WO2021159484A1 - Method and apparatus for scheduling pusch or pdsch - Google Patents

Method and apparatus for scheduling pusch or pdsch Download PDF

Info

Publication number
WO2021159484A1
WO2021159484A1 PCT/CN2020/075324 CN2020075324W WO2021159484A1 WO 2021159484 A1 WO2021159484 A1 WO 2021159484A1 CN 2020075324 W CN2020075324 W CN 2020075324W WO 2021159484 A1 WO2021159484 A1 WO 2021159484A1
Authority
WO
WIPO (PCT)
Prior art keywords
puschs
frequency resources
pdschs
subbands
pusch
Prior art date
Application number
PCT/CN2020/075324
Other languages
French (fr)
Inventor
Haipeng Lei
Original Assignee
Lenovo (Beijing) Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lenovo (Beijing) Limited filed Critical Lenovo (Beijing) Limited
Priority to CN202080096361.4A priority Critical patent/CN115088338A/en
Priority to PCT/CN2020/075324 priority patent/WO2021159484A1/en
Priority to EP20918833.3A priority patent/EP4104582A4/en
Priority to US17/792,767 priority patent/US20230052620A1/en
Publication of WO2021159484A1 publication Critical patent/WO2021159484A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0453Resources in frequency domain, e.g. a carrier in FDMA
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0044Arrangements for allocating sub-channels of the transmission path allocation of payload
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0091Signaling for the administration of the divided path
    • H04L5/0094Indication of how sub-channels of the path are allocated
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
    • H04W72/1268Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/14Spectrum sharing arrangements between different networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal

Definitions

  • the subject disclosure relates to 3 rd Generation Partnership Project (3GPP) 5G New Radio (NR) , and especially to a method and apparatus for scheduling Physical Uplink Shared Channel (PUSCH) or Physical Downlink Shared Channel (PDSCH) .
  • 3GPP 3rd Generation Partnership Project
  • NR 5G New Radio
  • PUSCH Physical Uplink Shared Channel
  • PDSCH Physical Downlink Shared Channel
  • the unlicensed spectrum at 5.7GHz has a wide bandwidth up to hundreds of MHz.
  • Ultra-Reliable Low Latency (URLLC) service on unlicensed spectrum the following problems might happen: 1) when URLLC is to be transmitted on the carrier but the Listen Before Talk (LBT) on the carrier failed, the URLLC cannot be transmitted, thus the latency requirements might not be met; and 2) due to the hidden node interference, when URLLC is transmitted on the carrier and LBT is successful, the reliability of the URLLC may not meet the reliability requirements.
  • LBT Listen Before Talk
  • DCI Downlink Control Information
  • One embodiment of the subject disclosure provides a method for scheduling Physical Uplink Shared Channel (PUSCH) , comprising: receiving a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and transmitting one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
  • PUSCH Physical Uplink Shared Channel
  • Another embodiment of the subject application provides a method for scheduling Physical Downlink Shared Channel (PDSCH) , comprising: receiving a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource; and receiving one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
  • PDSCH Physical Downlink Shared Channel
  • Yet another embodiment of the subject disclosure provides a method for scheduling Physical Uplink Shared Channel (PUSCH) , comprising: transmitting a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and receiving one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
  • PUSCH Physical Uplink Shared Channel
  • Still another embodiment of the subject disclosure provides a method for scheduling Physical Downlink Shared Channel (PDSCH) , comprising: transmitting a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource; and transmitting one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
  • PDSCH Physical Downlink Shared Channel
  • Still another embodiment of the subject disclosure provides an apparatus, comprising: a non-transitory computer-readable medium having stored thereon computer-executable instructions; a receiving circuitry; a transmitting circuitry; and a processor coupled to the non-transitory computer-readable medium, the receiving circuitry and the transmitting circuitry, wherein the computer-executable instructions cause the processor to implement the method for scheduling Physical Uplink Shared Channel (PUSCH) , comprising: receiving a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and transmitting one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
  • PUSCH Physical Uplink Shared Channel
  • Still another embodiment of the subject disclosure provides an apparatus, comprising: a non-transitory computer-readable medium having stored thereon computer-executable instructions; a receiving circuitry; a transmitting circuitry; and a processor coupled to the non-transitory computer-readable medium, the receiving circuitry and the transmitting circuitry, wherein the computer-executable instructions cause the processor to implement the method for scheduling Physical Uplink Shared Channel (PUSCH) , comprising: transmitting a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and receiving one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
  • PUSCH Physical Uplink Shared Channel
  • Figure 1 illustrates a schematic diagram of a wireless communication system in accordance with some embodiments of the subject disclosure.
  • Figure 2 illustrates a subband-based LBT for a wide carrier.
  • Figure 3 (a) illustrates an embodiment of a signal scheduling multiple PUSCHs/PDSCHs with one subband or one carrier per PUSCH/PDSCH according to a preferred embodiment of the subject disclosure.
  • Figure 3 (b) illustrates another embodiment of a signal scheduling multiple PUSCHs/PDSCHs with one or more subbands or one or more carriers per PUSCH/PDSCH according to a preferred embodiment of the subject disclosure.
  • Figure 3 (c) illustrates yet another embodiment of a signal scheduling multiple PUSCHs/PDSCHs with one or more subbands or one or more carriers per PUSCH/PDSCH according to a preferred embodiment of the subject disclosure.
  • Figure 4 illustrates an embodiment of a signal scheduling one PUSCH/PDSCH with TB repetition in each assigned subband according to a preferred embodiment of the subject disclosure.
  • Figure 5 illustrates a method performed by a UE for wireless communication according to a preferred embodiment of the subject disclosure.
  • Figure 6 illustrates another method performed by a UE for wireless communication according to a preferred embodiment of the subject disclosure.
  • Figure 7 illustrates a method performed by a BS for wireless communication according to a preferred embodiment of the subject disclosure.
  • Figure 8 illustrates another method performed by a BS for wireless communication according to a preferred embodiment of the subject disclosure.
  • Figure 9 illustrates a block diagram of a UE according to the embodiments of the subject disclosure.
  • Figure 10 illustrates a block diagram of a BS according to the embodiments of the subject disclosure.
  • the embodiments provide a method and apparatus for downlink (DL) or uplink (UL) data transmission on an unlicensed spectrum.
  • DL downlink
  • UL uplink
  • the embodiments are provided under specific network architecture and new service scenarios, such as 3GPP 5G, 3GPP LTE Release 8 and so on.
  • Persons skilled in the art know very well that, with the future development of network architecture and new service scenarios, the embodiments in the present disclosure are also applicable to similar technical problems.
  • Figure 1 illustrates a wireless communication system 100 according to an embodiment of the present disclosure.
  • the wireless communication system 100 includes UE 101 and BS 102.
  • the wireless communication system 100 includes three UEs 101 and three BSs 102 for illustrative purpose only. Even though a specific number of UEs 101 and BSs 102 are depicted in Figure 1, one skilled in the art will recognize that any number of UEs 101 and BSs 102 may be included in the wireless communication system 100.
  • the UEs 101 may include computing devices, such as desktop computers, laptop computers, personal digital assistants (PDAs) , tablet computers, smart televisions (e.g., televisions connected to the Internet) , set-top boxes, game consoles, security systems (including security cameras) , vehicle on-board computers, network devices (e.g., routers, switches, and modems) , or the like.
  • the UEs 101 may include a portable wireless communication device, a smart phone, a cellular telephone, a flip phone, a device having a subscriber identity module, a personal computer, a selective call receiver, or any other device that is capable of sending and receiving communication signals on a wireless network.
  • the UEs 101 include wearable devices, such as smart watches, fitness bands, optical head-mounted displays, or the like. Moreover, the UEs 101 may be referred to as a subscriber unit, a mobile phone, a mobile station, a user, a terminal, a mobile terminal, a wireless terminal, a fixed terminal, a subscriber station, a user terminal, or any device described using other terminology used in the art.
  • the UEs 101 may communicate directly with the BSs 102 via uplink (UL) communication signals.
  • UL uplink
  • the BSs 102 may be distributed over a geographic region.
  • each of the BSs 102 may also be referred to as an access point, an access terminal, a base, a macro cell, a Node-B, an enhanced Node B (eNB) , a gNB, a Home Node-B, a relay node, or any device described using other terminology used in the art.
  • the BSs 102 are generally part of a radio access network that may include one or more controllers communicably coupled to one or more corresponding BSs 102.
  • the wireless communication system 100 is compatible with any type of network that is capable of sending and receiving wireless communication signals.
  • the wireless communication system 100 is compatible with a wireless communication network, a cellular telephone network, a Time Division Multiple Access (TDMA) -based network, a Code Division Multiple Access (CDMA) -based network, an Orthogonal Frequency Division Multiple Access (OFDMA) -based network, an LTE network, a 3rd Generation Partnership Project (3GPP) -based network, a 3GPP 5G network, a satellite communications network, a high altitude platform network, and/or other communications networks.
  • TDMA Time Division Multiple Access
  • CDMA Code Division Multiple Access
  • OFDMA Orthogonal Frequency Division Multiple Access
  • the wireless communication system 100 is compatible with the 5G new radio (NR) of the 3GPP protocol, wherein the BSs 102 transmit data using an orthogonal frequency division multiplexing (OFDM) modulation scheme on the downlink and the UEs 101 transmit data on the uplink using Discrete Fourier Transform-Spread-Orthogonal Frequency Division Multiplexing (DFT-S-OFDM) or Cyclic Prefix-Orthogonal Frequency Division Multiplexing (CP-OFDM) scheme. More generally, however, the wireless communication system 100 may implement some other open or proprietary communication protocols, for example, WiMAX, among other protocols.
  • NR 5G new radio
  • the BSs 102 may communicate using other communication protocols, such as the IEEE 802.11 family of wireless communication protocols. Further, in some embodiments, the BSs 102 may communicate over licensed spectrums, whereas in other embodiments the BSs 102 may communicate over unlicensed spectrums. The present disclosure is not intended to be limited to the implementation of any particular wireless communication system architecture or protocol. In another embodiment, the BSs 102 may communicate with the UEs 101 using 3GPP 5G protocols.
  • LBT Listen Before Talk
  • MCOT maximum channel occupancy time
  • wireless signal transmission on unlicensed spectrum should meet the requirements of regulation subject to the management of the located country/region.
  • design of uplink waveform for NR-U PUSCH/PUCCH should meet the regulation requirements on unlicensed spectrum.
  • the requirements mainly include two aspects:
  • Occupied channel bandwidth the bandwidth containing 99%of the power of the signal, shall be between 80%and 100%of declared nominal channel bandwidth
  • NR-U In 5G NR, very wide bandwidth is supported, for example, up to 100 MHz bandwidth for Frequency Range 1 (FR1, 450MHz -6000MHz) and up to 400MHz bandwidth for Frequency Range 2 (FR2, 24250MHz -52600MHz) . Since the unlicensed spectrum at 5.7GHz has a wide bandwidth up to hundreds of MHz, NR-U also inherits the characteristic of wide bandwidth design.
  • FR1, 450MHz -6000MHz Frequency Range 1
  • FR2, 24250MHz -52600MHz Frequency Range 2
  • NR-U operating bandwidth is an integer multiple of 20MHz.
  • a channel access procedure also named Listen-Before-Talk (LBT) test, is performed in units of 20MHz. For a bandwidth larger than 20MHz, e.g., 40/60/80/100MHz, these bandwidths are partitioned into subband, each subband has a bandwidth of 20MHz.
  • LBT Listen-Before-Talk
  • LBT for NR-U is preformed based on 20MHz. Therefore, for a bandwidth with integer multiple of 20MHz, there are two ways for channel access:
  • CA Carrier Aggregation
  • subband operation By subband operation.
  • the UE or the BS performs LBT on each subband (e.g., 20 MHz) and aggregates available subbands for a single PUSCH/PDSCH. E.g., when LBT for some subbands are successful while for other subbands are not, then the UE or the BS can transmit data on the subbands with successful LBT. As shown in Figure 2, if subbands 200-0 and 200-3 have successful LBT outcome, then only subbands 200-0 and 200-3 can be simultaneously used for PUSCH/PDSCH transmission.
  • the CA-based LBT has less standard impact (using LTE-based License Assisted Access (LAA) as baseline) and require less stringent processing requirements since each TB is processed independently on each CC.
  • LAA License Assisted Access
  • the subband based LBT has two advantages: (1) the spectral efficiency is improved compared to CA since there is no need to place the guard-band (s) between contiguous subbands; (2) dynamic spectrum usage is realized with finer granularity of LBT bandwidth.
  • the base station For DL transmission, the base station performs the LBT test per subband (e.g., 20 MHz per subband) and aggregates available subbands for a single Physical Downlink Shared Channel (PDSCH) . That is, when the LBT tests for some subbands are successful while for other subbands are not, the base station can transmit data only on the subbands with successful LBT result.
  • reference numeral 200 represents a wideband with a bandwidth of 80 MHz
  • reference numerals 200-0, 200-1, 200-2, and 200-3 represent subbands with a bandwidth of 20 MHz. If subbands 200-2 and 200-3 have successful LBT results while subbands 200-0 and 200-1 do not, then PDSCH transmission of the base station can only be transmitted on subbands 200-2 and 200-3.
  • UE For UL transmission, UE performs LBT test per assigned subbands (e.g., 20 MHz per subband) and transmits Physical Uplink Shared Channel (PUSCH) on the available subbands. Namely, when LBT for some of assigned subbands are successful while for other subbands are not, then UE can transmit data on the subbands with successful LBT. For instance, as depict in Figure 2, since the LBT results of subbands 200-2 and 200-3 are successful, subbands 200-2 and 200-3 can be used for PUSCH transmission.
  • subbands 200-2 and 200-3 can be used for PUSCH transmission.
  • the scheduling decision is made before performing LBT.
  • LBT LBT-to-live
  • there are two natural options can be considered: 1) rate matching on the available subbands; or 2) puncture the data to be transmitted on the unavailable subbands.
  • rate matching is not a desirable solution for subband-based LBT operation.
  • the TB part that is mapped to the subband with failed LBT is punctured.
  • the benefit of this method is that UE implementation is simple. However, too much data being punctured may lead to failed TB decoding at gNB side.
  • control signaling overhead is high, which may lead to PDCCH capacity blocking.
  • One preferred embodiment of the subject disclosure relates to a signal, for example, a single DCI format, scheduling multiple PUSCHs/PDSCHs on multiple subbands or multiple carriers and the multiple PUSCHs/PDSCHs have the same time domain resource allocation.
  • the maximum number of PUSCHs which could be scheduled by the single DCI format is configured by RRC signaling, the maximum number might be 1, 2, 4, 8, 12, 16, 32 etc.
  • Radio Access Network Working Group 1 RAN1 has agreed to use 10 interlaces for 15 kHz subcarrier spacing, and to use 5 interlaces for 30 kHz subcarrier spacing.
  • the Resource Indication Value (RIV) based indication indicates the index of the starting interlace and the total number of contiguous interlaces, thus 6 bits are required for contiguous interlace allocation by means of RIV.
  • RIV Resource Indication Value
  • bitmap-based indication is used to indicate the interlaces, therefore, 5 bits are required for bitmap-based indication.
  • RIV based indication is used to indicate the assigned contiguous subbands.
  • M subbands in total in the active Uplink Bandwidth Part (BWP) bits are required for indicating the assigned contiguous subbands.
  • bits are needed, and for 30 kHz subcarrier, bits are needed.
  • the scheduled carriers can be also indicated using the RIV method. Assuming there are Z carriers configured, then bits are needed to indicate the RIV value.
  • the subject disclosure proposes a method to map the scheduled PUSCHs/PDSCHs to the assigned subbands on one carrier or to the assigned carriers.
  • the principle is to ensure nearly equal number of subbands per PUSCH, for example, any one PUSCH occupies at most more than one subband compared to any other PUSCH.
  • Figure 3 (a) illustrates an embodiment of one DCI format scheduling multiple PUSCHs/PDSCHs with one subband or one carrier per PUSCH/PDSCH according to a preferred embodiment of the subject disclosure.
  • PUSCHs occupying subbands it should be noted that the embodiment could also apply to PDSCHs occupying subbands, PDSCHs occupying carriers, and PUSCHs occupying carriers.
  • interlaced-based waveform is adopted, therefore, the term "occupy” here means the scheduled PUSCHs use the interlaces in the subband or in the carrier in frequency domain, not use all of the frequency resources in the subband or in the carrier in frequency domain.
  • FIG 3 (a) there are four PUSCHs, which are represented using the reference numerals 3000, 3001, 3002, and 3003; and there are four subbands, which are represented using the reference numerals 300-0, 300-1, 300-2, and 300-3.
  • the number of scheduled PUSCH is always equal to the number of assigned subbands. Therefore, it is not necessary to indicate the number of actually scheduled PUSCHs in the UL grant since the number of actually scheduled PUSCHs is equal to the number of assigned subbands.
  • Each scheduled PUSCH is restricted within the region of the associated subband and not across the subband boundary in frequency domain. For example, PUSCH 3000 is restricted within the region of subband 300-0.
  • Rate matching is independently performed for each PUSCH in the associated subband, and LBT is performed independently in each of the assigned subbands. For example, rate matching for PUSCH 3000 is performed in subband 300-0, and LBT for subbands 300-0, 300-1, 300-2, and 300-3 are independently performed.
  • Figure 3 (b) illustrates an embodiment of one DCI format scheduling multiple PUSCHs/PDSCHs with one or more subbands or one or more carriers per PUSCH/PDSCH according to a preferred embodiment of the subject disclosure.
  • the following content only describes PUSCHs occupying subbands, it should be noted that the embodiment could also apply to PDSCHs occupying subbands, PDSCHs occupying carriers, and PUSCHs occupying carriers.
  • N the number of actually scheduled PUSCHs, N, is indicated in the UL grant, and is represented using bits, wherein N max is the maximum number of schedulable PUSCHs scheduled by a single UL grant, and N max is configured by RRC signaling.
  • Each of the first x PUSCHs of the N scheduled PUSCHs occupies y 1 subbands; and each of the remaining N-x PUSCHs occupies y 2 subbands.
  • the first PUSCH occupies the first to the y 1 th subbands
  • the second PUSCH occupies the (y 1 +1) th to the (2 ⁇ y 1 ) th subbands
  • ...the x th PUSCH occupies the ( (x-1) ⁇ y 1 +1) th to the (x ⁇ y 1 ) th subbands
  • the (x+1) th PUSCH occupies the (x ⁇ y 1 +1) th to the (x ⁇ y 1 +y 2 ) th subbands
  • the last PUSCH occupies the last y 2 subbands.
  • each of the last x PUSCHs of the N scheduled PUSCHs occupies y 1 subbands; and each of the first N-x PUSCHs occupies y 2 subbands.
  • the last PUSCH occupies the last two subbands, namely, the PUSCH 3002 occupies subbands 300-2 and 300-3, and the first two PUSCHs, PUSCH 3000 and PUSCH 3001, occupy subband 300-0 and subband 300-1 respectively.
  • each of the last two PUSCHs occupy three subbands, and the remaining PUSCH occupies the remaining two subbands. More specifically, the last PUSCH occupies the last three subbands, the penultimate PUSCH occupies the next three subbands, and the first PUSCH occupies the first two subbands.
  • Rate matching is independently performed for each PUSCH in one or more associated subbands.
  • LBT is performed independently in each of the assigned subbands. With the above method, almost equal number of subbands per PUSCH is ensured.
  • the number of subbands, M is always greater than or equal to the number of PUSCHs, N, in short: M ⁇ N.
  • frequency-first time-second manner is performed independently within each scheduled PUSCH on the assigned one or more subbands.
  • the same time domain resource allocation indicated in the UL grant is adopted for each assigned subbands.
  • Transport Block (TB) allocation on the PUSCHs there are several approaches.
  • multiple TBs are allocated on multiple scheduled PUSCHs for control signaling overhead reduction, and one TB has an associated PUSCH. Therefore, each TB is carried by the associated PUSCH on the associated subband.
  • New Data Indication (NDI) and Redundancy Version (RV) are present in the UL grant for each of scheduled PUSCHs.
  • Hybrid Automatic Repeat reQuest (HARQ) process ID in the UL grant is applied to the first PUSCH, e.g., the PUSCH on the lowest subband index of the assigned subbands, then HARQ process ID for other scheduled PUSCH are incremented in order, if the index of the PUSCH is over 16, then a modulo 16 operation is performed to the index.
  • HARQ Hybrid Automatic Repeat reQuest
  • only one TB is allocated on the multiple scheduled PUSCHs for reliability purpose.
  • RRC signaling is introduced to configure UE the feature of one TB repetition in each assigned subband.
  • the UE assumes that one dedicated bit is present in the UL grant or detects UL grant using the new RNTI. Therefore, the single TB has multiple transmission opportunities in frequency domain.
  • the TB When there is only one of the assigned subbands passes the LBT procedure, the TB would be transmitted only in the subband.
  • the TB When more than one subbands pass the LBT procedure, the TB might be transmitted with repetition in all the assigned subbands with successful LBT outcome. In other words, the same TB is repeated in the multiple subbands of one carrier so that the transmission reliability can be greatly improved.
  • the TB might be transmitted only in one subband with successful LBT outcome, e.g., the subband may be the subband with the lowest or highest subband index of all the subbands with successful LBT outcome.
  • the same payload size is maintained compared to the legacy UL grant scheduling single PUSCH on one or more subbands.
  • the first method uses a new Radio Network Temporary Identity (RNTI) , e.g., MultiPUSCH-on-multiSubbands-RNTI.
  • RNTI Radio Network Temporary Identity
  • the new RNTI is used to scramble the CRC of DCI scheduling multiple PUSCHs on multiple subbands.
  • the second embodiment is implemented with the UL grant indicating the number of actually scheduled PUSCHs.
  • the UL grant indicates that only one PUSCH is scheduled, it implies that the BS schedules one PUSCH on one or more subbands, which is similar to legacy UL grant; when the UL grant indicates that more than one PUSCH is scheduled, it implies that the BS schedules more than one PUSCH on multiple subbands, which is different to legacy UL grant.
  • the third approach is accomplished with one dedicated bit in DCI format, which indicates whether the scheduled TB is to be repeated on each of the assigned subbands or to be transmitted on the assigned subbands without repetition in frequency domain.
  • FIG. 4 illustrates an embodiment of one DCI format scheduling one PUSCH/PDSCH with TB repetition in each assigned subband or carrier according to a preferred embodiment of the subject disclosure.
  • the following content uses PUSCH and subband as an example.
  • the one TB 4000 is dynamically scheduled by one UL grant on single PUSCH occupying more than one subbands: subband 400-0, 400-1, 400-2, and 400-3.
  • the TB 4000 is repeated in each of the assigned subbands: subband 400-0, 400-1, 400-2, and 400-3.
  • Each repetition of the TB is restricted within the region of the associated subband and not across subband boundary in frequency domain.
  • Rate matching is adopted to align the TB resource mapping in each subband.
  • LBT is performed independently in each of the assigned subbands. As long as one of the assigned subbands passes the LBT procedure, the TB would be transmitted in the subband.
  • the TB When more than one subband passes the LBT procedure, the TB shall be transmitted with repetition in all the assigned subbands with successful LBT outcome.
  • the four subbands 400-0, 400-1, 400-2, and 400-3 have successful LBT outcome, and the TB 4000 is repeatedly transmitted on the four subbands.
  • one TB has multiple transmission opportunities in multiple subbands of one carrier and can be repeated in the multiple subbands so that the transmission reliability can be greatly improved.
  • the TB shall be transmitted only in one subband with successful LBT outcome, e.g., this subband can be the subband with the lowest or highest subband index of all the subbands with successful LBT outcome.
  • the TB 4000 is transmitted only in subband 400-0.
  • the same payload size is maintained compared to the legacy UL grant scheduling single PUSCH carrying one TB on one or more subbands.
  • the first embodiment uses a new RNTI, e.g., TB-repetition-on-multi-subbands-RNTI.
  • the new RNTI is used to scramble the CRC of DCI scheduling single PUSCH for TB repetition on multiple subbands.
  • the second method uses one dedicated bit in DCI format, which indicates whether the scheduled TB is to be repeated on each of the assigned subbands or to be transmitted on the assigned subbands without repetition in frequency domain.
  • RRC signaling is introduced to configure UE the feature of one TB repetition in each of assigned subbands.
  • the UE assumes the aforementioned dedicated bit is present in the UL grant or detects UL grant using the new RNTI. If only one subband is assigned, then the TB is only transmitted on the assigned subband.
  • frequency-first time-second manner is performed independently within each of the assigned subbands. In this way, as long as any one of the assigned subbands passes the LBT, there is 90%probability for the BS to successfully decode the TB.
  • the UL grant indicates the same time domain resource allocation for each assigned subbands.
  • Still another preferred embodiment of the subject disclosure relates to multiple Configured Grant (CG) -PUSCHs/Semi-Persistent Scheduling (SPS) -PDSCHs on multi-LBT subbands or carriers over unlicensed spectrum, the CG-PUSCHs are configured by RRC signaling.
  • the multiple CG-PUSCHs have the same time domain resource allocation, and the number of the CG-PUSCHs is configured by RRC signaling, which might be 1, 2, 4, 8, 12, 16, 32 etc.
  • both the time domain resource and frequency domain resource are configured by RRC.
  • the same time domain resource allocation is adopted for each assigned subbands.
  • the subject disclosure proposes a method to map the CG-PUSCHs to the assigned subbands.
  • the principle is to ensure nearly equal number of subbands per CG-PUSCH, that is, any one CG-PUSCH occupies at most more than one subband compared to any other CG-PUSCH.
  • Figure 3 (a) also illustrates an embodiment of RRC signaling scheduling multiple CG-PUSCHs/SPS-PDSCHs with one subband or one carrier per CG-PUSCH/SPS-PDSCH according to a preferred embodiment of the subject disclosure.
  • the following content only relates to CG-PUSCH occupying one subband, it should be noted that the embodiment could also apply to CG-PUSCH occupying one carrier, SPS-PDSCH occupying one subband and SPS-PDSCH occupying one carrier.
  • CG-PUSCHs there are four CG-PUSCHs, which are represented using the reference numerals 3000, 3001, 3002, and 3003; and there are four subbands, which are represented using the reference numerals 300-0, 300-1, 300-2, and 300-3.
  • the number of CG-PUSCH is always equal to the number of assigned subbands. Therefore, it is not necessary to indicate the number of configured CG-PUSCHs in the UL grant since the number of CG-PUSCHs is equal to the number of assigned subbands.
  • Each CG-PUSCH is restricted within the region of the associated subband and not across the subband boundary in frequency domain. For example, CG-PUSCH 3000 is restricted within the region of subband 300-0.
  • Rate matching is independently performed for each CG-PUSCH in the associated subband, and LBT is performed independently in each of the assigned subbands. For example, rate matching for CG-PUSCH 3000 is performed in subband 300-0, and LBT for subbands 300-0, 300-1, 300-2, and 300-3 are independently performed.
  • Figure 3 (b) also illustrates an embodiment of RRC signaling scheduling multiple CG-PUSCHs/SPS-PDSCHs with one or more subbands or one or more carriers per CG-PUSCH/SPS-PDSCH according to a preferred embodiment of the subject disclosure.
  • CG-PUSCHs there are M subbands and N CG-PUSCHs, and M > N, then one or more CG-PUSCHs can occupy more than one subband in frequency domain.
  • the term "occupy” means the CG-PUSCHs use the interlaces in the subband in frequency domain, not use all of the frequency resources in the subband in frequency domain.
  • Each of the first x CG-PUSCHs of the N CG-PUSCHs occupies y 1 subbands; and each of the remaining N-x CG-PUSCHs occupies y 2 subbands.
  • the first CG-PUSCH occupies the first to the y 1 th subbands
  • the second CG-PUSCH occupies the (y 1 +1) th to the (2 ⁇ y 1 ) th subbands
  • ...the x th CG-PUSCH occupies the ( (x-1) ⁇ y 1 +1) th to the (x ⁇ y 1 ) th subbands
  • the (x+1) th CG-PUSCH occupies the (x ⁇ y 1 +1) th to the (x ⁇ y 1 +y 2 ) th subbands
  • the last CG-PUSCH occupies the last y 2 subbands.
  • each of the last x CG-PUSCHs of the N CG-PUSCHs occupies y 1 subbands; and each of the first N-x CG-PUSCHs occupies y 2 subbands.
  • the last CG-PUSCH occupies two subbands, namely, the CG-PUSCH 3002 occupies subbands 300-2 and 300-3, and the first two CG-PUSCHs, CG-PUSCH 3000 and CG-PUSCH 3001, occupy subband 300-0 and subband 300-1 respectively.
  • Rate matching is independently performed for each CG-PUSCH in one or more associated subbands.
  • LBT is performed independently in each of the assigned subbands. With the above method, almost equal number of subbands per CG-PUSCH is ensured.
  • the number of subbands , M is always greater than or equal to the number of CG-PUSCHs, N, in short: M ⁇ N.
  • frequency-first time-second manner is performed independently within each configured CG-PUSCH on the assigned one or more subbands.
  • the same time domain resource allocation indicated in the UL grant is adopted for each assigned subbands.
  • Transport Block (TB) allocation on the configured CG-PUSCHs there are several approaches.
  • multiple TBs are allocated on multiple CG-PUSCHs for control signaling overhead reduction. Therefore, each TB is carried by the associated CG-PUSCH on the associated subband.
  • HARQ process ID, New Data Indication (NDI) and Redundancy Version (RV) are present in the CG-UCI for each of configured CG-PUSCHs.
  • only one TB is allocated on the multiple configured CG-PUSCHs for reliability purpose.
  • RRC signaling is introduced to configure UE the feature of one TB repetition in each assigned subband.
  • the UE assumes that one dedicated bit is present in the UL grant or detects UL grant using the new RNTI. Therefore, the single TB has multiple transmission opportunities in frequency domain.
  • the TB When there is only one of the assigned subbands passes the LBT procedure, the TB would be transmitted only in the subband.
  • the TB When more than one subbands pass the LBT procedure, the TB might be transmitted with repetition in all the assigned subbands with successful LBT outcome. In other words, the same TB is repeated in the multiple subbands of one carrier so that the transmission reliability can be greatly improved.
  • the TB might be transmitted only in one subband with successful LBT outcome, e.g., the subband can be the subband with the lowest or highest subband index of all the subbands with successful LBT outcome.
  • Yet another preferred embodiment of the subject disclosure relates to a single CG-PUSCH/SPS-PDSCH on multi-LBT subbands over unlicensed spectrum, and the CG-PUSCH is configured by RRC signaling.
  • one CG-PUSCH is configured on more than one subbands: subbands 400-0, 400-1, 400-2, and 400-3, and one TB 4000 is repeated in each of the assigned subbands: subband 400-0, 400-1, 400-2, and 400-3.
  • Each repetition of the TB is restricted within the region of the associated subband and not across subband boundary in frequency domain.
  • Rate matching is adopted to align the TB resource mapping in each subband.
  • LBT is performed independently in each of the assigned subbands. As long as one of the assigned subbands passes the LBT procedure, the TB would be transmitted in the subband.
  • the TB When more than one subband passes the LBT procedure, the TB shall be transmitted with repetition in all the assigned subbands with successful LBT outcome.
  • the four subbands 400-0, 400-1, 400-2, and 400-3 have successful LBT outcome, and the TB 4000 is repeatedly transmitted on the four subbands.
  • one TB has multiple transmission opportunities in multiple subbands of one carrier and can be repeated in the multiple subbands so that the transmission reliability can be greatly improved.
  • the TB shall be transmitted only in one subband with successful LBT outcome, e.g., this subband can be the subband with the lowest or highest subband index of all the subbands with successful LBT outcome.
  • the TB 4000 is transmitted only in subband 400-0.
  • frequency-first time-second manner is performed independently within each of the assigned subbands. In this way, as long as any one of the assigned subbands passes the LBT, there is 90%probability for the BS to successfully decode the TB.
  • the UL grant indicates the same time domain resource allocation for each assigned subbands.
  • Figure 5 illustrates a method performed by a UE for wireless communication according to a preferred embodiment of the subject disclosure.
  • the UE receives a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with the same time domain resource.
  • the UE receives Downlink Control Information (DCI) , i.e., UL grants, which schedules three PUSCHs on four subbands on one carrier or four carriers.
  • DCI Downlink Control Information
  • the UE may receive RRC signaling, which configures the maximum number of the PUSCHs or configures the number of CG-PUSCHs.
  • DCI Downlink Control Information
  • the UE transmits one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources. For example, in Figure 3 (a) , the UE transmits three PUSCHs on four subbands or four carriers. The UE may transmits less than three PUSCHs on the four subbands or four carriers.
  • the DCI includes an indicator indicating a value of the first number.
  • the maximum number of schedulable PUSCHs by the DCI is configured by RRC signaling.
  • the number of actually scheduled PUSCHs is indicated in the UL grant, which requires bits, wherein N max is the RRC configured maximum number of schedulable PUSCHs by the single UL grant.
  • the number of the PUSCHs is not larger than the number of the subbands on one carrier or the number of the carriers. Therefore, one or more scheduled PUSCHs may occupy more than one subband in frequency domain.
  • one mapping rule between the subbands or carriers and the PUSCHs is as follows:
  • each of a first x PUSCHs of the N PUSCHs is transmitted on y 1 subbands or carriers of the M subbands or carriers, and each of the remaining PUSCHs of the N PUSCHs is transmitted on y 2 subbands or carriers of the M subbands or carriers, wherein x is equal to a remainder of M divided by N, y 1 is determined by rounding up a quotient of M divided by N, and y 2 is determined by rounding down the quotient.
  • the first one CG-PUSCH occupies two subbands, namely, the CG-PUSCH 3000 occupies subbands 300-0 and 300-1, and the remaining two CG-PUSCHs, CG-PUSCH 3001 and CG-PUSCH 3002, occupy subband 300-2 and subband 300-3 respectively.
  • Another mapping rule between the subbands or carriers and the PUSCHs is as follows: each of a last x PUSCHs of the N PUSCHs is transmitted on y 1 subbands or carriers of the M subbands or carriers, and each of the first N-x PUSCHs of the N PUSCHs is transmitted on y 2 subbands or carriers of the M subbands or carriers, wherein x is equal to a remainder of M divided by N, y 1 is determined by rounding up a quotient of M divided by N, and y 2 is determined by rounding down the quotient.
  • the number of the PUSCHs is equal to the number of the subbands on one carrier or the number of the carriers.
  • Each PUSCH is transmitted on the associated subband or carrier.
  • each of the first number of PUSCHs may carry a corresponding TB, or the same TB.
  • the CRC of the DCI is scrambled by a new RNTI, e.g., MultiPUSCH-on-multiSubbands-RNTI, the new RNTI is configured by RRC signaling.
  • a new RNTI e.g., MultiPUSCH-on-multiSubbands-RNTI
  • the new RNTI is configured by RRC signaling.
  • the signal includes a dedicated bit, which indicates whether a TB is to be repeated on each of the assigned subbands with a successful LBT outcome or transmitted on the assigned subbands without repetition in frequency domain with a successful LBT outcome.
  • the TB 4000 is repeatedly transmitted on subband 400-0, 400-1, 400-2, and 4003.
  • the signal schedules one PUSCH on the subbands with one TB repeatedly transmitted on each subband of the subbands.
  • Figure 6 illustrates another method performed by a UE for wireless communication according to a preferred embodiment of the subject disclosure.
  • the UE receives a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource.
  • the UE receives Downlink Control Information (DCI) , i.e., DL grants, which schedules three PDSCHs on four subbands on one carrier or four carriers.
  • DCI Downlink Control Information
  • the UE may receive RRC signaling, which configures the maximum number of the schedulable PDSCHs by single DL grant or configures the number of SPS-PDSCHs.
  • the UE receives one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
  • the UE receives three PDSCHs on four subbands or four carriers. The UE may receive less than three PDSCHs on the four subbands or four carriers.
  • the DCI includes an indicator indicating a value of the first number.
  • the maximum number of schedulable PDSCHs by the DCI is configured by RRC signaling.
  • the number of actually scheduled PDSCHs is indicated in the DL grant, which requires bits, wherein N max is the RRC configured maximum number of schedulable PDSCHs by the single DL grant.
  • the number of the PDSCHs is not larger than the number of the subbands on one carrier or the number of the carriers. Therefore, one or more scheduled PDSCHs may occupy more than one subband in frequency domain.
  • one mapping rule between the subbands or carriers and the PDSCHs is as follows:
  • each of a first x PDSCHs of the N PDSCHs is transmitted on y 1 subbands or carriers of the M subbands or carriers, and each of the remaining PDSCHs of the N PDSCHs is transmitted on y 2 subbands or carriers of the M subbands or carriers, wherein x is equal to a remainder of M divided by N, y 1 is determined by rounding up a quotient of M divided by N, and y 2 is determined by rounding down the quotient.
  • x is equal to a remainder of M divided by N
  • y 1 is determined by rounding up a quotient of M divided by N
  • y 2 is determined by rounding down the quotient.
  • the first one PDSCH occupies two subbands, namely, the PDSCH 3000 occupies subbands 300-0 and 300-1, and the remaining two PDSCHs, PDSCH 3001 and PDSCH 3002, occupy subband 300-2 and subband 300-3 respectively.
  • Another mapping rule between the subbands or carriers and the PDSCHs is as follows: each of a last x PDSCHs of the N PDSCHs is transmitted on y 1 subbands or carriers of the M subbands or carriers, and each of the remaining PDSCHs of the N PDSCHs is transmitted on y 2 subbands or carriers of the M subbands or carriers, wherein x is equal to a remainder of M divided by N, y 1 is determined by rounding up a quotient of M divided by N, and y 2 is determined by rounding down the quotient.
  • x is equal to a remainder of M divided by N
  • y 1 is determined by rounding up a quotient of M divided by N
  • y 2 is determined by rounding down the quotient.
  • the last PDSCH occupies two subbands, namely, the PDSCH 3002 occupies subbands 300-2 and 300-3, and the remaining PDSCHs, PDSCH 3000 and PDSCH 3001, occupy subband 300-0 and subband 300-1 respectively.
  • the number of the PDSCHs is equal to the number of the subbands on one carrier or the number of the carriers.
  • Each PDSCH is transmitted on the associated subband or carrier.
  • each of the first number of PDSCHs may carry a corresponding TB, or the same TB.
  • the CRC of the DCI is scrambled by a new RNTI, e.g., MultiPDSCH-on-multiSubbands-RNTI, and the new RNTI is configured by RRC signaling.
  • a new RNTI e.g., MultiPDSCH-on-multiSubbands-RNTI
  • the signal includes a dedicated bit, which indicates whether a TB is to be repeated on each of the assigned subbands with a successful LBT outcome or transmitted on the assigned subbands without repetition in frequency domain with a successful LBT outcome.
  • the TB 4000 is repeatedly transmitted on subband 400-0, 400-1, 400-2, and 4003.
  • the signal schedules one PDSCH on the subbands with one TB repeatedly transmitted on each subband of the subbands.
  • Figure 7 illustrates a method performed by a BS for wireless communication according to a preferred embodiment of the subject disclosure.
  • the BS transmits a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource.
  • the BS transmits Downlink Control Information (DCI) , i.e., UL grants, which schedules three PUSCHs on four subbands on one carrier or four carriers.
  • the BS may transmit RRC signaling, which configures the maximum number of the PUSCHs or configures the number of CG-PUSCHs.
  • the BS receives one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
  • the BS receives three PUSCHs on four subbands or four carriers. The BS may receive less than three PUSCHs on the four subbands or four carriers.
  • Figure 8 illustrates another method performed by a BS for wireless communication according to a preferred embodiment of the subject disclosure.
  • the BS transmits a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource.
  • the BS transmits Downlink Control Information (DCI) , i.e., DL grants, which schedules three PDSCHs on four subbands on one carrier or four carriers.
  • the BS may transmit RRC signaling, which configures the maximum number of the PDSCHs or configures the number of SPS-PDSCHs.
  • the BS transmits one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
  • the BS transmits three PDSCHs on four subbands or four carriers.
  • the BS may transmits less than three PDSCHs on the four subbands or four carriers.
  • FIG. 9 illustrates a block diagram of a UE according to the embodiments of the subject disclosure.
  • the UE 101 may include a receiving circuitry, a processor, and a transmitting circuitry.
  • the UE 101 may include a non-transitory computer-readable medium having stored thereon computer-executable instructions; a receiving circuitry; a transmitting circuitry; and a processor coupled to the non-transitory computer-readable medium, the receiving circuitry and the transmitting circuitry.
  • the computer executable instructions can be programmed to implement a method (e.g. the method in Figure 5) with the receiving circuitry, the transmitting circuitry and the processor. That is, upon performing the computer executable instructions, the receiving circuitry may receive, a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and the transmitting circuitry transmits one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
  • a method e.g. the method in Figure 5
  • the receiving circuitry may receive, a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and the transmitting circuitry transmits one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
  • the computer executable instructions can be programmed to implement another method (e.g. the method in Figure 6) with the receiving circuitry, the transmitting circuitry and the processor. That is, upon performing the computer executable instructions, the receiving circuitry may receive, a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource; and the receiving circuitry receives one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
  • another method e.g. the method in Figure 6
  • the receiving circuitry may receive, a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource; and the receiving circuitry receives one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
  • FIG. 10 illustrates a block diagram of a BS according to the embodiments of the subject disclosure.
  • the BS 102 may include a receiving circuitry, a processor, and a transmitting circuitry.
  • the BS may include a non-transitory computer-readable medium having stored thereon computer-executable instructions; a receiving circuitry; a transmitting circuitry; and a processor coupled to the non-transitory computer-readable medium, the receiving circuitry and the transmitting circuitry.
  • the computer executable instructions can be programmed to implement a method (e.g. the method in Figure 7) with the receiving circuitry, the transmitting circuitry and the processor. That is, upon performing the computer executable instructions, the transmitting circuitry may transmit, a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource, and the receiving circuitry may receive one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
  • a method e.g. the method in Figure 7
  • the computer executable instructions can be programmed to implement a method (e.g. the method in Figure 8) with the receiving circuitry, the transmitting circuitry and the processor. That is, upon performing the computer executable instructions, the transmitting circuitry may transmit, a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource, and the transmitting circuitry may transmit one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
  • a method e.g. the method in Figure 8
  • the method of the present disclosure can be implemented on a programmed processor.
  • the controllers, flowcharts, and modules may also be implemented on a general purpose or special purpose computer, a programmed microprocessor or microcontroller and peripheral integrated circuit elements, an integrated circuit, a hardware electronic or logic circuit such as a discrete element circuit, a programmable logic device, or the like.
  • any device that has a finite state machine capable of implementing the flowcharts shown in the figures may be used to implement the processing functions of the present disclosure.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present disclosure relates to a method and apparatus for scheduling PUSCH or PDSCH. One embodiment of the subject disclosure provides a method for scheduling Physical Uplink Shared Channel (PUSCH), comprising: receiving a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and transmitting one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.

Description

METHOD AND APPARATUS FOR SCHEDULING PUSCH OR PDSCH TECHNICAL FIELD
The subject disclosure relates to 3 rd Generation Partnership Project (3GPP) 5G New Radio (NR) , and especially to a method and apparatus for scheduling Physical Uplink Shared Channel (PUSCH) or Physical Downlink Shared Channel (PDSCH) .
BACKGROUND OF THE INVENTION
For New Radio access over unlicensed spectrum (NR-U) , the unlicensed spectrum at 5.7GHz has a wide bandwidth up to hundreds of MHz. For Ultra-Reliable Low Latency (URLLC) service on unlicensed spectrum, the following problems might happen: 1) when URLLC is to be transmitted on the carrier but the Listen Before Talk (LBT) on the carrier failed, the URLLC cannot be transmitted, thus the latency requirements might not be met; and 2) due to the hidden node interference, when URLLC is transmitted on the carrier and LBT is successful, the reliability of the URLLC may not meet the reliability requirements.
In addition, when multiple Downlink Control Information (DCI) formats are used to schedule multiple PUSCHs or PDSCHs on multiple subbands or on multiple carriers, wherein LBT is performed separately on each subband/carrier, the control signaling overhead is high, which may lead to PDCCH capacity blocking.
SUMMARY
It is desirable to provide a solution to solve aforementioned problems and further improve spectrum utilization efficiency.
One embodiment of the subject disclosure provides a method for scheduling Physical Uplink Shared Channel (PUSCH) , comprising: receiving a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time  domain resource; and transmitting one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
Another embodiment of the subject application provides a method for scheduling Physical Downlink Shared Channel (PDSCH) , comprising: receiving a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource; and receiving one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
Yet another embodiment of the subject disclosure provides a method for scheduling Physical Uplink Shared Channel (PUSCH) , comprising: transmitting a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and receiving one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
Still another embodiment of the subject disclosure provides a method for scheduling Physical Downlink Shared Channel (PDSCH) , comprising: transmitting a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource; and transmitting one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
Still another embodiment of the subject disclosure provides an apparatus, comprising: a non-transitory computer-readable medium having stored thereon computer-executable instructions; a receiving circuitry; a transmitting circuitry; and a processor coupled to the non-transitory computer-readable medium, the receiving circuitry and the transmitting circuitry, wherein the computer-executable instructions cause the processor to implement the method for scheduling Physical Uplink Shared Channel (PUSCH) , comprising: receiving a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and  transmitting one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
Still another embodiment of the subject disclosure provides an apparatus, comprising: a non-transitory computer-readable medium having stored thereon computer-executable instructions; a receiving circuitry; a transmitting circuitry; and a processor coupled to the non-transitory computer-readable medium, the receiving circuitry and the transmitting circuitry, wherein the computer-executable instructions cause the processor to implement the method for scheduling Physical Uplink Shared Channel (PUSCH) , comprising: transmitting a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and receiving one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
BRIEF DESCRIPTION OF THE DRAWINGS
Figure 1 illustrates a schematic diagram of a wireless communication system in accordance with some embodiments of the subject disclosure.
Figure 2 illustrates a subband-based LBT for a wide carrier.
Figure 3 (a) illustrates an embodiment of a signal scheduling multiple PUSCHs/PDSCHs with one subband or one carrier per PUSCH/PDSCH according to a preferred embodiment of the subject disclosure.
Figure 3 (b) illustrates another embodiment of a signal scheduling multiple PUSCHs/PDSCHs with one or more subbands or one or more carriers per PUSCH/PDSCH according to a preferred embodiment of the subject disclosure.
Figure 3 (c) illustrates yet another embodiment of a signal scheduling multiple PUSCHs/PDSCHs with one or more subbands or one or more carriers per PUSCH/PDSCH according to a preferred embodiment of the subject disclosure.
Figure 4 illustrates an embodiment of a signal scheduling one PUSCH/PDSCH with TB repetition in each assigned subband according to a preferred embodiment of the subject disclosure.
Figure 5 illustrates a method performed by a UE for wireless communication according to a preferred embodiment of the subject disclosure.
Figure 6 illustrates another method performed by a UE for wireless communication according to a preferred embodiment of the subject disclosure.
Figure 7 illustrates a method performed by a BS for wireless communication according to a preferred embodiment of the subject disclosure.
Figure 8 illustrates another method performed by a BS for wireless communication according to a preferred embodiment of the subject disclosure.
Figure 9 illustrates a block diagram of a UE according to the embodiments of the subject disclosure.
Figure 10 illustrates a block diagram of a BS according to the embodiments of the subject disclosure.
DETAILED DESCRIPTION
The detailed description of the appended drawings is intended as a description of the currently preferred embodiments of the present invention, and is not intended to represent the only form in which the present invention may be practiced. It should be understood that the same or equivalent functions may be accomplished by different embodiments that are intended to be encompassed within the spirit and scope of the present invention.
The embodiments provide a method and apparatus for downlink (DL) or uplink (UL) data transmission on an unlicensed spectrum. To facilitate understanding, the embodiments are provided under specific network architecture and new service scenarios, such as 3GPP 5G, 3GPP LTE Release 8 and so on.  Persons skilled in the art know very well that, with the future development of network architecture and new service scenarios, the embodiments in the present disclosure are also applicable to similar technical problems.
Figure 1 illustrates a wireless communication system 100 according to an embodiment of the present disclosure.
As shown in Figure 1, the wireless communication system 100 includes UE 101 and BS 102. In particular, the wireless communication system 100 includes three UEs 101 and three BSs 102 for illustrative purpose only. Even though a specific number of UEs 101 and BSs 102 are depicted in Figure 1, one skilled in the art will recognize that any number of UEs 101 and BSs 102 may be included in the wireless communication system 100.
The UEs 101 may include computing devices, such as desktop computers, laptop computers, personal digital assistants (PDAs) , tablet computers, smart televisions (e.g., televisions connected to the Internet) , set-top boxes, game consoles, security systems (including security cameras) , vehicle on-board computers, network devices (e.g., routers, switches, and modems) , or the like. According to an embodiment of the present disclosure, the UEs 101 may include a portable wireless communication device, a smart phone, a cellular telephone, a flip phone, a device having a subscriber identity module, a personal computer, a selective call receiver, or any other device that is capable of sending and receiving communication signals on a wireless network. In some embodiments, the UEs 101 include wearable devices, such as smart watches, fitness bands, optical head-mounted displays, or the like. Moreover, the UEs 101 may be referred to as a subscriber unit, a mobile phone, a mobile station, a user, a terminal, a mobile terminal, a wireless terminal, a fixed terminal, a subscriber station, a user terminal, or any device described using other terminology used in the art. The UEs 101 may communicate directly with the BSs 102 via uplink (UL) communication signals.
The BSs 102 may be distributed over a geographic region. In certain embodiments, each of the BSs 102 may also be referred to as an access point, an access terminal, a base, a macro cell, a Node-B, an enhanced Node B (eNB) , a gNB,  a Home Node-B, a relay node, or any device described using other terminology used in the art. The BSs 102 are generally part of a radio access network that may include one or more controllers communicably coupled to one or more corresponding BSs 102.
The wireless communication system 100 is compatible with any type of network that is capable of sending and receiving wireless communication signals. For example, the wireless communication system 100 is compatible with a wireless communication network, a cellular telephone network, a Time Division Multiple Access (TDMA) -based network, a Code Division Multiple Access (CDMA) -based network, an Orthogonal Frequency Division Multiple Access (OFDMA) -based network, an LTE network, a 3rd Generation Partnership Project (3GPP) -based network, a 3GPP 5G network, a satellite communications network, a high altitude platform network, and/or other communications networks.
In one embodiment, the wireless communication system 100 is compatible with the 5G new radio (NR) of the 3GPP protocol, wherein the BSs 102 transmit data using an orthogonal frequency division multiplexing (OFDM) modulation scheme on the downlink and the UEs 101 transmit data on the uplink using Discrete Fourier Transform-Spread-Orthogonal Frequency Division Multiplexing (DFT-S-OFDM) or Cyclic Prefix-Orthogonal Frequency Division Multiplexing (CP-OFDM) scheme. More generally, however, the wireless communication system 100 may implement some other open or proprietary communication protocols, for example, WiMAX, among other protocols.
In other embodiments, the BSs 102 may communicate using other communication protocols, such as the IEEE 802.11 family of wireless communication protocols. Further, in some embodiments, the BSs 102 may communicate over licensed spectrums, whereas in other embodiments the BSs 102 may communicate over unlicensed spectrums. The present disclosure is not intended to be limited to the implementation of any particular wireless communication system architecture or protocol. In another embodiment, the BSs 102 may communicate with the UEs 101 using 3GPP 5G protocols.
For transmission on unlicensed spectrum, in order to achieve fair coexistence with other wireless systems, Listen Before Talk (LBT) is required before the transmission on unlicensed spectrum. By means of performing energy detection on a certain channel, if the received power is below a predefined threshold, then the LBT is successful, which means the channel is deemed as empty and available for transmission. Only when the LBT is successful, an equipment can start the transmission on the channel and occupy the channel up to a maximum channel occupancy time (MCOT) ; otherwise, the equipment cannot start the transmission and continue to performing LBT until a successful LBT.
In addition, wireless signal transmission on unlicensed spectrum should meet the requirements of regulation subject to the management of the located country/region. Hence, the design of uplink waveform for NR-U PUSCH/PUCCH should meet the regulation requirements on unlicensed spectrum.
The requirements mainly include two aspects:
i. Occupied channel bandwidth (OCB) : the bandwidth containing 99%of the power of the signal, shall be between 80%and 100%of declared nominal channel bandwidth; and
ii. Maximum Power Spectrum Density (PSD) with a resolution bandwidth of 1MHz, e.g., 10dBm/MHz.
These two requirements dictate that a signal which occupies a small portion of the channel bandwidth cannot be transmitted at the maximum available power at the UE due to the PSD and OCB constraints.
In 5G NR, very wide bandwidth is supported, for example, up to 100 MHz bandwidth for Frequency Range 1 (FR1, 450MHz -6000MHz) and up to 400MHz bandwidth for Frequency Range 2 (FR2, 24250MHz -52600MHz) . Since the unlicensed spectrum at 5.7GHz has a wide bandwidth up to hundreds of MHz, NR-U also inherits the characteristic of wide bandwidth design.
In order to achieve fair coexistence between NR-U and Wi-Fi on unlicensed spectrum, NR-U operating bandwidth is an integer multiple of 20MHz. A channel access procedure, also named Listen-Before-Talk (LBT) test, is performed in units of 20MHz. For a bandwidth larger than 20MHz, e.g., 40/60/80/100MHz, these bandwidths are partitioned into subband, each subband has a bandwidth of 20MHz.
Based on the agreement, LBT for NR-U is preformed based on 20MHz. Therefore, for a bandwidth with integer multiple of 20MHz, there are two ways for channel access:
i. By Carrier Aggregation (CA) . In CA mode, similar to LTE LAA/eLAA, the UE or the BS performs LBT for each component carrier (e.g., 20MHz) based on multi-carrier LBT operation specified in LTE LAA/eLAA, then transmit on each available carrier.
ii. By subband operation. The UE or the BS performs LBT on each subband (e.g., 20 MHz) and aggregates available subbands for a single PUSCH/PDSCH. E.g., when LBT for some subbands are successful while for other subbands are not, then the UE or the BS can transmit data on the subbands with successful LBT. As shown in Figure 2, if subbands 200-0 and 200-3 have successful LBT outcome, then only subbands 200-0 and 200-3 can be simultaneously used for PUSCH/PDSCH transmission.
The above two approaches have different advantages, the CA-based LBT has less standard impact (using LTE-based License Assisted Access (LAA) as baseline) and require less stringent processing requirements since each TB is processed independently on each CC. The subband based LBT has two advantages: (1) the spectral efficiency is improved compared to CA since there is no need to place the guard-band (s) between contiguous subbands; (2) dynamic spectrum usage is realized with finer granularity of LBT bandwidth.
For DL transmission, the base station performs the LBT test per subband (e.g., 20 MHz per subband) and aggregates available subbands for a single Physical Downlink Shared Channel (PDSCH) . That is, when the LBT tests for some  subbands are successful while for other subbands are not, the base station can transmit data only on the subbands with successful LBT result. For example, as shown in Figure 2, reference numeral 200 represents a wideband with a bandwidth of 80 MHz, and reference numerals 200-0, 200-1, 200-2, and 200-3 represent subbands with a bandwidth of 20 MHz. If subbands 200-2 and 200-3 have successful LBT results while subbands 200-0 and 200-1 do not, then PDSCH transmission of the base station can only be transmitted on subbands 200-2 and 200-3.
For UL transmission, UE performs LBT test per assigned subbands (e.g., 20 MHz per subband) and transmits Physical Uplink Shared Channel (PUSCH) on the available subbands. Namely, when LBT for some of assigned subbands are successful while for other subbands are not, then UE can transmit data on the subbands with successful LBT. For instance, as depict in Figure 2, since the LBT results of subbands 200-2 and 200-3 are successful, subbands 200-2 and 200-3 can be used for PUSCH transmission.
From the perspective of scheduling, the scheduling decision is made before performing LBT. E.g., when a TB is determined to be transmitted on a wide frequency as shown in the left part of Figure 2, subject to LBT, not all the subbands are available for the TB transmission. In this case, there are two natural options can be considered: 1) rate matching on the available subbands; or 2) puncture the data to be transmitted on the unavailable subbands.
With the rate matching method, high coding rate will be caused in order to transmit the scheduled TB only in the available subbands and the coding rate is variable dependent on the number of available subbands. Furthermore, UE may not have enough processing time to perform rate matching considering there is nearly no extra time from the time instant when the LBT outcome is considered successful to the time instant that UE starts UL transmission. Accordingly, rate matching is not a desirable solution for subband-based LBT operation.
With the puncturing method, the TB part that is mapped to the subband with failed LBT is punctured. The benefit of this method is that UE  implementation is simple. However, too much data being punctured may lead to failed TB decoding at gNB side.
Furthermore, when URLLC service is supported on unlicensed spectrum, it does make sense to allocate very wide spectrum in frequency domain and quite short duration in time domain so as to meet the requirements on short latency and high date rate. However, due to the unpredicted LBT procedure, when URLLC is to be transmitted on the carrier while the LBT is failed, the URLLC cannot be transmitted, which may not meet the latency requirements; on the other hand, due to the hidden node interference, when URLLC is transmitted on the carrier and LBT is successful, the reliability of the URLLC may not meet the reliability requirements.
In addition, when multiple DCI formats are used to schedule multiple PUSCHs or PDSCHs on multiple subbands, wherein LBT is performed separately on each subband, control signaling overhead is high, which may lead to PDCCH capacity blocking.
In this disclosure, several solutions are proposed to solve the above technical problems. Specifically, several alternatives are proposed for multiple PUSCH scheduling on unlicensed spectrum so as to further improve data transmission reliability and save control signaling overhead.
One preferred embodiment of the subject disclosure relates to a signal, for example, a single DCI format, scheduling multiple PUSCHs/PDSCHs on multiple subbands or multiple carriers and the multiple PUSCHs/PDSCHs have the same time domain resource allocation. The maximum number of PUSCHs which could be scheduled by the single DCI format is configured by RRC signaling, the maximum number might be 1, 2, 4, 8, 12, 16, 32 etc.
In Rel-14 LTE eLAA, interlace-based waveform is adopted for unlicensed spectrum. For frequency domain resource allocation, both the interlace and the subband need to be indicated. For NR-U 20MHz bandwidth in NR-U, Radio Access Network Working Group 1 (RAN1) has agreed to use 10 interlaces for 15 kHz subcarrier spacing, and to use 5 interlaces for 30 kHz subcarrier spacing.
Regarding 15KHz subcarrier spacing, assuming the 10 interlaces are contiguous allocated, the Resource Indication Value (RIV) based indication indicates the index of the starting interlace and the total number of contiguous interlaces, thus 6 bits are required for contiguous interlace allocation by means of RIV. For 30kHz subcarrier spacing, there are 5 interlaces, and bitmap-based indication is used to indicate the interlaces, therefore, 5 bits are required for bitmap-based indication.
Assuming that the assigned subbands are also contiguous, therefore, RIV based indication is used to indicate the assigned contiguous subbands. Suppose there are M subbands in total in the active Uplink Bandwidth Part (BWP) , then 
Figure PCTCN2020075324-appb-000001
bits are required for indicating the assigned contiguous subbands.
Therefore, for indicating the assigned interlaces and assigned subbands for active UL BWP using 15 kHz subcarrier spacing, 
Figure PCTCN2020075324-appb-000002
bits are needed, and for 30 kHz subcarrier, 
Figure PCTCN2020075324-appb-000003
bits are needed.
When multiple PUSCHs or multiple PDSCHs on multiple carriers scheduled by single DCI format, the scheduled carriers can be also indicated using the RIV method. Assuming there are Z carriers configured, then
Figure PCTCN2020075324-appb-000004
bits are needed to indicate the RIV value.
Based on the above frequency domain resource allocation, the subject disclosure proposes a method to map the scheduled PUSCHs/PDSCHs to the assigned subbands on one carrier or to the assigned carriers. The principle is to ensure nearly equal number of subbands per PUSCH, for example, any one PUSCH occupies at most more than one subband compared to any other PUSCH.
Figure 3 (a) illustrates an embodiment of one DCI format scheduling multiple PUSCHs/PDSCHs with one subband or one carrier per PUSCH/PDSCH according to a preferred embodiment of the subject disclosure. For simplicity, the following content only describes PUSCHs occupying subbands, it should be noted that the embodiment could also apply to PDSCHs occupying subbands, PDSCHs  occupying carriers, and PUSCHs occupying carriers. As explained above, in this subject disclosure, interlaced-based waveform is adopted, therefore, the term "occupy" here means the scheduled PUSCHs use the interlaces in the subband or in the carrier in frequency domain, not use all of the frequency resources in the subband or in the carrier in frequency domain.
In Figure 3 (a) , there are four PUSCHs, which are represented using the  reference numerals  3000, 3001, 3002, and 3003; and there are four subbands, which are represented using the reference numerals 300-0, 300-1, 300-2, and 300-3. In this embodiment, the number of scheduled PUSCH is always equal to the number of assigned subbands. Therefore, it is not necessary to indicate the number of actually scheduled PUSCHs in the UL grant since the number of actually scheduled PUSCHs is equal to the number of assigned subbands. Each scheduled PUSCH is restricted within the region of the associated subband and not across the subband boundary in frequency domain. For example, PUSCH 3000 is restricted within the region of subband 300-0. Rate matching is independently performed for each PUSCH in the associated subband, and LBT is performed independently in each of the assigned subbands. For example, rate matching for PUSCH 3000 is performed in subband 300-0, and LBT for subbands 300-0, 300-1, 300-2, and 300-3 are independently performed.
Figure 3 (b) illustrates an embodiment of one DCI format scheduling multiple PUSCHs/PDSCHs with one or more subbands or one or more carriers per PUSCH/PDSCH according to a preferred embodiment of the subject disclosure. For simplicity, the following content only describes PUSCHs occupying subbands, it should be noted that the embodiment could also apply to PDSCHs occupying subbands, PDSCHs occupying carriers, and PUSCHs occupying carriers.
Suppose there are M subbands and N PUSCHs, and M > N, then one or more scheduled PUSCHs can occupy more than one subband in frequency domain. In this embodiment, the number of actually scheduled PUSCHs, N, is indicated in the UL grant, and is represented using
Figure PCTCN2020075324-appb-000005
bits, wherein N max is the maximum number of schedulable PUSCHs scheduled by a single UL grant, and N max is configured by RRC signaling.
As discussed above, the subject disclosure intends to ensure almost equal number of subbands per PUSCH, and the following three parameters calculated as follows are involved:
x=mod (M, N) ,
Figure PCTCN2020075324-appb-000006
Figure PCTCN2020075324-appb-000007
Each of the first x PUSCHs of the N scheduled PUSCHs occupies y 1 subbands; and each of the remaining N-x PUSCHs occupies y 2 subbands. The first PUSCH occupies the first to the y 1 th subbands, the second PUSCH occupies the (y 1+1)  th to the (2×y 1th subbands, …the x th PUSCH occupies the ( (x-1) ×y 1+1)  th to the (x×y 1th subbands, the (x+1)  th PUSCH occupies the (x×y 1+1)  th to the (x×y 1+y 2th subbands, …and the last PUSCH occupies the last y 2 subbands.
For example, in Figure 3 (b) , the number of subbands M = 4, and the number of PUSCH N = 3, then x = 1, y 1 = 2, y 2 = 1. Therefore, the first one PUSCH occupies two subbands, namely, the PUSCH 3000 occupies subbands 300-0 and 300-1, and the remaining two PUSCHs, PUSCH 3001 and PUSCH 3002, occupy subband 300-2 and subband 300-3 respectively. For another example, assuming M = 8, N = 3, then x = 2, y 1 = 3, y 2 = 2. So each of the first two PUSCHs occupy three subbands, and the last PUSCH occupies the remaining two subbands. More specifically, the first PUSCH occupies the first three subbands, the second PUSCH occupies the next three subbands, and the last PUSCH occupies the last two subbands.
Alternatively, each of the last x PUSCHs of the N scheduled PUSCHs occupies y 1 subbands; and each of the first N-x PUSCHs occupies y 2 subbands. For example, in Figure 3 (c) , the number of subbands M = 4, and the number of PUSCH N = 3, then x = 1, y 1 = 2, y 2 = 1. Therefore, the last PUSCH occupies the last two subbands, namely, the PUSCH 3002 occupies subbands 300-2 and 300-3, and the  first two PUSCHs, PUSCH 3000 and PUSCH 3001, occupy subband 300-0 and subband 300-1 respectively. For another example, assuming M = 8, N = 3, then x = 2, y 1 = 3, y 2 = 2. So each of the last two PUSCHs occupy three subbands, and the remaining PUSCH occupies the remaining two subbands. More specifically, the last PUSCH occupies the last three subbands, the penultimate PUSCH occupies the next three subbands, and the first PUSCH occupies the first two subbands.
Rate matching is independently performed for each PUSCH in one or more associated subbands. LBT is performed independently in each of the assigned subbands. With the above method, almost equal number of subbands per PUSCH is ensured.
It should be noted that it is not reasonable that more than one PUSCHs in frequency domain are scheduled within one subband in the same slot. Therefore, in the subject disclosure, the number of subbands, M, is always greater than or equal to the number of PUSCHs, N, in short: M ≥ N.
In this subject disclosure, for resource mapping, frequency-first time-second manner is performed independently within each scheduled PUSCH on the assigned one or more subbands. The same time domain resource allocation indicated in the UL grant is adopted for each assigned subbands.
Regarding the Transport Block (TB) allocation on the PUSCHs, there are several approaches. In one embodiment, multiple TBs are allocated on multiple scheduled PUSCHs for control signaling overhead reduction, and one TB has an associated PUSCH. Therefore, each TB is carried by the associated PUSCH on the associated subband. New Data Indication (NDI) and Redundancy Version (RV) are present in the UL grant for each of scheduled PUSCHs. Hybrid Automatic Repeat reQuest (HARQ) process ID in the UL grant is applied to the first PUSCH, e.g., the PUSCH on the lowest subband index of the assigned subbands, then HARQ process ID for other scheduled PUSCH are incremented in order, if the index of the PUSCH is over 16, then a modulo 16 operation is performed to the index.
In another embodiment, only one TB is allocated on the multiple scheduled PUSCHs for reliability purpose. RRC signaling is introduced to configure UE the feature of one TB repetition in each assigned subband. When the feature is configured, the UE assumes that one dedicated bit is present in the UL grant or detects UL grant using the new RNTI. Therefore, the single TB has multiple transmission opportunities in frequency domain.
When there is only one of the assigned subbands passes the LBT procedure, the TB would be transmitted only in the subband.
When more than one subbands pass the LBT procedure, the TB might be transmitted with repetition in all the assigned subbands with successful LBT outcome. In other words, the same TB is repeated in the multiple subbands of one carrier so that the transmission reliability can be greatly improved. Alternatively, the TB might be transmitted only in one subband with successful LBT outcome, e.g., the subband may be the subband with the lowest or highest subband index of all the subbands with successful LBT outcome.
For the UL grant scheduling multiple PUSCHs on multiple subbands, the same payload size is maintained compared to the legacy UL grant scheduling single PUSCH on one or more subbands. There are some embodiments to differentiate the two UL grant formats:
The first method uses a new Radio Network Temporary Identity (RNTI) , e.g., MultiPUSCH-on-multiSubbands-RNTI. The new RNTI is used to scramble the CRC of DCI scheduling multiple PUSCHs on multiple subbands.
The second embodiment is implemented with the UL grant indicating the number of actually scheduled PUSCHs. When the UL grant indicates that only one PUSCH is scheduled, it implies that the BS schedules one PUSCH on one or more subbands, which is similar to legacy UL grant; when the UL grant indicates that more than one PUSCH is scheduled, it implies that the BS schedules more than one PUSCH on multiple subbands, which is different to legacy UL grant.
The third approach is accomplished with one dedicated bit in DCI format, which indicates whether the scheduled TB is to be repeated on each of the assigned subbands or to be transmitted on the assigned subbands without repetition in frequency domain.
Another preferred embodiment of the subject disclosure relates to a single DCI format scheduling a single PUSCH/PDSCH on multiple subbands or carriers of unlicensed spectrum. Figure 4 illustrates an embodiment of one DCI format scheduling one PUSCH/PDSCH with TB repetition in each assigned subband or carrier according to a preferred embodiment of the subject disclosure. For simplicity, the following content uses PUSCH and subband as an example.
In Figure 4, the one TB 4000 is dynamically scheduled by one UL grant on single PUSCH occupying more than one subbands: subband 400-0, 400-1, 400-2, and 400-3. The TB 4000 is repeated in each of the assigned subbands: subband 400-0, 400-1, 400-2, and 400-3. Each repetition of the TB is restricted within the region of the associated subband and not across subband boundary in frequency domain. Rate matching is adopted to align the TB resource mapping in each subband. LBT is performed independently in each of the assigned subbands. As long as one of the assigned subbands passes the LBT procedure, the TB would be transmitted in the subband.
When more than one subband passes the LBT procedure, the TB shall be transmitted with repetition in all the assigned subbands with successful LBT outcome. For example, in Figure 4, the four subbands 400-0, 400-1, 400-2, and 400-3 have successful LBT outcome, and the TB 4000 is repeatedly transmitted on the four subbands. In this way, one TB has multiple transmission opportunities in multiple subbands of one carrier and can be repeated in the multiple subbands so that the transmission reliability can be greatly improved. Alternatively, the TB shall be transmitted only in one subband with successful LBT outcome, e.g., this subband can be the subband with the lowest or highest subband index of all the subbands with successful LBT outcome. For instance, in Figure 4, the TB 4000 is transmitted only in subband 400-0.
For one UL grant scheduling single PUSCH carrying one TB repeated in multiple subbands, the same payload size is maintained compared to the legacy UL grant scheduling single PUSCH carrying one TB on one or more subbands. There are several embodiments to differentiate the two UL grant formats.
The first embodiment uses a new RNTI, e.g., TB-repetition-on-multi-subbands-RNTI. The new RNTI is used to scramble the CRC of DCI scheduling single PUSCH for TB repetition on multiple subbands.
The second method uses one dedicated bit in DCI format, which indicates whether the scheduled TB is to be repeated on each of the assigned subbands or to be transmitted on the assigned subbands without repetition in frequency domain.
RRC signaling is introduced to configure UE the feature of one TB repetition in each of assigned subbands. When the feature is configured, the UE assumes the aforementioned dedicated bit is present in the UL grant or detects UL grant using the new RNTI. If only one subband is assigned, then the TB is only transmitted on the assigned subband.
For resource mapping, frequency-first time-second manner is performed independently within each of the assigned subbands. In this way, as long as any one of the assigned subbands passes the LBT, there is 90%probability for the BS to successfully decode the TB. The UL grant indicates the same time domain resource allocation for each assigned subbands.
Still another preferred embodiment of the subject disclosure relates to multiple Configured Grant (CG) -PUSCHs/Semi-Persistent Scheduling (SPS) -PDSCHs on multi-LBT subbands or carriers over unlicensed spectrum, the CG-PUSCHs are configured by RRC signaling. The multiple CG-PUSCHs have the same time domain resource allocation, and the number of the CG-PUSCHs is configured by RRC signaling, which might be 1, 2, 4, 8, 12, 16, 32 etc.
In this embodiment, both the time domain resource and frequency domain resource are configured by RRC. The same time domain resource allocation is adopted for each assigned subbands.
Based on the above frequency domain resource allocation, the subject disclosure proposes a method to map the CG-PUSCHs to the assigned subbands. The principle is to ensure nearly equal number of subbands per CG-PUSCH, that is, any one CG-PUSCH occupies at most more than one subband compared to any other CG-PUSCH.
Figure 3 (a) also illustrates an embodiment of RRC signaling scheduling multiple CG-PUSCHs/SPS-PDSCHs with one subband or one carrier per CG-PUSCH/SPS-PDSCH according to a preferred embodiment of the subject disclosure. For simplicity, the following content only relates to CG-PUSCH occupying one subband, it should be noted that the embodiment could also apply to CG-PUSCH occupying one carrier, SPS-PDSCH occupying one subband and SPS-PDSCH occupying one carrier. In Figure 3 (a) , there are four CG-PUSCHs, which are represented using the  reference numerals  3000, 3001, 3002, and 3003; and there are four subbands, which are represented using the reference numerals 300-0, 300-1, 300-2, and 300-3. In this embodiment, the number of CG-PUSCH is always equal to the number of assigned subbands. Therefore, it is not necessary to indicate the number of configured CG-PUSCHs in the UL grant since the number of CG-PUSCHs is equal to the number of assigned subbands. Each CG-PUSCH is restricted within the region of the associated subband and not across the subband boundary in frequency domain. For example, CG-PUSCH 3000 is restricted within the region of subband 300-0. Rate matching is independently performed for each CG-PUSCH in the associated subband, and LBT is performed independently in each of the assigned subbands. For example, rate matching for CG-PUSCH 3000 is performed in subband 300-0, and LBT for subbands 300-0, 300-1, 300-2, and 300-3 are independently performed.
Figure 3 (b) also illustrates an embodiment of RRC signaling scheduling multiple CG-PUSCHs/SPS-PDSCHs with one or more subbands or one or more carriers per CG-PUSCH/SPS-PDSCH according to a preferred embodiment of the subject disclosure.
Suppose there are M subbands and N CG-PUSCHs, and M > N, then one or more CG-PUSCHs can occupy more than one subband in frequency domain. As  explained above, in this subject disclosure, interlaced-based waveform is adopted, therefore, the term "occupy" means the CG-PUSCHs use the interlaces in the subband in frequency domain, not use all of the frequency resources in the subband in frequency domain.
As discussed above, the subject disclosure intends to ensure almost equal number of subbands per CG-PUSCH, and the following three parameters calculated as follows are involved:
x=mod (M, N) ,
Figure PCTCN2020075324-appb-000008
Figure PCTCN2020075324-appb-000009
Each of the first x CG-PUSCHs of the N CG-PUSCHs occupies y 1 subbands; and each of the remaining N-x CG-PUSCHs occupies y 2 subbands. The first CG-PUSCH occupies the first to the y 1 th subbands, the second CG-PUSCH occupies the (y 1+1)  th to the (2×y 1th subbands, …the x th CG-PUSCH occupies the ( (x-1) ×y 1+1)  th to the (x×y 1th subbands, the (x+1)  th CG-PUSCH occupies the (x×y 1+1)  th to the (x×y 1+y 2th subbands, …and the last CG-PUSCH occupies the last y 2 subbands.
For example, in Figure 3 (b) , the number of subbands M = 4, and the number of CG-PUSCH N = 3, then x = 1, y 1 = 2, y 2 = 1. Therefore, the first one CG-PUSCH occupies two subbands, namely, the CG-PUSCH 3000 occupies subbands 300-0 and 300-1, and the remaining two CG-PUSCHs, CG-PUSCH 3001 and CG-PUSCH 3002, occupy subband 300-2 and subband 300-3 respectively. For another example, assuming M = 8, N = 3, then x = 2, y 1 = 3, y 2 = 2. So each of the first two CG-PUSCHs occupy three subbands, and the last PUSCH occupies the remaining two subbands. More specifically, the first CG-PUSCH occupies the first three subbands, the second PUSCH occupies the next three subbands, and the last PUSCH occupies the last two subbands.
Alternatively, each of the last x CG-PUSCHs of the N CG-PUSCHs occupies y 1 subbands; and each of the first N-x CG-PUSCHs occupies y 2 subbands. For example, in Figure 3 (c) , the number of subbands M = 4, and the number of CG-PUSCH N = 3, then x = 1, y 1 = 2, y 2 = 1. Therefore, the last CG-PUSCH occupies two subbands, namely, the CG-PUSCH 3002 occupies subbands 300-2 and 300-3, and the first two CG-PUSCHs, CG-PUSCH 3000 and CG-PUSCH 3001, occupy subband 300-0 and subband 300-1 respectively. For another example, assuming M = 8, N = 3, then x = 2, y 1 = 3, y 2 = 2. So each of the last two CG-PUSCHs occupy three subbands, and the first CG-PUSCH occupies the first two subbands.
Rate matching is independently performed for each CG-PUSCH in one or more associated subbands. LBT is performed independently in each of the assigned subbands. With the above method, almost equal number of subbands per CG-PUSCH is ensured.
It should be noted that it not reasonable that more than one CG-PUSCHs in frequency domain are configured within one subband in the same slot. Therefore, in the subject disclosure, the number of subbands , M, is always greater than or equal to the number of CG-PUSCHs, N, in short: M ≥ N.
In this subject disclosure, for resource mapping, frequency-first time-second manner is performed independently within each configured CG-PUSCH on the assigned one or more subbands. The same time domain resource allocation indicated in the UL grant is adopted for each assigned subbands.
Regarding the Transport Block (TB) allocation on the configured CG-PUSCHs, there are several approaches. In one embodiment, multiple TBs are allocated on multiple CG-PUSCHs for control signaling overhead reduction. Therefore, each TB is carried by the associated CG-PUSCH on the associated subband. HARQ process ID, New Data Indication (NDI) and Redundancy Version (RV) are present in the CG-UCI for each of configured CG-PUSCHs.
In another embodiment, only one TB is allocated on the multiple configured CG-PUSCHs for reliability purpose. RRC signaling is introduced to  configure UE the feature of one TB repetition in each assigned subband. When the feature is configured, the UE assumes that one dedicated bit is present in the UL grant or detects UL grant using the new RNTI. Therefore, the single TB has multiple transmission opportunities in frequency domain.
When there is only one of the assigned subbands passes the LBT procedure, the TB would be transmitted only in the subband.
When more than one subbands pass the LBT procedure, the TB might be transmitted with repetition in all the assigned subbands with successful LBT outcome. In other words, the same TB is repeated in the multiple subbands of one carrier so that the transmission reliability can be greatly improved. Alternatively, the TB might be transmitted only in one subband with successful LBT outcome, e.g., the subband can be the subband with the lowest or highest subband index of all the subbands with successful LBT outcome.
Yet another preferred embodiment of the subject disclosure relates to a single CG-PUSCH/SPS-PDSCH on multi-LBT subbands over unlicensed spectrum, and the CG-PUSCH is configured by RRC signaling.
In Figure 4, one CG-PUSCH is configured on more than one subbands: subbands 400-0, 400-1, 400-2, and 400-3, and one TB 4000 is repeated in each of the assigned subbands: subband 400-0, 400-1, 400-2, and 400-3. Each repetition of the TB is restricted within the region of the associated subband and not across subband boundary in frequency domain. Rate matching is adopted to align the TB resource mapping in each subband. LBT is performed independently in each of the assigned subbands. As long as one of the assigned subbands passes the LBT procedure, the TB would be transmitted in the subband.
When more than one subband passes the LBT procedure, the TB shall be transmitted with repetition in all the assigned subbands with successful LBT outcome. For example, in Figure 4, the four subbands 400-0, 400-1, 400-2, and 400-3 have successful LBT outcome, and the TB 4000 is repeatedly transmitted on the four subbands. In this way, one TB has multiple transmission opportunities in  multiple subbands of one carrier and can be repeated in the multiple subbands so that the transmission reliability can be greatly improved. Alternatively, the TB shall be transmitted only in one subband with successful LBT outcome, e.g., this subband can be the subband with the lowest or highest subband index of all the subbands with successful LBT outcome. For instance, in Figure 4, the TB 4000 is transmitted only in subband 400-0.
For resource mapping, frequency-first time-second manner is performed independently within each of the assigned subbands. In this way, as long as any one of the assigned subbands passes the LBT, there is 90%probability for the BS to successfully decode the TB. The UL grant indicates the same time domain resource allocation for each assigned subbands.
Figure 5 illustrates a method performed by a UE for wireless communication according to a preferred embodiment of the subject disclosure. In step 501, the UE receives a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with the same time domain resource. For example, in Figure 3 (a) , the UE receives Downlink Control Information (DCI) , i.e., UL grants, which schedules three PUSCHs on four subbands on one carrier or four carriers. For another example, the UE may receive RRC signaling, which configures the maximum number of the PUSCHs or configures the number of CG-PUSCHs. In step 502, the UE transmits one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources. For example, in Figure 3 (a) , the UE transmits three PUSCHs on four subbands or four carriers. The UE may transmits less than three PUSCHs on the four subbands or four carriers.
In one embodiment, the DCI includes an indicator indicating a value of the first number. The maximum number of schedulable PUSCHs by the DCI is configured by RRC signaling. In other words, the number of actually scheduled PUSCHs is indicated in the UL grant, which requires
Figure PCTCN2020075324-appb-000010
bits, wherein N max is the RRC configured maximum number of schedulable PUSCHs by the single UL grant.
In this disclosure, the number of the PUSCHs is not larger than the number of the subbands on one carrier or the number of the carriers. Therefore, one or more scheduled PUSCHs may occupy more than one subband in frequency domain. In order to ensure nearly equal number of subbands or carriers per PUSCH, one mapping rule between the subbands or carriers and the PUSCHs is as follows:
Assuming there are M subbands or carriers and N PUSCHs, then each of a first x PUSCHs of the N PUSCHs is transmitted on y 1 subbands or carriers of the M subbands or carriers, and each of the remaining PUSCHs of the N PUSCHs is transmitted on y 2 subbands or carriers of the M subbands or carriers, wherein x is equal to a remainder of M divided by N, y 1 is determined by rounding up a quotient of M divided by N, and y 2 is determined by rounding down the quotient. For example, in Figure 3 (b) , the number of subbands M = 4, and the number of CG-PUSCH N = 3, then x = 1, y 1 = 2, y 2 = 1. Therefore, the first one CG-PUSCH occupies two subbands, namely, the CG-PUSCH 3000 occupies subbands 300-0 and 300-1, and the remaining two CG-PUSCHs, CG-PUSCH 3001 and CG-PUSCH 3002, occupy subband 300-2 and subband 300-3 respectively.
Another mapping rule between the subbands or carriers and the PUSCHs is as follows: each of a last x PUSCHs of the N PUSCHs is transmitted on y 1 subbands or carriers of the M subbands or carriers, and each of the first N-x PUSCHs of the N PUSCHs is transmitted on y 2 subbands or carriers of the M subbands or carriers, wherein x is equal to a remainder of M divided by N, y 1 is determined by rounding up a quotient of M divided by N, and y 2 is determined by rounding down the quotient. For example, in Figure 3 (c) , the number of subbands M = 4, and the number of CG-PUSCH N = 3, then x = 1, y 1 = 2, y 2 = 1. Therefore, the last CG-PUSCH occupies two subbands, namely, the CG-PUSCH 3002 occupies subbands 300-2 and 300-3, and the remaining CG-PUSCHs, CG-PUSCH 3000 and CG-PUSCH 3001, occupy subband 300-0 and subband 300-1 respectively.
In another embodiment, the number of the PUSCHs is equal to the number of the subbands on one carrier or the number of the carriers. Each PUSCH is transmitted on the associated subband or carrier.
As to the TB allocation on the scheduled PUSCHs, each of the first number of PUSCHs may carry a corresponding TB, or the same TB.
In one embodiment, the CRC of the DCI is scrambled by a new RNTI, e.g., MultiPUSCH-on-multiSubbands-RNTI, the new RNTI is configured by RRC signaling.
In another embodiment, the signal includes a dedicated bit, which indicates whether a TB is to be repeated on each of the assigned subbands with a successful LBT outcome or transmitted on the assigned subbands without repetition in frequency domain with a successful LBT outcome. For example, in Figure 4, the TB 4000 is repeatedly transmitted on subband 400-0, 400-1, 400-2, and 4003.
In yet another embodiment, the signal schedules one PUSCH on the subbands with one TB repeatedly transmitted on each subband of the subbands.
Figure 6 illustrates another method performed by a UE for wireless communication according to a preferred embodiment of the subject disclosure.
In step 601, the UE receives a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource. For example, in Figure 3 (a) , the UE receives Downlink Control Information (DCI) , i.e., DL grants, which schedules three PDSCHs on four subbands on one carrier or four carriers. For another example, the UE may receive RRC signaling, which configures the maximum number of the schedulable PDSCHs by single DL grant or configures the number of SPS-PDSCHs. In step 502, the UE receives one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources. For example, in Figure 3 (a) , the UE receives three PDSCHs on four subbands or four carriers. The UE may receive less than three PDSCHs on the four subbands or four carriers.
In one embodiment, the DCI includes an indicator indicating a value of the first number. The maximum number of schedulable PDSCHs by the DCI is configured by RRC signaling. In other words, the number of actually scheduled  PDSCHs is indicated in the DL grant, which requires
Figure PCTCN2020075324-appb-000011
bits, wherein N max is the RRC configured maximum number of schedulable PDSCHs by the single DL grant.
In this disclosure, the number of the PDSCHs is not larger than the number of the subbands on one carrier or the number of the carriers. Therefore, one or more scheduled PDSCHs may occupy more than one subband in frequency domain. In order to ensure nearly equal number of subbands or carriers per PDSCH, one mapping rule between the subbands or carriers and the PDSCHs is as follows:
Assuming there are M subbands or carriers and N PDSCHs, then each of a first x PDSCHs of the N PDSCHs is transmitted on y 1 subbands or carriers of the M subbands or carriers, and each of the remaining PDSCHs of the N PDSCHs is transmitted on y 2 subbands or carriers of the M subbands or carriers, wherein x is equal to a remainder of M divided by N, y 1 is determined by rounding up a quotient of M divided by N, and y 2 is determined by rounding down the quotient. For example, in Figure 3 (b) , the number of subbands M = 4, and the number of PDSCH N = 3, then x = 1, y 1 = 2, y 2 = 1. Therefore, the first one PDSCH occupies two subbands, namely, the PDSCH 3000 occupies subbands 300-0 and 300-1, and the remaining two PDSCHs, PDSCH 3001 and PDSCH 3002, occupy subband 300-2 and subband 300-3 respectively.
Another mapping rule between the subbands or carriers and the PDSCHs is as follows: each of a last x PDSCHs of the N PDSCHs is transmitted on y 1 subbands or carriers of the M subbands or carriers, and each of the remaining PDSCHs of the N PDSCHs is transmitted on y 2 subbands or carriers of the M subbands or carriers, wherein x is equal to a remainder of M divided by N, y 1 is determined by rounding up a quotient of M divided by N, and y 2 is determined by rounding down the quotient. For example, in Figure 3 (c) , the number of subbands M = 4, and the number of PDSCH N = 3, then x = 1, y 1 = 2, y 2 = 1. Therefore, the last PDSCH occupies two subbands, namely, the PDSCH 3002 occupies subbands 300-2 and 300-3, and the remaining PDSCHs, PDSCH 3000 and PDSCH 3001, occupy subband 300-0 and subband 300-1 respectively.
In another embodiment, the number of the PDSCHs is equal to the number of the subbands on one carrier or the number of the carriers. Each PDSCH is transmitted on the associated subband or carrier.
As to the TB allocation on the scheduled PDSCHs, each of the first number of PDSCHs may carry a corresponding TB, or the same TB.
In one embodiment, the CRC of the DCI is scrambled by a new RNTI, e.g., MultiPDSCH-on-multiSubbands-RNTI, and the new RNTI is configured by RRC signaling.
In another embodiment, the signal includes a dedicated bit, which indicates whether a TB is to be repeated on each of the assigned subbands with a successful LBT outcome or transmitted on the assigned subbands without repetition in frequency domain with a successful LBT outcome. For example, in Figure 4, the TB 4000 is repeatedly transmitted on subband 400-0, 400-1, 400-2, and 4003.
In yet another embodiment, the signal schedules one PDSCH on the subbands with one TB repeatedly transmitted on each subband of the subbands.
Figure 7 illustrates a method performed by a BS for wireless communication according to a preferred embodiment of the subject disclosure.
In step 701, the BS transmits a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource. For example, in Figure 3 (a) , the BS transmits Downlink Control Information (DCI) , i.e., UL grants, which schedules three PUSCHs on four subbands on one carrier or four carriers. For another example, the BS may transmit RRC signaling, which configures the maximum number of the PUSCHs or configures the number of CG-PUSCHs. In step 702, the BS receives one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources. For example, in Figure 3 (a) , the BS receives three PUSCHs on four subbands or four carriers. The BS may receive less than three PUSCHs on the four subbands or four carriers.
Figure 8 illustrates another method performed by a BS for wireless communication according to a preferred embodiment of the subject disclosure.
In step 801, the BS transmits a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource. For example, in Figure 3 (a) , the BS transmits Downlink Control Information (DCI) , i.e., DL grants, which schedules three PDSCHs on four subbands on one carrier or four carriers. For another example, the BS may transmit RRC signaling, which configures the maximum number of the PDSCHs or configures the number of SPS-PDSCHs. In step 802, the BS transmits one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources. For example, in Figure 3 (a) , the BS transmits three PDSCHs on four subbands or four carriers. The BS may transmits less than three PDSCHs on the four subbands or four carriers.
Figure 9 illustrates a block diagram of a UE according to the embodiments of the subject disclosure. The UE 101 may include a receiving circuitry, a processor, and a transmitting circuitry. In one embodiment, the UE 101 may include a non-transitory computer-readable medium having stored thereon computer-executable instructions; a receiving circuitry; a transmitting circuitry; and a processor coupled to the non-transitory computer-readable medium, the receiving circuitry and the transmitting circuitry.
The computer executable instructions can be programmed to implement a method (e.g. the method in Figure 5) with the receiving circuitry, the transmitting circuitry and the processor. That is, upon performing the computer executable instructions, the receiving circuitry may receive, a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and the transmitting circuitry transmits one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
The computer executable instructions can be programmed to implement another method (e.g. the method in Figure 6) with the receiving circuitry, the  transmitting circuitry and the processor. That is, upon performing the computer executable instructions, the receiving circuitry may receive, a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource; and the receiving circuitry receives one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
Figure 10 illustrates a block diagram of a BS according to the embodiments of the subject disclosure. The BS 102 may include a receiving circuitry, a processor, and a transmitting circuitry. In one embodiment, the BS may include a non-transitory computer-readable medium having stored thereon computer-executable instructions; a receiving circuitry; a transmitting circuitry; and a processor coupled to the non-transitory computer-readable medium, the receiving circuitry and the transmitting circuitry.
The computer executable instructions can be programmed to implement a method (e.g. the method in Figure 7) with the receiving circuitry, the transmitting circuitry and the processor. That is, upon performing the computer executable instructions, the transmitting circuitry may transmit, a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource, and the receiving circuitry may receive one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
The computer executable instructions can be programmed to implement a method (e.g. the method in Figure 8) with the receiving circuitry, the transmitting circuitry and the processor. That is, upon performing the computer executable instructions, the transmitting circuitry may transmit, a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource, and the transmitting circuitry may transmit one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
The method of the present disclosure can be implemented on a programmed processor. However, the controllers, flowcharts, and modules may also be implemented on a general purpose or special purpose computer, a programmed microprocessor or microcontroller and peripheral integrated circuit elements, an integrated circuit, a hardware electronic or logic circuit such as a discrete element circuit, a programmable logic device, or the like. In general, any device that has a finite state machine capable of implementing the flowcharts shown in the figures may be used to implement the processing functions of the present disclosure.
While the present disclosure has been described with specific embodiments thereof, it is evident that many alternatives, modifications, and variations will be apparent to those skilled in the art. For example, various components of the embodiments may be interchanged, added, or substituted in the other embodiments. Also, all of the elements shown in each figure are not necessary for operation of the disclosed embodiments. For example, one skilled in the art of the disclosed embodiments would be capable of making and using the teachings of the present disclosure by simply employing the elements of the independent claims. Accordingly, the embodiments of the present disclosure as set forth herein are intended to be illustrative, not limiting. Various changes may be made without departing from the spirit and scope of the present disclosure.
In this disclosure, relational terms such as "first, " "second, " and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. The terms "comprises, " "comprising, " or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. An element proceeded by "a, " "an, " or the like does not, without more constraints, preclude the existence of additional identical elements in the process, method, article, or apparatus that comprises the element. Also, the term "another" is defined as at least a second or more. The terms "including, " "having, " and the like, as used herein, are defined as "comprising. "

Claims (46)

  1. A method for scheduling Physical Uplink Shared Channel (PUSCH) , comprising:
    receiving a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and
    transmitting one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
  2. The method of Claim 1, wherein the signal is a downlink control information (DCI) for scheduling one or more PUSCHs.
  3. The method of Claim 1, wherein the signal is Radio Resource Control (RRC) signaling and the first number of PUSCHs are configured by the RRC signaling.
  4. The method of Claim 1, wherein the second number of frequency resources comprise the second number of subbands on one carrier.
  5. The method of Claim 1, wherein the second number of frequency resources comprise the second number of carriers.
  6. The method of Claim 2, wherein the DCI includes an indicator indicating a value of the first number.
  7. The method of Claim 6, wherein a maximum number of schedulable PUSCHs by the DCI is configured by RRC signaling.
  8. The method of Claim 1, wherein the first number is not larger than the second number.
  9. The method of Claim 8, wherein each of a first x PUSCHs of the first number of PUSCHs is transmitted on y 1 frequency resources of the second number of frequency resources, and each of the remaining PUSCHs of the first number of PUSCHs is transmitted on y 2 frequency resources of the second number of frequency resources, wherein x is equal to a remainder of the second number divided by the first number, y 1 is determined by rounding up a quotient of the second number divided by the first number, and y 2 is determined by rounding down the quotient.
  10. The method of Claim 8, wherein each of a last x PUSCHs of the first number of PUSCHs is transmitted on y 1 frequency resources of the second number of frequency resources, and each of the remaining PUSCHs of the first number of PUSCHs is transmitted on y 2 frequency resources of the second number of frequency resources, wherein x is equal to a remainder of the second number divided by the first number, y 1 is determined by rounding up a quotient of the second number divided by the first number, and y 2 is determined by rounding down the quotient.
  11. The method of Claim 1, wherein the first number is equal to the second number.
  12. The method of Claim 11, wherein each of the first number of PUSCHs is transmitted on an associated frequency resource of the second number of frequency resources.
  13. The method of Claim 1, wherein each of the first number of PUSCHs carries a transport block (TB) .
  14. The method of Claim 1, wherein each of the first number of PUSCHs carries a same TB.
  15. The method of Claim 2, wherein Cyclic Redundancy Check (CRC) of the DCI is scrambled by a new Radio Network Temporary Identifier (RNTI) which is configured by RRC signaling.
  16. The method of Claim 1, wherein the signal comprises one dedicated bit for indicating whether a single TB is to be repeatedly transmitted on each of the second number of frequency resources with a successful Listen Before Talk (LBT) outcome, or to be transmitted on one of the second number of frequency resources with a successful LBT outcome.
  17. The method of claim 1, wherein the signal schedules one PUSCH on the second number of frequency resources with one TB repeatedly transmitted on each of the second number of frequency resources.
  18. A method for scheduling Physical Downlink Shared Channel (PDSCH) , comprising:
    receiving a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource; and
    receiving one or more PDSCHs of the first number of PDSCHs on the second number of frequency resources.
  19. The method of Claim 18, wherein the signal is a downlink control information  (DCI) for scheduling one or more PDSCHs.
  20. The method of Claim 18, wherein the signal is Radio Resource Control (RRC) signaling and the first number of PDSCHs are configured by the RRC signaling.
  21. The method of Claim 18, wherein the second number of frequency resources comprise the second number of subbands on one carrier.
  22. The method of Claim 18, wherein the second number of frequency resources comprise the second number of carriers.
  23. The method of Claim 19, wherein the DCI includes an indicator indicating a value of the first number.
  24. The method of Claim 23, wherein a maximum number of schedulable PDSCHs by the DCI is configured by RRC signaling.
  25. The method of Claim 18, wherein the first number is not larger than the second number.
  26. The method of Claim 25, wherein each of a first x PDSCHs of the first number of PDSCHs is transmitted on y 1 frequency resources of the second number of frequency resources, and each of the remaining PDSCHs of the first number of PDSCHs is transmitted on y 2 frequency resources of the second number of frequency resources, wherein x is equal to a remainder of the second number divided by the first number, y 1 is determined by rounding up a quotient of the second number divided by the first number, and y 2 is determined by rounding down the quotient.
  27. The method of Claim 25, wherein each of a last x PDSCHs of the first number of PDSCHs is transmitted on y 1 frequency resources of the second number of frequency resources, and each of the remaining PDSCHs of the first number of PDSCHs is transmitted on y 2 frequency resources of the second number of frequency resources, wherein x is equal to a remainder of the second number divided by the first number, y 1 is determined by rounding up a quotient of the second number divided by the first number, and y 2 is determined by rounding down the quotient.
  28. The method of Claim 18, wherein the first number is equal to the second number.
  29. The method of Claim 28, wherein each of the first number of PDSCHs is transmitted on an associated frequency resource of the second number of frequency resources.
  30. The method of Claim 18, wherein each of the first number of PDSCHs carries a transport block (TB) .
  31. The method of Claim 18, wherein each of the first number of PDSCHs carries a same TB.
  32. The method of Claim 19, wherein Cyclic Redundancy Check (CRC) of the DCI is scrambled by a new Radio Network Temporary Identifier (RNTI) which is configured by RRC signaling.
  33. The method of Claim 18, wherein the signal comprises one dedicated bit for indicating whether a single TB is to be repeatedly transmitted on each of the second number of frequency resources with a successful Listen Before Talk (LBT) outcome, or to be transmitted on one of the second number of frequency resources with a successful LBT outcome.
  34. The method of claim 18, wherein the signal schedules one PDSCH on the second number of frequency resources with one TB repeatedly transmitted on each of the second number of frequency resources.
  35. A method for scheduling Physical Uplink Shared Channel (PUSCH) ,
    comprising:
    transmitting a signal scheduling a first number of PUSCHs on a second number of frequency resources, wherein the first number of PUSCHs are scheduled with same time domain resource; and
    receiving one or more PUSCHs of the first number of PUSCHs on the second number of frequency resources.
  36. The method of Claim 36, wherein the signal is downlink control information (DCI) for scheduling one or more PUSCHs.
  37. The method of Claim 36, wherein the signal is Radio Resource Control (RRC) signaling and the first number of PUSCHs are configured by the RRC signaling.
  38. The method of Claim 36, wherein the second number of frequency resources comprise the second number of subbands on one carrier.
  39. The method of Claim 36, wherein the second number of frequency resources comprise the second number of carriers.
  40. A method for scheduling Physical Downlink Shared Channel (PDSCH) ,
    comprising:
    transmitting a signal scheduling a first number of PDSCHs on a second number of frequency resources, wherein the first number of PDSCHs are scheduled with same time domain resource; and
    transmitting one or more PDSCHs of the first number of PDSCHs on the second  number of frequency resources.
  41. The method of Claim 41, wherein the signal is a downlink control information (DCI) for scheduling one or more PDSCHs.
  42. The method of Claim 41, wherein the signal is Radio Resource Control (RRC) signaling and the first number of PDSCHs are configured by the RRC signaling.
  43. The method of Claim 41, wherein the second number of frequency resources comprise the second number of subbands on one carrier.
  44. The method of Claim 41, wherein the second number of frequency resources comprise the second number of carriers.
  45. An apparatus, comprising:
    a non-transitory computer-readable medium having stored thereon computer-executable instructions;
    a receiving circuitry;
    a transmitting circuitry; and
    a processor coupled to the non-transitory computer-readable medium, the receiving circuitry and the transmitting circuitry,
    wherein the computer-executable instructions cause the processor to implement the method of any of Claims 1-34.
  46. An apparatus, comprising:
    a non-transitory computer-readable medium having stored thereon computer-executable instructions;
    a receiving circuitry;
    a transmitting circuitry; and
    a processor coupled to the non-transitory computer-readable medium, the receiving circuitry and the transmitting circuitry,
    wherein the computer-executable instructions cause the processor to implement the method of any of Claims 35-44.
PCT/CN2020/075324 2020-02-14 2020-02-14 Method and apparatus for scheduling pusch or pdsch WO2021159484A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN202080096361.4A CN115088338A (en) 2020-02-14 2020-02-14 Method and device for scheduling PUSCH or PDSCH
PCT/CN2020/075324 WO2021159484A1 (en) 2020-02-14 2020-02-14 Method and apparatus for scheduling pusch or pdsch
EP20918833.3A EP4104582A4 (en) 2020-02-14 2020-02-14 Method and apparatus for scheduling pusch or pdsch
US17/792,767 US20230052620A1 (en) 2020-02-14 2020-02-14 Method and apparatus for scheduling pusch or pdsch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2020/075324 WO2021159484A1 (en) 2020-02-14 2020-02-14 Method and apparatus for scheduling pusch or pdsch

Publications (1)

Publication Number Publication Date
WO2021159484A1 true WO2021159484A1 (en) 2021-08-19

Family

ID=77292081

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/075324 WO2021159484A1 (en) 2020-02-14 2020-02-14 Method and apparatus for scheduling pusch or pdsch

Country Status (4)

Country Link
US (1) US20230052620A1 (en)
EP (1) EP4104582A4 (en)
CN (1) CN115088338A (en)
WO (1) WO2021159484A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118574230A (en) * 2023-02-28 2024-08-30 上海朗帛通信技术有限公司 Method and apparatus in a node for wireless communication
WO2024206315A1 (en) * 2023-03-31 2024-10-03 Intel Corporation Systems and methods of dynamic waveform switching for transmission of physical downlink channels

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2579667A1 (en) 2010-05-24 2013-04-10 China Academy of Telecommunications Technology Configuration method and device for transmitting uplink control information (uci)
US20160007357A1 (en) 2013-03-22 2016-01-07 Fujitsu Limited Radio communication method, terminal, and base station
CN107005512A (en) * 2015-09-14 2017-08-01 华为技术有限公司 The method for demodulating uplink information, apparatus and system
WO2018038777A1 (en) 2016-08-22 2018-03-01 Intel IP Corporation Devices and methods for elaa multi-carrier lbt
US20190215104A1 (en) 2018-01-11 2019-07-11 Huawei Technologies Co., Ltd. System and Method for Reliable Transmission over Network Resources
WO2019214676A1 (en) * 2018-05-10 2019-11-14 夏普株式会社 Method executed by user equipment, and user equipment
WO2020030555A1 (en) * 2018-08-10 2020-02-13 Telefonaktiebolaget Lm Ericsson (Publ) Uplink scheduling grant for a plurality of physical uplink shared channels

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2579667A1 (en) 2010-05-24 2013-04-10 China Academy of Telecommunications Technology Configuration method and device for transmitting uplink control information (uci)
US20160007357A1 (en) 2013-03-22 2016-01-07 Fujitsu Limited Radio communication method, terminal, and base station
CN107005512A (en) * 2015-09-14 2017-08-01 华为技术有限公司 The method for demodulating uplink information, apparatus and system
WO2018038777A1 (en) 2016-08-22 2018-03-01 Intel IP Corporation Devices and methods for elaa multi-carrier lbt
US20190215104A1 (en) 2018-01-11 2019-07-11 Huawei Technologies Co., Ltd. System and Method for Reliable Transmission over Network Resources
WO2019214676A1 (en) * 2018-05-10 2019-11-14 夏普株式会社 Method executed by user equipment, and user equipment
WO2020030555A1 (en) * 2018-08-10 2020-02-13 Telefonaktiebolaget Lm Ericsson (Publ) Uplink scheduling grant for a plurality of physical uplink shared channels

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
HUAWEI: "Feature lead summary#2 of HARQ enhancements for NR-U", 3GPP DRAFT; R1-1913418, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Reno, USA; 20191118 - 20191122, 25 November 2019 (2019-11-25), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051830697 *
LG ELECTRONICS: "Discussion on resource allocation and TBS determination", 3GPP DRAFT; R1-1719929, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, 1 December 2017 (2017-12-01), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, pages 1 - 16, XP051369642 *
See also references of EP4104582A4

Also Published As

Publication number Publication date
EP4104582A1 (en) 2022-12-21
EP4104582A4 (en) 2023-11-08
CN115088338A (en) 2022-09-20
US20230052620A1 (en) 2023-02-16

Similar Documents

Publication Publication Date Title
US11832260B2 (en) Control information transmission method and apparatus, resource pool configuration method and apparatus, and communication device
US12074803B2 (en) Contention window size determining method and apparatus
EP3618483B1 (en) Method and apparatus for transmitting uplink control information
US11653362B2 (en) Resource allocation for user equipment
CN110167172B (en) Method and device for transmitting information
CN112534917A (en) User equipment, base station and method for uplink multiplexing
WO2021092902A1 (en) Methods and apparatuses for multiple pusch transmissions on unlicensed spectrum
CN114375053A (en) Data transmission method, terminal equipment and network equipment
CN114270766A (en) User equipment and base station for realizing uplink multiplexing
US20200045733A1 (en) Uplink Scheduling For NR-U
CN110999156A (en) Method and apparatus for autonomous transmission
CN114631388A (en) Channel drop behavior and timing relationships for uplink channel collisions with different priorities
US11991697B2 (en) Method and apparatus for subband based channel access on unlicensed spectrum
WO2021159484A1 (en) Method and apparatus for scheduling pusch or pdsch
WO2018201505A1 (en) Uplink data sending method and apparatus
US20230136550A1 (en) Method and apparatus for uplink resource allocation
US11902215B2 (en) Method and apparatus for resource mapping in unlicensed spectrum
CN109995462B (en) Data transmission format transmission method and device
CN116017487A (en) Wireless communication method, network device and terminal device
US12096450B2 (en) Method and apparatus for resource allocation on unlicensed spectrum
CN109831824B (en) Method, device and system for uplink piggyback transmission
US20230388088A1 (en) Method and apparatus for downlink and uplink transmissions over an unlicensed spectrum
WO2023087299A1 (en) Methods and apparatuses for a resource allocation in a sub-band full duplex scenario
EP4442054A1 (en) Methods and apparatuses of resource allocation for sidelink communication
CN118784181A (en) Communication method and communication device, storage medium, and program product

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20918833

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020918833

Country of ref document: EP

Effective date: 20220914