WO2022021847A1 - Waterbased paint coating line - Google Patents

Waterbased paint coating line Download PDF

Info

Publication number
WO2022021847A1
WO2022021847A1 PCT/CN2021/076822 CN2021076822W WO2022021847A1 WO 2022021847 A1 WO2022021847 A1 WO 2022021847A1 CN 2021076822 W CN2021076822 W CN 2021076822W WO 2022021847 A1 WO2022021847 A1 WO 2022021847A1
Authority
WO
WIPO (PCT)
Prior art keywords
chain
powder
accumulation
coated
area
Prior art date
Application number
PCT/CN2021/076822
Other languages
French (fr)
Chinese (zh)
Inventor
于东序
Original Assignee
于东序
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 于东序 filed Critical 于东序
Publication of WO2022021847A1 publication Critical patent/WO2022021847A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/20Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • B05B13/0264Overhead conveying means, i.e. the object or other work being suspended from the conveying means; Details thereof, e.g. hanging hooks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/48Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths specially adapted for particulate material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/40Construction elements specially adapted therefor, e.g. floors, walls or ceilings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/002Pretreatement
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D13/00Electrophoretic coating characterised by the process

Definitions

  • the invention belongs to the field of pipeline water-based paint coating, and particularly relates to an assembly line for spraying water-based paint on a to-be-coated piece by means of electrophoresis, powder spraying and the like.
  • the conventional protective material is paint.
  • spraying paint on the produced products is likely to cause greater environmental pollution, and at the same time, the protective effect of the paint on the products is poor.
  • water-based paints can be used to protect products, and the water-based paints will not pollute the air.
  • the process is relatively complicated, and the coating efficiency is low when there are many or large parts to be coated.
  • the purpose of the present invention is to propose a water-based paint coating line to solve the problem of low coating efficiency in the prior art when there are many or large pieces to be coated.
  • the invention provides a water-based paint coating line, which comprises an assembly area, a pool group area, a first drying room area, a powder spraying area and a second drying room area arranged in sequence.
  • the water-based paint coating line also includes an accumulation and release chain, which runs through the assembly area, the pool group area, the first drying room area, the powder spraying area, and the second drying area. room area.
  • the accumulation and release chain is provided with an accumulation and release chain hanger, and the accumulation and release chain hanger is used for hoisting the to-be-coated parts to be coated.
  • a hoisting platform is arranged in the assembly area, and the hoisting platform is used for the worker to install the to-be-coated piece on the accumulation chain hanger.
  • the pool group includes a pretreatment pool group, an electrophoresis pool group, and a washing pool group arranged in sequence, and the accumulation and release chain spreader passes through the pretreatment pool group, the electrophoresis pool group, and the pool in sequence on the accumulation and release chain.
  • the accumulation and release chain hanger is provided with a lifting mechanism, and the lifting mechanism is used to sequentially sink the to-be-coated parts hoisted on the accumulation and release chain hanger into the pretreatment.
  • a first drying room is arranged in the first drying room area, and the first drying room is used for fixing the electrophoretic paint on the to-be-coated piece.
  • the powder spraying area is provided with a powder spraying room, and the powder spraying room is used for spraying powder.
  • a second drying room is arranged in the second drying room area, and the second drying room is used to fix the powder on the to-be-coated piece.
  • the accumulation and release chain spreader includes a first spreader group, the first spreader group includes two front and rear first spreaders, the first spreader includes a primary load beam, and the two primary load beams pass through respectively.
  • the front trolley and the rear trolley are mounted on the accumulation chain.
  • the lower parts of the two first spreaders are provided with secondary load beams, and the front and rear parts of the secondary load beams are respectively connected with the two first spreaders.
  • the lower part of the secondary load beam is also provided with a hanger beam, and the lower end of the hanger beam is provided with a plurality of hanging chain connectors for connecting the hanging chain; the upper end of the hanger beam is also provided with two T-shaped A connecting piece, two ends of the secondary load beam are provided with grooves; the T-shaped connecting piece is adapted to the grooves.
  • the spreader beam is also provided with two sets of support rod groups, the support rod groups are respectively located at the front and the rear of the spreader beam; the support rod group includes two There are support rods perpendicular to the beams, and the two support rods are symmetrically distributed and extend to the left and the right respectively.
  • the spreader beam comprises I-shaped steel
  • the I-shaped steel comprises transverse plates located on the upper and lower sides respectively and a vertical plate located between the two transverse plates
  • the vertical plates are provided with a plurality of circular plates. hole.
  • the hanger beam is also provided with a plurality of reinforcing plate groups, the reinforcing plate group includes two reinforcing plates, and the two reinforcing plates are symmetrically distributed on both sides of the vertical plate; the upper end of the reinforcing plate and the lower ends are respectively connected with the two transverse plates.
  • a plurality of the hanging chain connecting pieces are evenly arranged at the lower end of the lateral plate located on the lower side, and the hanging chain connecting pieces are hanging loops, and the hanging chain is installed on the hanging loops.
  • the upper end surfaces of the primary load beam and the secondary load beam are further provided with an upper oil receiving pan and a lower oil receiving pan, respectively, and the upper oil receiving pan and the lower oil receiving pan are both located in the accumulator. the lower part of the chain.
  • the powder spray booth includes a powder booth main body, and the front and rear side walls of the powder booth main body are respectively provided with an inlet and an outlet for the parts to be coated to pass through.
  • a slot is provided on the top wall, and a hanging chain for suspending the to-be-coated piece passes through the slot.
  • the main body of the powder booth includes an automatic spray chamber and at least one supplementary spray chamber, wherein one of the supplementary spray chambers is located on the side of the automatic spray chamber close to the outlet.
  • the lower part of the automatic spray chamber is provided with a powder recovery port, and the powder recovery port is connected with an exhaust fan; the lower part of the supplementary spray chamber is provided with a plurality of air blowing ports, and the air blowing ports are connected with a blower through an air pipe; The gas port faces the powder recovery port.
  • both the front side wall and the rear side wall are composed of a left door and a right door, and the strip-shaped gap between the left door and the right door is an entrance or an exit.
  • a left partition plate and a right partition plate are arranged between the automatic spray chamber and the supplementary spray chamber, and a gap is left between the left partition plate and the right partition plate, and the gap is the part to be coated at least one supplementary injection position is set between the left partition plate and the left door, and at least one supplementary injection position is set between the right partition plate and the right door;
  • a lift table is provided.
  • the left door and the right door are respectively connected with a translation mechanism, and the left door and the right door approach or move away under the drive of the translation mechanism;
  • the width of the entrance is the same as the width of the exit. The width gradually increases from top to bottom.
  • the lower part of the entrance and the outlet is also provided with a reel, the reel is provided with a roll-up door cloth, the two sides of the roll-up door cloth are provided with sliders, the two sliders are connected by a sliding rod, and the roll-up door cloth is connected with the door.
  • the sliding rods are connected; the left door and the right door are respectively provided with vertical slideways, and the sliders are adapted to the vertical slideways; slider mounts.
  • flexible pieces are respectively provided on both side walls of the slot, and the hanging chain passes between the two flexible pieces.
  • the flexible member includes a sponge, and the sponge is pasted and fixed on both side walls of the slot; the sponge is covered with a cloth sheet, and the cloth sheet is provided with fluff.
  • two rotating assemblies are arranged on the top wall of the main body of the powder booth, and the rotating assemblies include a driving wheel, a driven wheel and a rotating ring, the driving wheel is connected with a servo motor, and the rotating ring is sleeved on the rotating ring. on the driving wheel and the driven wheel.
  • the two rotating rings are mirror-symmetrical with the slot as the central axis, and a plurality of rubber sheets are arranged on the rotating rings; the rubber sheets located on the two rotating rings abut and cover the slot.
  • the water-based paint coating line provided by the present invention has the following beneficial effects:
  • the assembly area, the pool group area, the first drying room area, the powder spraying area and the second drying room area are sequentially arranged in the workshop, and run through the accumulation chain.
  • the above-mentioned accumulation chain carries the parts to be coated through the chain hanger, and the parts to be coated are transported to the pretreatment pool for degreasing and water washing.
  • the accumulation chain transports the parts to be coated to the first through the accumulation chain hanger
  • the adhered water-based paint is fixed on the part to be coated to realize the coating of the primer of the part to be coated
  • the accumulation and release chain transports the to-be-coated parts to the powder through the accumulation and release chain hanger
  • the powder spraying room the powder is adhered to the surface of the part to be coated
  • the accumulation and release chain transports the to-be-coated part to the second drying room through the accumulation and release chain hanger, and the adhered powder is fixed in the second drying room.
  • the coating of the surface paint of the part to be coated is realized.
  • the above-mentioned water-based paint coating line transports the parts to be coated through the accumulation and release chain, and performs pretreatment such as degreasing, water washing, phosphating, and surface conditioning in the pools of the pretreatment pools, and performs pretreatment in the pools of the electrophoresis pools.
  • pretreatment such as degreasing, water washing, phosphating, and surface conditioning
  • pretreatment in the pools of the electrophoresis pools For electrophoresis treatment, the water-based paint is fixed on the part to be coated by baking in the first drying room area; powder is sprayed in the powder spraying room, and the powder is fixed on the part to be coated by baking in the second drying room area superior.
  • the position of each process is connected through the accumulation and release chain, which can conveniently carry out the water-based paint coating treatment on the parts to be coated with large volume and weight, and can also apply multiple small parts to be coated at one time at the same time. Water-based paint application is more efficient.
  • FIG. 1 is a schematic plan view of a water-based paint coating line in an embodiment of the present invention.
  • FIG. 2 is a front view of the accumulation and release chain spreader in the embodiment of the present invention.
  • FIG. 3 is an enlarged view of part A in FIG. 1 in an embodiment of the present invention.
  • FIG. 4 is a side view of the accumulation and release chain spreader in the embodiment of the present invention.
  • FIG. 5 is a perspective view of a powder spray booth in an embodiment of the present invention.
  • FIG. 6 is a front view or a rear view of the powder spraying room in the embodiment of the present invention.
  • FIG. 7 is a top view of the powder spray booth in the embodiment of the present invention.
  • the second drying room 2 Assembly area 11 front trolley 3 pool area 12 horn 4 The first drying room area 13 Spreader beam 5 Dusting area 11 front trolley 501 Automatic spray booth 12 horn 502 Refill room 13 Spreader beam 503 Refill position 14 primary load beam 504 slotted 15 secondary load beam 505 air blow 16 rear trolley 506 reciprocating spray gun 18 support rod 507 left door 71 oil pan 508 right door 72 Lower oil pan 509 entrance or exit 31 round hole 510 roll door cloth 32 Reinforcing plate 511 Slider 33 T-connector 512 rail 34 Hanging ring 513 rubber sheet 35 hanging chain 514 driving wheel or driven wheel
  • the terms "connected”, “fixed” and the like should be understood in a broad sense, for example, “fixed” may be a fixed connection, a detachable connection, or an integrated; It can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal communication between two elements or the interaction relationship between the two elements, unless otherwise clearly defined.
  • “fixed” may be a fixed connection, a detachable connection, or an integrated; It can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal communication between two elements or the interaction relationship between the two elements, unless otherwise clearly defined.
  • the water-based paint coating line includes an assembly area 2 , a pool group area 3 , a first drying room area 4 , and a powder spraying area 5 arranged in sequence. and the second oven zone 6.
  • the water-based paint coating line also includes an accumulation and release chain 1 , which runs through the assembly area 2 , the pool group area 3 , the first drying room area 4 , and the powder spraying area 5 and the second drying room area 6.
  • the accumulation and release chain 1 is provided with an accumulation and release chain hanger.
  • the accumulation and release chain hanger is used to hoist the to-be-coated parts to be coated, and to carry the to-be-coated parts through the pool group area 3, the first drying The room area 4, the powder spraying area 5 and the second drying room are coated with water-based paint.
  • a hoisting platform is provided in the assembling area 2, and the hoisting platform is used for the worker to install the parts to be coated on the accumulation chain hanger.
  • a lifting device, a 180-degree turning tooling of the vehicle frame, and the like can be provided in the assembly area 2 .
  • the pool group includes a pretreatment pool group, an electrophoresis pool group, and a washing pool group arranged in sequence, and the pretreatment pool group mainly includes a cleaning pool, a surface conditioning pool, and a phosphating pool.
  • the accumulating and releasing chain hanger passes through the pretreatment pool group, the electrophoresis pool group and the washing pool group in sequence on the accumulating and releasing chain 1.
  • the accumulating and releasing chain hanger is provided with a lifting mechanism, and the The lifting mechanism is used for sinking the to-be-coated parts hoisted on the accumulating and releasing chain hanger into the respective pools of the pretreatment pool group, the electrophoresis pool group and the washing pool group in sequence.
  • the first drying room area 4 is provided with a first drying room, and the first drying room is used for fixing the electrophoretic paint on the to-be-coated piece.
  • the powder spraying area 5 is provided with a powder spraying room, and the powder spraying room is used for spraying powder.
  • a second drying room is arranged in the second drying room area 6, and the second drying room is used to fix the powder on the to-be-coated piece.
  • the above-mentioned water-based paint coating assembly line arranges the assembly area 2, the pool group area 3, the first drying room area 4, the powder spraying area 5 and the second drying room area 6 in sequence in the workshop, and through the accumulation chain 1 run through.
  • the above-mentioned accumulation chain 1 carries the parts to be coated through the chain hanger, and transports the parts to be coated to the pretreatment pool for degreasing , water washing, surface conditioning, phosphating and other treatments; then transported to the electric pool for electrophoresis treatment, and the water-based paint is initially adhered to the parts to be coated; then, the accumulation chain 1 transports the parts to be coated through the accumulation chain hanger In the first drying room, the adhered water-based paint is fixed on the part to be coated to realize the coating of the primer of the part to be coated; then, the accumulation chain 1 passes the accumulation chain hanger to the to-be-coated part.
  • the accumulation and release chain 1 transports the to-be-coated part to the second drying room through the accumulation and release chain hanger, The adhered powder is fixed on the part to be coated to realize the coating of the surface paint of the part to be coated.
  • the above-mentioned water-based paint coating line transports the parts to be coated through the accumulation and release chain 1, and performs pretreatment such as degreasing, water washing, phosphating, and surface conditioning in each pool of the pretreatment pool group.
  • Carry out electrophoresis treatment fix the water-based paint on the part to be coated by baking in the first drying room area 4; spray powder in the powder spraying room, and fix the powder on the to-be-coated part by baking in the second drying room area 6. on the coating.
  • the position of each process is run through the accumulation and release chain 1, which can conveniently carry out the water-based paint coating treatment on the to-be-coated parts with large volume and weight, and can also coat multiple small-volume parts to be coated at one time at the same time. , the efficiency of water-based paint coating is higher.
  • a plurality of the accumulation and release chains 1 can be provided, a transfer machine is arranged between each accumulation and release chain 1, and the accumulation and release chain hanger is adapted to the transfer machine , the transfer machine is used to move the accumulation and release chain spreader or the spreader beam 13 of the accumulation and release chain spreader carrying the parts to be coated from one of the accumulation and release chains 1 to the other accumulation and release chain 1 .
  • the accumulation and release chain spreader includes a first spreader group, and the first spreader group includes two front and rear first spreaders.
  • the first spreader The tool includes a primary load beam 14 , and two of the primary load beams 14 are respectively mounted on the accumulation and release chain 1 through the front trolley 11 and the rear trolley 16 .
  • the lower parts of the two first spreaders are provided with secondary load beams 15, and the front and rear parts of the secondary load beams 15 are respectively connected with the two first spreaders.
  • the lower part of the secondary load beam 15 is further provided with a hanger beam 13 , and the lower end of the hanger beam 13 is provided with a plurality of hanging chain 35 connecting pieces for connecting the hanging chain 35 .
  • the upper end of the spreader beam 13 is also provided with two T-shaped connecting pieces 33 , and the two ends of the secondary load beam 15 are provided with grooves; the T-shaped connecting pieces 33 are adapted to the grooves.
  • the transverse rod of the T-shaped connecting piece 33 extends to the upper part of the secondary load beam 15, and when the secondary load beam 15 rises, the transverse rod is clamped into the secondary load beam 15.
  • the connection between the secondary load beam 15 and the spreader beam 13 is realized; when the secondary load beam 15 and the spreader beam 13 need to be separated, the spreader beam 13 is supported by other equipment and the lifting beam 13 is supported.
  • the tool beam 13 moves upward to make the transverse rod of the T-shaped connecting piece 33 disengage from the groove, thereby realizing the separation of the spreader beam 13 and the secondary load beam 15 .
  • the connection between the above-mentioned spreader beam 13 and the secondary load beam 15 is variable.
  • the staff can first install a plurality of parts to be coated on the hanging chain 35 connected with the spreader beam 13, and then attach the spreader beam 13.
  • the parts to be coated and the parts to be coated thereon are installed on the secondary load beam 15 as a whole. By hoisting the parts to be coated in the above way, the operation difficulty of the staff can be reduced.
  • the accumulation and release chain 1 is connected to and moves on the accumulation and release chain 1 through two first spreaders.
  • the two first spreaders are respectively connected to the front part and the rear part of the secondary load beam 15, which can be jointly
  • the gravity of the secondary load beam 15 is shared, and the load capacity of the secondary load beam 15 is increased, thereby facilitating the hoisting of more and heavier parts to be coated, and at the same time increasing the maximum load of the hoisted parts to be coated.
  • the front part and the rear part of the secondary load beam 15 are respectively connected with the two first hangers, which can also increase the stability of the secondary load beam 15 and prevent the secondary load beam 15 from side deviation.
  • the above-mentioned hanger beam 13 is installed on the secondary load beam 15 through a T-shaped connecting piece 33, and the hanger beam 13 is used for setting a hanging chain 35 connecting piece.
  • the above-mentioned hanging chain 35 connecting piece is a hanging ring 34.
  • a plurality of hanging rings 34 for connecting the hanging chains 35 can be evenly arranged on the spreader beam 13 as required, so that the staff can hoist a plurality of parts to be coated on the spreader beam 13 and increase the size of the spreader The number of parts to be coated that can be lifted.
  • two sets of support rods 18 are also provided on the spreader beam 13, and the support rods 18 groups are respectively located in the The front part and the rear part of the spreader beam 13; the support rod 18 group includes two support rods 18 perpendicular to the spreader beam 13, the two support rods 18 are symmetrically distributed and are respectively to the left and right side extension.
  • the support rods 18 are supported by the support members of the transfer machine, and then the support members are moved upward, thereby causing the spreader beam 13 to move upward.
  • the spreader The T-connector 33 on the beam 13 is separated from the groove.
  • the arrangement of the above-mentioned support rods 18 is convenient for supporting and moving the spreader beam 13 by the transfer machine.
  • the present invention does not involve the invention and creation of the transfer machine, and the transfer is not used here. However, it can be understood that the transfer machine only plays the role of supporting the upward movement and the overall movement of the transfer machine, thereby driving the movement of the spreader beam 13.
  • the above-mentioned transfer machine can be specially matched equipment. It can also be a hydraulic lifting device with a translation device.
  • the spreader beam 13 includes an I-shaped steel, and the I-shaped steel further includes transverse plates located on the upper and lower sides and a vertical plate located between the two transverse plates.
  • the overall structure of the spreader beam 13 is an I-shaped steel. Section steel can increase the mechanical strength of the spreader beam 13 .
  • the vertical plate is provided with a plurality of circular holes 31. The arrangement of the above circular holes 31 can reduce the overall weight of the spreader beam 13, thereby increasing the load capacity.
  • the spreader beam 13 is further provided with a plurality of reinforcement plates 32 , and the reinforcement plate 32 group includes two reinforcement plates 32 , and the two reinforcement plates 32 are symmetrically distributed on the left and right sides.
  • the upper end and the lower end of the reinforcing plate 32 are respectively connected with the two transverse plates.
  • a plurality of the hanging chain 35 connecting pieces are evenly arranged at the lower end of the lateral plate located on the lower side.
  • the staff can hoist the workpieces to be coated respectively through the plurality of hanging chains 35;
  • the worker can select the position of the hanging ring 34 to hoist the workpiece to be coated by at least two hanging chains 35 .
  • an oil receiving pan for collecting oil or other stains is also provided, and the specific configuration is as follows:
  • the end surface is also provided with an upper oil receiving pan 71 and a lower oil receiving pan 72 respectively, and the upper oil receiving pan 71 and the lower oil receiving pan 72 are both located at the lower part of the accumulation and release chain 1 .
  • the oil and other stains fall directly into the upper oil receiving pan 71 or the lower oil receiving pan 72 to prevent the oil or stains from falling into the lower coating equipment.
  • this embodiment provides a specific form of the upper oil pan 71 or the lower oil pan 72, one of which is: the upper oil pan 71 and the lower oil pan 72 are respectively opened in the primary The upper end face of the load beam 14 and the strip groove on the upper end face of the secondary load beam 15 .
  • the plates on which the upper end faces of the primary load beam 14 and the secondary load beam 15 are located are relatively thick, strip-shaped grooves may be respectively formed thereon, and the strip-shaped grooves form an upper oil receiving pan 71 and a lower oil receiving pan 72 .
  • the upper oil receiving pan 71 and the lower oil receiving pan 72 are respectively installed on the upper end face of the primary load beam 14 and the lower oil receiving pan 72 .
  • the bar-shaped box on the upper end surface of the secondary load beam 15 is provided with an opening at the upper end of the bar-shaped box.
  • an oil collecting bucket made of transparent material can also be fixed at the lower part of the secondary load beam 15.
  • the oil collecting bucket is communicated with the upper oil receiving pan 71 and the lower oil receiving pan 72 through an oil delivery pipe.
  • the oil and stains collected by the above-mentioned upper oil pan 71 and lower oil pan 72 enter the oil collecting barrel. of oil and stains.
  • the powder spray booth includes a powder booth body, and the front and rear side walls of the powder booth body are respectively provided with an inlet and an outlet for the parts to be coated to pass through,
  • a slot 504 is provided on the top wall of the main body of the powder booth, and the hanging chain 35 for suspending the part to be coated passes through the slot 504 .
  • the main body of the powder booth includes an automatic spray chamber 501 and at least one supplementary spray chamber 502, wherein one supplementary spray chamber 502 is located on the side of the automatic spray chamber 501 close to the outlet.
  • the lower part of the automatic spray chamber 501 is provided with a powder recovery port, and the powder recovery port is connected with an exhaust fan; the lower part of the supplementary spray chamber 502 is provided with a plurality of air blowing ports 505, and the air blowing ports 505 are connected with a blower through an air pipe. ; The blowing port 505 faces the powder recovery port.
  • a supplementary spraying room 502 is set on one side of the automatic spraying room 501, and the automatic spraying process and the supplementary spraying process are arranged in one place, which is convenient for the staff to quickly spray the parts to be sprayed.
  • a powder recovery port is set at the lower part of the automatic spray chamber 501, and the powder recovery port is connected to the exhaust fan.
  • the above-mentioned powder recovery port can quickly and effectively recover the powder in the automatic spray chamber 501.
  • the air blowing port 505 faces the powder recovery port, and the air blown by the blower can blow the powder falling on the bottom wall of the supplementary spray chamber 502 into the powder recovery port in the automatic spray chamber 501 to realize powder recovery.
  • the front side wall and the rear side wall are both composed of a left door 507 and a right door 508 , and a strip between the left door 507 and the right door 508 is formed.
  • the gap is either the inlet or the outlet.
  • a left partition plate and a right partition plate are arranged between the automatic spray chamber 501 and the supplementary spray chamber 502, and a gap is left between the left partition plate and the right partition plate, and the gap is the space to be coated.
  • a lift table is provided on the supplementary spray position 503 .
  • the above-mentioned supplementary spray position 503 is located between the left partition/right partition and the left door 507/right door 508, which can prevent the powder dispersed in the automatic spray chamber 501 from floating to the supplementary spray position 503 and improve the working environment of the staff;
  • the above-mentioned lifting platform is used to elevate or lower the standing position of the staff, so that the staff can coat different height positions of the parts to be coated.
  • the left door 507 and the right door 508 are respectively connected with a translation mechanism, and the left door 507 and the right door 508 are in the translation. Driven by the mechanism to approach or move away. According to the width of the part to be coated, the worker can translate the left door 507 and the right door 508 through the translation mechanism, thereby adjusting the width of the inlet and outlet, and reducing the amount of air entering from the inlet and outlet.
  • the width of the inlet and the width of the outlet gradually increase from top to bottom, so as to reduce the amount of air entering the lower part of the inlet and the outlet.
  • the inlet and the lower part of the outlet are also provided with reels, and the reels are provided with a roll-up door cloth 510 , and the roll-up door cloth
  • the two sliders are connected by a sliding rod 511, and the rolling door cloth 510 is connected with the sliding rod 511;
  • the left door 507 and the right door 508 are respectively provided with vertical slideways, so
  • the sliding block is adapted to the vertical slideway;
  • the vertical slideway is provided with a sliding block fixing member for fixing the sliding block, and the sliding block fixing member is used for fixing the sliding block and then fixing the roll door cloth 510.
  • the above-mentioned reel can be used to roll up or release the roll-up door cloth 510.
  • the staff can arrange the roll-up door cloth 510 at the entrance or outlet from bottom to top as required to prevent air from entering the main body of the powder room from the lower part of the entrance and the lower part of the outlet.
  • the air pressure in the lower part of the main body of the powder room is low, the air pressure in the upper part is high, and the air flows downward from the upper part, so as to collect the powder dispersed in the air, and also reduce the density of the powder in the air in the space where the staff is located. And prevent the powder from overflowing from the upper part of the powder spraying room.
  • the recovery port makes it easier to collect the powder in the main body of the powder room, especially the powder in the air of the supplementary spraying room 502; in addition, the supplementary spraying position 503 can be placed at the upper air outlet, which improves the working environment of the staff.
  • the air flows downward obliquely from both ends, which has less influence on the powder spraying, which can avoid uneven powder spraying on the upper and lower parts of the powder spraying part when the air flows directly downward. The problem.
  • the flexible member includes a sponge, and the sponge is pasted and fixed on both side walls of the slot 504; the sponge is covered with a cloth sheet, and the cloth sheet is Set with fluff.
  • the above-mentioned sponge has high elasticity, and has little resistance to the movement of the hanging chain 35;
  • the top wall of the main body of the powder booth is provided with two rotating
  • the rotating assembly includes a driving wheel, a driven wheel and a rotating ring, the driving wheel is connected with a servo motor, and the rotating ring is sleeved on the driving wheel and the driven wheel.
  • the two rotating rings are mirror-symmetrical with the slot 504 as the central axis, and a plurality of rubber sheets 513 are arranged on the rotating rings; the rubber sheets 513 on the two rotating rings abut and cover the openings.
  • the driving wheel and the driven wheel drive the rotating ring to move, and the abutting surfaces of the two rotating rings move in the same direction, that is, the abutting rubber sheets 513 move in the same direction.
  • the above-mentioned rubber sheet 513 covers the slot 504, which can prevent air from entering the main body of the powder booth from the slot 504.
  • the hanging chain 35 moves in the groove 504, and the rubber sheet 513 follows the hanging chain 35.
  • the rotation speed of the above-mentioned servo motor should be consistent with the movement speed of the accumulating and releasing chain 1 of the hanging chain 35.
  • the rubber sheet 513 can not only prevent the air from entering from the slot 504 to realize the movement of the air flow from the upper part of the two ends of the main body of the powder room to the powder recovery port, but also can clamp the hanging chain 35 to prevent the hanging chain 35 from swinging, so as to improve the powder spraying efficiency. stability.
  • the above-mentioned rotating rings are arranged as follows: each rotating ring is provided with a plurality of rubber sheets 513 ; At the same time, there are a plurality of rubber sheets 513, and the rubber sheets 513 can be closely distributed one by one.
  • the rubber sheets 513 run to the changing position of the driving wheel or the driven wheel, the rubber sheets 513 can be separated; and when the rubber sheets 513 have And when there is only one and the ring is fixed on the rotating ring, the rubber sheet 513 will inevitably be stretched and deformed when it runs to the driving wheel or the driven wheel. There are multiple rubber sheets 513, and the rubber sheet 513 runs to the driving wheel or the driven wheel. can be separated when the above situation can be avoided.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

A waterbased paint coating line, comprising an assembling region (2), a pool group region (3), a first drying room region (4), a powder spraying region (5), and a second drying room region (6) that are sequentially arranged. A power and free chain (1) penetrates through the foregoing regions; and by means of a power and free chain hanger, the power and free chain (1) lifts a member to be coated. According to the waterbased paint coating line, the assembling region, the pool group region, the first drying room region, the powder spraying region, and the second drying room region are sequentially arranged in a factory building, and by means of the penetration of the power and free chain, it is convenient to coat a member to be coated having the large size and weight with a waterbased paint, and a plurality of members to be coated having the small size can be simultaneously and uniformly coated, and thus, the coating efficiency of the paint is higher.

Description

一种水性涂料涂覆流水线A water-based paint coating line 技术领域technical field
本发明属于流水线水性涂料涂覆领域,具体涉及一种通过电泳和喷粉等途径,为待涂覆件喷涂水性涂料涂覆流水线。The invention belongs to the field of pipeline water-based paint coating, and particularly relates to an assembly line for spraying water-based paint on a to-be-coated piece by means of electrophoresis, powder spraying and the like.
背景技术Background technique
在工业生产中,需要在生产的产品表面涂覆防护材料,以达到防腐、美观等效果,常规的防护材料为油漆。但是,向生产的产品喷涂油漆,容易产生较大的环境污染,同时油漆对产品的防护效果较差。In industrial production, protective materials need to be coated on the surface of the produced products to achieve anti-corrosion and aesthetic effects. The conventional protective material is paint. However, spraying paint on the produced products is likely to cause greater environmental pollution, and at the same time, the protective effect of the paint on the products is poor.
现有技术中,可通过水性涂料对产品进行防护,涂覆水性涂料时不会对空气产生污染。但是,涂覆水性材料工序多,工艺较为复杂,且待涂覆件较多或较大时涂覆效率低。In the prior art, water-based paints can be used to protect products, and the water-based paints will not pollute the air. However, there are many processes for coating water-based materials, the process is relatively complicated, and the coating efficiency is low when there are many or large parts to be coated.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提出一种水性涂料涂覆流水线,以解决现有技术中待涂覆件较多或较大时涂覆效率低的问题。The purpose of the present invention is to propose a water-based paint coating line to solve the problem of low coating efficiency in the prior art when there are many or large pieces to be coated.
本发明提供一种水性涂料涂覆流水线,该水性涂料涂覆流水线包括依次排布的配装区、水池组区、第一烘房区、喷粉区和第二烘房区。所述水性涂料涂覆流水线还包括积放链,所述积放链贯串所述配装区、所述水池组区、所述第一烘房区、所述喷粉区和所述第二烘房区。所述积放链上设置有积放链吊具,所述积放链吊具用于吊装待涂覆的待涂覆件。所述配装区内设置有吊装平台,所述吊装平台用于工作人员将待涂覆件安装在积放链吊具上。所述水池组包括依次排布的预处理水池组、电泳水池组和水洗水池组,所述积放链吊具在积放链上依次路经所述预处理水池组、所述电泳水池组和所述水洗水池组,所述积 放链吊具上设置有升降机构,所述升降机构用于将吊装在所述积放链吊具上的所述待涂覆件依次沉入所述预处理水池组、所述电泳水池组和所述水洗水池组的各水池中。所述第一烘房区内设置有第一烘房,所述第一烘房用于将电泳涂料固定在所述待涂覆件上。所述喷粉区内设置有粉体喷粉房,所述喷粉房用于喷涂粉料。所述第二烘房区内设置有第二烘房,所述第二烘房用于将粉料固定在所述待涂覆件上。The invention provides a water-based paint coating line, which comprises an assembly area, a pool group area, a first drying room area, a powder spraying area and a second drying room area arranged in sequence. The water-based paint coating line also includes an accumulation and release chain, which runs through the assembly area, the pool group area, the first drying room area, the powder spraying area, and the second drying area. room area. The accumulation and release chain is provided with an accumulation and release chain hanger, and the accumulation and release chain hanger is used for hoisting the to-be-coated parts to be coated. A hoisting platform is arranged in the assembly area, and the hoisting platform is used for the worker to install the to-be-coated piece on the accumulation chain hanger. The pool group includes a pretreatment pool group, an electrophoresis pool group, and a washing pool group arranged in sequence, and the accumulation and release chain spreader passes through the pretreatment pool group, the electrophoresis pool group, and the pool in sequence on the accumulation and release chain. In the water washing pool group, the accumulation and release chain hanger is provided with a lifting mechanism, and the lifting mechanism is used to sequentially sink the to-be-coated parts hoisted on the accumulation and release chain hanger into the pretreatment. in each pool of the pool group, the electrophoresis pool group and the water washing pool group. A first drying room is arranged in the first drying room area, and the first drying room is used for fixing the electrophoretic paint on the to-be-coated piece. The powder spraying area is provided with a powder spraying room, and the powder spraying room is used for spraying powder. A second drying room is arranged in the second drying room area, and the second drying room is used to fix the powder on the to-be-coated piece.
优选的,所述积放链有多条,各积放链之间设置有移载机,所述积放链吊具与所述移载机相适配。所述积放链吊具包括第一吊具组,所述第一吊具组包括前后两个第一吊具,所述第一吊具包括一次载荷梁,两个所述一次载荷梁分别通过前小车和后小车安装在积放链上。两个所述第一吊具的下部设置有二次载荷梁,二次载荷梁的前部和后部分别与两个所述第一吊具相连接。所述二次载荷梁的下部还设置有吊具梁,所述吊具梁下端设置有多个用于连接挂链的挂链连接件;所述吊具梁的上端还设置有两个T形连接件,所述二次载荷梁的两端设置有凹槽;所述T形连接件与所述凹槽相适配。Preferably, there are multiple accumulating and releasing chains, a transfer machine is arranged between each accumulating and releasing chain, and the accumulating and releasing chain hanger is adapted to the transferring machine. The accumulation and release chain spreader includes a first spreader group, the first spreader group includes two front and rear first spreaders, the first spreader includes a primary load beam, and the two primary load beams pass through respectively. The front trolley and the rear trolley are mounted on the accumulation chain. The lower parts of the two first spreaders are provided with secondary load beams, and the front and rear parts of the secondary load beams are respectively connected with the two first spreaders. The lower part of the secondary load beam is also provided with a hanger beam, and the lower end of the hanger beam is provided with a plurality of hanging chain connectors for connecting the hanging chain; the upper end of the hanger beam is also provided with two T-shaped A connecting piece, two ends of the secondary load beam are provided with grooves; the T-shaped connecting piece is adapted to the grooves.
再优选的,所述吊具梁上还设置有两组支撑杆组,所述支撑杆组分别位于所述吊具梁的前部和后部;所述支撑杆组包括两个与所述吊具梁相垂直的支撑杆,两个所述支撑杆对称分布且分别向左侧和右侧延伸。More preferably, the spreader beam is also provided with two sets of support rod groups, the support rod groups are respectively located at the front and the rear of the spreader beam; the support rod group includes two There are support rods perpendicular to the beams, and the two support rods are symmetrically distributed and extend to the left and the right respectively.
再优选的,所述吊具梁包括工型钢,所述工型钢包括分别位于上下两侧的横向板和位于两个所述横向板之间的竖板,所述竖板上设置有多个圆孔。所述吊具梁上还设置有多个加强板组,所述加强板组包括两个加强板,两个所述加强板左右对称分布在所述竖板的两侧;所述加强板的上端和下端分别与两个所述横向板相连接。在位于下侧的横向板下端均匀设置有多个所述挂链连接件,所述挂链连接件是挂环,所述挂链安装在所述挂环上。Further preferably, the spreader beam comprises I-shaped steel, the I-shaped steel comprises transverse plates located on the upper and lower sides respectively and a vertical plate located between the two transverse plates, and the vertical plates are provided with a plurality of circular plates. hole. The hanger beam is also provided with a plurality of reinforcing plate groups, the reinforcing plate group includes two reinforcing plates, and the two reinforcing plates are symmetrically distributed on both sides of the vertical plate; the upper end of the reinforcing plate and the lower ends are respectively connected with the two transverse plates. A plurality of the hanging chain connecting pieces are evenly arranged at the lower end of the lateral plate located on the lower side, and the hanging chain connecting pieces are hanging loops, and the hanging chain is installed on the hanging loops.
再优选的,所述一次载荷梁和二次载荷梁的上端面还分别设置有上接油盘和下接油盘,所述上接油盘和所述下接油盘均位于所述积放链的下部。Further preferably, the upper end surfaces of the primary load beam and the secondary load beam are further provided with an upper oil receiving pan and a lower oil receiving pan, respectively, and the upper oil receiving pan and the lower oil receiving pan are both located in the accumulator. the lower part of the chain.
优选的,所述粉体喷粉房包括粉房主体,所述粉房主体的前侧壁和后侧壁分别设置有用于所述待涂覆件通过的入口和出口,所述粉房主体的顶壁上设置有开槽,用于悬挂所述待涂覆件的挂链从所述开槽通过。所述粉房主体包括自动喷室和至少一个补喷室,其中一个补喷室位于所述自动喷室靠近所述出口的一侧。所述自动喷室的下部设置有粉末回收口,所述粉末回收口连接有抽风机;所述补喷室的下部设置有多个鼓气口,所述鼓气口通过气管连接有鼓风机;所述鼓气口面向所述粉末回收口。Preferably, the powder spray booth includes a powder booth main body, and the front and rear side walls of the powder booth main body are respectively provided with an inlet and an outlet for the parts to be coated to pass through. A slot is provided on the top wall, and a hanging chain for suspending the to-be-coated piece passes through the slot. The main body of the powder booth includes an automatic spray chamber and at least one supplementary spray chamber, wherein one of the supplementary spray chambers is located on the side of the automatic spray chamber close to the outlet. The lower part of the automatic spray chamber is provided with a powder recovery port, and the powder recovery port is connected with an exhaust fan; the lower part of the supplementary spray chamber is provided with a plurality of air blowing ports, and the air blowing ports are connected with a blower through an air pipe; The gas port faces the powder recovery port.
再优选的,所述前侧壁和所述后侧壁均是由左门和右门构成的,所述左门和所述右门之间的条形间隙为入口或出口。所述自动喷室和所述补喷室之间设置有左隔板和右隔板,所述左隔板和所述右隔板之间留有间隙,所述间隙为所述待涂覆件通过的通道;所述左隔板和所述左门之间设置有至少一个补喷位,所述右隔板和所述右门之间设置有至少一个补喷位;所述补喷位上设置有升降台。Still more preferably, both the front side wall and the rear side wall are composed of a left door and a right door, and the strip-shaped gap between the left door and the right door is an entrance or an exit. A left partition plate and a right partition plate are arranged between the automatic spray chamber and the supplementary spray chamber, and a gap is left between the left partition plate and the right partition plate, and the gap is the part to be coated at least one supplementary injection position is set between the left partition plate and the left door, and at least one supplementary injection position is set between the right partition plate and the right door; A lift table is provided.
再优选的,所述左门和所述右门分别连接有平移机构,所述左门和所述右门在所述平移机构的驱动下靠近或远离;所述入口的宽度和所述出口的宽度从上到下逐渐增大。所述入口和所述出口下部还设置有卷轴,所述卷轴上设置有卷门布,所述卷门布的两侧设置有滑块,两滑块通过滑杆相连接,卷门布与该滑杆相连接;所述左门和右门上分别设置有竖向滑道,所述滑块和所述竖向滑道相适配;所述竖向滑道上设置有用于固定所述滑块的滑块固定件。Still preferably, the left door and the right door are respectively connected with a translation mechanism, and the left door and the right door approach or move away under the drive of the translation mechanism; the width of the entrance is the same as the width of the exit. The width gradually increases from top to bottom. The lower part of the entrance and the outlet is also provided with a reel, the reel is provided with a roll-up door cloth, the two sides of the roll-up door cloth are provided with sliders, the two sliders are connected by a sliding rod, and the roll-up door cloth is connected with the door. The sliding rods are connected; the left door and the right door are respectively provided with vertical slideways, and the sliders are adapted to the vertical slideways; slider mounts.
再优选的,所述开槽的两侧侧壁分别设置有柔性件,所述挂链从两个柔性件之间通过。所述柔性件包括海绵,所述海绵粘贴固定在所述开槽的两侧侧壁上;所述海绵上包覆有布片,所述布片上设置有绒毛。Further preferably, flexible pieces are respectively provided on both side walls of the slot, and the hanging chain passes between the two flexible pieces. The flexible member includes a sponge, and the sponge is pasted and fixed on both side walls of the slot; the sponge is covered with a cloth sheet, and the cloth sheet is provided with fluff.
再优选的,所述粉房主体的顶壁上设置有两个旋转组件,所述旋转组件包括主动轮、从动轮和旋转环,所述主动轮连接有伺服电机,所述旋转环套设在所述主动轮和所述从动轮上。两个所述旋转环以所述开槽为中心轴镜像对称,所述旋转环上设置有多个橡胶片;位于两个所述旋转环上的橡胶片抵接并覆盖 所述开槽。More preferably, two rotating assemblies are arranged on the top wall of the main body of the powder booth, and the rotating assemblies include a driving wheel, a driven wheel and a rotating ring, the driving wheel is connected with a servo motor, and the rotating ring is sleeved on the rotating ring. on the driving wheel and the driven wheel. The two rotating rings are mirror-symmetrical with the slot as the central axis, and a plurality of rubber sheets are arranged on the rotating rings; the rubber sheets located on the two rotating rings abut and cover the slot.
本发明提供的水性涂料涂覆流水线与现有技术相比,具有以下有益效果:Compared with the prior art, the water-based paint coating line provided by the present invention has the following beneficial effects:
上述一种水性涂料涂覆流水线,将配装区、水池组区、第一烘房区、喷粉区和第二烘房区依次排布在厂房内,并通过积放链贯串。在配装区将待涂覆件安装在积放链吊具上后,上述积放链通过积放链吊具携带待涂覆件,将待涂覆件运送至预处理水池组进行脱脂、水洗、表调、磷化等处理;然后运送至电泳池进行电泳处理,在待涂覆件上初步粘附水性涂料;接着,积放链通过积放链吊具将待涂覆件运送至第一烘房内,将粘附的水性涂料固定在待涂覆件上,实现待涂覆件底漆的涂覆;再接着,积放链通过积放链吊具将待涂覆件运送至粉体喷粉房内,将粉料粘附在待涂覆件的表面;最后,积放链通过积放链吊具将待涂覆件运送至第二烘房内,将粘附的粉料固定在待涂覆件上,实现待涂覆件表层漆的涂覆。In the above-mentioned water-based paint coating line, the assembly area, the pool group area, the first drying room area, the powder spraying area and the second drying room area are sequentially arranged in the workshop, and run through the accumulation chain. After the parts to be coated are installed on the chain hanger in the assembly area, the above-mentioned accumulation chain carries the parts to be coated through the chain hanger, and the parts to be coated are transported to the pretreatment pool for degreasing and water washing. , surface conditioning, phosphating and other treatments; then transported to the electric pool for electrophoresis treatment, and the water-based paint is initially adhered to the parts to be coated; then, the accumulation chain transports the parts to be coated to the first through the accumulation chain hanger In the drying room, the adhered water-based paint is fixed on the part to be coated to realize the coating of the primer of the part to be coated; then, the accumulation and release chain transports the to-be-coated parts to the powder through the accumulation and release chain hanger In the powder spraying room, the powder is adhered to the surface of the part to be coated; finally, the accumulation and release chain transports the to-be-coated part to the second drying room through the accumulation and release chain hanger, and the adhered powder is fixed in the second drying room. On the part to be coated, the coating of the surface paint of the part to be coated is realized.
上述一种水性涂料涂覆流水线,通过积放链运输待涂覆件,在预处理水池组的各水池内进行脱脂、水洗、磷化、表调等预处理,在电泳水池组的水池内进行电泳处理,在第一烘房区通过烘烤将水性涂料固定在待涂覆件;在粉体喷粉房内喷粉,在第二烘房区通过烘烤将粉料固定在待涂覆件上。各工序所在位置通过积放链贯串,可以方便的对体积和重量较大的待涂覆件进行水性涂料涂覆处理,同时也能够同时对多个体积较小的待涂覆件一次涂覆,水性涂料涂覆的效率更高。The above-mentioned water-based paint coating line transports the parts to be coated through the accumulation and release chain, and performs pretreatment such as degreasing, water washing, phosphating, and surface conditioning in the pools of the pretreatment pools, and performs pretreatment in the pools of the electrophoresis pools. For electrophoresis treatment, the water-based paint is fixed on the part to be coated by baking in the first drying room area; powder is sprayed in the powder spraying room, and the powder is fixed on the part to be coated by baking in the second drying room area superior. The position of each process is connected through the accumulation and release chain, which can conveniently carry out the water-based paint coating treatment on the parts to be coated with large volume and weight, and can also apply multiple small parts to be coated at one time at the same time. Water-based paint application is more efficient.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍。In order to illustrate the embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that are required in the description of the embodiments or the prior art.
显而易见地,下面描述中的附图仅仅是本发明的一些具体实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图示出的结构获得其他的附图。Obviously, the drawings in the following description are only some specific embodiments of the present invention, and for those skilled in the art, without creative efforts, other structures can also be obtained according to the structures shown in these drawings. Attached.
图1为本发明实施例中水性涂料涂覆流水线的平面示意图。FIG. 1 is a schematic plan view of a water-based paint coating line in an embodiment of the present invention.
图2为本发明实施例中积放链吊具的主视图。FIG. 2 is a front view of the accumulation and release chain spreader in the embodiment of the present invention.
图3为本发明实施例中图1中的A部放大图。FIG. 3 is an enlarged view of part A in FIG. 1 in an embodiment of the present invention.
图4为本发明实施例中积放链吊具的侧视图。FIG. 4 is a side view of the accumulation and release chain spreader in the embodiment of the present invention.
图5为本发明实施例中粉体喷粉房的透视图。FIG. 5 is a perspective view of a powder spray booth in an embodiment of the present invention.
图6为本发明实施例中粉体喷粉房的主视图或后视图。FIG. 6 is a front view or a rear view of the powder spraying room in the embodiment of the present invention.
图7为本发明实施例中粉体喷粉房的俯视图。FIG. 7 is a top view of the powder spray booth in the embodiment of the present invention.
附图标号说明:Description of reference numbers:
标号label 名称 name 标号label 名称name
11 积放链 accumulation chain 66 第二烘房区The second drying room
22 配装区Assembly area 1111 前小车 front trolley
33 水池组区 pool area 1212 发号杆 horn
44 第一烘房区The first drying room area 1313 吊具梁 Spreader beam
55 喷粉区Dusting area 1111 前小车 front trolley
501501 自动喷室 Automatic spray booth 1212 发号杆 horn
502502 补喷室 Refill room 1313 吊具梁 Spreader beam
503503 补喷位 Refill position 1414 一次载荷梁 primary load beam
504504 开槽slotted 1515 二次载荷梁 secondary load beam
505505 鼓气口 air blow 1616 后小车 rear trolley
506506 往复式喷枪reciprocating spray gun 1818 支撑杆 support rod
507507 左门 left door 7171 上接油盘 oil pan
508508 右门 right door 7272 下接油盘 Lower oil pan
509509 入口或出口entrance or exit 3131 圆孔 round hole
510510 卷门布 roll door cloth 3232 加强板Reinforcing plate
511511 滑杆Slider 3333 T形连接件T-connector
512512 滑轨 rail 3434 挂环 Hanging ring
513513 橡胶片 rubber sheet 3535 挂链hanging chain
514514 主动轮或从动轮driving wheel or driven wheel      
具体实施方式detailed description
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明的一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments.
基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
需要说明,本发明实施例中所有方向性指示(诸如上、下、左、右、前、后……)仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present invention are only used to explain the relationship between various components under a certain posture (as shown in the accompanying drawings). The relative positional relationship, the movement situation, etc., if the specific posture changes, the directional indication also changes accordingly.
另外,在本发明中如涉及“第一”、“第二”等的描述仅用于描述目的,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。在本发明的描述中,“多个”的含义是至少两个,例如两个,三个等,除非另有明确具体的限定。In addition, descriptions such as "first", "second", etc. in the present invention are only for descriptive purposes, and should not be construed as indicating or implying their relative importance or implicitly indicating the number of indicated technical features. Thus, a feature delimited with "first", "second" may expressly or implicitly include at least one of that feature. In the description of the present invention, "plurality" means at least two, such as two, three, etc., unless otherwise expressly and specifically defined.
在本发明中,除非另有明确的规定和限定,术语“连接”、“固定”等应做广义理解,例如,“固定”可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the present invention, unless otherwise expressly specified and limited, the terms "connected", "fixed" and the like should be understood in a broad sense, for example, "fixed" may be a fixed connection, a detachable connection, or an integrated; It can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal communication between two elements or the interaction relationship between the two elements, unless otherwise clearly defined. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.
另外,本发明各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础,当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在,也不在本发明要求的保护范围之内。In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but must be based on the realization by those of ordinary skill in the art. When the combination of technical solutions is contradictory or cannot be achieved, it should be considered that the combination of technical solutions does not exist and is not within the scope of protection claimed by the present invention.
实施例Example
本实施例提供一种水性涂料涂覆流水线,如图1所示,该水性涂料涂覆流水线包括依次排布的配装区2、水池组区3、第一烘房区4、喷粉区5和第二烘房区6。所述水性涂料涂覆流水线还包括积放链1,所述积放链1贯串所述配装区2、所述水池组区3、所述第一烘房区4、所述喷粉区5和所述第二烘房区6。所述积放链1上设置有积放链吊具,所述积放链吊具用于吊装待涂覆的待涂覆件,并携带待涂覆件依次经水池组区3、第一烘房区4、喷粉区5和第二烘房进行水性涂料涂覆。所述配装区2内设置有吊装平台,所述吊装平台用于工作人员将待涂覆件安装在积放链吊具上。当然,为了方便将待涂覆件安装在积放链吊具上,可以在配装区2内设置升降装置、车架180度翻转工装等。所述水池组包括依次排布的预处理水池组、电泳水池组和水洗水池组,上述预处理水池组主要包括清洗池、表调池和磷化池等。所述积放链吊具在积放链1上依次路经所述预处理水池组、所述电泳水池组和所述水洗水池组,所述积放链吊具上设置有升降机构,所述升降机构用于将吊装在所述积放链吊具上的所述待涂覆件依次沉入所述预处理水池组、所述电泳水池组和所述水洗水池组的各水池中。所述第一烘房区4内设置有第一烘房,所述第一烘房用于将电泳涂料固定在所述待涂覆件上。所述喷粉区5内设置有粉体喷粉房,所述喷粉房用于喷涂粉料。所述第二烘房区6内设置有第二烘房,所述第二烘房用于将粉料固定在所述待涂覆件上。This embodiment provides a water-based paint coating line. As shown in FIG. 1 , the water-based paint coating line includes an assembly area 2 , a pool group area 3 , a first drying room area 4 , and a powder spraying area 5 arranged in sequence. and the second oven zone 6. The water-based paint coating line also includes an accumulation and release chain 1 , which runs through the assembly area 2 , the pool group area 3 , the first drying room area 4 , and the powder spraying area 5 and the second drying room area 6. The accumulation and release chain 1 is provided with an accumulation and release chain hanger. The accumulation and release chain hanger is used to hoist the to-be-coated parts to be coated, and to carry the to-be-coated parts through the pool group area 3, the first drying The room area 4, the powder spraying area 5 and the second drying room are coated with water-based paint. A hoisting platform is provided in the assembling area 2, and the hoisting platform is used for the worker to install the parts to be coated on the accumulation chain hanger. Of course, in order to facilitate the installation of the parts to be coated on the chain hanger, a lifting device, a 180-degree turning tooling of the vehicle frame, and the like can be provided in the assembly area 2 . The pool group includes a pretreatment pool group, an electrophoresis pool group, and a washing pool group arranged in sequence, and the pretreatment pool group mainly includes a cleaning pool, a surface conditioning pool, and a phosphating pool. The accumulating and releasing chain hanger passes through the pretreatment pool group, the electrophoresis pool group and the washing pool group in sequence on the accumulating and releasing chain 1. The accumulating and releasing chain hanger is provided with a lifting mechanism, and the The lifting mechanism is used for sinking the to-be-coated parts hoisted on the accumulating and releasing chain hanger into the respective pools of the pretreatment pool group, the electrophoresis pool group and the washing pool group in sequence. The first drying room area 4 is provided with a first drying room, and the first drying room is used for fixing the electrophoretic paint on the to-be-coated piece. The powder spraying area 5 is provided with a powder spraying room, and the powder spraying room is used for spraying powder. A second drying room is arranged in the second drying room area 6, and the second drying room is used to fix the powder on the to-be-coated piece.
上述一种水性涂料涂覆流水线,将配装区2、水池组区3、第一烘房区4、喷粉区5和第二烘房区6依次排布在厂房内,并通过积放链1贯串。在配装区2将待涂覆件安装在积放链吊具上后,上述积放链1通过积放链吊具携带待涂覆件,将待涂覆件运送至预处理水池组进行脱脂、水洗、表调、磷化等处理;然后运送至电泳池进行电泳处理,在待涂覆件上初步粘附水性涂料;接着,积放链1通过积放链吊具将待涂覆件运送至第一烘房内,将粘附的水性涂料固定在待涂覆件上,实现待涂覆件底漆的涂覆;再接着,积放链1通过积放链吊具将待涂覆件运送至粉体喷粉房内,将粉料通过喷粉粘附在待涂覆件的表面;最后,积放链1通 过积放链吊具将待涂覆件运送至第二烘房内,将粘附的粉料固定在待涂覆件上,实现待涂覆件表层漆的涂覆。The above-mentioned water-based paint coating assembly line arranges the assembly area 2, the pool group area 3, the first drying room area 4, the powder spraying area 5 and the second drying room area 6 in sequence in the workshop, and through the accumulation chain 1 run through. After the parts to be coated are installed on the chain hanger in the assembly area 2, the above-mentioned accumulation chain 1 carries the parts to be coated through the chain hanger, and transports the parts to be coated to the pretreatment pool for degreasing , water washing, surface conditioning, phosphating and other treatments; then transported to the electric pool for electrophoresis treatment, and the water-based paint is initially adhered to the parts to be coated; then, the accumulation chain 1 transports the parts to be coated through the accumulation chain hanger In the first drying room, the adhered water-based paint is fixed on the part to be coated to realize the coating of the primer of the part to be coated; then, the accumulation chain 1 passes the accumulation chain hanger to the to-be-coated part. It is transported to the powder spraying room, and the powder is adhered to the surface of the part to be coated by powder spraying; finally, the accumulation and release chain 1 transports the to-be-coated part to the second drying room through the accumulation and release chain hanger, The adhered powder is fixed on the part to be coated to realize the coating of the surface paint of the part to be coated.
上述一种水性涂料涂覆流水线,通过积放链1运输待涂覆件,在预处理水池组的各水池内进行脱脂、水洗、磷化、表调等预处理,在电泳水池组的水池内进行电泳处理,在第一烘房区4通过烘烤将水性涂料固定在待涂覆件;在粉体喷粉房内喷粉,在第二烘房区6通过烘烤将粉料固定在待涂覆件上。各工序所在位置通过积放链1贯串,可以方便的对体积和重量较大的待涂覆件进行水性涂料涂覆处理,同时也能够同时对多个体积较小的待涂覆件一次涂覆,水性涂料涂覆的效率更高。The above-mentioned water-based paint coating line transports the parts to be coated through the accumulation and release chain 1, and performs pretreatment such as degreasing, water washing, phosphating, and surface conditioning in each pool of the pretreatment pool group. Carry out electrophoresis treatment, fix the water-based paint on the part to be coated by baking in the first drying room area 4; spray powder in the powder spraying room, and fix the powder on the to-be-coated part by baking in the second drying room area 6. on the coating. The position of each process is run through the accumulation and release chain 1, which can conveniently carry out the water-based paint coating treatment on the to-be-coated parts with large volume and weight, and can also coat multiple small-volume parts to be coated at one time at the same time. , the efficiency of water-based paint coating is higher.
具体的,在本实施例中,所述积放链1可以设置有多条,各积放链1之间设置有移载机,所述积放链吊具与所述移载机相适配,该移载机用于将积放链吊具或积放链吊具中携带待涂覆件的吊具梁13从其中一个积放链1移动到另一个积放链1中。在本实施例中,如图2至图4所示,所述积放链吊具包括第一吊具组,所述第一吊具组包括前后两个第一吊具,所述第一吊具包括一次载荷梁14,两个所述一次载荷梁14分别通过前小车11和后小车16安装在积放链1上。两个所述第一吊具的下部设置有二次载荷梁15,二次载荷梁15的前部和后部分别与两个所述第一吊具相连接。所述二次载荷梁15的下部还设置有吊具梁13,所述吊具梁13下端设置有多个用于连接挂链35的挂链35连接件。Specifically, in this embodiment, a plurality of the accumulation and release chains 1 can be provided, a transfer machine is arranged between each accumulation and release chain 1, and the accumulation and release chain hanger is adapted to the transfer machine , the transfer machine is used to move the accumulation and release chain spreader or the spreader beam 13 of the accumulation and release chain spreader carrying the parts to be coated from one of the accumulation and release chains 1 to the other accumulation and release chain 1 . In this embodiment, as shown in FIG. 2 to FIG. 4 , the accumulation and release chain spreader includes a first spreader group, and the first spreader group includes two front and rear first spreaders. The first spreader The tool includes a primary load beam 14 , and two of the primary load beams 14 are respectively mounted on the accumulation and release chain 1 through the front trolley 11 and the rear trolley 16 . The lower parts of the two first spreaders are provided with secondary load beams 15, and the front and rear parts of the secondary load beams 15 are respectively connected with the two first spreaders. The lower part of the secondary load beam 15 is further provided with a hanger beam 13 , and the lower end of the hanger beam 13 is provided with a plurality of hanging chain 35 connecting pieces for connecting the hanging chain 35 .
所述吊具梁13的上端还设置有两个T形连接件33,所述二次载荷梁15的两端设置有凹槽;所述T形连接件33与所述凹槽相适配。当吊具梁13和所述二次载荷梁15相连时,该T形连接件33的横向杆延伸至二次载荷梁15上部,当二次载荷梁15上升时,该横向杆卡入二次载荷梁15上端面的凹槽内,实现二次载荷梁15和吊具梁13的连接;当需要分离二次载荷梁15和吊具梁13时,通过其它设备支撑吊具梁13并使吊具梁13向上运动,使T形连接件33的横向杆与凹槽脱离,进而实现吊具梁13和二次载荷梁15的分离。上述吊具梁13和二次载荷梁15的连接是可变的,工作人员可以先将多个待涂覆件安装在与吊具梁13相连 接的挂链35上,然后将吊具梁13及其上的待涂覆件作为一个整体安装在二次载荷梁15上,通过上述方式吊装待涂覆件,可以降低工作人员的操作难度。The upper end of the spreader beam 13 is also provided with two T-shaped connecting pieces 33 , and the two ends of the secondary load beam 15 are provided with grooves; the T-shaped connecting pieces 33 are adapted to the grooves. When the spreader beam 13 is connected to the secondary load beam 15, the transverse rod of the T-shaped connecting piece 33 extends to the upper part of the secondary load beam 15, and when the secondary load beam 15 rises, the transverse rod is clamped into the secondary load beam 15. In the groove on the upper end face of the load beam 15, the connection between the secondary load beam 15 and the spreader beam 13 is realized; when the secondary load beam 15 and the spreader beam 13 need to be separated, the spreader beam 13 is supported by other equipment and the lifting beam 13 is supported. The tool beam 13 moves upward to make the transverse rod of the T-shaped connecting piece 33 disengage from the groove, thereby realizing the separation of the spreader beam 13 and the secondary load beam 15 . The connection between the above-mentioned spreader beam 13 and the secondary load beam 15 is variable. The staff can first install a plurality of parts to be coated on the hanging chain 35 connected with the spreader beam 13, and then attach the spreader beam 13. The parts to be coated and the parts to be coated thereon are installed on the secondary load beam 15 as a whole. By hoisting the parts to be coated in the above way, the operation difficulty of the staff can be reduced.
在本实施例中,通过两个第一吊具连接积放链1,并在积放链1上运动,两个第一吊具分别连接二次载荷梁15的前部和后部,可以共同分担二次载荷梁15的重力,增大二次载荷梁15的负载能力,进而便于吊装更多更重的待涂覆件,同时增大吊装的待涂覆件的最大载荷。上述二次载荷梁15的前部和后部分别与两个第一吊具相连接,也能够增大二次载荷梁15的稳定性,防止二次载荷梁15侧偏。上述吊具梁13通过T形连接件33安装在二次载荷梁15上,该吊具梁13用于设置挂链35连接件,本实施例中,上述挂链35连接件为挂环34,在具体制造时,吊具梁13上可以根据需要均匀设置多个用于连接挂链35的挂环34,以便工作人员将多个待涂覆件吊装在吊具梁13上,增大吊具能够吊装的待涂覆件的数量。In this embodiment, the accumulation and release chain 1 is connected to and moves on the accumulation and release chain 1 through two first spreaders. The two first spreaders are respectively connected to the front part and the rear part of the secondary load beam 15, which can be jointly The gravity of the secondary load beam 15 is shared, and the load capacity of the secondary load beam 15 is increased, thereby facilitating the hoisting of more and heavier parts to be coated, and at the same time increasing the maximum load of the hoisted parts to be coated. The front part and the rear part of the secondary load beam 15 are respectively connected with the two first hangers, which can also increase the stability of the secondary load beam 15 and prevent the secondary load beam 15 from side deviation. The above-mentioned hanger beam 13 is installed on the secondary load beam 15 through a T-shaped connecting piece 33, and the hanger beam 13 is used for setting a hanging chain 35 connecting piece. In this embodiment, the above-mentioned hanging chain 35 connecting piece is a hanging ring 34, During specific manufacturing, a plurality of hanging rings 34 for connecting the hanging chains 35 can be evenly arranged on the spreader beam 13 as required, so that the staff can hoist a plurality of parts to be coated on the spreader beam 13 and increase the size of the spreader The number of parts to be coated that can be lifted.
再具体的,如图4所示,为了便于移载机移动上述吊具梁13,在所述吊具梁13上还设置有两组支撑杆18组,所述支撑杆18组分别位于所述吊具梁13的前部和后部;所述支撑杆18组包括两个与所述吊具梁13相垂直的支撑杆18,两个所述支撑杆18对称分布且分别向左侧和右侧延伸。More specifically, as shown in FIG. 4 , in order to facilitate the transfer machine to move the above-mentioned spreader beam 13, two sets of support rods 18 are also provided on the spreader beam 13, and the support rods 18 groups are respectively located in the The front part and the rear part of the spreader beam 13; the support rod 18 group includes two support rods 18 perpendicular to the spreader beam 13, the two support rods 18 are symmetrically distributed and are respectively to the left and right side extension.
在具体移载过程中,通过移载机的支撑件支撑各支撑杆18,然后使各支撑件上移,进而使吊具梁13向上移动,在吊具梁13向上移动的过程中,吊具梁13上的T形连接件33与凹槽分离。在本实施例中,上述各支撑杆18的设置,便于通过移载机支撑并移动该吊具梁13,需要说明的是,本发明并不是涉及移载机的发明创造,在此不对移载机进行详细说明;但可以了解的是,该移载机仅仅是起到支撑上移和移载机整体移动,进而带动吊具梁13运动的作用,上述移载机可以是专门配套的设备,也可以是带有平移装置的液压升降设备。In the specific transfer process, the support rods 18 are supported by the support members of the transfer machine, and then the support members are moved upward, thereby causing the spreader beam 13 to move upward. During the upward movement of the spreader beam 13, the spreader The T-connector 33 on the beam 13 is separated from the groove. In this embodiment, the arrangement of the above-mentioned support rods 18 is convenient for supporting and moving the spreader beam 13 by the transfer machine. It should be noted that the present invention does not involve the invention and creation of the transfer machine, and the transfer is not used here. However, it can be understood that the transfer machine only plays the role of supporting the upward movement and the overall movement of the transfer machine, thereby driving the movement of the spreader beam 13. The above-mentioned transfer machine can be specially matched equipment. It can also be a hydraulic lifting device with a translation device.
再具体的,所述吊具梁13包括工型钢,所述工型钢还包括分别位于上下两侧的横向板和位于两个所述横向板之间的竖板,吊具梁13整体架构为工型钢,可增大吊具梁13的力学强度。所述竖板上设置有多个圆孔31,上述圆孔31的设 置,可以减少吊具梁13的整体重量,进而增大载荷量。为了进一步增强吊具梁13的强度,所述吊具梁13上还设置有多个加强板32组,所述加强板32组包括两个加强板32,两个所述加强板32左右对称分布在所述竖板的两侧;所述加强板32的上端和下端分别与两个所述横向板相连接。在位于下侧的横向板下端均匀设置有多个所述挂链35连接件,所述挂链35连接件是挂环34,所述挂链35安装在所述挂环34上。挂环34有多个,工作人员可以根据需要挂置合适数量的挂链35,当待涂覆的工件较小时,工作人员可以通过多个挂链35分别吊装各待涂覆的工件;当待涂覆的工件较大时,工作人员可选择挂环34位置,通过至少两个挂链35吊装待涂覆的工件。More specifically, the spreader beam 13 includes an I-shaped steel, and the I-shaped steel further includes transverse plates located on the upper and lower sides and a vertical plate located between the two transverse plates. The overall structure of the spreader beam 13 is an I-shaped steel. Section steel can increase the mechanical strength of the spreader beam 13 . The vertical plate is provided with a plurality of circular holes 31. The arrangement of the above circular holes 31 can reduce the overall weight of the spreader beam 13, thereby increasing the load capacity. In order to further enhance the strength of the spreader beam 13 , the spreader beam 13 is further provided with a plurality of reinforcement plates 32 , and the reinforcement plate 32 group includes two reinforcement plates 32 , and the two reinforcement plates 32 are symmetrically distributed on the left and right sides. On both sides of the vertical plate; the upper end and the lower end of the reinforcing plate 32 are respectively connected with the two transverse plates. A plurality of the hanging chain 35 connecting pieces are evenly arranged at the lower end of the lateral plate located on the lower side. There are a plurality of hanging rings 34, and the staff can hang a suitable number of hanging chains 35 as needed. When the workpiece to be coated is small, the staff can hoist the workpieces to be coated respectively through the plurality of hanging chains 35; When the workpiece to be coated is large, the worker can select the position of the hanging ring 34 to hoist the workpiece to be coated by at least two hanging chains 35 .
具体的,如图4所示,在积放链1运行过程中,积放链1上的润滑油或积放链1上的其它油液容易滴落到下部,为了防止油液滴落到预处理池或其它下部设备中,在本实施例中还设置了用于收集油液或其它污渍的接油盘,具体配置如下所示:在所述一次载荷梁14和二次载荷梁15的上端面还分别设置有上接油盘71和下接油盘72,所述上接油盘71和所述下接油盘72均位于所述积放链1的下部。在积放链1运行中,油液和其它污渍掉落后直接进入上接油盘71或下接油盘72中,防止油液或污渍掉入下部的涂覆设备中。Specifically, as shown in Figure 4, during the operation of the accumulation and release chain 1, the lubricating oil on the accumulation and release chain 1 or other oil on the accumulation and release chain 1 easily drips to the lower part. In the treatment tank or other lower equipment, in this embodiment, an oil receiving pan for collecting oil or other stains is also provided, and the specific configuration is as follows: The end surface is also provided with an upper oil receiving pan 71 and a lower oil receiving pan 72 respectively, and the upper oil receiving pan 71 and the lower oil receiving pan 72 are both located at the lower part of the accumulation and release chain 1 . During the operation of the accumulation and release chain 1, the oil and other stains fall directly into the upper oil receiving pan 71 or the lower oil receiving pan 72 to prevent the oil or stains from falling into the lower coating equipment.
其中,本实施例给出了上接油盘71或下接油盘72的一种具体形式,其中一种为:所述上接油盘71和下接油盘72是分别开设在所述一次载荷梁14上端面和所述二次载荷梁15上端面上的条形凹槽。一次载荷梁14和二次载荷梁15的上端面所在板较厚时,可以在其上分别开设条形槽,该条形槽形成上接油盘71和下接油盘72。本实施例提供的上接油盘71和下接油盘72的另一种具体形式为:所述上接油盘71和下接油盘72是分别安装在所述一次载荷梁14上端面和所述二次载荷梁15上端面上的条形盒,所述条形盒的上端设置有开口。Among them, this embodiment provides a specific form of the upper oil pan 71 or the lower oil pan 72, one of which is: the upper oil pan 71 and the lower oil pan 72 are respectively opened in the primary The upper end face of the load beam 14 and the strip groove on the upper end face of the secondary load beam 15 . When the plates on which the upper end faces of the primary load beam 14 and the secondary load beam 15 are located are relatively thick, strip-shaped grooves may be respectively formed thereon, and the strip-shaped grooves form an upper oil receiving pan 71 and a lower oil receiving pan 72 . Another specific form of the upper oil receiving pan 71 and the lower oil receiving pan 72 provided in this embodiment is: the upper oil receiving pan 71 and the lower oil receiving pan 72 are respectively installed on the upper end face of the primary load beam 14 and the lower oil receiving pan 72 . The bar-shaped box on the upper end surface of the secondary load beam 15 is provided with an opening at the upper end of the bar-shaped box.
再具体的,为了收集上接油盘71和下接油盘72内的油液和污渍,在所述二次载荷梁15的下部还可以固定有由透明材料制成的集油桶,所述集油桶与所述上接油盘71和所述下接油盘72通过输油管相连通。上述上接油盘71和下 接油盘72收集的油液和污渍进入集油桶内,当集油桶内存储的油液和污渍过多时,工作人员可直接观察到并对集油桶内的油液和污渍进行处理。More specifically, in order to collect the oil and stains in the upper oil pan 71 and the lower oil pan 72, an oil collecting bucket made of transparent material can also be fixed at the lower part of the secondary load beam 15. The oil collecting bucket is communicated with the upper oil receiving pan 71 and the lower oil receiving pan 72 through an oil delivery pipe. The oil and stains collected by the above-mentioned upper oil pan 71 and lower oil pan 72 enter the oil collecting barrel. of oil and stains.
具体的,如图5所示,所述粉体喷粉房包括粉房主体,所述粉房主体的前侧壁和后侧壁分别设置有用于所述待涂覆件通过的入口和出口,所述粉房主体的顶壁上设置有开槽504,用于悬挂所述待涂覆件的挂链35从所述开槽504通过。所述粉房主体包括自动喷室501和至少一个补喷室502,其中一个补喷室502位于所述自动喷室501靠近所述出口的一侧。所述自动喷室501的下部设置有粉末回收口,所述粉末回收口连接有抽风机;所述补喷室502的下部设置有多个鼓气口505,所述鼓气口505通过气管连接有鼓风机;所述鼓气口505面向所述粉末回收口。Specifically, as shown in FIG. 5 , the powder spray booth includes a powder booth body, and the front and rear side walls of the powder booth body are respectively provided with an inlet and an outlet for the parts to be coated to pass through, A slot 504 is provided on the top wall of the main body of the powder booth, and the hanging chain 35 for suspending the part to be coated passes through the slot 504 . The main body of the powder booth includes an automatic spray chamber 501 and at least one supplementary spray chamber 502, wherein one supplementary spray chamber 502 is located on the side of the automatic spray chamber 501 close to the outlet. The lower part of the automatic spray chamber 501 is provided with a powder recovery port, and the powder recovery port is connected with an exhaust fan; the lower part of the supplementary spray chamber 502 is provided with a plurality of air blowing ports 505, and the air blowing ports 505 are connected with a blower through an air pipe. ; The blowing port 505 faces the powder recovery port.
本实施例提供的上述一种粉体喷粉房,在自动喷室501的一侧设置补喷室502,将自动喷工序和补喷工序设置在一处,方便工作人员快速为待喷粉件进行补喷。自动喷室501下部设置粉末回收口,且粉末回收口连接抽风机,上述粉末回收口能够快速有效的回收自动喷室501内的粉料,同时,补喷室502内设置有多个鼓气口505,该鼓气口505面向粉末回收口,鼓风机鼓出的风可将掉落在补喷室502底壁上的粉料吹到自动喷室501内的粉末回收口内,实现粉料的回收。In the above-mentioned powder spraying room provided in this embodiment, a supplementary spraying room 502 is set on one side of the automatic spraying room 501, and the automatic spraying process and the supplementary spraying process are arranged in one place, which is convenient for the staff to quickly spray the parts to be sprayed. Refill. A powder recovery port is set at the lower part of the automatic spray chamber 501, and the powder recovery port is connected to the exhaust fan. The above-mentioned powder recovery port can quickly and effectively recover the powder in the automatic spray chamber 501. The air blowing port 505 faces the powder recovery port, and the air blown by the blower can blow the powder falling on the bottom wall of the supplementary spray chamber 502 into the powder recovery port in the automatic spray chamber 501 to realize powder recovery.
再具体的,如图6所示,所述前侧壁和所述后侧壁均是由左门507和右门508构成的,所述左门507和所述右门508之间的条形间隙为入口或出口。上述左门507和右门508的设置,可以减少粉房主体前侧壁和后侧壁进入的空气,进而更好的在粉房主体内形成负压,以便通过粉末回收口回收掉落以及弥散在空气中的粉料。所述自动喷室501和所述补喷室502之间设置有左隔板和右隔板,所述左隔板和所述右隔板之间留有间隙,所述间隙为所述待涂覆件通过的通道;所述左隔板和所述左门507之间设置有至少一个补喷位503,所述右隔板和所述右门508之间设置有至少一个补喷位503;所述补喷位503上设置有升降台。上述补喷位503位于左隔板/右隔板和左门507/右门508之间位置,可以防止自动喷室501 内弥散的粉料飘散至补喷位503,改善工作人员的工作环境;上述升降平台用于提升或降低工作人员站立的位置,便于工作人员对待涂覆件不同高度位置进行涂覆。More specifically, as shown in FIG. 6 , the front side wall and the rear side wall are both composed of a left door 507 and a right door 508 , and a strip between the left door 507 and the right door 508 is formed. The gap is either the inlet or the outlet. The above-mentioned setting of the left door 507 and the right door 508 can reduce the air entering the front and rear side walls of the main body of the powder room, and then better form a negative pressure in the main body of the powder room, so that the powder can be recovered and dispersed through the powder recovery port. Powder in the air. A left partition plate and a right partition plate are arranged between the automatic spray chamber 501 and the supplementary spray chamber 502, and a gap is left between the left partition plate and the right partition plate, and the gap is the space to be coated. The passage through which the cover passes; at least one supplementary spray position 503 is provided between the left partition and the left door 507, and at least one supplementary spray position 503 is provided between the right partition and the right door 508; A lift table is provided on the supplementary spray position 503 . The above-mentioned supplementary spray position 503 is located between the left partition/right partition and the left door 507/right door 508, which can prevent the powder dispersed in the automatic spray chamber 501 from floating to the supplementary spray position 503 and improve the working environment of the staff; The above-mentioned lifting platform is used to elevate or lower the standing position of the staff, so that the staff can coat different height positions of the parts to be coated.
再具体的,为了进一步控制粉房主体内气流方向以及各位置气压,所述左门507和所述右门508分别连接有平移机构,所述左门507和所述右门508在所述平移机构的驱动下靠近或远离。工作人员可根据待涂覆件的宽度,通过平移机构平移上述左门507和右门508,进而调整入口和出口的宽度,减少从入口和出口进入的空气量。More specifically, in order to further control the air flow direction in the main body of the powder room and the air pressure at each position, the left door 507 and the right door 508 are respectively connected with a translation mechanism, and the left door 507 and the right door 508 are in the translation. Driven by the mechanism to approach or move away. According to the width of the part to be coated, the worker can translate the left door 507 and the right door 508 through the translation mechanism, thereby adjusting the width of the inlet and outlet, and reducing the amount of air entering from the inlet and outlet.
另外,如图6所示,所述入口的宽度和所述出口的宽度从上到下逐渐增大,以减少入口和出口下部进入的空气量。In addition, as shown in FIG. 6 , the width of the inlet and the width of the outlet gradually increase from top to bottom, so as to reduce the amount of air entering the lower part of the inlet and the outlet.
为了更进一步减少通过出口和入口进入粉房主体的空气,如图6所示,所述入口和所述出口下部还设置有卷轴,所述卷轴上设置有卷门布510,所述卷门布510的两侧设置有滑块,两滑块通过滑杆511相连接,卷门布510与该滑杆511相连接;所述左门507和右门508上分别设置有竖向滑道,所述滑块和所述竖向滑道相适配;所述竖向滑道上设置有用于固定所述滑块的滑块固定件,该滑块固定件用于固定滑块,进而固定卷门布510。上述卷轴可以用于卷起或释放卷门布510,在具体使用时,工作人员可根据需要将卷门布510从下向上布置在入口或出口,防止空气从入口下部和出口下部进入粉房主体,最终形成粉房主体内下部气压低,上部气压高,空气从上部向下流动的状况,以便收集弥散在空气中的粉料,同时也降低工作人员所处空间粉料在空气中的密度,并防止粉料从粉体喷粉房上部溢出。In order to further reduce the air entering the main body of the powder booth through the outlet and the inlet, as shown in FIG. 6 , the inlet and the lower part of the outlet are also provided with reels, and the reels are provided with a roll-up door cloth 510 , and the roll-up door cloth There are sliders on both sides of 510, the two sliders are connected by a sliding rod 511, and the rolling door cloth 510 is connected with the sliding rod 511; the left door 507 and the right door 508 are respectively provided with vertical slideways, so The sliding block is adapted to the vertical slideway; the vertical slideway is provided with a sliding block fixing member for fixing the sliding block, and the sliding block fixing member is used for fixing the sliding block and then fixing the roll door cloth 510. The above-mentioned reel can be used to roll up or release the roll-up door cloth 510. In specific use, the staff can arrange the roll-up door cloth 510 at the entrance or outlet from bottom to top as required to prevent air from entering the main body of the powder room from the lower part of the entrance and the lower part of the outlet. Finally, the air pressure in the lower part of the main body of the powder room is low, the air pressure in the upper part is high, and the air flows downward from the upper part, so as to collect the powder dispersed in the air, and also reduce the density of the powder in the air in the space where the staff is located. And prevent the powder from overflowing from the upper part of the powder spraying room.
再具体的,在本实施例中,为了使补喷位503位于上风位,改善工作人员的工作环境,同时也为了更好的收集弥散在补喷室502中的粉料,在本实施例中,应尽量减少从顶壁开槽504中进入的空气。为此,在本实施例中,所述开槽504的两侧侧壁分别设置有柔性件,所述挂链35从两个柔性件之间通过,上述柔性 件的设置,可以用于封堵开槽504,阻止空气从开槽504进入粉房主体,使更多的空气从粉房主体的两端上部进入,进而形成从两端上部向粉末回收口流动的气流,该气流的设置使粉末回收口更易收集粉房主体内各位置尤其是补喷室502空气中弥漫的粉料;再者也能使补喷位503处于上风口,改善工作人员的工作环境。另外,与空气直接从上部开槽504进入相比,空气从两端倾斜向下流动,对喷粉的影响较小,可避免空气直接向下流动时待喷粉件上部和下部喷粉不均匀的问题。More specifically, in this embodiment, in order to make the post-spraying position 503 at the upwind position, to improve the working environment of the staff, and also to better collect the powder dispersed in the post-spray chamber 502, in this embodiment, , air entry from the top wall slot 504 should be minimized. To this end, in this embodiment, flexible members are respectively provided on both side walls of the slot 504, and the hanging chain 35 passes between the two flexible members. The above-mentioned flexible members can be used for blocking Slots 504 prevent air from entering the main body of the powder booth from the slot 504, so that more air enters from the upper parts of the two ends of the main body of the powder booth, thereby forming an airflow flowing from the upper parts of the two ends to the powder recovery port. The recovery port makes it easier to collect the powder in the main body of the powder room, especially the powder in the air of the supplementary spraying room 502; in addition, the supplementary spraying position 503 can be placed at the upper air outlet, which improves the working environment of the staff. In addition, compared with the air entering directly from the upper slot 504, the air flows downward obliquely from both ends, which has less influence on the powder spraying, which can avoid uneven powder spraying on the upper and lower parts of the powder spraying part when the air flows directly downward. The problem.
其中,上述柔性件可以是已如下形式存在,该柔性件包括海绵,所述海绵粘贴固定在所述开槽504的两侧侧壁上;所述海绵上包覆有布片,所述布片上设置有绒毛。上述海绵弹性较大,对挂链35的运动阻力小;绒毛可以阻挡空气进入,同时还不会阻碍挂链35运动。Wherein, the above-mentioned flexible member may already exist in the following form. The flexible member includes a sponge, and the sponge is pasted and fixed on both side walls of the slot 504; the sponge is covered with a cloth sheet, and the cloth sheet is Set with fluff. The above-mentioned sponge has high elasticity, and has little resistance to the movement of the hanging chain 35;
再具体的,如图7所示,为了阻挡空气从开槽504进入粉房主体,还可以通过本实施例中的另一种实现方式,所述粉房主体的顶壁上设置有两个旋转组件,所述旋转组件包括主动轮、从动轮和旋转环,所述主动轮连接有伺服电机,所述旋转环套设在所述主动轮和所述从动轮上。两个所述旋转环以所述开槽504为中心轴镜像对称,所述旋转环上设置有多个橡胶片513;位于两个所述旋转环上的橡胶片513抵接并覆盖所述开槽504。在上述方案中,主动轮和从动轮带动旋转环运动,且两个旋转环相贴合的一面运动方向一致,即相抵接的两橡胶片513运动方向一致。上述橡胶片513覆盖所述开槽504,可防止空气从开槽504进入粉房主体内,在待喷粉件运动时,挂链35在开槽504内运动,橡胶片513随着挂链35的运动而运动,当然,为了保持橡胶片513的运动与挂链35的运动一致,上述伺服电机的转速应与吊挂挂链35的积放链1运动速度一致。上述橡胶片513除了防止空气从开槽504进入,以实现气流从粉房主体的两端上部向粉末回收口运动外,还能够夹持挂链35,防止挂链35摇摆,以提高喷粉的稳定性。上述旋转环设置为:各个旋转环上设置多个橡胶片513;多个橡胶片513的设置,便于挂链35置于相邻橡胶片513的间隙处。同时,橡胶片513有多个,橡胶片513可逐 一紧贴分布,当橡胶片513运行至主动轮或从动轮处的变向处时,橡胶片513之间可分离;而当橡胶片513有且只有一个且环状固定在旋转环上时,橡胶片513运行至主动轮或从动轮处时必然会被拉伸变形,橡胶片513有多个,橡胶片513运行至主动轮或从动轮处时可以分离,可以避免上述状况的发生。More specifically, as shown in FIG. 7 , in order to prevent the air from entering the main body of the powder booth from the slot 504, another implementation method in this embodiment can also be used. The top wall of the main body of the powder booth is provided with two rotating The rotating assembly includes a driving wheel, a driven wheel and a rotating ring, the driving wheel is connected with a servo motor, and the rotating ring is sleeved on the driving wheel and the driven wheel. The two rotating rings are mirror-symmetrical with the slot 504 as the central axis, and a plurality of rubber sheets 513 are arranged on the rotating rings; the rubber sheets 513 on the two rotating rings abut and cover the openings. Slot 504. In the above solution, the driving wheel and the driven wheel drive the rotating ring to move, and the abutting surfaces of the two rotating rings move in the same direction, that is, the abutting rubber sheets 513 move in the same direction. The above-mentioned rubber sheet 513 covers the slot 504, which can prevent air from entering the main body of the powder booth from the slot 504. When the powder-spraying part moves, the hanging chain 35 moves in the groove 504, and the rubber sheet 513 follows the hanging chain 35. Of course, in order to keep the movement of the rubber sheet 513 consistent with the movement of the hanging chain 35, the rotation speed of the above-mentioned servo motor should be consistent with the movement speed of the accumulating and releasing chain 1 of the hanging chain 35. The rubber sheet 513 can not only prevent the air from entering from the slot 504 to realize the movement of the air flow from the upper part of the two ends of the main body of the powder room to the powder recovery port, but also can clamp the hanging chain 35 to prevent the hanging chain 35 from swinging, so as to improve the powder spraying efficiency. stability. The above-mentioned rotating rings are arranged as follows: each rotating ring is provided with a plurality of rubber sheets 513 ; At the same time, there are a plurality of rubber sheets 513, and the rubber sheets 513 can be closely distributed one by one. When the rubber sheets 513 run to the changing position of the driving wheel or the driven wheel, the rubber sheets 513 can be separated; and when the rubber sheets 513 have And when there is only one and the ring is fixed on the rotating ring, the rubber sheet 513 will inevitably be stretched and deformed when it runs to the driving wheel or the driven wheel. There are multiple rubber sheets 513, and the rubber sheet 513 runs to the driving wheel or the driven wheel. can be separated when the above situation can be avoided.
当然,以上所述仅为本发明的优选实施例,并非因此限制本发明的专利范围,凡是在本发明的发明构思下,利用本发明说明书及附图内容所作的等效结构变换,或直接/间接运用在其他相关的技术领域均包括在本发明的专利保护范围内,理应受到本发明的保护。Of course, the above descriptions are only preferred embodiments of the present invention, and are not intended to limit the scope of the present invention. Under the inventive concept of the present invention, any equivalent structural transformation made by using the contents of the description and accompanying drawings of the present invention, or directly/ Indirect applications in other related technical fields are included in the scope of patent protection of the present invention, and should be protected by the present invention.

Claims (10)

  1. 一种水性涂料涂覆流水线,其特征在于,A water-based paint coating assembly line, characterized in that,
    包括依次排布的配装区、水池组区、第一烘房区、喷粉区和第二烘房区;It includes an assembly area, a pool group area, a first drying room area, a powder spraying area and a second drying room area arranged in sequence;
    所述水性涂料涂覆流水线还包括积放链,所述积放链贯串所述配装区、所述水池组区、所述第一烘房区、所述喷粉区和所述第二烘房区;The water-based paint coating line also includes an accumulation and release chain, which runs through the assembly area, the pool group area, the first drying room area, the powder spraying area, and the second drying area. housing area;
    所述积放链上设置有积放链吊具,所述积放链吊具用于吊装待涂覆的待涂覆件;The accumulation and release chain is provided with an accumulation and release chain sling, and the accumulation and release chain sling is used for hoisting the to-be-coated parts to be coated;
    所述配装区内设置有吊装平台,所述吊装平台用于工作人员将待涂覆件安装在积放链吊具上;A hoisting platform is arranged in the assembly area, and the hoisting platform is used by the staff to install the to-be-coated parts on the accumulation and release chain spreader;
    所述水池组包括依次排布的预处理水池组、电泳水池组和水洗水池组,所述积放链吊具在积放链上依次路经所述预处理水池组、所述电泳水池组和所述水洗水池组,所述积放链吊具上设置有升降机构,所述升降机构用于将吊装在所述积放链吊具上的所述待涂覆件依次沉入所述预处理水池组、所述电泳水池组和所述水洗水池组的各水池中;The pool group includes a pretreatment pool group, an electrophoresis pool group, and a washing pool group arranged in sequence, and the accumulation and release chain spreader passes through the pretreatment pool group, the electrophoresis pool group, and the pool in sequence on the accumulation and release chain. In the water washing pool group, the accumulation and release chain hanger is provided with a lifting mechanism, and the lifting mechanism is used to sequentially sink the to-be-coated parts hoisted on the accumulation and release chain hanger into the pretreatment. in each pool of the pool group, the electrophoresis pool group and the washing pool group;
    所述第一烘房区内设置有第一烘房,所述第一烘房用于将电泳涂料固定在所述待涂覆件上;A first drying room is arranged in the first drying room area, and the first drying room is used for fixing the electrophoretic paint on the to-be-coated piece;
    所述喷粉区内设置有粉体喷粉房,所述喷粉房用于喷涂粉料;The powder spraying area is provided with a powder spraying room, and the powder spraying room is used for spraying powder;
    所述第二烘房区内设置有第二烘房,所述第二烘房用于将粉料固定在所述待涂覆件上。A second drying room is arranged in the second drying room area, and the second drying room is used to fix the powder on the to-be-coated piece.
  2. 如权利要求1所述的水性涂料涂覆流水线,其特征在于,The water-based paint coating assembly line according to claim 1, characterized in that,
    所述积放链有多条,各积放链之间设置有移载机,所述积放链吊具与所述移载机相适配;There are multiple accumulating and releasing chains, a transfer machine is arranged between each accumulating and releasing chain, and the accumulating and releasing chain spreader is adapted to the transferring machine;
    所述积放链吊具包括第一吊具组,所述第一吊具组包括前后两个第一吊具,所述第一吊具包括一次载荷梁,两个所述一次载荷梁分别通过前小车和后 小车安装在积放链上;The accumulation and release chain spreader includes a first spreader group, the first spreader group includes two front and rear first spreaders, the first spreader includes a primary load beam, and the two primary load beams pass through respectively. The front trolley and the rear trolley are installed on the accumulation chain;
    两个所述第一吊具的下部设置有二次载荷梁,二次载荷梁的前部和后部分别与两个所述第一吊具相连接;The lower parts of the two first spreaders are provided with secondary load beams, and the front and rear parts of the secondary load beams are respectively connected with the two first spreaders;
    所述二次载荷梁的下部还设置有吊具梁,所述吊具梁下端设置有多个用于连接挂链的挂链连接件;所述吊具梁的上端还设置有两个T形连接件,所述二次载荷梁的两端设置有凹槽;所述T形连接件与所述凹槽相适配。The lower part of the secondary load beam is also provided with a hanger beam, and the lower end of the hanger beam is provided with a plurality of hanging chain connectors for connecting the hanging chain; the upper end of the hanger beam is also provided with two T-shaped A connecting piece, two ends of the secondary load beam are provided with grooves; the T-shaped connecting piece is adapted to the grooves.
  3. 如权利要求2所述的水性涂料涂覆流水线,其特征在于,The water-based paint coating assembly line according to claim 2, characterized in that,
    所述吊具梁上还设置有两组支撑杆组,所述支撑杆组分别位于所述吊具梁的前部和后部;所述支撑杆组包括两个与所述吊具梁相垂直的支撑杆,两个所述支撑杆对称分布且分别向左侧和右侧延伸。The spreader beam is also provided with two sets of support rod groups, the support rod groups are respectively located at the front and the rear of the spreader beam; the support rod group includes two sets of support rods that are perpendicular to the spreader beam The two support rods are symmetrically distributed and extend to the left and right respectively.
  4. 如权利要求2所述的水性涂料涂覆流水线,其特征在于,The water-based paint coating assembly line according to claim 2, characterized in that,
    所述吊具梁包括工型钢,所述工型钢包括分别位于上下两侧的横向板和位于两个所述横向板之间的竖板,所述竖板上设置有多个圆孔;The spreader beam includes I-shaped steel, and the I-shaped steel includes transverse plates located on the upper and lower sides respectively and a vertical plate located between the two transverse plates, and a plurality of circular holes are provided on the vertical plate;
    所述吊具梁上还设置有多个加强板组,所述加强板组包括两个加强板,两个所述加强板左右对称分布在所述竖板的两侧;所述加强板的上端和下端分别与两个所述横向板相连接;The hanger beam is also provided with a plurality of reinforcing plate groups, the reinforcing plate group includes two reinforcing plates, and the two reinforcing plates are symmetrically distributed on both sides of the vertical plate; the upper end of the reinforcing plate and the lower ends are respectively connected with the two transverse plates;
    在位于下侧的横向板下端均匀设置有多个所述挂链连接件,所述挂链连接件是挂环,所述挂链安装在所述挂环上。A plurality of the hanging chain connecting pieces are evenly arranged at the lower end of the lateral plate located on the lower side, and the hanging chain connecting pieces are hanging loops, and the hanging chain is installed on the hanging loops.
  5. 如权利要求2所述的水性涂料涂覆流水线,其特征在于,The water-based paint coating assembly line according to claim 2, characterized in that,
    所述一次载荷梁和二次载荷梁的上端面还分别设置有上接油盘和下接油盘,所述上接油盘和所述下接油盘均位于所述积放链的下部。The upper end surfaces of the primary load beam and the secondary load beam are further provided with an upper oil receiving pan and a lower oil receiving pan respectively, and both the upper oil receiving pan and the lower oil receiving pan are located at the lower part of the accumulation and release chain.
  6. 如权利要求1所述的水性涂料涂覆流水线,其特征在于,The water-based paint coating assembly line according to claim 1, characterized in that,
    所述粉体喷粉房包括粉房主体,所述粉房主体的前侧壁和后侧壁分别设置有用于所述待涂覆件通过的入口和出口,所述粉房主体的顶壁上设置有开槽,用于悬挂所述待涂覆件的挂链从所述开槽通过;The powder spray booth includes a powder booth main body. The front and rear side walls of the powder booth body are respectively provided with an inlet and an outlet for the parts to be coated to pass through. A slot is provided, and the chain used for suspending the to-be-coated piece passes through the slot;
    其特征在于,所述粉房主体包括自动喷室和至少一个补喷室,其中一个补喷室位于所述自动喷室靠近所述出口的一侧;It is characterized in that, the main body of the powder booth includes an automatic spray chamber and at least one supplementary spray chamber, wherein one supplementary spray chamber is located on the side of the automatic spray chamber close to the outlet;
    所述自动喷室的下部设置有粉末回收口,所述粉末回收口连接有抽风机;所述补喷室的下部设置有多个鼓气口,所述鼓气口通过气管连接有鼓风机;所述鼓气口面向所述粉末回收口。The lower part of the automatic spray chamber is provided with a powder recovery port, and the powder recovery port is connected with an exhaust fan; the lower part of the supplementary spray chamber is provided with a plurality of air blowing ports, and the air blowing ports are connected with a blower through an air pipe; The gas port faces the powder recovery port.
  7. 如权利要求6所述的水性涂料涂覆流水线,其特征在于,The water-based paint coating assembly line according to claim 6, characterized in that,
    所述前侧壁和所述后侧壁均是由左门和右门构成的,所述左门和所述右门之间的条形间隙为入口或出口;The front side wall and the rear side wall are both composed of a left door and a right door, and the strip-shaped gap between the left door and the right door is an entrance or an exit;
    所述自动喷室和所述补喷室之间设置有左隔板和右隔板,所述左隔板和所述右隔板之间留有间隙,所述间隙为所述待涂覆件通过的通道;所述左隔板和所述左门之间设置有至少一个补喷位,所述右隔板和所述右门之间设置有至少一个补喷位;所述补喷位上设置有升降台。A left partition plate and a right partition plate are arranged between the automatic spray chamber and the supplementary spray chamber, and a gap is left between the left partition plate and the right partition plate, and the gap is the part to be coated at least one supplementary injection position is set between the left partition plate and the left door, and at least one supplementary injection position is set between the right partition plate and the right door; A lift table is provided.
  8. 如权利要求7所述的水性涂料涂覆流水线,其特征在于,The water-based paint coating assembly line according to claim 7, characterized in that,
    所述左门和所述右门分别连接有平移机构,所述左门和所述右门在所述平移机构的驱动下靠近或远离;所述入口的宽度和所述出口的宽度从上到下逐渐增大;The left door and the right door are respectively connected with a translation mechanism, and the left door and the right door approach or move away under the drive of the translation mechanism; the width of the entrance and the width of the exit are from top to bottom gradually increase
    所述入口和所述出口下部还设置有卷轴,所述卷轴上设置有卷门布,所述卷门布的两侧设置有滑块,两滑块通过滑杆相连接,卷门布与该滑杆相连接;所述左门和右门上分别设置有竖向滑道,所述滑块和所述竖向滑道相适配;所述竖向滑道上设置有用于固定所述滑块的滑块固定件。The lower part of the entrance and the outlet is also provided with a reel, the reel is provided with a roll-up door cloth, the two sides of the roll-up door cloth are provided with sliders, the two sliders are connected by a sliding rod, and the roll-up door cloth is connected with the door. The sliding rods are connected; the left door and the right door are respectively provided with vertical slideways, and the sliders are adapted to the vertical slideways; slider mounts.
  9. 如权利要求6所述的水性涂料涂覆流水线,其特征在于,The water-based paint coating assembly line according to claim 6, characterized in that,
    所述开槽的两侧侧壁分别设置有柔性件,所述挂链从两个柔性件之间通过;The side walls on both sides of the slot are respectively provided with flexible parts, and the hanging chain passes between the two flexible parts;
    所述柔性件包括海绵,所述海绵粘贴固定在所述开槽的两侧侧壁上;所述海绵上包覆有布片,所述布片上设置有绒毛。The flexible member includes a sponge, and the sponge is pasted and fixed on both side walls of the slot; the sponge is covered with a cloth sheet, and the cloth sheet is provided with fluff.
  10. 如权利要求6所述的水性涂料涂覆流水线,其特征在于,The water-based paint coating assembly line according to claim 6, characterized in that,
    所述粉房主体的顶壁上设置有两个旋转组件,所述旋转组件包括主动轮、从动轮和旋转环,所述主动轮连接有伺服电机,所述旋转环套设在所述主动轮和所述从动轮上;The top wall of the main body of the powder room is provided with two rotating components, the rotating components include a driving wheel, a driven wheel and a rotating ring, the driving wheel is connected with a servo motor, and the rotating ring is sleeved on the driving wheel. and on the driven wheel;
    两个所述旋转环以所述开槽为中心轴镜像对称,所述旋转环上设置有多个橡胶片;位于两个所述旋转环上的橡胶片抵接并覆盖所述开槽。The two rotating rings are mirror-symmetrical with the slot as the central axis, and a plurality of rubber sheets are arranged on the rotating rings; the rubber sheets located on the two rotating rings abut and cover the slot.
PCT/CN2021/076822 2020-07-31 2021-03-04 Waterbased paint coating line WO2022021847A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010754869.0A CN111921767B (en) 2020-07-31 2020-07-31 Water based paint coating assembly line
CN202010754869.0 2020-07-31

Publications (1)

Publication Number Publication Date
WO2022021847A1 true WO2022021847A1 (en) 2022-02-03

Family

ID=73314418

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/076822 WO2022021847A1 (en) 2020-07-31 2021-03-04 Waterbased paint coating line

Country Status (2)

Country Link
CN (1) CN111921767B (en)
WO (1) WO2022021847A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114918066A (en) * 2022-04-12 2022-08-19 福建芬林家居用品有限公司 Material conveying device of paint spraying assembly line

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111921767B (en) * 2020-07-31 2022-06-21 山东中亚车业有限公司 Water based paint coating assembly line
CN111871671B (en) * 2020-07-31 2022-08-19 山东中亚车业有限公司 Powder spraying room

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011529388A (en) * 2008-07-29 2011-12-08 デュール システムズ ゲゼルシャフト ミット ベシュレンクテル ハフツング Painting system for painting objects to be painted
CN107138335A (en) * 2017-03-29 2017-09-08 山东卫禾传动科技有限公司 A kind of agricultural equipment gearbox paint line and its coating process
CN109746150A (en) * 2019-02-12 2019-05-14 南通贝思特机械工程有限公司 A kind of finishing line
CN208912458U (en) * 2018-09-29 2019-05-31 扬州奥尔斯特机械有限公司 Open recovery system of dusting
CN209577152U (en) * 2019-01-30 2019-11-05 厦门鑫华晨机电设备有限公司 A kind of automatic spray coating powder room
CN110694844A (en) * 2019-11-05 2020-01-17 泰安盛源电气有限公司 Electric cabinet pretreatment line and treatment process
CN210230439U (en) * 2019-07-01 2020-04-03 日立电梯(成都)有限公司 Electrophoresis and powder spraying production line
CN111921767A (en) * 2020-07-31 2020-11-13 山东中亚车业有限公司 Water based paint coating assembly line

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007060492A1 (en) * 2007-12-05 2009-06-10 Gerd Wurster coating plant
CN103057906A (en) * 2013-01-30 2013-04-24 无锡市顺达物流涂装设备有限公司 Hanging chain hanger with elevating device
CN103302468B (en) * 2013-05-24 2015-09-09 天津钢铁集团有限公司 Wire rod overhead chain conveyer C type hook assembly assembly and disassembly methods
CN208152496U (en) * 2018-03-23 2018-11-27 田之兵 A kind of flush coater
CN208120105U (en) * 2018-04-25 2018-11-20 深圳亚王万相科技有限公司 Energy-efficient full automatic watch surface treatment goes up and down production line
CN208516265U (en) * 2018-04-28 2019-02-19 浙江超浪新材料有限公司 A kind of lifting conveying device for molding powder production
CN109013151B (en) * 2018-09-30 2024-06-18 浙江华立智能装备股份有限公司 Powder spraying room for electrostatic spraying
CN210849857U (en) * 2019-10-15 2020-06-26 青岛兴东机械有限公司 Suspension type shot-blasting machine top sealing device
CN210682094U (en) * 2019-11-01 2020-06-05 苏州柳溪机电工程有限公司 Multi-process efficient intelligent coating assembly line

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011529388A (en) * 2008-07-29 2011-12-08 デュール システムズ ゲゼルシャフト ミット ベシュレンクテル ハフツング Painting system for painting objects to be painted
CN107138335A (en) * 2017-03-29 2017-09-08 山东卫禾传动科技有限公司 A kind of agricultural equipment gearbox paint line and its coating process
CN208912458U (en) * 2018-09-29 2019-05-31 扬州奥尔斯特机械有限公司 Open recovery system of dusting
CN209577152U (en) * 2019-01-30 2019-11-05 厦门鑫华晨机电设备有限公司 A kind of automatic spray coating powder room
CN109746150A (en) * 2019-02-12 2019-05-14 南通贝思特机械工程有限公司 A kind of finishing line
CN210230439U (en) * 2019-07-01 2020-04-03 日立电梯(成都)有限公司 Electrophoresis and powder spraying production line
CN110694844A (en) * 2019-11-05 2020-01-17 泰安盛源电气有限公司 Electric cabinet pretreatment line and treatment process
CN111921767A (en) * 2020-07-31 2020-11-13 山东中亚车业有限公司 Water based paint coating assembly line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114918066A (en) * 2022-04-12 2022-08-19 福建芬林家居用品有限公司 Material conveying device of paint spraying assembly line

Also Published As

Publication number Publication date
CN111921767A (en) 2020-11-13
CN111921767B (en) 2022-06-21

Similar Documents

Publication Publication Date Title
WO2022021847A1 (en) Waterbased paint coating line
US7666077B1 (en) Paint booth arrangement and method for directing airflow
CN210413486U (en) Automatic flexible production line for metal support products
CN208341004U (en) A kind of bridge Wavelike steel webplate automatic spraying system
KR102583026B1 (en) Powder coating system
CN112354729B (en) Processing technology of aluminum alloy section
CN107029928B (en) Automatic machinery people's spray-painting production line for large-scale wind electricity product
KR101052009B1 (en) Powder coating device
CN210675624U (en) Automatic assembly line for spraying steel structure
WO2022021845A1 (en) Powder spray booth
WO2022021846A1 (en) Power and free chain lifting appliance
CN213161544U (en) Full-automatic spraying line
CN214736155U (en) Full-automatic cleaning production line for electrogalvanizing of precise slender steel pipe
CN211756353U (en) Painting device for outer wall of seamless steel pipe
CN208627663U (en) A kind of pallet fork automatic painting system
CN111672683A (en) Circulating paint spraying line
CN207981521U (en) A kind of Workpiece coating system
JPH11216404A (en) Powder coating booth for automotive body coating plant
WO2023216510A1 (en) Top-speed curing spraying device based on robot functional intelligent coating production line
CN108031602A (en) A kind of Workpiece coating system
CN210598278U (en) Container house production water line
CN113957371B (en) Galvanized rust-proof system
CN110237973B (en) Application method of automatic spraying production line for workpieces with slender structures
CN210058770U (en) Painting device
CN215906284U (en) Galvanized antirust system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21849658

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21849658

Country of ref document: EP

Kind code of ref document: A1