WO2021003978A1 - Steel valve chamber - Google Patents

Steel valve chamber Download PDF

Info

Publication number
WO2021003978A1
WO2021003978A1 PCT/CN2019/122758 CN2019122758W WO2021003978A1 WO 2021003978 A1 WO2021003978 A1 WO 2021003978A1 CN 2019122758 W CN2019122758 W CN 2019122758W WO 2021003978 A1 WO2021003978 A1 WO 2021003978A1
Authority
WO
WIPO (PCT)
Prior art keywords
valve
fixed
pipe
inlet pipe
welded
Prior art date
Application number
PCT/CN2019/122758
Other languages
French (fr)
Chinese (zh)
Inventor
王静静
Original Assignee
菏泽昊阳设备制造股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 菏泽昊阳设备制造股份有限公司 filed Critical 菏泽昊阳设备制造股份有限公司
Publication of WO2021003978A1 publication Critical patent/WO2021003978A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B9/00Methods or installations for drawing-off water
    • E03B9/02Hydrants; Arrangements of valves therein; Keys for hydrants
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B9/00Methods or installations for drawing-off water
    • E03B9/02Hydrants; Arrangements of valves therein; Keys for hydrants
    • E03B9/04Column hydrants
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Definitions

  • the invention relates to the technical field of valve wells, in particular to a valve well made of steel.
  • valve wells are valves for underground pipelines and underground pipelines. It is convenient to open and close part of the pipe network operation or maintenance operations. Just set up a well similar to a small room and install valves and other valves in this well. This well is called a valve well.
  • a valve well must have a valve, but if there are valves, there must be valves. There must be a valve well.
  • the existing valve well has a single function. It is not easy to clean up the internal water. The valve well is easily affected by groundwater and weather, and is prone to water leakage and water seepage. It is easy to cause equipment aging and rust. In addition, it is inconvenient for maintenance personnel to enter for maintenance and inspection, and cannot meet the needs of use. Therefore, we proposed a steel valve well to solve the above problems.
  • the present invention proposes a steel valve well.
  • a steel valve well proposed by the present invention includes a valve well body provided at the top of the pit body for opening.
  • the top of the valve well body is welded with a manhole cover, and the inner wall of the bottom of the valve well body is welded.
  • the top of the support plate is provided with a plurality of water seepage holes.
  • the first gate valve is provided above the support plate, and one end of the first gate valve is screwed with a first Double-headed flange, the other side of the first gate valve is connected and fixed with a three-way.
  • the ends of the three-way and the first double-headed flange that are far from each other are threadedly fixed with a first single flange, and the two first single flanges are respectively
  • the fixed sleeve is provided with a water inlet pipe and a water outlet pipe.
  • the ends of the water inlet pipe and the water outlet pipe far away from each other extend outside the valve well body.
  • the water inlet pipe and the water outlet pipe are both fixedly sleeved with a second single flange, the water inlet pipe and the water outlet pipe.
  • the upper movable sleeves are provided with positioning sleeves
  • the valve well body is fixedly sleeved on two positioning sleeves
  • the sides of the two second single flanges away from each other are screwed to the corresponding positioning sleeves
  • the first gate valve is provided with
  • the valve stem the top of the valve stem is threadedly fixed with an extension rod
  • the top of the extension rod extends to the top of the well cover and is welded with a handle
  • the water inlet pipe is provided with various instruments
  • the top of the tee is threaded with a second gate valve
  • the top of the second gate valve is threadedly fixed with a connecting pipe
  • the connecting pipe is provided with an automatic drain valve
  • the top of the connecting pipe is threaded with a second double-headed flange
  • the top of the second double-headed flange is threadedly fixed with the top of the manhole cover.
  • the third single flange is in contact, and the inner fixed sleeve of the third single flange is provided with a fire hydrant.
  • the fire hydrant is provided with a suction port, a first hose interface and a second hose interface, and one side of the fire hydrant is provided There is a flexible water stop. The bottom end of the flexible water stop extends below the well cover and is connected and fixed with a conduit. The bottom end of the conduit extends below the support plate.
  • the support plate is fixedly sleeved on the conduit and the manhole cover is fixedly sleeved
  • the top of the flexible water stop is connected and fixed with a water pump elbow joint, and a manned ladder is welded on the inner wall of one side of the valve well body, and a maintenance inlet pipe is arranged above the man ladder, and the manhole cover is fixedly sleeved in
  • a pipe cover is installed on the top side of the maintenance inlet pipe, and the bottom of the pipe cover is in movable contact with the top of the maintenance inlet pipe.
  • the inner walls of both sides of the valve well body are provided with first through holes, and the side walls of the first through holes are welded and fixed to the outside of the corresponding positioning sleeve.
  • the top of the manhole cover is provided with a second through hole, and the side wall of the second through hole is welded and fixed to the outside of the maintenance inlet pipe.
  • the top of the well cover is provided with a first circular hole, and the side wall of the first circular hole is in movable contact with the outside of the extension rod.
  • a second circular hole is opened on the inner wall of the top of the manhole cover, and the side wall of the second circular hole is in movable contact with the outside of the fire hydrant.
  • the top of the manhole cover is provided with a third through hole, and the side wall of the third through hole is adhesively fixed to the outer side of the flexible water stop.
  • a third circular hole is opened on the top of the support plate, and the side wall of the third circular hole is fixedly connected to the outside of the pipe.
  • one side of the second single flange is provided with a fourth round hole, and the outer sides of the water inlet pipe and the water outlet pipe are respectively welded and fixed to the side walls of the corresponding fourth round hole.
  • the two positioning sleeves are welded with a plurality of screws at the ends close to each other, one side of the second single flange is provided with a plurality of through holes, one end of the screw penetrates the corresponding through holes, and the screw is threadedly connected with a fastening bolt , The fastening screw ring is in contact with the side of the corresponding second single flange close to the first gate valve.
  • valve well body Through the valve well body, manhole cover, support rod, support plate, first gate valve, positioning sleeve, water outlet pipe, extension rod, handle, tee, water inlet pipe, various instruments, second gate valve, connecting pipe, automatic drain valve, The second double-headed flange, fire hydrant, first hose interface, water suction port, second hose interface, conduit, flexible water stop, water pump elbow joint, maintenance inlet pipe, pipe cover, man ladder, valve well
  • the water permeated in the body flows into the bottom of the support plate through the water seepage hole and is pumped through the external water pump to connect the water pump elbow joint, so that the accumulated water is drawn out through the pipe, the flexible water stop and the water pump elbow joint in turn.
  • the extension rod is set up to facilitate the outside Control the opening and closing of the first gate valve.
  • the installation of the maintenance inlet pipe and the man ladder is convenient for maintenance personnel to enter the valve well body.
  • the installation of various instruments is convenient for maintenance personnel to observe and record.
  • the water enters the fire hydrant through the tee, the second gate valve, the connecting pipe and the second double-headed flange to supply water for it, so as to achieve the integration of normal water supply and fire protection, and improve its utilization rate and use function.
  • the invention has reasonable design, is convenient for draining the accumulated water in the valve well body, convenient for maintenance personnel to enter and climb out of the valve well body for inspection records, and is convenient for opening the second gate valve to supply water to the fire hydrant when used for fire fighting, achieving the integration of normal water supply and fire fighting , To improve its utilization and use functions to meet the needs of use.
  • Figure 1 is a structural schematic diagram of a steel valve well proposed by the present invention
  • Figure 2 is a schematic sectional view of a steel valve well proposed by the present invention.
  • Figure 3 is a schematic view of the structure of part A of a steel valve well proposed by the present invention.
  • Fig. 4 is a schematic diagram of the sectional structure of part B of a steel valve well proposed by the present invention.
  • Fig. 5 is a schematic diagram of the sectional structure of part C of a steel valve well proposed by the present invention.
  • valve well body 1 valve well body, 2 well cover, 3 support rod, 4 support plate, 5 first gate valve, 6 first double-end flange, 7 first single flange, 8 positioning sleeve, 9 outlet pipe, 10 extension rod , 11 handles, 12 three-way, 13 water inlet pipe, 14 various instruments, 15 second gate valve, 16 connecting pipe, 17 automatic drain valve, 18 second double flange, 19 fire hydrant, 20 first hose interface , 21 suction port, 22 second hose interface, 23 conduit, 24 flexible water stop, 25 water pump elbow joint, 26 maintenance inlet pipe, 27 pipe cover, 28 person ladder, 29 third single flange, 30 second single Flange.
  • this embodiment proposes a steel valve well, which includes a valve well body 1 with an opening on the top of the pit.
  • the top of the valve well body 1 is welded with a well cover 2, and the valve well body 1
  • a plurality of support rods 3 are welded on the inner wall of the bottom of the support rod 3, and the same support plate 4 is placed on the top of the support rods 3.
  • the top of the support plate 4 is provided with a plurality of water seepage holes, and a first gate valve is provided above the support plate 4 5.
  • first gate valve 5 is threadedly fixed with a first double-headed flange 6, and the other side of the first gate valve 5 is connected and fixed with a tee 12, and the end of the tee 12 and the first double-headed flange 6 away from each other Both are threadedly fixed with a first single flange 7.
  • the two first single flanges 7 are respectively fixedly sleeved with a water inlet pipe 13 and a water outlet pipe 9, and the ends of the water inlet pipe 13 and the water outlet pipe 9 far away from each other extend to the valve well body 1.
  • the inlet pipe 13 and the outlet pipe 9 are fixedly sleeved with a second single flange 30, the inlet pipe 13 and the outlet pipe 9 are movable sleeves with positioning sleeves 8, and the valve well body 1 is fixedly sleeved on two On the positioning sleeve 8, the sides of the two second single flanges 30 away from each other are screwed to the corresponding positioning sleeve 8.
  • the first gate valve 5 is provided with a valve stem, and the top of the valve stem is threadedly fixed with an extension rod 10, the extension rod
  • the top of 10 extends to the top of the manhole cover 2 and is welded with a handle 11, various meters 14 are provided on the water inlet pipe 13, a second gate valve 15 is screwed on the top of the tee 12, and a connecting pipe is screwed on the top of the second gate valve 15 16.
  • the connecting pipe 16 is provided with an automatic drain valve 17, the top of the connecting pipe 16 is threadedly fixed with a second double-headed flange 18, and the top of the second double-headed flange 18 is threadedly fixed with a third threaded contact with the top of the manhole cover 2.
  • a single flange 29, and a fire hydrant 19 is fixed in the third single flange 29.
  • the fire hydrant 19 is provided with a suction port 21, a first hose interface 20 and a second hose interface 22, one of the fire hydrant 19
  • a flexible water stop 24 is provided on the side. The bottom end of the flexible water stop 24 extends below the well cover 2 and is connected and fixed with a conduit 23.
  • the bottom end of the conduit 23 extends below the support plate 4, and the support plate 4 is fixedly sleeved
  • the manhole cover 2 is fixedly sleeved on the flexible water stopper 24, the top of the flexible water stopper 24 is connected and fixed with a water pump elbow joint 25, and one side of the inner wall of the valve well body 1 is welded with a human ladder 28 and a human ladder 28
  • a maintenance inlet pipe 26 is provided above the manhole cover 2 and the manhole cover 2 is fixedly sleeved on the maintenance inlet pipe 26.
  • a pipe cover 27 is installed on the top side of the maintenance inlet pipe 26.
  • the bottom of the pipe cover 27 is in movable contact with the top of the maintenance inlet pipe 26
  • the present invention has reasonable design, is convenient for draining the accumulated water in the valve well body 1, is convenient for maintenance personnel to enter and climb out of the valve well body 1 for inspection records, and is convenient for opening the second gate valve 15 to supply water to the fire hydrant 19 during fire fighting. Achieve the integration of normal water supply and fire protection, improve its utilization and use functions, and meet use needs.
  • the inner walls of both sides of the valve well body 1 are provided with first through holes, and the side walls of the first through holes are welded and fixed to the outside of the corresponding positioning sleeve 8, and the top of the manhole cover 2 is provided with a second through hole.
  • the side wall of the second through hole is welded and fixed to the outer side of the maintenance inlet pipe 26, the top of the manhole cover 2 is provided with a first circular hole, and the side wall of the first circular hole is in movable contact with the outer side of the extension rod 10, the manhole cover 2
  • a second round hole is provided on the inner wall of the top of the second round hole, and the side wall of the second round hole is in movable contact with the outside of the fire hydrant 19.
  • the outer side of the water tank 24 is glued and fixed, the top of the support plate 4 is provided with a third circular hole, and the side wall of the third circular hole is fixedly connected with the outer side of the pipe 23, and the second single flange 30 is provided with a fourth
  • the outer sides of the round hole, the water inlet pipe 13 and the water outlet pipe 9 are respectively welded and fixed to the side wall of the corresponding fourth round hole.
  • the two positioning sleeves 8 are welded with a plurality of screws at the ends close to each other.
  • One of the second single flange 30 A plurality of through holes are provided on the side, one end of the screw penetrates the corresponding through hole, a fastening bolt is threaded on the screw, and the fastening screw ring is in contact with the side of the corresponding second single flange 30 close to the first gate valve 5,
  • the invention has reasonable design, is convenient for draining the accumulated water in the valve well body 1, is convenient for maintenance personnel to enter and climb out of the valve well body 1 for inspection records, and is convenient for opening the second gate valve 15 to supply water to the fire hydrant 19 when used for fire fighting.
  • the normal water supply and fire protection are integrated to improve its utilization and use functions to meet the use needs.
  • the water in the valve well body 1 when water accumulates in the valve well body 1, the water flows under the support plate 4 through the seepage holes on the support plate 4.
  • the water pump elbow joint 25 When there is a lot of water under the support plate 4, connect the water pump elbow joint 25 through the external pump
  • the water in the valve well body 1 enters the flexible water stop 24 through the conduit 23, and then enters the water pump elbow joint 25 through the flexible water stop 24, and then is pumped out by the pump, so that the water in the valve well body 1 can be easily discharged.
  • the setting of the extension rod 10 is convenient for controlling the opening and closing of the first gate valve 5 from the outside, which improves the opening and closing efficiency of the first gate valve 5.
  • the setting of the maintenance inlet pipe 26 is convenient for maintenance personnel to open the pipe cover 27 to enter the valve well body In 1, the entering maintenance personnel can easily go down to the inner bottom of the valve well body 1 through the human ladder 28, and it is convenient for the maintenance personnel to climb out through the human ladder 28.
  • the setting of various instruments 14 is convenient for the maintenance personnel to observe and record.
  • the second gate valve 15 Set when firefighters enter the valve well body 1 during fire fighting, open the second gate valve 15 to allow the water in the inlet pipe 13 to enter the connecting pipe 16 through the tee 12 and the second gate valve 15, and then enter the connecting pipe 16.
  • the second double-headed flange 18 enters the fire hydrant 19 through the second double-headed flange 18, so as to supply water for the fire hydrant 19, which can be used for fire fighting, improve its utilization rate, and achieve the integration of normal water supply and fire fighting. , Improve its use function.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mechanically-Actuated Valves (AREA)
  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

Disclosed in the present invention is a steel valve chamber, comprising a valve chamber body arranged in a pit, a top portion of said chamber being configured as an opening. A chamber cover is welded to the top portion of the valve chamber body, and a plurality of support rods are welded to an inner wall of a bottom portion of the valve chamber, a same support plate being placed at the top ends of the plurality of support rods, and a plurality of water seepage holes being opened in a top portion of the support plate. A first gate valve is provided above the support plate, and a first double flange is screwed and fixed on a first end of the first gate valve, a Y-joint being communicated with and fixedly provided on the other side of the first gate valve. First single flanges are screwed and fixed on the ends of the Y-joint and of the first double flange away from one another. The present invention features a reasonable design, facilitates expulsion of water that has collected inside the valve chamber, facilitates maintenance personnel entering and climbing out of the valve chamber for inspection and recording, and facilitates opening of a second gate valve during firefighting usage to provide water to a fire hydrant, achieving integration of normal water supply and firefighting water supply, improving the utilization rate and usage functions thereof, and satisfying usage requirements.

Description

一种钢制的阀门井A steel valve well 技术领域Technical field
本发明涉及阀门井技术领域,尤其涉及一种钢制的阀门井。The invention relates to the technical field of valve wells, in particular to a valve well made of steel.
背景技术Background technique
随着社会的发展,科学的进步社会中出现了大量的阀门井,钢制的阀门井固定思议既是为钢铁材质制作成的阀门井,阀门井是地下管线及地下管道的阀门,为了在需要进行开启和关闭部分管网操作或者检修作业时方便,就设置类似小房间的一个井,将阀门等安装布置在这个井里,这个井就叫阀门井,有阀门井必定有阀门,但有阀门不一定有阀门井,现有的阀门井功能单一,其不便于对内部积水进行清理,阀门井易受到地下水和天气影响,容易出现漏水、渗水的现象,容易造成设备老化和生锈的弊端,且维修人员不便于进入维修检查,不能满足使用需求,因此我们提出了一种钢制的阀门井用于解决上述问题。With the development of society and the progress of science, a large number of valve wells have appeared in the society. The fixed idea of steel valve wells is not only a valve well made of steel materials, and valve wells are valves for underground pipelines and underground pipelines. It is convenient to open and close part of the pipe network operation or maintenance operations. Just set up a well similar to a small room and install valves and other valves in this well. This well is called a valve well. A valve well must have a valve, but if there are valves, there must be valves. There must be a valve well. The existing valve well has a single function. It is not easy to clean up the internal water. The valve well is easily affected by groundwater and weather, and is prone to water leakage and water seepage. It is easy to cause equipment aging and rust. In addition, it is inconvenient for maintenance personnel to enter for maintenance and inspection, and cannot meet the needs of use. Therefore, we proposed a steel valve well to solve the above problems.
发明概述Summary of the invention
技术问题technical problem
基于背景技术存在的技术问题,本发明提出了一种钢制的阀门井。Based on the technical problems existing in the background art, the present invention proposes a steel valve well.
问题的解决方案The solution to the problem
技术解决方案Technical solutions
本发明提出的一种钢制的阀门井,包括设置在坑体内的顶部为开口设置的阀门井本体,所述阀门井本体的顶部焊接有井盖,所述阀门井本体的底部内壁上焊接有多个支撑杆,且多个支撑杆的顶端放置有同一个支撑板,支撑板的顶部开设有多个渗水孔,支撑板的上方设有第一闸阀,且第一闸阀的一端螺纹固定有第一双头法兰,第一闸阀的另一侧连通并固定有三通,三通和第一双头法兰相互远离的一端均螺纹固定有第一单法兰,两个第一单法兰内分别固定套设有进水管和出水管,进水管和出水管相互远离的一端均延伸至阀门井本体外,所述进水管和出水管上均固定套设有第二单法兰,进水管和出水管上均活动套设有定位套,阀门井本体固定套设在两个定位套上,两个第二单法兰相互远离的一 侧分别与对应的定位套螺纹固定,所述第一闸阀设有阀杆,阀杆的顶端螺纹固定有延长杆,延长杆的顶端延伸至井盖的上方并焊接有把手,所述进水管上设有各类仪表,所述三通的顶端螺纹固定有第二闸阀,第二闸阀的顶端螺纹固定有连接管,连接管上设置有自动泄水阀,连接管的顶端螺纹固定有第二双头法兰,第二双头法兰顶部螺纹固定有与井盖顶部活动接触的第三单法兰,且第三单法兰内固定套设有消防栓,消防栓上设置有吸水口、第一水带接口和第二水带接口,所述消防栓的一侧设有柔性止水器,柔性止水器的底端延伸至井盖的下方并连通固定有导管,导管的底端延伸至支撑板的下方,所述支撑板固定套设在导管上,井盖固定套设在柔性止水器上,柔性止水器的顶端连通并固定有水泵弯接头,所述阀门井本体的一侧内壁上焊接有人梯,人梯的上方设有检修入口管,井盖固定套设在检修入口管上,检修入口管的顶部一侧转动安装有管盖,管盖的底部与检修入口管的顶部活动接触。A steel valve well proposed by the present invention includes a valve well body provided at the top of the pit body for opening. The top of the valve well body is welded with a manhole cover, and the inner wall of the bottom of the valve well body is welded. There are two support rods, and the same support plate is placed on the top of the support rods. The top of the support plate is provided with a plurality of water seepage holes. The first gate valve is provided above the support plate, and one end of the first gate valve is screwed with a first Double-headed flange, the other side of the first gate valve is connected and fixed with a three-way. The ends of the three-way and the first double-headed flange that are far from each other are threadedly fixed with a first single flange, and the two first single flanges are respectively The fixed sleeve is provided with a water inlet pipe and a water outlet pipe. The ends of the water inlet pipe and the water outlet pipe far away from each other extend outside the valve well body. The water inlet pipe and the water outlet pipe are both fixedly sleeved with a second single flange, the water inlet pipe and the water outlet pipe. The upper movable sleeves are provided with positioning sleeves, the valve well body is fixedly sleeved on two positioning sleeves, the sides of the two second single flanges away from each other are screwed to the corresponding positioning sleeves, and the first gate valve is provided with The valve stem, the top of the valve stem is threadedly fixed with an extension rod, the top of the extension rod extends to the top of the well cover and is welded with a handle, the water inlet pipe is provided with various instruments, and the top of the tee is threaded with a second gate valve , The top of the second gate valve is threadedly fixed with a connecting pipe, the connecting pipe is provided with an automatic drain valve, the top of the connecting pipe is threaded with a second double-headed flange, and the top of the second double-headed flange is threadedly fixed with the top of the manhole cover. The third single flange is in contact, and the inner fixed sleeve of the third single flange is provided with a fire hydrant. The fire hydrant is provided with a suction port, a first hose interface and a second hose interface, and one side of the fire hydrant is provided There is a flexible water stop. The bottom end of the flexible water stop extends below the well cover and is connected and fixed with a conduit. The bottom end of the conduit extends below the support plate. The support plate is fixedly sleeved on the conduit and the manhole cover is fixedly sleeved On the flexible water stop, the top of the flexible water stop is connected and fixed with a water pump elbow joint, and a manned ladder is welded on the inner wall of one side of the valve well body, and a maintenance inlet pipe is arranged above the man ladder, and the manhole cover is fixedly sleeved in On the maintenance inlet pipe, a pipe cover is installed on the top side of the maintenance inlet pipe, and the bottom of the pipe cover is in movable contact with the top of the maintenance inlet pipe.
优选的,所述阀门井本体的两侧内壁上均开设有第一通孔,且第一通孔的侧壁与对应的定位套的外侧焊接固定。Preferably, the inner walls of both sides of the valve well body are provided with first through holes, and the side walls of the first through holes are welded and fixed to the outside of the corresponding positioning sleeve.
优选的,所述井盖的顶部开设有第二通孔,且第二通孔的侧壁与检修入口管的外侧焊接固定。Preferably, the top of the manhole cover is provided with a second through hole, and the side wall of the second through hole is welded and fixed to the outside of the maintenance inlet pipe.
优选的,所述井盖的顶部开设有第一圆孔,且第一圆孔的侧壁与延长杆的外侧活动接触。Preferably, the top of the well cover is provided with a first circular hole, and the side wall of the first circular hole is in movable contact with the outside of the extension rod.
优选的,所述井盖的顶部内壁上开设有第二圆孔,且第二圆孔的侧壁与消防栓的外侧活动接触。Preferably, a second circular hole is opened on the inner wall of the top of the manhole cover, and the side wall of the second circular hole is in movable contact with the outside of the fire hydrant.
优选的,所述井盖的顶部开设有第三通孔,且第三通孔的侧壁与柔性止水器的外侧粘接固定。Preferably, the top of the manhole cover is provided with a third through hole, and the side wall of the third through hole is adhesively fixed to the outer side of the flexible water stop.
优选的,所述支撑板的顶部开设有第三圆孔,且第三圆孔的侧壁与导管的外侧固定连接。Preferably, a third circular hole is opened on the top of the support plate, and the side wall of the third circular hole is fixedly connected to the outside of the pipe.
优选的,所述第二单法兰的一侧设有第四圆孔,进水管和出水管的外侧分别与对应的第四圆孔的侧壁焊接固定。Preferably, one side of the second single flange is provided with a fourth round hole, and the outer sides of the water inlet pipe and the water outlet pipe are respectively welded and fixed to the side walls of the corresponding fourth round hole.
优选的,两个定位套相互靠近的一端均焊接有多个螺杆,第二单法兰的一侧设有多个通孔,螺杆的一端贯穿对应的通孔,螺杆上螺纹连接有紧固螺栓,紧固 螺环与对应的第二单法兰靠近第一闸阀的一侧相接触。Preferably, the two positioning sleeves are welded with a plurality of screws at the ends close to each other, one side of the second single flange is provided with a plurality of through holes, one end of the screw penetrates the corresponding through holes, and the screw is threadedly connected with a fastening bolt , The fastening screw ring is in contact with the side of the corresponding second single flange close to the first gate valve.
发明的有益效果The beneficial effects of the invention
有益效果Beneficial effect
与现有的技术相比,本发明的有益效果是:Compared with the existing technology, the beneficial effects of the present invention are:
通过阀门井本体、井盖、支撑杆、支撑板、第一闸阀、定位套、出水管、延长杆、把手、三通、进水管、各类仪表、第二闸阀、连接管、自动泄水阀、第二双头法兰、消防栓、第一水带接口、吸水口、第二水带接口、导管、柔性止水器、水泵弯接头、检修入口管、管盖、人梯相配合,阀门井本体内渗透的水经渗水孔流入支撑板的下方堆积,通过外界抽水泵连接水泵弯接头进行抽水,使得积水依次经导管、柔性止水器和水泵弯接头被抽出,延长杆的设置便于在外界操控第一闸阀开启和关闭,检修入口管和人梯的设置便于检修人员进入阀门井本体内,各类仪表的设置便于检修人员观察记录,在消防使用时,开启第二闸阀能够将进水管内的水依次经三通、第二闸阀、连接管和第二双头法兰进入消防栓内为其供水,达到其正常供水和消防一体化,提高其利用率和使用功能。Through the valve well body, manhole cover, support rod, support plate, first gate valve, positioning sleeve, water outlet pipe, extension rod, handle, tee, water inlet pipe, various instruments, second gate valve, connecting pipe, automatic drain valve, The second double-headed flange, fire hydrant, first hose interface, water suction port, second hose interface, conduit, flexible water stop, water pump elbow joint, maintenance inlet pipe, pipe cover, man ladder, valve well The water permeated in the body flows into the bottom of the support plate through the water seepage hole and is pumped through the external water pump to connect the water pump elbow joint, so that the accumulated water is drawn out through the pipe, the flexible water stop and the water pump elbow joint in turn. The extension rod is set up to facilitate the outside Control the opening and closing of the first gate valve. The installation of the maintenance inlet pipe and the man ladder is convenient for maintenance personnel to enter the valve well body. The installation of various instruments is convenient for maintenance personnel to observe and record. The water enters the fire hydrant through the tee, the second gate valve, the connecting pipe and the second double-headed flange to supply water for it, so as to achieve the integration of normal water supply and fire protection, and improve its utilization rate and use function.
本发明设计合理,便于排出阀门井本体内的积水,便于维修人员进入和爬出阀门井本体内进行检查记录,且便于在消防使用时开启第二闸阀为消防栓供水,达到正常供水和消防一体化,提高其利用率和使用功能,满足使用需求。The invention has reasonable design, is convenient for draining the accumulated water in the valve well body, convenient for maintenance personnel to enter and climb out of the valve well body for inspection records, and is convenient for opening the second gate valve to supply water to the fire hydrant when used for fire fighting, achieving the integration of normal water supply and fire fighting , To improve its utilization and use functions to meet the needs of use.
对附图的简要说明Brief description of the drawings
附图说明Description of the drawings
图1为本发明提出的一种钢制的阀门井的结构示意图;Figure 1 is a structural schematic diagram of a steel valve well proposed by the present invention;
图2为本发明提出的一种钢制的阀门井的剖视结构示意图;Figure 2 is a schematic sectional view of a steel valve well proposed by the present invention;
图3为本发明提出的一种钢制的阀门井的A部分结构示意图;Figure 3 is a schematic view of the structure of part A of a steel valve well proposed by the present invention;
图4为本发明提出的一种钢制的阀门井的B部分剖视结构示意图;Fig. 4 is a schematic diagram of the sectional structure of part B of a steel valve well proposed by the present invention;
图5为本发明提出的一种钢制的阀门井的C部分剖视结构示意图。Fig. 5 is a schematic diagram of the sectional structure of part C of a steel valve well proposed by the present invention.
图中:1阀门井本体、2井盖、3支撑杆、4支撑板、5第一闸阀、6第一双头法兰、7第一单法兰、8定位套、9出水管、10延长杆、11把手、12三通、13进水管、14各类仪表、15第二闸阀、16连接管、17自动泄水阀、18第二双头法兰、19消 防栓、20第一水带接口、21吸水口、22第二水带接口、23导管、24柔性止水器、25水泵弯接头、26检修入口管、27管盖、28人梯、29第三单法兰、30第二单法兰。In the picture: 1 valve well body, 2 well cover, 3 support rod, 4 support plate, 5 first gate valve, 6 first double-end flange, 7 first single flange, 8 positioning sleeve, 9 outlet pipe, 10 extension rod , 11 handles, 12 three-way, 13 water inlet pipe, 14 various instruments, 15 second gate valve, 16 connecting pipe, 17 automatic drain valve, 18 second double flange, 19 fire hydrant, 20 first hose interface , 21 suction port, 22 second hose interface, 23 conduit, 24 flexible water stop, 25 water pump elbow joint, 26 maintenance inlet pipe, 27 pipe cover, 28 person ladder, 29 third single flange, 30 second single Flange.
发明实施例Invention embodiment
本发明的实施方式Embodiments of the invention
下面结合具体实施例对本发明作进一步解说。The present invention will be further explained below in conjunction with specific embodiments.
实施例Example
参照图1-5,本实施例提出了一种钢制的阀门井,包括设置在坑体内的顶部为开口设置的阀门井本体1,阀门井本体1的顶部焊接有井盖2,阀门井本体1的底部内壁上焊接有多个支撑杆3,且多个支撑杆3的顶端放置有同一个支撑板4,支撑板4的顶部开设有多个渗水孔,支撑板4的上方设有第一闸阀5,且第一闸阀5的一端螺纹固定有第一双头法兰6,第一闸阀5的另一侧连通并固定有三通12,三通12和第一双头法兰6相互远离的一端均螺纹固定有第一单法兰7,两个第一单法兰7内分别固定套设有进水管13和出水管9,进水管13和出水管9相互远离的一端均延伸至阀门井本体1外,进水管13和出水管9上均固定套设有第二单法兰30,进水管13和出水管9上均活动套设有定位套8,阀门井本体1固定套设在两个定位套8上,两个第二单法兰30相互远离的一侧分别与对应的定位套8螺纹固定,第一闸阀5设有阀杆,阀杆的顶端螺纹固定有延长杆10,延长杆10的顶端延伸至井盖2的上方并焊接有把手11,进水管13上设有各类仪表14,三通12的顶端螺纹固定有第二闸阀15,第二闸阀15的顶端螺纹固定有连接管16,连接管16上设置有自动泄水阀17,连接管16的顶端螺纹固定有第二双头法兰18,第二双头法兰18顶部螺纹固定有与井盖2顶部活动接触的第三单法兰29,且第三单法兰29内固定套设有消防栓19,消防栓19上设置有吸水口21、第一水带接口20和第二水带接口22,消防栓19的一侧设有柔性止水器24,柔性止水器24的底端延伸至井盖2的下方并连通固定有导管23,导管23的底端延伸至支撑板4的下方,支撑板4固定套设在导管23上,井盖2固定套设在柔性止水器24上,柔性止水器24的顶端连通并固定有水泵弯接头25,阀门井本体1的一侧内壁上焊接有人梯28,人梯28的上方设有检修入口管26,井盖2固定套设在检修入口管26上,检修入口管26的 顶部一侧转动安装有管盖27,管盖27的底部与检修入口管26的顶部活动接触,本发明设计合理,便于排出阀门井本体1内的积水,便于维修人员进入和爬出阀门井本体1内进行检查记录,且便于在消防使用时开启第二闸阀15为消防栓19供水,达到正常供水和消防一体化,提高其利用率和使用功能,满足使用需求。With reference to Figures 1-5, this embodiment proposes a steel valve well, which includes a valve well body 1 with an opening on the top of the pit. The top of the valve well body 1 is welded with a well cover 2, and the valve well body 1 A plurality of support rods 3 are welded on the inner wall of the bottom of the support rod 3, and the same support plate 4 is placed on the top of the support rods 3. The top of the support plate 4 is provided with a plurality of water seepage holes, and a first gate valve is provided above the support plate 4 5. One end of the first gate valve 5 is threadedly fixed with a first double-headed flange 6, and the other side of the first gate valve 5 is connected and fixed with a tee 12, and the end of the tee 12 and the first double-headed flange 6 away from each other Both are threadedly fixed with a first single flange 7. The two first single flanges 7 are respectively fixedly sleeved with a water inlet pipe 13 and a water outlet pipe 9, and the ends of the water inlet pipe 13 and the water outlet pipe 9 far away from each other extend to the valve well body 1. In addition, the inlet pipe 13 and the outlet pipe 9 are fixedly sleeved with a second single flange 30, the inlet pipe 13 and the outlet pipe 9 are movable sleeves with positioning sleeves 8, and the valve well body 1 is fixedly sleeved on two On the positioning sleeve 8, the sides of the two second single flanges 30 away from each other are screwed to the corresponding positioning sleeve 8. The first gate valve 5 is provided with a valve stem, and the top of the valve stem is threadedly fixed with an extension rod 10, the extension rod The top of 10 extends to the top of the manhole cover 2 and is welded with a handle 11, various meters 14 are provided on the water inlet pipe 13, a second gate valve 15 is screwed on the top of the tee 12, and a connecting pipe is screwed on the top of the second gate valve 15 16. The connecting pipe 16 is provided with an automatic drain valve 17, the top of the connecting pipe 16 is threadedly fixed with a second double-headed flange 18, and the top of the second double-headed flange 18 is threadedly fixed with a third threaded contact with the top of the manhole cover 2. A single flange 29, and a fire hydrant 19 is fixed in the third single flange 29. The fire hydrant 19 is provided with a suction port 21, a first hose interface 20 and a second hose interface 22, one of the fire hydrant 19 A flexible water stop 24 is provided on the side. The bottom end of the flexible water stop 24 extends below the well cover 2 and is connected and fixed with a conduit 23. The bottom end of the conduit 23 extends below the support plate 4, and the support plate 4 is fixedly sleeved On the conduit 23, the manhole cover 2 is fixedly sleeved on the flexible water stopper 24, the top of the flexible water stopper 24 is connected and fixed with a water pump elbow joint 25, and one side of the inner wall of the valve well body 1 is welded with a human ladder 28 and a human ladder 28 A maintenance inlet pipe 26 is provided above the manhole cover 2 and the manhole cover 2 is fixedly sleeved on the maintenance inlet pipe 26. A pipe cover 27 is installed on the top side of the maintenance inlet pipe 26. The bottom of the pipe cover 27 is in movable contact with the top of the maintenance inlet pipe 26 The present invention has reasonable design, is convenient for draining the accumulated water in the valve well body 1, is convenient for maintenance personnel to enter and climb out of the valve well body 1 for inspection records, and is convenient for opening the second gate valve 15 to supply water to the fire hydrant 19 during fire fighting. Achieve the integration of normal water supply and fire protection, improve its utilization and use functions, and meet use needs.
本实施例中,阀门井本体1的两侧内壁上均开设有第一通孔,且第一通孔的侧壁与对应的定位套8的外侧焊接固定,井盖2的顶部开设有第二通孔,且第二通孔的侧壁与检修入口管26的外侧焊接固定,井盖2的顶部开设有第一圆孔,且第一圆孔的侧壁与延长杆10的外侧活动接触,井盖2的顶部内壁上开设有第二圆孔,且第二圆孔的侧壁与消防栓19的外侧活动接触,井盖2的顶部开设有第三通孔,且第三通孔的侧壁与柔性止水器24的外侧粘接固定,支撑板4的顶部开设有第三圆孔,且第三圆孔的侧壁与导管23的外侧固定连接,第二单法兰30的一侧设有第四圆孔,进水管13和出水管9的外侧分别与对应的第四圆孔的侧壁焊接固定,两个定位套8相互靠近的一端均焊接有多个螺杆,第二单法兰30的一侧设有多个通孔,螺杆的一端贯穿对应的通孔,螺杆上螺纹连接有紧固螺栓,紧固螺环与对应的第二单法兰30靠近第一闸阀5的一侧相接触,本发明设计合理,便于排出阀门井本体1内的积水,便于维修人员进入和爬出阀门井本体1内进行检查记录,且便于在消防使用时开启第二闸阀15为消防栓19供水,达到正常供水和消防一体化,提高其利用率和使用功能,满足使用需求。In this embodiment, the inner walls of both sides of the valve well body 1 are provided with first through holes, and the side walls of the first through holes are welded and fixed to the outside of the corresponding positioning sleeve 8, and the top of the manhole cover 2 is provided with a second through hole. The side wall of the second through hole is welded and fixed to the outer side of the maintenance inlet pipe 26, the top of the manhole cover 2 is provided with a first circular hole, and the side wall of the first circular hole is in movable contact with the outer side of the extension rod 10, the manhole cover 2 A second round hole is provided on the inner wall of the top of the second round hole, and the side wall of the second round hole is in movable contact with the outside of the fire hydrant 19. The outer side of the water tank 24 is glued and fixed, the top of the support plate 4 is provided with a third circular hole, and the side wall of the third circular hole is fixedly connected with the outer side of the pipe 23, and the second single flange 30 is provided with a fourth The outer sides of the round hole, the water inlet pipe 13 and the water outlet pipe 9 are respectively welded and fixed to the side wall of the corresponding fourth round hole. The two positioning sleeves 8 are welded with a plurality of screws at the ends close to each other. One of the second single flange 30 A plurality of through holes are provided on the side, one end of the screw penetrates the corresponding through hole, a fastening bolt is threaded on the screw, and the fastening screw ring is in contact with the side of the corresponding second single flange 30 close to the first gate valve 5, The invention has reasonable design, is convenient for draining the accumulated water in the valve well body 1, is convenient for maintenance personnel to enter and climb out of the valve well body 1 for inspection records, and is convenient for opening the second gate valve 15 to supply water to the fire hydrant 19 when used for fire fighting. The normal water supply and fire protection are integrated to improve its utilization and use functions to meet the use needs.
本实施例中,当阀门井本体1内出现积水时,水经支撑板4上的渗水孔流入支撑板4的下方,支撑板4的下方积水较多时通过外界抽水泵连接水泵弯接头25进行抽水,阀门井本体1内的积水经导管23进入柔性止水器24,再经柔性止水器24进入水泵弯接头25,再被抽水泵抽出,使得便于排出阀门井本体1内的积水,延长杆10的设置便于在外界操控第一闸阀5开启和关闭,提高了对第一闸阀5的开启和关闭效率,检修入口管26的设置便于检修人员掀开管盖27进入阀门井本体1内,进入的检修人员通过人梯28能够方便下至阀门井本体1内底部,且方便检修人员通过人梯28爬出,各类仪表14的设置便于检修人员观察记录,第二闸阀15的设置在消防使用时消防人员进入阀门井本体1内后,开启第二闸阀15能够将进水管13内的水通过三通12和第二闸阀15进入连接管16内,再经连接管16内进入第 二双头法兰18内,再经第二双头法兰18进入消防栓19内,达到为消防栓19供水,达到能够供消防使用,提高其利用率,达到其正常供水和消防一体化,提高其使用功能。In this embodiment, when water accumulates in the valve well body 1, the water flows under the support plate 4 through the seepage holes on the support plate 4. When there is a lot of water under the support plate 4, connect the water pump elbow joint 25 through the external pump For pumping, the water in the valve well body 1 enters the flexible water stop 24 through the conduit 23, and then enters the water pump elbow joint 25 through the flexible water stop 24, and then is pumped out by the pump, so that the water in the valve well body 1 can be easily discharged. The setting of the extension rod 10 is convenient for controlling the opening and closing of the first gate valve 5 from the outside, which improves the opening and closing efficiency of the first gate valve 5. The setting of the maintenance inlet pipe 26 is convenient for maintenance personnel to open the pipe cover 27 to enter the valve well body In 1, the entering maintenance personnel can easily go down to the inner bottom of the valve well body 1 through the human ladder 28, and it is convenient for the maintenance personnel to climb out through the human ladder 28. The setting of various instruments 14 is convenient for the maintenance personnel to observe and record. The second gate valve 15 Set when firefighters enter the valve well body 1 during fire fighting, open the second gate valve 15 to allow the water in the inlet pipe 13 to enter the connecting pipe 16 through the tee 12 and the second gate valve 15, and then enter the connecting pipe 16. The second double-headed flange 18 enters the fire hydrant 19 through the second double-headed flange 18, so as to supply water for the fire hydrant 19, which can be used for fire fighting, improve its utilization rate, and achieve the integration of normal water supply and fire fighting. , Improve its use function.
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above are only preferred specific embodiments of the present invention, but the protection scope of the present invention is not limited to this. Anyone familiar with the technical field within the technical scope disclosed by the present invention, according to the technical solution of the present invention The equivalent replacement or change of the inventive concept thereof shall be covered by the protection scope of the present invention.

Claims (9)

  1. 一种钢制的阀门井,包括设置在坑体内的顶部为开口设置的阀门井本体(1),所述阀门井本体(1)的顶部焊接有井盖(2),其特征在于,所述阀门井本体(1)的底部内壁上焊接有多个支撑杆(3),且多个支撑杆(3)的顶端放置有同一个支撑板(4),支撑板(4)的顶部开设有多个渗水孔,支撑板(4)的上方设有第一闸阀(5),且第一闸阀(5)的一端螺纹固定有第一双头法兰(6),第一闸阀(5)的另一侧连通并固定有三通(12),三通(12)和第一双头法兰(6)相互远离的一端均螺纹固定有第一单法兰(7),两个第一单法兰(7)内分别固定套设有进水管(13)和出水管(9),进水管(13)和出水管(9)相互远离的一端均延伸至阀门井本体(1)外,所述进水管(13)和出水管(9)上均固定套设有第二单法兰(30),进水管(13)和出水管(9)上均活动套设有定位套(8),阀门井本体(1)固定套设在两个定位套(8)上,两个第二单法兰(30)相互远离的一侧分别与对应的定位套(8)螺纹固定,所述第一闸阀(5)设有阀杆,阀杆的顶端螺纹固定有延长杆(10),延长杆(10)的顶端延伸至井盖(2)的上方并焊接有把手(11),所述进水管(13)上设有各类仪表(14),所述三通(12)的顶端螺纹固定有第二闸阀(15),第二闸阀(15)的顶端螺纹固定有连接管(16),连接管(16)上设置有自动泄水阀(17),连接管(16)的顶端螺纹固定有第二双头法兰(18),第二双头法兰(18)顶部螺纹固定有与井盖(2)顶部活动接触的第三单法兰(29),且第三单法兰(29)内固定套设有消防栓(19),消防栓(19)上设置有吸水口(21)、第一水带接口(20)和第二水带接口(22),所述消防栓(19)的一侧设有柔性止水器(24),柔性止水器(24)的底端延伸至井盖(2)的下方并连通固定有导管(23),导管(23)的底端延伸至支撑板(4)的下方,所述支撑板(4)固定套设在导管(2 3)上,井盖(2)固定套设在柔性止水器(24)上,柔性止水器(24)的顶端连通并固定有水泵弯接头(25),所述阀门井本体(1)的一侧内壁上焊接有人梯(28),人梯(28)的上方设有检修入口管(26),井盖(2)固定套设在检修入口管(26)上,检修入口管(26)的顶部一侧转动安装有管盖(27),管盖(27)的底部与检修入口管(26)的顶部活动接触。A steel valve well, comprising a valve well body (1) arranged at the top of a pit body for opening, and a well cover (2) is welded on the top of the valve well body (1), characterized in that the valve The bottom inner wall of the well body (1) is welded with multiple support rods (3), and the top of the multiple support rods (3) is placed with the same support plate (4), and the top of the support plate (4) is provided with multiple For the water seepage hole, a first gate valve (5) is provided above the support plate (4), and one end of the first gate valve (5) is threadedly fixed with a first double flange (6), and the other of the first gate valve (5) A tee (12) is connected and fixed on the side. The ends of the tee (12) and the first double-headed flange (6) far away from each other are threadedly fixed with a first single flange (7), and two first single flanges ( 7) The inlet pipe (13) and the outlet pipe (9) are respectively fixedly sleeved inside, and the ends of the inlet pipe (13) and the outlet pipe (9) far away from each other extend to the outside of the valve well body (1). The inlet pipe (13) and the outlet pipe (9) are fixedly sleeved with a second single flange (30), the inlet pipe (13) and the outlet pipe (9) are movable sleeves with positioning sleeves (8), the valve well body (1) The fixed sleeves are arranged on the two positioning sleeves (8), the sides of the two second single flanges (30) far away from each other are screwed to the corresponding positioning sleeves (8), and the first gate valve (5) ) Is provided with a valve stem, the top end of the valve stem is threadedly fixed with an extension rod (10), the top end of the extension rod (10) extends to the top of the well cover (2) and is welded with a handle (11), and the water inlet pipe (13) Various instruments (14) are provided, the top of the three-way (12) is threadedly fixed with a second gate valve (15), and the top of the second gate valve (15) is threaded with a connecting pipe (16), and a connecting pipe (16) There is an automatic drain valve (17), the top of the connecting pipe (16) is threadedly fixed with a second double-headed flange (18), and the top of the second double-headed flange (18) is threaded with the top of the well cover (2). The third single flange (29) is movably contacted, and the third single flange (29) is fixed with a fire hydrant (19), and the fire hydrant (19) is provided with a suction port (21) and a first hose The interface (20) and the second hose interface (22), one side of the fire hydrant (19) is provided with a flexible water stop (24), and the bottom end of the flexible water stop (24) extends to the well cover (2) The pipe (23) is connected and fixed under the pipe (23). The bottom end of the pipe (23) extends below the support plate (4). The support plate (4) is fixedly sleeved on the pipe (2 3), and the well cover (2) The fixed sleeve is fixed on the flexible water stopper (24), the top of the flexible water stopper (24) communicates with and is fixed with a water pump elbow joint (25), and one side inner wall of the valve well body (1) is welded with a stepped ladder ( 28), there is an inspection inlet pipe (26) above the human ladder (28), the manhole cover (2) is fixedly sleeved on the inspection inlet pipe (26), and the top side of the inspection inlet pipe (26) is installed with a pipe cover. (27), the bottom of the pipe cover (27) is in movable contact with the top of the maintenance inlet pipe (26).
  2. 根据权利要求1所述的一种钢制的阀门井,其特征在于,所述阀门井本体(1)的两侧内壁上均开设有第一通孔,且第一通孔的侧壁与对应的定位套(8)的外侧焊接固定。A steel valve well according to claim 1, characterized in that the inner walls of both sides of the valve well body (1) are provided with first through holes, and the side walls of the first through holes correspond to The outer side of the positioning sleeve (8) is welded and fixed.
  3. 根据权利要求1所述的一种钢制的阀门井,其特征在于,所述井盖(2)的顶部开设有第二通孔,且第二通孔的侧壁与检修入口管(26)的外侧焊接固定。A steel valve well according to claim 1, wherein the top of the manhole cover (2) is provided with a second through hole, and the side wall of the second through hole is connected to the maintenance inlet pipe (26) The outside is welded and fixed.
  4. 根据权利要求1所述的一种钢制的阀门井,其特征在于,所述井盖(2)的顶部开设有第一圆孔,且第一圆孔的侧壁与延长杆(10)的外侧活动接触。The valve well made of steel according to claim 1, wherein the top of the manhole cover (2) is provided with a first circular hole, and the side wall of the first circular hole and the outer side of the extension rod (10) Activity contact.
  5. 根据权利要求1所述的一种钢制的阀门井,其特征在于,所述井盖(2)的顶部内壁上开设有第二圆孔,且第二圆孔的侧壁与消防栓(19)的外侧活动接触。The valve well made of steel according to claim 1, wherein a second round hole is opened on the inner wall of the top of the well cover (2), and the side wall of the second round hole and the fire hydrant (19) Contact with outside activities.
  6. 根据权利要求1所述的一种钢制的阀门井,其特征在于,所述井盖(2)的顶部开设有第三通孔,且第三通孔的侧壁与柔性止水器(24)的外侧粘接固定。The valve well made of steel according to claim 1, wherein the top of the well cover (2) is provided with a third through hole, and the side wall of the third through hole and a flexible water stop (24) The outer side is glued and fixed.
  7. 根据权利要求1所述的一种钢制的阀门井,其特征在于,所述支撑板(4)的顶部开设有第三圆孔,且第三圆孔的侧壁与导管(23)的外侧固定连接。The valve well made of steel according to claim 1, wherein the top of the support plate (4) is provided with a third circular hole, and the side wall of the third circular hole is connected to the outer side of the conduit (23). Fixed connection.
  8. 根据权利要求1所述的一种钢制的阀门井,其特征在于,所述第二单法兰(30)的一侧设有第四圆孔,进水管(13)和出水管(9)的外侧分别与对应的第四圆孔的侧壁焊接固定。A steel valve well according to claim 1, characterized in that a fourth round hole is provided on one side of the second single flange (30), a water inlet pipe (13) and a water outlet pipe (9) The outer sides of are respectively welded and fixed to the side walls of the corresponding fourth circular holes.
  9. 根据权利要求1所述的一种钢制的阀门井,其特征在于,两个定位 套(8)相互靠近的一端均焊接有多个螺杆,第二单法兰(30)的一侧设有多个通孔,螺杆的一端贯穿对应的通孔,螺杆上螺纹连接有紧固螺栓,紧固螺环与对应的第二单法兰(30)靠近第一闸阀(5)的一侧相接触。The valve well made of steel according to claim 1, characterized in that the two positioning sleeves (8) are welded with a plurality of screws at the ends close to each other, and one side of the second single flange (30) is provided with Multiple through holes, one end of the screw threaded through the corresponding through hole, the screw thread is connected with a fastening bolt, and the fastening screw ring is in contact with the side of the corresponding second single flange (30) close to the first gate valve (5) .
PCT/CN2019/122758 2019-07-05 2019-12-03 Steel valve chamber WO2021003978A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910622369.9 2019-07-05
CN201910622369.9A CN110344445A (en) 2019-07-05 2019-07-05 A kind of valve well of steel

Publications (1)

Publication Number Publication Date
WO2021003978A1 true WO2021003978A1 (en) 2021-01-14

Family

ID=68175710

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2019/122758 WO2021003978A1 (en) 2019-07-05 2019-12-03 Steel valve chamber

Country Status (2)

Country Link
CN (1) CN110344445A (en)
WO (1) WO2021003978A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293592A (en) * 2021-12-30 2022-04-08 福建诚兴新材料科技有限公司 Ultrahigh-performance concrete material well lid
CN114809095A (en) * 2022-03-30 2022-07-29 上海译格照明设计有限公司 Invisible well lid opening and automatic resetting mechanism and opening and moving mechanism
CN115949095A (en) * 2023-03-16 2023-04-11 泊头市普惠仪表有限公司 Multifunctional water meter and water meter protection well
CN117647349A (en) * 2024-01-30 2024-03-05 三峡金沙江云川水电开发有限公司 Hydropower station fluid pressure measuring device
EP4375425A1 (en) * 2022-11-28 2024-05-29 Mertens Home Solutions BV Bracket, assembly and method for inserting a conduit into a reservoir

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344445A (en) * 2019-07-05 2019-10-18 菏泽昊阳设备制造股份有限公司 A kind of valve well of steel
CN115325301A (en) * 2022-09-01 2022-11-11 天津劲驰科技有限公司 Flexible connecting structure for large-diameter stainless steel pipeline

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2915957Y (en) * 2006-04-13 2007-06-27 李洪泉 Well special for ground type hydrant
KR100806134B1 (en) * 2007-11-19 2008-02-22 삼영기술주식회사 A valve room structures
GB2460635A (en) * 2008-05-31 2009-12-09 P N Daly Ltd Inspection assembly for a buried pipe
KR20110112898A (en) * 2010-04-08 2011-10-14 덕성밸브 주식회사 A valve room
CN203603212U (en) * 2013-11-26 2014-05-21 昆明普尔顿环保科技股份有限公司 Fire hydrant chamber
CN107780438A (en) * 2016-08-26 2018-03-09 冯晓芳 Fire valve well
CN208815568U (en) * 2018-09-11 2019-05-03 宁夏宸宇建筑科技有限公司 The prefabricated valve well of antiseepage ability of swimming
CN110344445A (en) * 2019-07-05 2019-10-18 菏泽昊阳设备制造股份有限公司 A kind of valve well of steel

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201011157Y (en) * 2006-09-05 2008-01-23 翟代明 Low power imbedded driven well house for farm irrigation
CN108005123A (en) * 2017-12-26 2018-05-08 国网山东省电力公司滨州供电公司 A kind of controller switching equipment basis well

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2915957Y (en) * 2006-04-13 2007-06-27 李洪泉 Well special for ground type hydrant
KR100806134B1 (en) * 2007-11-19 2008-02-22 삼영기술주식회사 A valve room structures
GB2460635A (en) * 2008-05-31 2009-12-09 P N Daly Ltd Inspection assembly for a buried pipe
KR20110112898A (en) * 2010-04-08 2011-10-14 덕성밸브 주식회사 A valve room
CN203603212U (en) * 2013-11-26 2014-05-21 昆明普尔顿环保科技股份有限公司 Fire hydrant chamber
CN107780438A (en) * 2016-08-26 2018-03-09 冯晓芳 Fire valve well
CN208815568U (en) * 2018-09-11 2019-05-03 宁夏宸宇建筑科技有限公司 The prefabricated valve well of antiseepage ability of swimming
CN110344445A (en) * 2019-07-05 2019-10-18 菏泽昊阳设备制造股份有限公司 A kind of valve well of steel

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293592A (en) * 2021-12-30 2022-04-08 福建诚兴新材料科技有限公司 Ultrahigh-performance concrete material well lid
CN114809095A (en) * 2022-03-30 2022-07-29 上海译格照明设计有限公司 Invisible well lid opening and automatic resetting mechanism and opening and moving mechanism
CN114809095B (en) * 2022-03-30 2023-12-08 上海译格照明设计有限公司 Invisible well lid opening and automatic resetting mechanism and opening and moving mechanism
EP4375425A1 (en) * 2022-11-28 2024-05-29 Mertens Home Solutions BV Bracket, assembly and method for inserting a conduit into a reservoir
BE1031078B1 (en) * 2022-11-28 2024-06-24 Mertens Home Solutions Bv Bracket, assembly and method for inserting a pipe into a reservoir
CN115949095A (en) * 2023-03-16 2023-04-11 泊头市普惠仪表有限公司 Multifunctional water meter and water meter protection well
CN117647349A (en) * 2024-01-30 2024-03-05 三峡金沙江云川水电开发有限公司 Hydropower station fluid pressure measuring device
CN117647349B (en) * 2024-01-30 2024-05-31 三峡金沙江云川水电开发有限公司 Hydropower station fluid pressure measuring device

Also Published As

Publication number Publication date
CN110344445A (en) 2019-10-18

Similar Documents

Publication Publication Date Title
WO2021003978A1 (en) Steel valve chamber
CN108679451B (en) High-rise building drainage pipeline blocking fault positioning and monitoring device
US5975133A (en) Emergency water tank reservoir system
US20020144731A1 (en) Hydrant with improved drain mechanism
CN103397683A (en) Novel water tank and washing method thereof
CN209837172U (en) Underground double-layer fire pool for building engineering
CN215053748U (en) Anti-seepage structure of toilet floor drain
CN205776547U (en) Mute non-vacuum pressure pipe network Pressure-superposed water supply equipment
JP3046444U (en) Fire check valve
CN208733759U (en) Box-type room use in toilet squatting pan and box-type room toilet
CN205688494U (en) Height is guaranteed the quality No clean water tank
CN215585354U (en) Novel building fire control detects device
CN206128191U (en) Novel fire hydrant
US20150129052A1 (en) Freeze Proof Sanitary Yard Hydrant
CN205444324U (en) Running water moisturizing device
CN210315800U (en) Round steel fire well
CN109356262A (en) Press open and close type floor drain
CN219732156U (en) Fire control steady voltage water supply system
US20090255860A1 (en) Greywater diversion and hair catcher assembly for baths that is comprised of the novel assembly of a hair catcher mesh cup, a two-port valve, a direct-drain waste-overflow assembly, and an indirect-drain waste-overflow assembly
CN221608996U (en) Basement fire-fighting water pool structure
CN203334381U (en) Leakage-proof toilet bowl with alarm
CN211039891U (en) Quick water stopping device for spray header
CN209361978U (en) A kind of drip irrigation system filter
CN207597507U (en) A kind of antifouling decompression drainage arrangement
CN219137843U (en) Outdoor hydrant

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19936552

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 19936552

Country of ref document: EP

Kind code of ref document: A1