WO2022168698A1 - 曲げ成形装置、及び曲げ成形方法 - Google Patents
曲げ成形装置、及び曲げ成形方法 Download PDFInfo
- Publication number
- WO2022168698A1 WO2022168698A1 PCT/JP2022/002845 JP2022002845W WO2022168698A1 WO 2022168698 A1 WO2022168698 A1 WO 2022168698A1 JP 2022002845 W JP2022002845 W JP 2022002845W WO 2022168698 A1 WO2022168698 A1 WO 2022168698A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- glass plate
- upper mold
- zone
- mold
- carrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/02—Re-forming glass sheets
- C03B23/023—Re-forming glass sheets by bending
- C03B23/025—Re-forming glass sheets by bending by gravity
- C03B23/0252—Re-forming glass sheets by bending by gravity by gravity only, e.g. sagging
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/02—Re-forming glass sheets
- C03B23/023—Re-forming glass sheets by bending
- C03B23/03—Re-forming glass sheets by bending by press-bending between shaping moulds
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/02—Re-forming glass sheets
- C03B23/023—Re-forming glass sheets by bending
- C03B23/03—Re-forming glass sheets by bending by press-bending between shaping moulds
- C03B23/0302—Re-forming glass sheets by bending by press-bending between shaping moulds between opposing full-face shaping moulds
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/02—Re-forming glass sheets
- C03B23/023—Re-forming glass sheets by bending
- C03B23/035—Re-forming glass sheets by bending using a gas cushion or by changing gas pressure, e.g. by applying vacuum or blowing for supporting the glass while bending
- C03B23/0352—Re-forming glass sheets by bending using a gas cushion or by changing gas pressure, e.g. by applying vacuum or blowing for supporting the glass while bending by suction or blowing out for providing the deformation force to bend the glass sheet
- C03B23/0357—Re-forming glass sheets by bending using a gas cushion or by changing gas pressure, e.g. by applying vacuum or blowing for supporting the glass while bending by suction or blowing out for providing the deformation force to bend the glass sheet by suction without blowing, e.g. with vacuum or by venturi effect
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B35/00—Transporting of glass products during their manufacture, e.g. hot glass lenses, prisms
- C03B35/14—Transporting hot glass sheets or ribbons, e.g. by heat-resistant conveyor belts or bands
- C03B35/20—Transporting hot glass sheets or ribbons, e.g. by heat-resistant conveyor belts or bands by gripping tongs or supporting frames
- C03B35/202—Transporting hot glass sheets or ribbons, e.g. by heat-resistant conveyor belts or bands by gripping tongs or supporting frames by supporting frames
Definitions
- the carrier 20 before sandwiching and pressing the glass sheet 2 between the upper mold 30 and the lower mold 40, the carrier 20 is retracted from the press zone Z2 to the retraction zone Z3.
- a mechanism 27 and a slide mechanism 29 are provided.
- the upper mold 30 can enter the movement path of the carrier 20, and the glass plate 2 can be sandwiched between the upper mold 30 and the lower mold 40 and pressed. .
- the first elevating mechanism 37 lowers the upper mold 30 to bring the lower surface 31 of the upper mold 30 close to the glass plate 2 until there is a slight gap (step S102). . Subsequently, the suction device 32 sucks the glass plate 2 onto the upper mold 30 (step S103). Next, as shown in FIG. 2B, the first elevating mechanism 37 raises the glass plate 2 together with the upper mold 30 (step S104).
- the slide mechanism 29 lifts and removes the carrier 20 from the conveyor 25 in the press zone Z2, and horizontally slides the removed carrier 20 from the press zone Z2 to the evacuation zone Z3 (step S105).
- the slide mechanism 29 slides the empty carrier 20 below the carrier 20 previously lifted by the second lifting mechanism 27 .
- the first elevating mechanism 37 lowers the glass plate 2 together with the upper mold 30, bringing the glass plate 2 closer to the lower mold 40 until a slight gap is created (step S106). Subsequently, the suction device 32 releases the suction of the glass plate 2 to the upper mold 30 (step S107). Next, as shown in FIG. 3A, the first elevating mechanism 37 further lowers the upper mold 30 to sandwich and press the glass plate 2 between the upper mold 30 and the lower mold 40 (step S108).
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022579480A JP7826949B2 (ja) | 2021-02-03 | 2022-01-26 | 曲げ成形装置、及び曲げ成形方法 |
| EP22749572.8A EP4289797B1 (en) | 2021-02-03 | 2022-01-26 | Bend molding apparatus and bend molding method |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021015486 | 2021-02-03 | ||
| JP2021-015486 | 2021-02-03 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2022168698A1 true WO2022168698A1 (ja) | 2022-08-11 |
Family
ID=82741626
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2022/002845 Ceased WO2022168698A1 (ja) | 2021-02-03 | 2022-01-26 | 曲げ成形装置、及び曲げ成形方法 |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP4289797B1 (https=) |
| JP (1) | JP7826949B2 (https=) |
| WO (1) | WO2022168698A1 (https=) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003335534A (ja) * | 2002-03-13 | 2003-11-25 | Asahi Glass Co Ltd | ガラス板の曲げ成形方法および装置 |
| JP2015504409A (ja) * | 2011-11-23 | 2015-02-12 | コーニング インコーポレイテッド | 精密なガラスシート曲げプロセスおよびシステム |
| JP2017537864A (ja) * | 2014-10-28 | 2017-12-21 | サン−ゴバン グラス フランスSaint−Gobain Glass France | ガラス曲げプロセス用の工具 |
| JP2021015486A (ja) | 2019-07-12 | 2021-02-12 | いすゞ自動車株式会社 | 移動採血車運行管理システム及び移動採血車運行管理方法 |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS59121127A (ja) * | 1982-12-24 | 1984-07-13 | Central Glass Co Ltd | 板ガラスの強化方法 |
| JPS59141536U (ja) * | 1983-03-08 | 1984-09-21 | 日本板硝子株式会社 | 板ガラスのプレス成形用位置決め装置 |
| US7240519B2 (en) * | 2002-11-18 | 2007-07-10 | Ppg Industries Ohio, Inc. | Apparatus and method for bending glass sheets |
| JP2005206458A (ja) * | 2003-12-26 | 2005-08-04 | Asahi Glass Co Ltd | ガラス板の曲げ成形方法及びその装置 |
-
2022
- 2022-01-26 EP EP22749572.8A patent/EP4289797B1/en active Active
- 2022-01-26 JP JP2022579480A patent/JP7826949B2/ja active Active
- 2022-01-26 WO PCT/JP2022/002845 patent/WO2022168698A1/ja not_active Ceased
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003335534A (ja) * | 2002-03-13 | 2003-11-25 | Asahi Glass Co Ltd | ガラス板の曲げ成形方法および装置 |
| JP2015504409A (ja) * | 2011-11-23 | 2015-02-12 | コーニング インコーポレイテッド | 精密なガラスシート曲げプロセスおよびシステム |
| JP2017537864A (ja) * | 2014-10-28 | 2017-12-21 | サン−ゴバン グラス フランスSaint−Gobain Glass France | ガラス曲げプロセス用の工具 |
| JP2021015486A (ja) | 2019-07-12 | 2021-02-12 | いすゞ自動車株式会社 | 移動採血車運行管理システム及び移動採血車運行管理方法 |
Non-Patent Citations (1)
| Title |
|---|
| See also references of EP4289797A4 |
Also Published As
| Publication number | Publication date |
|---|---|
| EP4289797A4 (en) | 2025-01-01 |
| EP4289797A1 (en) | 2023-12-13 |
| JP7826949B2 (ja) | 2026-03-10 |
| JPWO2022168698A1 (https=) | 2022-08-11 |
| EP4289797B1 (en) | 2026-03-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102741190B (zh) | 玻璃板及玻璃板的制造方法 | |
| US20150274572A1 (en) | Method for manufacturing cover glass for display and device for manufacturing cover glass for display | |
| JP5886291B2 (ja) | ガラス基板を成形する装置及び方法 | |
| US8468850B2 (en) | Bending method for a glass plate and bending apparatus for a glass plate | |
| US10252930B2 (en) | Bent glass plate for optical use and fabrication method thereof | |
| US8746011B2 (en) | Method for cambering glass sheets by suction | |
| US20150274570A1 (en) | Method for manufacturing cover glass for display and device for manufacturing cover glass for display | |
| US20070157671A1 (en) | Method for crowning sheets of glass by pressing and suction | |
| US10640411B2 (en) | Device for bending sheets of glass | |
| CN104843976A (zh) | 一种3d曲面超薄玻璃弯曲成型装置和制造方法 | |
| CN102741177A (zh) | 玻璃板的退火方法及其装置 | |
| JPH03131539A (ja) | 曲げ成型用プレス型とガラス板の曲げ成型方法及びその装置 | |
| CN109952276B (zh) | 存在辐射反骨架的玻璃的重力弯曲 | |
| JP2020508282A (ja) | 減少した引張応力を有するガラスペイン | |
| CN110691759A (zh) | 用于对玻璃板进行成形的方法和装置 | |
| JPWO2016093031A1 (ja) | 合わせガラスの製造方法 | |
| EP0445672A1 (en) | Method of and apparatus for bend-shaping a glass plate and bending mold used for them | |
| TW202039379A (zh) | 玻璃板之成形裝置 | |
| TWI830868B (zh) | 玻璃板之成形方法 | |
| JP7826949B2 (ja) | 曲げ成形装置、及び曲げ成形方法 | |
| JP4420764B2 (ja) | ラミネート装置 | |
| RU2742682C1 (ru) | Устройство и способ изгибания прессованием стеклянных листов | |
| WO2013137154A1 (ja) | ガラス板の曲げ成形方法及び曲げ成形装置並びに合わせガラス | |
| JPH0729793B2 (ja) | 合せガラス用合せ素板ガラスの曲げ成形加工方法及びその装置 | |
| JPWO2006001474A1 (ja) | 合わせガラスの製造方法及び製造装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 22749572 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2022579480 Country of ref document: JP Kind code of ref document: A |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2022749572 Country of ref document: EP Effective date: 20230904 |
|
| WWG | Wipo information: grant in national office |
Ref document number: 2022749572 Country of ref document: EP |