WO2022100175A1 PCT/CN2021/112279 CN2021112279W WO2022100175A1 WO 2022100175 A1 WO2022100175 A1 WO 2022100175A1 CN 2021112279 W CN2021112279 W CN 2021112279W WO 2022100175 A1 WO2022100175 A1 WO 2022100175A1
Authority
WO
WIPO (PCT)
Prior art keywords
shaped
steel
shaped column
portal
column
Prior art date
Application number
PCT/CN2021/112279
Other languages
French (fr)
Chinese (zh)
Inventor
卢林枫
Original Assignee
长安大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN202011261200.4 external-priority
Application filed by 长安大学 filed Critical 长安大学
Publication of WO2022100175A1 publication Critical patent/WO2022100175A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures

Abstract

An assembly method for an H-beam combined special shaped column portal rigid frame structure, comprising: prefabrication preparation: preparing H-beams used for forming L-shaped columns of end portal rigid frames, T-shaped columns of middle portal rigid frames, and longitudinal steel beams (11), each L-shaped column comprising an L-shaped column primary H-beam (1) and an L-shaped column secondary H-beam (2), each T-shaped column comprising a T-shaped column primary H-beam (3) and a T-shaped column secondary H-beam (4), and the L-shaped column secondary H-beams (2) and the T-shaped column secondary H-beams (4) being punched to be connected to the longitudinal steel beams (11) and portal frame steel beams (12) respectively by means of longitudinal beam end plates (16) and portal frame end plates (14); assembly of special shaped column portal rigid frames: connecting the portal frame steel beams (12) to the L-shaped column secondary H-beams (2) and the T-shaped column secondary H-beams (4) by means of first high strength bolts (15); assembly of an H-beam combined special shaped column portal rigid frame structure; and assembly of the end portal rigid frames and the middle portal rigid frames. The assembly method is low in cost, large in bending stiffness, and rich in section combination form.

Description

一种H型钢组合异形柱门式刚架结构装配方法A kind of H-shaped steel combined special-shaped column portal rigid frame structure assembly method 技术领域technical field
本发明属于异形柱门式刚架结构装配技术领域,具体涉及一种H型钢组合异形柱门式刚架结构装配方法。The invention belongs to the technical field of assembling a special-shaped column portal rigid frame structure, and particularly relates to an assembly method of an H-shaped steel combined special-shaped column portal rigid frame structure.
背景技术Background technique
我国每年的单层工业厂房建设量非常大。门式刚架轻型房屋钢结构是常采用的结构体系,国家也颁布实施了《门式刚架轻型房屋钢结构技术规范》规范也规定了目前国内的门式刚架结构仅能用于起重量不大于20吨的A1~A5工作级别的桥式吊车。按照规范,门式刚架柱为等截面或变截面的H形钢柱,带桥式吊车的门式刚架结构采用等截面柱。目前应用的门式钢架结构纵向不设置与门架柱刚接的纵向钢梁,只设置支撑系统(上柱间支撑,下柱间支撑和屋面支撑)与钢系杆(牛腿处,檐口和屋脊),而门架柱为H形柱,强轴作用于钢架平面内,其绕弱轴的刚度较差,平面外稳定性依靠柱间支撑程度较高,自身的平面外稳定强度较低,上述这些原因决定了目前所使用的门式钢架结构的纵向刚度比较差,不能承受20吨以上桥式吊车带来的水平作用荷载,需要按重型厂房结构设计,结构复杂且用钢量不合理而增加结构造价。与我国倡导的发展绿色建筑和“节地、节能、节水、节材”的建筑可持续发展战略相违背。我国热轧H型钢的年产量已高达1600万吨,但热轧H型钢在钢结构中的应用仅为15%~20%,远低于发达国家40%~50%的水平,不利于国家经济建设。即使想在带20吨以下桥式吊车的门式刚架结构中使用热轧H型钢,由于其弱轴刚度差,现有生产的型钢截面不容易满足门架柱稳定承载力的要求,需要采用焊接H形截面,造价提高。国外现有热轧H型钢应用比例高的原因是采用了热轧H型钢和剖分T型钢焊成的钢异形柱替代热轧H型钢柱。但是剖分T型钢由于市场使用份额少,我国一些大型钢铁公司也是按订单来组织生产,因此剖分T型钢价格较热轧H型钢高,货源短缺,而且剖分T型钢的截面高度有限(高度仅为所选热轧H型钢的一半),因此采用钢异形柱的实际工程几乎没有。近年来,我国政府大力推广各类装配式结 构,对结构装配率也有明确要求,提高现有门式刚架的结构装配率也是必然的趋势。my country's annual construction of single-story industrial plants is very large. The steel structure of portal rigid frame light house is a commonly used structural system. The state has also promulgated and implemented the "Technical Specification for Steel Structure of Portal Rigid Frame Lightweight House", which also stipulates that the current domestic portal rigid frame structure can only be used for lifting weight. Overhead cranes of A1 to A5 working levels not greater than 20 tons. According to the specification, the portal frame column is an H-shaped steel column with constant or variable cross-section, and the portal frame structure with bridge crane adopts equal-section columns. The currently applied portal steel frame structure is not provided with longitudinal steel beams rigidly connected to the portal columns, but only with support systems (support between upper columns, support between lower columns and roof support) and steel tie rods (corbels, cornices) and roof ridge), and the gantry column is an H-shaped column, the strong axis acts in the plane of the steel frame, its stiffness around the weak axis is poor, the out-of-plane stability depends on the support degree between the columns, and its own out-of-plane stability strength is relatively high. The above reasons determine that the longitudinal rigidity of the currently used portal steel frame structure is relatively poor, and it cannot withstand the horizontal action load brought by the bridge crane of more than 20 tons. Unreasonable and increase the structural cost. It is contrary to the development of green buildings and the sustainable development strategy of "land saving, energy saving, water saving and material saving" advocated by our country. The annual output of hot-rolled H-beams in my country has reached 16 million tons, but the application of hot-rolled H-beams in steel structures is only 15% to 20%, far below the level of 40% to 50% in developed countries, which is not conducive to the national economy. building. Even if you want to use hot-rolled H-section steel in the portal frame structure with overhead cranes below 20 tons, due to the poor stiffness of the weak shaft, the existing section of the section steel is not easy to meet the requirements of the stable bearing capacity of the gantry column. Welding H-shaped section increases the cost. The reason for the high application ratio of existing hot-rolled H-beams abroad is that the hot-rolled H-beams are replaced by steel special-shaped columns welded by hot-rolled H-beams and split T-beams. However, due to the small market share of split T-section steel, some large steel companies in my country also organize production according to orders. Therefore, the price of split T-section steel is higher than that of hot-rolled H-section steel, and the supply is in short supply. Moreover, the section height of split T-section steel is limited (height). Only half of the selected hot-rolled H-beam), so there is almost no actual engineering with steel special-shaped columns. In recent years, the Chinese government has vigorously promoted various prefabricated structures, and has clear requirements for the structural assembly rate. It is also an inevitable trend to improve the structural assembly rate of the existing portal frame.
发明内容SUMMARY OF THE INVENTION
本发明所要解决的技术问题在于针对上述现有技术中的不足,提供一种H型钢组合异形柱门式刚架结构装配方法,直接采用热轧H型钢组合成异形柱,其与采用热轧H型钢和剖分T型钢焊成的异形柱相比,型材采购方便,更具有成本优势,而且截面组合形式更丰富,截面抗弯刚度更大,更容易满足工程设计需要,可以在现有带20吨以下桥式吊车的门式刚架结构和带20吨以上桥式吊车的门式刚架结构中使用,便于推广使用。The technical problem to be solved by the present invention is to provide a method for assembling an H-shaped steel combined special-shaped column portal rigid frame structure in view of the above-mentioned deficiencies in the prior art. Compared with the special-shaped column welded by the split T-section steel, the section steel is more convenient to purchase and has more cost advantages, and the cross-section combination forms are more abundant, the bending stiffness of the section is larger, and it is easier to meet the needs of engineering design. It is used in the portal rigid frame structure of bridge cranes below 20 tons and the portal rigid frame structure with bridge cranes above 20 tons, which is convenient for popularization and use.
为解决上述技术问题,本发明采用的技术方案是:一种H型钢组合异形柱门式刚架结构装配方法,其特征在于,该方法包括以下步骤:In order to solve the above-mentioned technical problems, the technical scheme adopted in the present invention is: a method for assembling an H-shaped steel composite special-shaped column portal rigid frame structure, characterized in that the method comprises the following steps:
步骤一、预制准备:按照设计图纸在工厂内准备连接相邻两榀异形柱门式刚架的纵向钢梁所需的H型钢;Step 1. Prefabrication preparation: Prepare the H-beams required to connect the longitudinal steel beams of the adjacent two special-shaped column portal rigid frames in the factory according to the design drawings;
所述异形柱门式刚架为位于刚架结构端部的端位门式刚架或位于刚架结构中部的中位门式刚架;The special-shaped column portal rigid frame is an end portal rigid frame located at the end of the rigid frame structure or a mid-position portal rigid frame located in the middle of the rigid frame structure;
按照设计图纸在工厂内准备位于刚架结构端部的端位门式刚架的L型柱、位于刚架结构中部的中位门式刚架的T字型柱所需的H型钢;Prepare the H-shaped steel required for the L-shaped column of the end portal frame at the end of the frame structure and the T-shaped column of the middle portal frame at the middle of the frame structure in the factory according to the design drawings;
其中,L型柱包括L型柱主H型钢和L型柱辅H型钢,T字型柱包括T字型柱主H型钢和T字型柱辅H型钢;在L型柱辅H型钢的一个翼缘板、以及T字型柱辅H型钢的一个翼缘板与门架钢梁连接位置处打孔;在L型柱主H型钢的一个翼缘板、以及T字型柱主H型钢与纵向钢梁连接位置处打孔;Among them, the L-shaped column includes the main H-shaped steel of the L-shaped column and the auxiliary H-shaped steel of the L-shaped column, and the T-shaped column includes the main H-shaped steel of the T-shaped column and the auxiliary H-shaped steel of the T-shaped column; in one of the auxiliary H-shaped steel of the L-shaped column The flange plate and a flange plate of the auxiliary H-shaped steel of the T-shaped column and the connection position of the gantry steel beam are punched; a flange plate of the main H-shaped steel of the L-shaped column, and the main H-shaped steel of the T-shaped column and the steel beam are punched. Punch holes at the connection positions of longitudinal steel beams;
在纵向钢梁的两端均焊接纵梁端板,在纵梁端板上打孔;The longitudinal beam end plates are welded at both ends of the longitudinal steel beam, and holes are punched in the longitudinal beam end plates;
在门架钢梁的两端均焊接门架端板,在门架端板上打孔;Weld the gantry end plates at both ends of the gantry steel beam, and punch holes in the gantry end plates;
步骤二、异形柱门式刚架的装配:Step 2. Assembly of the special-shaped column portal rigid frame:
端位门式刚架的装配过程:将L型柱辅H型钢的一个翼缘板连接在L型柱主H型钢腹板的端部位置,形成L型柱,在L型柱上焊接钢牛腿;按照设计图纸将两个呈对称设置且焊接有钢牛腿的L型柱安装就位,在两个呈对称设置且焊接有钢牛腿的L型柱之间装配门架钢梁,门架端板通过多个第一高强度螺栓与L型柱辅H型钢的另一个翼缘板连接;The assembly process of the end portal frame: connect a flange plate of the L-shaped column auxiliary H-shaped steel to the end position of the main H-shaped steel web of the L-shaped column to form an L-shaped column, and weld the steel cow on the L-shaped column. Legs; install the two symmetrically arranged L-shaped columns with steel corbels welded in place according to the design drawings, and assemble the gantry steel beams between the two symmetrically arranged L-shaped columns with welded steel corbels. The frame end plate is connected with another flange plate of the L-shaped column auxiliary H-shaped steel through a plurality of first high-strength bolts;
中位门式刚架的装配过程:将T字型柱辅H型钢的一个翼缘板连接在T字型柱主H型钢腹板的中心位置,形成T字型柱,在T字型柱上焊接钢牛腿;按照设计图纸将两个呈对称设置且焊接有钢牛腿的T字型柱安装就位,在两个呈对称设置且焊接有钢牛腿的T字型柱之间装配门架钢梁,门架端板通过多个第一高强度螺栓与T字型柱辅H型钢的另一个翼缘板连接;The assembly process of the median portal frame: connect a flange plate of the auxiliary H-shaped steel of the T-shaped column to the center of the main H-shaped steel web of the T-shaped column to form a T-shaped column, on the T-shaped column. Weld steel corbels; install two symmetrically arranged T-shaped columns with steel corbels welded in place according to the design drawings, and assemble a door between the two symmetrically arranged and welded steel corbels T-shaped columns The frame steel beam, the gantry end plate is connected with another flange plate of the T-shaped column auxiliary H-shaped steel through a plurality of first high-strength bolts;
步骤三、H型钢组合异形柱门式刚架结构装配,过程如下:Step 3, H-beam combination special-shaped column portal rigid frame structure assembly, the process is as follows:
步骤301、端位门式刚架与中位门式刚架的装配:端位门式刚架和与其相邻的中位门式刚架之间的纵向钢梁一端的纵梁端板通过多个第二高强度螺栓与L型柱主H型钢的一个翼缘板连接,端位门式刚架和与其相邻的中位门式刚架之间的纵向钢梁另一端的纵梁端板通过多个第二高强度螺栓与T字型柱主H型钢的一个翼缘板连接;Step 301, the assembly of the end portal rigid frame and the middle portal rigid frame: the longitudinal beam end plate at one end of the longitudinal steel beam between the end portal rigid frame and the adjacent median portal rigid frame passes through multiple A second high-strength bolt is connected to a flange plate of the main H-shaped steel of the L-shaped column, and the longitudinal beam end plate at the other end of the longitudinal steel beam between the end portal frame and its adjacent middle portal frame Connect with a flange plate of the main H-section steel of the T-shaped column through a plurality of second high-strength bolts;
步骤302、相邻两个中位门式刚架之间的纵向钢梁的两个纵梁端板分别与对应的T字型柱主H型钢的一个翼缘板连接;Step 302, connecting the two longitudinal beam end plates of the longitudinal steel beam between the two adjacent median portal rigid frames with one flange plate of the corresponding T-shaped column main H-shaped steel respectively;
步骤303、相邻两榀异形柱门式刚架之间的门架钢梁通过屋脊钢系杆连接;相邻两榀异形柱门式刚架之间同侧的两个钢牛腿通过牛腿钢系杆连接;Step 303, the portal steel beams between the two adjacent special-shaped column portal rigid frames are connected by the ridge steel tie rods; the two steel corbels on the same side between the adjacent two special-shaped column portal rigid frames are connected by the corbels Steel tie rod connections;
步骤四、端位门式刚架和与其相邻的中位门式刚架之间装配支撑系统。Step 4: Assemble a support system between the end portal rigid frame and its adjacent median portal rigid frame.
上述的一种H型钢组合异形柱门式刚架结构装配方法,其特征在于:步骤四中,所述支撑系统包括设置在端位门式刚架的门架钢梁和与其相邻的中位门式刚架的门架钢梁之间的屋面支撑、以及设置在端位门式刚架和与其相邻的中位门式刚架同侧的柱体之间的下柱间支撑和上柱间支撑。The above-mentioned method for assembling an H-shaped steel composite special-shaped column portal rigid frame structure is characterized in that: in step 4, the support system includes a portal frame steel beam arranged on the end portal portal rigid frame and a neutral position adjacent to it. The roof support between the portal steel beams of the portal rigid frame, and the lower inter-column support and the upper column arranged between the end portal rigid frame and the column on the same side of the adjacent median portal rigid frame between support.
上述的一种H型钢组合异形柱门式刚架结构装配方法,其特征在于:步骤二中,端位门式刚架的装配过程中,将L型柱辅H型钢的一个翼缘板焊接在L型柱主H型钢腹板的端部位置,形成L型柱;The above-mentioned method for assembling an H-shaped steel combined special-shaped column portal rigid frame structure is characterized in that: in step 2, in the assembly process of the end portal rigid frame, a flange plate of the L-shaped column auxiliary H-shaped steel is welded on the H-shaped column. The end position of the main H-shaped steel web of the L-shaped column forms an L-shaped column;
中位门式刚架的装配过程中,T字型柱辅H型钢的一个翼缘板焊接在T字型柱主H型钢腹板的中心位置。During the assembly process of the median portal frame, a flange plate of the auxiliary H-shaped steel of the T-shaped column is welded to the center of the main H-shaped steel web of the T-shaped column.
上述的一种H型钢组合异形柱门式刚架结构装配方法,其特征在于:步骤一中,工厂内预先在L型柱主H型钢的腹板和L型柱辅H型钢的一 个翼缘板装配位置处打两列安装孔;在T字型柱主H型钢的腹板和T字型柱辅H型钢的一个翼缘板装配位置处打两列安装孔;The above-mentioned method for assembling an H-shaped steel combined special-shaped column portal rigid frame structure is characterized in that: in step 1, the web of the main H-shaped steel of the L-shaped column and a flange plate of the auxiliary H-shaped steel of the L-shaped column are pre-installed in the factory. Drill two rows of mounting holes at the assembly position; punch two rows of mounting holes at the assembly position of the web of the main H-shaped steel of the T-shaped column and a flange plate of the auxiliary H-shaped steel of the T-shaped column;
步骤二中,端位门式刚架的装配过程中,将L型柱辅H型钢的一个翼缘板通过两列第三高强度螺栓连接在L型柱主H型钢腹板的端部位置,形成L型柱;In step 2, during the assembly process of the end-position portal rigid frame, a flange plate of the auxiliary H-shaped steel of the L-shaped column is connected to the end position of the web of the main H-shaped steel of the L-shaped column through two rows of third high-strength bolts. form an L-shaped column;
中位门式刚架的装配过程中,T字型柱辅H型钢的一个翼缘板通过两列第三高强度螺栓连接在T字型柱主H型钢腹板的中心位置。During the assembly process of the median portal frame, one flange plate of the auxiliary H-shaped steel of the T-shaped column is connected to the center of the main H-shaped steel web of the T-shaped column through two rows of third high-strength bolts.
本发明与现有技术相比具有以下优点:Compared with the prior art, the present invention has the following advantages:
1、本发明通过设置位于刚架结构端部的端位门式刚架或位于刚架结构中部的中位门式刚架组成异形柱门式刚架,其中,端位门式刚架中包含两个呈对称设置的L型柱,中位门式刚架包含两个呈对称设置的T字型柱,L型柱和T字型柱直接采用热轧H型钢组合成异形柱,其与采用热轧H型钢和剖分T型钢焊成的异形柱相比,型材采购方便,更具有成本优势,而且截面组合形式更丰富,截面抗弯刚度更大,更容易满足工程设计需要,可以在现有带20吨以下桥式吊车的门式刚架结构和带20吨以上桥式吊车的门式刚架结构中使用,位于刚架结构端部的端位门式刚架的异形柱采用L型柱,保证装配式H型钢组合异形柱门式刚架端部平面效果更好,便于推广使用。1. The present invention forms a special-shaped column portal rigid frame by setting the end portal rigid frame located at the end of the rigid frame structure or the middle portal rigid frame located in the middle of the rigid frame structure, wherein the end portal rigid frame contains Two symmetrically arranged L-shaped columns, and the median portal frame includes two symmetrically arranged T-shaped columns. The L-shaped column and the T-shaped column are directly combined with hot-rolled H-shaped steel to form a special-shaped column. Compared with the special-shaped column welded by the split T-section steel, the hot-rolled H-section steel is more convenient to purchase and has a cost advantage, and the cross-section combination forms are more abundant, the bending stiffness of the section is larger, and it is easier to meet the needs of engineering design. There are portal rigid frame structures with overhead cranes under 20 tons and portal rigid frame structures with overhead cranes over 20 tons. The special-shaped columns of the end portal rigid frames located at the ends of the rigid frame structure are L-shaped. Column, to ensure that the assembled H-beam combination special-shaped column portal rigid frame has a better end plane effect, which is convenient for popularization and use.
2、本发明L型柱和T字型柱中H型钢通过焊缝或高强度螺栓连接,提高了使用单一H型钢的截面绕两个主轴回转半径和柱子的双向稳定性,解决了扩大了单一H型的截面面积提高柱稳定承载力带来的材料浪费问题,从而降低了结构用钢量和建造成本;门架钢梁的两端均焊接有门架端板,纵向钢梁的两端均焊接有纵梁端板,异形柱分肢间都是平面接触,自稳定性好,不需要额外的组立机构辅助就可完成焊接,制造成本低。2. The H-shaped steels in the L-shaped column and the T-shaped column of the present invention are connected by welding seams or high-strength bolts, which improves the radius of gyration of the cross-section of the single H-shaped steel around the two main shafts and the bidirectional stability of the column, and solves the problem of expanding the single H-shaped steel. The H-shaped cross-sectional area improves the material waste caused by the stable bearing capacity of the column, thereby reducing the amount of structural steel and construction costs; both ends of the gantry steel beam are welded with gantry end plates, and both ends of the longitudinal steel beam are The longitudinal beam end plates are welded, and the special-shaped columns are in plane contact with each other, and the self-stability is good. The welding can be completed without the assistance of an additional assembly mechanism, and the manufacturing cost is low.
3、本发明方法步骤简单,装配快速,自稳定性好,成本低,便于推广使用。3. The method of the present invention has the advantages of simple steps, quick assembly, good self-stability, low cost, and easy popularization and use.
综上所述,本发明直接采用热轧H型钢组合成异形柱,其与采用热轧H型钢和剖分T型钢焊成的异形柱相比,型材采购方便,更具有成本优势,而且截面组合形式更丰富,截面抗弯刚度更大,更容易满足工程设计需要,可以在现有带20吨以下桥式吊车的门式刚架结构和带20吨以上 桥式吊车的门式刚架结构中使用,便于推广使用。To sum up, the present invention directly adopts the hot-rolled H-section steel to form the special-shaped column. Compared with the special-shaped column welded by the hot-rolled H-section steel and the split T-section steel, the profile purchase is convenient and the cost advantage is more. The form is richer, the flexural rigidity of the section is larger, and it is easier to meet the needs of engineering design. It is easy to promote and use.
下面通过附图和实施例,对本发明的技术方案做进一步的详细描述。The technical solutions of the present invention will be further described in detail below through the accompanying drawings and embodiments.
附图说明Description of drawings
图1为本发明实施例1对应的结构示意图。FIG. 1 is a schematic structural diagram corresponding to Embodiment 1 of the present invention.
图2为本发明门架钢梁与L型柱辅H型钢和T字型柱辅H型钢的连接关系示意图。FIG. 2 is a schematic diagram of the connection relationship between the gantry steel beam and the L-shaped column auxiliary H-shaped steel and the T-shaped column auxiliary H-shaped steel according to the present invention.
图3为本发明纵向钢梁与L型柱主H型钢和T字型柱主H型钢的连接关系示意图。3 is a schematic diagram of the connection relationship between the longitudinal steel beam of the present invention, the main H-shaped steel of the L-shaped column, and the main H-shaped steel of the T-shaped column.
图4为本发明实施例2对应的结构示意图。FIG. 4 is a schematic structural diagram corresponding to Embodiment 2 of the present invention.
图5为本发明L型柱主H型钢通过第三高强度螺栓与L型柱辅H型钢连接的结构示意图。FIG. 5 is a schematic structural diagram of the connection between the main H-shaped steel of the L-shaped column according to the present invention and the auxiliary H-shaped steel of the L-shaped column through the third high-strength bolt.
图6为本发明T字型柱主H型钢通过第三高强度螺栓与T字型柱辅H型钢连接的结构示意图。6 is a schematic structural diagram of the connection between the main H-shaped steel of the T-shaped column of the present invention and the auxiliary H-shaped steel of the T-shaped column through the third high-strength bolt.
图7为本发明的方法流程框图。FIG. 7 is a flow chart of the method of the present invention.
附图标记说明:Explanation of reference numbers:
1—L型柱主H型钢;2—L型柱辅H型钢;3—T字型柱主H型钢;1—L-type column main H-beam; 2—L-type column auxiliary H-beam; 3—T-type column main H-beam;
4—T字型柱辅H型钢;5—牛腿钢系杆;6—下柱间支撑;4—T-shaped column auxiliary H-beam; 5—Corbel steel tie rod; 6—Support between lower columns;
7—屋面支撑;8—上柱间支撑;9—屋脊钢系杆;7-roof support; 8-support between upper columns; 9-roof steel tie rod;
10—钢牛腿;11—纵向钢梁;12—门架钢梁;10—steel corbel; 11—longitudinal steel beam; 12—gantry steel beam;
13—第三高强度螺栓;14—门架端板;15—第一高强度螺栓;13—the third high-strength bolt; 14—the end plate of the gantry; 15—the first high-strength bolt;
16—纵梁端板;17—第二高强度螺栓。16—the end plate of the longitudinal beam; 17—the second high-strength bolt.
具体实施方式Detailed ways
实施例1Example 1
如图1至图3、图7所示,本发明的一种H型钢组合异形柱门式刚架结构装配方法,包括以下步骤:As shown in Figure 1 to Figure 3 and Figure 7, a method for assembling an H-shaped steel combined special-shaped column portal rigid frame structure of the present invention includes the following steps:
步骤一、预制准备:按照设计图纸在工厂内准备连接相邻两榀异形柱门式刚架的纵向钢梁11所需的H型钢;Step 1. Prefabrication preparation: Prepare the H-beams required to connect the longitudinal steel beams 11 of the adjacent two special-shaped column portal rigid frames in the factory according to the design drawings;
异形柱门式刚架为位于刚架结构端部的端位门式刚架或位于刚架结构中部的中位门式刚架;The special-shaped column portal rigid frame is the end portal rigid frame located at the end of the rigid frame structure or the middle portal rigid frame located in the middle of the rigid frame structure;
按照设计图纸在工厂内准备位于刚架结构端部的端位门式刚架的L 型柱、位于刚架结构中部的中位门式刚架的T字型柱所需的H型钢;Prepare the H-shaped steel required for the L-shaped column of the end portal rigid frame at the end of the rigid frame structure and the T-shaped column of the middle portal rigid frame at the middle of the rigid frame structure in the factory according to the design drawings;
其中,L型柱包括L型柱主H型钢1和L型柱辅H型钢2,T字型柱包括T字型柱主H型钢3和T字型柱辅H型钢4;在L型柱辅H型钢2的一个翼缘板、以及T字型柱辅H型钢4的一个翼缘板与门架钢梁12连接位置处打孔;在L型柱主H型钢1的一个翼缘板、以及T字型柱主H型钢3与纵向钢梁11连接位置处打孔;Among them, the L-shaped column includes the main H-shaped steel 1 of the L-shaped column and the auxiliary H-shaped steel 2 of the L-shaped column, and the T-shaped column includes the main H-shaped steel 3 of the T-shaped column and the auxiliary H-shaped steel 4 of the T-shaped column; A flange plate of the H-shaped steel 2 and a flange plate of the auxiliary H-shaped steel 4 of the T-shaped column are punched at the connection position with the gantry steel beam 12; a flange plate of the main H-shaped steel 1 of the L-shaped column, and Punch holes at the connection position of the main H-shaped steel 3 of the T-shaped column and the longitudinal steel beam 11;
在纵向钢梁11的两端均焊接纵梁端板16,在纵梁端板16上打孔;The longitudinal beam end plates 16 are welded at both ends of the longitudinal steel beam 11, and holes are drilled on the longitudinal beam end plates 16;
在门架钢梁12的两端均焊接门架端板14,在门架端板14上打孔;The gantry end plates 14 are welded on both ends of the gantry steel beam 12, and holes are punched on the gantry end plates 14;
步骤二、异形柱门式刚架的装配:Step 2. Assembly of the special-shaped column portal rigid frame:
端位门式刚架的装配过程:将L型柱辅H型钢2的一个翼缘板连接在L型柱主H型钢1腹板的端部位置,形成L型柱,在L型柱上焊接钢牛腿10;按照设计图纸将两个呈对称设置且焊接有钢牛腿10的L型柱安装就位,在两个呈对称设置且焊接有钢牛腿10的L型柱之间装配门架钢梁12,门架端板14通过多个第一高强度螺栓15与L型柱辅H型钢2的另一个翼缘板连接;The assembly process of the end portal rigid frame: connect a flange plate of the L-shaped column auxiliary H-shaped steel 2 to the end position of the L-shaped column main H-shaped steel 1 web to form an L-shaped column, which is welded on the L-shaped column Steel corbel 10; install two L-shaped columns symmetrically arranged and welded with steel corbels 10 in place according to the design drawings, and assemble a door between the two L-shaped columns symmetrically arranged and welded with steel corbels 10 The frame steel beam 12, the gantry end plate 14 is connected with another flange plate of the L-shaped column auxiliary H-shaped steel 2 through a plurality of first high-strength bolts 15;
中位门式刚架的装配过程:将T字型柱辅H型钢4的一个翼缘板连接在T字型柱主H型钢3腹板的中心位置,形成T字型柱,在T字型柱上焊接钢牛腿10;按照设计图纸将两个呈对称设置且焊接有钢牛腿10的T字型柱安装就位,在两个呈对称设置且焊接有钢牛腿10的T字型柱之间装配门架钢梁12,门架端板14通过多个第一高强度螺栓15与T字型柱辅H型钢4的另一个翼缘板连接;The assembly process of the median portal frame: connect a flange plate of the auxiliary H-shaped steel 4 of the T-shaped column to the center of the web of the main H-shaped steel 3 of the T-shaped column to form a T-shaped column. Steel corbels 10 are welded on the column; two T-shaped columns symmetrically arranged and welded with steel corbels 10 are installed in place according to the design drawings, and two T-shaped columns symmetrically arranged and welded with steel corbels 10 are installed in place. The gantry steel beam 12 is assembled between the columns, and the gantry end plate 14 is connected with another flange plate of the T-shaped column auxiliary H-shaped steel 4 through a plurality of first high-strength bolts 15;
步骤三、H型钢组合异形柱门式刚架结构装配,过程如下:Step 3, H-beam combination special-shaped column portal rigid frame structure assembly, the process is as follows:
步骤301、端位门式刚架与中位门式刚架的装配:端位门式刚架和与其相邻的中位门式刚架之间的纵向钢梁11一端的纵梁端板16通过多个第二高强度螺栓17与L型柱主H型钢1的一个翼缘板连接,端位门式刚架和与其相邻的中位门式刚架之间的纵向钢梁11另一端的纵梁端板16通过多个第二高强度螺栓17与T字型柱主H型钢3的一个翼缘板连接;Step 301, the assembly of the end portal frame and the middle portal frame: the longitudinal beam end plate 16 at one end of the longitudinal steel beam 11 between the end portal frame and the adjacent middle portal frame The second high-strength bolts 17 are connected to one flange plate of the L-column main H-shaped steel 1, and the other end of the longitudinal steel beam 11 between the end portal frame and its adjacent median portal frame The longitudinal beam end plate 16 is connected with a flange plate of the T-shaped column main H-shaped steel 3 through a plurality of second high-strength bolts 17;
步骤302、相邻两个中位门式刚架之间的纵向钢梁11的两个纵梁端板16分别与对应的T字型柱主H型钢3的一个翼缘板连接;Step 302, the two longitudinal beam end plates 16 of the longitudinal steel beam 11 between the two adjacent median portal frames are respectively connected with one flange plate of the corresponding T-shaped column main H-shaped steel 3;
步骤303、相邻两榀异形柱门式刚架之间的门架钢梁12通过屋脊钢 系杆9连接;相邻两榀异形柱门式刚架之间同侧的两个钢牛腿10通过牛腿钢系杆5连接;Step 303, the gantry steel beams 12 between the adjacent two special-shaped column portal rigid frames are connected by the ridge steel tie rods 9; the two steel corbels 10 on the same side between the adjacent two special-shaped column portal rigid frames Connected by corbel steel tie rod 5;
步骤四、端位门式刚架和与其相邻的中位门式刚架之间装配支撑系统。Step 4: Assemble a support system between the end portal rigid frame and its adjacent median portal rigid frame.
本实施例中,步骤四中,支撑系统包括设置在端位门式刚架的门架钢梁12和与其相邻的中位门式刚架的门架钢梁12之间的屋面支撑7、以及设置在端位门式刚架和与其相邻的中位门式刚架同侧的柱体之间的下柱间支撑6和上柱间支撑8。In this embodiment, in step 4, the support system includes the roof supports 7, 7 and 7, which are arranged between the portal steel beam 12 of the end portal frame and the portal steel beam 12 of the adjacent middle portal frame. And the lower inter-column support 6 and the upper inter-column support 8 arranged between the end portal rigid frame and the column on the same side of the intermediate portal rigid frame adjacent to it.
需要说明的是,屋面支撑7、下柱间支撑6和上柱间支撑8的设置保证装配式H型钢组合异形柱门式刚架抵御风力,使风的水平荷载传递下来。It should be noted that the settings of the roof support 7, the lower inter-column support 6 and the upper inter-column support 8 ensure that the assembled H-shaped steel combined special-shaped column portal rigid frame can resist the wind, so that the horizontal load of the wind is transmitted down.
本实施例中,步骤二中,端位门式刚架的装配过程中,将L型柱辅H型钢2的一个翼缘板焊接在L型柱主H型钢1腹板的端部位置,形成L型柱;In this embodiment, in step 2, during the assembly process of the end portal rigid frame, a flange plate of the auxiliary H-shaped steel 2 of the L-shaped column is welded to the end position of the web of the main H-shaped steel 1 of the L-shaped column to form L-shaped column;
中位门式刚架的装配过程中,T字型柱辅H型钢4的一个翼缘板焊接在T字型柱主H型钢3腹板的中心位置。During the assembly process of the median portal frame, a flange plate of the auxiliary H-shaped steel 4 of the T-shaped column is welded to the center of the web of the main H-shaped steel 3 of the T-shaped column.
需要说明的是,L型柱辅H型钢2的一个翼缘板焊接在L型柱主H型钢1腹板远离纵向钢梁11的端部位置。It should be noted that one flange plate of the L-shaped column auxiliary H-shaped steel 2 is welded to the end position of the L-shaped column main H-shaped steel 1 web plate away from the longitudinal steel beam 11 .
本发明通过设置位于刚架结构端部的端位门式刚架或位于刚架结构中部的中位门式刚架组成异形柱门式刚架,其中,端位门式刚架中包含两个呈对称设置的L型柱,中位门式刚架包含两个呈对称设置的T字型柱,L型柱和T字型柱直接采用热轧H型钢组合成异形柱,其与采用热轧H型钢和剖分T型钢焊成的异形柱相比,型材采购方便,更具有成本优势,而且截面组合形式更丰富,截面抗弯刚度更大,更容易满足工程设计需要,可以在现有带20吨以下桥式吊车的门式刚架结构和带20吨以上桥式吊车的门式刚架结构中使用;位于刚架结构端部的端位门式刚架的异形柱采用L型柱,保证装配式H型钢组合异形柱门式刚架端部平面效果更好;L型柱和T字型柱中H型钢通过焊缝或高强度螺栓连接,提高了使用单一H型钢的截面绕两个主轴回转半径和柱子的双向稳定性,解决了扩大了单一H型的截面面积提高柱稳定承载力带来的材料浪费问题,从而降低了 结构用钢量和建造成本;门架钢梁的两端均焊接有门架端板,纵向钢梁的两端均焊接有纵梁端板,异形柱分肢间都是平面接触,自稳定性好,不需要额外的组立机构辅助就可完成焊接,制造成本低。The present invention forms a special-shaped column portal rigid frame by arranging an end portal rigid frame located at the end of the rigid frame structure or a middle portal rigid frame located in the middle of the rigid frame structure, wherein the end portal rigid frame includes two The L-shaped column is symmetrically arranged, and the median portal frame includes two T-shaped columns that are arranged symmetrically. The L-shaped column and the T-shaped column are directly combined with hot-rolled H-shaped steel to form a special-shaped column. Compared with the special-shaped column welded by the split T-section steel, the H-section steel is more convenient to purchase and has a cost advantage, and the cross-section combination forms are more abundant, the bending stiffness of the section is higher, and it is easier to meet the needs of engineering design. It is used in the portal rigid frame structure of bridge cranes under 20 tons and the portal rigid frame structure with bridge cranes above 20 tons; the special-shaped columns of the end portal rigid frame located at the end of the rigid frame structure are L-shaped columns. Ensure that the assembled H-shaped steel combined special-shaped column portal rigid frame has a better end plane effect; the H-shaped steel in the L-shaped column and the T-shaped column are connected by welding seams or high-strength bolts, which improves the use of a single H-shaped steel section. The radius of gyration of the main shaft and the bidirectional stability of the column solve the problem of material waste caused by expanding the cross-sectional area of a single H-shape to improve the stable bearing capacity of the column, thereby reducing the amount of structural steel and construction costs; both ends of the gantry steel beam The end plates of the gantry are welded, and the end plates of the longitudinal beams are welded at both ends of the longitudinal steel beam. Manufacturing costs are low.
实施例2Example 2
如图4至图6所示,本实施例与实施例1不同的是,步骤一中,工厂内预先在L型柱主H型钢1的腹板和L型柱辅H型钢2的一个翼缘板装配位置处打两列安装孔;在T字型柱主H型钢3的腹板和T字型柱辅H型钢4的一个翼缘板装配位置处打两列安装孔;As shown in FIGS. 4 to 6 , the difference between this embodiment and Embodiment 1 is that in step 1, the web of the main H-shaped steel 1 of the L-shaped column and a flange of the auxiliary H-shaped steel 2 of the L-shaped column are pre-installed in the factory. Two rows of mounting holes are punched at the plate assembly position; two rows of mounting holes are punched at the web plate of the main H-shaped steel 3 of the T-shaped column and a flange plate of the auxiliary H-shaped steel 4 of the T-shaped column at the assembly position;
步骤二中,端位门式刚架的装配过程中,将L型柱辅H型钢2的一个翼缘板通过两列第三高强度螺栓13连接在L型柱主H型钢1腹板的端部位置,形成L型柱;In step 2, during the assembly process of the end portal rigid frame, one flange plate of the L-shaped column auxiliary H-shaped steel 2 is connected to the end of the L-shaped column main H-shaped steel 1 web through two rows of third high-strength bolts 13. at the top position to form an L-shaped column;
中位门式刚架的装配过程中,T字型柱辅H型钢4的一个翼缘板通过两列第三高强度螺栓13连接在T字型柱主H型钢3腹板的中心位置。During the assembly process of the median portal frame, one flange plate of the auxiliary H-shaped steel 4 of the T-shaped column is connected to the center of the web of the main H-shaped steel 3 of the T-shaped column through two rows of third high-strength bolts 13 .
需要说明的是,L型柱辅H型钢2的一个翼缘板通过两列第三高强度螺栓13连接在L型柱主H型钢1腹板的端部位置;T字型柱辅H型钢4的一个翼缘板通过两列第三高强度螺栓13连接在T字型柱主H型钢3腹板的中心位置,保证结构整体的装配率,拆装便利,装配率高,同时也便于结构遭受地震破坏后更换部分肢件,与热轧H型钢和剖分T型钢的焊接相比,异形柱分肢间都是平面接触,自稳定性好,不需要额外的组立机构辅助就可完成焊接,型材采购方便,制造成本低,结构灵活多变。It should be noted that one flange plate of the L-shaped column auxiliary H-shaped steel 2 is connected to the end position of the web plate of the L-shaped column main H-shaped steel 1 through two rows of third high-strength bolts 13; the T-shaped column auxiliary H-shaped steel 4 One of the flange plates is connected to the center of the main H-beam 3 web of the T-shaped column through two rows of third high-strength bolts 13, which ensures the overall assembly rate of the structure, facilitates disassembly and assembly, and has a high assembly rate. It is also convenient for the structure to suffer. Part of the limbs are replaced after the earthquake damage. Compared with the welding of hot-rolled H-section steel and split T-section steel, the limbs of the special-shaped column are in plane contact, and the self-stability is good, and the welding can be completed without the assistance of an additional assembly mechanism. , Profile procurement is convenient, the manufacturing cost is low, and the structure is flexible and changeable.
以上,仅是本发明的较佳实施例,并非对本发明作任何限制,凡是根据本发明技术实质对以上实施例所作的任何简单修改、变更以及等效结构变化,均仍属于本发明技术方案的保护范围内。The above are only preferred embodiments of the present invention, and do not limit the present invention. Any simple modifications, changes and equivalent structural changes made to the above embodiments according to the technical essence of the present invention still belong to the technical solutions of the present invention. within the scope of protection.

Claims (4)

  1. 一种H型钢组合异形柱门式刚架结构装配方法,其特征在于,该方法包括以下步骤:A method for assembling an H-shaped steel combined special-shaped column portal rigid frame structure, characterized in that the method comprises the following steps:
    步骤一、预制准备:按照设计图纸在工厂内准备连接相邻两榀异形柱门式刚架的纵向钢梁(11)所需的H型钢;Step 1. Prefabrication preparation: prepare the H-beams required to connect the longitudinal steel beams (11) of the adjacent two special-shaped column portal frames in the factory according to the design drawings;
    所述异形柱门式刚架为位于刚架结构端部的端位门式刚架或位于刚架结构中部的中位门式刚架;The special-shaped column portal rigid frame is an end portal rigid frame located at the end of the rigid frame structure or a mid-position portal rigid frame located in the middle of the rigid frame structure;
    按照设计图纸在工厂内准备位于刚架结构端部的端位门式刚架的L型柱、位于刚架结构中部的中位门式刚架的T字型柱所需的H型钢;Prepare the H-shaped steel required for the L-shaped column of the end portal frame at the end of the frame structure and the T-shaped column of the middle portal frame at the middle of the frame structure in the factory according to the design drawings;
    其中,L型柱包括L型柱主H型钢(1)和L型柱辅H型钢(2),T字型柱包括T字型柱主H型钢(3)和T字型柱辅H型钢(4);在L型柱辅H型钢(2)的一个翼缘板、以及T字型柱辅H型钢(4)的一个翼缘板与门架钢梁(12)连接位置处打孔;在L型柱主H型钢(1)的一个翼缘板、以及T字型柱主H型钢(3)与纵向钢梁(11)连接位置处打孔;Among them, the L-shaped column includes the main H-shaped steel of the L-shaped column (1) and the auxiliary H-shaped steel of the L-shaped column (2), and the T-shaped column includes the main H-shaped steel of the T-shaped column (3) and the auxiliary H-shaped steel of the T-shaped column ( 4); punch a hole at the connection position of a flange plate of the L-shaped column auxiliary H-shaped steel (2) and a flange plate of the T-shaped column auxiliary H-shaped steel (4) and the gantry steel beam (12); A flange plate of the main H-shaped steel (1) of the L-shaped column and the connection position of the main H-shaped steel (3) of the T-shaped column and the longitudinal steel beam (11) are punched;
    在纵向钢梁(11)的两端均焊接纵梁端板(16),在纵梁端板(16)上打孔;The longitudinal beam end plates (16) are welded at both ends of the longitudinal steel beam (11), and holes are drilled on the longitudinal beam end plates (16);
    在门架钢梁(12)的两端均焊接门架端板(14),在门架端板(14)上打孔;The gantry end plates (14) are welded at both ends of the gantry steel beam (12), and holes are drilled on the gantry end plates (14);
    步骤二、异形柱门式刚架的装配:Step 2. Assembly of the special-shaped column portal rigid frame:
    端位门式刚架的装配过程:将L型柱辅H型钢(2)的一个翼缘板连接在L型柱主H型钢(1)腹板的端部位置,形成L型柱,在L型柱上焊接钢牛腿(10);按照设计图纸将两个呈对称设置且焊接有钢牛腿(10)的L型柱安装就位,在两个呈对称设置且焊接有钢牛腿(10)的L型柱之间装配门架钢梁(12),门架端板(14)通过多个第一高强度螺栓(15)与L型柱辅H型钢(2)的另一个翼缘板连接;The assembly process of the end portal rigid frame: connect a flange plate of the L-shaped column auxiliary H-shaped steel (2) to the end position of the L-shaped column main H-shaped steel (1) web to form an L-shaped column. A steel corbel (10) is welded on the shaped column; two L-shaped columns symmetrically arranged and welded with the steel corbel (10) are installed in place according to the design drawings, and the two symmetrically arranged and welded steel corbels ( 10) The gantry steel beam (12) is assembled between the L-shaped columns, and the gantry end plate (14) is connected to another flange of the L-shaped column auxiliary H-shaped steel (2) through a plurality of first high-strength bolts (15) board connection;
    中位门式刚架的装配过程:将T字型柱辅H型钢(4)的一个翼缘板连接在T字型柱主H型钢(3)腹板的中心位置,形成T字型柱,在T字型柱上焊接钢牛腿(10);按照设计图纸将两个呈对称设置且焊接有钢牛腿(10)的T字型柱安装就位,在两个呈对称设置且焊接有钢牛腿(10)的T字型柱之间装配门架钢梁(12),门架端板(14)通过多个第一高强度螺栓(15)与T字型柱辅H型钢(4)的另一个翼缘板连接;The assembly process of the median portal frame: connect a flange plate of the auxiliary H-shaped steel (4) of the T-shaped column to the center of the web of the main H-shaped steel (3) of the T-shaped column to form a T-shaped column. Weld the steel corbels (10) on the T-shaped column; install the two symmetrically arranged T-shaped columns with the steel corbels (10) welded in place according to the design drawings, and install the two symmetrically arranged and welded T-shaped columns in place. A gantry steel beam (12) is assembled between the T-shaped columns of the steel corbel (10), and the gantry end plate (14) is connected to the T-shaped column auxiliary H-shaped steel (4) through a plurality of first high-strength bolts (15) ) is connected to another flange plate;
    步骤三、H型钢组合异形柱门式刚架结构装配,过程如下:Step 3, H-beam combination special-shaped column portal rigid frame structure assembly, the process is as follows:
    步骤301、端位门式刚架与中位门式刚架的装配:端位门式刚架和与其相邻的中位门式刚架之间的纵向钢梁(11)一端的纵梁端板(16)通过多个第二高强度螺栓(17)与L型柱主H型钢(1)的一个翼缘板连接,端位门式刚架和与其相邻的中位门式刚架之间的纵向钢梁(11)另一端的纵梁端板(16)通过多个第二高强度螺栓(17)与T字型柱主H型钢(3)的一个翼缘板连接;Step 301, the assembly of the end portal rigid frame and the middle portal rigid frame: the longitudinal beam end at one end of the longitudinal steel beam (11) between the end portal rigid frame and the adjacent median portal rigid frame The plate (16) is connected to a flange plate of the main H-shaped steel (1) of the L-shaped column through a plurality of second high-strength bolts (17). The longitudinal beam end plate (16) at the other end of the longitudinal steel beam (11) between them is connected with a flange plate of the main H-shaped steel (3) of the T-shaped column through a plurality of second high-strength bolts (17);
    步骤302、相邻两个中位门式刚架之间的纵向钢梁(11)的两个纵梁端板(16)分别与对应的T字型柱主H型钢(3)的一个翼缘板连接;Step 302 , the two longitudinal beam end plates ( 16 ) of the longitudinal steel beam ( 11 ) between the two adjacent median portal frames are respectively connected with one flange of the corresponding T-shaped column main H-shaped steel ( 3 ) board connection;
    步骤303、相邻两榀异形柱门式刚架之间的门架钢梁(12)通过屋脊钢系杆(9)连接;相邻两榀异形柱门式刚架之间同侧的两个钢牛腿(10)通过牛腿钢系杆(5)连接;Step 303, the gantry steel beams (12) between the two adjacent special-shaped column portal rigid frames are connected by the ridge steel tie rods (9); the two adjacent special-shaped column portal rigid frames on the same side are connected The steel corbel (10) is connected by the corbel steel tie rod (5);
    步骤四、端位门式刚架和与其相邻的中位门式刚架之间装配支撑系统。Step 4: Assemble a support system between the end portal rigid frame and its adjacent median portal rigid frame.
  2. 按照权利要求1所述的H型钢组合异形柱门式刚架结构装配方法,其特征在于:步骤四中,所述支撑系统包括设置在端位门式刚架的门架钢梁(12)和与其相邻的中位门式刚架的门架钢梁(12)之间的屋面支撑(7)、以及设置在端位门式刚架和与其相邻的中位门式刚架同侧的柱体之间的下柱间支撑(6)和上柱间支撑(8)。The method for assembling an H-shaped steel combined special-shaped column portal rigid frame structure according to claim 1, characterized in that: in step 4, the support system comprises portal steel beams (12) arranged on the end portal portal rigid frame and The roof support (7) between the gantry steel beams (12) of the adjacent mid-position gantry frame, and the roof support (7) disposed on the same side of the end-position gantry frame and the adjacent mid-position gantry frame A lower inter-column support (6) and an upper inter-column support (8) between the columns.
  3. 按照权利要求1所述的H型钢组合异形柱门式刚架结构装配方法,其特征在于:步骤二中,端位门式刚架的装配过程中,将L型柱辅H型钢(2)的一个翼缘板焊接在L型柱主H型钢(1)腹板的端部位置,形成L型柱;The method for assembling an H-shaped steel combined special-shaped column portal rigid frame structure according to claim 1, characterized in that: in step 2, in the assembly process of the end portal rigid frame, the L-shaped column is assisted by the H-shaped steel (2). A flange plate is welded to the end of the web of the main H-section steel (1) of the L-shaped column to form an L-shaped column;
    中位门式刚架的装配过程中,T字型柱辅H型钢(4)的一个翼缘板焊接在T字型柱主H型钢(3)腹板的中心位置。During the assembly process of the median portal frame, a flange plate of the auxiliary H-shaped steel (4) of the T-shaped column is welded to the center of the web of the main H-shaped steel (3) of the T-shaped column.
  4. 按照权利要求1所述的H型钢组合异形柱门式刚架结构装配方法,其特征在于:步骤一中,工厂内预先在L型柱主H型钢(1)的腹板和L型柱辅H型钢(2)的一个翼缘板装配位置处打两列安装孔;在T字型柱主H型钢(3)的腹板和T字型柱辅H型钢(4)的一个翼缘板装配位置处打两列安 装孔;The method for assembling an H-shaped steel combined special-shaped column portal rigid frame structure according to claim 1, characterized in that: in step 1, the web of the L-shaped column main H-shaped steel (1) and the L-shaped column auxiliary H are pre-installed in the factory. Two rows of mounting holes are drilled at one flange plate assembly position of the section steel (2); one flange plate assembly position of the T-shaped column main H-section steel (3) and the T-shaped column auxiliary H section steel (4) Punch two rows of mounting holes;
    步骤二中,端位门式刚架的装配过程中,将L型柱辅H型钢(2)的一个翼缘板通过两列第三高强度螺栓(13)连接在L型柱主H型钢(1)腹板的端部位置,形成L型柱;In step 2, during the assembly process of the end-position portal rigid frame, one flange plate of the L-shaped column auxiliary H-shaped steel (2) is connected to the L-shaped column main H-shaped steel (13) through two rows of third high-strength bolts (13). 1) The end position of the web, forming an L-shaped column;
    中位门式刚架的装配过程中,T字型柱辅H型钢(4)的一个翼缘板通过两列第三高强度螺栓(13)连接在T字型柱主H型钢(3)腹板的中心位置。During the assembly process of the median portal frame, one flange plate of the auxiliary H-shaped steel (4) of the T-shaped column is connected to the web of the main H-shaped steel (3) of the T-shaped column through two rows of third high-strength bolts (13). the center of the board.
PCT/CN2021/112279 2020-11-12 2021-08-12 Assembly method for h-beam combined special shaped column portal rigid frame structure WO2022100175A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202011261200.4 2020-11-12
CN202011261200.4A CN112324158A (en) 2020-11-12 2020-11-12 Assembling method for H-shaped steel combined special-shaped column portal rigid frame structure

Publications (1)

Publication Number Publication Date
WO2022100175A1 true WO2022100175A1 (en) 2022-05-19

Family

ID=74317682

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/112279 WO2022100175A1 (en) 2020-11-12 2021-08-12 Assembly method for h-beam combined special shaped column portal rigid frame structure

Country Status (2)

Country Link
CN (1) CN112324158A (en)
WO (1) WO2022100175A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112324158A (en) * 2020-11-12 2021-02-05 长安大学 Assembling method for H-shaped steel combined special-shaped column portal rigid frame structure

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1277302A (en) * 1999-06-14 2000-12-20 樊志 Construction process of plant building in goal type steel frame structure
JP2001214514A (en) * 2000-02-01 2001-08-10 Sumitomo Metal Ind Ltd Column-to-beam connection
CN103015535A (en) * 2012-12-21 2013-04-03 郑州大学 Rigid connecting structure for H-shaped column in weak shaft direction and H-shaped beam and manufacture method thereof
CN203113554U (en) * 2013-03-01 2013-08-07 金天德 Rigid connection joint of combined profile steel box-shaped steel plate shear wall and steel beam
CN103290951A (en) * 2013-05-09 2013-09-11 中国矿业大学 Wind-resistant wall with portal rigid frame comprising special-shaped columns
CN103711215A (en) * 2013-12-19 2014-04-09 北京工业大学 Novel post-earthquake easily-repaired steel special-shaped column frame-eccentric supporting frame
CN206971551U (en) * 2017-06-21 2018-02-06 上海拜创建筑工程有限公司 Steel construction H type abnormal shape combining structure posts
CN112324158A (en) * 2020-11-12 2021-02-05 长安大学 Assembling method for H-shaped steel combined special-shaped column portal rigid frame structure
CN213897484U (en) * 2020-11-12 2021-08-06 长安大学 Assembled H shaped steel combination dysmorphism post portal frame structure
CN213897479U (en) * 2020-09-30 2021-08-06 华南理工大学 Novel assembled steel frame structure

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410218A (en) * 2013-07-26 2013-11-27 北京工业大学 Fabricated multistory and high-rise prestressed steel frame-sway brace system provided with special-shaped columns
CN205189117U (en) * 2015-11-18 2016-04-27 云南昆钢钢结构股份有限公司 Steel structure skeleton of two -layer antidetonation local -style dwelling houses
CN206331736U (en) * 2016-10-09 2017-07-14 浙江太学科技有限公司 Detachable I-steel band bracket gate-type steel construction training model
JP6890486B2 (en) * 2017-07-03 2021-06-18 トリニティ工業株式会社 Reinforcement structure, equipment mount and booth
CN109610640B (en) * 2018-12-29 2020-12-29 中国人民解放军63921部队 Portal rigid frame connection structure based on composite column limb

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1277302A (en) * 1999-06-14 2000-12-20 樊志 Construction process of plant building in goal type steel frame structure
JP2001214514A (en) * 2000-02-01 2001-08-10 Sumitomo Metal Ind Ltd Column-to-beam connection
CN103015535A (en) * 2012-12-21 2013-04-03 郑州大学 Rigid connecting structure for H-shaped column in weak shaft direction and H-shaped beam and manufacture method thereof
CN203113554U (en) * 2013-03-01 2013-08-07 金天德 Rigid connection joint of combined profile steel box-shaped steel plate shear wall and steel beam
CN103290951A (en) * 2013-05-09 2013-09-11 中国矿业大学 Wind-resistant wall with portal rigid frame comprising special-shaped columns
CN103711215A (en) * 2013-12-19 2014-04-09 北京工业大学 Novel post-earthquake easily-repaired steel special-shaped column frame-eccentric supporting frame
CN206971551U (en) * 2017-06-21 2018-02-06 上海拜创建筑工程有限公司 Steel construction H type abnormal shape combining structure posts
CN213897479U (en) * 2020-09-30 2021-08-06 华南理工大学 Novel assembled steel frame structure
CN112324158A (en) * 2020-11-12 2021-02-05 长安大学 Assembling method for H-shaped steel combined special-shaped column portal rigid frame structure
CN213897484U (en) * 2020-11-12 2021-08-06 长安大学 Assembled H shaped steel combination dysmorphism post portal frame structure

Also Published As

Publication number Publication date
CN112324158A (en) 2021-02-05

Similar Documents

Publication Publication Date Title
CN103334490B (en) One how high-rise assembling type steel structure frame supported system
CN102979176B (en) Industrialized multi-story high-rise assembled steel structure system
CN201128956Y (en) Assembled integral flat-plate or curve type vierendeel steel lattice structure
CN2390933Y (en) Square steel pipe concrete beam and column jointing gusset
WO2022100175A1 (en) Assembly method for h-beam combined special shaped column portal rigid frame structure
CN103276809A (en) Assembly-type multi-storey steel special-shaped column framework-steel plate shear wall structure system
CN112922237A (en) Take telescopic assembled reinforced concrete post and girder steel connected node
CN111809729A (en) Dry-type connected node of assembled concrete beam column
CN111075015A (en) Socket joint type prefabricated steel-concrete joint
CN205935406U (en) House housing system and combination column that includes thereof
CN103276839B (en) The how high-rise assembled steel framework-eccentrical braces of a kind of hollow irregular column
CN103276803B (en) The how high-rise assembling type steel structure system of a kind of hollow irregular column
CN107023076A (en) A kind of assembly concrete pole steel beam connecting node and preparation method thereof
CN213897484U (en) Assembled H shaped steel combination dysmorphism post portal frame structure
CN208455880U (en) A kind of novel fabricated clod wash heavy wall structural steel frame-shear wall structure system
CN213868342U (en) Steel reinforced concrete cross lattice column-shaped steel beam assembled node
CN211646776U (en) Transverse expansion joint structure of steel structure factory building
CN211285978U (en) Beam flange micropore type node suitable for high strength steel
CN217537315U (en) Energy-consuming beam section with disc spring and SMA (shape memory alloy) rod
CN211312871U (en) Net rack roof primary and secondary purline connecting joint
CN215716567U (en) Take telescopic assembled reinforced concrete post and girder steel connected node
CN103276798B (en) A kind of hollow irregular column high-rise assembled steel framework-prestressing force eccentrical braces
CN216892820U (en) Assembled steel construction beam column connected node
CN216552933U (en) Cold-formed steel supporting beam framework
CN209874053U (en) Fast-assembly type H-shaped steel concrete beam column connecting node

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21890704

Country of ref document: EP