WO2022005492A1 - Downhole solids handling in wells - Google Patents
Downhole solids handling in wells Download PDFInfo
- Publication number
- WO2022005492A1 WO2022005492A1 PCT/US2020/042229 US2020042229W WO2022005492A1 WO 2022005492 A1 WO2022005492 A1 WO 2022005492A1 US 2020042229 W US2020042229 W US 2020042229W WO 2022005492 A1 WO2022005492 A1 WO 2022005492A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- tubing
- stream
- annulus
- receptacle
- chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
- E21B43/35—Arrangements for separating materials produced by the well specially adapted for separating solids
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
- E21B43/38—Arrangements for separating materials produced by the well in the well
Definitions
- HEAL Horizontal Enhanced Artificial Lift
- solids, liquid, and gas flow from a horizontal section of the well into a sized regulating tubing, which conditions the flow to ensure there is no slugging flow.
- a vortex separator separates the solids, liquid, and gas.
- the gas flows up an annulus between a pump and a casing to the surface, whereas the liquid and solids flow downwards by gravity.
- the liquid reverses direction around a comer and flows upwards towards the pump, while the solids continue their downward flow, where they accumulate at the HEAL seal within a solids sump.
- the solids sump of the HEAL system is part of the casing in the well. Over time, solids accumulate in the sump, and the level of the solids rises to the turning comer where the liquid is separated from the solids. When this occurs, liquid supply is cut off from the pump. In other words, the pump can mn dry or is starved of liquids. In addition, solids can be sucked into the inlet of the pump. Either or a combination of these events will result in a premature failure of the artificial lift system. In a more advanced case, even if the pump is shut in to prevent liquid starvation and solids ingestion, solids can also accumulate up to the discharge of the vortex separator. When this occurs, gas production stops, and the entire system is no longer operative.
- a system for handling solids downhole includes a receptacle disposed in a wellbore.
- the receptacle has a top end, a closed bottom end, and a chamber between the top end and the closed bottom end.
- the receptacle is positioned to form a first annulus between the receptacle and the wellbore.
- the system includes a first tubing disposed in the wellbore and positioned to form a second annulus between the first tubing and the receptacle.
- the second annulus is fluidly connected to the chamber.
- the system includes a second tubing disposed in the wellbore and positioned to form a third annulus between the second tubing and the wellbore.
- the third annulus is fluidly connected to the first annulus, and the second tubing is fluidly connected to the first tubing.
- the system includes a first separation region formed at an end of the first annulus to separate a fluid stream carrying solids into a first separated stream that is reversed in direction into the second annulus and a second separated stream that continues to move in an uphole direction into the third annulus.
- the system includes a second separation region formed at an end of the first tubing to separate the first separated stream into a third separated stream that is reversed in direction into the first tubing and a fourth separated stream that continues to move in a downhole direction into the chamber.
- the first separated stream may include a liquid component of the fluid stream and the solids
- the second separated stream may include a gas component of the fluid stream.
- the first tubing may extend into the chamber.
- the first separation region may be located proximate the top end of the receptacle.
- the second separation region may be located proximate a bottom end of the first tubing inside the chamber.
- the receptacle may be physically coupled to the first tubing, which may be physically coupled to the second tubing.
- the second tubing may be a production tubing.
- the system may include an artificial lift system disposed along the second tubing and operable to lift the third separated stream received in the first tubing up the second tubing.
- the receptacle may include at least one port that is fluidly connected to the second annulus.
- the system may include an inlet check valve positioned in the at least one inlet port to control flow into the second annulus.
- the inlet check valve may be responsive to a pressure of the fluid stream.
- the receptacle may include at least one outlet port that is fluidly connected to the chamber.
- the system may include an outlet check valve positioned to control flow out of the at least one outlet port.
- the outlet check valve may be responsive to a fluid pressure inside the chamber.
- the system may include an artificial system disposed along the second tubing.
- the artificial lift system may be operable in a first mode to lift the third separated stream received in the first tubing up the second tubing and in a second mode to increase the fluid pressure within the chamber to at least a threshold pressure at which the outlet check valve opens.
- an apparatus for handling solids includes a receptacle having a top end, a closed bottom end, and a chamber.
- the top end has at least one inlet port and a central bore.
- a first tubing is inserted into the chamber through the central bore.
- a second tubing is physically and fluidly connected to the first tubing.
- An artificial lift system is disposed along the second tubing.
- the receptacle may include at least one outlet port that is fluidly connected to the chamber.
- the apparatus may include an inlet check valve positioned to control flow through the at least one inlet port and an outlet check valve positioned to control flow through the at least one outlet port.
- the artificial lift system may be operable to pump fluid in a first direction in one mode and in a second direction that is opposed to the first direction in a second mode.
- a method for handling solids downhole includes disposing a tubing in a wellbore.
- the method includes disposing a receptacle in the wellbore and proximate a bottom end of the tubing.
- the method includes receiving a reservoir fluid stream carrying solids in a first annulus formed between the receptacle and the wellbore from a producing zone of the wellbore.
- the method includes separating the reservoir fluid stream into a first separated stream and a second separated stream at a first separation region formed at an end of the first annulus. The first separated stream is reversed in direction into a second annulus formed between the tubing and receptacle.
- the second separated stream is directed in an uphole direction into a third annulus formed between the tubing and the wellbore.
- the first separated stream is separated into a third separated stream and a fourth separated stream at a second separation region formed at an end of the second annulus.
- the third separated stream is reversed in direction into the tubing.
- the fourth separated stream is directed in a downhole direction into a chamber of the receptacle.
- the method may include lifting the third separated stream received in the tubing to a surface location.
- the method may include retrieving the tubing and receptacle to a surface location and emptying the chamber.
- the method may include conditioning the reservoir fluid stream to prevent slugging prior to separating the reservoir fluid stream.
- the act of reversing the first separated stream in direction into the second annulus formed between the tubing and the receptacle may include directing the first separated stream into the second annulus through at least one inlet check valve positioned at an inlet of the second annulus.
- the method may include flushing out the chamber through one or more outlet ports formed in the receptacle by increasing a fluid pressure within the chamber to open at least one check valve positioned to control flow out of the one or more outlet ports.
- the act of increasing the fluid pressure within the chamber may include operating an artificial lift system disposed along the tubing to pump fluid into the chamber.
- the act of separating the reservoir fluid stream into the first separated stream and the second separated stream at the first separation region may include separating out a liquid component of the reservoir fluid stream and the solids as the first separated stream and separating out a gas component of the reservoir fluid stream as the second separated stream.
- the act of separating the first separated stream into the third separated stream and the fourth separated stream at the second separation region may include separating out the liquid component carried by the first separated stream as the third separated stream and separating out the solids carried by the first separated stream as the fourth separated stream.
- FIG. 1 is a cross-sectional view of a solids collector.
- FIG. 2 is a cross-sectional view of an alternative solids collector showing a flanged connection between a tubing and a receptacle.
- FIG. 3 is a schematic view of a production system including a solids collector as shown in FIG. 1 or FIG. 2.
- FIGS. 4A and 4B are schematic views of a production system including a solids collector as shown in FIG. 1 or FIG. 2 with a packer around the solids collector.
- FIG. 5 is a cross-sectional view of an alternative solids collector with flushing capability.
- FIG. 6 is a schematic view of a production system including the alternative solids collector of FIG. 5 in a normal production mode.
- FIG. 7 is a schematic view of the production system of FIG. 6 in a flushing mode.
- System, method, and apparatus for handling solids after separating the solids from gas and liquid are described herein.
- the system, method, and apparatus effectively remove an accumulated amount of solids from the well.
- the system, method, and apparatus may provide a benefit of elongating production operation and improving the bottom line for the operator, especially in long horizontal wells with high sand concentrations.
- FIG. 1 shows one illustrative implementation of a solids collector 100 that may be used in a wellbore to collect solids, e.g., sand and other granular materials, while producing reservoir fluids to the surface.
- Solids collector 100 includes a receptacle 104 having a bottom wall 108, a side wall 112, and a top wall 116.
- Receptacle walls 108, 112, 116 form a chamber 120.
- the volume of chamber 120 defines the amount of solids that can be accumulated in solids collector 100.
- the dimensions of receptacle 104 can be suitably selected to provide the desired volume of chamber 120.
- Receptacle 104 has a tubular shape, which may be straight as shown.
- receptacle 104 When receptacle 104 is deployed into a wellbore, receptacle 104 may conform to the shape of the wellbore. For example, if receptacle 104 is located in a bent portion of the wellbore, the receptacle may have a bent tubular shape when in the wellbore. Receptacle 104 may be made of joined pipes to achieve a desired length of the receptacle 104.
- One or more inlet ports 124 are formed in top wall 116. Inlet ports 124 are through-holes with openings located at the top and bottom surfaces 128, 132 of top wall 116. Inlet ports 124 may be straight cylindrical holes as shown but are not limited to straight cylindrical holes.
- inlet ports 124 may be tapered holes, having larger openings on the top surface 128 than on the bottom surface 132.
- an inlet port that is a spiral hole may be formed in top wall 116 with openings of the port located at the top and bottom surfaces 128, 132 of top wall 116.
- Inlet ports 124 allow a stream, e.g., a solids-liquid stream, to enter chamber 120.
- Top wall 116 includes a central bore 136.
- a tubing 140 is disposed in central bore 136 and extends into chamber 120.
- An annulus 144 is defined between an inner surface of receptacle 104 and an outer surface of a portion of tubing 140 disposed inside chamber 120. Annulus 144 may be referred to as a collector-tubing annulus.
- Collector tubing annulus 144 is located in an upper part of chamber 120 and is fluidly connected to inlet ports 124.
- An imaginary line 146 is shown demarcating collector-tubing annulus 144 from chamber portion 120a below tubing 140. In reality, collector-tubing annulus 144 and chamber portion 120a are fluidly connected.
- An outer surface of tubing 140 may include a threaded section 148.
- top wall 116 defining central bore 136 may include threaded section 152 that is complementary to the threaded section 148. Threaded sections 148, 152 may engage each other to form a threaded connection between tubing 140 and receptacle 104 and thereby secure tubing 140 to receptacle 104. Alternatively, a flanged connection may be used to secure tubing 140 to receptacle 104. As shown in FIG. 2, tubing 140' may carry a flange 156 that can be fastened to receptacle 104, e.g., by bolts.
- flange 156 may have holes 160 that are aligned with inlet ports 124 in top wall 116' in order to allow a stream, e.g., a solids-liquid stream, to flow through flange 156 into inlet ports 124.
- a weld connection may be used to fasten tubing 140 to receptacle 104.
- FIG. 3 shows an exemplary production system where tubing 140 of solids collector 100 is attached to a downhole end of a wellbore tubular 200 that is disposed in a wellbore 204.
- Tubing 140 may be attached to wellbore tubular 200 using any suitable method for connecting tubing joints together.
- Wellbore tubular 200 may be a production tubing, i.e., a tubing used to produce reservoir fluids.
- wellbore 204 traverses a reservoir 208, which may be a hydrocarbon bearing reservoir.
- reservoir fluids may include, for example, oil, water, and hydrocarbon gases.
- Casings 212, 216, and liner 220 may be installed in wellbore 204.
- a liner is a casing that does not extend to the top of the wellbore.
- liner 220 is hung from casing 216.
- the number of casings illustrated is not intended to be limiting. In some cases, a casing that extends to the top of the wellbore may be used instead of liner 220.
- liner 220 extends into reservoir 208 and may include perforations or wall openings (not shown separately) to allow reservoir fluids from reservoir 208 to enter into wellbore 204.
- Wellbore tubular 200 may be suspended in wellbore 204 by means of a tubing hanger (not shown) in a surface wellhead 228.
- An artificial lift system 232 may be disposed along wellbore tubular 200.
- An artificial lift system adds energy to reservoir fluid or leverages the energy of the reservoir fluid to produce the fluid to the surface.
- a pump is an example of an artificial lift system.
- the pump may be a positive displacement pump, centrifugal pump, or other type of pump that may be used to add energy to reservoir fluid.
- the pump may be driven from the surface or from downhole.
- Artificial lift system 232 is shown as through-tubing deployed. In other implementations, artificial lift system 232 could be installed as a component of wellbore tubular 200.
- solids collector 100 is located within liner 220. Although not shown, solids collector 100 may also extend into an open hole section of the wellbore. In the illustrated example, solids collector 100 is in a bent section of wellbore 204, with a portion of solids collector 100 in a vertical section of wellbore 204 and another portion of solids collector 100 in a horizontal section of wellbore 204.
- An annulus 236 is formed between receptacle 104 of solids collector 100 and a portion of wellbore 204 including liner 220. Annulus 236 may be referred to as collector-casing annulus.
- Collector casing annulus 236 extends from the bottom end of receptacle 104 (i.e., the end proximate bottom wall 108) to the top end of receptacle 104 (i.e., the end proximate top wall 116).
- An annulus 240 is formed between wellbore tubular 200 and a portion of wellbore 204 including casing 216. Annulus 240 may be referred to as tubing-casing annulus. Annulus 240 is fluidly connected to annulus 236.
- a swellable packer 250 may be disposed around solids collector 100.
- Swellable packer 250 will expand to seal against the casing wall, e.g., wall of liner 220, during production.
- a path for flow of reservoir fluid stream will be created between the swellable packer and the solids collector, as shown in FIG. 4B .
- a reservoir fluid stream enters wellbore 204 through liner 220 or through an open hole section of the wellbore.
- the reservoir fluid stream may include any combination of liquids, solids, and gases.
- the reservoir fluid stream enters collector-casing annulus 236 and moves uphole along collector-casing annulus 236, as shown by arrows 244.
- the hydraulic diameter of collector-casing annulus 236 can be selected such that the reservoir fluid stream is conditioned to prevent slugging.
- the hydraulic diameter can be determined from prior hydraulic simulation. Slugging flow is a flow regime experienced in horizontal and vertical conduits. It depends on fluid properties, flow conditions, and conduit dimensions. Typically, slug flow occurs at low superficial gas velocity.
- the superficial gas velocity needs to be increased. This can be achieved by reducing the flow area. In implementations herein, this is achieved by reducing the cross-sectional area of collector-annulus 236, i.e., by increasing the diameter of receptacle 104 of the solids collector.
- At the top of collector-casing annulus 236 is a first separation region where the reservoir fluid stream separates into a first stream that continues moving uphole along tubing-casing 240, as shown by arrows 248, and a second stream that reverses in direction and enters inlet ports 124 of solids collector 100, as shown by arrows 252.
- the first stream that continues to move uphole along tubing-casing 240 includes the gas component of the reservoir fluid stream, and the second stream that reverses in direction into inlet ports 124 includes the liquid and solid components of the reservoir fluid.
- the gas preferentially has a higher velocity due to its lower density and will travel uphole compared to the liquid and solids. Mixture velocity decreases as area increases from annulus 236 to annulus 240. The lower velocity of the liquid and solids means insufficient inertia/momentum to flow upwards. Therefore, most of the liquid and solids will fall into the collector.
- the gas stream moving uphole along tubing-casing 240 may be diverted into a flowline 272 at surface wellhead 228. The gas may be combined with liquid production at the surface and transported together via surface flowline to processing plants.
- the solids-liquid stream received in inlet ports 124 travels down collector tubing annulus 144.
- tubing 140 At the bottom of tubing 140 is a second separation region where the solids-liquid stream separates into a third stream that reverses in direction and enters tubing 140, as shown by arrows 256, and a fourth stream that continues to move downward into chamber portion 120a, as shown by arrows 260.
- the third stream that reverses in direction and enters tubing 140 includes substantially a liquid component of the solids- liquid stream.
- the fourth stream that continues to move downward into chamber portion 120a includes substantially the solid component of the solids-liquid stream.
- the separation of the solids-liquid stream at the bottom of tubing 140 is aided by both gravity and suction created by the artificial lift system 232 at the bottom of tubing 140.
- Artificial lift system 232 is operated to pump the liquid stream entering tubing 140 up wellbore tubular 200 to the surface. At the surface, the liquid stream may enter a pumping tee 264 mounted on surface wellhead 228 and flow into a flowline 268 through a side outlet of pumping tee 264.
- solids 276 are shown accumulating inside chamber 120.
- production is stopped and wellbore tubular 200 and solids collector 100 are retrieved to the surface.
- solids concentration in the well can be monitored at the surface.
- the volume of solids can be estimated. The time for a certain volume of solids to equal the volume of the solids collector below the end of tubing 140 can be used as a guide to schedule retrieval of the solids collector to the surface.
- solids collector 100 is emptied and serviced.
- tubing 140 is separated from wellbore tubular 200. After separating tubing 140 from wellbore tubular 200, tubing 140 may be separated from receptacle 104, which will leave the central bore 136 (in FIGS. 1 and 2) open. Solids in chamber 120 can be flushed out through central bore 136 and inlet ports 124 (in FIGS. 1 and 2).
- An alternative may be to provide receptacle 104 with a bottom wall that can be swung open in order to dump the contents of chamber 120.
- Another alternative may be to form an opening in the bottom wall (108 in FIGS. 1 and 2) of receptacle 104 and cover the opening with a gate that can be swung open in order to dump the contents of chamber 120.
- Receptacle 104 can be very long, e.g., 1 to 4 km in length, in order to prevent slugging in the long open hole section of the wellbore.
- receptacle 104 can be joined pipes. As each pipe joint is retrieved to the surface and disconnected from the rest of the receptacle 104, solids can be removed and flushed out of that pipe joint. After emptying solids collector 100 and performing any additional maintenance services on solids collector 100, solids collector 100 may be reattached to wellbore tubular 200 and returned to the well.
- FIG. 5 shows an alternative solids collector 100" where accumulated solids can be flushed out of chamber 120 while the solids collector is in the well, which avoids numerous trips to the surface to empty the solids collector.
- one or more outlet ports 168 are formed in a bottom wall 108" of receptacle 104".
- a check valve 172 is arranged to control fluid communication between chamber 120 and outlet ports 168.
- Check valve 172 includes a valve seat 176 having an orifice 180 and a valve chamber 184.
- Outlet ports 168 can communicate with orifice 180 through valve chamber 184.
- a valve element 188 such as a ball, is disposed in valve chamber 184.
- Valve element 188 is biased against valve seat 176 and orifice 180 by a spring 192. In a normal position, under the action of spring 192, valve element 188 rests against valve seat 176 and closes orifice 180.
- Spring 192 may be sized to resist the pressure force that can be anticipated at the location of check valve 172 during normal use of solids collector 100", which means that check valve 172 will remain closed during normal use of the solids collector.
- valve element 188 moves away from valve seat 176 and orifice 180, allowing fluid communication between chamber 120 and outlet ports 168 through valve chamber 184. Thus, by applying appropriate pressure to chamber 120, the contents of chamber 120 may be flushed out through outlet ports 168.
- Check valves 184 may be arranged in inlet ports 124 formed in top wall 116" of receptacle 104" to control flow into collector-tubing annulus 144.
- check valves 184 may be flapper valves or swing-type valves.
- a valve element 184a, e.g., a flapper, of the check valve 184 is spring-loaded and normally rests against a valve seat 188 formed in top wall 116" .
- V alve elements 184a can be pushed down to allow an incoming fluid stream to enter collector-tubing annulus 144 from inlet ports 124. Valve elements 184a return to the valve seat 188 when there is no incoming fluid stream or when the pressure of the incoming fluid stream is insufficient to push valve elements 184a away from valve seats 188. In this closed position of check valves 184, chamber 120 can be pressurized, e.g., for the purpose of flushing out chamber 120. When chamber 120 is pressurized, fluids and solids within chamber 120 can push on valve elements 184a from below. However, since valve elements 184a rest firmly against valve seats 188, check valves 184 will remain closed.
- Solids collector 100" has been illustrated with tubing 140 attached to top wall 116" by a threaded connection.
- tubing 140 may be attached to top wall 116" by a flanged connection, as previously described with respect to FIG. 2, or by weld connection.
- FIG. 5 shows one check valve 172 at the bottom of receptacle 104", there may be more than one check valve arranged along the bottom of receptacle 104" in other implementations. Other types of check valves besides the one specifically shown may also be used. Check valves may also be arranged at other locations of receptacle, such as at the side wall 112 (indicated symbolically at 174), to allow for flushing of contents out of chamber 120 at different locations.
- FIG. 6 shows the system of FIG. 3 modified with solids collector 100", i.e., solids collector 100 in FIG. 3 has been replaced with solids collector 100" in FIG. 6.
- artificial lift system 232" includes a pump that is operable in a first mode to lift fluids up wellbore tubular 200 and in a second mode to pump fluids into chamber 120 of solids collector 100”.
- a pump is a progressive cavity pump.
- valve 172 at the bottom of solids collector 100" is closed.
- a reservoir fluid stream enters collector-casing annulus 236 and moves uphole along collector-casing 236, as shown by arrows 244.
- the reservoir fluid stream separates into a gas stream that moves uphole along tubing-casing annulus 240 and a solids-liquid stream that reverses in direction and enters inlet port 124.
- the pressure of the solids-liquid stream opens valves 184, allowing the solids-liquid stream to enter collector-tubing annulus 144, as shown by arrows 252.
- the solids-liquid stream separates into a liquid stream that reverses in direction and enters tubing 140, as shown by arrows 256, and solids that continue to move downward into chamber portion 120a, as shown by arrows 260.
- Artificial lift system 232" is operated to pump the liquid stream entering tubing 140 up wellbore tubular 200 to the surface.
- artificial lift system 232" can be operated in the normal direction to resume normal production operation.
- the ability to flush out chamber 120 in the well saves time and cost associated with retrieval of the system to the surface in order to empty the chamber.
- the operator may still choose to retrieve the system to the surface as part of a field maintenance program. However, due to the flushing capability of the system, the scheduled time between maintenance operations will be longer, which is an added economic benefit to the operator.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Separation Of Solids By Using Liquids Or Pneumatic Power (AREA)
- Cyclones (AREA)
- Filtration Of Liquid (AREA)
Abstract
Description
Claims
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SA523442006A SA523442006B1 (en) | 2020-07-16 | 2023-01-01 | Downhole Solids Handling in Wells |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US16/919,819 US11525348B2 (en) | 2020-07-02 | 2020-07-02 | Downhole solids handling in wells |
| US16/919,819 | 2020-07-02 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2022005492A1 true WO2022005492A1 (en) | 2022-01-06 |
Family
ID=71895301
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2020/042229 Ceased WO2022005492A1 (en) | 2020-07-02 | 2020-07-16 | Downhole solids handling in wells |
Country Status (2)
| Country | Link |
|---|---|
| US (2) | US11525348B2 (en) |
| WO (1) | WO2022005492A1 (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12104479B2 (en) * | 2021-06-08 | 2024-10-01 | Modicum Llc | Down hole desander |
| WO2023154836A1 (en) * | 2022-02-10 | 2023-08-17 | Chevron U.S.A. Inc. | In-situ downhole separation for oil and gas reservoirs |
| US11708746B1 (en) * | 2022-07-08 | 2023-07-25 | Saudi Arabian Oil Company | Electrical submersible pumping system (ESP) solid management y-tool |
| US12371962B2 (en) | 2023-06-16 | 2025-07-29 | Evolution Completions, Inc. | Debris exclusion tool, system and method |
| US12410697B2 (en) * | 2023-12-21 | 2025-09-09 | Endurance Lift Solutions, Llc | Downhole sand and gas separator |
| US20260036032A1 (en) * | 2024-08-02 | 2026-02-05 | Daniel J. Snyder | Downhole gas separator |
| US12331627B1 (en) * | 2024-11-05 | 2025-06-17 | Jordan Binstock | Desander for a downhole assembly |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2429043A (en) * | 1943-04-05 | 1947-10-14 | Paul F Barnhart | Bottom hole gas anchor |
| RU2006574C1 (en) * | 1992-08-24 | 1994-01-30 | Роберт Юнусович Сулейманов | Gear for separation of sand and gas from crude oil in well |
| US5295537A (en) * | 1992-08-04 | 1994-03-22 | Trainer C W | Sand separating, producing-well accessory |
| WO2011041572A1 (en) * | 2009-09-30 | 2011-04-07 | Conocophillips Company | Double string pump for hydrocarbon wells |
| WO2011079218A2 (en) * | 2009-12-23 | 2011-06-30 | Bp Corporation North America Inc. | Rigless low volume pump system |
| US20180100384A1 (en) | 2014-03-24 | 2018-04-12 | Heal Systems Lp | Systems and Apparatuses for Separating Wellbore Fluids and Solids During Production |
| US20180223642A1 (en) * | 2017-02-08 | 2018-08-09 | Saudi Arabian Oil Company | Inverted y-tool for downhole gas separation |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4161985A (en) | 1978-07-07 | 1979-07-24 | The Dow Chemical Company | Tool for removing fluids and loose material from an earth formation |
| US5207897A (en) * | 1991-05-20 | 1993-05-04 | Baird William E | Floating hydrocarbons separator pump with buoyant housing and two-chamber vertically moveable member |
| US5653286A (en) | 1995-05-12 | 1997-08-05 | Mccoy; James N. | Downhole gas separator |
| US6089322A (en) | 1996-12-02 | 2000-07-18 | Kelley & Sons Group International, Inc. | Method and apparatus for increasing fluid recovery from a subterranean formation |
| US6382317B1 (en) | 2000-05-08 | 2002-05-07 | Delwin E. Cobb | Apparatus and method for separating gas and solids from well fluids |
| US9631472B2 (en) * | 2013-08-21 | 2017-04-25 | Baker Hughes Incorporated | Inverted shroud for submersible well pump |
| US20150075772A1 (en) | 2013-09-13 | 2015-03-19 | Triaxon Oil Corp. | System and Method for Separating Gaseous Material From Formation Fluids |
| US9353614B2 (en) | 2014-02-20 | 2016-05-31 | Saudi Arabian Oil Company | Fluid homogenizer system for gas segregated liquid hydrocarbon wells and method of homogenizing liquids produced by such wells |
| CN203730269U (en) | 2014-03-28 | 2014-07-23 | 白霞 | Parallel dual-cavity sand pump |
| WO2017053624A1 (en) | 2015-09-22 | 2017-03-30 | Production Tool Solution, Inc. | Gas separator |
| WO2019094167A1 (en) * | 2017-11-13 | 2019-05-16 | Baker Hughes, A Ge Company, Llc | Pre-flush for oil foamers |
| US10590740B2 (en) * | 2018-06-01 | 2020-03-17 | Oil Rebel Innovations Ltd. | Modified downhole isolation tool having a seating means and ported sliding sleeve |
| US10605064B1 (en) | 2019-06-11 | 2020-03-31 | Wellworx Energy Solutions Llc | Sand and solids bypass separator |
-
2020
- 2020-07-02 US US16/919,819 patent/US11525348B2/en active Active
- 2020-07-16 WO PCT/US2020/042229 patent/WO2022005492A1/en not_active Ceased
-
2022
- 2022-12-12 US US18/079,795 patent/US11988082B2/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2429043A (en) * | 1943-04-05 | 1947-10-14 | Paul F Barnhart | Bottom hole gas anchor |
| US5295537A (en) * | 1992-08-04 | 1994-03-22 | Trainer C W | Sand separating, producing-well accessory |
| RU2006574C1 (en) * | 1992-08-24 | 1994-01-30 | Роберт Юнусович Сулейманов | Gear for separation of sand and gas from crude oil in well |
| WO2011041572A1 (en) * | 2009-09-30 | 2011-04-07 | Conocophillips Company | Double string pump for hydrocarbon wells |
| WO2011079218A2 (en) * | 2009-12-23 | 2011-06-30 | Bp Corporation North America Inc. | Rigless low volume pump system |
| US20180100384A1 (en) | 2014-03-24 | 2018-04-12 | Heal Systems Lp | Systems and Apparatuses for Separating Wellbore Fluids and Solids During Production |
| US20180223642A1 (en) * | 2017-02-08 | 2018-08-09 | Saudi Arabian Oil Company | Inverted y-tool for downhole gas separation |
Also Published As
| Publication number | Publication date |
|---|---|
| US11525348B2 (en) | 2022-12-13 |
| US20220003103A1 (en) | 2022-01-06 |
| US20230109245A1 (en) | 2023-04-06 |
| US11988082B2 (en) | 2024-05-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11988082B2 (en) | Downhole solids handling in wells | |
| US7475731B2 (en) | Sand plunger | |
| US6668925B2 (en) | ESP pump for gassy wells | |
| US8529756B2 (en) | Separating sand from fluids produced by a well | |
| US9790779B2 (en) | Gas separator with inlet tail pipe | |
| US4074763A (en) | Bottom-hole gas-liquid separator | |
| CN111094693B (en) | Systems, devices, and methods for downhole water separation | |
| CN104024564A (en) | System and method for production of reservoir fluids | |
| US20050150827A1 (en) | Separator | |
| WO2010124394A1 (en) | Method and apparatus for separating downhole hydrocarbons from water | |
| US12006810B2 (en) | Downhole separator | |
| US20240344432A1 (en) | Sand collector for electric submersible pump | |
| US12473809B2 (en) | Downhole separator | |
| US20260009318A1 (en) | Desander assembly for plunger lift system | |
| US20220018236A1 (en) | Variable width sand bridge inducer | |
| US20230340964A1 (en) | Sand protection device for downhole pump | |
| CA3075312C (en) | Progressive cavity pump and methods for using the same | |
| RU2157447C2 (en) | Technique of cleaning of string of tubing string when oil is produced by mechanized process | |
| RU2847728C1 (en) | Method for cleaning a well | |
| CA3177339C (en) | Variable width sand bridge inducer | |
| US20130220117A1 (en) | Device for capturing gas from a produced water stream | |
| WO2025061798A1 (en) | In-well gas abatement apparatus | |
| CA2782874A1 (en) | Circulating coil cleanout tool and method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20750132 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 20750132 Country of ref document: EP Kind code of ref document: A1 |
|
| 32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 16.08.2023) |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 523442006 Country of ref document: SA |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 20750132 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 523442006 Country of ref document: SA |
|
| WWG | Wipo information: grant in national office |
Ref document number: 523442006 Country of ref document: SA |