WO2022115407A1 - Advanced lateral accessibility, segmented monitoring, and control of multi-lateral wells - Google Patents
Advanced lateral accessibility, segmented monitoring, and control of multi-lateral wells Download PDFInfo
- Publication number
- WO2022115407A1 WO2022115407A1 PCT/US2021/060463 US2021060463W WO2022115407A1 WO 2022115407 A1 WO2022115407 A1 WO 2022115407A1 US 2021060463 W US2021060463 W US 2021060463W WO 2022115407 A1 WO2022115407 A1 WO 2022115407A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- lateral
- wellbore
- segment
- production tubular
- control device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
- E21B41/0042—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches characterised by sealing the junction between a lateral and a main bore
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/124—Units with longitudinally-spaced plugs for isolating the intermediate space
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/04—Measuring depth or liquid level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/087—Well testing, e.g. testing for reservoir productivity or formation parameters
- E21B49/0875—Well testing, e.g. testing for reservoir productivity or formation parameters determining specific fluid parameters
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/06—Sleeve valves
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
Definitions
- the present disclosure relates to subterranean well development, and more specifically, the disclosure relates to systems for developing and producing dual-lateral wells.
- any workover involving entry into a branched lateral portion of a well can be lengthy, costly, and introduce risk due to uncertainties in entering the branched lateral portion.
- a workover can require the use of a workover rig or other specialize equipment and procedures to gain access to a lateral portion of a well.
- Embodiments of this disclosure provide well construction and completion methods and systems to integrate multilateral intelligent completions with mechanical sleeve inflow control devices in the lateral wellbores.
- a lateral access system enables rigless wireline and coil tubing access into each of the lateral wellbores.
- the lateral wellbores are subdivided into a number of lateral segments. Remote monitoring of each lateral segment is accomplished through wireless sensors or a tracer system. Fluid flow can be controlled at the lateral segment level by separate inflow control devices that are located within each lateral segment.
- the inflow control devices can be accessed through the lateral access system for mechanical adjustment. Logging operations can also be accomplished by passing a logging tool through the lateral access system.
- a method for producing fluids from a subterranean well includes forming the subterranean well having at least one lateral wellbore.
- the lateral wellbore is completed with a lateral production tubular that extends into the lateral wellbore.
- the lateral wellbore is subdivided into subsequent lateral segments, each lateral segment being defined by a downhole lateral packer and an uphole lateral packer.
- Each of the downhole lateral packer and the uphole lateral packer seal an annular lateral space defined by an outer diameter surface of the lateral production tubular and an inner diameter surface of the lateral wellbore.
- a main production tubular is extended into the subterranean well.
- the main production tubular includes a lateral access system that provides selective access to the lateral wellbore.
- a flow of a fluid within the lateral segment is controlled with an inflow control device of the lateral segment.
- the inflow control device is mechanically adjusted by a tool that is delivered to the inflow control device through the lateral access system.
- the lateral wellbore can be an open wellbore and the inner diameter surface of the lateral wellbore can be a subterranean formation.
- the flow of the fluids within the lateral segment can be monitored with a monitoring system of such lateral segment.
- a pressure of the fluids within the lateral segment can be monitored with the monitoring system of such lateral segment.
- a composition of the fluids within the lateral segment can be monitored with a monitoring system of such lateral segment.
- a flow of a production fluid within the main production tubular and the flow of the production fluid in an annular space external of the main production tubular can be controlled with a control valve system, where the control valve system is secured in line with the main production tubular.
- Controlling the flow of the fluid within the lateral segment with the inflow control device of the lateral segment can include shifting a sleeve of the inflow control device.
- Logging operations can be performed in the lateral wellbore by a logging system that is delivered to the lateral wellbore through the lateral access system.
- a method for producing fluids from a subterranean well includes forming the subterranean well having multiple lateral wellbores. Each of the multiple lateral wellbores is completed with a lateral production tubular that extends into an open bore of the lateral wellbore. Each of the multiple lateral wellbores is subdivided into subsequent lateral segments. Each lateral segment is defined by a downhole lateral packer and an uphole lateral packer. Each of the downhole lateral packer and the uphole lateral packer seal an annular lateral space defined by an outer diameter surface of the lateral production tubular and an inner diameter surface of the lateral wellbore. A main production tubular is extended into the subterranean well.
- the main production tubular includes a lateral access system that provides selective access to each of the multiple lateral wellbores.
- a flow of a fluid within each of the subsequent lateral segments is monitored for an amount of undesired fluid.
- the flow of the fluid within each of the subsequent lateral segments is controlled with an inflow control device of the lateral segment to reduce the amount of undesired fluid within a production fluid.
- the inflow control device of the lateral segment is mechanically adjusted by a tool that is delivered to the inflow control device through the lateral access system. Mechanical adjustment of the inflow control device of one of the lateral segments is independent of any adjustment of the inflow control device of any other of the lateral segments.
- a system for producing fluids from a subterranean well include the subterranean well having at least one lateral wellbore.
- a lateral production tubular extends into the lateral wellbore.
- the lateral wellbore is subdivided into subsequent lateral segments.
- Each lateral segment is defined by a downhole lateral packer and an uphole lateral packer.
- Each of the downhole lateral packer and the uphole lateral packer seal an annular lateral space defined by an outer diameter surface of the lateral production tubular and an inner diameter surface of the lateral wellbore.
- a main production tubular extends into the subterranean well.
- the main production tubular includes a lateral access system that provides selective access to the lateral wellbore.
- An inflow control device of the lateral segment is operable to control a flow of a fluid within the lateral segment with.
- the inflow control device is mechanically adjustable by a tool that is delivered to the inflow control device through the lateral access system.
- the lateral wellbore can be an open wellbore and the inner diameter surface of the lateral wellbore can be a subterranean formation.
- the lateral segment can include a monitoring system operable to monitor the flow of the fluids within the lateral segment.
- the lateral segment can alternately include a monitoring system operable to monitor a pressure of the fluids within the lateral segment.
- the lateral segment can alternately include a monitoring system operable to monitor a composition of the fluids within the lateral segment.
- the system can further include a control valve system, where the control valve system can be secured in line with the main production tubular.
- the control valve system can be operable to control a flow of a production fluid within the main production tubular and to control the flow of the production fluid in an annular space external of the main production tubular.
- the inflow control device of the lateral segment can include a sleeve that is shiftable to control the flow of the fluid within the lateral segment.
- a logging system can be delivered to the lateral wellbore through the lateral access system and can be operable to perform logging operations in the lateral wellbore.
- Figure 1 is a schematic sectional view of a subterranean well with a hydrocarbon development system in accordance with an embodiment of this disclosure.
- Figure 2 is a schematic detailed sectional view of a wellbore of a subterranean well with a hydrocarbon development system in accordance with an embodiment of this disclosure.
- the words “comprise,” “has,” “includes”, and all other grammatical variations are each intended to have an open, non-limiting meaning that does not exclude additional elements, components or steps.
- Embodiments of the present disclosure may suitably “comprise”, “consist” or “consist essentially of’ the limiting features disclosed, and may be practiced in the absence of a limiting feature not disclosed. For example, it can be recognized by those skilled in the art that certain steps can be combined into a single step.
- the term “substantially equal” means that the values being referenced have a difference of no more than two percent of the larger of the values being referenced.
- subterranean well 10 can have wellbore 12 that extends to an earth’s surface 14.
- Wellbore 12 can be drilled from surface 14 and into and through various formation zones of subterranean formations.
- Subterranean well 10 can be an offshore well or a land based well and can be used for producing hydrocarbons from a subterranean hydrocarbon reservoir.
- Subterranean well 10 includes a main wellbore 16 with a central axis 18.
- Main wellbore 16 can be a generally vertical well bore as shown in Figure 1, or can be angled relative to the plane of the surface 14.
- Subterranean well 10 can further include lower lateral wellbore 20 and upper lateral wellbore 22, each having a heel 24 and a toe 26.
- Lower lateral wellbore 20 and upper lateral wellbore 22 can extend from main wellbore 16 in a direction generally horizontally. In the embodiment of Figure 1, two lateral wellbores are shown. In alternate embodiments there can be one lateral wellbore or more than two lateral wellbores.
- Main production tubular 28 can extend into subterranean well 10 through main wellbore 16.
- Main production tubular 28 can extend from earth’s surface 14 and can provide a flow path for producing production fluids to the surface.
- the production fluids can include fluids that are delivered from the hydrocarbon reservoirs by way of lower lateral wellbore 20 and upper lateral wellbore 22.
- the production fluids can be delivered to a surface system 30 for further handling, transportation, refining, or storage.
- Each of the lateral wellbores can be completed with lateral production tubular 32.
- Lateral production tubular 32 extends into each of the lateral wellbores.
- Lateral production tubular 32 is in fluid communication with main production tubular 28.
- lateral production tubular 32 of lower lateral wellbore 20 can be secured to a downhole end of main production tubular 28.
- lateral production tubular 32 of lower lateral wellbore 20 can be connected to the downhole end of main production tubular 28 by way of liner hanger 34 and seal assemblies.
- the inner bore of the lower lateral production tubular 32 of lower lateral wellbore 20 is in direct fluid communication with the inner bore of main production tubular 28 through tubing section in 24.
- Lower packer assembly 36 can circumscribe main production tubular 28 proximate to the downhole end of main production tubular 28.
- Lower packer assembly 36 can seal annular space 38 external of main production tubular 28 and defined by the outer diameter surface of main production tubular 28 and the inner diameter surface of wellbore 12 so that fluids cannot travel between lower lateral wellbore 20 and annular space 38.
- fluids within annular lateral space 40 of lower lateral wellbore 20 can only enter main wellbore 16 by way of entering lateral production tubular 32 of lower lateral wellbore 20 and traveling within the bore of lateral production tubular 32 to the bore of main production tubular 28.
- Lateral production tubular 32 of upper lateral wellbore 22 can be secured within wellbore 12 by way of upper hanger assembly 42.
- Upper hanger assembly 42 can include a liner hanger so that the inner bore of lateral production tubular 32 of upper lateral wellbore 22 is in direct fluid communication with annular space 38.
- Upper hanger assembly 42 can further include upper packer 43.
- Upper packer 43 can circumscribe lateral production tubular 32 of upper lateral wellbore 22.
- Upper packer 43 can seal against the inner diameter surface of wellbore 12 so that fluids cannot travel between upper lateral wellbore 22 and annular space 38 past upper packer 43.
- fluids within annular lateral space 40 of upper lateral wellbore 22 can only enter main wellbore 16 by way of entering lateral production tubular 32 of upper lateral wellbore 22 and traveling within the bore of lateral production tubular 32 to annular space 38.
- control valve system 44 which includes inlet valve 50 and main control valve 54 can be secured in line with main production tubular 28.
- Control valve system 44 is a lateral access and isolation system.
- Main control valve 54 can control the flow of the production fluid from the lower lateral while inlet valve 50 controls the flow from upper laterals.
- Both inlet valve 50 and main control valve 54 can be remotely operated from the surface and has multiple choke setting to control the operation and rate of flow from each lateral independently.
- the lateral access and isolation system of control valve system 44 can further include one or more control packers 46.
- Control packer 46 can seal across annular space 38 uphole of the junction of main wellbore 16 with the lateral wellbore, downhole of the junction of main wellbore 16 with the lateral wellbore.
- a first control packer 46 can be located uphole of the junction of main wellbore 16 with the lateral wellbore
- a second control packer 46 can be located downhole of the junction of main wellbore 16 with the lateral wellbore.
- a control packer 46 can be located between each lateral wellbore. Each of the control packers 46 seal across annular space 38 so that fluids within annular space 38 cannot travel within annular space 38 past the control packer 46.
- the lateral access and isolation system of control valve system 44 can further include a packer bypass valve 48 to allow flow from the lateral.
- Packer bypass valve 48 can be, for example, a perforated pipe or a sliding sleeve valve.
- Packer bypass valve 48 is associated with a control packer 46 that is used to secure the lateral access system 56 in the correct location.
- Packer bypass valve 48 can be a mechanical valve and can provide a fluid flow path for a fluid within annular space to travel within annular space 38 past control packer 46.
- Isolation packer 57 is located between lateral access system 56 and lower packer assembly 36 provides fluid isolation between the lower later and upper lateral.
- fluid that is produced from the upper lateral wellbore can travel uphole within annular space 38, through packer bypass valve 48 past control packer 46, and into annular space 38 uphole of control packer 46.
- the produced fluid can then enter main production tubular 28 through inlet valve 50.
- Inlet valve 50 can be remotely controlled from the surface to control the rate of flow from the upper lateral.
- Inlet valve 50 can have positions between fully open and fully closed and can be adjusted to such positions to control the rate of flow of fluid from upper lateral within annular space 38 traveling through packer bypass valve 48.
- Main control valve 54 provides a fluid flow path between the lower lateral and the bore of main production tubular 28.
- Inlet valve 50 allows for fluid produced from upper lateral wellbore 22 to enter the bore of main production tubular 28.
- Main packer 52 can seal annular space 38 so that the fluids within annular space 38 cannot travel uphole of main packer 52 and must instead enter main production tubular 28 to be produced to the surface.
- control valve system 44 further includes main control valve 54 and inlet valve 50.
- Main control valve 54 can be a smart valve that can be operated remotely from the surface.
- Main control valve 54 can be a wired or a wireless device.
- main control valve 54 In the open position, main control valve 54 will allow fluid from the lower lateral to main production tubular 28 to travel through the bore of main production tubular 28 past main control valve 54. In the closed position, main control valve 54 will block fluid within main production tubular 28 from traveling through the bore of main production tubular 28 past main control valve 54.
- Main control valve 54 can have multiple intermediate positions between fully open and fully closed to control inflow from the lower lateral and can be remotely adjusted from surface without well intervention to such positions to control the rate of flow of fluid from lower lateral to main production tubular 28 traveling past main control valve 54.
- control valve system 44 provides an intelligent completion features that can be used to control the flow of fluids at the lateral level. That is, control valve system 44 can control the rate of flow of fluids being produced from each lateral wellbore.
- lateral access system 56 is included in line with main production tubular 28 to provide selective access to upper lateral wellbore 22 from main production tubular 28.
- the lateral access system includes features to accurately align the tubing window with the casing window. This alignment between the tubing window and casing window is critical to allow an intervention tool that is run through main production tubular 28 to enter into a lateral.
- the lateral access tubing window can include an internal nipple profile to secure an isolation sleeve to prevent fluid from the lateral entering through the tubing window. This isolation sleeve can divert the fluid from the lateral into the annular space, through the packer bypass valve 48, and then to the inlet valve 50.
- lateral access system 56 can be operated to allow a tool to be riglessly delivered from main production tubular 28, through an open window of lateral access system 56, and into the bore of upper lateral wellbore 22.
- Lateral access system 56 can include a directing member, such as a tubing whipstock, that will help to direct the tool through the window of lateral access system 56 and into upper lateral wellbore 22.
- the tool can further be lowered into the bore of lateral production tubular 32 and extend through lateral production tubular 32.
- a production logging tool or inflow control device adjustment tool can be delivered into lateral production tubular 32 on a wireline or coiled tubing through lateral access system 56.
- each lateral wellbore can be subdivided into subsequent lateral segments 58 by a series of lateral packers 60.
- Each lateral segment 58 is defined between uphole lateral packer 62 and downhole lateral packer 64. Because the lateral segments 58 are adjacent, an uphole lateral packer 62 of one of the lateral segments 58 can be a downhole lateral packer 64 of an adjacent lateral segment 58. Similarly, a downhole lateral packer 64 of one of the lateral segments 58 can be an uphole lateral packer 62 of an adjacent lateral segment 58.
- Annular lateral space 40 is defined by an outer diameter surface of lateral production tubular 32 and an inner diameter surface of the lateral wellbore.
- the lateral wellbores are open wellbores and the inner diameter surface of the lateral wellbore is a subterranean formation.
- the lateral wellbores can be lined with a liner, for example with a casing or other tubular member, and the inner diameter surface of the lateral wellbore is the liner.
- each lateral packer 60 there are four lateral packers 60 in each lateral wellbore, defining three lateral segments 58 in each lateral wellbore.
- a fourth lateral segment of each lateral wellbore is defined between the downhole-most lateral packer 60 and toe of 26 of each lateral wellbore.
- lateral segments 58 may be short as 100 ft to as long as 2500 ft.
- Each lateral segment 58 includes a separate inflow control device 66.
- Inflow control device 66 can control a flow of fluid that travels into lateral production tubular 32 from the lateral wellbore of lateral segment 58.
- Inflow control device 66 can provide a fluid flow path into lateral production tubular 32 from the portion of the lateral wellbore of lateral segment 58.
- the production entrance of inflow control device 66 may be in the form of a screen or perforations.
- the inflow control devices 66 in each compartment can alternately have a sliding sleeve that can be opened and closed to control inflow from each compartment.
- Each inflow control device 66 can be mechanically adjusted by a tool that is delivered to inflow control device 66 through lateral access system 56. As an example, a tool can be lowered into the bore of main production tubular 28, through lateral access system 56, and into the bore of lateral production tubular 32. The tool can then extend to inflow control device 66.
- inflow control device 66 can have a sleeve that can be shifted by the mechanical tool.
- the shifting of the sleeve can adjust the rate of the flow of fluids through inflow control device 66, for example by covering and uncovering openings that provide the fluid flow path between lateral production tubular 32 and annular lateral space 40 of lateral segment 58.
- Each lateral segment 58 includes a separate monitoring system 68.
- Monitoring system 68 can include, for example, a flow monitor unit, a pressure sensor unit, a fluid composition monitor unit, and any combination of such units. Monitoring system 68 can therefore monitor a flow rate of the fluids within lateral segment 58, a pressure of the fluids within lateral segment 58, a composition of the fluids within lateral segment 58, and any combination of such functions.
- Monitoring system 68 can be a wireless system that can be remotely monitored by an operator at the surface. Wireless pressure, temperature and fluid monitoring sensors may be placed in each lateral segment 58 for performing monitoring operations. Alternately, monitoring system 68 can be a tracer system. Unique oil, water and gas tracers can be placed in the annulus of each lateral segment 58. Fluid samples are collected and analyzed at the surface to identify any lateral segment 58 with water and gas that should be closed by stopping lateral access or by closing inflow control device 66, such as by sleeve shifting. Chemical tracers allow downhole monitoring without well intervention in laterals and without downhole cables for regular permanent downhole sensors.
- Monitoring system 68 can identify the compartments with undesirable fluid, such as compartments with high water or gas ratios.
- the high water or gas production will can be associated with a particular lateral segment 58.
- an operator has the ability to close or choke back the inflow control device 66 of such lateral segment 58 mechanically using wireline or coil tubing access into lateral production tubular 32.
- the inflow control device 66 of the other lateral segments 58 of the lateral wellbore can be unchanged. In this way, fluid flow into the lateral segment 58 with the high water or gas ratio can be stopped or reduced while production of fluids through other lateral segments 58 of the same lateral wellbore can continue.
- subterranean well 10 is drilled and completed with multiple lateral wellbores sidetracked from the main wellbore 8.
- Each lateral wellbore is completed with lateral packers 60 defining separate lateral segments 58.
- Each lateral segment includes a separate monitoring system 68 and separate inflow control device 66.
- During production the performance of each lateral segment 58 is remotely monitored and lateral segments 58 with high water or gas are identified and tracked.
- smart well valves can be remotely operated to reduce drawdown from the whole lateral wellbore to reduce the production of water or gas. If the lateral level control does not sufficiently reduce the water or gas production, then wireline or coil tubing can be mobilized to riglessly access the applicable lateral wellbore and choke back fluid flow from the offending lateral segment 58.
- Embodiments of this disclosure therefore provide compartment or segment level monitoring and control in multilateral wells. Such monitoring of a water breakthrough will reduce the need for conventional logging. However, if conventional logging is desired, logging operations in any lateral wellbore can be performed by a logging system that is delivered to the lateral wellbore through lateral access system 56.
- systems and method of the current application can extend well life by mechanical shut off of only the offending lateral segment, while continuing to produce from adjacent sections within the same lateral wellbore.
- the inflow rate from each lateral can be optimized to reduce coning and delay water breakthrough.
- Embodiments of this disclosure provide a finer and more precise level of monitoring and control within lateral wellbores compared to a current practice of controlling the whole lateral wellbore from the junction of the lateral wellbore and the main wellbore.
- Embodiments of this disclosure are well adapted to carry out the objects and attain the ends and advantages mentioned, as well as others that are inherent. While embodiments of the disclosure has been given for purposes of disclosure, numerous changes exist in the details of procedures for accomplishing the desired results. These and other similar modifications will readily suggest themselves to those skilled in the art, and are intended to be encompassed within the spirit of the present disclosure and the scope of the appended claims.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US17/103,407 | 2020-11-24 | ||
| US17/103,407 US11692417B2 (en) | 2020-11-24 | 2020-11-24 | Advanced lateral accessibility, segmented monitoring, and control of multi-lateral wells |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2022115407A1 true WO2022115407A1 (en) | 2022-06-02 |
Family
ID=80225684
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2021/060463 Ceased WO2022115407A1 (en) | 2020-11-24 | 2021-11-23 | Advanced lateral accessibility, segmented monitoring, and control of multi-lateral wells |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US11692417B2 (en) |
| SA (1) | SA523440561B1 (en) |
| WO (1) | WO2022115407A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2025085338A1 (en) * | 2023-10-16 | 2025-04-24 | Saudi Arabian Oil Company | Method for deep well testing and permeability determination in different directions |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12168929B2 (en) * | 2023-03-10 | 2024-12-17 | Saudi Arabian Oil Company | Quantifying zonal flow in multi-lateral wells via taggants of fluids |
| US12523123B2 (en) * | 2023-08-25 | 2026-01-13 | Halliburton Energy Services, Inc. | Downhole fluid separator design in multilateral well |
| US12305504B2 (en) * | 2023-10-19 | 2025-05-20 | Saudi Arabian Oil Company | Quantifying zonal flow in multi-lateral wells via taggants of fluids |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0937861A2 (en) * | 1998-02-24 | 1999-08-25 | Halliburton Energy Services, Inc. | Apparatus and methods for completing a wellbore |
| US20040069487A1 (en) * | 2002-10-09 | 2004-04-15 | Schlumberger Technology Corporation | System and method for installation and use of devices in microboreholes |
| US20130020088A1 (en) * | 2011-07-19 | 2013-01-24 | Schlumberger Technology Corporation | Chemically targeted control of downhole flow control devices |
| US20130255938A1 (en) * | 2012-03-29 | 2013-10-03 | Halliburton Energy Services, Inc. | Activation-Indicating Wellbore Stimulation Assemblies and Methods of Using the Same |
| WO2014124533A1 (en) * | 2013-02-12 | 2014-08-21 | Devon Canada Corporation | Well injection and production method and system |
| WO2016007165A1 (en) * | 2014-07-10 | 2016-01-14 | Halliburton Energy Services Inc. | Multilateral junction fitting for intelligent completion of well |
| WO2019059885A1 (en) * | 2017-09-19 | 2019-03-28 | Halliburton Energy Services, Inc. | Energy transfer mechanism for a junction assembly to communicate with a lateral completion assembly |
| WO2019125410A1 (en) * | 2017-12-19 | 2019-06-27 | Halliburton Energy Services, Inc. | Energy transfer mechanism for wellbore junction assembly |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2302349B (en) | 1995-02-09 | 1999-08-18 | Baker Hughes Inc | Subsurface valve position and monitoring system for a production well |
| US6095248A (en) | 1998-11-03 | 2000-08-01 | Halliburton Energy Services, Inc. | Method and apparatus for remote control of a tubing exit sleeve |
| US6951252B2 (en) | 2002-09-24 | 2005-10-04 | Halliburton Energy Services, Inc. | Surface controlled subsurface lateral branch safety valve |
| US20090080291A1 (en) | 2007-09-25 | 2009-03-26 | Tubel Paulo S | Downhole gauge telemetry system and method for a multilateral well |
| US8104535B2 (en) * | 2009-08-20 | 2012-01-31 | Halliburton Energy Services, Inc. | Method of improving waterflood performance using barrier fractures and inflow control devices |
| US9388686B2 (en) | 2010-01-13 | 2016-07-12 | Halliburton Energy Services, Inc. | Maximizing hydrocarbon production while controlling phase behavior or precipitation of reservoir impairing liquids or solids |
| US9249559B2 (en) | 2011-10-04 | 2016-02-02 | Schlumberger Technology Corporation | Providing equipment in lateral branches of a well |
| US9140102B2 (en) * | 2011-10-09 | 2015-09-22 | Saudi Arabian Oil Company | System for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well |
| MX361795B (en) | 2013-05-24 | 2018-12-17 | Schlumberger Technology Bv | Production logging in multi-lateral wells. |
| MX386266B (en) | 2014-09-17 | 2025-03-11 | Halliburton Energy Services Inc | COMPLETION DEFLECTOR FOR SMART WELL COMPLETION. |
| CA2987408C (en) | 2015-06-22 | 2021-03-09 | Saudi Arabian Oil Company | Systems, methods, and apparatuses for downhole lateral detection using electromagnetic sensors |
| US10774625B2 (en) * | 2018-01-19 | 2020-09-15 | Saudi Arabian Oil Company | Method of producing from a hydrocarbon bearing zone with laterals extending from an inclined main bore |
| US10352137B1 (en) * | 2019-01-07 | 2019-07-16 | Upwing Energy, LLC | Removing liquid by subsurface compression system |
-
2020
- 2020-11-24 US US17/103,407 patent/US11692417B2/en active Active
-
2021
- 2021-11-23 WO PCT/US2021/060463 patent/WO2022115407A1/en not_active Ceased
-
2023
- 2023-04-28 SA SA523440561A patent/SA523440561B1/en unknown
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0937861A2 (en) * | 1998-02-24 | 1999-08-25 | Halliburton Energy Services, Inc. | Apparatus and methods for completing a wellbore |
| US20040069487A1 (en) * | 2002-10-09 | 2004-04-15 | Schlumberger Technology Corporation | System and method for installation and use of devices in microboreholes |
| US20130020088A1 (en) * | 2011-07-19 | 2013-01-24 | Schlumberger Technology Corporation | Chemically targeted control of downhole flow control devices |
| US20130255938A1 (en) * | 2012-03-29 | 2013-10-03 | Halliburton Energy Services, Inc. | Activation-Indicating Wellbore Stimulation Assemblies and Methods of Using the Same |
| WO2014124533A1 (en) * | 2013-02-12 | 2014-08-21 | Devon Canada Corporation | Well injection and production method and system |
| WO2016007165A1 (en) * | 2014-07-10 | 2016-01-14 | Halliburton Energy Services Inc. | Multilateral junction fitting for intelligent completion of well |
| WO2019059885A1 (en) * | 2017-09-19 | 2019-03-28 | Halliburton Energy Services, Inc. | Energy transfer mechanism for a junction assembly to communicate with a lateral completion assembly |
| WO2019125410A1 (en) * | 2017-12-19 | 2019-06-27 | Halliburton Energy Services, Inc. | Energy transfer mechanism for wellbore junction assembly |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2025085338A1 (en) * | 2023-10-16 | 2025-04-24 | Saudi Arabian Oil Company | Method for deep well testing and permeability determination in different directions |
Also Published As
| Publication number | Publication date |
|---|---|
| US20220162927A1 (en) | 2022-05-26 |
| US11692417B2 (en) | 2023-07-04 |
| SA523440561B1 (en) | 2024-10-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11692417B2 (en) | Advanced lateral accessibility, segmented monitoring, and control of multi-lateral wells | |
| US9062530B2 (en) | Completion assembly | |
| US7367395B2 (en) | Sand control completion having smart well capability and method for use of same | |
| US8127845B2 (en) | Methods and systems for completing multi-zone openhole formations | |
| US6513599B1 (en) | Thru-tubing sand control method and apparatus | |
| CA2952247C (en) | Multi-lateral well system | |
| US5941308A (en) | Flow segregator for multi-drain well completion | |
| US6722440B2 (en) | Multi-zone completion strings and methods for multi-zone completions | |
| US8037940B2 (en) | Method of completing a well using a retrievable inflow control device | |
| US10145219B2 (en) | Completion system for gravel packing with zonal isolation | |
| CA2847875C (en) | Dual purpose observation and production well | |
| US9644461B2 (en) | Flow control device and method | |
| US11512563B2 (en) | Systems and methods for opening screen joints | |
| US9574428B2 (en) | Screened production sleeve for multilateral junctions | |
| US12024985B2 (en) | Selective inflow control device, system, and method | |
| US20100212895A1 (en) | Screen Flow Equalization System | |
| EP4259899B1 (en) | Controlling fluid flow through a wellbore tubular | |
| US9828826B2 (en) | Wellbore isolation system with communication lines | |
| US20240376799A1 (en) | Concentric smart well completion | |
| US20160010420A1 (en) | Wellbore Isolation System with Communication Lines | |
| US20090139714A1 (en) | Interventionless pinpoint completion and treatment | |
| NO349412B1 (en) | Wellbore isolation system and method for isolating a lower completion. | |
| OA16528A (en) | Completion assembly. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21854702 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 523440561 Country of ref document: SA |
|
| 32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 05/10/2023) |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 21854702 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 523440561 Country of ref document: SA |
|
| WWG | Wipo information: grant in national office |
Ref document number: 523440561 Country of ref document: SA |