UL ADU, packet, or the combination thereof being less than the threshold value; and determining a second DL transmission starting time, a second duration or a combination thereof based on: whether the delay budget for the UL ADU, packet, or the combination thereof is less than the threshold value; the first offset, the first duration, an untransmitted portion of the UL ADU, packet, or the combination thereof; or
- a second CG-UCI is included in a second configured grant UL transmission, and the second CG-UCI indicates a second offset, the second duration, or a combination thereof.
- the second CG-UCI is at least a certain time after the first
- the second DL transmission starting time is at least a certain time earlier than the first DL transmission starting time.
- the second duration is at least a certain time greater than the first duration.
- the threshold value is configured by higher layer signaling.
- the delay budget for the UL ADU, packet, or the combination thereof is exceeded.
- the method further comprises dropping the remainder of the UL ADU, packet, or the combination thereof transmission.
- the second DL transmission starting time is at or later than a time at which the remainder of the UL ADU, packet, or the combination thereof transmission is dropped.
- the method further comprises indicating to a network device that the delay budget is exceeded, that the remainder of the UL ADU, packet, or the combination thereof transmission is to be dropped, or a combination thereof.
- the second DL transmission starting time, the second duration, or a combination thereof is further determined based on a time at which a remainder of a transmission of the UL ADU, packet, or the combination thereof is dropped.
- the method further comprises determining a set of UL extended reality (XR) poses to be canceled based on a delay budget for a DL ADU, packet, or a combination thereof, an UL ADU, packet, or a combination thereof, or a combination thereof being exceeded.
- XR extended reality
- the method further comprises indicating the set of UL XR poses to a network device.
- the method further comprises receiving an indication that the delay budget for a DL ADU, packet, or a combination thereof is exceeded or to be exceeded within a certain time, wherein, in response to the indication, the method further comprises determining a set of UL extended reality (XR) poses to be canceled, muted, or a combination thereof.
- XR extended reality
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Description
Claims
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US18/852,000 US20250220670A1 (en) | 2022-03-28 | 2023-03-28 | A configuration based on configured grant uplink control information |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US202263324415P | 2022-03-28 | 2022-03-28 | |
| US63/324,415 | 2022-03-28 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2023187652A1 true WO2023187652A1 (en) | 2023-10-05 |
Family
ID=87067043
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/IB2023/053089 Ceased WO2023187652A1 (en) | 2022-03-28 | 2023-03-28 | A configuration based on configured grant uplink control information |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US20250220670A1 (en) |
| WO (1) | WO2023187652A1 (en) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA3179183A1 (en) * | 2020-04-30 | 2021-11-04 | Vivo Mobile Communication Co., Ltd. | Downlink reception triggering method, terminal and network-side device |
| US20220095313A1 (en) * | 2020-09-18 | 2022-03-24 | Qualcomm Incorporated | Low latency transmission techniques for uplink power saving |
-
2023
- 2023-03-28 WO PCT/IB2023/053089 patent/WO2023187652A1/en not_active Ceased
- 2023-03-28 US US18/852,000 patent/US20250220670A1/en active Pending
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA3179183A1 (en) * | 2020-04-30 | 2021-11-04 | Vivo Mobile Communication Co., Ltd. | Downlink reception triggering method, terminal and network-side device |
| US20220095313A1 (en) * | 2020-09-18 | 2022-03-24 | Qualcomm Incorporated | Low latency transmission techniques for uplink power saving |
Also Published As
| Publication number | Publication date |
|---|---|
| US20250220670A1 (en) | 2025-07-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20230269769A1 (en) | Channel occupancy time sharing | |
| US12532301B2 (en) | Configuring demodulation reference signal bundling and transport block scheduling | |
| US20230283413A1 (en) | Data and feedback relaying | |
| US10986658B2 (en) | Uplink/downlink scheduling in a wireless communication system | |
| EP3665974A1 (en) | Transmit power control command for transmission power adjustment | |
| US12058681B2 (en) | Buffer status report for packet duplication | |
| US20230107546A1 (en) | Channel state information report scheduling | |
| US11456816B2 (en) | Flexible uplink/downlink transmissions in a wireless communication system | |
| CN117678176A (en) | Determine resources based on resource assignments | |
| US10736133B2 (en) | Burst-based transmission scheduling in a wireless communication system | |
| US20240014951A1 (en) | Transmitting a prioritized transport block | |
| US12537652B2 (en) | Monitoring downlink control information formats | |
| WO2023187716A1 (en) | Determining a delay budget based on a remaining delay budget | |
| US20250220670A1 (en) | A configuration based on configured grant uplink control information | |
| US20250212198A1 (en) | Configuring channel occupancy time | |
| WO2021229362A1 (en) | Transmitting a sidelink buffer status report for an empty buffer | |
| WO2022029728A1 (en) | Multiplexing hybrid automatic repeat request acknowledgment information | |
| US20250168877A1 (en) | Selecting a destination as part of a logical channel prioritization procedure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23736190 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 18852000 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 23736190 Country of ref document: EP Kind code of ref document: A1 |
|
| WWP | Wipo information: published in national office |
Ref document number: 18852000 Country of ref document: US |


